Conceptual Site Model Development and
Environmental Molecular Diagnostics Use
for PlumeStop® Liquid Activated Carbon™
Application at a Trichlorofluoromethane
Groundwater Plume
Robert R. Thompson, III, PG, RSM
Clemson Hydrogeology Symposium
Clemson, SC
April 4, 2019
Site Setting
Piedmont Geology & Hydrogeology–Remediation Focused on TZ
Large Dissolved VOC Plume – 1,200 ft
Mass Flux Estimated At 210 kg/year
2 Source Areas: 1. Methylene Chloride, 2. Floor Drains Inside (ongoing)
Remediation Since 1992; Antea Group Active Since 2007
50 Acre Manufacturing Facility In North Carolina Since 1960’s
Site Layout and Groundwater Flow Direction
Pilot Study
Area
PlumeStop® Bio
Barrier
Methylene
Chloride
Source Area
Floor
Drain
Source
Area
Pre-Remedial Design Investigation
Passive Soil Gas Survey Surface Resistivity Survey
A
A’
A A’
5
What Geochem Data Can Tell You
Where the site is on the REDOX
ladder
What microbial populations are likely
dominating
If one or more parameter
excessive/outside the norm
Aids in the refinement of the CSM
Critical to troubleshooting poorly performing sites
Pilot Study
• Pilot study using DPT
• 3,600 lbs. PlumeStop®
• 330 lbs. HRC®
• Design verification
• Soil VOC data
• Groundwater data
• Soil geotechnical data
• One year monitoring, per
NCDEQ
• State-wide use of
PlumeStop® approved
• Final Design
GW Flow
DO & ORP – February 2019
Dissolved Oxygen – Aerobic Conditions Oxidation-Reduction Potential – Reducing Conditions
Results: Post-Injection Pilot Study Data
0
500
1,000
1,500
2,000
2,500
3,000
0
2
4
6
8
10
12
9/18/2014 4/6/2015 10/23/2015 5/10/2016 11/26/2016 6/14/2017 12/31/2017 7/19/2018 2/4/2019
Freon11(µg/L)
PCE,TCE,and1,4-DioxaneConcentrations
(µg/L)
Date
15 Feet Downgradient From Pilot Study
PCE (µg/L) PCE 2L Standard
TCE (µg/L) 1,4-Dioxane (µg/L)
TCE and 1,4-Dioxane 2L Standard PlumeStop Pilot Study
Freon 11 (µg/L) Phase I PlumeStop Injection
Freon 11 2L Standard
Results: Post-Injection Pilot Study Data
0
100
200
300
400
500
600
700
800
900
1000
0
20
40
60
80
100
120
140
160
180
200
9/18/2014 4/6/2015 10/23/2015 5/10/2016 11/26/2016 6/14/2017 12/31/2017 7/19/2018 2/4/2019
Freon11and1,4-Dioxane(µg/L)
PCEandTCEConcentrations(µg/L)
Date
PCE (µg/L) PCE 2L Standard
TCE (µg/L) TCE and 1,4-Dioxane 2L Standard
PlumeStop Pilot Study 1,4-Dioxane (µg/L)
Freon 11 (µg/L) Freon 11 2L Standard
Phase I PlumeStop Injection
100 Feet Downgradient From Pilot Study
QuantArray-Chlor
MW-12S
December
2014
(pre-pilot study)
MW-12S
September
2018
Aerobic
(co)metabolic
species
Dehalobacter spp.
Dehalobacter spp. in Cross-Section
GW Flow Direction
Microbial Community Cross-Section
GW Flow Direction
GW Flow Direction
Total Eubacteria – Phase 2 Area
GW Flow Direction
Full Scale Phase 1 PlumeStop®
• Largest PlumeStop® application
for Freon 11 plume in the world
• 32,400 lbs. PlumeStop® applied
into injection wells
• 5,700 lbs. PlumeStop® applied by
DPT
• 5,400 lbs. HRC-X®
• 5,400 lbs. HRC Primer®
• 33 injection well locations
• 10 DPT locations
The Chemistry - Tools
Total VOCs October 2012
Total VOCs November 2018 Total VOCs February 2019
Total VOCs November 2014
Results – Post Injection Barrier Area
0
500
1,000
1,500
2,000
2,500
3,000
3,500
0
5
10
15
20
25
30
35
10/13/2013 4/11/2014 10/8/2014 4/6/2015 10/3/2015 3/31/2016 9/27/2016 3/26/2017 9/22/2017 3/21/2018 9/17/2018 3/16/2019
Freon11andTotalVOCs(µg/L)
PCE,TCE,1,4-DioxaneConcentrations(µg/L)
Date
Upgradient -- Downgradient
MW-24S PCE (ug/L) MW-24S TCE (ug/L)
PlumeStop Pilot Study MW-24S 1,4-Dioxane (ug/L)
MW-19S PCE MW-19S TCE
MW-19S 1,4-Dioxane MW-24S Freon 11 (ug/L)
Phase I PlumeStop Injection MW-24S Total VOCs (µg/L)
MW-19S Freon 11 MW-19S Total VOCs
Upgradient
Downgradient
Groundwater Plume Visualization-Freon 11
3D Cross Sections
Total VOCs - 2014
Freon 11 - 2019
GW Flow Direction
GW Flow Direction
Freon 11 Cross Section – February 2019
GW Flow Direction
Summary
Robust data collection
is needed
Data collection during
RI pays off in the long
run
Consider all the tools
available for use
Performance
monitoring is key
Field awareness keeps
everyone safe
Preparedness
improves project
quality
Remedial design leads
to surgical placement
Consider options that
yield results and save
funds
Thank You
Jack Sheldon
Senior Professional, Antea Group
Jack.Sheldon@anteagroup.com
515.971.8329
If you don’t have time to do it right the first time, what makes you think
you’ll have time (and resources) to do it right the second time?
Robert R. Thompson, III, PG, RSM
Senior Professional, Antea Group
Rob.Thompson@anteagroup.com
704.324.7046
We do more than effectively
solve client challenges; we
deliver sustainable results for a
better future.

