                      an IV CTI
The project life cycle consists of four
phases:
The initiation phase

It can be divided into six steps:

                                               Establish the
     Develop a               Undertake a
                                                 Terms of
    Business Case          Feasibility Study
                                                Reference



    Appoint the                Set up a          Perform
    Project Team            Project Office     Phase Review
Develop a business case: A business case is created to define a
business problem or opportunity in detail and identify a preferred
solution for implementation.
Undertake feasibility study: The purpose of a feasibility study is
to assess the likelihood of each alternative solution option
achieving the benefits outlined in the business case.
Establish the terms of reference: After the previous steps, a new
project is formed and at this point terms of reference are created.
They define the vision, objectives, scope and deliverables.
Appoint the project team: a project manager is generally
appointed before this stage and with his help, the team is formed.
Set up a project office: defining the physical environment – the
place, the equipment, communication infrastructure, tools, etc.
Perform a phase review: This is a checkpoint to ensure that the
project has achieved its objectives. (at the initiation’s phase end)
The planning phase

     Create a           Create a            Create a
   Project Plan       Resource Plan      Financial Plan




    Create a             Create a          Create an
   Quality Plan          Risk Plan      Acceptance Plan



    Create a             Create a        Contract the
Communication Plan   Procurement Plan     Suppliers



                        Perform
                      Phase Review
Create a project plan: A 'work breakdown structure' (WBS) is
identified which includes a hierarchical set of phases, activities
and tasks to be undertaken to complete the project, then . This
project plan is the key tool used by the project manager to assess
the progress of the project throughout the project life cycle.
Create a resource plan: After the project plan is formed, the level
of resource required to undertake each of the activities and tasks
listed within the project plan will need to be allocated. A schedule
is assembled for each type of resource so that the project
manager can review the resource allocation at each stage in the
project.
Create a financial plan: is made to identify the total quantity of
money required to undertake each phase in the project (in other
words, the budget).
Create a quality plan: This is made to ensure the quality
expectations of the customer. It defines the term quality, some
precise targets, a quality assurance plan, and it identifies the
techniques that control the actual quality level of each
deliverable.
Create a risk plan: The next step is to document all foreseeable
project risks within a risk plan, and also define the actions that
will prevent each risk from occurring or reduce it’s impact.
Create a acceptance plan: we need the customer’s acceptance
that the deliverables produced by the project meet or exceed
requirements. This plan has to clarify the completion criteria for
each deliverable and provide a schedule of acceptance reviews.
Create a communications plan: Prior to the execution phase, it is
required to identify how each of the stakeholders will be kept in
touch. (means of communication, frequency, and responsibilities)
Create a procurement plan: The procurement plan provides a
detailed description of the products (that is, goods and services)
to be acquired from suppliers, the justification for acquiring each
product externally as opposed to from within the business, and
the schedule for product delivery.
Contract the suppliers: Although external suppliers may be
appointed at any stage of the project, it is usual to appoint
suppliers after the project plans have been documented but prior
to the execution phase of the project.
Perform a phase review: At the end of the planning phase, a
phase review is performed. This is a checkpoint to ensure that the
project has achieved its objectives as planned.
Project Execution
      Build
  Deliverables
                                Perform
                              Phase Review
   Monitor &
    Control


  Perform         Perform        Perform       Perform
    Time            Cost          Quality       Change
 Management      Management     Management    Management

                                                          Perform
                                                       Communications
                                                        Management

  Perform         Perform         Perform      Perform
    Risk            Issue       Procurement      Time
 Management      Management     Management    Management
Build the deliverables:This phase involves physically constructing
each deliverable for acceptance by the customer. The activities
undertaken to construct each deliverable will vary depending on
the type of project being undertaken.
Monitor and control: While the project team are physically
producing each deliverable, the project manager implements a
series of management processes to monitor and control the
activities being undertaken by the project team.
Time management: Time management is the process of recording
and controlling time spent by staff on the project. As time is a
scarce resource within projects, each team member should record
time spent undertaking project activities on a timesheet form.
Cost management: Cost management is the process by which
costs/expenses incurred on the project are formally identified,
approved and paid.
Quality management: Quality management is the process by
which quality is assured and controlled for the project, using
quality assurance and quality control techniques.
Change management: Change management is the process by
which changes to the project scope, deliverables, timescales or
resources are formally requested, evaluated and approved prior
to implementation.
Risk management: is the process by which risks to the project are
formally identified, quantified and managed.
Issue management: the method by which issues currently
affecting the ability of the project to produce the required
deliverable are formally managed.
Procurement management: the process of sourcing products
from an external supplier.
Acceptance management: is the process of gaining customer
acceptance for deliverables produced by the project.
Communications management: Communications management is
the process by which formal communications messages are
identified, created, reviewed and communicated within a project.
Perform a phase review: At the end of the planning phase, a
phase review is performed. This is a checkpoint to ensure that the
project has achieved its objectives as planned.


