1© 2000, QualityToolBox.com, LLC, all rights reserved
A STRATEGY FOR PERFORMANCE
EXCELLENCE
( One Step Setup)
Set-up and changeover reductions for
equipment, tooling and machines.
2© 2000, QualityToolBox.com, LLC, all rights reserved
Executive Overview
Participant manual
Tools WorkbookKnowledge
Breakthrough
Lecture notes Lecture notes
Performance Excellence Series
Training Module Elements
3© 2000, QualityToolBox.com, LLC, all rights reserved
Session 1.0 Introduction…….……...…………………... 4
Session 2.0 Waste Management ………………………. 12
Session 3.0 Setup Practices…………………………….. 22
Session 4.0 Traditional /Strategic Setup Approach…… 29
Session 5.0 SMED Implementation Planning…………. 34
Element 5.1 Implementation Team……………………… 36
Element 5.2 Implementation Plan………………………. 37
Element 5.3 Communication Plan………………………. 38
Element 5.4 Training Plan………………………………. 40
Element 5.5 One Step Setup…………………………….. 42
Element 5.5.1 Separate Internal from External Setup…… 44
Element 5.5.2 Integrating Internal into External Setup…. 49
Element 5.5.3 Reducing Setup Processing Time…………. 63
Element 5.5.4 Optimizing Setup Processes……………….. 92
Element 5.6 Verification & Standardization…………… 95
Session 6.0 Summary…………………………………… 105
Table of Contents
Knowledge Breakthrough
4© 2000, QualityToolBox.com, LLC, all rights reserved
SMED is Continuous Improvement
It is a customer driven requirement. Customers are
demanding:
Product and service diversity
Lower costs
Higher reliability and quality.
In essence organizations need to become leaner !
So organizations must:
Produce smaller lots, more frequently.
Expand the scope and diversity of products and
services.
Reduce quality defects.
5© 2000, QualityToolBox.com, LLC, all rights reserved
Ultimately, SMED focuses on reducing changeover and set-up
times, thus enabling organizations to:
Produce smaller lots of products and services more
frequently !
Develop a broader scope of products and services !
Reduce quality defects towards zero !
Meet Customer’s Expectations !
6© 2000, QualityToolBox.com, LLC, all rights reserved
What Does Set-up/changeover reduction
mean for my business?
Increased customer service levels and
profits !
Via Waste Elimination resulting in:
Reduced Lead Times-Faster Delivery
Zero Inventories-Reduced Working Capital
Improved Quality
Improved Safety
Smaller lots of products-flexibility
Diversified Product & Service Options
7© 2000, QualityToolBox.com, LLC, all rights reserved
•To eliminate the wastes that result from
“uncontrolled” processes increasing inventories and
lead times..
• To gain control on equipment, material &
inventory.
• Apply Control Techniques to Eliminate Erosion of
Improvements.
• Standardize Improvements for Maintenance of
Critical Set-up Parameters.
Look Familiar?
Why SMED ?
8© 2000, QualityToolBox.com, LLC, all rights reserved
Major CPI
Tools (6σ) Kaizen Lean Description
Cp/Cpk Process capability assessment
DOE Design of experiments
SPC Process control based on statistics and data analysis
FMEA Risk assessment tool
Regression Correlate effect one variable has on another
Process Map Map process steps to communicate and identify opportunities
5 whys /2 hows Determination methods for root cause discovery
Pareto Column chart ranking items highest to lowest
Fishbone Cause / Effect Diagram
5S Elimination waste
Visual Mgmt Emphasis on visual techniques to manage process
Poka-Yoke Error proofing techniques
Spaghetti Chart
Kanban Material storage technique used to control process
Takt Time Determine pace or beat of a process
Std Work Evaluate tasks done during a process
SMED Single minute exchange of dies - Quick machine set up
TPM Integrate maintenance strategy with process
Cellular Flow Reduce inventory & cycle time through process layout and pull
production techniques
Expand Process Improvement Program to Utilize Kaizen Tool KitExpand Process Improvement Program to Utilize Kaizen Tool Kit
Tool Kit Comparison
9© 2000, QualityToolBox.com, LLC, all rights reserved
Identify what types of internal and external setup times are
involved in the following pictures.
Picture A: Wire Cutting
Machine
Picture B: Metal Stamping
Machine
10© 2000, QualityToolBox.com, LLC, all rights reserved
Identify what types of internal and external setup & times are involved in the
following pictures.
Picture A: Wire Cutting Machine Picture B: Metal Stamping Machine
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
____________________________
____________________________
____________________________
____________________________
____________________________
____________________________
____________________________
____________________________
Setup Type Setup TypeTime ( Min) Time ( Min)
Think Break
11© 2000, QualityToolBox.com, LLC, all rights reserved
Internal External Setup
Classify Three items under each item category.
ExternalInternal
____________
____________
____________
____________
____________
____________
Which items would you convert from internal to external Setup ?
____________________________________________________
____________________________________________________
Why?
____________________________________________________
____________________________________________________
Think Break
12© 2000, QualityToolBox.com, LLC, all rights reserved
Traditional Setup Practices
Material movement occurs
after the machine is
turned off.
Detection of defects or
missing equipment is noticed
which the machine is running.
Defective tooling,fixtures,
setup instruments are
noticed after the machine is
turned on.
•Completed products are transferred to
next operation.
•Raw material is moved after the
machine is stopped.
•Setup tooling delivered after the
changeover has begun.
•Defective product identified after
internal setup has begun.
•The operator notices that equipment is
missing after internal setup has begun.
13© 2000, QualityToolBox.com, LLC, all rights reserved
Preparation - Ensures that all the tools are working properly and are in
the right location.
Mounting & Extraction - Involves the removal of the tooling after the
production lot is completed and the placement of the new tooling
before the next production lot.
Establishing Control Settings - Setting all the process control settings
prior to the production run. Inclusive of calibrations and
measurements needed to make the machine, tooling operate
effectively.
First Run Capability - This includes the necessary adjustments( re-
calibrations, additional measurements) required after the first trial
pieces are produced.
Setup Improvement- The time after processing during which the
tooling, machinery is cleaned, identified, and tested for functionality
prior to storage.
5 “Traditional”Setup Steps Defined
14© 2000, QualityToolBox.com, LLC, all rights reserved
Setup Steps Setup Type
Traditional
Internal
Setup Type
Traditional
External
Resource
Consumption
( %)
Setup Type
One-Step
Internal
Setup Type
One-Step
External
Preparation
X 20 % X
Mounting & Extraction
X 5 % X
Establish Control
Settings X 15 % X
First Run Capability
X 50 % N/A N/A
Process Improvement
X 10 % X
“Traditional”Setup Resource Consumption Analysis
15© 2000, QualityToolBox.com, LLC, all rights reserved
Examples of wastes in a traditional setup !
What kind of “setup wastes” can you identify in this pictures ?
________________________________________________________
________________________________________________________
________________________________________________________
Think Break
16© 2000, QualityToolBox.com, LLC, all rights reserved
Separate Internal
from External
Setup
Optimizing Setup
Processes
Integrate Internal into
External Setup
Reduction of Setup
Processes
One Step Setup
Implementation
Plan
Progressive
Enhancements
Step 2
Develop Specific
Implementation Plan
Step 3
Develop Communication
Plan
Step 4
Develop One Step
Setup Training Plan
Step 5
Implement One Step
Set-up
Step 6
Verification / Standardization
Step 1
Develop One Step Setup
Implementation Team