Más contenido relacionado

La actualidad más candente

Dr J N Brown - PhD thesis (2002) Partitioning of Chemical Contaminants in Urb...
Dr J N Brown - PhD thesis (2002) Partitioning of Chemical Contaminants in Urb...Dr J N Brown - PhD thesis (2002) Partitioning of Chemical Contaminants in Urb...
Dr J N Brown - PhD thesis (2002) Partitioning of Chemical Contaminants in Urb...
Jeff Brown, PhD, CNMA
 
Souza Filho Talk IGARSS 2011 final version.pptx
Souza Filho Talk IGARSS 2011 final version.pptxSouza Filho Talk IGARSS 2011 final version.pptx
Souza Filho Talk IGARSS 2011 final version.pptx
grssieee
 
15 Reasons Not to Use Percent Removals
15 Reasons Not to Use Percent Removals15 Reasons Not to Use Percent Removals
15 Reasons Not to Use Percent Removals
Marcus Quigley
 

La actualidad más candente (20)

Is This Going to Stink?
Is This Going to Stink?Is This Going to Stink?
Is This Going to Stink?
 
Monitoring and analysis of a novel highway runoff
Monitoring and analysis of a novel highway runoffMonitoring and analysis of a novel highway runoff
Monitoring and analysis of a novel highway runoff
 
The use of a hand-held mid-infrared spectrometer for the rapid prediction of ...
The use of a hand-held mid-infrared spectrometer for the rapid prediction of ...The use of a hand-held mid-infrared spectrometer for the rapid prediction of ...
The use of a hand-held mid-infrared spectrometer for the rapid prediction of ...
 
