Change Management Options
Figuring out which Change workflow is for you
Simple, Express, CMII or Custom
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 3
Agenda
 Aras Change Management Philosophy
 CMII Change Process: PR, ERC, ECN
 Simple Change Process: ECO & MCO
 Express Change Process: ECO & Impact Matrix
 Document Change Process: DCO
 Optional Custom Change Processes
 Custom Change Process Examples
 Summary
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 4
Why Change Management ?
 As soon as there is a need for managing revisions of a data object you need
to think about managing the changes between revisions.
 Scenario 1 - If you deal with a single object that has revisions, change
management is usually very simple.
 Scenario 2 - If you deal with data objects that have revisions that are
related to other data objects that have revisions (revisioned
structures), you are introducing the principles of configuration
management and change management can get very complex. In addition to
revisions the behavior of relationship (fixed or float) must be managed, as
well.
Doc 1000 – Rev A
Doc 1000 – Rev B
Doc 1000 – Rev C
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 5
The Impact of
Enterprise Changes
 Functional Impact – Do other items need to be changed ?
 Price Impact – Will the price of this item and other affected items change ?
 Timing Impact – Will it delay or speed up other activities ?
 Cross-Functional Impact – Who needs to be informed and agree ?
 Customers, Partners ?
 Purchasing, Supply Chain, Manufacturing, QA ?
 And more …
Planning and Executing a Change can quickly impact many different
organizations in your company. Decision making and approvals sign-offs
will require additional coordination.
 Any Change will create Effort and Cost
 New Design, New Prototype …
 Documentation Change …
 New Tooling …
 Meetings, Reviews …
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 6
How to Plan a Change ?
 Do planning and approvals outside of PLM:
and then only run „Change Orders“ in Aras to execute on the planned
changes and document(s) changed.
 In this case the Simple Change Process or Manual Revision & Release are
what you want to use.
 Do planning as part of the Change Management Process inside
PLM:
and document the planning & approvals, as well as, execution of
„Change Orders“ in Aras.
 In this case change mechanisms that support planning and documenting
your change actions & decisions and that allow change impact analysis are
what you want to use. Either CMII, Express Change Process or Custom.
 Aras provides Out-of-the-Box (OOTB) Functionality
that supports both approaches.
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 7
Aras Change Processes:
Out-of-the-Box (OOTB)
 CMII Change Process: PR  ECR  ECN
 Simple Change Process: ECO & MCO
 Express Change Process: ECO with Impact Matrix
 Document Change Process: DCO
 Manual Revision & Release: No Process  By Permissions
 The owner of a Part or a Document
has the security permissions to
revise and release
without a workflow
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 8
CMII Change Process
 The CMII Change Management principles define multiple stages for a
Change process.
 CMII defines specific users roles responsible for each of the stages.
 At a high level: Multiple PRs can be mapped to an ECR and multiple ECRs
can be mapped to an ECN that finalizes the Change process.
PR
PR
PR
PR
PR
PR
PR
PR
ECR
ECR
ECN
Anyone
can raise
a Problem Report
Change Specialist 1 (role)
Coordinates PR‘s and ECR‘s
Change Review Board
(CRB) Reviews and approves
Change Implementation Board
(CIB) Validates and approves
Change Specialist 2 (role)
Coordinates ECN‘s
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 9
CMII Changes: PR & ECR
Simple Workflow for PRs
ECR is used to document Change Impact,
Criticality, Change Cost, and Timing to determine a
Go or NoGo decision by members of the
Change Review Board (CRB)
ECR Workflow includes review activities for the CRB
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 10
CMII Changes: ECN
Then, an ECN is used to
document implemented
changes and effectivity date.
The versioning of affected items
takes place here.
The Change Implementation
Board (CIB) approves the
completed changes.
With the release of an ECN all
affected items are also released
to their planned new revisions.
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 11
Simple Change Process:
ECO & MCO
 Offers a streamlined approach to managing changes
 Can be used in parallel with CMII change process
 Engineering Change Order (ECO)
 Used to add, update or delete parts and documents in three state
changes.
 ECO is shorter than the CMII process by removing the PR and ECR steps
from the process.
 Both Parts and Document (and CAD) items can be driven by this ECO
 Manufacturing Change Order (MCO)
 Used to edit an Approved Manufacturers List (the AML tab on Parts)
after a Part has been released.
 Does not increment revision sequence.
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 12
Simple ECO Form & Workflow
Simple ECO allows for
optional Reviews and Fast
Track.
Changes to Part, Document
and CAD items can be
managed together.
The Signoffs tab provides
quick access to the
Workflow History and to
pending workflow activities
of the current user.
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 13
Express Change Process
Different ECO Option that inc Impact Matrix
 Can be used in parallel with CMII and/or Simple ECO change process.