17© 2000, QualityToolBox.com, LLC, all rights reserved
Phase 2 Combining equipment functionality
Involves standardizing the equipment ( parts, tooling, processes) based on
commonality between setups to reduce the number of setup steps and cycle
times. The common setup parts were identified and
replaced with this jig/holder combination.
Notice how
different
quantities of the
same part can
be setup with
the same fixture.
Also, these
setups can occur
while the
machine is
running.
By using these
fixtures, the
parts are
automatically
centered and
adjusted for
height and
flatness as a
part of
External setup-
not Internal
setup.
18© 2000, QualityToolBox.com, LLC, all rights reserved
Tooling supplies are clearly
labeled
Tooling supplies are neatly assigned a
unique location.
Waste associated with finding, replacing, motion will be
eliminated by this example of visual placement.
19© 2000, QualityToolBox.com, LLC, all rights reserved
Phase 3: Reducing setup
processing time.
Elimination of Bolts &
Adjustments.
Bolt attachments requires 32
complete turns for each bolt or
screw (1 for each thread) to
fasten this bolt and die to a
machine.
This clamp attachment requires one
step to attach the die to a machine.
Example of One Step Fastening
SMED for the
Workplace
Training and
Sourcebook
for
SMED
Worksheets
How to Use This Manual
The continuous improvement tools that are presented in Sections
1-10 of this manual are shown in order of use. These forms
MUST be completed in the order presented in this manual. Each
section contains a brief description of the tool, its purpose, when
to use it, who should use it, how to use it, and the expected
results.
Remember to focus on the elimination of waste.
Strive to maximize yields and obtain cost reductions
from existing machinery and equipment before
“buying solutions”. Improve current systems and
techniques before automation. Automating a system
or practices without first having an understanding of
the process will not solve underlying process
problems.
Perhaps the most important point to remember is that
we must understand a process before we make any
attempt in changing it. “No Tampering” is the first rule
of continuous improvement. We can not tamper with
a process without understanding it.
By using these tools, we will all share a common and
systematic approach for questioning, analyzing,
proposing solutions, experimenting, and finally,
implementing proven changes.
“The problems that exist in the world
today
cannot be solved by the same level of
thinking
that created them.”
Improvement
Identify waste
Measurement
SMED
Template
Table of Contents
Section 1 Development of SMED “To Do” Plan: Establishment of the SMED team’s Action plan
identifying the specific actions required for each of the four (4) phases of SMED
implementation. Deliverable includes action plan and associated tasks with the SMED
implementation. 4
Section 2 Waste Identification Map: Identification of the 9 wastes associated with production of
products and services. A detailed map of each major work area is developed describing the
major types of wastes in each area. These wastes are the improvement opportunities that
exist prior to SMED.
The overall wastes is calculated for all the work areas and identified on the 9 Waste Radar
Chart 7
Section 3 SMED Action sheet: Establishing baseline key performance metrics in terms of key
deliverables, photographs, and current conditions of the “before” SMED implementation
phase. Deliverable includes the SMED action sheet. Please note: A video recording of the “
before” setup operation is recommended. 11
Section 4 Setup Process Map: A map showing the critical setup inputs, processes and outputs for
each machine/equipment setup operation.
14
Section 5 Standard Operation Setup Check-sheet: Identifies the setup operations and respective
process parameters required for an effective changeover. Also identifies resource
requirements for the setup operations previously identified.
17
Section 6 Setup Work Combination Sheet: Used to graphically display the amount on Internal and
External setup time within a changeover process for a particular machine. It further shows
tasks that are performed in series and parallel for further analysis.
21
Section 7 Setup Conversion Matrix: A matrix identifying the methodology for converting internal
setup operations into external setup operations.
24
Section 8 SMED Conversion “To Do”: An action list identifying specific setup improvement tasks for
each conversion opportunity identified in the “Setup Conversion Matrix”.
27
Section 9 Operational Control Plan: Procedure for setup operations AFTER setup improvements
have been made. This is a control plan to ensure consistent setup with the newly identified
setup parameters as a result of the SMED implementation. Includes visuals of setup tooling,
& supplies. 30
Section 10 Standard Visual Sign: Used to identify the machine, tooling, supplies, & inventory location
within the workplace. Shows the type of item, location of item, quantity of item, and the
preceding and following processes.
34
Section 11 SMED Status Report: Provides a format to compare improvement efforts between a
desired target and known starting value.
36
Section 12 Waste Identification Map: Identification of the 9 wastes associated with production of
products and services. A detailed map of each major work area is developed describing the
major types of wastes in each area. These wastes are the improvement opportunities that
exist prior to SMED.
9 Wastes Radar Chart: After the completion of SMED, the results of the waste reduction is
recorded, charted and compared to the initial 9 Waste Radar Chart. 39
Section 7
Setup Conversion Matrix
SET-UP CONVERSION MATRIX
Sheet
Date:
Page of
Operator
Number
Standard Set-up TimeArea/Department Machine/Equipment Name Set-up Tools Required
Date Prepared Minutes
CURRENT PROCESS CURRENT TIME PROPOSED TIME
NO. Task/Operation Internal External
IMPROVEMENT
Internal External
Current Total: Improve Total
Conversation Methology
Preparation of Set-up Process Combining Equipment Functionality Standardized Jigs
Setup Conversion Matrix
Purpose Used to identify specific actions taken to convert internal setup operations
into external setup operations as part of Phase 1 in the SMED program.
When To Use The Setup conversion Matrix should be used after the Setup work
Combination sheet has been completed.
Who Should Use It The Setup conversion Matrix can be used by anyone involved in area or
process improvement.
Expected Benefits The resultant deliverables will be specific actions aligned with each of the
three conversion methodologies(Preparation of Setup Processes,
Combining Equipment Functionality, Standardized Jigs) to convert internal
setup operations into external setup operations.
How To Use It 1. Complete the sections titled “ Area/Department,
Machine/Equipment Name, Setup Tools required, Operator
Number, Date, and Standard Setup time.
2. List all the specific setup tasks/steps in sequential order(can obtain
this information from the process map)under the column titled
“tasks/operations” and indication the step number under the column
titled ”No.”.
3. Next list the total amount of Internal and External Setup time in the
appropriate column for each task Before any changes have been
made.
4. Complete the column titled” improvement” by listing the specific
continual improvement actions that will be taken to convert the Internal
setup time into External setup time.
5. Next complete the column titled “proposed time” by listing the
expected Internal and External setup times.
6. Finally add up the total internal and External setup times for both the
current and proposed columns and list these at the bottom of the
form in the sections titled “ Current Total & Improved Total “
respectively.
Next Step You are now ready to move to the next step, the SMED Conversion To Do
List.
Smed smpl 1
Smed smpl 1
Smed smpl 1
Smed smpl 1