Dr J N Brown - PhD thesis (2002) Partitioning of Chemical Contaminants in Urb...
Dr J N Brown - PhD thesis (2002) Partitioning of Chemical Contaminants in Urb...Dr J N Brown - PhD thesis (2002) Partitioning of Chemical Contaminants in Urb...
Dr J N Brown - PhD thesis (2002) Partitioning of Chemical Contaminants in Urb...
 
Soil Spectroscopy to monitor the state of soil resources in the present and i...
Soil Spectroscopy to monitor the state of soil resources in the present and i...Soil Spectroscopy to monitor the state of soil resources in the present and i...
Soil Spectroscopy to monitor the state of soil resources in the present and i...
 
Spatial analysis of groundwater quality using GIS system
Spatial analysis of groundwater quality using GIS systemSpatial analysis of groundwater quality using GIS system
Spatial analysis of groundwater quality using GIS system
 
A field study assessing the impact of on site valerie mc-carthy_slideshare
A field study assessing the impact of on site valerie mc-carthy_slideshareA field study assessing the impact of on site valerie mc-carthy_slideshare
A field study assessing the impact of on site valerie mc-carthy_slideshare
 
06a PFLOTRAN-RepoTREND code intercomparison
06a PFLOTRAN-RepoTREND code intercomparison06a PFLOTRAN-RepoTREND code intercomparison
06a PFLOTRAN-RepoTREND code intercomparison
 
Soil spectroscopy as a tool for the spatial assessment of soil erosion states...
Soil spectroscopy as a tool for the spatial assessment of soil erosion states...Soil spectroscopy as a tool for the spatial assessment of soil erosion states...
Soil spectroscopy as a tool for the spatial assessment of soil erosion states...
 
Konnaris - CEG8110
Konnaris - CEG8110Konnaris - CEG8110
Konnaris - CEG8110
 
Study on Quality of Soil: Part-II. Simultaneous Determination of Cu, Pb, Cd, ...
Study on Quality of Soil: Part-II. Simultaneous Determination of Cu, Pb, Cd, ...Study on Quality of Soil: Part-II. Simultaneous Determination of Cu, Pb, Cd, ...
Study on Quality of Soil: Part-II. Simultaneous Determination of Cu, Pb, Cd, ...
 
CHARACTERISTICS OF THE LEACHATE FROM MSW LANDFILL,BANGALORE
CHARACTERISTICS OF THE LEACHATE FROM MSW LANDFILL,BANGALORE CHARACTERISTICS OF THE LEACHATE FROM MSW LANDFILL,BANGALORE
CHARACTERISTICS OF THE LEACHATE FROM MSW LANDFILL,BANGALORE
 
SILTFLUX Data
SILTFLUX DataSILTFLUX Data
SILTFLUX Data
 
Challenges in detecting a response to elevated sediment
Challenges in detecting a response to elevated sedimentChallenges in detecting a response to elevated sediment
Challenges in detecting a response to elevated sediment
 
CONTAMINATED LAND MANAGEMENT AND SITE REMEDY
CONTAMINATED LAND MANAGEMENT AND SITE REMEDYCONTAMINATED LAND MANAGEMENT AND SITE REMEDY
CONTAMINATED LAND MANAGEMENT AND SITE REMEDY
 
Poster Battelle conference 2016 poster palm springs
Poster  Battelle conference 2016 poster palm springs Poster  Battelle conference 2016 poster palm springs
Poster Battelle conference 2016 poster palm springs
 
DHI Pigment Standards - DHI Lab 2015
DHI Pigment Standards - DHI Lab 2015DHI Pigment Standards - DHI Lab 2015
DHI Pigment Standards - DHI Lab 2015
 
Souza Filho Talk IGARSS 2011 final version.pptx
Souza Filho Talk IGARSS 2011 final version.pptxSouza Filho Talk IGARSS 2011 final version.pptx
Souza Filho Talk IGARSS 2011 final version.pptx
 
Potential Contamination of Mercury from Artisanal Gold Mining
Potential Contamination of Mercury from Artisanal Gold MiningPotential Contamination of Mercury from Artisanal Gold Mining
Potential Contamination of Mercury from Artisanal Gold Mining
 
