Shared services –
Case studies 2011
Contents:
03   Creating a Sustainable Learning Community for Buckinghamshire
     Led by Aylesbury College

09   Services in Sussex Colleges (SiSC)
     Led by Central Sussex College

15   Synergy Project
     Led by Easton College

21   Sharing Student Services in the South
     Led by Nescot College

27   Solent Colleges Innovation Partnership (SCIP)
     Led by Portsmouth College

33   Stockport Work Based Learning
     Led by Stockport College

39   North East Shared Services Project (NESSP)
     Led by City of Sunderland College

45   Joining up Services for Cheshire and Warrington Colleges
     Led by West Cheshire College
Creating a Sustainable
Learning Community
for Buckinghamshire




The Partners


The project is seeking to build on a substantial
history of collaboration between the two institutions.
Stretching back approximately 10 years this
partnership has evolved as both organisations have
increasingly placed collaborative working at the heart
of their approaches. Over a 12 month period the project
has sought to explore the options for the development
of an innovative partnership between both institutions.
Areas of Focus
    ...have a shared                          The project has focused on developing a federation to:

    educational ethos and                   • Develop progression routes through a skills escalator
                                              for Buckinghamshire;
    are looking to drive                    • Take forward Construction and IT curriculum to pilot
    institutions in similar                   the joint marketing and delivery of Further and Higher
                                              Education. Apprenticeships and the development of a
    directions...                             University Technical College are central to this activity.
                                              The use of Technology blended within the learning
                                              process and the exploration of different flexible ways
                                              of delivering learning also form an important component
                                              of this activity.

                                              Associated back office functions are also being explored
                                              for sharing potential as part of this process.

                                              Rationale
                                              The project is a product of the evolving relationship
                                              between the institutions with both partners “working
                                              closely on identifying where the opportunities for greater
                                              collaboration are and what is the best way of enabling them
                                              to happen”. Central to these discussions has been ability
                                              of the partnership to grow to meet the ongoing needs
                                              of students’, employers and the communities they serve.
                                              Within this context partners identified a number of actual
                                              and anticipated external drivers that have influenced the
                                              direction of travel, including:
                                            • The need for flexible and responsive models of provision
                                              to respond to changing study patterns and differing
                                              models for financing provision in the future;
                                            • Increasing fee income through workplace learning and
                                              the roll out of higher level apprenticeships.


                                                 prime driver is not to save money
                                                 but how can we improve the
                                                 student offer




4   | Shared services – Case studies 2011
The vision is for ‘cradle                 Objectives
   to grave’ learning in an                  In submitting their bid to the FE
                                             Efficiency Innovation Fund partners
   inclusive community                       outline the following objectives for
                                             the project:
   with a desire to
                                           • Explore the potential for developing
   provide a wide range                      new models of delivery for Further
   of facilities for people                  and Higher Education;

   to learn, develop,                      • Break down the traditional barriers
                                             between FE and HE;
   share, create, socialise,               • Encourage progression into HE, both
   innovate, nurture and                     for young people already in full time
   much more                                 education, and for older learners
                                             including those already in employment;
                                           • Look at how far a joined up approach
                                             to marketing and delivery of FE and HE
Vision                                       can raise aspirations and encourage and
Both partners aim to create a joint          enable employers to develop the skills
sustainable learning campus for              of their workforce up to and (where
Buckinghamshire, developing a skills         appropriate) beyond level 3;
escalator concept for the seamless
                                           • Utilise technology to find new solutions
delivery of curriculum from levels
                                             for easy ways to learn at times to suit
of one to eight in a range of technical,
                                             the individual.
practical and academic subjects




                                                                    Shared services – Case studies 2011 |   5
Activities                                 Shared Services Model
                        Participation has been at the heart of     Federation
                        the project development process with
                        collaborative exploration and planning     Savings
                        sessions held at key stages throughout.
                        Partners have also explored developing     This project is focused on growth and
                        best practice through shared delivery      increasing revenue streams for both
                        and have explored a number of potential    organisations. Both institutions’ remain
                        models for sharing services. Having the    in discussions regarding the future of
                        capacity and finding the time and space    shared services with a recent successful
                        to explore and develop the project has     bid for the establishment of a University
                        been central to the process. Partners      Technical College (UTC) a central part of
                        particularly value the role played here    their plans. Initial projections suggest that
                        by the FE Efficiency Innovation Fund       if successful, the net increase in annual
                        which “enabled them to take the time and   revenue will be £70,000 in 2014/15 rising
                        space they needed to understand what       to £1.16 million in 2019/20.
                        shared services could be”.                 To date the collaboration has already
                                                                   resulted in some efficiency savings
                                                                   through the joint employment of New
                                                                   Buckinghamshire University’s Human
                                                                   Resources Director being seconded to
                                                                   the Aylesbury College for 1 day a week
                                                                   and £25,000 saved by joint marketing
                                                                   activity in 2009/10. With increased
                                                                   collaboration, savings such as these
                                                                   are likely to increase.




                            vital by enabling us
                            to take a step back
                            from our day to day
                            pressures




6   | Shared services – Case studies 2011
many of the challenges                Enablers
  lie ahead as we move                  Key factors in the project’s development
                                        have been:
  from visioning and                  • FE Efficiency Innovation Grant Fund
  strategic level activity              – this has provided the additional
                                        resources and capacity to enable
  towards practicalities                staff to have the time and space to
  and implementation                    really explore and understand shared
                                        services and what they should look
                                        like and achieve for the partnership;
                                      • Effective, timely and inclusive
Outcomes and the Future
                                        communication – a participative
Partners are committed to the           approach to developing the project
development of the Federation           through joint facilitated workshops,
and are currently in the process        open discussion and debate;
of developing and finalising their
business plan for shared services     • Strategic Commitment – leaders
with the successful UTC bid playing     in both institutions are committed
an important role in this. Partners     to growing their organisations in
discovered the positive outcome         collaboration and have driven the
of this bid on 10 October 2011          project in a “coherent and structured way”;
with implementation on joint          • Consensus and Trust – as a result
curriculum and student pathways         of the long term relationship between
to commence immediately.                partners there is a strong culture of
                                        trust and a consensus in terms of the
                                        direction of travel for the institutions
                                        both individually and collectively.


                                           unless you get very
                                           clear and complete
                                           agreement from the top
                                           on day 1 you haven’t
                                           got much chance...we
                                           had that




                                                               Shared services – Case studies 2011 |   7
Critical Factors
                         Factor             Barrier           Solution                                                          Importance

                         Culture &          Organisational    As partners move towards the practicalities of shared             Medium/
                         Climate            Cultures          services, bringing together the different cultures of an HE       High
                                                              and an FE organisation is seen as a potential challenge.
                                                              Open communication is seen as the way in which this
                                                              can be addressed.

                         Process            Time              Developing shared services requires considerable time             Low/
                                            commitments       commitments. The FE Efficiency and Innovation Fund support        Medium
                                                              was identified as integral to supporting and maintaining
                                                              partner involvement in this process.

                                            Staff technical   Some staff had to improve their competence to embrace             Medium
                                            capabilities      technological solutions through dedicated training.

                         Externalities      Systems           Partners anticipate this being a potential barrier as they move   Medium
                                            compatibility     towards implementation.




                        Summary
                        This project highlights the importance
                        of investing time in building relationships
                        and establishing trust between
                        institutions with differing cultures.
                        The project has evolved as part of a
                        long term process of collaboration by
                        the two organisations involved. While
                        this process began long before the                                  funding has acted
                        Innovation Fund, partners suggest
                        that the additional capacity provided
                                                                                            as a catalyst that
                        has accelerated this process and added                              has enabled us to
                        considerable value to their approach.
                                                                                            explore and take
                        Based on a strategy of growth this project
                        is part of a wider collaborative agenda                             forward a number of
                        which incorporates the development
                        of a University Technical College for
                                                                                            medium and longer
                        Buckinghamshire.                                                    term ambitions for
                        Watch, on the AoC website aoc.co.uk                                 collaboration
                        Aylesbury College and Buckinghamshire
                        New University’s journey on working
                        together and the benefits the projects
                        has brought to apprentices.




8   | Shared services – Case studies 2011
Services in Sussex
Colleges (SiSC)




The Partners

The project is seeking to build on a substantial history
of collaboration between all of the Sussex based
colleges through FE Sussex. For the purposes of this
project two Surrey colleges have joined the consortia.
FE Sussex is a membership based organisation,
owned by Sussex colleges. It has a history of
facilitating collaborative working across Sussex
colleges in a diverse range of activities including
the development of shared procurement processes
strategy and the sharing of senior and specialist
Human Resources and Health & Safety roles.
Areas of Focus
 this project will                             The project is focused on the following areas:

 position [the colleges]                     • Finance, including reporting, sales invoicing and
                                               accounts receivable, purchasing and payments and
 to select the best                            cash and banking; and

 shared services option                      • Human Resources (HR), including staff information,
                                               recruitment, training and development and payroll
 with partner colleges                         and benefits.

 whatever the financial                         Management Information Systems (MIS) were also
                                               considered as part of this project but it was decided that
 and organisational                            partners would not move forward with collaboration in
 demands of the future                         this area at present.

 may be                                        Rationale
                                               The project should be seen as a product of the evolving
                                               relationship between the majority of the institutions
                                               involved in the partnership. Within the current funding
                                               and economic environment FE Sussex partners were keen
                                               to explore further collaborative opportunities to improve
                                               the efficiency of back office operations. The ‘Case for
                                               Action’ outlines the project rationale as:
                                                  “responding to significant reductions in future
                                                   government funding, we are taking proactive steps to
                                                   explore the potential to improve service delivery through
                                                   the adoption of best practices and reduce costs by carrying
                                                   out back office transactional processing on a shared
                                                   service basis.”

                                                  Front line staff have developed
                                                  their understanding of their ‘back
                                                  office’ systems and processes
                                                  independently which has led to
                                                  great variation across the sector,
                                                  albeit within a range




10   | Shared services – Case studies 2011
we aim to produce a                           Activities
   payback on investment                         The project has been designed as a
                                                 two phase process. To date phase one
   that justifies a                               has been completed with activities
                                                 undertaken including:
   continued commitment
                                               • Collaborative development of a ‘Case
   to the project and we                         for Action’;
   aim to produce overall                      • An exploration of existing shared service
   annual efficiency                              practice beyond FE;

   savings                                     • Strand 1: Systems – defining the most
                                                 appropriate IT systems for each service
                                                 area, scoping process and resources
                                                 required for each college to change to
Vision                                           a common platform;
The project’s ‘Case for Action’ outlines       • Strand 2: Business models – consideration
the anticipated benefits to be to produce        and evaluation of potential business
a pay back on investment that justifies a        models to ensure that the model chosen
continued commitment to the project and          fulfils the governance and service
an overall annual efficiency saving.             delivery requirements of each partner.
                                                 This process also incorporated an
Objectives                                       exploration of implementation barriers;
Key project objectives can be summarised as:   • Development of an Outline Business Case.

   Exploring the potential
   to improve service
   delivery through
   adoption of best
   practices and reduce
   costs by carrying
   out transactional
   processing on a shared
   platform and service
   basis




                                                                       Shared services – Case studies 2011 |   11
Shared Services Model                                         a great deal of ground
                       The current proposed delivery model
                       is that of a not for profit company
                                                                                     work needs to be
                       limited by guarantee.                                         carried out at an early
                       Savings
                                                                                     stage in order to set
                       The outline business case outlines the
                                                                                     up shared back-office
                       following potential cost savings over three                   systems
                       years based on an eight College model:

                        Service Area Gross              Investment   Net
                                     savings            Required     Savings      Outcomes and the Future
                        Transactional        £986,655   £690,000     £296,655     Partners are committed to the
                        Finance                                                   development of the project and are
                                                                                  currently in the process of developing
                        Transactional        £577,488   £336,000     £241,488
                        HR & Payroll
                                                                                  and finalising their business plan
                                                                                  and detailed business case for shared
                                                                                  services. At present they are looking
                       It should be noted that the distribution                   to proceed with a phased approach of
                       of total net savings differs significantly                 implementation, which will involve:
                       between partners with the lowest return                  • Aligning IT systems;
                       for transactional finance estimated at
                       £9,505 over three years and the lowest                   • Aligning processes;
                       for transactional HR & Payroll only                      • Potential development of a shared
                       £4,627 over three years.                                   services centre.

                                                                                     everyone is at different
                                                                                     stages and converging
                                                                                     from different starting
                                                                                     points and this causes
                                                                                     difficulties for shared
                                                                                     services as we all need
                                                                                     to get to the same
                                                                                     starting point before
                                                                                     launching collaborative
                                                                                     approaches




12   | Shared services – Case studies 2011
Enablers                                   funding was a great
  Key factors in the project’s
  development have been:
                                             opportunity to develop
• Additionality of FE Efficiency
                                             shared services,
  Innovation Fund - it has provided          address key challenges
  additional resources and capacity
  to enable partners to build on their       and reduce costs
  existing collaborative activity and
  take this forward to drive efficiencies
  in key back office functions;              unless you get very
• History of collaboration – as a            clear and complete
  result of the long term relationship
  between partners there is a strong         agreement from the top
  culture of trust and a degree of
  consensus in terms of the direction
                                             on day one you haven’t
  of travel for the institutions involved;   got much chance...
• Existing collaborative infrastructure      we had that
  – the established structure of FE Sussex
  provided an existing collaborative
  organisation with a track record of
  collectively working with and on
  behalf of partner colleges.




                                                         Shared services – Case studies 2011 |   13
Critical Factors
                        Factor               Barrier          Solution                                                       Importance

                        Culture &            Organisational   Establish pilot and working groups well in advance to enable   Medium/
                        Climate              Cultures         cultural embedding of cooperation.                             High

                        Process              Timescales       Developing shared services is complex and requires             High
                                                              considerable time commitments. Incorporating college
                                                              decision making processes within planned timescales is
                                                              challenging and needs to be considered at the outset.
                                                              Funding timescales may require compromises to be made.

                                             Communication    A communication strategy is essential to ensure all leaders    Medium/
                                                              and governing bodies are fully aware of direction of           High
                                                              travel and that communication is effective both across the
                                                              partnership and within the partner organisations themselves.

                        Externalities        ICT Costs        ICT systems require significant upfront investment by          Medium/
                                                              partners.                                                      High



                       Summary
                       This project highlights the importance
                       of lead times in building relationships
                       and trust. The presence of an existing
                       collaborative infrastructure is an
                       important driver in the strength of
                                                                                          while developing
                       this project which should be seen as                               shared services may
                       having evolved as part of this long
                       term process of collaboration. While
                                                                                          seem straight forward
                       this process and an awareness or desire                            at a superficial level
                       to explore shared services was present
                       before the Innovation Fund intervention,                           it is actually very
                       partners suggest that the additional                               complex
                       capacity provided has accelerated this
                       process and added considerable value
                       to their approach.




