Project Challenge 2013 
Presentation by Antony Della Porta 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
Case Study on Using 
AgilePM 
in a 
PRINCE2 Project 
This presentation will be taking a look at a project where 
“Agile Project Management” and PRINCE2 methods of 
project delivery were successfully employed together. The 
project was to delivery a new bandwidth usage protocol, 
Quality of Service (QoS), configuration onto a Bank’s National 
Network, to enable Application bandwidth prioritization for 
the new Java-based applications project for the Retail Bank 
Division Teller System 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. 
The purpose of this 
Presentation 
Agile Project Management and PRINCE2® In Projects
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
Presenter 
Antony 
C. 
Della 
Porta 
• Antony has over 25 years experience of working in project 
delivery, rescue and consultancy roles 
• Major verticals such as Finance, Travel, Media and 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. 
Pharmaceuticals. 
• Established trainer in delivering courses in Project 
Management methodologies, and courses relevant to the 
delivery and realisation of business strategy. 
• Started using PRINCE2®, in earnest, over 14 years ago, 
along with Agile Project management 
• Fairly unique in having successfully managed and 
implemented a number of PRINCE2® -AgilePM projects 
prior to quite recently becoming a trainer. 
• APMG accredited and member of Institute of Consultants
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
Introduction to Relationship between 
PRINCE2 and AgilePM methodologies 
• The following slide will show a graphic view of 
the correlation of processes in PRINCE2 and 
the Phases employed by Atern Agile Project 
Management 
• AgilePM established with PRINCE2 
• Correlation of the Processes/Stages to 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. 
Phases/Increments 
• Relationship of plans and lifecycles 
Agile Project Management and 
PRINCE2® In Projects
Process Overview of PRINCE2 and AgilePM 
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. 
Key: AgilePM; PRINCE2®
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. 
The Project - 
St. George Bank Network Upgrade 
• Part of bank teller system replacement programme to employ Java based 
applications 
• Network to introduce QoS (Quality of Service) banding 
– Gold for high demand applications (40% b/w) 
– Silver for general demand applications (next 30%) 
– Bronze – backoffice applications (20% b/w) 
• QoS was a new concept indicating that the required solution to Prioritize traffic 
would have to evolve 
• Scope was two years old so requirements would have to be reviewed as well as 
equipment 
• Proof of Concept (PoC)facilities no longer available from the incoming Telco 
(Optus) so alternative had to be sourced 
• PoC was allocated one (1) month to complete defining, testing and piloting the 
Gold, Silver and Bronze (as Coulds). 
• Estimates for Effort would be broad as new functionality, and no known active 
solution for this type of network
• Initial Project Start Up employing PRINCE2® as the primary methodology 
• Stage 1- (P2) Initiating a Project used to setup and review Project in detail 
• Stage 2 - (P2) Redefine current scope, Tenders for Integrators, Pre Project phase for Stage 3 
• Stage 3 – (APM) Define and Develop requirements for technical solution, deploy 1st Pilot 
• Stage 4 – (APM-P2) Refine Technical solution (Pilot feedback), 1st Pilot - Engage Integrator 
• Stage 5 – (APM-P2) Refine Technical solution (Pilot feedback), 2nd Pilot - Plan National Roll-Out 
• Stage 6 – (P2) First group of Retail Banks for Live Upgrade 
• Stage 7 – (P2) Upgrade remaining 345 retail branches Nationwide 
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. 
The Project Plan -
• Initial Project Start Up employing PRINCE2® as the primary methodology 
• Stage 1- (P2) Initiating a Project used to setup and review Project in detail 
• Stage 2 - (P2) Seek Integrators and Hardware requirements 
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. 
SU and Stages 1-2 – PRINCE2 – High Level
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
SU and Stages 1-2 – PRINCE2 - Detail 
• Starting Up a Project: document and sign-off Project Brief and 
Approach - Use a hybrid of methodology using PRINCE2 and Agile 
• Initiating a Project: Usual IP activities and preparing Stage 2 , 