 An additional planning step is included on the workflow.
 During planning an intelligent “Impact Matrix” allows to define and plan
change actions.
 The Impact Matrix:
 Provides an interactive user interface for where-used / impact analysis
 Utilizes new item actions:
Release, Revise, Renumber, Supersede, Obsolete, Review, None
 And it supports relationship actions: Add, Modify, Delete
 For additional access control – a team can be assigned (team
manager, members and guests)
 Like with Simple ECO the Signoffs tab is enabled for quick access to the
Workflow history and current workflow activities.
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 14
Express ECO Form Impact Matrix
and Workflow
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 15
Document Change Process: DCO
 Can be used in parallel with CMII and/or
Simple ECO and/or Express ECO.
 This Change Process is designed to be used
for changes to Document or CAD items.
 Like Express ECO it utilizes Team access
controls and the quick access to the
Workflow on the Signoffs tab.
 Benefits
 Can be used to do a „mass“ release of a list of
Documents in one process. With reviews.
 Can be used to do change revisions of a list of
Documents in one process. With reviews.
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 16
Need a Custom Change Process?
If the OOTB Change Processes (ECR, ECO etc.) DO NOT FULFILL your company‘s specific
change management requirements, then you still have options:
 Adapt existing Change Process. Common extensions include:
 Additional access control logic  will not impact the versioning behavior of the change process
 Add more Properties or Sub-Forms with checking logic  will not impact the versioning
behavior of the change process
 Add new or different Assignees to existing workflow activities  easy to do
 Add new Workflow Activities  you may need to extend existing workflow business logic
 Add steps to the change process Life Cycle Map  you may need to extend existing business
logic of the lifecycle map driving the Affeected Items mechanism
 Build your own Change Process (own Forms, Lifecycles and Workflows – It‘s Not Hard)
 If your new process does not need to be used interchangeably with the OOTB change forms and
workflow, then you are pretty free to add any new form, workflow , business logic.
 If your new process does need to be used interchangeably, you will need to connect to the
functionality of the OOTB processes and match your data model with the „Affected Item“
concept and the concept of flagging pending changes.
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 17
Custom Change Examples
Special circumstances, competitive practices, complexity
may create need for custom change process
 Lear – Engineering driven Automotive
 Spontech Spine – QA driven Med Devices
 Xerox – Time-to-Market driven Electronics
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 18
Lear Change Workflows
Slide 18
Main Workflow
Additonal Sub-Flow for complex changes
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 19
Lear Change Form
Slide 19
Multiple Programs, Multiple Locations Impacted based on Affected Items
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 20
Spontech Spine
One Main CM Form many Sub-Forms and Sub-Workflows
Main
CM
Analysis
Dispo Actions
Change Plan
Action Item
Single Item
Change
Order
Affected Documents
All sub workflows of „Single Item Changes“
and „Action Items“ must be closed before
Main CM workflow can close
Adhoc
Actions Affected Parts
Sub-Forms on Tabs
Sub-Workflows
Sub-Workflows
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 21
Spontech Spine Change Form
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 22
Xerox Change Workflow
Many Optional Steps to Handle Wide Range of Scenarios
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 23
Summary
 The core behavior for versioning and revisions can be turned on (and off) with just a
simple flag on an Item Type (manual or automatic).
 OOTB Item Types: Part, Document, CAD have versioning turned on by default.
 Your custom Item Type can easily be defined as versionable items.
 Relationship behavior can be configured to be „fix“ or „float“ for a wide variety of
complex configuration management requirements. Addl rules can be customized.
 The core behaviour for versions & revisions can be extended by customizing the
„Version“ event and/or the related life cycle states and/or workflow activities logic.
 To get started quickly, you can choose to use any of the OOTB change forms and
processes in Aras. (like ECR, ECO, DCO etc.)
 You can easily build your own change forms, lifecycles and workflows for more
specialized change processes and change collaboration scenarios.
Everything is Possible: from very simple version control
to highly specialized and complex change and
configuration management procedures, as required.
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 24
 Integrated „Help“ Just Ask Innovator
 Search for: PR, ECR, ECO, or CMII
 Aras Training
 Configuring Solutions Course
http://www.aras.com/university/training-classes.aspx
 Online Learning - Product Engineering Essentials
http://www.aras.com/SubscriberPortal/
(for Subscribers)
 Educational Organizations
 Institute of Configuration Management http://www.icmhq.com
 Configuration Management Process Improvement Center http://www.cmpic.com/
More Information
aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 25
Q & A