14   | Shared services – Case studies 2011
Synergy Project




The Partners
Areas of Focus
 Our work with the                             The project had four initial areas of focus:

 Synergy project has                         • Finance;
                                             • Management Information Systems;
 built a very strong                         • Information Technology;
 partnership between                         • Human Resources.
 the two colleges                              To these were added secondary workstreams of
                                               Work Based Learning and Marketing & Quality.

                                               Rationale
                                               Three years ago, Otley College, in Suffolk, commissioned
                                               external consultants to undertake a review of the College
                                               and look for potential partners as part of a growth
                                               strategy. The College has a land-based specialism.
                                               It was looking to get “match fit”, with a labour market
                                               focus on rural employment, and to “grow our sector”.
                                               Through this process, Easton College, another land-based
                                               college based in Norfolk, was identified as a potential
                                               partner. Both Colleges are a similar size, and are the last
                                               specialist colleges of this kind in the locality, with others
                                               now amalgamated with other FE providers. Although the
                                               campuses are 44 miles apart, both Colleges have a history
                                               of being very competitive with each other. The rationale
                                               for collaboration is primarily sectoral, as both colleges
                                               target rural areas.




16   | Shared services – Case studies 2011
Vision                                          Objectives
   The project aimed to:                           The project sought to achieve three
                                                   deliverables:
• Strengthen landbased provision to meet
   the needs of learners and industry;          • Shared Management Information
                                                   providing timely information on
• Increase efficiency generating significant
                                                   learners, human and physical resources
   savings for reinvestment;
                                                   and streaming benchmark information
• Promote best practice at both colleges           between the colleges. It was also intended
   though undertaking a full review of their       that this could provide a platform for
   systems, processes and procedures; and          other colleges to join;
• Expand the range of teaching materials        • A unified web based Sharepoint interface
   available in each college through sharing.      for information gathering, sharing and
                                                   improvement; and
                                                • The creation of an e-library of process
                                                   and system documentation that spans
                                                   the two colleges building best practice.
                                                   These processes are intended to be
                                                   developed to provide core unified
                                                   systems for key shared service areas,
                                                   and again have the potential to become
                                                   a platform for other colleges.




                                                                        Shared services – Case studies 2011 |   17
Initial Joint
                    Project                                  Working    Implementa-     Workstream       Merger
                                             post/project
                  Development                                Groups    tion Planning    Development      proposal
                                              manager




                       Activities                                         Savings
                       The initial process was driven by the              The initial gross payroll and oncost
                       creation of a shared post, which was               savings for the first 12 months are
                       filled by a member of Easton’s senior              c.£250,000. This is expected to increase
                       management. Implementation of                      annually as the project progresses.
                       specific activities was driven by joint            There are, however, additional one
                       working groups of practitioners within             off capital set up costs of c.£340,000
                       the colleges who have driven thematic              to be incurred to full implementation,
                       aspects of the project.                            including upgrading and future
                       The development of these close working             proofing software and IT infrastructure.
                       relationships, and a communications
                       strategy with college staff, has helped               The Synergy project
                       to enable project implementation. This
                       has been further developed by bringing                funding has enabled
                       the governors together in joint meetings
                       to be informed of progress and provide
                                                                             us to develop detailed
                       strategic direction.                                  shared services leading
                                                                             to effective joint
                       Model
                       The model has developed over the project
                                                                             understanding and
                       process from joint service delivery to a              savings in the first
                       full merger proposal, while maintaining
                       separate college branding.
                                                                             year




18   | Shared services – Case studies 2011
Aligning cultures will                    Enablers
     be a long path which                      Key factors in the project’s development
                                               have been:
     has its own challenges                  • Joint Posts – The early establishment
     and rewards                               of joint posts, drawn from each of the
                                               colleges, to drive and lead aspects of the
                                               shared services;
  Outcomes and the Future                    • Joint team working – across the colleges
                                               in each of the functional areas, in order to
  The Colleges now have five shared            acclimatise staff with working with each
  posts, comprising:                           other and sharing best practice; and
• Vice Principal Finance & Resources
                                             • Active strategic leadership – Joint
  (who is the project lead);                   Steering group consisting of Governors
• Assistant Principal Planning,                established at an early stage.
  Funding and Efficiency;
                                               In addition, the project has learned from
• Director of Human Resources;                 good practice elsewhere, for example
• Director of Enterprise and                   with senior leaders from each college
  Marketing; and                               visiting Cornwall College, to look at its
                                               management and group structure, which
• Work Based Learning Contracts Manager.       has separately branded colleges within a
                                               collective entity.
     Biggest outcome is
     trust and vision
  The sharing structure is that the staff
  remain employed by an individual
  college but are seconded to the other
  college for part of their time. This
  currently has VAT implications.
  Work is continuing on the alignment of
  processes, for example in the adaptation
  of IT and HR approaches, utilising good
  practice from each of the two colleges.
  The Shared Services resources have
  been used to develop projects to bring
  the Colleges closer together. They have
  now agreed to work towards a Type ‘A’
  merger proposal.




                                                                     Shared services – Case studies 2011 |   19
Critical Factors
                        Factor               Barrier            Solution                                                          Importance

                        Leadership &         Existing           Creation of joint posts, mainly drawn from existing staff, and    High
                        Governance           perception of      encouraging practice sharing using best from each college.
                                             competition        In addition, there has been close working between the senior
                                                                leadership teams and governors of each college, enabled
                                                                through regular joint meetings and working groups.

                        Culture &            Concerns over      Joint working across teams within colleges was at the centre      High
                        Climate              budget cuts and    of the approach, encouraging transparent communication
                                             future of jobs     and involvement in re-engineering processes, which helped
                                                                to establish trust across the two colleges and with senior
                                                                management. All college staff were actively encouraged to
                                                                visit counterpart and share best practice extending benefits
                                                                beyond the Synergy Project workstreams. Project focus on
                                                                growth and excellence rather than staffing cuts.

                        Process              Time               Staff commitment and future project design/resource               High
                                             commitments        implications were addressed by segmenting issues rather than
                                                                addressing all at once.
                                                                Utilising external consultant’s expertise (although there is
                                                                recognition of ownership issues around this). The colleges will
                                                                also backfill staff to help with the day job moving forward.

                        Externalities        IT compatibility   Significant effort has gone into examination of this aspect       High
                                                                through a joint working group and commissioning external
                                                                advice on systems development. These one-off costs, including
                                                                costs of future proofing and enabling other partners to join in
                                                                the future, have been incorporated into the planning process.

                                             VAT                The VAT costs have been accepted and are factored into overall    Medium
                                             implications       savings calculations, although they will not have an impact on
                                                                the colleges after merger. However, VAT is likely to remain an
                                                                issue for future shared services partners.




                       Summary
                       While this project is an exception in that                         in the context of understanding the changes
                       it is leading to a proposal for college                            in the FE market, and strengthening their
                       merger, it highlights the importance                               specialism as rural providers.
                       of lead times in building relationships
                       and trust. The process of co-operation                                With hindsight I realise
                       was developing prior to the Innovation
                       Fund intervention, although the partners                              we needed far more
                       acknowledge that the process would
                       have been much longer without this
                                                                                             resources than we had
                       support. Merger is now seen as the                                    available resulting in
                       logical conclusion of this process
                                                                                             long hours for the staff
                       While the focus has been on shared
                       resources, the colleges involved have also                            involved (although they
                       developed from having a perception of                                 have continued to be
                       each other as competitors to now looking
                       at the joint market they are addressing in                            enthusiastic)
                       rural East Anglia. This decision was taken

20   | Shared services – Case studies 2011
Sharing Student
Services in the South




The Partners
Areas of Focus
 In order to realise                           The project reviewed the feasibility of providing shared
                                               services using a customer contact centre model for the
 the full efficiencies                          delivery of student services between three colleges in
                                               South-East London and Surrey. This aimed to create an
 and improvements                              integrated customer pre-entry experience for potential
 in quality standards,                         learners at the three partner colleges, focusing on the
                                               customer journey from enquiry and the provision of
 standardised processes                        information and advice support through to admission
                                               and enrolment. It therefore addressed:
 and systems were
                                             • The customer journey;
 required                                    • Information, Advice and Guidance and enrolment; and
                                             • Supporting systems.


                                               Rationale
                                               The project partners are two neighbouring colleges,
                                               in Greenwich and Bexley, and a third college in Surrey,
                                               NESCOT, as the project lead. An independent training
                                               provider, Mainport Training, was part of the initial bid,
                                               but dropped out at an early stage. In addition, there were
                                               two “observing” partners, NACRO and the University for
                                               the Creative Arts, who did not play a part in the project.
                                               Relations between the partners were assisted by the fact
                                               that the newly appointed principal of Greenwich has
                                               formerly been Vice-Principal of NESCOT. The Principal
                                               of Bexley was also relatively new to post.
                                               This project focused on whether front-office student
                                               related services could be shared and deliver both
                                               efficiency savings and service improvements.




22   | Shared services – Case studies 2011
Vision                                             Objective
 Potential learners, their parents, carers          The overall objective was to create a
 and advisors will experience a service             shared customer contact centre that
 that is customer focused, is efficient,            was web and mobile-enabled for IAG
 effective and that provides information            and admissions while ensuring students
 and advice that “gets it right the first           experienced a service that was branded
 time”, whether that is online, through a           for each individual college.
 telephone enquiry or face to face and the
 facility to enable on-line applications and
 enrolments. Also self service models of
 customer service will be developed.




                  MoU/
Scoping/        appointing       Initial Joint    Implementa-                         Business
                                                                   Reporting
Planning          project         Working        tion Planning                        Case
                 manager




 Activities
 The partners appointed an independent              This also required the alignment of
 project manager, who managed the                   information systems, with, for example,
 project using PRINCE2®. The agreement              two of the colleges using the same
 between the partners required Principal            back-office management information
 level participation at all meetings, in            system for student records including
 order to maintain ownership.                       applications; while the other college uses
 There were issues of alignment in                  a separate system. Advice was sought
 practice: one college made significant             on ways in which these could be made
 and increasing use of online applications          to work together, without excessive
 (44% of students apply online); another            investment in new systems.
 makes very limited use of online                   In addition, as a result of working
 processing which currently results in dual         together, two of the colleges now have a
 data entry; while the other does not have          shared Executive Finance Director post
 an online applications module, meaning             at senior management level which has
 that all applicant information is manually         resulted in significant cost savings.
 data processed by admissions staff.                The work to date has been focused on the
                                                    development of the business case to take
                                                    forward to implementation in Phase 2,
                                                    once resources have been sourced.




                                                                         Shared services – Case studies 2011 |   23
Model                                     Savings
                       Six delivery models were considered       The business case estimates that
                       in the business case:                     the preferred options could achieve
                                                                 operational savings of 31% over five
                   • Status quo;
                                                                 years and cash savings, after investment
                   • Sharing expertise between the college       costs, of 12-14% over a five year period
                       partners;                                 (c.£333,000).
                   • Development of a Virtual Customer           This is in addition to the existing savings on
                       Contact Centre;                           a shared post between two of the partners.
                   • Development of a Centralised Customer
                       Contact Centre;                              In-house delivery is
                   • Working with an external partner to            favoured on financial
                       establish a managed service Customer
                       Contact Centre; and
                                                                    and quality grounds
                   • Outsourcing the function to a specialist
                       supplier.

                       Each option was exposed to SWOT
                       analysis, appraised using financial and
                       non-financial criteria, and exposed to
                       a sensitivity analysis. Options 3 and 4
                       were preferred.




                           Governors keen to
                           work together with
                           joint development
                           sessions – they don’t
                           feel threatened




24   | Shared services – Case studies 2011
The key to success is                         Enablers
      trust and having the                        • Existing relationships and confidence
                                                    – between partners, which has been built
      same expectation of                           through work to develop and refine
      standards                                     the bid agreeing priorities and sharing
                                                    resources underpins the project.
                                                  • External project manager – was
                                                    appointed, working with the principals,
   Outcomes and the Future                          was also seen a key factor in project
   The business case provides a proposed            implementation.
   implementation plan for the preferred
                                                  • Using previous experience – the project
   options with a start date of November
                                                    also drew on the experience and advice
   2012 (i.e. applications for entry in
                                                    of the Kingston City Group, which was
   academic year 2013-2014).
                                                    established in 2005, and involves 14 higher
   However, there remain issues over the            education institutions in London and the
   availability or resources to achieve this,       South East area accessing shared internal
   and further work may be required to              audit services. The models developed by
   validate the achievability of this timeline.     the Group informed the development of
   The project has also identified                  the business case although it should be
   non-financial benefits, comprising:              noted that this structure does not provide
                                                    limited liability.
• Collaboration without loss of identity;
                                                  • Independent legal advice – The project
• More effective use of partner assets,
                                                    also utilised independent legal advice
   including rapid access to specialist areas
                                                    over the structures to be adopted, and
   of expertise. For example, one college
                                                    the taxation implications.
   has a reputation for excellent curriculum
   management and innovation, another for
   recruiting international students;                  Independent project
• Improved quality of service to students;             manager is very
• Shared resources, for example in                     important to keep the
   recruitment of joint posts;
• Sharing best practice;
                                                       project on track
• Peer review;
• Learning and development of staff;
• New opportunities for staff; and
• Opportunities for further collaboration
   and engagement with other colleges,
   contributing to sustainability.




                                                                         Shared services – Case studies 2011 |   25
Critical Factors
                        Factor               Barrier          Solution                                                           Importance

                        Leadership &         Building trust   Ensuring senior level involvement at all project meetings          High
                        Governance                            Consultations with Governors to understand strategic options
                                                              and the risks involved in shared services.

                        Culture &            Managing         Ensuring that the relevant workforce is ‘right sized’ or ‘lean’    High/
                        Climate              change           before sharing.                                                    Medium


                        Process              Management       Using readily available and inexpensive technologies to            Medium
                                             time             connect partners (e.g. Skype).
                                                              Learning from others through ‘business tourism’.

                        Externalities        Taxation         VAT is only charged on the non-pay element of total costs as       Medium/
                                                              the total pay cost is ‘staff’ by virtue of a joint employment      High
                                                              contracts. Advice from tax advisors to the project has
                                                              suggested that the staff cost element of charges to the member
                                                              institutions is free of VAT as there is no deemed supply, with
                                                              any generated surpluses generated on being exempt from
                                                              corporation tax.
                                                              However, any charge over and above the recovery of
                                                              staff costs is subject to VAT, and if the project provides
                                                              services to institutions which are not ‘joint employers’,
                                                              VAT becomes liable.