planning the project to engage both delivery approaches: Agile 
for the PoC and PRINCE2 for the main rollout and overall 
Organisation and governance mapping for Roles and 
Responsibilities 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. 
• Stage 2 
o Review current scope (2 years old at this point) 
o Define resource requirements (original Proof of Concept facilities no longer valid) 
o Define Approach for PoC delivery (AgilePM) for Stage 3 
o Plan Stage 3 - AgilePM Feasibility/Foundations and then move into first Development Phase 
(Exploration and Engineering Timeboxes)
Stage 3 – AgilePM managed Increment (P2 stage) HighLevel 
• Stage 3 – (APM) Define and Develop requirements for technical solution, 
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. 
deploy 1st and 2nd Pilots to check initial design
Stage 3 – AgilePM Development Phase 
• Use Feasibility/Foundations to define and prioritize the requirements to be delivered 
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. 
over how many increments. 
• Approach was to build the “Gold” application configuration requirements during the 
1st increment and deploy into the 1st Pilot 
• Feedback on the 1st Pilot (HeadOffice branch) was fed back to 2nd Timebox for further 
refinement 
• 2nd Pilot used for checking Telco configurations and hence full “Gold” function
• Agile: Refine Technical solution (Pilot feedback), 2nd Pilot 
• PRINCE2: Engage Integrator, Preparations for Hardware builds and 
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. 
configuration 
Stage 4 – Joint AgilePM and PRINCE2
Stage 4 - PRINCE2 managed stage – AgilePM Develop solution 
Agile: 
• Refine Technical solution for Gold using Pilot feedback (1st Pilot) 
• Commence development of configurations for Silver and Bronze 
• Deploy Silver and Bronze solutions and commence 2nd Pilot 
PRINCE2 
• Engage Integrator 
• Start planning the roll-out stages 6 and 7 with Integrator 
• Define and order hardware requirements 
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stage 5 - PRINCE2 managed stage – AgilePM - Develop solution 
• AgilePM - Refine Technical solution (Pilot feedback), 2nd Pilot 
• PRINCE2 - Plan National Roll-Out in detail 
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stage 5 - PRINCE2 managed stage – AgilePM Develop solution 
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. 
AgilePM 
• Timeboxes under this Development Increment used to 
• Refine Silver and Bronze applications 
• Develop other requirements (including any dropped from earlier Timeboxes) 
• Complete Pilot stage and sign-off developed solution now ready for 
Deployment and hand back to PRINCE2 
PRINCE2 
• Finalize plans for 1st Stage roll-out in Stage 6 
• Ensure resources in place and hardware (replacement network) preconfigured
Stages 6 and 7 - PRINCE2 managed stages: Main Project Roll-Out 
• Stage 6 – (P2) First group of Retail Banks for Live Upgrade 
• Stage 7 – (P2) Upgrade remaining 345 retail branches Nationwide 
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
Stages 6 and 7 - PRINCE2 managed stages: Main Project Roll-Out 
• Stage 6 - Upgrade the first 20 Branches spread nationally: 5 a night 4 
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
Stage 
6 
Controlling 
a Stage 
Controlling 
a Stage 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. 
nights 
• Stage 7 – On successful completion of Stage 6 and sign-off, follow rest of 
the Roll-out plan and upgrade the remaining 345 Nation-wide branches 
• Post Project – Agile to monitor the success of the Bandwidth Prioritization 
Post Project 
MP 
Work 
Package 
1 
Stage 
Boun 
dary 
MP 
Work 
Package 
1 
Closin 
g 
Project 
Stage 
7
Summary of Presentation 
• PRINCE2 and Atern AgilePM can be used to deliver projects of 
varying delivery requirements and needs 
• Most projects are probably in reality managed this way 
• There are some direct correlations between the processes/ 
phases of both methodologies 
• Not necessary to marry these up directly, more important to 
know and understand how each can be best employed for 
each project 
• This project was in 2003 to show the two approaches being 
used together back then! 
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net 
Contact Details for Presenter 
Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office 
The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. 
Antony della Porta 
Telephone: +44 7533 240 675 
Email: acdp@d-p-c.net