Más contenido relacionado

La actualidad más candente

Practical Enterprise Architecture - Introducing CSVLOD EA Model
Practical Enterprise Architecture - Introducing CSVLOD EA ModelPractical Enterprise Architecture - Introducing CSVLOD EA Model
Practical Enterprise Architecture - Introducing CSVLOD EA ModelAshraf Fouad
 
SAP Engineering Control Center interface to PTC Creo: Product Presentation
SAP Engineering Control Center interface to PTC Creo: Product PresentationSAP Engineering Control Center interface to PTC Creo: Product Presentation
SAP Engineering Control Center interface to PTC Creo: Product Presentationriessengineering
 
Aras PLM Roadmap
Aras PLM RoadmapAras PLM Roadmap
Aras PLM RoadmapAras
 
Introduction to monte-carlo analysis for software development - Troy Magennis...
Introduction to monte-carlo analysis for software development - Troy Magennis...Introduction to monte-carlo analysis for software development - Troy Magennis...
Introduction to monte-carlo analysis for software development - Troy Magennis...Troy Magennis
 
Enterprise architecture 101.36205348
Enterprise architecture 101.36205348Enterprise architecture 101.36205348
Enterprise architecture 101.36205348jamesoni1
 
Windchill Migration Overview
Windchill Migration OverviewWindchill Migration Overview
Windchill Migration OverviewEric Braun
 
BPM (Business Process Management) Introduction
BPM (Business Process Management) IntroductionBPM (Business Process Management) Introduction
BPM (Business Process Management) IntroductionIntegrify
 
SAP Alfresco Connector by Ctac
SAP Alfresco Connector by CtacSAP Alfresco Connector by Ctac
SAP Alfresco Connector by CtacAlfresco Software
 
4 Change Catalyzing Questions
4 Change Catalyzing Questions4 Change Catalyzing Questions
4 Change Catalyzing QuestionsTim Creasey
 
Modeling TOGAF with ArchiMate
Modeling TOGAF with ArchiMateModeling TOGAF with ArchiMate
Modeling TOGAF with ArchiMateIver Band
 
Understanding and Implementing Organizational Change
Understanding and Implementing Organizational ChangeUnderstanding and Implementing Organizational Change
Understanding and Implementing Organizational ChangeCourtney Doutherd
 
IT Portfolio Management Using Enterprise Architecture and ITIL® Service Strategy
IT Portfolio Management Using Enterprise Architecture and ITIL® Service StrategyIT Portfolio Management Using Enterprise Architecture and ITIL® Service Strategy
IT Portfolio Management Using Enterprise Architecture and ITIL® Service StrategyNUS-ISS
 
Strategic BOM Management
Strategic BOM ManagementStrategic BOM Management
Strategic BOM ManagementAras
 