                                             Legal issues     Formal organisational vehicles can be problematic for              Medium
                                                              colleges work teams that are operating at historically different
                                                              levels of efficiency and quality. Unincorporated associations
                                                              (membership) can work well for some small-scale shared
                                                              services, although they are problematic where TUPE applies.




                       Summary
                       The project has remained focused
                       on the development of a persuasive
                                                                                            In the early stages of
                       business case for the development                                    the project there was a
                       of shared applicant/student facing
                       services. Extensive use was made of
                                                                                            long debate about the
                       external advice and of good practice                                 number and type of
                       from elsewhere. The preferred options
                       identified suggest that an in-house                                  partners to be included
                       approach will be more effective.                                     in the project. As a
                       Development of the project will be
                       contingent on identifying the funding                                result it was agreed to
                       sources to take this approach forward.                               keep the maximum to 3
                       The project has also led to the
                       establishment of a joint senior post
                                                                                            to ensure the project’s
                       between two of the collaborating colleges.                           deliverability



26   | Shared services – Case studies 2011
Solent Colleges
Innovation
Partnership (SCIP)




The Partners
Areas of Focus
 The key to the project                      The project has had a very broad focus, with the outline
                                             business case identifying a wide range of potential
 was the similarity of                       shared services including; adult provision; management
                                             information services; procurement; cloud based services;
 the partners                                business continuity; human resources policy; health
                                             and safety; professional services; building management,
                                             information and communications technology support;
                                             shared virtual learning environment; bid writing and
                                             bid consortia; and international students. A number of
                                             potential shared service vehicles are being considered.

                                             Rationale
                                             The Hampshire Group of eleven sixth form colleges have
                                             worked together for over 11 years. A sub-group of 5 colleges,
                                             with a focus on more urban, open access community
                                             activities saw a commonality of interest which they wished
                                             to pursue. They were later joined by a sixth member.

                                                need for flexibility and appetite
                                                for change
                                             The sixth form colleges are all relatively small, when
                                             compared to general FE colleges, and saw a potential
                                             benefit in seeking out areas where they could share
                                             services. However, there are significant variations in local
                                             needs and demand and these are reflected in the service
                                             delivery of the colleges. The colleges consider that they
                                             must retain a local autonomy in order to service their
                                             communities and that this must not be compromised
                                             through a wider regional grouping. The colleges are
                                             firmly rooted within their local communities and
                                             accountability is a key issue.

                                                not a quick process - maybe five
                                                years rather than one year
                                             Discussions have also indicated the potential to split the
                                             partnership into two cluster groups for certain activities,
                                             one serving the western (Southampton) area and one
                                             the eastern (Portsmouth). Clusters are seen as providing
                                             the opportunity for geographically localised support
                                             and service yet retaining the overall grouping for wider
                                             partnership, representation and service.


28   | Shared services – Case studies 2011
Vision                                         Activities
The Solent Colleges have gained                The project commenced with the
experience of working together over            appointment of an independent project
some time. However, to date, this work         manager, who had experience of
has mainly been at an informal level           working in the local sixth form college
with agreement to work in cooperation          environment. It is managed through
while retaining full independence and          monthly meetings of a steering group
governance in all areas.                       made up of the college principals and
The project seeks to leverage a                project manager.
transition in the practice and experience      An initial meeting brought together
of partnership, moving from the                the senior management teams of all
operational to the strategic level of          the colleges, and relevant functional
partnership. That requires a more              leads. This meeting was used to identify
formalised agreement between partners          potential areas for collaboration, and
Business models range from the informal        came up with a very wide range of
cooperative (the current model) through        areas impacting both on front and back
a series of stages to full integration with    office activities. For example, 5 of the 6
a variety approaches being considered.         colleges use the same MIS, which provide
                                               potential for collaboration, and the AoC
Objective                                      Procurement Team have been involved
                                               in supporting the project in accessing
The project seeks to take forward              external benchmarking information.
an existing informal collaborative
partnership into a more formal                 The colleges are also working together
arrangement in the form of a membership        on small department subject areas,
association. Through membership of an          such as law, science and maths,
association, the partners seek to be able to   joining together delivery with a view
create a unified partnership to represent      to creating virtual departments across
smaller colleges in a close geographical       the partnership and possibly leading
location and, through that partnership         towards common heads of department.
seeks to achieve increased value for           Representatives from the partnership have
money and quality.                             also attended a number of training events
                                               in areas appropriate to the development
                                               of the project. These have included
                                               specialist training in procurement and
                                               contract management and law and
                                               background to and implementation
                                               of the shared service agenda.




                                                                    Shared services – Case studies 2011 |   29
The partners see the project as a longer
                       term process, to four years and more,
                                                                         not just about saving
                       comprising:                                       money – funding is
                   • Working together for ‘quick wins’ over              invaluable
                       the first year: Identifying commonalities;
                       sharing data and policies; process
                       mapping, securing external advice;
                       establishing shared service groups;            Savings
                       and developing lead college status             At this early stage, some reductions in
                       within an unincorporated association;          the cost of joint legal work have been
                                                                      obtained, and there are projected savings
                   • Coming together over the next two
                                                                      of 2-5% savings in exam fees.
                       years: Creating services as a joint venture;
                       sharing services in the cloud; sharing         Joint purchasing of MIS is anticipated
                       management; sharing students; and              to save £250,000 over five years.
                   • Exploring federation in year four, with
                       the intention of establishing a group of          Best funding meeting
                       colleges provided with common services            in my entire career
                       and management by a single company.


                       Model
                       At the moment, the model is a Soft
                       Federation, as there are differences in
                       the rate at which partners may want to
                       progress. This creates opportunities for
                       an overall group of six colleges providing
                       central services which may or may not be
                       taken up by partners and for sub groups
                       or clusters of colleges who may wish to
                       work in particular directions, at differing
                       rates and in response to more local
                       factors. However, ultimately the vision
                       is to create a shared service company.




30   | Shared services – Case studies 2011
Outcomes and the Future                         Enablers
  There remain issues over the relative           Key enablers for the project comprise:
  ambitions of the partners over the scale
                                                • Independent Project Manager – The
  of implementation across some areas.
                                                  role and experience of the independent
  Working groups are taking forward               project manager, who already had contact
  activities in:                                  with the colleges involved. However,
• Finance;                                        it was considered essential that project
                                                  ownership remains with the colleges
• MIS (development plan in place);                themselves;
• HR (development plan in place);               • Early engagement – practitioners were
• Student Support;                                involved in an early stage within the
                                                  working groups to identify ways forward;
• Curriculum and Student Experience; and
                                                • Trust – The level of trust from
• Clerks to Corporation.
                                                  working together that has enabled
                                                  full benchmarking of activities across
     Events may push [the                         the colleges, including the sharing of
                                                  financial data;
     partnership] farther                       • Governors – Involvement of governors,
     and faster                                   through regular meetings (2 joint
                                                  meetings held and third scheduled)
                                                  ensuring that there is leadership
  However, the partnership has evolved,
                                                  commitment;
  and some of the work will be divided
  into two groups. (Southampton &               • Joint Collaboration – Gradual awareness,
  Portsmouth) dependant on the project            through working together, that there
  areas. It is also considering new partners,     could be a long term joint collaborative
  and there have been discussions with            strategy that would benefit all partners,
  the HE sector (Portsmouth University)           rather than competing with each other.
  around curriculum offering.
                                                     Fantastic to know
                                                     you’re not alone




                                                                        Shared services – Case studies 2011 |   31
Critical Factors
                        Factor               Barrier            Solution                                                        Importance

                        Leadership &         Large number       The need to understand governance and legal requirements        Medium/
                        Governance           of partners        has been central to project development.                        High
                                                                Governors have been kept involved as a central part of
                                                                the process.

                        Culture &            Desire for         Colleges are participating at their own pace within a           High
                        Climate              independence       pre-existing collaborative structure.
                                             within college
                                             structures

                        Process              Wide range         The establishment of functional working groups and              High
                                             of activities      sub-regional partnerships. Recognition of need to
                                             included in        manage quality.
                                             proposals

                        Externalities        Shift in funding   Review of project implications including VAT implications for   Medium
                                             of Sixth Form      schools as opposed to FE colleges.
                                             Colleges from
                                             SFA



                       Summary
                       As the activities section notes, the
                                                                                             Maybe end up with
                       project is seen as a medium to long                                   2 geographic clusters
                       term development, with a specific
                       geographical and functional focus
                                                                                             each with 3 partners
                       for like-minded colleges facing similar
                       local issues.
                       The activities in scope extend across
                       front- and back-office functions, and
                       have major implications for investment,
                       staffing and service delivery.
                       The range of activities being considered
                       means that different types of approaches
                       and partnerships are likely to develop as
                       the project moves on over the next few
                       years, with an initial impact on MIS,
                       HR and procurement.




32   | Shared services – Case studies 2011
Stockport Work
Based Learning




The Partners

A number of the partners have some experience of
working collaboratively.


                                                                                                 *




                                                   * Damar are joining the federation in 2012.
Areas of Focus
 this isn’t a standard                         The project is focused on work based learning (WBL),
                                               including joint bidding for contracts and aligning
 shared services                               marketing and stakeholder and employer engagement.
 project...exploratory                            it is very confusing for employers,
 conversations have                               they get swamped by a complex
 centred on future                                range of organisations... we want
 business, generating                             to simplify the offer
 resource streams
 through collaborative                         Rationale
 working, and                                  The project has evolved out of collaboration between
 some joint areas of                           partners with the following factors driving it towards
                                               its current focus:
 marketing and bid                           • The lead institution, Stockport College, have a long
 management                                    standing set of relationships with the private training
                                               providers involved in the partnership, having worked in
                                               a number of different setting with these partners. In recent
                                               years the College have led a consortium of providers
                                               which develops and delivers apprenticeship training for
                                               the Local Authority. Through this work they have aware
                                               of the strengths of these organisations and the quality of
                                               provision delivered.
                                             • The launch of the Skills Funding Agency (SFA) Minimum
                                               Contract Level (MCL) is another key driver with some
                                               partners initially concerned that the minimum threshold
                                               may threaten their sustainability.
                                             • A desire to simplify the work based learning offer for
                                               employers in Stockport.

                                               Against this backdrop Stockport College decided that
                                               something should be done to strengthen both their
                                               partnership with the providers involved in the project
                                               and the WBL offer in Stockport.




34   | Shared services – Case studies 2011
Vision                                            the overriding priority
  The creation of a federated structure
  incorporating providers serving the
                                                    and focus of the
  Stockport sub-region with the main                federation is to improve
  purpose of managing the relationship
  and negotiating a single work-based               the learner offer,
  learning contract for Stockport with the          learner experience and
  Skills Funding Agency, whilst enabling
  federated organisations to maintain their         leaner pathway... and
  own local focus and individual identity.          broaden the provision
  The Federation will lead improvements
  in three areas:
                                                    offered in this area...
• Cost reduction (both to providers and             targeting of specific
  to the SFA);                                      sectors with specific
• Quality improvement (including                    partners where this will
  the rigorous application of agreed
  performance standards); and                       strengthen the offer
• Apprenticeship development (driving
  innovation and adopting new                    Partners are clear that the Federation
  frameworks to tackle skills gaps and           will not replace their core business
  shortages).                                    activities. Instead it will provide a
                                                 platform for greater scope and more
  It is also intended that the organisation      strategically-planned collaboration.
  will become a regional voice for providers     In doing so partners aim to achieve
  on apprenticeship issues.                      the following objectives for partners,
                                                 learners and clients:
  Objectives                                   • Wider reach across the region;
  It is anticipated that the Federation
                                               • Moving into new territory and new
  agreement will allow partners to bid
                                                 provision;
  for and manage larger, more complex
  projects in a collaborative manner with      • Strategically planned offering;
  an aim to:                                   • Unified approach/role;
• Drive growth;                                • Scale of bidding, vehicle ready to bid
• Broaden the provision offered in the area;     and provide business;
• Increase knowledge and expertise across      • New business – cohesively targeted
  all partner organisations.                     planning;
                                               • Cohesive offer – overlap and trading
                                                 of provision to avoid duplication;
                                               • Future proofing against possible rises
                                                 in MCL; and
                                               • Independence – with enhanced links
                                                 to other strong like-minded partners.



                                                                       Shared services – Case studies 2011 |   35
Investiga-               Imple-
                      Scoping/                                                                             Toolkit
                                           tive      Analysis   mentation      Transition    Reporting
                      Planning                                                                             Development
                                        Fieldwork               Planning




                       Activities                                           Savings
                       The project began in November 2010.                  The Stockport WBL project is focused
                       Key activities and project stages                    on business growth rather than solely
                       undertaken to the Business Case stage                generating efficiency savings through
                       are shown in the diagram above.                      reduced costs. However, there is an
                       Each of these key stages has involved                expectation that joint marketing and
                       a significant amount of collaborative                collaborative bidding will reduce costs
                       activity between partners with                       for partners. Current projections suggest
                       participatory workshops held to                      that such savings would equate to £17,000
                       facilitate discussion at key stages.                 for every £120,000 of activity allocated to
                       Legal representatives are currently                  the Federation. This represents a saving
                       finalising the business model.                       of 14% on current allocated expenditure
                                                                            to an income of £120,000.

                       Model                                                  the project is about
                       The model being developed for the
                       Federation between partners will be a                  innovation and
                       Company limited by guarantee controlled                income generation,
                       and equally shared by its members.
                                                                              with efficiency acting
                           wanted something                                   as an important but
                           stronger than                                      subsidiary feature of the
                           partnership but                                    project
                           short of merger




36   | Shared services – Case studies 2011
[funding] has been a                         Enablers
     catalyst that enabled                        Key factors in the project’s development
                                                  have been:
     us to bring in the                         • Independent Project Manager – Funding
     necessary support... the                     an independent external consultant as
                                                  project manager and ‘honest broker’ and
     project wouldn’t have                        as an independent change agent. This has
     happened in the same                         facilitated honest open debate and greatly
                                                  enhanced trust between partners;
     way without it                             • Collaborative Approach – Stockport
                                                  College showing their commitment and
                                                  intentions with their philosophy and
  Outcomes and the Future                         approach emphasising that this was
  Partners are committed to the                   about collaboration and not merger;
  development of joint company limited by       • Prioritisation – Leadership participation
  guarantee, with partners expecting this to      from Stockport College showing
  be registered before the end of 2011. Work      partners the importance the College
  with legal advisors on this is progressing.     placed on the project;
  However, partners suggest they are
  frustrated with the pace of progress.         • Building Relationships &
                                                  Communication – Stakeholder relations
  Partners have identified a number of            have enhanced through clear lines of
  positive outcomes through participation         candid yet constructive communication
  in the project, including:
                                                  between partners;
• The benefits of collaboration between
                                                • A history of collaboration – between
  FE Colleges and private sector providers
                                                  the lead institution and other partners.
  with considerable potential for
  knowledge and values transfer between
  the sectors;                                       needed someone
• Improved levels of trust between                   who could be seen as
  participating organisations which has
  served to strengthen the partnership.              an honest broker...
                                                     [external support]
     bringing together                               has been really useful
     public and private                              in developing trust
     sector organisations,                           between partners...
     has been a major                                played a very
     positive feature of the                         significant role
     project



                                                                       Shared services – Case studies 2011 |   37
Critical Factors
                        Factor               Barrier            Solution                                                            Importance

                        Leadership &         Differing          Providing a range of levels of partnership and recognition that     High
                        Governance           organisational     each partner is not required to sign up to all activities as part
                                             context and        of the federation.
                                             objectives

                        Culture &            Trust issues       Some partners were nervous about the motivations of                 Medium/
                        Climate                                 partnership and the potential threat to their autonomy.             High
                                                                Partners have sought to build trust to address this and the
                                                                use of an external consultant played an important role in this.