Más contenido relacionado

La actualidad más candente

Benefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking SoftwareBenefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking SoftwareWintriss Controls Group, LLC
 
Oee on hana overall equipment effectiveness overview aug 2012 (2)
Oee on hana   overall equipment effectiveness overview aug 2012 (2)Oee on hana   overall equipment effectiveness overview aug 2012 (2)
Oee on hana overall equipment effectiveness overview aug 2012 (2)Marco Bueno
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Brian Thomas
 
6 OEE overview
6 OEE overview6 OEE overview
6 OEE overviewWebseology
 
benefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivnessbenefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivnessahmed_shimi
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityParsec_Automation_Corp
 
Oee (overall equipment effectifness)
Oee (overall equipment effectifness)Oee (overall equipment effectifness)
Oee (overall equipment effectifness)Anang Tristianto
 
The 7 deadly sins of Overall Equipment Effectiveness (OEE)
The 7 deadly sins of Overall Equipment Effectiveness (OEE)The 7 deadly sins of Overall Equipment Effectiveness (OEE)
The 7 deadly sins of Overall Equipment Effectiveness (OEE)Claire Healey
 
OEE Interphex New York 2013
OEE Interphex New York 2013OEE Interphex New York 2013
OEE Interphex New York 2013Adrian Pask
 