Change Management2
Change Management2Change Management2
Change Management2hss601
 
Enterprise Architecture & Project Portfolio Management 2/2
Enterprise Architecture & Project Portfolio Management 2/2Enterprise Architecture & Project Portfolio Management 2/2
Enterprise Architecture & Project Portfolio Management 2/2Jean Gehring
 
ArchiMate 3.0: A New Standard for Architecture
ArchiMate 3.0: A New Standard for ArchitectureArchiMate 3.0: A New Standard for Architecture
ArchiMate 3.0: A New Standard for ArchitectureIver Band
 
2019 07 Bizbok with Archimate 3 v3 [UPDATED !]
 2019 07 Bizbok with Archimate 3 v3 [UPDATED !] 2019 07 Bizbok with Archimate 3 v3 [UPDATED !]
2019 07 Bizbok with Archimate 3 v3 [UPDATED !]COMPETENSIS
 
Cloud architecture with the ArchiMate Language
Cloud architecture with the ArchiMate LanguageCloud architecture with the ArchiMate Language
Cloud architecture with the ArchiMate LanguageIver Band
 
Prosci Webinar - Advanced Applications of ADKAR
Prosci Webinar - Advanced Applications of ADKARProsci Webinar - Advanced Applications of ADKAR
Prosci Webinar - Advanced Applications of ADKARProsci ANZ
 
Application Management Services
Application Management ServicesApplication Management Services
Application Management ServicesAshish Srivastava
 

La actualidad más candente (20)

Practical Enterprise Architecture - Introducing CSVLOD EA Model
Practical Enterprise Architecture - Introducing CSVLOD EA ModelPractical Enterprise Architecture - Introducing CSVLOD EA Model
Practical Enterprise Architecture - Introducing CSVLOD EA Model
 
SAP Engineering Control Center interface to PTC Creo: Product Presentation
SAP Engineering Control Center interface to PTC Creo: Product PresentationSAP Engineering Control Center interface to PTC Creo: Product Presentation
SAP Engineering Control Center interface to PTC Creo: Product Presentation
 
Aras PLM Roadmap
Aras PLM RoadmapAras PLM Roadmap
Aras PLM Roadmap
 
Introduction to monte-carlo analysis for software development - Troy Magennis...
Introduction to monte-carlo analysis for software development - Troy Magennis...Introduction to monte-carlo analysis for software development - Troy Magennis...
Introduction to monte-carlo analysis for software development - Troy Magennis...
 
Enterprise architecture 101.36205348
Enterprise architecture 101.36205348Enterprise architecture 101.36205348
Enterprise architecture 101.36205348
 
Windchill Migration Overview
Windchill Migration OverviewWindchill Migration Overview
Windchill Migration Overview
 
BPM (Business Process Management) Introduction
BPM (Business Process Management) IntroductionBPM (Business Process Management) Introduction
BPM (Business Process Management) Introduction
 
SAP Alfresco Connector by Ctac
SAP Alfresco Connector by CtacSAP Alfresco Connector by Ctac
SAP Alfresco Connector by Ctac
 
4 Change Catalyzing Questions
4 Change Catalyzing Questions4 Change Catalyzing Questions
4 Change Catalyzing Questions
 
Modeling TOGAF with ArchiMate
Modeling TOGAF with ArchiMateModeling TOGAF with ArchiMate
Modeling TOGAF with ArchiMate
 
Understanding and Implementing Organizational Change
Understanding and Implementing Organizational ChangeUnderstanding and Implementing Organizational Change
Understanding and Implementing Organizational Change
 
IT Portfolio Management Using Enterprise Architecture and ITIL® Service Strategy
IT Portfolio Management Using Enterprise Architecture and ITIL® Service StrategyIT Portfolio Management Using Enterprise Architecture and ITIL® Service Strategy
IT Portfolio Management Using Enterprise Architecture and ITIL® Service Strategy
 
Strategic BOM Management
Strategic BOM ManagementStrategic BOM Management
Strategic BOM Management
 