                                             Staff              Participation has largely been restricted to leadership groups      Medium/
                                                                within partner organisations. This is due to the potential          High
                                                                for wider staff groups to associate the project with recent
                                                                restructuring. Clear lines of communication will be established
                                                                once the project is opened up to wider staff involvement.

                        Process              Time               Smaller partners in particular have capacity issues. Utilising      High
                                             commitment         an external consultant has been one way the group has sought
                                                                to address this. However, three larger partners have largely
                                                                driven the project.

                        Externalities        Establishing the   The process of working with legal advisors to establish the         Medium
                                             company            company has taken longer than anticipated.

                                             VAT                Partners are currently in consultation with legal advisors to       Medium/
                                             implications       consider the issue of VAT and its collective and individual         High
                                                                implications.




                           It was assumed at the                                          Summary
                           outset that an honest,                                         A proactive shared services project
                                                                                          based on business growth rather than
                           open dialogue between                                          only cost reduction, Stockport WBL
                           partners should lead                                           illustrates the importance of a history of
                                                                                          partnership between the lead institution
                           to a shared outcome.                                           and its partners. It also highlights the
                           Whilst this did result,                                        importance of an “independent broker”
                                                                                          to build relationships and trust by
                           to some extent, not all                                        facilitating difficult conversations in
                           partners can travel as                                         an approach that encourages open
                                                                                          debate and discussion.
                           far or as fast                                                 The commitment and leadership of the
                                                                                          lead institution was key driver in the
                                                                                          development and progress of this project.
                                                                                             “it’s about trust, you have to be trusted.
                                                                                              It takes time and you need to live it as
                                                                                              well as say it”




38   | Shared services – Case studies 2011
North East
Shared Services
Project (NESSP)




The Partners


Originally a partnership of seven colleges, three partners
have since left for a variety of reasons ranging from the
private sector provider that left due to the VAT related
issues and a College that had to withdraw due to a
possible future merger.
The four partners do not have a history of working in
partnership together, with the lead institution bringing
together the partnership specifically for NESSP.
Areas of Focus
 [partners] have                                The project has focused on:

 worked really well                          • Finance – this includes budgetary management, Capital
                                                Budgets, Income Receivable, Supplier Payments, Fixed
 together...in some                             Asset Management, VAT Returns, Management Accounts,
                                                Payroll, Procurement and System Administration.
 ways we see each                            • Management Information Systems – this includes
 others as direct                               Curriculum Planning, Enrolment, Timetabling and
                                                Registers, Coding and Masterfile Maintenance, ILR
 competitors... trust                           and Examinations.
 has developed... project                    • Routine Processes – All processes that are routine,
                                                rules based or delivered remotely are in scope for
 has strengthened and                           future development.
 reinforced these links
                                                Rationale
                                                Decreasing resources is a context common to all Colleges.
                                                Consequently the need to realise efficiencies through
                                                reduced costs is one of the principal drivers of all Shared
                                                Services projects. However, partners involved in NESSP
                                                were keen to reiterate that this process is also about
                                                driving quality improvements in the delivery of back
                                                office services. Therefore, the project should not simply
                                                be seen as a cost saving exercise. In particular the project
                                                is focused on shifting to a more efficient, responsive
                                                and personalised approach by addressing some of the
                                                following shortcomings in existing systems and processes
                                                used by participating colleges:
                                             • A shortage of accurate information and priorities;
                                             • A need to continually collate information from various
                                                sources and relatively bureaucratic, slow and inflexible
                                                systems; and
                                             • A lack of responsive, personalised services for students.




40   | Shared services – Case studies 2011
Vision                                                  Objectives
   At the beginning of the journey,                        In addressing the above issues and
   NESSP partners agreed that their                        achieving their vision partners have
   vision would be to:                                     defined the following critical success
                                                           factors for NESSP:
• Delight our students and stakeholders
   by having personalised services and a               • Reduction in cost of at least 10-20%;
   single point of contact to resolve issues           • An improvement in service standards
   with response times second to none;                     in all areas;
• Have accurate information that allows
                                                       • Flexibility to provide the required data
   managers to deal with important issues                  to the front line in a timely manner;
   before they become urgent;
                                                       • Flexibility to respond quickly to
• Have information focused on priorities
                                                           changes in requirements from the
   and routinely drawn together to enable                  college or funders;
   Senior Managers to feel in control and
   to be proactive and dynamic;                        • The removal of the overhead required
                                                           in the management of support staff;
• Use ‘best of breed’ IT systems that allow
   staff to deliver the best possible service;         • Release of space to provide opportunities
                                                           for teaching and possible growth.
• Reinvest in effective front line services
   the savings from having more efficient
   and effective back office provision.


   Activities
   The project began in October 2010.
   Key milestones are illustrated in the
   diagram below which spans the journey
   from October 2010 to September 2011.



                                 Vice
                              Principals        Memo-
  Funding        Shared       Received          randum         Process       Business        Business
    bid          Vision         Shared         of Under-       Mapping        Case           Plan in
 developed       Agreed        Services        standing       Completed     Completed        development
                              Architects        Agreed
                               Training




                                                                                Shared services – Case studies 2011 |   41
Case Studies Phase 1
Case Studies Phase 1
Case Studies Phase 1
Case Studies Phase 1
Case Studies Phase 1
Case Studies Phase 1
Case Studies Phase 1
Case Studies Phase 1
Case Studies Phase 1
Case Studies Phase 1
Case Studies Phase 1

Más contenido relacionado

La actualidad más candente

10 Steps for Library Transformation
10 Steps for Library Transformation10 Steps for Library Transformation
10 Steps for Library Transformationbrightspot
 
Stocktake of Prevention, Education and Frontline responses to Child Abuse in ...
Stocktake of Prevention, Education and Frontline responses to Child Abuse in ...Stocktake of Prevention, Education and Frontline responses to Child Abuse in ...
Stocktake of Prevention, Education and Frontline responses to Child Abuse in ...WERDS_NZ
 
ICT_Integration_framework
ICT_Integration_frameworkICT_Integration_framework
ICT_Integration_frameworkvictor omondi
 
Programme design and on activities aimed at involving stakeholders - by Iain ...
Programme design and on activities aimed at involving stakeholders - by Iain ...Programme design and on activities aimed at involving stakeholders - by Iain ...
Programme design and on activities aimed at involving stakeholders - by Iain ...OECD CFE
 
HOPES Conference consulting project
HOPES Conference consulting projectHOPES Conference consulting project
HOPES Conference consulting projectCaitlin Reese
 
Transforming the Academic Workplace at the Campus Scale
Transforming the Academic Workplace at the Campus ScaleTransforming the Academic Workplace at the Campus Scale
Transforming the Academic Workplace at the Campus Scalebrightspot
 
Innovation Labs: More than just walls, whiteboards, and post-its
Innovation Labs: More than just walls, whiteboards, and post-itsInnovation Labs: More than just walls, whiteboards, and post-its
Innovation Labs: More than just walls, whiteboards, and post-itsbrightspot
 
Working w/ the Generations
Working w/ the GenerationsWorking w/ the Generations
Working w/ the GenerationsHiggins
 
Subprov actionplan
Subprov actionplanSubprov actionplan
Subprov actionplanbunnearath
 
Reach Presentation
Reach PresentationReach Presentation
Reach Presentationncook
 
Sesi 04 km capture & codify
Sesi 04 km capture & codifySesi 04 km capture & codify
Sesi 04 km capture & codifyArif Partono
 
Dewi case study swansea met
Dewi case study swansea metDewi case study swansea met
Dewi case study swansea metTony Toole
 
Greenwich peer evaluation june 2013 13-1
Greenwich peer evaluation june 2013 13-1Greenwich peer evaluation june 2013 13-1
Greenwich peer evaluation june 2013 13-1Association of Colleges
 
Summer learning-overview
Summer learning-overviewSummer learning-overview
Summer learning-overviewbostonbeyonddm
 
Review june15 tqr_projectpalm_vetfutures2010
Review june15 tqr_projectpalm_vetfutures2010Review june15 tqr_projectpalm_vetfutures2010
Review june15 tqr_projectpalm_vetfutures2010TQRprojectPALM
 

La actualidad más candente (20)

10 Steps for Library Transformation
10 Steps for Library Transformation10 Steps for Library Transformation
10 Steps for Library Transformation
 
Stocktake of Prevention, Education and Frontline responses to Child Abuse in ...
Stocktake of Prevention, Education and Frontline responses to Child Abuse in ...Stocktake of Prevention, Education and Frontline responses to Child Abuse in ...
Stocktake of Prevention, Education and Frontline responses to Child Abuse in ...
 
ICT_Integration_framework
ICT_Integration_frameworkICT_Integration_framework
ICT_Integration_framework
 
AWPA presentation on Workforce Development at the 7th Annual Australasian Tal...
AWPA presentation on Workforce Development at the 7th Annual Australasian Tal...AWPA presentation on Workforce Development at the 7th Annual Australasian Tal...
AWPA presentation on Workforce Development at the 7th Annual Australasian Tal...
 
Programme design and on activities aimed at involving stakeholders - by Iain ...
Programme design and on activities aimed at involving stakeholders - by Iain ...Programme design and on activities aimed at involving stakeholders - by Iain ...
Programme design and on activities aimed at involving stakeholders - by Iain ...
 
HOPES Conference consulting project
HOPES Conference consulting projectHOPES Conference consulting project
HOPES Conference consulting project
 
Transforming the Academic Workplace at the Campus Scale
Transforming the Academic Workplace at the Campus ScaleTransforming the Academic Workplace at the Campus Scale
Transforming the Academic Workplace at the Campus Scale
 
Innovation Labs: More than just walls, whiteboards, and post-its
Innovation Labs: More than just walls, whiteboards, and post-itsInnovation Labs: More than just walls, whiteboards, and post-its
Innovation Labs: More than just walls, whiteboards, and post-its
 
Learning Session 2-3 A Learning-to-Work Partnership - Apprenticeship and College
Learning Session 2-3 A Learning-to-Work Partnership - Apprenticeship and CollegeLearning Session 2-3 A Learning-to-Work Partnership - Apprenticeship and College
Learning Session 2-3 A Learning-to-Work Partnership - Apprenticeship and College
 
Working w/ the Generations
Working w/ the GenerationsWorking w/ the Generations
Working w/ the Generations
 
CLC-2013
CLC-2013CLC-2013
CLC-2013
 
Subprov actionplan
Subprov actionplanSubprov actionplan
Subprov actionplan
 
Reach Presentation
Reach PresentationReach Presentation
Reach Presentation
 
Sesi 04 km capture & codify
Sesi 04 km capture & codifySesi 04 km capture & codify
Sesi 04 km capture & codify
 
Dewi case study swansea met
Dewi case study swansea metDewi case study swansea met
Dewi case study swansea met
 
Greenwich peer evaluation june 2013 13-1
Greenwich peer evaluation june 2013 13-1Greenwich peer evaluation june 2013 13-1
Greenwich peer evaluation june 2013 13-1
 
Summer learning-overview
Summer learning-overviewSummer learning-overview
Summer learning-overview
 
PRSA 2011-13 Strategic Plan
PRSA 2011-13 Strategic PlanPRSA 2011-13 Strategic Plan
PRSA 2011-13 Strategic Plan
 
Review june15 tqr_projectpalm_vetfutures2010
Review june15 tqr_projectpalm_vetfutures2010Review june15 tqr_projectpalm_vetfutures2010
Review june15 tqr_projectpalm_vetfutures2010
 
Sesi 03-km-models
Sesi 03-km-modelsSesi 03-km-models
Sesi 03-km-models
 

Destacado

Destacado (20)

Briefings
BriefingsBriefings
Briefings
 
110114 issue 86
110114 issue 86110114 issue 86
110114 issue 86
 
Bulletin Issue 84
Bulletin Issue 84Bulletin Issue 84
Bulletin Issue 84
 
Tackling and preventing_gang_problems_in_london_colleges_a_review_of_good_pra...
Tackling and preventing_gang_problems_in_london_colleges_a_review_of_good_pra...Tackling and preventing_gang_problems_in_london_colleges_a_review_of_good_pra...
Tackling and preventing_gang_problems_in_london_colleges_a_review_of_good_pra...
 
Accrington&rossendale pdf
Accrington&rossendale pdfAccrington&rossendale pdf
Accrington&rossendale pdf
 
Chesterfield 1
Chesterfield 1Chesterfield 1
Chesterfield 1
 
How to use Twitter
How to use TwitterHow to use Twitter
How to use Twitter
 
AoC Beacon Awards 2009/10 Winning College Profiles
AoC Beacon Awards 2009/10 Winning College ProfilesAoC Beacon Awards 2009/10 Winning College Profiles
AoC Beacon Awards 2009/10 Winning College Profiles
 
Transforming Education in Norfolk
Transforming Education in NorfolkTransforming Education in Norfolk
Transforming Education in Norfolk
 
Wessex Partnership
Wessex PartnershipWessex Partnership
Wessex Partnership
 
Janet brokerage
Janet brokerageJanet brokerage
Janet brokerage
 
City College Norwich - Federation and shared services Development
City College Norwich - Federation and shared services DevelopmentCity College Norwich - Federation and shared services Development
City College Norwich - Federation and shared services Development
 
AoC Conference - shared services strategy and structures - March 2013; Ruth S...
AoC Conference - shared services strategy and structures - March 2013; Ruth S...AoC Conference - shared services strategy and structures - March 2013; Ruth S...
AoC Conference - shared services strategy and structures - March 2013; Ruth S...
 