Ims Maint Mgmt Best Practice
Ims Maint Mgmt Best PracticeIms Maint Mgmt Best Practice
Ims Maint Mgmt Best PracticeMatthew Clemens
 
What is Lean Six Sigma - ADDVALUE - Nilesh Arora
What is Lean Six Sigma -  ADDVALUE - Nilesh AroraWhat is Lean Six Sigma -  ADDVALUE - Nilesh Arora
What is Lean Six Sigma - ADDVALUE - Nilesh AroraADD VALUE CONSULTING Inc
 
Plant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CasePlant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CaseMohammed Hamed Ahmed Soliman
 

La actualidad más candente (20)

OEE
OEEOEE
OEE
 
Benefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking SoftwareBenefits of Collecting OEE Data with Production Tracking Software
Benefits of Collecting OEE Data with Production Tracking Software
 
Oee on hana overall equipment effectiveness overview aug 2012 (2)
Oee on hana   overall equipment effectiveness overview aug 2012 (2)Oee on hana   overall equipment effectiveness overview aug 2012 (2)
Oee on hana overall equipment effectiveness overview aug 2012 (2)
 
Oee Explained
Oee ExplainedOee Explained
Oee Explained
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
The Six Big Losses of OEE
The Six Big Losses of OEEThe Six Big Losses of OEE
The Six Big Losses of OEE
 
6 OEE overview
6 OEE overview6 OEE overview
6 OEE overview
 
benefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivnessbenefits from calculating overall equipment effectivness
benefits from calculating overall equipment effectivness
 
OEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing ProductivityOEE - The Critical KPI to Drive Manufacturing Productivity
OEE - The Critical KPI to Drive Manufacturing Productivity
 
Oee (overall equipment effectifness)
Oee (overall equipment effectifness)Oee (overall equipment effectifness)
Oee (overall equipment effectifness)
 
The 7 deadly sins of Overall Equipment Effectiveness (OEE)
The 7 deadly sins of Overall Equipment Effectiveness (OEE)The 7 deadly sins of Overall Equipment Effectiveness (OEE)
The 7 deadly sins of Overall Equipment Effectiveness (OEE)
 
How To Track OEE
How To Track OEEHow To Track OEE
How To Track OEE
 
OEE Webinar
OEE WebinarOEE Webinar
OEE Webinar
 
OEE Interphex New York 2013
OEE Interphex New York 2013OEE Interphex New York 2013
OEE Interphex New York 2013
 
Tpm
TpmTpm
Tpm
 
Oee guide
Oee guideOee guide
Oee guide
 
Ims Maint Mgmt Best Practice
Ims Maint Mgmt Best PracticeIms Maint Mgmt Best Practice
Ims Maint Mgmt Best Practice
 
What is Lean Six Sigma - ADDVALUE - Nilesh Arora
What is Lean Six Sigma -  ADDVALUE - Nilesh AroraWhat is Lean Six Sigma -  ADDVALUE - Nilesh Arora
What is Lean Six Sigma - ADDVALUE - Nilesh Arora
 
Plant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business CasePlant Productivity Measurement, Analysis & Improvement: Business Case
Plant Productivity Measurement, Analysis & Improvement: Business Case
 

Destacado (20)

The Setup Machine
The Setup MachineThe Setup Machine
The Setup Machine
 
Tooling Technology - Quick Change Locks
Tooling Technology - Quick Change LocksTooling Technology - Quick Change Locks
Tooling Technology - Quick Change Locks
 
SMED Final
SMED FinalSMED Final
SMED Final
 
Smed smpl 1
Smed smpl 1Smed smpl 1
Smed smpl 1
 
thesis-presentation (1)
thesis-presentation (1)thesis-presentation (1)
thesis-presentation (1)
 
Smed Training Model Trainer Instructions[1]
Smed Training Model Trainer Instructions[1]Smed Training Model Trainer Instructions[1]
Smed Training Model Trainer Instructions[1]
 
The SMED Method by CLT Services
The SMED Method by CLT ServicesThe SMED Method by CLT Services
The SMED Method by CLT Services
 
Do you SMED?
Do you SMED?Do you SMED?
Do you SMED?
 
How to reduce changeover loss
How to reduce changeover lossHow to reduce changeover loss
How to reduce changeover loss
 
O modelo SCOR
O modelo SCORO modelo SCOR
O modelo SCOR
 
Major Breakthrough Inventions for Injection Molding
Major Breakthrough Inventions for Injection MoldingMajor Breakthrough Inventions for Injection Molding
Major Breakthrough Inventions for Injection Molding
 
SMED overview
SMED overviewSMED overview
SMED overview
 
Smed
SmedSmed
Smed
 
Plastics injection molding
Plastics injection moldingPlastics injection molding
Plastics injection molding
 
Know about injection moulding copy
Know about injection moulding   copyKnow about injection moulding   copy
Know about injection moulding copy
 
Quick Smed Sample
Quick Smed SampleQuick Smed Sample
Quick Smed Sample
 
Lean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training ModuleLean Quick Changeover (SMED) Training Module
Lean Quick Changeover (SMED) Training Module
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change Over
 