Change Management2
Change Management2Change Management2
Change Management2
 
Enterprise Architecture & Project Portfolio Management 2/2
Enterprise Architecture & Project Portfolio Management 2/2Enterprise Architecture & Project Portfolio Management 2/2
Enterprise Architecture & Project Portfolio Management 2/2
 
ArchiMate 3.0: A New Standard for Architecture
ArchiMate 3.0: A New Standard for ArchitectureArchiMate 3.0: A New Standard for Architecture
ArchiMate 3.0: A New Standard for Architecture
 
2019 07 Bizbok with Archimate 3 v3 [UPDATED !]
 2019 07 Bizbok with Archimate 3 v3 [UPDATED !] 2019 07 Bizbok with Archimate 3 v3 [UPDATED !]
2019 07 Bizbok with Archimate 3 v3 [UPDATED !]
 
Cloud architecture with the ArchiMate Language
Cloud architecture with the ArchiMate LanguageCloud architecture with the ArchiMate Language
Cloud architecture with the ArchiMate Language
 
Prosci Webinar - Advanced Applications of ADKAR
Prosci Webinar - Advanced Applications of ADKARProsci Webinar - Advanced Applications of ADKAR
Prosci Webinar - Advanced Applications of ADKAR
 
Application Management Services
Application Management ServicesApplication Management Services
Application Management Services
 

Destacado

Engineering in oracle
Engineering in oracleEngineering in oracle
Engineering in oracleLarry Sherrod
 
Using ECO Manager automated change management software to improve productivity
Using ECO Manager automated change management  software to improve productivityUsing ECO Manager automated change management  software to improve productivity
Using ECO Manager automated change management software to improve productivityKubotek USA
 
Aras PLM Software Solutions
Aras PLM Software SolutionsAras PLM Software Solutions
Aras PLM Software SolutionsAras
 
Change Management
Change ManagementChange Management
Change ManagementEstragon
 
Engineering Change Management - Overview and Best Practices
Engineering Change Management - Overview and Best PracticesEngineering Change Management - Overview and Best Practices
Engineering Change Management - Overview and Best PracticesShobhit Singhal
 

Destacado (7)

ARAS - change management
ARAS - change managementARAS - change management
ARAS - change management
 
Engineering in oracle
Engineering in oracleEngineering in oracle
Engineering in oracle
 
Using ECO Manager automated change management software to improve productivity
Using ECO Manager automated change management  software to improve productivityUsing ECO Manager automated change management  software to improve productivity
Using ECO Manager automated change management software to improve productivity
 
Aras PLM Software Solutions
Aras PLM Software SolutionsAras PLM Software Solutions
Aras PLM Software Solutions
 
SAP Engineering Change Management(ECM)
SAP Engineering Change Management(ECM) SAP Engineering Change Management(ECM)
SAP Engineering Change Management(ECM)
 
Change Management
Change ManagementChange Management
Change Management
 
Engineering Change Management - Overview and Best Practices
Engineering Change Management - Overview and Best PracticesEngineering Change Management - Overview and Best Practices
Engineering Change Management - Overview and Best Practices
 

Similar a Change Management Options

Removing the barriers to business transformation with ArchiMate
Removing the barriers to business transformation with ArchiMateRemoving the barriers to business transformation with ArchiMate
Removing the barriers to business transformation with ArchiMateCorso
 
PCM to unifier migration considerations - Oracle Primavera P6 Collaborate 14
PCM to unifier migration considerations  - Oracle Primavera P6 Collaborate 14PCM to unifier migration considerations  - Oracle Primavera P6 Collaborate 14
PCM to unifier migration considerations - Oracle Primavera P6 Collaborate 14p6academy
 
Using Change Management in Primavera Contract Management
Using Change Management in Primavera Contract ManagementUsing Change Management in Primavera Contract Management
Using Change Management in Primavera Contract Managementp6academy
 
Business Process De Pillis Tool Comparison
Business Process De Pillis Tool ComparisonBusiness Process De Pillis Tool Comparison
Business Process De Pillis Tool ComparisonG.J. dePillis
 
