Project Management Professional
(PMP)
A Brief Introduction
What is PMP?
Project Management Professional (PMP) is an internationally recognized professional designation offered by Project Management Institute (PMI).
As of March 2018, there are 833,025 active PMP certified individuals and 286 chartered chapters across 210 countries and territories worldwide.
The exam is based on the PMI Project Management Body of Knowledge (PMBOK), and the prerequisites are:
• Secondary degree (high school diploma, associate’s degree or the global equivalent)
• 7,500 hours leading and directing projects
• 35 hours of project management education
OR
• Four-year degree
• 4,500 hours leading and directing projects
• 35 hours of project management education
• A candidate who passes the exam and meets the professional requirements is awarded the PMP certification.
What is a project?
• A temporary endeavour undertaken to create Unique products, services or
result.
In other way, a project may also be defined as a set of interrelated tasks to be
executed over a fixed period and within a certain cost and certain limitations.
Features of Project
• It has a defined beginning, end, schedule and approach
• End results have specific goals
• Use Resources like time, people, money, equipment and facilities, explicitly
allocated to the work
• Follows a planned and organized approach
• Mostly involves a team of people
Project vs Operation
Project Operation
Temporary Ongoing
Unique Repetitive
Ends when objectives are met Does not end even on achieving the objectives
Project Operation
What is project management?
As per Project Management Institute, Inc. (PMI) defines Project Management
as the application of knowledge, skills, tools and techniques to a broad range
of activities in order to meet the requirements of a particular project.
Project Management is the practice of initiating, planning, executing,
controlling and closing the work of a team to achieve specific goals and meet
specific success criteria at the specified time.
The project constraints
The
Project
Scope
TimeCost
Risk Quality
Resources
Project constraints are anything that
restricts or dictates the actions of the project
team.
The triple constraints i.e. time, resources
(cost), and quality (scope) - are the big
hitters, and every project has one or two, if
not all three, of the triple constraints as
a project driver.
The project constraints - 2
• These Triple Constraints, i.e. time, cost and scope, indicate the key factors that two out of
three define the framework of a project, and direct project managers as to where
adjustments would have to be made if one or another of those constraints became
problematic.
• These constraints can also be interpreted as “cheap, fast or good”. This means if you want
to have it cheap (low cost), and fast (short time frame), you would have to settle for limited
scope or lower quality. In the same way, if you wanted it fast and good (high quality with full
scope), then it would cost you. In the third scenario, if the project was expected to run
longer than planned, to bring it back into the desired time frame would require a
compromise on either cost (i.e. spend more money to get it done on time) or scope/quality
(i.e. reduce the scope or settle for lower quality in the form of less features or less quality
checking).
What is the program?
• A program is a group of related projects, subsidiary programs, and program
activities managed in a coordinated way to obtain benefits and control not
available from managing them individually.
• Program management focuses on interdependencies of projects and
describes the best approach to achieve program objectives.
What is a portfolio?
A portfolio is a collection of projects, programs, subsidiary portfolios, and
operations managed as a group to achieve strategic objectives.
Project management processes
• Every project management process produces one or more outputs from one
or more inputs by using appropriate project management tools and
techniques.
Inputs Tools & Techniques Outputs
Process Groups & Knowledge Areas
The Process Groups remain the same in PMBOK’s 6th edition. While, two of
the Knowledge Areas have been renamed - ‘Project Time Management’ and
‘Project Human Resource Management’ are now ‘Project Schedule Management’
and ‘Project Resource Management’ respectively.
Process Groups Knowledge Areas
1. Initiating Process Group 1. Project Integration Management
2. Planning Process Group 2. Project Scope Management
3. Executing Process Group 3. Project Schedule Management
4. Monitor & Controlling Process Group 4. Project Cost Management