Project closure
      Perform                Review
      Project                Project
      Closure              Completion
Perform project closure: involves winding up the project.
This includes:
     • Determining whether all of the project completion criteria
     have been met;
     • Identifying any outstanding project activities, risks or
     issues;
     • Handing over all project deliverables and documentation to
     the customer;
     • Cancelling supplier contracts and releasing project
     resources to the business;
     • Communicating the closure of the project to all
     stakeholders and interested parties.
Review project completion: The final activity within a project is
the review of its success by an independent party. Success is
determined by how well it performed against the defined
objectives and conformed to the management processes outlined
in the planning phase. To determine how well it performed, the
following types of questions are answered:
• Did it result in the benefits defined in the business case?
• Did it achieve the objectives outlined in the terms of reference?
• Did it operate within the scope of the terms of reference? 0 Did
the deliverables meet the criteria defined in the quality plan?
• Was it delivered within the schedule outlined in the project
plan?
• Was it delivered within the budget outlined in the financial
plan?

Más contenido relacionado

La actualidad más candente

Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Managementguest90bddb
 
Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management - dyaksa hanindito
 
Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Agus Suhanto
 
Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsThink For A Change
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniquesShivangi Saini
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementMohamed Loey
 
Project management
Project managementProject management
Project managementSimran Kaur
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementWaleed Elnaggar
 
Project scope management
Project scope managementProject scope management
Project scope managementAnit Roy
 
Project scope management
Project scope managementProject scope management
Project scope managementJody R Flower
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesMohamed Loey
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasMazen Zbib
 
Project Management: Importance in Detail
Project Management: Importance in DetailProject Management: Importance in Detail
Project Management: Importance in DetailNIILM University Online
 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoringharoldtaylor1113
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project ManagementKris Kimmerle
 
Estimating Cost & Time.ppt
Estimating Cost & Time.pptEstimating Cost & Time.ppt
Estimating Cost & Time.ppt341741357
 

La actualidad más candente (20)

Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Management
 
Project Scope Management -
Project Scope Management - Project Scope Management -
Project Scope Management -
 
Project management
Project managementProject management
Project management
 
Project Management Tools
Project Management ToolsProject Management Tools
Project Management Tools
 
Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Project Cost Management - PMBOK6
Project Cost Management - PMBOK6
 
Project Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management ConceptsProject Management Foundations Course 101 - Project Management Concepts
Project Management Foundations Course 101 - Project Management Concepts
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniques
 
Project Management
Project ManagementProject Management
Project Management
 
PMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project ManagementPMP Lecture 1: Introduction to Project Management
PMP Lecture 1: Introduction to Project Management
 
Project management
Project managementProject management
Project management
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Project Execution
Project ExecutionProject Execution
Project Execution
 
Project scope management
Project scope managementProject scope management
Project scope management
 
Project scope management
Project scope managementProject scope management
Project scope management
 
PMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management ProcessesPMP Lecture 3: Project Management Processes
PMP Lecture 3: Project Management Processes
 
Project management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areasProject management process and Project Management Knowledge areas
Project management process and Project Management Knowledge areas
 
Project Management: Importance in Detail
Project Management: Importance in DetailProject Management: Importance in Detail
Project Management: Importance in Detail
 
Project Controlling and Project Monitoring
Project Controlling and Project MonitoringProject Controlling and Project Monitoring
Project Controlling and Project Monitoring
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 
Estimating Cost & Time.ppt
Estimating Cost & Time.pptEstimating Cost & Time.ppt
Estimating Cost & Time.ppt
 

Destacado

Project management Critical Success Factor
Project management Critical Success FactorProject management Critical Success Factor
Project management Critical Success FactorVenture Advisors
 
Project development
Project developmentProject development
Project developmentPolly Cooper
 
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Erik Kijne
 
Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.Ashutosh Mishra
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project managementBarun_agnihotri
 
Project life cycle
Project life cycleProject life cycle
Project life cycleMaryam Juma
 
Practical Project Management - full course
Practical Project Management - full coursePractical Project Management - full course
Practical Project Management - full courseMarten Schoonman
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1Craig Brown
 

Destacado (13)

Project management Critical Success Factor
Project management Critical Success FactorProject management Critical Success Factor
Project management Critical Success Factor
 
Project development
Project developmentProject development
Project development
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Project development cycle
Project development cycleProject development cycle
Project development cycle
 
Project cycle
Project cycleProject cycle
Project cycle
 
Project Life Cycle and Phases
Project Life Cycle and PhasesProject Life Cycle and Phases
Project Life Cycle and Phases
 
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
Project Cycle Management (PCM) & Logical Framework Analysis (LFA)
 
Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.
 