Innovative Engineering Workshop Npi 30march10
Innovative Engineering Workshop   Npi   30march10Innovative Engineering Workshop   Npi   30march10
Innovative Engineering Workshop Npi 30march10mccall1966
 
]project-open[ Roll Out Plan
]project-open[ Roll Out Plan]project-open[ Roll Out Plan
]project-open[ Roll Out PlanKlaus Hofeditz
 
System Development Life Cycle ( Sdlc )
System Development Life Cycle ( Sdlc )System Development Life Cycle ( Sdlc )
System Development Life Cycle ( Sdlc )Jennifer Wright
 
Business Intelligence Module 3
Business Intelligence Module 3Business Intelligence Module 3
Business Intelligence Module 3Home
 
Control-M - Guide to Selecting a Workflow Orchestration Product
Control-M - Guide to Selecting a Workflow Orchestration ProductControl-M - Guide to Selecting a Workflow Orchestration Product
Control-M - Guide to Selecting a Workflow Orchestration ProductIT Central Station
 
CRM system for WeLoveVideo.pptCRM System for WeLoveVid.docx
CRM system for WeLoveVideo.pptCRM System for WeLoveVid.docxCRM system for WeLoveVideo.pptCRM System for WeLoveVid.docx
CRM system for WeLoveVideo.pptCRM System for WeLoveVid.docxmydrynan
 
Agile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystemsAgile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystemsulfkoester
 
3 Approaches to Integrated ALM, A case for ALM Platform
3 Approaches to Integrated ALM, A case for ALM Platform3 Approaches to Integrated ALM, A case for ALM Platform
3 Approaches to Integrated ALM, A case for ALM PlatformKovair
 
Appendix C – Project Close-out ChecklistSection 1.General Inf.docx
Appendix C – Project Close-out ChecklistSection 1.General Inf.docxAppendix C – Project Close-out ChecklistSection 1.General Inf.docx
Appendix C – Project Close-out ChecklistSection 1.General Inf.docxfestockton
 
Yapp methodology anjo-kolk
Yapp methodology anjo-kolkYapp methodology anjo-kolk
Yapp methodology anjo-kolkToon Koppelaars
 
Introduction to Agile change agent
Introduction to Agile change agentIntroduction to Agile change agent
Introduction to Agile change agentTraining Bytesize
 

Similar a Change Management Options (20)

Removing the barriers to business transformation with ArchiMate
Removing the barriers to business transformation with ArchiMateRemoving the barriers to business transformation with ArchiMate
Removing the barriers to business transformation with ArchiMate
 
0.3 aim phases_and_documentations
0.3 aim phases_and_documentations0.3 aim phases_and_documentations
0.3 aim phases_and_documentations
 
Mohamed Tawila CV
Mohamed Tawila CVMohamed Tawila CV
Mohamed Tawila CV
 
PCM to unifier migration considerations - Oracle Primavera P6 Collaborate 14
PCM to unifier migration considerations  - Oracle Primavera P6 Collaborate 14PCM to unifier migration considerations  - Oracle Primavera P6 Collaborate 14
PCM to unifier migration considerations - Oracle Primavera P6 Collaborate 14
 
Using Change Management in Primavera Contract Management
Using Change Management in Primavera Contract ManagementUsing Change Management in Primavera Contract Management
Using Change Management in Primavera Contract Management
 
Business Process De Pillis Tool Comparison
Business Process De Pillis Tool ComparisonBusiness Process De Pillis Tool Comparison
Business Process De Pillis Tool Comparison
 
Innovative Engineering Workshop Npi 30march10
Innovative Engineering Workshop   Npi   30march10Innovative Engineering Workshop   Npi   30march10
Innovative Engineering Workshop Npi 30march10
 
]project-open[ Roll Out Plan
]project-open[ Roll Out Plan]project-open[ Roll Out Plan
]project-open[ Roll Out Plan
 
Aim crisp handout
Aim crisp handoutAim crisp handout
Aim crisp handout
 
System Development Life Cycle ( Sdlc )
System Development Life Cycle ( Sdlc )System Development Life Cycle ( Sdlc )
System Development Life Cycle ( Sdlc )
 