15 Reasons Not to Use Percent Removals
15 Reasons Not to Use Percent Removals15 Reasons Not to Use Percent Removals
15 Reasons Not to Use Percent Removals
 

Similar a Conceptual Site Model Development and Environmental Molecular Diagnostics

City Council August 2, 2011 Hickory Ground Water Project Presentation
City Council August 2, 2011 Hickory Ground Water Project PresentationCity Council August 2, 2011 Hickory Ground Water Project Presentation
City Council August 2, 2011 Hickory Ground Water Project Presentation
City of San Angelo Texas
 
Question 1 – 200 Words1. What are the EPAs seven criteria pollu.docx
Question 1 – 200 Words1. What are the EPAs seven criteria pollu.docxQuestion 1 – 200 Words1. What are the EPAs seven criteria pollu.docx
Question 1 – 200 Words1. What are the EPAs seven criteria pollu.docx
IRESH3
 
Pestigation-H S Gadad
Pestigation-H S GadadPestigation-H S Gadad
Pestigation-H S Gadad
Gadad H S
 

Similar a Conceptual Site Model Development and Environmental Molecular Diagnostics (20)

Canada Wide Residential Stormwater Management Pond Sediment Chemistry Study -...
Canada Wide Residential Stormwater Management Pond Sediment Chemistry Study -...Canada Wide Residential Stormwater Management Pond Sediment Chemistry Study -...
Canada Wide Residential Stormwater Management Pond Sediment Chemistry Study -...
 
Frank resume 20150707
Frank resume 20150707Frank resume 20150707
Frank resume 20150707
 
Remedition Using Soy Based Aerobic Co-Metabolism for Removal of Chlorinated H...
Remedition Using Soy Based Aerobic Co-Metabolism for Removal of Chlorinated H...Remedition Using Soy Based Aerobic Co-Metabolism for Removal of Chlorinated H...
Remedition Using Soy Based Aerobic Co-Metabolism for Removal of Chlorinated H...
 
ISPAC2013 plenary talk - Environmental Forensics and PAHs
ISPAC2013 plenary talk - Environmental Forensics and PAHsISPAC2013 plenary talk - Environmental Forensics and PAHs
ISPAC2013 plenary talk - Environmental Forensics and PAHs
 
Liddell TERN-super sites-phenology-ACEAS
Liddell TERN-super sites-phenology-ACEASLiddell TERN-super sites-phenology-ACEAS
Liddell TERN-super sites-phenology-ACEAS
 
’Sustainable Rural Wastewater Treatment in Rural Housing’ Presentation 1 02 08
’Sustainable Rural Wastewater Treatment in Rural Housing’  Presentation 1 02 08’Sustainable Rural Wastewater Treatment in Rural Housing’  Presentation 1 02 08
’Sustainable Rural Wastewater Treatment in Rural Housing’ Presentation 1 02 08
 
City Council August 2, 2011 Hickory Ground Water Project Presentation
City Council August 2, 2011 Hickory Ground Water Project PresentationCity Council August 2, 2011 Hickory Ground Water Project Presentation
City Council August 2, 2011 Hickory Ground Water Project Presentation
 
Indoor Air Quality Sampling And Evaluation
Indoor Air Quality Sampling And EvaluationIndoor Air Quality Sampling And Evaluation
Indoor Air Quality Sampling And Evaluation
 
Question 1 – 200 Words1. What are the EPAs seven criteria pollu.docx
Question 1 – 200 Words1. What are the EPAs seven criteria pollu.docxQuestion 1 – 200 Words1. What are the EPAs seven criteria pollu.docx
Question 1 – 200 Words1. What are the EPAs seven criteria pollu.docx
 
Stormwater Pond Sediment Beneficial Use Study - Plant Ecotoxicity Test Results
Stormwater Pond Sediment Beneficial Use Study - Plant Ecotoxicity Test ResultsStormwater Pond Sediment Beneficial Use Study - Plant Ecotoxicity Test Results
Stormwater Pond Sediment Beneficial Use Study - Plant Ecotoxicity Test Results
 
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
Endophyte Assisted Phytoremediation of TCE and Derivatives Using Hybrid Popla...
 