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction ProcessSMED or Single Minute Exchange of Dies and Set-up Reduction Process
SMED or Single Minute Exchange of Dies and Set-up Reduction Process
 
5s Lean Presentation
5s Lean Presentation5s Lean Presentation
5s Lean Presentation
 

Similar a Smed smpl 1

Phuong phap trien khai 5S trong doanh nghiep
Phuong phap trien khai 5S trong doanh nghiepPhuong phap trien khai 5S trong doanh nghiep
Phuong phap trien khai 5S trong doanh nghiepnguyenanvuong2007
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentIRJET Journal
 
Error Proofing And Cost Reduction 2
Error Proofing And Cost Reduction 2Error Proofing And Cost Reduction 2
Error Proofing And Cost Reduction 2Brian King
 
5s Strategy For Performance Excellence
5s Strategy For Performance Excellence5s Strategy For Performance Excellence
5s Strategy For Performance Excellenceramstar
 
Chapter 1 production planning
Chapter 1  production planningChapter 1  production planning
Chapter 1 production planningctsan
 
Lean manufacturing concepts
Lean manufacturing conceptsLean manufacturing concepts
Lean manufacturing conceptsSatyendra Sinha
 
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementWebinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementStork
 
Where Does The Time Go?
Where Does The Time Go?Where Does The Time Go?
Where Does The Time Go?gstevick1980
 
5 ways to increase manufacturing productivity with an mes
5 ways to increase manufacturing productivity with an mes5 ways to increase manufacturing productivity with an mes
5 ways to increase manufacturing productivity with an mesMetis Automation Ltd
 
Total productivity maintenance
Total productivity maintenanceTotal productivity maintenance
Total productivity maintenanceFELIX JONATHAN
 

Similar a Smed smpl 1 (20)

5s smpl 1
5s smpl 15s smpl 1
5s smpl 1
 
Phuong phap trien khai 5S trong doanh nghiep
Phuong phap trien khai 5S trong doanh nghiepPhuong phap trien khai 5S trong doanh nghiep
Phuong phap trien khai 5S trong doanh nghiep
 
Setup and changeover.ppt
Setup and changeover.pptSetup and changeover.ppt
Setup and changeover.ppt
 
Kaizen.ppt
Kaizen.pptKaizen.ppt
Kaizen.ppt
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
 
Error Proofing And Cost Reduction 2
Error Proofing And Cost Reduction 2Error Proofing And Cost Reduction 2
Error Proofing And Cost Reduction 2
 
5S
5S5S
5S
 
5S
5S5S
5S
 
5s Strategy For Performance Excellence
5s Strategy For Performance Excellence5s Strategy For Performance Excellence
5s Strategy For Performance Excellence
 
5 S Presentation
5 S Presentation5 S Presentation
5 S Presentation
 
5s
5s5s
5s
 
Chapter 1 production planning
Chapter 1  production planningChapter 1  production planning
Chapter 1 production planning
 
Tpm Diagnostic 4
Tpm Diagnostic              4Tpm Diagnostic              4
Tpm Diagnostic 4
 
Me6703 cim systems
Me6703 cim systemsMe6703 cim systems
Me6703 cim systems
 
Lean manufacturing concepts
Lean manufacturing conceptsLean manufacturing concepts
Lean manufacturing concepts
 
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset managementWebinar - Slimme besluitvorming over project-portfolio’s in asset management
Webinar - Slimme besluitvorming over project-portfolio’s in asset management
 
Where Does The Time Go?
Where Does The Time Go?Where Does The Time Go?
Where Does The Time Go?
 
5 ways to increase manufacturing productivity with an mes
5 ways to increase manufacturing productivity with an mes5 ways to increase manufacturing productivity with an mes
5 ways to increase manufacturing productivity with an mes
 
Total productivity maintenance
Total productivity maintenanceTotal productivity maintenance
Total productivity maintenance
 
lean & agile
lean & agilelean & agile
lean & agile
 

Último

/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...lizamodels9
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 

Último (20)

/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In.../:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
/:Call Girls In Indirapuram Ghaziabad ➥9990211544 Independent Best Escorts In...
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 