Mills and Reeves - Legal Information
Mills and Reeves - Legal InformationMills and Reeves - Legal Information
Mills and Reeves - Legal Information
 
Qesf.1pdf
Qesf.1pdfQesf.1pdf
Qesf.1pdf
 
Points Based System
Points Based SystemPoints Based System
Points Based System
 
3584
35843584
3584
 
3066
30663066
3066
 
464
464464
464
 
5084
50845084
5084
 

Similar a Case Studies Phase 1

Effective resuse and Sharing of Best Teaching Practices
Effective resuse and Sharing of Best Teaching PracticesEffective resuse and Sharing of Best Teaching Practices
Effective resuse and Sharing of Best Teaching Practicesamooool2000
 
Cooperative Education Programs: Bridging Classroom to Career
Cooperative Education Programs: Bridging Classroom to CareerCooperative Education Programs: Bridging Classroom to Career
Cooperative Education Programs: Bridging Classroom to CareerFuture Education Magazine
 
Tqr staff capability development 2010
Tqr staff capability development 2010Tqr staff capability development 2010
Tqr staff capability development 2010Colleen Hodgins
 
Unified in Learning –Separated by Space (S-ICT 2008 Conference Proceedings)
Unified in Learning –Separated by Space (S-ICT 2008 Conference Proceedings)Unified in Learning –Separated by Space (S-ICT 2008 Conference Proceedings)
Unified in Learning –Separated by Space (S-ICT 2008 Conference Proceedings)Martin Rehm
 
Adult Enterprise; New Approach, New Framework
Adult Enterprise; New Approach, New FrameworkAdult Enterprise; New Approach, New Framework
Adult Enterprise; New Approach, New FrameworkAssociation of Colleges
 
Managing Training Concepts in Multicultural Business Environments
Managing Training Concepts in Multicultural Business EnvironmentsManaging Training Concepts in Multicultural Business Environments
Managing Training Concepts in Multicultural Business EnvironmentseLearning Papers
 
Creative Partnerships Mentoring Programme
Creative Partnerships Mentoring ProgrammeCreative Partnerships Mentoring Programme
Creative Partnerships Mentoring Programmepesec
 
Service Transformation ReviewV1
Service Transformation ReviewV1Service Transformation ReviewV1
Service Transformation ReviewV1darrenatkinson
 
Evaluation Report - The Many Faces of Collaboration
Evaluation Report - The Many Faces of CollaborationEvaluation Report - The Many Faces of Collaboration
Evaluation Report - The Many Faces of CollaborationAssociation of Colleges
 
Strategic Visions & Values: Inclusive Curricula and Leadership in Learning an...
Strategic Visions & Values: Inclusive Curricula and Leadership in Learning an...Strategic Visions & Values: Inclusive Curricula and Leadership in Learning an...
Strategic Visions & Values: Inclusive Curricula and Leadership in Learning an...Richard Hall
 
Developing an holistic institutional approach to digital capabilities develop...
Developing an holistic institutional approach to digital capabilities develop...Developing an holistic institutional approach to digital capabilities develop...
Developing an holistic institutional approach to digital capabilities develop...Jisc
 
Keynote - Developing a holistic institutional approach to digital capabilitie...
Keynote - Developing a holistic institutional approach to digital capabilitie...Keynote - Developing a holistic institutional approach to digital capabilitie...
Keynote - Developing a holistic institutional approach to digital capabilitie...Jisc
 
University of the Highlands and Islands, Business and Leisure, JISC Maturity ...
University of the Highlands and Islands, Business and Leisure, JISC Maturity ...University of the Highlands and Islands, Business and Leisure, JISC Maturity ...
University of the Highlands and Islands, Business and Leisure, JISC Maturity ...Rob Macpherson
 
Strategic Visions & Values: Inclusive Curricula and Leadership in Learning an...
Strategic Visions & Values: Inclusive Curricula and Leadership in Learning an...Strategic Visions & Values: Inclusive Curricula and Leadership in Learning an...
Strategic Visions & Values: Inclusive Curricula and Leadership in Learning an...Richard Hall
 
Jisc webinar: Curriculum design: Changing the paradigm
Jisc webinar: Curriculum design: Changing the paradigmJisc webinar: Curriculum design: Changing the paradigm
Jisc webinar: Curriculum design: Changing the paradigmJisc
 
eLearning Proposal
eLearning ProposaleLearning Proposal
eLearning Proposalayounce
 
REEDNet presentation to UVAC 2009
REEDNet presentation to UVAC 2009REEDNet presentation to UVAC 2009
REEDNet presentation to UVAC 2009Lydia Arnold
 
Faculty Engagement and Performance Improvement in Engineering Students ID 25 ...
Faculty Engagement and Performance Improvement in Engineering Students ID 25 ...Faculty Engagement and Performance Improvement in Engineering Students ID 25 ...
Faculty Engagement and Performance Improvement in Engineering Students ID 25 ...ThanikachalamVedhath1
 

Similar a Case Studies Phase 1 (20)

Effective resuse and Sharing of Best Teaching Practices
Effective resuse and Sharing of Best Teaching PracticesEffective resuse and Sharing of Best Teaching Practices
Effective resuse and Sharing of Best Teaching Practices
 
Cooking for Freedom
Cooking for FreedomCooking for Freedom
Cooking for Freedom
 
Cooperative Education Programs: Bridging Classroom to Career
Cooperative Education Programs: Bridging Classroom to CareerCooperative Education Programs: Bridging Classroom to Career
Cooperative Education Programs: Bridging Classroom to Career
 
Tqr staff capability development 2010
Tqr staff capability development 2010Tqr staff capability development 2010
Tqr staff capability development 2010
 
Unified in Learning –Separated by Space (S-ICT 2008 Conference Proceedings)
Unified in Learning –Separated by Space (S-ICT 2008 Conference Proceedings)Unified in Learning –Separated by Space (S-ICT 2008 Conference Proceedings)
Unified in Learning –Separated by Space (S-ICT 2008 Conference Proceedings)
 
Adult Enterprise; New Approach, New Framework
Adult Enterprise; New Approach, New FrameworkAdult Enterprise; New Approach, New Framework
Adult Enterprise; New Approach, New Framework
 
Portsmouth college v1
Portsmouth college v1Portsmouth college v1
Portsmouth college v1
 
Managing Training Concepts in Multicultural Business Environments
Managing Training Concepts in Multicultural Business EnvironmentsManaging Training Concepts in Multicultural Business Environments
Managing Training Concepts in Multicultural Business Environments
 
Creative Partnerships Mentoring Programme
Creative Partnerships Mentoring ProgrammeCreative Partnerships Mentoring Programme
Creative Partnerships Mentoring Programme
 
Service Transformation ReviewV1
Service Transformation ReviewV1Service Transformation ReviewV1
Service Transformation ReviewV1
 
Evaluation Report - The Many Faces of Collaboration
Evaluation Report - The Many Faces of CollaborationEvaluation Report - The Many Faces of Collaboration
Evaluation Report - The Many Faces of Collaboration
 
Strategic Visions & Values: Inclusive Curricula and Leadership in Learning an...
Strategic Visions & Values: Inclusive Curricula and Leadership in Learning an...Strategic Visions & Values: Inclusive Curricula and Leadership in Learning an...
Strategic Visions & Values: Inclusive Curricula and Leadership in Learning an...
 
Developing an holistic institutional approach to digital capabilities develop...
Developing an holistic institutional approach to digital capabilities develop...Developing an holistic institutional approach to digital capabilities develop...
Developing an holistic institutional approach to digital capabilities develop...
 
Keynote - Developing a holistic institutional approach to digital capabilitie...
Keynote - Developing a holistic institutional approach to digital capabilitie...Keynote - Developing a holistic institutional approach to digital capabilitie...
Keynote - Developing a holistic institutional approach to digital capabilitie...
 
University of the Highlands and Islands, Business and Leisure, JISC Maturity ...
University of the Highlands and Islands, Business and Leisure, JISC Maturity ...University of the Highlands and Islands, Business and Leisure, JISC Maturity ...
University of the Highlands and Islands, Business and Leisure, JISC Maturity ...
 
Strategic Visions & Values: Inclusive Curricula and Leadership in Learning an...
Strategic Visions & Values: Inclusive Curricula and Leadership in Learning an...Strategic Visions & Values: Inclusive Curricula and Leadership in Learning an...
Strategic Visions & Values: Inclusive Curricula and Leadership in Learning an...
 
Jisc webinar: Curriculum design: Changing the paradigm
Jisc webinar: Curriculum design: Changing the paradigmJisc webinar: Curriculum design: Changing the paradigm
Jisc webinar: Curriculum design: Changing the paradigm
 
eLearning Proposal
eLearning ProposaleLearning Proposal
eLearning Proposal
 
REEDNet presentation to UVAC 2009
REEDNet presentation to UVAC 2009REEDNet presentation to UVAC 2009
REEDNet presentation to UVAC 2009
 
Faculty Engagement and Performance Improvement in Engineering Students ID 25 ...
Faculty Engagement and Performance Improvement in Engineering Students ID 25 ...Faculty Engagement and Performance Improvement in Engineering Students ID 25 ...
Faculty Engagement and Performance Improvement in Engineering Students ID 25 ...
 

Más de Association of Colleges

AoC Beacon Awards 2014-15 - How to Apply
AoC Beacon Awards 2014-15 - How to ApplyAoC Beacon Awards 2014-15 - How to Apply
AoC Beacon Awards 2014-15 - How to ApplyAssociation of Colleges
 
AoC Beacon Awards 2014-15 - OCR Award for Innovation in FE
AoC Beacon Awards 2014-15 - OCR Award for Innovation in FEAoC Beacon Awards 2014-15 - OCR Award for Innovation in FE
AoC Beacon Awards 2014-15 - OCR Award for Innovation in FEAssociation of Colleges
 
AoC Beacon Awards 2014-15 - NAMSS Award for Student Support
AoC Beacon Awards 2014-15 - NAMSS Award for Student SupportAoC Beacon Awards 2014-15 - NAMSS Award for Student Support
AoC Beacon Awards 2014-15 - NAMSS Award for Student SupportAssociation of Colleges
 
AoC Beacon Awards 2014-15 - Microlink, AoC Charitable Trust and Achievement f...
AoC Beacon Awards 2014-15 - Microlink, AoC Charitable Trust and Achievement f...AoC Beacon Awards 2014-15 - Microlink, AoC Charitable Trust and Achievement f...
AoC Beacon Awards 2014-15 - Microlink, AoC Charitable Trust and Achievement f...Association of Colleges
 
AoC Beacon Awards 2014-15 - Learning Consortium Award for Improvement in Teac...
AoC Beacon Awards 2014-15 - Learning Consortium Award for Improvement in Teac...AoC Beacon Awards 2014-15 - Learning Consortium Award for Improvement in Teac...
AoC Beacon Awards 2014-15 - Learning Consortium Award for Improvement in Teac...Association of Colleges
 
AoC Beacon Awards 2014-15 prospectus - JLT Employee Benefits Award for Health...
AoC Beacon Awards 2014-15 prospectus - JLT Employee Benefits Award for Health...AoC Beacon Awards 2014-15 prospectus - JLT Employee Benefits Award for Health...
AoC Beacon Awards 2014-15 prospectus - JLT Employee Benefits Award for Health...Association of Colleges
 
AoC Beacon Awards 2014-15 - How to Ppply
AoC Beacon Awards 2014-15 - How to PpplyAoC Beacon Awards 2014-15 - How to Ppply
AoC Beacon Awards 2014-15 - How to PpplyAssociation of Colleges
 
AoC Beacon Awards 2014-15 - Jisc Award for the Effective Use of Technology in FE
AoC Beacon Awards 2014-15 - Jisc Award for the Effective Use of Technology in FEAoC Beacon Awards 2014-15 - Jisc Award for the Effective Use of Technology in FE
AoC Beacon Awards 2014-15 - Jisc Award for the Effective Use of Technology in FEAssociation of Colleges
 
AoC Beacon Awards 2014-15 - Guidance on How to Apply
AoC Beacon Awards 2014-15 - Guidance on How to ApplyAoC Beacon Awards 2014-15 - Guidance on How to Apply
AoC Beacon Awards 2014-15 - Guidance on How to ApplyAssociation of Colleges
 
AoC Beacon Awards 2014-15 - Education and Training Foundation Award for Trans...
AoC Beacon Awards 2014-15 - Education and Training Foundation Award for Trans...AoC Beacon Awards 2014-15 - Education and Training Foundation Award for Trans...
AoC Beacon Awards 2014-15 - Education and Training Foundation Award for Trans...Association of Colleges
 
AoC Beacon Awards 2014-15 - edge award for practical teaching and practical l...
AoC Beacon Awards 2014-15 - edge award for practical teaching and practical l...AoC Beacon Awards 2014-15 - edge award for practical teaching and practical l...
AoC Beacon Awards 2014-15 - edge award for practical teaching and practical l...Association of Colleges
 
AoC Beacon Awards 2014-15 - Association of Colleges Award for College Engagem...
AoC Beacon Awards 2014-15 - Association of Colleges Award for College Engagem...AoC Beacon Awards 2014-15 - Association of Colleges Award for College Engagem...
AoC Beacon Awards 2014-15 - Association of Colleges Award for College Engagem...Association of Colleges
 
AoC Beacon Awards 2014-15 - AQA Award for Continued Engagement in Education a...
AoC Beacon Awards 2014-15 - AQA Award for Continued Engagement in Education a...AoC Beacon Awards 2014-15 - AQA Award for Continued Engagement in Education a...
AoC Beacon Awards 2014-15 - AQA Award for Continued Engagement in Education a...Association of Colleges
 
AoC Beacon Awards 2014-15 - Application Form
AoC Beacon Awards 2014-15 - Application FormAoC Beacon Awards 2014-15 - Application Form
AoC Beacon Awards 2014-15 - Application FormAssociation of Colleges
 

Más de Association of Colleges (20)

Aoc prospectus online_2014-15_vict
Aoc prospectus online_2014-15_victAoc prospectus online_2014-15_vict
Aoc prospectus online_2014-15_vict
 
AoC Prospectus 2014-15
AoC Prospectus 2014-15AoC Prospectus 2014-15
AoC Prospectus 2014-15
 
AoC Beacon Awards 2014-15 - How to Apply
AoC Beacon Awards 2014-15 - How to ApplyAoC Beacon Awards 2014-15 - How to Apply
AoC Beacon Awards 2014-15 - How to Apply
 
AoC Beacon Awards 2014-15 - Prospectus
AoC Beacon Awards 2014-15 - ProspectusAoC Beacon Awards 2014-15 - Prospectus
AoC Beacon Awards 2014-15 - Prospectus
 
AoC Beacon Awards 2014-15 - Programme
AoC Beacon Awards 2014-15 - ProgrammeAoC Beacon Awards 2014-15 - Programme
AoC Beacon Awards 2014-15 - Programme
 
AoC Beacon Awards 2014-15 - OCR Award for Innovation in FE
AoC Beacon Awards 2014-15 - OCR Award for Innovation in FEAoC Beacon Awards 2014-15 - OCR Award for Innovation in FE
AoC Beacon Awards 2014-15 - OCR Award for Innovation in FE
 
AoC Beacon Awards 2014-15 - NAMSS Award for Student Support
AoC Beacon Awards 2014-15 - NAMSS Award for Student SupportAoC Beacon Awards 2014-15 - NAMSS Award for Student Support
AoC Beacon Awards 2014-15 - NAMSS Award for Student Support
 
AoC Beacon Awards 2014-15 - Microlink, AoC Charitable Trust and Achievement f...
AoC Beacon Awards 2014-15 - Microlink, AoC Charitable Trust and Achievement f...AoC Beacon Awards 2014-15 - Microlink, AoC Charitable Trust and Achievement f...
AoC Beacon Awards 2014-15 - Microlink, AoC Charitable Trust and Achievement f...
 