Más contenido relacionado

La actualidad más candente

Prince2 Vs PMBOK
Prince2 Vs PMBOKPrince2 Vs PMBOK
Prince2 Vs PMBOKsundong
 
Novare Consulting PRINCE2 Agile Roadshow
Novare Consulting PRINCE2 Agile RoadshowNovare Consulting PRINCE2 Agile Roadshow
Novare Consulting PRINCE2 Agile RoadshowNovare Consulting
 
PRINCE2 Foundation Workshops -- Organization
PRINCE2 Foundation Workshops -- OrganizationPRINCE2 Foundation Workshops -- Organization
PRINCE2 Foundation Workshops -- OrganizationFrank Turley
 
PRINCE2 2017 - laster update of the most popular project management method
PRINCE2 2017 - laster update of the most popular project management methodPRINCE2 2017 - laster update of the most popular project management method
PRINCE2 2017 - laster update of the most popular project management methodBranislav Gablas PMP (5k)
 
An introduction to prince2
An introduction to prince2An introduction to prince2
An introduction to prince2Business Beam
 
Prince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison DemystifiedPrince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison DemystifiedCTE Solutions Inc.
 
PMBOK® Vs PRINCE2®
PMBOK®  Vs PRINCE2®PMBOK®  Vs PRINCE2®
PMBOK® Vs PRINCE2®Rajiv Sharma
 
A simple PRINCE2 glossary
A simple PRINCE2 glossaryA simple PRINCE2 glossary
A simple PRINCE2 glossaryFrank Turley
 
Prince2 quick guide
Prince2 quick guidePrince2 quick guide
Prince2 quick guideMaven
 
Between Scrum and Kanban - define test process for Agile methodologies
Between Scrum and Kanban - define test process for Agile methodologiesBetween Scrum and Kanban - define test process for Agile methodologies
Between Scrum and Kanban - define test process for Agile methodologiessuwalki24.pl
 
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)projectingIT
 
Prince2 for Value Driven Project Management
Prince2 for Value Driven Project ManagementPrince2 for Value Driven Project Management
Prince2 for Value Driven Project ManagementEdureka!
 
PRINCE2 and Agile Project Management - ProjectingIT APMG ATO
PRINCE2 and Agile Project Management - ProjectingIT APMG ATOPRINCE2 and Agile Project Management - ProjectingIT APMG ATO
PRINCE2 and Agile Project Management - ProjectingIT APMG ATOprojectingIT
 
Learn the PRINCE2 Principles ebook
Learn the PRINCE2 Principles ebookLearn the PRINCE2 Principles ebook
Learn the PRINCE2 Principles ebookKnowledge Train
 

La actualidad más candente (20)

Prince2
Prince2Prince2
Prince2
 
Prince2 Vs PMBOK
Prince2 Vs PMBOKPrince2 Vs PMBOK
Prince2 Vs PMBOK
 
Novare Consulting PRINCE2 Agile Roadshow
Novare Consulting PRINCE2 Agile RoadshowNovare Consulting PRINCE2 Agile Roadshow
Novare Consulting PRINCE2 Agile Roadshow
 
Prince2 Methodology
Prince2 MethodologyPrince2 Methodology
Prince2 Methodology
 
PRINCE2 Foundation Workshops -- Organization
PRINCE2 Foundation Workshops -- OrganizationPRINCE2 Foundation Workshops -- Organization
PRINCE2 Foundation Workshops -- Organization
 
PRINCE2 2017 - laster update of the most popular project management method
PRINCE2 2017 - laster update of the most popular project management methodPRINCE2 2017 - laster update of the most popular project management method
PRINCE2 2017 - laster update of the most popular project management method
 
An introduction to prince2
An introduction to prince2An introduction to prince2
An introduction to prince2
 
Prince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison DemystifiedPrince2 & PMBOK Comparison Demystified
Prince2 & PMBOK Comparison Demystified
 