Smed smpl 1

  • 1. 1© 2000, QualityToolBox.com, LLC, all rights reserved A STRATEGY FOR PERFORMANCE EXCELLENCE ( One Step Setup) Set-up and changeover reductions for equipment, tooling and machines.
  • 2. 2© 2000, QualityToolBox.com, LLC, all rights reserved Executive Overview Participant manual Tools WorkbookKnowledge Breakthrough Lecture notes Lecture notes Performance Excellence Series Training Module Elements
  • 3. 3© 2000, QualityToolBox.com, LLC, all rights reserved Session 1.0 Introduction…….……...…………………... 4 Session 2.0 Waste Management ………………………. 12 Session 3.0 Setup Practices…………………………….. 22 Session 4.0 Traditional /Strategic Setup Approach…… 29 Session 5.0 SMED Implementation Planning…………. 34 Element 5.1 Implementation Team……………………… 36 Element 5.2 Implementation Plan………………………. 37 Element 5.3 Communication Plan………………………. 38 Element 5.4 Training Plan………………………………. 40 Element 5.5 One Step Setup…………………………….. 42 Element 5.5.1 Separate Internal from External Setup…… 44 Element 5.5.2 Integrating Internal into External Setup…. 49 Element 5.5.3 Reducing Setup Processing Time…………. 63 Element 5.5.4 Optimizing Setup Processes……………….. 92 Element 5.6 Verification & Standardization…………… 95 Session 6.0 Summary…………………………………… 105 Table of Contents Knowledge Breakthrough
  • 4. 4© 2000, QualityToolBox.com, LLC, all rights reserved SMED is Continuous Improvement It is a customer driven requirement. Customers are demanding: Product and service diversity Lower costs Higher reliability and quality. In essence organizations need to become leaner ! So organizations must: Produce smaller lots, more frequently. Expand the scope and diversity of products and services. Reduce quality defects.
  • 5. 5© 2000, QualityToolBox.com, LLC, all rights reserved Ultimately, SMED focuses on reducing changeover and set-up times, thus enabling organizations to: Produce smaller lots of products and services more frequently ! Develop a broader scope of products and services ! Reduce quality defects towards zero ! Meet Customer’s Expectations !
  • 6. 6© 2000, QualityToolBox.com, LLC, all rights reserved What Does Set-up/changeover reduction mean for my business? Increased customer service levels and profits ! Via Waste Elimination resulting in: Reduced Lead Times-Faster Delivery Zero Inventories-Reduced Working Capital Improved Quality Improved Safety Smaller lots of products-flexibility Diversified Product & Service Options
  • 7. 7© 2000, QualityToolBox.com, LLC, all rights reserved •To eliminate the wastes that result from “uncontrolled” processes increasing inventories and lead times.. • To gain control on equipment, material & inventory. • Apply Control Techniques to Eliminate Erosion of Improvements. • Standardize Improvements for Maintenance of Critical Set-up Parameters. Look Familiar? Why SMED ?
  • 8. 8© 2000, QualityToolBox.com, LLC, all rights reserved Major CPI Tools (6σ) Kaizen Lean Description Cp/Cpk Process capability assessment DOE Design of experiments SPC Process control based on statistics and data analysis FMEA Risk assessment tool Regression Correlate effect one variable has on another Process Map Map process steps to communicate and identify opportunities 5 whys /2 hows Determination methods for root cause discovery Pareto Column chart ranking items highest to lowest Fishbone Cause / Effect Diagram 5S Elimination waste Visual Mgmt Emphasis on visual techniques to manage process Poka-Yoke Error proofing techniques Spaghetti Chart Kanban Material storage technique used to control process Takt Time Determine pace or beat of a process Std Work Evaluate tasks done during a process SMED Single minute exchange of dies - Quick machine set up TPM Integrate maintenance strategy with process Cellular Flow Reduce inventory & cycle time through process layout and pull production techniques Expand Process Improvement Program to Utilize Kaizen Tool KitExpand Process Improvement Program to Utilize Kaizen Tool Kit Tool Kit Comparison
  • 9. 9© 2000, QualityToolBox.com, LLC, all rights reserved Identify what types of internal and external setup times are involved in the following pictures. Picture A: Wire Cutting Machine Picture B: Metal Stamping Machine
  • 10. 10© 2000, QualityToolBox.com, LLC, all rights reserved Identify what types of internal and external setup & times are involved in the following pictures. Picture A: Wire Cutting Machine Picture B: Metal Stamping Machine ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ___________________________ ____________________________ ____________________________ ____________________________ ____________________________ ____________________________ ____________________________ ____________________________ ____________________________ Setup Type Setup TypeTime ( Min) Time ( Min) Think Break
  • 11. 11© 2000, QualityToolBox.com, LLC, all rights reserved Internal External Setup Classify Three items under each item category. ExternalInternal ____________ ____________ ____________ ____________ ____________ ____________ Which items would you convert from internal to external Setup ? ____________________________________________________ ____________________________________________________ Why? ____________________________________________________ ____________________________________________________ Think Break
  • 12. 12© 2000, QualityToolBox.com, LLC, all rights reserved Traditional Setup Practices Material movement occurs after the machine is turned off. Detection of defects or missing equipment is noticed which the machine is running. Defective tooling,fixtures, setup instruments are noticed after the machine is turned on. •Completed products are transferred to next operation. •Raw material is moved after the machine is stopped. •Setup tooling delivered after the changeover has begun. •Defective product identified after internal setup has begun. •The operator notices that equipment is missing after internal setup has begun.
  • 13. 13© 2000, QualityToolBox.com, LLC, all rights reserved Preparation - Ensures that all the tools are working properly and are in the right location. Mounting & Extraction - Involves the removal of the tooling after the production lot is completed and the placement of the new tooling before the next production lot. Establishing Control Settings - Setting all the process control settings prior to the production run. Inclusive of calibrations and measurements needed to make the machine, tooling operate effectively. First Run Capability - This includes the necessary adjustments( re- calibrations, additional measurements) required after the first trial pieces are produced. Setup Improvement- The time after processing during which the tooling, machinery is cleaned, identified, and tested for functionality prior to storage. 5 “Traditional”Setup Steps Defined
  • 14. 14© 2000, QualityToolBox.com, LLC, all rights reserved Setup Steps Setup Type Traditional Internal Setup Type Traditional External Resource Consumption ( %) Setup Type One-Step Internal Setup Type One-Step External Preparation X 20 % X Mounting & Extraction X 5 % X Establish Control Settings X 15 % X First Run Capability X 50 % N/A N/A Process Improvement X 10 % X “Traditional”Setup Resource Consumption Analysis
  • 15. 15© 2000, QualityToolBox.com, LLC, all rights reserved Examples of wastes in a traditional setup ! What kind of “setup wastes” can you identify in this pictures ? ________________________________________________________ ________________________________________________________ ________________________________________________________ Think Break
  • 16. 16© 2000, QualityToolBox.com, LLC, all rights reserved Separate Internal from External Setup Optimizing Setup Processes Integrate Internal into External Setup Reduction of Setup Processes One Step Setup Implementation Plan Progressive Enhancements Step 2 Develop Specific Implementation Plan Step 3 Develop Communication Plan Step 4 Develop One Step Setup Training Plan Step 5 Implement One Step Set-up Step 6 Verification / Standardization Step 1 Develop One Step Setup Implementation Team