Introduction to project management
Introduction to project managementIntroduction to project management
Introduction to project management
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
Practical Project Management - full course
Practical Project Management - full coursePractical Project Management - full course
Practical Project Management - full course
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1
 
Project management and project life cycle
Project management and project life cycleProject management and project life cycle
Project management and project life cycle
 

Similar a Project management life cycle

life cycle of project team
life cycle of project teamlife cycle of project team
life cycle of project teamShourya Puri
 
Project lifecycle
Project lifecycleProject lifecycle
Project lifecycleAyo Apampa
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life CycleOdekunle Sakiru
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its PhasesGaurav Sukhija
 
Project Management
Project ManagementProject Management
Project ManagementPrarthan P
 
Project life cycle_management by Subbu
Project life cycle_management by SubbuProject life cycle_management by Subbu
Project life cycle_management by SubbuTechGigDotCom
 
Za project & project cycle management
Za   project & project cycle managementZa   project & project cycle management
Za project & project cycle managementhamza khwaja
 
ICB Competence, Project Standards
ICB Competence, Project StandardsICB Competence, Project Standards
ICB Competence, Project StandardsUjjwal Joshi
 
Construction-Project-cycle-and-organization.pptx
Construction-Project-cycle-and-organization.pptxConstruction-Project-cycle-and-organization.pptx
Construction-Project-cycle-and-organization.pptxlexfred55
 
Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3Amr Miqdadi
 
Lect 1 project management
Lect 1 project management Lect 1 project management
Lect 1 project management Muhammad Bilal
 
1 project & project cycle management
1   project & project cycle management1   project & project cycle management
1 project & project cycle managementSundasmushtaq
 
What is a project
What is a projectWhat is a project
What is a projectbooskoos
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptxFawadAfridi6
 
Introduction to project management
Introduction to project management Introduction to project management
Introduction to project management ervissmakaj
 

Similar a Project management life cycle (20)

life cycle of project team
life cycle of project teamlife cycle of project team
life cycle of project team
 
Project lifecycle
Project lifecycleProject lifecycle
Project lifecycle
 
Project Management Life Cycle
Project Management Life CycleProject Management Life Cycle
Project Management Life Cycle
 
Project
ProjectProject
Project
 
Project Management Process and Its Phases
Project Management Process and Its PhasesProject Management Process and Its Phases
Project Management Process and Its Phases
 
Project Management
Project ManagementProject Management
Project Management
 
D.K. Saini....
D.K. Saini....D.K. Saini....
D.K. Saini....
 
Project life cycle_management by Subbu
Project life cycle_management by SubbuProject life cycle_management by Subbu
Project life cycle_management by Subbu
 
Za project & project cycle management
Za   project & project cycle managementZa   project & project cycle management
Za project & project cycle management
 
ICB Competence, Project Standards
ICB Competence, Project StandardsICB Competence, Project Standards
ICB Competence, Project Standards
 
Construction-Project-cycle-and-organization.pptx
Construction-Project-cycle-and-organization.pptxConstruction-Project-cycle-and-organization.pptx
Construction-Project-cycle-and-organization.pptx
 
Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3Undestand PMBok 5th, Section 3
Undestand PMBok 5th, Section 3
 
Lect 1 project management
Lect 1 project management Lect 1 project management
Lect 1 project management
 
1 project & project cycle management
1   project & project cycle management1   project & project cycle management
1 project & project cycle management
 
PME- CH 1.pptx
PME- CH 1.pptxPME- CH 1.pptx
PME- CH 1.pptx
 
Project management
Project managementProject management
Project management
 
What is a project
What is a projectWhat is a project
What is a project
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptx
 
Introduction to project management
Introduction to project management Introduction to project management
Introduction to project management
 
Project Management
Project ManagementProject Management
Project Management
 

Último

Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCRashishs7044
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 

Último (20)

Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
8447779800, Low rate Call girls in Kotla Mubarakpur Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 