3.pdf
3.pdf3.pdf
3.pdf
 
Leachate generation from tsdf and its treatment options
Leachate generation from tsdf and its treatment optionsLeachate generation from tsdf and its treatment options
Leachate generation from tsdf and its treatment options
 
Passive Samplers for Vapor Intrusion Monitoring: Update of EPA’s Technical S...
Passive Samplers for Vapor Intrusion Monitoring:  Update of EPA’s Technical S...Passive Samplers for Vapor Intrusion Monitoring:  Update of EPA’s Technical S...
Passive Samplers for Vapor Intrusion Monitoring: Update of EPA’s Technical S...
 
Remediation of Volatile Organics in Groundwater Using In Situ Carbon (ISC) In...
Remediation of Volatile Organics in Groundwater Using In Situ Carbon (ISC) In...Remediation of Volatile Organics in Groundwater Using In Situ Carbon (ISC) In...
Remediation of Volatile Organics in Groundwater Using In Situ Carbon (ISC) In...
 
Establishment of mobile soil and water testing unit
Establishment of mobile soil and water testing unitEstablishment of mobile soil and water testing unit
Establishment of mobile soil and water testing unit
 
Pestigation-H S Gadad
Pestigation-H S GadadPestigation-H S Gadad
Pestigation-H S Gadad
 
Exploitation of Source Rock Hydrocarbons through Propane Stimulation
Exploitation of Source Rock Hydrocarbons through Propane StimulationExploitation of Source Rock Hydrocarbons through Propane Stimulation
Exploitation of Source Rock Hydrocarbons through Propane Stimulation
 
Tokyo Presentation August 15 2011
Tokyo Presentation August 15 2011Tokyo Presentation August 15 2011
Tokyo Presentation August 15 2011
 
Tokyo presentation august 15 2011
Tokyo presentation august 15 2011Tokyo presentation august 15 2011
Tokyo presentation august 15 2011
 

Más de Antea Group

Más de Antea Group (20)

Preparation for Post-Incident - Claims Adjusting and Clean-up
Preparation for Post-Incident - Claims Adjusting and Clean-upPreparation for Post-Incident - Claims Adjusting and Clean-up
Preparation for Post-Incident - Claims Adjusting and Clean-up
 
Overview of STI SP001 vs. API 653 Tank Inspections
Overview of STI SP001 vs. API 653 Tank InspectionsOverview of STI SP001 vs. API 653 Tank Inspections
Overview of STI SP001 vs. API 653 Tank Inspections
 
Lessons Learned from PFAS in Groundwater
Lessons Learned from PFAS in GroundwaterLessons Learned from PFAS in Groundwater
Lessons Learned from PFAS in Groundwater
 
Unpacking the Business and Stakeholder Relationship Management Toolbox
Unpacking the Business and Stakeholder Relationship Management ToolboxUnpacking the Business and Stakeholder Relationship Management Toolbox
Unpacking the Business and Stakeholder Relationship Management Toolbox
 
Tracking Full-Scale Performance of an Injectable Sorptive Biobarrier: One Yea...
Tracking Full-Scale Performance of an Injectable Sorptive Biobarrier: One Yea...Tracking Full-Scale Performance of an Injectable Sorptive Biobarrier: One Yea...
Tracking Full-Scale Performance of an Injectable Sorptive Biobarrier: One Yea...
 