AoC Beacon Awards 2014-15 - Learning Consortium Award for Improvement in Teac...
AoC Beacon Awards 2014-15 - Learning Consortium Award for Improvement in Teac...AoC Beacon Awards 2014-15 - Learning Consortium Award for Improvement in Teac...
AoC Beacon Awards 2014-15 - Learning Consortium Award for Improvement in Teac...
 
AoC Beacon Awards 2014-15 prospectus - JLT Employee Benefits Award for Health...
AoC Beacon Awards 2014-15 prospectus - JLT Employee Benefits Award for Health...AoC Beacon Awards 2014-15 prospectus - JLT Employee Benefits Award for Health...
AoC Beacon Awards 2014-15 prospectus - JLT Employee Benefits Award for Health...
 
AoC Beacon Awards 2014-15 - How to Ppply
AoC Beacon Awards 2014-15 - How to PpplyAoC Beacon Awards 2014-15 - How to Ppply
AoC Beacon Awards 2014-15 - How to Ppply
 
AoC Beacon Awards 2014-15 - Jisc Award for the Effective Use of Technology in FE
AoC Beacon Awards 2014-15 - Jisc Award for the Effective Use of Technology in FEAoC Beacon Awards 2014-15 - Jisc Award for the Effective Use of Technology in FE
AoC Beacon Awards 2014-15 - Jisc Award for the Effective Use of Technology in FE
 
AoC Beacon Awards 2014-15 - Guidance on How to Apply
AoC Beacon Awards 2014-15 - Guidance on How to ApplyAoC Beacon Awards 2014-15 - Guidance on How to Apply
AoC Beacon Awards 2014-15 - Guidance on How to Apply
 
AoC Beacon Awards 2014-15 - Education and Training Foundation Award for Trans...
AoC Beacon Awards 2014-15 - Education and Training Foundation Award for Trans...AoC Beacon Awards 2014-15 - Education and Training Foundation Award for Trans...
AoC Beacon Awards 2014-15 - Education and Training Foundation Award for Trans...
 
AoC Beacon Awards 2014-15 - edge award for practical teaching and practical l...
AoC Beacon Awards 2014-15 - edge award for practical teaching and practical l...AoC Beacon Awards 2014-15 - edge award for practical teaching and practical l...
AoC Beacon Awards 2014-15 - edge award for practical teaching and practical l...
 
AoC Beacon Awards 2014-15 - Calendar
AoC Beacon Awards 2014-15 - CalendarAoC Beacon Awards 2014-15 - Calendar
AoC Beacon Awards 2014-15 - Calendar
 
AoC Beacon Awards 2014-15 - Association of Colleges Award for College Engagem...
AoC Beacon Awards 2014-15 - Association of Colleges Award for College Engagem...AoC Beacon Awards 2014-15 - Association of Colleges Award for College Engagem...
AoC Beacon Awards 2014-15 - Association of Colleges Award for College Engagem...
 
AoC Beacon Awards 2014-15 - Assessment
AoC Beacon Awards 2014-15 - AssessmentAoC Beacon Awards 2014-15 - Assessment
AoC Beacon Awards 2014-15 - Assessment
 
AoC Beacon Awards 2014-15 - AQA Award for Continued Engagement in Education a...
AoC Beacon Awards 2014-15 - AQA Award for Continued Engagement in Education a...AoC Beacon Awards 2014-15 - AQA Award for Continued Engagement in Education a...
AoC Beacon Awards 2014-15 - AQA Award for Continued Engagement in Education a...
 
AoC Beacon Awards 2014-15 - Application Form
AoC Beacon Awards 2014-15 - Application FormAoC Beacon Awards 2014-15 - Application Form
AoC Beacon Awards 2014-15 - Application Form
 

Último

Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingTeacherCyreneCayanan
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 

Último (20)

Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
fourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writingfourth grading exam for kindergarten in writing
fourth grading exam for kindergarten in writing
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 