5. Closing Process Group 5. Project Quality Management
6. Project Resource Management
7. Project Communication Management
8. Project Risk Management
9. Project Procurement Management
10. Project Stakeholder Management
Mapping of Project Management Process Groups to
the Knowledge Areas - 1
Process Groups
Knowledge Areas
Initiating Process
Group
Planning Process
Group
Executing Process
Group
Monitoring & Controlling
Process Group
Closing Process
Group
1. Project
Integration
Management
1.1. Develop Project Charter 1.2. Develop Project Management
Plan
1.3. Direct and Manage Project Work
1.4. Manage Project Knowledge
1.5. Monitor and Control Project
Work
1.6. Perform Integrated Change
Control
1.7. Close Project or Phase
2. Project Scope
Management
2.1. Plan Scope Management
2.2. Collect Requirements
2.3. Define Scope
2.4. Create WBS
2.5. Validate Scope
2.6. Control Scope
3. Project Schedule
Management
3.1. Plan Schedule Management
3.2. Define Activities
3.3. Sequence Activities
3.4. Estimate Activity Durations
3.5. Develop Schedule
3.6. Control Schedules
4. Project Cost
Management
4.1. Plan Cost Management
4.2. Estimate Costs
4.3. Determine Budget
4.4. Control Costs
5. Project Quality
Management
5.1. Plan Quality Management 5.2. Manage Quality 5.3. Control Quality
Mapping of Project Management Process Groups to
the Knowledge Areas - 1
Process Groups
Knowledge Areas
Initiating Process
Group
Planning Process
Group
Executing Process
Group
Monitoring & Controlling
Process Group
Closing Process
Group
6. Project Resource
Management
6.1. Plan Resource Management
6.2. Estimate Activity Resources
6.3. Acquire Resources
6.4. Develop Team
6.5. Manage Team
6.6. Control Resources
7. Project
Communications
Management
7.1. Plan Communications
Management
7.2. Manage Communications 7.3. Monitor Communications
8. Project Risk
Management
8.1. Plan Risk Management
8.2. Identify Risks
8.3. Perform Qualitative Risk Analysis
8.4. Perform Quantitative Risk
Analysis
8.5. Plan Risk Responses
8.6. Implement Risk Responses 8.7. Monitor Risks
9. Project
Procurement
Management
9.1. Plan Procurement Management 9.2. Conduct Procurements 9.3. Control Procurements
10. Project
Stakeholder
Management
10.1. Identify Stakeholders 10.2. Plan Stakeholder Engagement 10.3. Manage Stakeholder
Engagement
10.4. Monitor Stakeholder
Engagement
Process Groups & Knowledge Areas
In this way, after introduction of 3 new processes, now there are 49 processes
in total in 6th Edition of PMBOK. These 3 new processes are listed below:
1. Manage Project Knowledge (Executing Process Group & Project
Integration Management Knowledge Area)
2. Implement Risk Responses (Executing Process Group & Project Risk
Management Knowledge Area)
3. Control Resources (Monitoring and Controlling Process Group & Project
Resource Management Knowledge Area)
Renaming of Processes in PMBOK 6
PMBOK 5 PMBOK 6
Perform Quality Assurance Manage Quality
Plan Human Resource Management Plan Resource Management
Acquire Project Team Acquire Resources
Develop Project Team Develop Team
Manage Project Team Manage Team
Control Communications Monitor Communications
Control Risks Monitor Risks
Plan Stakeholder Management Plan Stakeholder Engagement
Control Stakeholder Engagement Monitor Stakeholder Engagement
Another minor changes in Processes
• In PMBOK 6, ‘Estimate Activity Resources’ is now associated with the
Project Resource Management. Earlier in PMBOK 5, it was in the Project
Schedule Management Processes. But, it is still part of the Planning Process
Group.
• The Close Procurement process has been removed and portions have now
been moved to Control Procurements and other portions to the Close
Project or Phase process in the Project Integration Management knowledge
area.
Tailoring
• The selection of appropriate project management processes, inputs, tools,
techniques, outputs and life cycle phases to manage a project is known as
Tailoring.
• Tailoring is necessary because each project is unique. Hence, not necessary
that all of the processes, tools and techniques defined in PMBOK® are
required in every project.
Project Management Office (PMO)
Following are the tasks of a PMO:
• Identifying and developing project management methodology, best practices, and standards.
• Coaching, mentoring, training, and oversight
• Coordinating communication across projects
• Managing shared resources across all projects administered by the PMO
• Monitoring compliance with project management standards, policies, procedures, and
templates by means of project audits
• Developing and managing project policies, procedures, templates, and other shared
documentation