  • 17. 17© 2000, QualityToolBox.com, LLC, all rights reserved Phase 2 Combining equipment functionality Involves standardizing the equipment ( parts, tooling, processes) based on commonality between setups to reduce the number of setup steps and cycle times. The common setup parts were identified and replaced with this jig/holder combination. Notice how different quantities of the same part can be setup with the same fixture. Also, these setups can occur while the machine is running. By using these fixtures, the parts are automatically centered and adjusted for height and flatness as a part of External setup- not Internal setup.
  • 18. 18© 2000, QualityToolBox.com, LLC, all rights reserved Tooling supplies are clearly labeled Tooling supplies are neatly assigned a unique location. Waste associated with finding, replacing, motion will be eliminated by this example of visual placement.
  • 19. 19© 2000, QualityToolBox.com, LLC, all rights reserved Phase 3: Reducing setup processing time. Elimination of Bolts & Adjustments. Bolt attachments requires 32 complete turns for each bolt or screw (1 for each thread) to fasten this bolt and die to a machine. This clamp attachment requires one step to attach the die to a machine. Example of One Step Fastening
  • 20. SMED for the Workplace Training and Sourcebook for SMED Worksheets
  • 21. How to Use This Manual The continuous improvement tools that are presented in Sections 1-10 of this manual are shown in order of use. These forms MUST be completed in the order presented in this manual. Each section contains a brief description of the tool, its purpose, when to use it, who should use it, how to use it, and the expected results. Remember to focus on the elimination of waste. Strive to maximize yields and obtain cost reductions from existing machinery and equipment before “buying solutions”. Improve current systems and techniques before automation. Automating a system or practices without first having an understanding of the process will not solve underlying process problems. Perhaps the most important point to remember is that we must understand a process before we make any attempt in changing it. “No Tampering” is the first rule of continuous improvement. We can not tamper with a process without understanding it. By using these tools, we will all share a common and systematic approach for questioning, analyzing, proposing solutions, experimenting, and finally, implementing proven changes. “The problems that exist in the world today cannot be solved by the same level of thinking that created them.” Improvement Identify waste Measurement SMED Template
  • 22. Table of Contents Section 1 Development of SMED “To Do” Plan: Establishment of the SMED team’s Action plan identifying the specific actions required for each of the four (4) phases of SMED implementation. Deliverable includes action plan and associated tasks with the SMED implementation. 4 Section 2 Waste Identification Map: Identification of the 9 wastes associated with production of products and services. A detailed map of each major work area is developed describing the major types of wastes in each area. These wastes are the improvement opportunities that exist prior to SMED. The overall wastes is calculated for all the work areas and identified on the 9 Waste Radar Chart 7 Section 3 SMED Action sheet: Establishing baseline key performance metrics in terms of key deliverables, photographs, and current conditions of the “before” SMED implementation phase. Deliverable includes the SMED action sheet. Please note: A video recording of the “ before” setup operation is recommended. 11 Section 4 Setup Process Map: A map showing the critical setup inputs, processes and outputs for each machine/equipment setup operation. 14 Section 5 Standard Operation Setup Check-sheet: Identifies the setup operations and respective process parameters required for an effective changeover. Also identifies resource requirements for the setup operations previously identified. 17 Section 6 Setup Work Combination Sheet: Used to graphically display the amount on Internal and External setup time within a changeover process for a particular machine. It further shows tasks that are performed in series and parallel for further analysis. 21
  • 23. Section 7 Setup Conversion Matrix: A matrix identifying the methodology for converting internal setup operations into external setup operations. 24 Section 8 SMED Conversion “To Do”: An action list identifying specific setup improvement tasks for each conversion opportunity identified in the “Setup Conversion Matrix”. 27 Section 9 Operational Control Plan: Procedure for setup operations AFTER setup improvements have been made. This is a control plan to ensure consistent setup with the newly identified setup parameters as a result of the SMED implementation. Includes visuals of setup tooling, & supplies. 30 Section 10 Standard Visual Sign: Used to identify the machine, tooling, supplies, & inventory location within the workplace. Shows the type of item, location of item, quantity of item, and the preceding and following processes. 34 Section 11 SMED Status Report: Provides a format to compare improvement efforts between a desired target and known starting value. 36 Section 12 Waste Identification Map: Identification of the 9 wastes associated with production of products and services. A detailed map of each major work area is developed describing the major types of wastes in each area. These wastes are the improvement opportunities that exist prior to SMED. 9 Wastes Radar Chart: After the completion of SMED, the results of the waste reduction is recorded, charted and compared to the initial 9 Waste Radar Chart. 39
  • 25. SET-UP CONVERSION MATRIX Sheet Date: Page of Operator Number Standard Set-up TimeArea/Department Machine/Equipment Name Set-up Tools Required Date Prepared Minutes CURRENT PROCESS CURRENT TIME PROPOSED TIME NO. Task/Operation Internal External IMPROVEMENT Internal External Current Total: Improve Total Conversation Methology Preparation of Set-up Process Combining Equipment Functionality Standardized Jigs
  • 26. Setup Conversion Matrix Purpose Used to identify specific actions taken to convert internal setup operations into external setup operations as part of Phase 1 in the SMED program. When To Use The Setup conversion Matrix should be used after the Setup work Combination sheet has been completed. Who Should Use It The Setup conversion Matrix can be used by anyone involved in area or process improvement. Expected Benefits The resultant deliverables will be specific actions aligned with each of the three conversion methodologies(Preparation of Setup Processes, Combining Equipment Functionality, Standardized Jigs) to convert internal setup operations into external setup operations.
  • 27. How To Use It 1. Complete the sections titled “ Area/Department, Machine/Equipment Name, Setup Tools required, Operator Number, Date, and Standard Setup time. 2. List all the specific setup tasks/steps in sequential order(can obtain this information from the process map)under the column titled “tasks/operations” and indication the step number under the column titled ”No.”. 3. Next list the total amount of Internal and External Setup time in the appropriate column for each task Before any changes have been made. 4. Complete the column titled” improvement” by listing the specific continual improvement actions that will be taken to convert the Internal setup time into External setup time. 5. Next complete the column titled “proposed time” by listing the expected Internal and External setup times. 6. Finally add up the total internal and External setup times for both the current and proposed columns and list these at the bottom of the form in the sections titled “ Current Total & Improved Total “ respectively. Next Step You are now ready to move to the next step, the SMED Conversion To Do List.