Case Studies Phase 1

  • 2. Contents: 03 Creating a Sustainable Learning Community for Buckinghamshire Led by Aylesbury College 09 Services in Sussex Colleges (SiSC) Led by Central Sussex College 15 Synergy Project Led by Easton College 21 Sharing Student Services in the South Led by Nescot College 27 Solent Colleges Innovation Partnership (SCIP) Led by Portsmouth College 33 Stockport Work Based Learning Led by Stockport College 39 North East Shared Services Project (NESSP) Led by City of Sunderland College 45 Joining up Services for Cheshire and Warrington Colleges Led by West Cheshire College
  • 3. Creating a Sustainable Learning Community for Buckinghamshire The Partners The project is seeking to build on a substantial history of collaboration between the two institutions. Stretching back approximately 10 years this partnership has evolved as both organisations have increasingly placed collaborative working at the heart of their approaches. Over a 12 month period the project has sought to explore the options for the development of an innovative partnership between both institutions.
  • 4. Areas of Focus ...have a shared The project has focused on developing a federation to: educational ethos and • Develop progression routes through a skills escalator for Buckinghamshire; are looking to drive • Take forward Construction and IT curriculum to pilot institutions in similar the joint marketing and delivery of Further and Higher Education. Apprenticeships and the development of a directions... University Technical College are central to this activity. The use of Technology blended within the learning process and the exploration of different flexible ways of delivering learning also form an important component of this activity. Associated back office functions are also being explored for sharing potential as part of this process. Rationale The project is a product of the evolving relationship between the institutions with both partners “working closely on identifying where the opportunities for greater collaboration are and what is the best way of enabling them to happen”. Central to these discussions has been ability of the partnership to grow to meet the ongoing needs of students’, employers and the communities they serve. Within this context partners identified a number of actual and anticipated external drivers that have influenced the direction of travel, including: • The need for flexible and responsive models of provision to respond to changing study patterns and differing models for financing provision in the future; • Increasing fee income through workplace learning and the roll out of higher level apprenticeships. prime driver is not to save money but how can we improve the student offer 4 | Shared services – Case studies 2011
  • 5. The vision is for ‘cradle Objectives to grave’ learning in an In submitting their bid to the FE Efficiency Innovation Fund partners inclusive community outline the following objectives for the project: with a desire to • Explore the potential for developing provide a wide range new models of delivery for Further of facilities for people and Higher Education; to learn, develop, • Break down the traditional barriers between FE and HE; share, create, socialise, • Encourage progression into HE, both innovate, nurture and for young people already in full time much more education, and for older learners including those already in employment; • Look at how far a joined up approach to marketing and delivery of FE and HE Vision can raise aspirations and encourage and Both partners aim to create a joint enable employers to develop the skills sustainable learning campus for of their workforce up to and (where Buckinghamshire, developing a skills appropriate) beyond level 3; escalator concept for the seamless • Utilise technology to find new solutions delivery of curriculum from levels for easy ways to learn at times to suit of one to eight in a range of technical, the individual. practical and academic subjects Shared services – Case studies 2011 | 5
  • 6. Activities Shared Services Model Participation has been at the heart of Federation the project development process with collaborative exploration and planning Savings sessions held at key stages throughout. Partners have also explored developing This project is focused on growth and best practice through shared delivery increasing revenue streams for both and have explored a number of potential organisations. Both institutions’ remain models for sharing services. Having the in discussions regarding the future of capacity and finding the time and space shared services with a recent successful to explore and develop the project has bid for the establishment of a University been central to the process. Partners Technical College (UTC) a central part of particularly value the role played here their plans. Initial projections suggest that by the FE Efficiency Innovation Fund if successful, the net increase in annual which “enabled them to take the time and revenue will be £70,000 in 2014/15 rising space they needed to understand what to £1.16 million in 2019/20. shared services could be”. To date the collaboration has already resulted in some efficiency savings through the joint employment of New Buckinghamshire University’s Human Resources Director being seconded to the Aylesbury College for 1 day a week and £25,000 saved by joint marketing activity in 2009/10. With increased collaboration, savings such as these are likely to increase. vital by enabling us to take a step back from our day to day pressures 6 | Shared services – Case studies 2011
  • 7. many of the challenges Enablers lie ahead as we move Key factors in the project’s development have been: from visioning and • FE Efficiency Innovation Grant Fund strategic level activity – this has provided the additional resources and capacity to enable towards practicalities staff to have the time and space to and implementation really explore and understand shared services and what they should look like and achieve for the partnership; • Effective, timely and inclusive Outcomes and the Future communication – a participative Partners are committed to the approach to developing the project development of the Federation through joint facilitated workshops, and are currently in the process open discussion and debate; of developing and finalising their business plan for shared services • Strategic Commitment – leaders with the successful UTC bid playing in both institutions are committed an important role in this. Partners to growing their organisations in discovered the positive outcome collaboration and have driven the of this bid on 10 October 2011 project in a “coherent and structured way”; with implementation on joint • Consensus and Trust – as a result curriculum and student pathways of the long term relationship between to commence immediately. partners there is a strong culture of trust and a consensus in terms of the direction of travel for the institutions both individually and collectively. unless you get very clear and complete agreement from the top on day 1 you haven’t got much chance...we had that Shared services – Case studies 2011 | 7
  • 8. Critical Factors Factor Barrier Solution Importance Culture & Organisational As partners move towards the practicalities of shared Medium/ Climate Cultures services, bringing together the different cultures of an HE High and an FE organisation is seen as a potential challenge. Open communication is seen as the way in which this can be addressed. Process Time Developing shared services requires considerable time Low/ commitments commitments. The FE Efficiency and Innovation Fund support Medium was identified as integral to supporting and maintaining partner involvement in this process. Staff technical Some staff had to improve their competence to embrace Medium capabilities technological solutions through dedicated training. Externalities Systems Partners anticipate this being a potential barrier as they move Medium compatibility towards implementation. Summary This project highlights the importance of investing time in building relationships and establishing trust between institutions with differing cultures. The project has evolved as part of a long term process of collaboration by the two organisations involved. While this process began long before the funding has acted Innovation Fund, partners suggest that the additional capacity provided as a catalyst that has accelerated this process and added has enabled us to considerable value to their approach. explore and take Based on a strategy of growth this project is part of a wider collaborative agenda forward a number of which incorporates the development of a University Technical College for medium and longer Buckinghamshire. term ambitions for Watch, on the AoC website aoc.co.uk collaboration Aylesbury College and Buckinghamshire New University’s journey on working together and the benefits the projects has brought to apprentices. 8 | Shared services – Case studies 2011
  • 9. Services in Sussex Colleges (SiSC) The Partners The project is seeking to build on a substantial history of collaboration between all of the Sussex based colleges through FE Sussex. For the purposes of this project two Surrey colleges have joined the consortia. FE Sussex is a membership based organisation, owned by Sussex colleges. It has a history of facilitating collaborative working across Sussex colleges in a diverse range of activities including the development of shared procurement processes strategy and the sharing of senior and specialist Human Resources and Health & Safety roles.
  • 10. Areas of Focus this project will The project is focused on the following areas: position [the colleges] • Finance, including reporting, sales invoicing and accounts receivable, purchasing and payments and to select the best cash and banking; and shared services option • Human Resources (HR), including staff information, recruitment, training and development and payroll with partner colleges and benefits. whatever the financial Management Information Systems (MIS) were also considered as part of this project but it was decided that and organisational partners would not move forward with collaboration in demands of the future this area at present. may be Rationale The project should be seen as a product of the evolving relationship between the majority of the institutions involved in the partnership. Within the current funding and economic environment FE Sussex partners were keen to explore further collaborative opportunities to improve the efficiency of back office operations. The ‘Case for Action’ outlines the project rationale as: “responding to significant reductions in future government funding, we are taking proactive steps to explore the potential to improve service delivery through the adoption of best practices and reduce costs by carrying out back office transactional processing on a shared service basis.” Front line staff have developed their understanding of their ‘back office’ systems and processes independently which has led to great variation across the sector, albeit within a range 10 | Shared services – Case studies 2011
  • 11. we aim to produce a Activities payback on investment The project has been designed as a two phase process. To date phase one that justifies a has been completed with activities undertaken including: continued commitment • Collaborative development of a ‘Case to the project and we for Action’; aim to produce overall • An exploration of existing shared service annual efficiency practice beyond FE; savings • Strand 1: Systems – defining the most appropriate IT systems for each service area, scoping process and resources required for each college to change to Vision a common platform; The project’s ‘Case for Action’ outlines • Strand 2: Business models – consideration the anticipated benefits to be to produce and evaluation of potential business a pay back on investment that justifies a models to ensure that the model chosen continued commitment to the project and fulfils the governance and service an overall annual efficiency saving. delivery requirements of each partner. This process also incorporated an Objectives exploration of implementation barriers; Key project objectives can be summarised as: • Development of an Outline Business Case. Exploring the potential to improve service delivery through adoption of best practices and reduce costs by carrying out transactional processing on a shared platform and service basis Shared services – Case studies 2011 | 11
  • 12. Shared Services Model a great deal of ground The current proposed delivery model is that of a not for profit company work needs to be limited by guarantee. carried out at an early Savings stage in order to set The outline business case outlines the up shared back-office following potential cost savings over three systems years based on an eight College model: Service Area Gross Investment Net savings Required Savings Outcomes and the Future Transactional £986,655 £690,000 £296,655 Partners are committed to the Finance development of the project and are currently in the process of developing Transactional £577,488 £336,000 £241,488 HR & Payroll and finalising their business plan and detailed business case for shared services. At present they are looking It should be noted that the distribution to proceed with a phased approach of of total net savings differs significantly implementation, which will involve: between partners with the lowest return • Aligning IT systems; for transactional finance estimated at £9,505 over three years and the lowest • Aligning processes; for transactional HR & Payroll only • Potential development of a shared £4,627 over three years. services centre. everyone is at different stages and converging from different starting points and this causes difficulties for shared services as we all need to get to the same starting point before launching collaborative approaches 12 | Shared services – Case studies 2011
  • 13. Enablers funding was a great Key factors in the project’s development have been: opportunity to develop • Additionality of FE Efficiency shared services, Innovation Fund - it has provided address key challenges additional resources and capacity to enable partners to build on their and reduce costs existing collaborative activity and take this forward to drive efficiencies in key back office functions; unless you get very • History of collaboration – as a clear and complete result of the long term relationship between partners there is a strong agreement from the top culture of trust and a degree of consensus in terms of the direction on day one you haven’t of travel for the institutions involved; got much chance... • Existing collaborative infrastructure we had that – the established structure of FE Sussex provided an existing collaborative organisation with a track record of collectively working with and on behalf of partner colleges. Shared services – Case studies 2011 | 13
  • 14. Critical Factors Factor Barrier Solution Importance Culture & Organisational Establish pilot and working groups well in advance to enable Medium/ Climate Cultures cultural embedding of cooperation. High Process Timescales Developing shared services is complex and requires High considerable time commitments. Incorporating college decision making processes within planned timescales is challenging and needs to be considered at the outset. Funding timescales may require compromises to be made. Communication A communication strategy is essential to ensure all leaders Medium/ and governing bodies are fully aware of direction of High travel and that communication is effective both across the partnership and within the partner organisations themselves. Externalities ICT Costs ICT systems require significant upfront investment by Medium/ partners. High Summary This project highlights the importance of lead times in building relationships and trust. The presence of an existing collaborative infrastructure is an important driver in the strength of while developing this project which should be seen as shared services may having evolved as part of this long term process of collaboration. While seem straight forward this process and an awareness or desire at a superficial level to explore shared services was present before the Innovation Fund intervention, it is actually very partners suggest that the additional complex capacity provided has accelerated this process and added considerable value to their approach. 14 | Shared services – Case studies 2011
  • 16. Areas of Focus Our work with the The project had four initial areas of focus: Synergy project has • Finance; • Management Information Systems; built a very strong • Information Technology; partnership between • Human Resources. the two colleges To these were added secondary workstreams of Work Based Learning and Marketing & Quality. Rationale Three years ago, Otley College, in Suffolk, commissioned external consultants to undertake a review of the College and look for potential partners as part of a growth strategy. The College has a land-based specialism. It was looking to get “match fit”, with a labour market focus on rural employment, and to “grow our sector”. Through this process, Easton College, another land-based college based in Norfolk, was identified as a potential partner. Both Colleges are a similar size, and are the last specialist colleges of this kind in the locality, with others now amalgamated with other FE providers. Although the campuses are 44 miles apart, both Colleges have a history of being very competitive with each other. The rationale for collaboration is primarily sectoral, as both colleges target rural areas. 16 | Shared services – Case studies 2011
  • 17. Vision Objectives The project aimed to: The project sought to achieve three deliverables: • Strengthen landbased provision to meet the needs of learners and industry; • Shared Management Information providing timely information on • Increase efficiency generating significant learners, human and physical resources savings for reinvestment; and streaming benchmark information • Promote best practice at both colleges between the colleges. It was also intended though undertaking a full review of their that this could provide a platform for systems, processes and procedures; and other colleges to join; • Expand the range of teaching materials • A unified web based Sharepoint interface available in each college through sharing. for information gathering, sharing and improvement; and • The creation of an e-library of process and system documentation that spans the two colleges building best practice. These processes are intended to be developed to provide core unified systems for key shared service areas, and again have the potential to become a platform for other colleges. Shared services – Case studies 2011 | 17
  • 18. Initial Joint Project Working Implementa- Workstream Merger post/project Development Groups tion Planning Development proposal manager Activities Savings The initial process was driven by the The initial gross payroll and oncost creation of a shared post, which was savings for the first 12 months are filled by a member of Easton’s senior c.£250,000. This is expected to increase management. Implementation of annually as the project progresses. specific activities was driven by joint There are, however, additional one working groups of practitioners within off capital set up costs of c.£340,000 the colleges who have driven thematic to be incurred to full implementation, aspects of the project. including upgrading and future The development of these close working proofing software and IT infrastructure. relationships, and a communications strategy with college staff, has helped The Synergy project to enable project implementation. This has been further developed by bringing funding has enabled the governors together in joint meetings to be informed of progress and provide us to develop detailed strategic direction. shared services leading to effective joint Model The model has developed over the project understanding and process from joint service delivery to a savings in the first full merger proposal, while maintaining separate college branding. year 18 | Shared services – Case studies 2011
  • 19. Aligning cultures will Enablers be a long path which Key factors in the project’s development have been: has its own challenges • Joint Posts – The early establishment and rewards of joint posts, drawn from each of the colleges, to drive and lead aspects of the shared services; Outcomes and the Future • Joint team working – across the colleges in each of the functional areas, in order to The Colleges now have five shared acclimatise staff with working with each posts, comprising: other and sharing best practice; and • Vice Principal Finance & Resources • Active strategic leadership – Joint (who is the project lead); Steering group consisting of Governors • Assistant Principal Planning, established at an early stage. Funding and Efficiency; In addition, the project has learned from • Director of Human Resources; good practice elsewhere, for example • Director of Enterprise and with senior leaders from each college Marketing; and visiting Cornwall College, to look at its management and group structure, which • Work Based Learning Contracts Manager. has separately branded colleges within a collective entity. Biggest outcome is trust and vision The sharing structure is that the staff remain employed by an individual college but are seconded to the other college for part of their time. This currently has VAT implications. Work is continuing on the alignment of processes, for example in the adaptation of IT and HR approaches, utilising good practice from each of the two colleges. The Shared Services resources have been used to develop projects to bring the Colleges closer together. They have now agreed to work towards a Type ‘A’ merger proposal. Shared services – Case studies 2011 | 19
  • 20. Critical Factors Factor Barrier Solution Importance Leadership & Existing Creation of joint posts, mainly drawn from existing staff, and High Governance perception of encouraging practice sharing using best from each college. competition In addition, there has been close working between the senior leadership teams and governors of each college, enabled through regular joint meetings and working groups. Culture & Concerns over Joint working across teams within colleges was at the centre High Climate budget cuts and of the approach, encouraging transparent communication future of jobs and involvement in re-engineering processes, which helped to establish trust across the two colleges and with senior management. All college staff were actively encouraged to visit counterpart and share best practice extending benefits beyond the Synergy Project workstreams. Project focus on growth and excellence rather than staffing cuts. Process Time Staff commitment and future project design/resource High commitments implications were addressed by segmenting issues rather than addressing all at once. Utilising external consultant’s expertise (although there is recognition of ownership issues around this). The colleges will also backfill staff to help with the day job moving forward. Externalities IT compatibility Significant effort has gone into examination of this aspect High through a joint working group and commissioning external advice on systems development. These one-off costs, including costs of future proofing and enabling other partners to join in the future, have been incorporated into the planning process. VAT The VAT costs have been accepted and are factored into overall Medium implications savings calculations, although they will not have an impact on the colleges after merger. However, VAT is likely to remain an issue for future shared services partners. Summary While this project is an exception in that in the context of understanding the changes it is leading to a proposal for college in the FE market, and strengthening their merger, it highlights the importance specialism as rural providers. of lead times in building relationships and trust. The process of co-operation With hindsight I realise was developing prior to the Innovation Fund intervention, although the partners we needed far more acknowledge that the process would have been much longer without this resources than we had support. Merger is now seen as the available resulting in logical conclusion of this process long hours for the staff While the focus has been on shared resources, the colleges involved have also involved (although they developed from having a perception of have continued to be each other as competitors to now looking at the joint market they are addressing in enthusiastic) rural East Anglia. This decision was taken 20 | Shared services – Case studies 2011
  • 21. Sharing Student Services in the South The Partners
  • 22. Areas of Focus In order to realise The project reviewed the feasibility of providing shared services using a customer contact centre model for the the full efficiencies delivery of student services between three colleges in South-East London and Surrey. This aimed to create an and improvements integrated customer pre-entry experience for potential in quality standards, learners at the three partner colleges, focusing on the customer journey from enquiry and the provision of standardised processes information and advice support through to admission and enrolment. It therefore addressed: and systems were • The customer journey; required • Information, Advice and Guidance and enrolment; and • Supporting systems. Rationale The project partners are two neighbouring colleges, in Greenwich and Bexley, and a third college in Surrey, NESCOT, as the project lead. An independent training provider, Mainport Training, was part of the initial bid, but dropped out at an early stage. In addition, there were two “observing” partners, NACRO and the University for the Creative Arts, who did not play a part in the project. Relations between the partners were assisted by the fact that the newly appointed principal of Greenwich has formerly been Vice-Principal of NESCOT. The Principal of Bexley was also relatively new to post. This project focused on whether front-office student related services could be shared and deliver both efficiency savings and service improvements. 22 | Shared services – Case studies 2011
  • 23. Vision Objective Potential learners, their parents, carers The overall objective was to create a and advisors will experience a service shared customer contact centre that that is customer focused, is efficient, was web and mobile-enabled for IAG effective and that provides information and admissions while ensuring students and advice that “gets it right the first experienced a service that was branded time”, whether that is online, through a for each individual college. telephone enquiry or face to face and the facility to enable on-line applications and enrolments. Also self service models of customer service will be developed. MoU/ Scoping/ appointing Initial Joint Implementa- Business Reporting Planning project Working tion Planning Case manager Activities The partners appointed an independent This also required the alignment of project manager, who managed the information systems, with, for example, project using PRINCE2®. The agreement two of the colleges using the same between the partners required Principal back-office management information level participation at all meetings, in system for student records including order to maintain ownership. applications; while the other college uses There were issues of alignment in a separate system. Advice was sought practice: one college made significant on ways in which these could be made and increasing use of online applications to work together, without excessive (44% of students apply online); another investment in new systems. makes very limited use of online In addition, as a result of working processing which currently results in dual together, two of the colleges now have a data entry; while the other does not have shared Executive Finance Director post an online applications module, meaning at senior management level which has that all applicant information is manually resulted in significant cost savings. data processed by admissions staff. The work to date has been focused on the development of the business case to take forward to implementation in Phase 2, once resources have been sourced. Shared services – Case studies 2011 | 23
