SlideShare una empresa de Scribd logo
1 de 18
CONTOURS
• Contours are those lines you
can see on OS maps.
• A contour line is an imaginary
line that joins points of equal
height above sea level.
• They can be used to learn
about the shape of the land
(the relief).
• A map with only a few contour
lines will be flat (and often low
lying)
• If a map has lots of contours it
is a mountainous or hilly area.
• The actual pattern of the lines
will tell you more detail about
the area too.
Steep slopes
Area that is
flatter with only
a gentle slope
CONTOURS
• Contour An imaginary line on the ground surface joining the points
of equal elevation is known as contour.
• In other words, contour is a line in which the ground surface is
intersected by a level surface obtained by joining points of equal
elevation. This line on the map represents a contour and is called
contour line.
• Contour Map :-A map showing contour lines is known as Contour
map.
• A contour map gives an idea of the altitudes of the surface features
as well as their relative positions in plan serves the purpose of both,
a plan and a section.
Contouring
• The process of tracing contour lines on the surface of the earth is called
Contouring.
• PURPOSE OF CONTOURING
• Contour survey is carried out at the starting of any engineering
project such as a road, a railway, a canal, a dam, a building etc.
i) For preparing contour maps in order to select the most economical
or suitable site.
ii) To locate the alignment of a canal so that it should follow a ridge
line.
iii) To mark the alignment of roads and railways so that the quantity of
earthwork both in cutting and filling should be minimum.
iv) For getting information about the ground whether it is flat,
undulating or mountainous.
v) To find the capacity of a reservoir and volume of earthwork
especially in a mountainous region.
vi) To trace out the given grade of a particular route.
vii)To locate the physical features of the ground such as a pond
depression, hill, steep or small slopes.
METHODS OF CONTOURING
• There are mainly two methods of
locating contours:-
(1)Direct Method and
(2) Indirect Method.
1] Direct Method:
• In this method, the contours to be
located are directly traced out in
the field by locating and marking a
number of points on each contour.
These points are then surveyed
and plotted on plan and the
contours drawn through them.
• This method is most accurate but
very slow and tedious as a lot of
time is wasted in searching points
of the same elevation for a
contour.
• This is suitable for small area and
where great accuracy is required
50
48
B.M.
DIRECT METHOD OF
CONTOURING
Procedure:
• To start with, a temporary B.M is established near the area to be
surveyed with reference to a permanent B.M by fly levelling.
• The level is then set up in such a position so that the maximum
number of points can be commanded from the instrument station.
• The height of instrument is determined by taking a back sight on the
B.M. and adding it to the R.L. of bench mark.
• The staff reading required to fix points on the various contours is
determined by subtracting the R.L. of each of the contours from the
height of instrument.
• Example:
• If the height of instrument is 82.48m., then the staff readings
required to locate 82, 81 and 80m contours are 0.48, 1.48 and
2.48m respectively. The staff is held on an approximate position of
point and then moved up and down the slope until the desired
reading is obtained. The point is marked with a peg.
• Similarly various other points are marked on each contour. The line
joining all these points give the required contour. It may be noted
that one contour is located at a time. Having fixed the contours
within the range of the instrument, the level is shifted and set up in
a new position.
Procedure (Contd…..)
• The new height of instrument and the required staff readings are
then calculated in a similar manner and the process repeated till all
the contours are located. The positions of the contour points are
located suitably either simultaneous with levelling or afterwards. A
theodolite , a compass or a plane table traversing is usually adopted
for locating these points. The points are then plotted on the plan
and the contours drawn by joining the corresponding points by
dotted curved lines.
Direct Method By Radial Lines
• This method is suitable for
small areas, where a single
point in the centre can
command the whole area.
Radial lines are laid out from
the common centre by
theodolite or compass and
their positions are fixed up by
horizontal angles and bearings.
RADIAL LINES METHOD
OF CONTOURING
70
65
60
55
Direct Method By Radial Lines (contd.):
• Temporary bench marks are first established at the centre and near
the ends of the radial lines .
• The contour points are then located and marked on these lines and
their positions are determined by measuring their distances along
the radial lines.
• They are then plotted on the plan and the contours drawn by
joining all the corresponding points with the help of a plane table
instrument.
2. INDIRECT METHOD
• In this method the points located and surveyed are not necessarily
on the contour lines but the spot levels are taken along the series of
lines laid out over the area .
• The spot levels of the several representative points representing
hills, depressions, ridge and valley lines and the changes in the
slope all over the area to be contoured are also observed.
• Their positions are then plotted on the plan and the contours drawn
by interpolation.
• This method of contouring is also known as contouring by spot
levels.
• This method is commonly employed in all kinds of surveys as this is
cheaper, quicker and less tedious as compared to direct method.
There are mainly three method of contouring in indirect method:
• (I) BY SQUARES [SQUARE METHOD]:- In this method, the whole
area is divided into number of squares, the side of which may vary
from 5m to 30m depending upon the nature of the ground and the
contour interval. The square need not be of the same size
throughout.
• The corners of the squares are pegged out and the reduced levels
of these points are determined with a level.
SQUARE METHOD
(II) By Cross- Sections: This method is most suitable for the survey of
long narrow strips such as a road, railway or canal etc.
• (III) By Tacheometric method:
• A techeometer is a transit theodolite having a diaphragm fitted with
two stadia wires, one above and other below the central wire. The
horizontal distance between the instrument and staff station may
be determined by multiplying the difference of the staff readings of
the upper and lower stadia wires with the stadia constant of the
instrument, which is usually 100.Thus the techeometer is used for
both the vertical as well as horizontal measurements.
Stadia Wires at Diaphragm
iii) By Tacheometric method (contd…):
• This method is most suitable in hilly areas as the number of stations
which can be commanded by a techeometer is far more than those
by a level and thus the number of instrument settings are
considerably reduced. A number of radial lines are laid out at a
known angular interval and representative points are marked by
pegs along these radial lines. Their elevations and distances are
then calculated and plotted on the plan and the contour lines are
then interpolated.