PMBOK® Vs PRINCE2®
PMBOK®  Vs PRINCE2®PMBOK®  Vs PRINCE2®
PMBOK® Vs PRINCE2®
 
A simple PRINCE2 glossary
A simple PRINCE2 glossaryA simple PRINCE2 glossary
A simple PRINCE2 glossary
 
Agile Methodologies
Agile MethodologiesAgile Methodologies
Agile Methodologies
 
Prince2 quick guide
Prince2 quick guidePrince2 quick guide
Prince2 quick guide
 
Between Scrum and Kanban - define test process for Agile methodologies
Between Scrum and Kanban - define test process for Agile methodologiesBetween Scrum and Kanban - define test process for Agile methodologies
Between Scrum and Kanban - define test process for Agile methodologies
 
Agile, PMI and PMBOK
Agile, PMI and PMBOKAgile, PMI and PMBOK
Agile, PMI and PMBOK
 
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)
Webinar on PRINCE2 + Agile - by Ashish Dhoke (projectingIT)
 
Prince2 2005 Vs Prince2 2009
Prince2 2005 Vs Prince2 2009Prince2 2005 Vs Prince2 2009
Prince2 2005 Vs Prince2 2009
 
Prince2 for Value Driven Project Management
Prince2 for Value Driven Project ManagementPrince2 for Value Driven Project Management
Prince2 for Value Driven Project Management
 
PRINCE2 Executive Briefing
PRINCE2 Executive BriefingPRINCE2 Executive Briefing
PRINCE2 Executive Briefing
 
PRINCE2 and Agile Project Management - ProjectingIT APMG ATO
PRINCE2 and Agile Project Management - ProjectingIT APMG ATOPRINCE2 and Agile Project Management - ProjectingIT APMG ATO
PRINCE2 and Agile Project Management - ProjectingIT APMG ATO
 
Learn the PRINCE2 Principles ebook
Learn the PRINCE2 Principles ebookLearn the PRINCE2 Principles ebook
Learn the PRINCE2 Principles ebook
 

Similar a How "AgilePM" and PRINCE2 were used in the same project

PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...
PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...
PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...PECB
 
Instruments & control System Engineer
Instruments & control System EngineerInstruments & control System Engineer
Instruments & control System EngineerPrabu Singarayar
 
Atul_Oracle Functional Distribution and WMS Consultant
Atul_Oracle Functional Distribution and WMS ConsultantAtul_Oracle Functional Distribution and WMS Consultant
Atul_Oracle Functional Distribution and WMS ConsultantAtul Kumar
 
Somdipa1 _Wipro Technologies
Somdipa1 _Wipro TechnologiesSomdipa1 _Wipro Technologies
Somdipa1 _Wipro Technologiessomdipa majumdar
 
Munish_Updated Resume
Munish_Updated ResumeMunish_Updated Resume
Munish_Updated Resumemunish raj
 
Lietuvos paštas. Agile PMO generic
Lietuvos paštas. Agile PMO genericLietuvos paštas. Agile PMO generic
Lietuvos paštas. Agile PMO genericAgile Lietuva
 
FInal_CV_08_4_2016
FInal_CV_08_4_2016FInal_CV_08_4_2016
FInal_CV_08_4_2016PANKAJ PAL
 
NRB MAINFRAME DAY 06 - Linda De Bruyn - A realistic and pragmatic approach to...
NRB MAINFRAME DAY 06 - Linda De Bruyn - A realistic and pragmatic approach to...NRB MAINFRAME DAY 06 - Linda De Bruyn - A realistic and pragmatic approach to...
NRB MAINFRAME DAY 06 - Linda De Bruyn - A realistic and pragmatic approach to...NRB
 
Removing Crucial Dependencies to Enable KPN as a Virtual Telecom Provider
Removing Crucial Dependencies to Enable KPN as a Virtual Telecom ProviderRemoving Crucial Dependencies to Enable KPN as a Virtual Telecom Provider
Removing Crucial Dependencies to Enable KPN as a Virtual Telecom ProviderCA Technologies
 
OpenERP - Project Methodology
OpenERP - Project MethodologyOpenERP - Project Methodology
OpenERP - Project MethodologyQuang Ngoc
 

Similar a How "AgilePM" and PRINCE2 were used in the same project (20)

PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...
PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...
PECB Webinar: Aligning a PRINCE2 Project with TOGAF ADM While Complying with ...
 