Más contenido relacionado

La actualidad más candente

Introduction to PMP Brief Presentation
Introduction to PMP Brief PresentationIntroduction to PMP Brief Presentation
Introduction to PMP Brief Presentationjamilireifij
 
Project Communications Management - PMBOK6
Project Communications Management - PMBOK6Project Communications Management - PMBOK6
Project Communications Management - PMBOK6Agus Suhanto
 
PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary Amr Miqdadi
 
06. Project Management Process Groups
06. Project Management Process Groups06. Project Management Process Groups
06. Project Management Process GroupsBhuWan Khadka
 
Project communication management
Project communication managementProject communication management
Project communication managementTakudzwa Chatora
 
Smart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectivelySmart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectivelyChetan Khanzode
 
PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication managementejlp12
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsMaria Erland, PMP
 
Project communication management
Project communication managementProject communication management
Project communication managementDikshant Ghimire
 
Project communication management
Project communication managementProject communication management
Project communication managementPreshan Pradeepa
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project managementMohamed Amin
 
11. Project Communication Management
11. Project Communication Management11. Project Communication Management
11. Project Communication ManagementBhuWan Khadka
 
Pmp(project management professional ) presentation
Pmp(project management professional ) presentationPmp(project management professional ) presentation
Pmp(project management professional ) presentationgokula kannan
 

La actualidad más candente (20)

Introduction to PMP Brief Presentation
Introduction to PMP Brief PresentationIntroduction to PMP Brief Presentation
Introduction to PMP Brief Presentation
 
Project Communications Management - PMBOK6
Project Communications Management - PMBOK6Project Communications Management - PMBOK6
Project Communications Management - PMBOK6
 
PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary PMBOK GUIDE 7th Summary
PMBOK GUIDE 7th Summary
 
PMP_Project Communication Management
PMP_Project Communication ManagementPMP_Project Communication Management
PMP_Project Communication Management
 
06. Project Management Process Groups
06. Project Management Process Groups06. Project Management Process Groups
06. Project Management Process Groups
 
Project communication management
Project communication managementProject communication management
Project communication management
 
The role of the project manager
The role of the project managerThe role of the project manager
The role of the project manager
 
Smart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectivelySmart project management - Best Practices to Manage Project effectively
Smart project management - Best Practices to Manage Project effectively
 
PMP Training - 10 project communication management
PMP Training - 10 project communication managementPMP Training - 10 project communication management
PMP Training - 10 project communication management
 
PMP PMBOK 6th
PMP PMBOK 6thPMP PMBOK 6th
PMP PMBOK 6th
 
Pmo
PmoPmo
Pmo
 
Project Management Office Roles Functions And Benefits
Project Management Office Roles Functions And BenefitsProject Management Office Roles Functions And Benefits
Project Management Office Roles Functions And Benefits
 
Project communication management
Project communication managementProject communication management
Project communication management
 
Project communication management
Project communication managementProject communication management
Project communication management
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
 
11. Project Communication Management
11. Project Communication Management11. Project Communication Management
11. Project Communication Management
 
10- PMP Training - Risk Management
10- PMP Training - Risk Management 10- PMP Training - Risk Management
10- PMP Training - Risk Management
 
Pmp study-notes
Pmp study-notesPmp study-notes
Pmp study-notes
 
Pmp(project management professional ) presentation
Pmp(project management professional ) presentationPmp(project management professional ) presentation
Pmp(project management professional ) presentation
 
Presentation on Project Risk Management
Presentation on Project Risk ManagementPresentation on Project Risk Management
Presentation on Project Risk Management
 

Similar a PMP as per PMBOK 6

Project management essentials 3 day training program
Project management essentials   3 day training programProject management essentials   3 day training program
Project management essentials 3 day training programParamjit Arora
 