Más contenido relacionado

La actualidad más candente

Chain surveying and offset
Chain surveying and offsetChain surveying and offset
Chain surveying and offsetMir Zafarullah
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2Muhammad Zubair
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in SurveyLord1911
 
12.1. Horizontal and vertical control (1).pptx
12.1.  Horizontal and vertical control (1).pptx12.1.  Horizontal and vertical control (1).pptx
12.1. Horizontal and vertical control (1).pptxSaddoAjmal
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in SurveyingRAHUL SINHA
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying neharajpl
 
Theodolite angle measurement
Theodolite angle measurementTheodolite angle measurement
Theodolite angle measurementMujeeb Muji
 
Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Bathla Tuition Centre
 
Chain surveying
Chain surveyingChain surveying
Chain surveyingJNTUK
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & RangingRakesh Verma
 
Project report2 of contour
Project report2 of contourProject report2 of contour
Project report2 of contourRamesh Ranjan
 

La actualidad más candente (20)

Chain surveying and offset
Chain surveying and offsetChain surveying and offset
Chain surveying and offset
 
Levelling
LevellingLevelling
Levelling
 
Traverse Survey Part 1/2
Traverse Survey Part 1/2Traverse Survey Part 1/2
Traverse Survey Part 1/2
 
Curves and there application in Survey
Curves and there application in SurveyCurves and there application in Survey
Curves and there application in Survey
 
Total station
Total station Total station
Total station
 
12.1. Horizontal and vertical control (1).pptx
12.1.  Horizontal and vertical control (1).pptx12.1.  Horizontal and vertical control (1).pptx
12.1. Horizontal and vertical control (1).pptx
 
Levelling in Surveying
Levelling in SurveyingLevelling in Surveying
Levelling in Surveying
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
Theodolite angle measurement
Theodolite angle measurementTheodolite angle measurement
Theodolite angle measurement
 
Electronic distance measurement (EDM)
Electronic distance measurement (EDM)Electronic distance measurement (EDM)
Electronic distance measurement (EDM)
 
Tacheometry ppt
Tacheometry pptTacheometry ppt
Tacheometry ppt
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
 