Notas del editor

  1. Single Minute Exchange of Dies is a “Process” focused on reducing waste through the reduction of setup processes associated with Equipment, Machines, Tooling. It is a continual improvement process focused on incremental improvement driving towards a “ On Step Setup Operation” We use One Step Setup to confer that the goal for setup operations should be a One Step Process taking less than a few minutes.
  2. Single Minute Exchange of Dies is a “Process” focused on reducing waste through the reduction of setup processes associated with Equipment, Machines, Tooling. It is a continual improvement process focused on incremental improvement driving towards a “ On Step Setup Operation” We use One Step Setup to confer that the goal for setup operations should be a One Step Process taking less than a few minutes.
  3. 5 S is a continual improvement process. It isn’t complete once you perform the 5 initial steps- this is known as “active 5S”. In fact, this is the beginning point for the next two applications of 5S: Making 5S a Habit and Preventive 5S.
  4. One Step Setup ( SMED) is a critical success factor required for an organizations growth and profitability! With an effecti8ve SMED program in place, companies will reduce waste associated with excess motion, excess inventories, excess waiting times, excess transportation, process waste, waste associated with defects. The result ----- A more flexible organization which can produce smaller and more diversified lots of products and services, at lower costs, without inventory buildups and with zero defects! Hence, on time deliveries, in the right quantity,at competitive costs.
  5. One Step Setup results in customer service.
  6. The ultimate deliverable of SMED is to increase service levels and profits ! It does this by the elimination of the wastes noted earlier. The only reason were in business is to make money ( profits) we do this by satisfying the customer, and we satisfy the customer by providing the “right product and service” at the “right time” at the “correct quantities”.
  7. The primary focus of SMED is the elimination of wastes in the work environment that result from unorganized, unclean material, tools, machines, associated with setup/changeover processes.
  8. This matrix is extremely important in understanding the relationship of Kaizen, Six Sigma, and Lean- site manufacturing. Notice that many of the continual improvement tools are common amongst the three programs. In essence it is important to note that Lean-site Manufacturing is really a deliverable of Kaizen ( when employed completely and correctly). It is also important here to recognize where SMED fits into the equation. SMED focuses on the elimination of wastes, so it is common and required for successful completion of Kaizen and Lean-site initiatives.
  9. Have the group form in pairs and identify the types of inside/outside setup operations required for these types of machines. As part of the exercise, have them list an approximate setup time for each of the setup operations identified.
  10. Have the group form in pairs and identify the types of inside/outside setup operations required for these types of machines. As part of the exercise, have them list an approximate setup time for each of the setup operations identified.
  11. Have the group do this individually and give them about 10 minutes to complete this exercise. Lead a discussion on why items were put into each category and why the items were chosen to be discarded.
  12. Have the group identify the types of waste associated with the setup/changeover operations for these two machines. How would an improved setup process eliminate or reduce these waste ?
  13. Listed above is the implementation plan for a 5S program. Each step is explained on the upcoming slides.