Project management life cycle

  • 1. Project Management Life Cycle Andrei Crăciun an IV CTI
  • 2. The project life cycle consists of four phases:
  • 3. The initiation phase It can be divided into six steps: Establish the Develop a Undertake a Terms of Business Case Feasibility Study Reference Appoint the Set up a Perform Project Team Project Office Phase Review
  • 4. Develop a business case: A business case is created to define a business problem or opportunity in detail and identify a preferred solution for implementation. Undertake feasibility study: The purpose of a feasibility study is to assess the likelihood of each alternative solution option achieving the benefits outlined in the business case. Establish the terms of reference: After the previous steps, a new project is formed and at this point terms of reference are created. They define the vision, objectives, scope and deliverables. Appoint the project team: a project manager is generally appointed before this stage and with his help, the team is formed. Set up a project office: defining the physical environment – the place, the equipment, communication infrastructure, tools, etc. Perform a phase review: This is a checkpoint to ensure that the project has achieved its objectives. (at the initiation’s phase end)
  • 5. The planning phase Create a Create a Create a Project Plan Resource Plan Financial Plan Create a Create a Create an Quality Plan Risk Plan Acceptance Plan Create a Create a Contract the Communication Plan Procurement Plan Suppliers Perform Phase Review
  • 6. Create a project plan: A 'work breakdown structure' (WBS) is identified which includes a hierarchical set of phases, activities and tasks to be undertaken to complete the project, then . This project plan is the key tool used by the project manager to assess the progress of the project throughout the project life cycle. Create a resource plan: After the project plan is formed, the level of resource required to undertake each of the activities and tasks listed within the project plan will need to be allocated. A schedule is assembled for each type of resource so that the project manager can review the resource allocation at each stage in the project. Create a financial plan: is made to identify the total quantity of money required to undertake each phase in the project (in other words, the budget).
  • 7. Create a quality plan: This is made to ensure the quality expectations of the customer. It defines the term quality, some precise targets, a quality assurance plan, and it identifies the techniques that control the actual quality level of each deliverable. Create a risk plan: The next step is to document all foreseeable project risks within a risk plan, and also define the actions that will prevent each risk from occurring or reduce it’s impact. Create a acceptance plan: we need the customer’s acceptance that the deliverables produced by the project meet or exceed requirements. This plan has to clarify the completion criteria for each deliverable and provide a schedule of acceptance reviews. Create a communications plan: Prior to the execution phase, it is required to identify how each of the stakeholders will be kept in touch. (means of communication, frequency, and responsibilities)
  • 8. Create a procurement plan: The procurement plan provides a detailed description of the products (that is, goods and services) to be acquired from suppliers, the justification for acquiring each product externally as opposed to from within the business, and the schedule for product delivery. Contract the suppliers: Although external suppliers may be appointed at any stage of the project, it is usual to appoint suppliers after the project plans have been documented but prior to the execution phase of the project. Perform a phase review: At the end of the planning phase, a phase review is performed. This is a checkpoint to ensure that the project has achieved its objectives as planned.
  • 9. Project Execution Build Deliverables Perform Phase Review Monitor & Control Perform Perform Perform Perform Time Cost Quality Change Management Management Management Management Perform Communications Management Perform Perform Perform Perform Risk Issue Procurement Time Management Management Management Management
  • 10. Build the deliverables:This phase involves physically constructing each deliverable for acceptance by the customer. The activities undertaken to construct each deliverable will vary depending on the type of project being undertaken. Monitor and control: While the project team are physically producing each deliverable, the project manager implements a series of management processes to monitor and control the activities being undertaken by the project team. Time management: Time management is the process of recording and controlling time spent by staff on the project. As time is a scarce resource within projects, each team member should record time spent undertaking project activities on a timesheet form. Cost management: Cost management is the process by which costs/expenses incurred on the project are formally identified, approved and paid.
  • 11. Quality management: Quality management is the process by which quality is assured and controlled for the project, using quality assurance and quality control techniques. Change management: Change management is the process by which changes to the project scope, deliverables, timescales or resources are formally requested, evaluated and approved prior to implementation. Risk management: is the process by which risks to the project are formally identified, quantified and managed. Issue management: the method by which issues currently affecting the ability of the project to produce the required deliverable are formally managed. Procurement management: the process of sourcing products from an external supplier.
  • 12. Acceptance management: is the process of gaining customer acceptance for deliverables produced by the project. Communications management: Communications management is the process by which formal communications messages are identified, created, reviewed and communicated within a project. Perform a phase review: At the end of the planning phase, a phase review is performed. This is a checkpoint to ensure that the project has achieved its objectives as planned. Project closure Perform Review Project Project Closure Completion
  • 13. Perform project closure: involves winding up the project. This includes: • Determining whether all of the project completion criteria have been met; • Identifying any outstanding project activities, risks or issues; • Handing over all project deliverables and documentation to the customer; • Cancelling supplier contracts and releasing project resources to the business; • Communicating the closure of the project to all stakeholders and interested parties.
  • 14. Review project completion: The final activity within a project is the review of its success by an independent party. Success is determined by how well it performed against the defined objectives and conformed to the management processes outlined in the planning phase. To determine how well it performed, the following types of questions are answered: • Did it result in the benefits defined in the business case? • Did it achieve the objectives outlined in the terms of reference? • Did it operate within the scope of the terms of reference? 0 Did the deliverables meet the criteria defined in the quality plan? • Was it delivered within the schedule outlined in the project plan? • Was it delivered within the budget outlined in the financial plan?