Traversing
TraversingTraversing
Traversing
 
Levelling
LevellingLevelling
Levelling
 
Plane Table Surveying PPt
Plane Table Surveying PPtPlane Table Surveying PPt
Plane Table Surveying PPt
 
EDM
EDMEDM
EDM
 
1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging1.1 Linear measurement original: Chaining & Ranging
1.1 Linear measurement original: Chaining & Ranging
 
Curve setting ppt
Curve setting pptCurve setting ppt
Curve setting ppt
 
Project report2 of contour
Project report2 of contourProject report2 of contour
Project report2 of contour
 
Setting out work
Setting out workSetting out work
Setting out work
 

Destacado

Destacado (9)

Contours And Its Uses
Contours And Its UsesContours And Its Uses
Contours And Its Uses
 
Topomaps
TopomapsTopomaps
Topomaps
 
Section 1 structure
Section 1 structureSection 1 structure
Section 1 structure
 
Earth Science Mapping; interactive topographic maps
Earth Science Mapping; interactive topographic mapsEarth Science Mapping; interactive topographic maps
Earth Science Mapping; interactive topographic maps
 
Reading a topographic map
Reading a topographic mapReading a topographic map
Reading a topographic map
 
Contour map hw problems
Contour map hw problemsContour map hw problems
Contour map hw problems
 
Isolines and contour lines
Isolines and contour linesIsolines and contour lines
Isolines and contour lines
 
height on maps contours
 height on maps contours height on maps contours
height on maps contours
 
Contouring
ContouringContouring
Contouring
 

Similar a surveying contouring

contouring-180417110533.pdf
contouring-180417110533.pdfcontouring-180417110533.pdf
contouring-180417110533.pdfshucaybcabdi
 
Contour maps: preparation and understanding.
Contour maps: preparation and understanding.Contour maps: preparation and understanding.
Contour maps: preparation and understanding.VIVEK CHAUHAN
 
contouring Surveying of Civil Engineering.pptx
contouring Surveying of Civil Engineering.pptxcontouring Surveying of Civil Engineering.pptx
contouring Surveying of Civil Engineering.pptxramjan14
 
CET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdfCET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdfKumkumaIp
 
Information About Contour And its charecteristics
Information About Contour And its charecteristicsInformation About Contour And its charecteristics
Information About Contour And its charecteristicsAshraf Sayyed
 
contouring.pptx
contouring.pptxcontouring.pptx
contouring.pptxSaiSrija7
 
Contour lines - Survey & Levelling
Contour lines - Survey & LevellingContour lines - Survey & Levelling
Contour lines - Survey & LevellingAr. Avitesh
 
UNit no 1 Contouring.pptx
UNit no 1 Contouring.pptxUNit no 1 Contouring.pptx
UNit no 1 Contouring.pptxADCET, Ashta
 
LEVELING AND CONTOURING
LEVELING AND CONTOURINGLEVELING AND CONTOURING
LEVELING AND CONTOURINGANAND JIBHKATE
 
surveyf tururu ururtu65 6ru5uu56 686585 868
surveyf tururu ururtu65 6ru5uu56 686585 868surveyf tururu ururtu65 6ru5uu56 686585 868
surveyf tururu ururtu65 6ru5uu56 686585 868RahulSinghParihar18
 
Theory of theodolite traversing
Theory of theodolite traversingTheory of theodolite traversing
Theory of theodolite traversingSuman Jyoti
 
Contour lines by sk
Contour lines by skContour lines by sk
Contour lines by skSalman Khan
 

Similar a surveying contouring (20)

contouring-180417110533.pdf
contouring-180417110533.pdfcontouring-180417110533.pdf
contouring-180417110533.pdf
 
Contouring
ContouringContouring
Contouring
 
Contour maps: preparation and understanding.
Contour maps: preparation and understanding.Contour maps: preparation and understanding.
Contour maps: preparation and understanding.
 
contouring Surveying of Civil Engineering.pptx
contouring Surveying of Civil Engineering.pptxcontouring Surveying of Civil Engineering.pptx
contouring Surveying of Civil Engineering.pptx
 