Instruments & control System Engineer
Instruments & control System EngineerInstruments & control System Engineer
Instruments & control System Engineer
 
C. Bright Singh
C. Bright SinghC. Bright Singh
C. Bright Singh
 
Resume-Prashanth
Resume-PrashanthResume-Prashanth
Resume-Prashanth
 
Resume of Kalaiyappan Thannirmalai
Resume of Kalaiyappan ThannirmalaiResume of Kalaiyappan Thannirmalai
Resume of Kalaiyappan Thannirmalai
 
Vinay Resume
Vinay ResumeVinay Resume
Vinay Resume
 
Atul_Oracle Functional Distribution and WMS Consultant
Atul_Oracle Functional Distribution and WMS ConsultantAtul_Oracle Functional Distribution and WMS Consultant
Atul_Oracle Functional Distribution and WMS Consultant
 
Somdipa1 _Wipro Technologies
Somdipa1 _Wipro TechnologiesSomdipa1 _Wipro Technologies
Somdipa1 _Wipro Technologies
 
Munish_Updated Resume
Munish_Updated ResumeMunish_Updated Resume
Munish_Updated Resume
 
Lietuvos paštas. Agile PMO generic
Lietuvos paštas. Agile PMO genericLietuvos paštas. Agile PMO generic
Lietuvos paštas. Agile PMO generic
 
FInal_CV_08_4_2016
FInal_CV_08_4_2016FInal_CV_08_4_2016
FInal_CV_08_4_2016
 
NRB MAINFRAME DAY 06 - Linda De Bruyn - A realistic and pragmatic approach to...
NRB MAINFRAME DAY 06 - Linda De Bruyn - A realistic and pragmatic approach to...NRB MAINFRAME DAY 06 - Linda De Bruyn - A realistic and pragmatic approach to...
NRB MAINFRAME DAY 06 - Linda De Bruyn - A realistic and pragmatic approach to...
 
Resume_SAP_ABAP_Certified
Resume_SAP_ABAP_CertifiedResume_SAP_ABAP_Certified
Resume_SAP_ABAP_Certified
 
Mrunal--CV Latest
Mrunal--CV LatestMrunal--CV Latest
Mrunal--CV Latest
 
Removing Crucial Dependencies to Enable KPN as a Virtual Telecom Provider
Removing Crucial Dependencies to Enable KPN as a Virtual Telecom ProviderRemoving Crucial Dependencies to Enable KPN as a Virtual Telecom Provider
Removing Crucial Dependencies to Enable KPN as a Virtual Telecom Provider
 
Saichander resume
Saichander resumeSaichander resume
Saichander resume
 
Resume
ResumeResume
Resume
 
OpenERP - Project Methodology
OpenERP - Project MethodologyOpenERP - Project Methodology
OpenERP - Project Methodology
 
Resume-Aero
Resume-AeroResume-Aero
Resume-Aero
 
CV Giovanni FRISO-Nov2015
CV Giovanni FRISO-Nov2015CV Giovanni FRISO-Nov2015
CV Giovanni FRISO-Nov2015
 

Último

Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalWilliam (Bill) H. Bender, FCSI
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field ArtilleryKennethSwanberg
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxAaron Stannard
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxssuserf63bd7
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamraAllTops
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownSandaliGurusinghe2
 
Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Ram V Chary
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdfAlejandromexEspino
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdfArtiSrivastava23
 
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in DelhiIndependent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhiguptaswati8536
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentNimot Muili
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysistanmayarora45
 

Último (17)

Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...Leaders enhance communication by actively listening, providing constructive f...
Leaders enhance communication by actively listening, providing constructive f...
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in DelhiIndependent Escorts Vikaspuri  / 9899900591 High Profile Escort Service in Delhi
Independent Escorts Vikaspuri / 9899900591 High Profile Escort Service in Delhi
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysis
 