The Art Of Project Management
The Art Of Project ManagementThe Art Of Project Management
The Art Of Project Managementhatemk
 
Chapter 1-Project and Construction project.pptx
Chapter 1-Project and Construction project.pptxChapter 1-Project and Construction project.pptx
Chapter 1-Project and Construction project.pptxteshome eshetu
 
Project management professional (PMP)
Project management professional (PMP)Project management professional (PMP)
Project management professional (PMP)Saad Al Jabri
 
ProjectManagementforNGOs
ProjectManagementforNGOsProjectManagementforNGOs
ProjectManagementforNGOswebuploader
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management Yesica Adicondro
 
Fundamentalsof PM.pptx
Fundamentalsof PM.pptxFundamentalsof PM.pptx
Fundamentalsof PM.pptxagathamarlinee
 
Pmp Prep Session 1 Overview
Pmp Prep Session 1 OverviewPmp Prep Session 1 Overview
Pmp Prep Session 1 Overviewhouserdah
 
An introduction to project management
An introduction to project management An introduction to project management
An introduction to project management Siva Teja Boddeti
 
Pmp Course Outline
Pmp Course OutlinePmp Course Outline
Pmp Course Outlinequahance
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principlestltiede
 
01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-maomao-osman73
 

Similar a PMP as per PMBOK 6 (20)

Project management essentials 3 day training program
Project management essentials   3 day training programProject management essentials   3 day training program
Project management essentials 3 day training program
 
Pm training 1 18
Pm training 1 18Pm training 1 18
Pm training 1 18
 
The Art Of Project Management
The Art Of Project ManagementThe Art Of Project Management
The Art Of Project Management
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 
Chapter 1-Project and Construction project.pptx
Chapter 1-Project and Construction project.pptxChapter 1-Project and Construction project.pptx
Chapter 1-Project and Construction project.pptx
 
Project management professional (PMP)
Project management professional (PMP)Project management professional (PMP)
Project management professional (PMP)
 
Day 1 framework
Day 1 frameworkDay 1 framework
Day 1 framework
 
ProjectManagementforNGOs
ProjectManagementforNGOsProjectManagementforNGOs
ProjectManagementforNGOs
 
Fundamentals of Project Management
Fundamentals of Project Management Fundamentals of Project Management
Fundamentals of Project Management
 
Fundamentalsof PM.pptx
Fundamentalsof PM.pptxFundamentalsof PM.pptx
Fundamentalsof PM.pptx
 
SPM Unit 1.pptx
SPM Unit 1.pptxSPM Unit 1.pptx
SPM Unit 1.pptx
 
2) PMT & PIM.pptx
2) PMT & PIM.pptx2) PMT & PIM.pptx
2) PMT & PIM.pptx
 
Pmp Prep Session 1 Overview
Pmp Prep Session 1 OverviewPmp Prep Session 1 Overview
Pmp Prep Session 1 Overview
 
Fundamentals of Project Management
Fundamentals of Project ManagementFundamentals of Project Management
Fundamentals of Project Management
 
pmppgoav14.ppt
pmppgoav14.pptpmppgoav14.ppt
pmppgoav14.ppt
 
An introduction to project management
An introduction to project management An introduction to project management
An introduction to project management
 
Pmp Course Outline
Pmp Course OutlinePmp Course Outline
Pmp Course Outline
 
PMI Project Management Principles
PMI Project Management PrinciplesPMI Project Management Principles
PMI Project Management Principles
 
Project Management V1
Project Management V1Project Management V1
Project Management V1
 
01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao01 02&03 introduction to pmp-mao
01 02&03 introduction to pmp-mao
 

Último

Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamraAllTops
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentNimot Muili
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdfArtiSrivastava23
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Ram V Chary
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdfAlejandromexEspino
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field ArtilleryKennethSwanberg
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownSandaliGurusinghe2
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalWilliam (Bill) H. Bender, FCSI
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siligurimeghakumariji156
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxssuserf63bd7
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxAaron Stannard
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNitya salvi
 

Último (16)

Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 

PMP as per PMBOK 6

  • 2. What is PMP? Project Management Professional (PMP) is an internationally recognized professional designation offered by Project Management Institute (PMI). As of March 2018, there are 833,025 active PMP certified individuals and 286 chartered chapters across 210 countries and territories worldwide. The exam is based on the PMI Project Management Body of Knowledge (PMBOK), and the prerequisites are: • Secondary degree (high school diploma, associate’s degree or the global equivalent) • 7,500 hours leading and directing projects • 35 hours of project management education OR • Four-year degree • 4,500 hours leading and directing projects • 35 hours of project management education • A candidate who passes the exam and meets the professional requirements is awarded the PMP certification.
  • 3. What is a project? • A temporary endeavour undertaken to create Unique products, services or result. In other way, a project may also be defined as a set of interrelated tasks to be executed over a fixed period and within a certain cost and certain limitations.
  • 4. Features of Project • It has a defined beginning, end, schedule and approach • End results have specific goals • Use Resources like time, people, money, equipment and facilities, explicitly allocated to the work • Follows a planned and organized approach • Mostly involves a team of people
  • 5. Project vs Operation Project Operation Temporary Ongoing Unique Repetitive Ends when objectives are met Does not end even on achieving the objectives Project Operation
  • 6. What is project management? As per Project Management Institute, Inc. (PMI) defines Project Management as the application of knowledge, skills, tools and techniques to a broad range of activities in order to meet the requirements of a particular project. Project Management is the practice of initiating, planning, executing, controlling and closing the work of a team to achieve specific goals and meet specific success criteria at the specified time.
  • 7. The project constraints The Project Scope TimeCost Risk Quality Resources Project constraints are anything that restricts or dictates the actions of the project team. The triple constraints i.e. time, resources (cost), and quality (scope) - are the big hitters, and every project has one or two, if not all three, of the triple constraints as a project driver.
  • 8. The project constraints - 2 • These Triple Constraints, i.e. time, cost and scope, indicate the key factors that two out of three define the framework of a project, and direct project managers as to where adjustments would have to be made if one or another of those constraints became problematic. • These constraints can also be interpreted as “cheap, fast or good”. This means if you want to have it cheap (low cost), and fast (short time frame), you would have to settle for limited scope or lower quality. In the same way, if you wanted it fast and good (high quality with full scope), then it would cost you. In the third scenario, if the project was expected to run longer than planned, to bring it back into the desired time frame would require a compromise on either cost (i.e. spend more money to get it done on time) or scope/quality (i.e. reduce the scope or settle for lower quality in the form of less features or less quality checking).
  • 9. What is the program? • A program is a group of related projects, subsidiary programs, and program activities managed in a coordinated way to obtain benefits and control not available from managing them individually. • Program management focuses on interdependencies of projects and describes the best approach to achieve program objectives.
  • 10. What is a portfolio? A portfolio is a collection of projects, programs, subsidiary portfolios, and operations managed as a group to achieve strategic objectives.
  • 11. Project management processes • Every project management process produces one or more outputs from one or more inputs by using appropriate project management tools and techniques. Inputs Tools & Techniques Outputs
  • 12. Process Groups & Knowledge Areas The Process Groups remain the same in PMBOK’s 6th edition. While, two of the Knowledge Areas have been renamed - ‘Project Time Management’ and ‘Project Human Resource Management’ are now ‘Project Schedule Management’ and ‘Project Resource Management’ respectively.
  • 13. Process Groups Knowledge Areas 1. Initiating Process Group 1. Project Integration Management 2. Planning Process Group 2. Project Scope Management 3. Executing Process Group 3. Project Schedule Management 4. Monitor & Controlling Process Group 4. Project Cost Management 5. Closing Process Group 5. Project Quality Management 6. Project Resource Management 7. Project Communication Management 8. Project Risk Management 9. Project Procurement Management 10. Project Stakeholder Management