CET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdfCET205 Module 1 Contouring.pdf
CET205 Module 1 Contouring.pdf
 
Contouring
ContouringContouring
Contouring
 
Information About Contour And its charecteristics
Information About Contour And its charecteristicsInformation About Contour And its charecteristics
Information About Contour And its charecteristics
 
Contouring
ContouringContouring
Contouring
 
contouring.pptx
contouring.pptxcontouring.pptx
contouring.pptx
 
Contour lines - Survey & Levelling
Contour lines - Survey & LevellingContour lines - Survey & Levelling
Contour lines - Survey & Levelling
 
UNit no 1 Contouring.pptx
UNit no 1 Contouring.pptxUNit no 1 Contouring.pptx
UNit no 1 Contouring.pptx
 
Unit 2
Unit 2Unit 2
Unit 2
 
CONTOURING
CONTOURINGCONTOURING
CONTOURING
 
LEVELING AND CONTOURING
LEVELING AND CONTOURINGLEVELING AND CONTOURING
LEVELING AND CONTOURING
 
surveyf tururu ururtu65 6ru5uu56 686585 868
surveyf tururu ururtu65 6ru5uu56 686585 868surveyf tururu ururtu65 6ru5uu56 686585 868
surveyf tururu ururtu65 6ru5uu56 686585 868
 
1. Intro to Surveying.pdf
1. Intro to Surveying.pdf1. Intro to Surveying.pdf
1. Intro to Surveying.pdf
 
Surveying
Surveying Surveying
Surveying
 
Levelling
LevellingLevelling
Levelling
 
Theory of theodolite traversing
Theory of theodolite traversingTheory of theodolite traversing
Theory of theodolite traversing
 
Contour lines by sk
Contour lines by skContour lines by sk
Contour lines by sk
 

Último

ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.MaryamAhmad92
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxRamakrishna Reddy Bijjam
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and ModificationsMJDuyan
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxcallscotland1987
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxdhanalakshmis0310
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsMebane Rash
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxheathfieldcps1
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Association for Project Management
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 

Último (20)

ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024Mehran University Newsletter Vol-X, Issue-I, 2024
Mehran University Newsletter Vol-X, Issue-I, 2024
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Dyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptxDyslexia AI Workshop for Slideshare.pptx
Dyslexia AI Workshop for Slideshare.pptx
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Magic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptxMagic bus Group work1and 2 (Team 3).pptx
Magic bus Group work1and 2 (Team 3).pptx
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 