2018 Railroad Environmental Conference: Local Stormwater Charges
2018 Railroad Environmental Conference: Local Stormwater Charges2018 Railroad Environmental Conference: Local Stormwater Charges
2018 Railroad Environmental Conference: Local Stormwater Charges
 
2018 Railroad Environmental Conference: Managing Health and Safety
2018 Railroad Environmental Conference: Managing Health and Safety2018 Railroad Environmental Conference: Managing Health and Safety
2018 Railroad Environmental Conference: Managing Health and Safety
 
2018 UST Regulations Update: What You Need to Know
2018 UST Regulations Update: What You Need to Know2018 UST Regulations Update: What You Need to Know
2018 UST Regulations Update: What You Need to Know
 
2018 National Tanks Conference & Exposition: HRSC Data Visualization
2018 National Tanks Conference & Exposition: HRSC Data Visualization2018 National Tanks Conference & Exposition: HRSC Data Visualization
2018 National Tanks Conference & Exposition: HRSC Data Visualization
 
Using Data Management and 3-Dimensional Data Visualization to Generate More C...
Using Data Management and 3-Dimensional Data Visualization to Generate More C...Using Data Management and 3-Dimensional Data Visualization to Generate More C...
Using Data Management and 3-Dimensional Data Visualization to Generate More C...
 
Using Environmental Molecular Diagnostics to support a Rhizodegradation Closu...
Using Environmental Molecular Diagnostics to support a Rhizodegradation Closu...Using Environmental Molecular Diagnostics to support a Rhizodegradation Closu...
Using Environmental Molecular Diagnostics to support a Rhizodegradation Closu...
 
Optimizing a Sorptive Biomatrix MTBE Barrier
Optimizing a Sorptive Biomatrix MTBE BarrierOptimizing a Sorptive Biomatrix MTBE Barrier
Optimizing a Sorptive Biomatrix MTBE Barrier
 
Life Safety, Emergency Response, and Fire Safety: EU Regional EHS Regulatory ...
Life Safety, Emergency Response, and Fire Safety: EU Regional EHS Regulatory ...Life Safety, Emergency Response, and Fire Safety: EU Regional EHS Regulatory ...
Life Safety, Emergency Response, and Fire Safety: EU Regional EHS Regulatory ...
 
Critical H&S Obligations: EU Regional EHS Regulatory Highlights
Critical H&S Obligations: EU Regional EHS Regulatory HighlightsCritical H&S Obligations: EU Regional EHS Regulatory Highlights
Critical H&S Obligations: EU Regional EHS Regulatory Highlights
 
Industrial Hygiene and Occupational Health: EU Regional EHS Regulatory Highli...
Industrial Hygiene and Occupational Health: EU Regional EHS Regulatory Highli...Industrial Hygiene and Occupational Health: EU Regional EHS Regulatory Highli...
Industrial Hygiene and Occupational Health: EU Regional EHS Regulatory Highli...
 
Greater Europe EHS Regulatory Challenges
Greater Europe EHS Regulatory ChallengesGreater Europe EHS Regulatory Challenges
Greater Europe EHS Regulatory Challenges
 
Psychosocial Risks: European Expectations
Psychosocial Risks: European ExpectationsPsychosocial Risks: European Expectations
Psychosocial Risks: European Expectations
 
Injury Prevention for Seasonal Workers
Injury Prevention for Seasonal WorkersInjury Prevention for Seasonal Workers
Injury Prevention for Seasonal Workers
 
Reducing Costs using a Green Lens
Reducing Costs using a Green Lens Reducing Costs using a Green Lens
Reducing Costs using a Green Lens
 
EHSxTech Update: Brazil Home Office Legislation 12-12-17
EHSxTech Update: Brazil Home Office Legislation 12-12-17EHSxTech Update: Brazil Home Office Legislation 12-12-17
EHSxTech Update: Brazil Home Office Legislation 12-12-17
 

Último

Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptx
hossanmdjobayer103
 
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
nirzagarg
 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Anamikakaur10
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
ZAPPAC1
 

Último (20)

RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING  SYSTEMS- IGBC, GRIHA, LEED--.pptxRATING  SYSTEMS- IGBC, GRIHA, LEED--.pptx
RATING SYSTEMS- IGBC, GRIHA, LEED--.pptx
 
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Jejuri Call Me 7737669865 Budget Friendly No Advance Booking
 
Environmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptxEnvironmental Science - Nuclear Hazards and Us.pptx
Environmental Science - Nuclear Hazards and Us.pptx
 
Climate Change
Climate ChangeClimate Change
Climate Change
 
CSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting DayCSR_Module5_Green Earth Initiative, Tree Planting Day
CSR_Module5_Green Earth Initiative, Tree Planting Day
 
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...Verified Trusted Kalyani Nagar Call Girls  8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
Verified Trusted Kalyani Nagar Call Girls 8005736733 𝐈𝐍𝐃𝐄𝐏𝐄𝐍𝐃𝐄𝐍𝐓 Call 𝐆𝐈𝐑𝐋 𝐕...
 
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
Call Girls in Sakinaka Agency, { 9892124323 } Mumbai Vashi Call Girls Serivce...
 
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Uruli Kanchan ( Pune ) Call ON 8005736733 Starting From ...
 
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
💚😋 Mathura Escort Service Call Girls, 9352852248 ₹5000 To 25K With AC💚😋
 
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
(NEHA) Call Girls Navi Mumbai Call Now 8250077686 Navi Mumbai Escorts 24x7
 
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Valsad 7001035870 Whatsapp Number, 24/07 Booking
 
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
Get Premium Hoskote Call Girls (8005736733) 24x7 Rate 15999 with A/c Room Cas...
 
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
Call Now ☎️🔝 9332606886 🔝 Call Girls ❤ Service In Muzaffarpur Female Escorts ...
 
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Hadapsar ( Pune ) Call ON 8005736733 Starting From 5K to...
 
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Ramtek Call Me 7737669865 Budget Friendly No Advance Booking
 
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Kondhwa ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Kondhwa ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
VVIP Pune Call Girls Wagholi WhatSapp Number 8005736733 With Elite Staff And ...
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
Call Girls Service Pune ₹7.5k Pick Up & Drop With Cash Payment 8005736733 Cal...
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 