  • 14. Mapping of Project Management Process Groups to the Knowledge Areas - 1 Process Groups Knowledge Areas Initiating Process Group Planning Process Group Executing Process Group Monitoring & Controlling Process Group Closing Process Group 1. Project Integration Management 1.1. Develop Project Charter 1.2. Develop Project Management Plan 1.3. Direct and Manage Project Work 1.4. Manage Project Knowledge 1.5. Monitor and Control Project Work 1.6. Perform Integrated Change Control 1.7. Close Project or Phase 2. Project Scope Management 2.1. Plan Scope Management 2.2. Collect Requirements 2.3. Define Scope 2.4. Create WBS 2.5. Validate Scope 2.6. Control Scope 3. Project Schedule Management 3.1. Plan Schedule Management 3.2. Define Activities 3.3. Sequence Activities 3.4. Estimate Activity Durations 3.5. Develop Schedule 3.6. Control Schedules 4. Project Cost Management 4.1. Plan Cost Management 4.2. Estimate Costs 4.3. Determine Budget 4.4. Control Costs 5. Project Quality Management 5.1. Plan Quality Management 5.2. Manage Quality 5.3. Control Quality
  • 15. Mapping of Project Management Process Groups to the Knowledge Areas - 1 Process Groups Knowledge Areas Initiating Process Group Planning Process Group Executing Process Group Monitoring & Controlling Process Group Closing Process Group 6. Project Resource Management 6.1. Plan Resource Management 6.2. Estimate Activity Resources 6.3. Acquire Resources 6.4. Develop Team 6.5. Manage Team 6.6. Control Resources 7. Project Communications Management 7.1. Plan Communications Management 7.2. Manage Communications 7.3. Monitor Communications 8. Project Risk Management 8.1. Plan Risk Management 8.2. Identify Risks 8.3. Perform Qualitative Risk Analysis 8.4. Perform Quantitative Risk Analysis 8.5. Plan Risk Responses 8.6. Implement Risk Responses 8.7. Monitor Risks 9. Project Procurement Management 9.1. Plan Procurement Management 9.2. Conduct Procurements 9.3. Control Procurements 10. Project Stakeholder Management 10.1. Identify Stakeholders 10.2. Plan Stakeholder Engagement 10.3. Manage Stakeholder Engagement 10.4. Monitor Stakeholder Engagement
  • 16. Process Groups & Knowledge Areas In this way, after introduction of 3 new processes, now there are 49 processes in total in 6th Edition of PMBOK. These 3 new processes are listed below: 1. Manage Project Knowledge (Executing Process Group & Project Integration Management Knowledge Area) 2. Implement Risk Responses (Executing Process Group & Project Risk Management Knowledge Area) 3. Control Resources (Monitoring and Controlling Process Group & Project Resource Management Knowledge Area)
  • 17. Renaming of Processes in PMBOK 6 PMBOK 5 PMBOK 6 Perform Quality Assurance Manage Quality Plan Human Resource Management Plan Resource Management Acquire Project Team Acquire Resources Develop Project Team Develop Team Manage Project Team Manage Team Control Communications Monitor Communications Control Risks Monitor Risks Plan Stakeholder Management Plan Stakeholder Engagement Control Stakeholder Engagement Monitor Stakeholder Engagement
  • 18. Another minor changes in Processes • In PMBOK 6, ‘Estimate Activity Resources’ is now associated with the Project Resource Management. Earlier in PMBOK 5, it was in the Project Schedule Management Processes. But, it is still part of the Planning Process Group. • The Close Procurement process has been removed and portions have now been moved to Control Procurements and other portions to the Close Project or Phase process in the Project Integration Management knowledge area.
  • 19. Tailoring • The selection of appropriate project management processes, inputs, tools, techniques, outputs and life cycle phases to manage a project is known as Tailoring. • Tailoring is necessary because each project is unique. Hence, not necessary that all of the processes, tools and techniques defined in PMBOK® are required in every project.
  • 20. Project Management Office (PMO) Following are the tasks of a PMO: • Identifying and developing project management methodology, best practices, and standards. • Coaching, mentoring, training, and oversight • Coordinating communication across projects • Managing shared resources across all projects administered by the PMO • Monitoring compliance with project management standards, policies, procedures, and templates by means of project audits • Developing and managing project policies, procedures, templates, and other shared documentation

Notas del editor