surveying contouring

  • 2. • Contours are those lines you can see on OS maps. • A contour line is an imaginary line that joins points of equal height above sea level. • They can be used to learn about the shape of the land (the relief). • A map with only a few contour lines will be flat (and often low lying) • If a map has lots of contours it is a mountainous or hilly area. • The actual pattern of the lines will tell you more detail about the area too. Steep slopes Area that is flatter with only a gentle slope
  • 3. CONTOURS • Contour An imaginary line on the ground surface joining the points of equal elevation is known as contour. • In other words, contour is a line in which the ground surface is intersected by a level surface obtained by joining points of equal elevation. This line on the map represents a contour and is called contour line. • Contour Map :-A map showing contour lines is known as Contour map. • A contour map gives an idea of the altitudes of the surface features as well as their relative positions in plan serves the purpose of both, a plan and a section.
  • 4. Contouring • The process of tracing contour lines on the surface of the earth is called Contouring. • PURPOSE OF CONTOURING • Contour survey is carried out at the starting of any engineering project such as a road, a railway, a canal, a dam, a building etc. i) For preparing contour maps in order to select the most economical or suitable site. ii) To locate the alignment of a canal so that it should follow a ridge line. iii) To mark the alignment of roads and railways so that the quantity of earthwork both in cutting and filling should be minimum.
  • 5. iv) For getting information about the ground whether it is flat, undulating or mountainous. v) To find the capacity of a reservoir and volume of earthwork especially in a mountainous region. vi) To trace out the given grade of a particular route. vii)To locate the physical features of the ground such as a pond depression, hill, steep or small slopes.
  • 6. METHODS OF CONTOURING • There are mainly two methods of locating contours:- (1)Direct Method and (2) Indirect Method.
  • 7. 1] Direct Method: • In this method, the contours to be located are directly traced out in the field by locating and marking a number of points on each contour. These points are then surveyed and plotted on plan and the contours drawn through them. • This method is most accurate but very slow and tedious as a lot of time is wasted in searching points of the same elevation for a contour. • This is suitable for small area and where great accuracy is required 50 48 B.M. DIRECT METHOD OF CONTOURING
  • 8. Procedure: • To start with, a temporary B.M is established near the area to be surveyed with reference to a permanent B.M by fly levelling. • The level is then set up in such a position so that the maximum number of points can be commanded from the instrument station. • The height of instrument is determined by taking a back sight on the B.M. and adding it to the R.L. of bench mark. • The staff reading required to fix points on the various contours is determined by subtracting the R.L. of each of the contours from the height of instrument.
  • 9. • Example: • If the height of instrument is 82.48m., then the staff readings required to locate 82, 81 and 80m contours are 0.48, 1.48 and 2.48m respectively. The staff is held on an approximate position of point and then moved up and down the slope until the desired reading is obtained. The point is marked with a peg. • Similarly various other points are marked on each contour. The line joining all these points give the required contour. It may be noted that one contour is located at a time. Having fixed the contours within the range of the instrument, the level is shifted and set up in a new position.
  • 10. Procedure (Contd…..) • The new height of instrument and the required staff readings are then calculated in a similar manner and the process repeated till all the contours are located. The positions of the contour points are located suitably either simultaneous with levelling or afterwards. A theodolite , a compass or a plane table traversing is usually adopted for locating these points. The points are then plotted on the plan and the contours drawn by joining the corresponding points by dotted curved lines.
  • 11. Direct Method By Radial Lines • This method is suitable for small areas, where a single point in the centre can command the whole area. Radial lines are laid out from the common centre by theodolite or compass and their positions are fixed up by horizontal angles and bearings. RADIAL LINES METHOD OF CONTOURING 70 65 60 55
  • 12. Direct Method By Radial Lines (contd.): • Temporary bench marks are first established at the centre and near the ends of the radial lines . • The contour points are then located and marked on these lines and their positions are determined by measuring their distances along the radial lines. • They are then plotted on the plan and the contours drawn by joining all the corresponding points with the help of a plane table instrument.
  • 13. 2. INDIRECT METHOD • In this method the points located and surveyed are not necessarily on the contour lines but the spot levels are taken along the series of lines laid out over the area . • The spot levels of the several representative points representing hills, depressions, ridge and valley lines and the changes in the slope all over the area to be contoured are also observed. • Their positions are then plotted on the plan and the contours drawn by interpolation. • This method of contouring is also known as contouring by spot levels.
  • 14. • This method is commonly employed in all kinds of surveys as this is cheaper, quicker and less tedious as compared to direct method. There are mainly three method of contouring in indirect method: • (I) BY SQUARES [SQUARE METHOD]:- In this method, the whole area is divided into number of squares, the side of which may vary from 5m to 30m depending upon the nature of the ground and the contour interval. The square need not be of the same size throughout. • The corners of the squares are pegged out and the reduced levels of these points are determined with a level.
  • 16. (II) By Cross- Sections: This method is most suitable for the survey of long narrow strips such as a road, railway or canal etc.
  • 17. • (III) By Tacheometric method: • A techeometer is a transit theodolite having a diaphragm fitted with two stadia wires, one above and other below the central wire. The horizontal distance between the instrument and staff station may be determined by multiplying the difference of the staff readings of the upper and lower stadia wires with the stadia constant of the instrument, which is usually 100.Thus the techeometer is used for both the vertical as well as horizontal measurements. Stadia Wires at Diaphragm
  • 18. iii) By Tacheometric method (contd…): • This method is most suitable in hilly areas as the number of stations which can be commanded by a techeometer is far more than those by a level and thus the number of instrument settings are considerably reduced. A number of radial lines are laid out at a known angular interval and representative points are marked by pegs along these radial lines. Their elevations and distances are then calculated and plotted on the plan and the contour lines are then interpolated.