  • 24. Model Savings Six delivery models were considered The business case estimates that in the business case: the preferred options could achieve operational savings of 31% over five • Status quo; years and cash savings, after investment • Sharing expertise between the college costs, of 12-14% over a five year period partners; (c.£333,000). • Development of a Virtual Customer This is in addition to the existing savings on Contact Centre; a shared post between two of the partners. • Development of a Centralised Customer Contact Centre; In-house delivery is • Working with an external partner to favoured on financial establish a managed service Customer Contact Centre; and and quality grounds • Outsourcing the function to a specialist supplier. Each option was exposed to SWOT analysis, appraised using financial and non-financial criteria, and exposed to a sensitivity analysis. Options 3 and 4 were preferred. Governors keen to work together with joint development sessions – they don’t feel threatened 24 | Shared services – Case studies 2011
  • 25. The key to success is Enablers trust and having the • Existing relationships and confidence – between partners, which has been built same expectation of through work to develop and refine standards the bid agreeing priorities and sharing resources underpins the project. • External project manager – was appointed, working with the principals, Outcomes and the Future was also seen a key factor in project The business case provides a proposed implementation. implementation plan for the preferred • Using previous experience – the project options with a start date of November also drew on the experience and advice 2012 (i.e. applications for entry in of the Kingston City Group, which was academic year 2013-2014). established in 2005, and involves 14 higher However, there remain issues over the education institutions in London and the availability or resources to achieve this, South East area accessing shared internal and further work may be required to audit services. The models developed by validate the achievability of this timeline. the Group informed the development of The project has also identified the business case although it should be non-financial benefits, comprising: noted that this structure does not provide limited liability. • Collaboration without loss of identity; • Independent legal advice – The project • More effective use of partner assets, also utilised independent legal advice including rapid access to specialist areas over the structures to be adopted, and of expertise. For example, one college the taxation implications. has a reputation for excellent curriculum management and innovation, another for recruiting international students; Independent project • Improved quality of service to students; manager is very • Shared resources, for example in important to keep the recruitment of joint posts; • Sharing best practice; project on track • Peer review; • Learning and development of staff; • New opportunities for staff; and • Opportunities for further collaboration and engagement with other colleges, contributing to sustainability. Shared services – Case studies 2011 | 25
  • 26. Critical Factors Factor Barrier Solution Importance Leadership & Building trust Ensuring senior level involvement at all project meetings High Governance Consultations with Governors to understand strategic options and the risks involved in shared services. Culture & Managing Ensuring that the relevant workforce is ‘right sized’ or ‘lean’ High/ Climate change before sharing. Medium Process Management Using readily available and inexpensive technologies to Medium time connect partners (e.g. Skype). Learning from others through ‘business tourism’. Externalities Taxation VAT is only charged on the non-pay element of total costs as Medium/ the total pay cost is ‘staff’ by virtue of a joint employment High contracts. Advice from tax advisors to the project has suggested that the staff cost element of charges to the member institutions is free of VAT as there is no deemed supply, with any generated surpluses generated on being exempt from corporation tax. However, any charge over and above the recovery of staff costs is subject to VAT, and if the project provides services to institutions which are not ‘joint employers’, VAT becomes liable. Legal issues Formal organisational vehicles can be problematic for Medium colleges work teams that are operating at historically different levels of efficiency and quality. Unincorporated associations (membership) can work well for some small-scale shared services, although they are problematic where TUPE applies. Summary The project has remained focused on the development of a persuasive In the early stages of business case for the development the project there was a of shared applicant/student facing services. Extensive use was made of long debate about the external advice and of good practice number and type of from elsewhere. The preferred options identified suggest that an in-house partners to be included approach will be more effective. in the project. As a Development of the project will be contingent on identifying the funding result it was agreed to sources to take this approach forward. keep the maximum to 3 The project has also led to the establishment of a joint senior post to ensure the project’s between two of the collaborating colleges. deliverability 26 | Shared services – Case studies 2011
  • 28. Areas of Focus The key to the project The project has had a very broad focus, with the outline business case identifying a wide range of potential was the similarity of shared services including; adult provision; management information services; procurement; cloud based services; the partners business continuity; human resources policy; health and safety; professional services; building management, information and communications technology support; shared virtual learning environment; bid writing and bid consortia; and international students. A number of potential shared service vehicles are being considered. Rationale The Hampshire Group of eleven sixth form colleges have worked together for over 11 years. A sub-group of 5 colleges, with a focus on more urban, open access community activities saw a commonality of interest which they wished to pursue. They were later joined by a sixth member. need for flexibility and appetite for change The sixth form colleges are all relatively small, when compared to general FE colleges, and saw a potential benefit in seeking out areas where they could share services. However, there are significant variations in local needs and demand and these are reflected in the service delivery of the colleges. The colleges consider that they must retain a local autonomy in order to service their communities and that this must not be compromised through a wider regional grouping. The colleges are firmly rooted within their local communities and accountability is a key issue. not a quick process - maybe five years rather than one year Discussions have also indicated the potential to split the partnership into two cluster groups for certain activities, one serving the western (Southampton) area and one the eastern (Portsmouth). Clusters are seen as providing the opportunity for geographically localised support and service yet retaining the overall grouping for wider partnership, representation and service. 28 | Shared services – Case studies 2011
  • 29. Vision Activities The Solent Colleges have gained The project commenced with the experience of working together over appointment of an independent project some time. However, to date, this work manager, who had experience of has mainly been at an informal level working in the local sixth form college with agreement to work in cooperation environment. It is managed through while retaining full independence and monthly meetings of a steering group governance in all areas. made up of the college principals and The project seeks to leverage a project manager. transition in the practice and experience An initial meeting brought together of partnership, moving from the the senior management teams of all operational to the strategic level of the colleges, and relevant functional partnership. That requires a more leads. This meeting was used to identify formalised agreement between partners potential areas for collaboration, and Business models range from the informal came up with a very wide range of cooperative (the current model) through areas impacting both on front and back a series of stages to full integration with office activities. For example, 5 of the 6 a variety approaches being considered. colleges use the same MIS, which provide potential for collaboration, and the AoC Objective Procurement Team have been involved in supporting the project in accessing The project seeks to take forward external benchmarking information. an existing informal collaborative partnership into a more formal The colleges are also working together arrangement in the form of a membership on small department subject areas, association. Through membership of an such as law, science and maths, association, the partners seek to be able to joining together delivery with a view create a unified partnership to represent to creating virtual departments across smaller colleges in a close geographical the partnership and possibly leading location and, through that partnership towards common heads of department. seeks to achieve increased value for Representatives from the partnership have money and quality. also attended a number of training events in areas appropriate to the development of the project. These have included specialist training in procurement and contract management and law and background to and implementation of the shared service agenda. Shared services – Case studies 2011 | 29
  • 30. The partners see the project as a longer term process, to four years and more, not just about saving comprising: money – funding is • Working together for ‘quick wins’ over invaluable the first year: Identifying commonalities; sharing data and policies; process mapping, securing external advice; establishing shared service groups; Savings and developing lead college status At this early stage, some reductions in within an unincorporated association; the cost of joint legal work have been obtained, and there are projected savings • Coming together over the next two of 2-5% savings in exam fees. years: Creating services as a joint venture; sharing services in the cloud; sharing Joint purchasing of MIS is anticipated management; sharing students; and to save £250,000 over five years. • Exploring federation in year four, with the intention of establishing a group of Best funding meeting colleges provided with common services in my entire career and management by a single company. Model At the moment, the model is a Soft Federation, as there are differences in the rate at which partners may want to progress. This creates opportunities for an overall group of six colleges providing central services which may or may not be taken up by partners and for sub groups or clusters of colleges who may wish to work in particular directions, at differing rates and in response to more local factors. However, ultimately the vision is to create a shared service company. 30 | Shared services – Case studies 2011
  • 31. Outcomes and the Future Enablers There remain issues over the relative Key enablers for the project comprise: ambitions of the partners over the scale • Independent Project Manager – The of implementation across some areas. role and experience of the independent Working groups are taking forward project manager, who already had contact activities in: with the colleges involved. However, • Finance; it was considered essential that project ownership remains with the colleges • MIS (development plan in place); themselves; • HR (development plan in place); • Early engagement – practitioners were • Student Support; involved in an early stage within the working groups to identify ways forward; • Curriculum and Student Experience; and • Trust – The level of trust from • Clerks to Corporation. working together that has enabled full benchmarking of activities across Events may push [the the colleges, including the sharing of financial data; partnership] farther • Governors – Involvement of governors, and faster through regular meetings (2 joint meetings held and third scheduled) ensuring that there is leadership However, the partnership has evolved, commitment; and some of the work will be divided into two groups. (Southampton & • Joint Collaboration – Gradual awareness, Portsmouth) dependant on the project through working together, that there areas. It is also considering new partners, could be a long term joint collaborative and there have been discussions with strategy that would benefit all partners, the HE sector (Portsmouth University) rather than competing with each other. around curriculum offering. Fantastic to know you’re not alone Shared services – Case studies 2011 | 31
  • 32. Critical Factors Factor Barrier Solution Importance Leadership & Large number The need to understand governance and legal requirements Medium/ Governance of partners has been central to project development. High Governors have been kept involved as a central part of the process. Culture & Desire for Colleges are participating at their own pace within a High Climate independence pre-existing collaborative structure. within college structures Process Wide range The establishment of functional working groups and High of activities sub-regional partnerships. Recognition of need to included in manage quality. proposals Externalities Shift in funding Review of project implications including VAT implications for Medium of Sixth Form schools as opposed to FE colleges. Colleges from SFA Summary As the activities section notes, the Maybe end up with project is seen as a medium to long 2 geographic clusters term development, with a specific geographical and functional focus each with 3 partners for like-minded colleges facing similar local issues. The activities in scope extend across front- and back-office functions, and have major implications for investment, staffing and service delivery. The range of activities being considered means that different types of approaches and partnerships are likely to develop as the project moves on over the next few years, with an initial impact on MIS, HR and procurement. 32 | Shared services – Case studies 2011
  • 33. Stockport Work Based Learning The Partners A number of the partners have some experience of working collaboratively. * * Damar are joining the federation in 2012.
  • 34. Areas of Focus this isn’t a standard The project is focused on work based learning (WBL), including joint bidding for contracts and aligning shared services marketing and stakeholder and employer engagement. project...exploratory it is very confusing for employers, conversations have they get swamped by a complex centred on future range of organisations... we want business, generating to simplify the offer resource streams through collaborative Rationale working, and The project has evolved out of collaboration between some joint areas of partners with the following factors driving it towards its current focus: marketing and bid • The lead institution, Stockport College, have a long management standing set of relationships with the private training providers involved in the partnership, having worked in a number of different setting with these partners. In recent years the College have led a consortium of providers which develops and delivers apprenticeship training for the Local Authority. Through this work they have aware of the strengths of these organisations and the quality of provision delivered. • The launch of the Skills Funding Agency (SFA) Minimum Contract Level (MCL) is another key driver with some partners initially concerned that the minimum threshold may threaten their sustainability. • A desire to simplify the work based learning offer for employers in Stockport. Against this backdrop Stockport College decided that something should be done to strengthen both their partnership with the providers involved in the project and the WBL offer in Stockport. 34 | Shared services – Case studies 2011
  • 35. Vision the overriding priority The creation of a federated structure incorporating providers serving the and focus of the Stockport sub-region with the main federation is to improve purpose of managing the relationship and negotiating a single work-based the learner offer, learning contract for Stockport with the learner experience and Skills Funding Agency, whilst enabling federated organisations to maintain their leaner pathway... and own local focus and individual identity. broaden the provision The Federation will lead improvements in three areas: offered in this area... • Cost reduction (both to providers and targeting of specific to the SFA); sectors with specific • Quality improvement (including partners where this will the rigorous application of agreed performance standards); and strengthen the offer • Apprenticeship development (driving innovation and adopting new Partners are clear that the Federation frameworks to tackle skills gaps and will not replace their core business shortages). activities. Instead it will provide a platform for greater scope and more It is also intended that the organisation strategically-planned collaboration. will become a regional voice for providers In doing so partners aim to achieve on apprenticeship issues. the following objectives for partners, learners and clients: Objectives • Wider reach across the region; It is anticipated that the Federation • Moving into new territory and new agreement will allow partners to bid provision; for and manage larger, more complex projects in a collaborative manner with • Strategically planned offering; an aim to: • Unified approach/role; • Drive growth; • Scale of bidding, vehicle ready to bid • Broaden the provision offered in the area; and provide business; • Increase knowledge and expertise across • New business – cohesively targeted all partner organisations. planning; • Cohesive offer – overlap and trading of provision to avoid duplication; • Future proofing against possible rises in MCL; and • Independence – with enhanced links to other strong like-minded partners. Shared services – Case studies 2011 | 35
  • 36. Investiga- Imple- Scoping/ Toolkit tive Analysis mentation Transition Reporting Planning Development Fieldwork Planning Activities Savings The project began in November 2010. The Stockport WBL project is focused Key activities and project stages on business growth rather than solely undertaken to the Business Case stage generating efficiency savings through are shown in the diagram above. reduced costs. However, there is an Each of these key stages has involved expectation that joint marketing and a significant amount of collaborative collaborative bidding will reduce costs activity between partners with for partners. Current projections suggest participatory workshops held to that such savings would equate to £17,000 facilitate discussion at key stages. for every £120,000 of activity allocated to Legal representatives are currently the Federation. This represents a saving finalising the business model. of 14% on current allocated expenditure to an income of £120,000. Model the project is about The model being developed for the Federation between partners will be a innovation and Company limited by guarantee controlled income generation, and equally shared by its members. with efficiency acting wanted something as an important but stronger than subsidiary feature of the partnership but project short of merger 36 | Shared services – Case studies 2011
  • 37. [funding] has been a Enablers catalyst that enabled Key factors in the project’s development have been: us to bring in the • Independent Project Manager – Funding necessary support... the an independent external consultant as project manager and ‘honest broker’ and project wouldn’t have as an independent change agent. This has happened in the same facilitated honest open debate and greatly enhanced trust between partners; way without it • Collaborative Approach – Stockport College showing their commitment and intentions with their philosophy and Outcomes and the Future approach emphasising that this was Partners are committed to the about collaboration and not merger; development of joint company limited by • Prioritisation – Leadership participation guarantee, with partners expecting this to from Stockport College showing be registered before the end of 2011. Work partners the importance the College with legal advisors on this is progressing. placed on the project; However, partners suggest they are frustrated with the pace of progress. • Building Relationships & Communication – Stakeholder relations Partners have identified a number of have enhanced through clear lines of positive outcomes through participation candid yet constructive communication in the project, including: between partners; • The benefits of collaboration between • A history of collaboration – between FE Colleges and private sector providers the lead institution and other partners. with considerable potential for knowledge and values transfer between the sectors; needed someone • Improved levels of trust between who could be seen as participating organisations which has served to strengthen the partnership. an honest broker... [external support] bringing together has been really useful public and private in developing trust sector organisations, between partners... has been a major played a very positive feature of the significant role project Shared services – Case studies 2011 | 37
  • 38. Critical Factors Factor Barrier Solution Importance Leadership & Differing Providing a range of levels of partnership and recognition that High Governance organisational each partner is not required to sign up to all activities as part context and of the federation. objectives Culture & Trust issues Some partners were nervous about the motivations of Medium/ Climate partnership and the potential threat to their autonomy. High Partners have sought to build trust to address this and the use of an external consultant played an important role in this. Staff Participation has largely been restricted to leadership groups Medium/ within partner organisations. This is due to the potential High for wider staff groups to associate the project with recent restructuring. Clear lines of communication will be established once the project is opened up to wider staff involvement. Process Time Smaller partners in particular have capacity issues. Utilising High commitment an external consultant has been one way the group has sought to address this. However, three larger partners have largely driven the project. Externalities Establishing the The process of working with legal advisors to establish the Medium company company has taken longer than anticipated. VAT Partners are currently in consultation with legal advisors to Medium/ implications consider the issue of VAT and its collective and individual High implications. It was assumed at the Summary outset that an honest, A proactive shared services project based on business growth rather than open dialogue between only cost reduction, Stockport WBL partners should lead illustrates the importance of a history of partnership between the lead institution to a shared outcome. and its partners. It also highlights the Whilst this did result, importance of an “independent broker” to build relationships and trust by to some extent, not all facilitating difficult conversations in partners can travel as an approach that encourages open debate and discussion. far or as fast The commitment and leadership of the lead institution was key driver in the development and progress of this project. “it’s about trust, you have to be trusted. It takes time and you need to live it as well as say it” 38 | Shared services – Case studies 2011
  • 39. North East Shared Services Project (NESSP) The Partners Originally a partnership of seven colleges, three partners have since left for a variety of reasons ranging from the private sector provider that left due to the VAT related issues and a College that had to withdraw due to a possible future merger. The four partners do not have a history of working in partnership together, with the lead institution bringing together the partnership specifically for NESSP.
  • 40. Areas of Focus [partners] have The project has focused on: worked really well • Finance – this includes budgetary management, Capital Budgets, Income Receivable, Supplier Payments, Fixed together...in some Asset Management, VAT Returns, Management Accounts, Payroll, Procurement and System Administration. ways we see each • Management Information Systems – this includes others as direct Curriculum Planning, Enrolment, Timetabling and Registers, Coding and Masterfile Maintenance, ILR competitors... trust and Examinations. has developed... project • Routine Processes – All processes that are routine, rules based or delivered remotely are in scope for has strengthened and future development. reinforced these links Rationale Decreasing resources is a context common to all Colleges. Consequently the need to realise efficiencies through reduced costs is one of the principal drivers of all Shared Services projects. However, partners involved in NESSP were keen to reiterate that this process is also about driving quality improvements in the delivery of back office services. Therefore, the project should not simply be seen as a cost saving exercise. In particular the project is focused on shifting to a more efficient, responsive and personalised approach by addressing some of the following shortcomings in existing systems and processes used by participating colleges: • A shortage of accurate information and priorities; • A need to continually collate information from various sources and relatively bureaucratic, slow and inflexible systems; and • A lack of responsive, personalised services for students. 40 | Shared services – Case studies 2011
  • 41. Vision Objectives At the beginning of the journey, In addressing the above issues and NESSP partners agreed that their achieving their vision partners have vision would be to: defined the following critical success factors for NESSP: • Delight our students and stakeholders by having personalised services and a • Reduction in cost of at least 10-20%; single point of contact to resolve issues • An improvement in service standards with response times second to none; in all areas; • Have accurate information that allows • Flexibility to provide the required data managers to deal with important issues to the front line in a timely manner; before they become urgent; • Flexibility to respond quickly to • Have information focused on priorities changes in requirements from the and routinely drawn together to enable college or funders; Senior Managers to feel in control and to be proactive and dynamic; • The removal of the overhead required in the management of support staff; • Use ‘best of breed’ IT systems that allow staff to deliver the best possible service; • Release of space to provide opportunities for teaching and possible growth. • Reinvest in effective front line services the savings from having more efficient and effective back office provision. Activities The project began in October 2010. Key milestones are illustrated in the diagram below which spans the journey from October 2010 to September 2011. Vice Principals Memo- Funding Shared Received randum Process Business Business bid Vision Shared of Under- Mapping Case Plan in developed Agreed Services standing Completed Completed development Architects Agreed Training Shared services – Case studies 2011 | 41