How "AgilePM" and PRINCE2 were used in the same project

  • 1. m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Project Challenge 2013 Presentation by Antony Della Porta Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 2. m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Case Study on Using AgilePM in a PRINCE2 Project This presentation will be taking a look at a project where “Agile Project Management” and PRINCE2 methods of project delivery were successfully employed together. The project was to delivery a new bandwidth usage protocol, Quality of Service (QoS), configuration onto a Bank’s National Network, to enable Application bandwidth prioritization for the new Java-based applications project for the Retail Bank Division Teller System Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. The purpose of this Presentation Agile Project Management and PRINCE2® In Projects
  • 3. m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Presenter Antony C. Della Porta • Antony has over 25 years experience of working in project delivery, rescue and consultancy roles • Major verticals such as Finance, Travel, Media and Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. Pharmaceuticals. • Established trainer in delivering courses in Project Management methodologies, and courses relevant to the delivery and realisation of business strategy. • Started using PRINCE2®, in earnest, over 14 years ago, along with Agile Project management • Fairly unique in having successfully managed and implemented a number of PRINCE2® -AgilePM projects prior to quite recently becoming a trainer. • APMG accredited and member of Institute of Consultants
  • 4. m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Introduction to Relationship between PRINCE2 and AgilePM methodologies • The following slide will show a graphic view of the correlation of processes in PRINCE2 and the Phases employed by Atern Agile Project Management • AgilePM established with PRINCE2 • Correlation of the Processes/Stages to Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. Phases/Increments • Relationship of plans and lifecycles Agile Project Management and PRINCE2® In Projects
  • 5. Process Overview of PRINCE2 and AgilePM m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. Key: AgilePM; PRINCE2®
  • 6. m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. The Project - St. George Bank Network Upgrade • Part of bank teller system replacement programme to employ Java based applications • Network to introduce QoS (Quality of Service) banding – Gold for high demand applications (40% b/w) – Silver for general demand applications (next 30%) – Bronze – backoffice applications (20% b/w) • QoS was a new concept indicating that the required solution to Prioritize traffic would have to evolve • Scope was two years old so requirements would have to be reviewed as well as equipment • Proof of Concept (PoC)facilities no longer available from the incoming Telco (Optus) so alternative had to be sourced • PoC was allocated one (1) month to complete defining, testing and piloting the Gold, Silver and Bronze (as Coulds). • Estimates for Effort would be broad as new functionality, and no known active solution for this type of network
  • 7. • Initial Project Start Up employing PRINCE2® as the primary methodology • Stage 1- (P2) Initiating a Project used to setup and review Project in detail • Stage 2 - (P2) Redefine current scope, Tenders for Integrators, Pre Project phase for Stage 3 • Stage 3 – (APM) Define and Develop requirements for technical solution, deploy 1st Pilot • Stage 4 – (APM-P2) Refine Technical solution (Pilot feedback), 1st Pilot - Engage Integrator • Stage 5 – (APM-P2) Refine Technical solution (Pilot feedback), 2nd Pilot - Plan National Roll-Out • Stage 6 – (P2) First group of Retail Banks for Live Upgrade • Stage 7 – (P2) Upgrade remaining 345 retail branches Nationwide m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. The Project Plan -
  • 8. • Initial Project Start Up employing PRINCE2® as the primary methodology • Stage 1- (P2) Initiating a Project used to setup and review Project in detail • Stage 2 - (P2) Seek Integrators and Hardware requirements m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. SU and Stages 1-2 – PRINCE2 – High Level