Conceptual Site Model Development and Environmental Molecular Diagnostics

  • 1. The logo and ANTEA are registration trademarks of Antea USA, Inc. Conceptual Site Model Development and Environmental Molecular Diagnostics Use for PlumeStop® Liquid Activated Carbon™ Application at a Trichlorofluoromethane Groundwater Plume Robert R. Thompson, III, PG, RSM Clemson Hydrogeology Symposium Clemson, SC April 4, 2019
  • 2. Site Setting Piedmont Geology & Hydrogeology–Remediation Focused on TZ Large Dissolved VOC Plume – 1,200 ft Mass Flux Estimated At 210 kg/year 2 Source Areas: 1. Methylene Chloride, 2. Floor Drains Inside (ongoing) Remediation Since 1992; Antea Group Active Since 2007 50 Acre Manufacturing Facility In North Carolina Since 1960’s
  • 3. Site Layout and Groundwater Flow Direction Pilot Study Area PlumeStop® Bio Barrier Methylene Chloride Source Area Floor Drain Source Area
  • 4. Pre-Remedial Design Investigation Passive Soil Gas Survey Surface Resistivity Survey A A’ A A’
  • 5. 5 What Geochem Data Can Tell You Where the site is on the REDOX ladder What microbial populations are likely dominating If one or more parameter excessive/outside the norm Aids in the refinement of the CSM Critical to troubleshooting poorly performing sites
  • 6. Pilot Study • Pilot study using DPT • 3,600 lbs. PlumeStop® • 330 lbs. HRC® • Design verification • Soil VOC data • Groundwater data • Soil geotechnical data • One year monitoring, per NCDEQ • State-wide use of PlumeStop® approved • Final Design GW Flow
  • 7. DO & ORP – February 2019 Dissolved Oxygen – Aerobic Conditions Oxidation-Reduction Potential – Reducing Conditions
  • 8. Results: Post-Injection Pilot Study Data 0 500 1,000 1,500 2,000 2,500 3,000 0 2 4 6 8 10 12 9/18/2014 4/6/2015 10/23/2015 5/10/2016 11/26/2016 6/14/2017 12/31/2017 7/19/2018 2/4/2019 Freon11(µg/L) PCE,TCE,and1,4-DioxaneConcentrations (µg/L) Date 15 Feet Downgradient From Pilot Study PCE (µg/L) PCE 2L Standard TCE (µg/L) 1,4-Dioxane (µg/L) TCE and 1,4-Dioxane 2L Standard PlumeStop Pilot Study Freon 11 (µg/L) Phase I PlumeStop Injection Freon 11 2L Standard
  • 9. Results: Post-Injection Pilot Study Data 0 100 200 300 400 500 600 700 800 900 1000 0 20 40 60 80 100 120 140 160 180 200 9/18/2014 4/6/2015 10/23/2015 5/10/2016 11/26/2016 6/14/2017 12/31/2017 7/19/2018 2/4/2019 Freon11and1,4-Dioxane(µg/L) PCEandTCEConcentrations(µg/L) Date PCE (µg/L) PCE 2L Standard TCE (µg/L) TCE and 1,4-Dioxane 2L Standard PlumeStop Pilot Study 1,4-Dioxane (µg/L) Freon 11 (µg/L) Freon 11 2L Standard Phase I PlumeStop Injection 100 Feet Downgradient From Pilot Study
  • 11. Dehalobacter spp. Dehalobacter spp. in Cross-Section GW Flow Direction
  • 12. Microbial Community Cross-Section GW Flow Direction GW Flow Direction
  • 13. Total Eubacteria – Phase 2 Area GW Flow Direction
  • 14. Full Scale Phase 1 PlumeStop® • Largest PlumeStop® application for Freon 11 plume in the world • 32,400 lbs. PlumeStop® applied into injection wells • 5,700 lbs. PlumeStop® applied by DPT • 5,400 lbs. HRC-X® • 5,400 lbs. HRC Primer® • 33 injection well locations • 10 DPT locations
  • 16. Total VOCs October 2012 Total VOCs November 2018 Total VOCs February 2019 Total VOCs November 2014
  • 17. Results – Post Injection Barrier Area 0 500 1,000 1,500 2,000 2,500 3,000 3,500 0 5 10 15 20 25 30 35 10/13/2013 4/11/2014 10/8/2014 4/6/2015 10/3/2015 3/31/2016 9/27/2016 3/26/2017 9/22/2017 3/21/2018 9/17/2018 3/16/2019 Freon11andTotalVOCs(µg/L) PCE,TCE,1,4-DioxaneConcentrations(µg/L) Date Upgradient -- Downgradient MW-24S PCE (ug/L) MW-24S TCE (ug/L) PlumeStop Pilot Study MW-24S 1,4-Dioxane (ug/L) MW-19S PCE MW-19S TCE MW-19S 1,4-Dioxane MW-24S Freon 11 (ug/L) Phase I PlumeStop Injection MW-24S Total VOCs (µg/L) MW-19S Freon 11 MW-19S Total VOCs Upgradient Downgradient
  • 19. 3D Cross Sections Total VOCs - 2014 Freon 11 - 2019 GW Flow Direction GW Flow Direction
  • 20. Freon 11 Cross Section – February 2019 GW Flow Direction
  • 21. Summary Robust data collection is needed Data collection during RI pays off in the long run Consider all the tools available for use Performance monitoring is key Field awareness keeps everyone safe Preparedness improves project quality Remedial design leads to surgical placement Consider options that yield results and save funds
  • 22. Thank You Jack Sheldon Senior Professional, Antea Group Jack.Sheldon@anteagroup.com 515.971.8329 If you don’t have time to do it right the first time, what makes you think you’ll have time (and resources) to do it right the second time? Robert R. Thompson, III, PG, RSM Senior Professional, Antea Group Rob.Thompson@anteagroup.com 704.324.7046 We do more than effectively solve client challenges; we deliver sustainable results for a better future.