  • 9. m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net SU and Stages 1-2 – PRINCE2 - Detail • Starting Up a Project: document and sign-off Project Brief and Approach - Use a hybrid of methodology using PRINCE2 and Agile • Initiating a Project: Usual IP activities and preparing Stage 2 , planning the project to engage both delivery approaches: Agile for the PoC and PRINCE2 for the main rollout and overall Organisation and governance mapping for Roles and Responsibilities Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. • Stage 2 o Review current scope (2 years old at this point) o Define resource requirements (original Proof of Concept facilities no longer valid) o Define Approach for PoC delivery (AgilePM) for Stage 3 o Plan Stage 3 - AgilePM Feasibility/Foundations and then move into first Development Phase (Exploration and Engineering Timeboxes)
  • 10. Stage 3 – AgilePM managed Increment (P2 stage) HighLevel • Stage 3 – (APM) Define and Develop requirements for technical solution, m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. deploy 1st and 2nd Pilots to check initial design
  • 11. Stage 3 – AgilePM Development Phase • Use Feasibility/Foundations to define and prioritize the requirements to be delivered m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. over how many increments. • Approach was to build the “Gold” application configuration requirements during the 1st increment and deploy into the 1st Pilot • Feedback on the 1st Pilot (HeadOffice branch) was fed back to 2nd Timebox for further refinement • 2nd Pilot used for checking Telco configurations and hence full “Gold” function
  • 12. • Agile: Refine Technical solution (Pilot feedback), 2nd Pilot • PRINCE2: Engage Integrator, Preparations for Hardware builds and m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. configuration Stage 4 – Joint AgilePM and PRINCE2
  • 13. Stage 4 - PRINCE2 managed stage – AgilePM Develop solution Agile: • Refine Technical solution for Gold using Pilot feedback (1st Pilot) • Commence development of configurations for Silver and Bronze • Deploy Silver and Bronze solutions and commence 2nd Pilot PRINCE2 • Engage Integrator • Start planning the roll-out stages 6 and 7 with Integrator • Define and order hardware requirements m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 14. Stage 5 - PRINCE2 managed stage – AgilePM - Develop solution • AgilePM - Refine Technical solution (Pilot feedback), 2nd Pilot • PRINCE2 - Plan National Roll-Out in detail m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 15. Stage 5 - PRINCE2 managed stage – AgilePM Develop solution m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. AgilePM • Timeboxes under this Development Increment used to • Refine Silver and Bronze applications • Develop other requirements (including any dropped from earlier Timeboxes) • Complete Pilot stage and sign-off developed solution now ready for Deployment and hand back to PRINCE2 PRINCE2 • Finalize plans for 1st Stage roll-out in Stage 6 • Ensure resources in place and hardware (replacement network) preconfigured
  • 16. Stages 6 and 7 - PRINCE2 managed stages: Main Project Roll-Out • Stage 6 – (P2) First group of Retail Banks for Live Upgrade • Stage 7 – (P2) Upgrade remaining 345 retail branches Nationwide m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 17. Stages 6 and 7 - PRINCE2 managed stages: Main Project Roll-Out • Stage 6 - Upgrade the first 20 Branches spread nationally: 5 a night 4 m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Stage 6 Controlling a Stage Controlling a Stage Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. nights • Stage 7 – On successful completion of Stage 6 and sign-off, follow rest of the Roll-out plan and upgrade the remaining 345 Nation-wide branches • Post Project – Agile to monitor the success of the Bandwidth Prioritization Post Project MP Work Package 1 Stage Boun dary MP Work Package 1 Closin g Project Stage 7
  • 18. Summary of Presentation • PRINCE2 and Atern AgilePM can be used to deliver projects of varying delivery requirements and needs • Most projects are probably in reality managed this way • There are some direct correlations between the processes/ phases of both methodologies • Not necessary to marry these up directly, more important to know and understand how each can be best employed for each project • This project was in 2003 to show the two approaches being used together back then! m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd.
  • 19. m: 44 7533 240 675; e: acdp@d-p-c.net; w: www.d-p-c.net Contact Details for Presenter Copyright © 2013 della porta consulting Ltd. All Rights Reserved. PRINCE2® ® is a Registered Trade Mark of the Cabinet Office The APMG Swirl Agile Project Management Device is a Trade Mark of APM Group Ltd. Antony della Porta Telephone: +44 7533 240 675 Email: acdp@d-p-c.net