Business Intelligence Module 3
Business Intelligence Module 3Business Intelligence Module 3
Business Intelligence Module 3
 
25155
2515525155
25155
 
Control-M - Guide to Selecting a Workflow Orchestration Product
Control-M - Guide to Selecting a Workflow Orchestration ProductControl-M - Guide to Selecting a Workflow Orchestration Product
Control-M - Guide to Selecting a Workflow Orchestration Product
 
FAQs on Billings and Project Milestones
FAQs on Billings and Project MilestonesFAQs on Billings and Project Milestones
FAQs on Billings and Project Milestones
 
CRM system for WeLoveVideo.pptCRM System for WeLoveVid.docx
CRM system for WeLoveVideo.pptCRM System for WeLoveVid.docxCRM system for WeLoveVideo.pptCRM System for WeLoveVid.docx
CRM system for WeLoveVideo.pptCRM System for WeLoveVid.docx
 
Agile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystemsAgile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystems
 
3 Approaches to Integrated ALM, A case for ALM Platform
3 Approaches to Integrated ALM, A case for ALM Platform3 Approaches to Integrated ALM, A case for ALM Platform
3 Approaches to Integrated ALM, A case for ALM Platform
 
Appendix C – Project Close-out ChecklistSection 1.General Inf.docx
Appendix C – Project Close-out ChecklistSection 1.General Inf.docxAppendix C – Project Close-out ChecklistSection 1.General Inf.docx
Appendix C – Project Close-out ChecklistSection 1.General Inf.docx
 
Yapp methodology anjo-kolk
Yapp methodology anjo-kolkYapp methodology anjo-kolk
Yapp methodology anjo-kolk
 
Introduction to Agile change agent
Introduction to Agile change agentIntroduction to Agile change agent
Introduction to Agile change agent
 

Más de Aras

Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods IndustryImplementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods IndustryAras
 
Client Technology Directions
Client Technology DirectionsClient Technology Directions
Client Technology DirectionsAras
 
Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016Aras
 
Aras Community Update 2016
Aras Community Update 2016Aras Community Update 2016
Aras Community Update 2016Aras
 
MBSE and the Business of Engineering
MBSE and the Business of EngineeringMBSE and the Business of Engineering
MBSE and the Business of EngineeringAras
 
Beyond ECAD Connectors
Beyond ECAD ConnectorsBeyond ECAD Connectors
Beyond ECAD ConnectorsAras
 
The PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic VisionThe PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic VisionAras
 
The Impact of IoT on Product Design
The Impact of IoT on Product DesignThe Impact of IoT on Product Design
The Impact of IoT on Product DesignAras
 
Enterprise Agile Deployment
Enterprise Agile DeploymentEnterprise Agile Deployment
Enterprise Agile DeploymentAras
 
Taking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next LevelTaking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next LevelAras
 
Quality Systems
Quality SystemsQuality Systems
Quality SystemsAras
 
The Power of Self Service Reporting
The Power of Self Service ReportingThe Power of Self Service Reporting
The Power of Self Service ReportingAras
 
Making users More Productive with Enterprise Search
Making users More Productive with Enterprise SearchMaking users More Productive with Enterprise Search
Making users More Productive with Enterprise SearchAras
 
Understanding the New Content Modeling Framework
Understanding the New Content Modeling FrameworkUnderstanding the New Content Modeling Framework
Understanding the New Content Modeling FrameworkAras
 
Technical Documentation for Technical Publications
Technical Documentation for Technical PublicationsTechnical Documentation for Technical Publications
Technical Documentation for Technical PublicationsAras
 
Supplier Exchange Portal
Supplier Exchange PortalSupplier Exchange Portal
Supplier Exchange PortalAras
 
Quality Planning for Product Risk Management
Quality Planning for Product Risk ManagementQuality Planning for Product Risk Management
Quality Planning for Product Risk ManagementAras
 
How to Configure Tech Docs
How to Configure Tech DocsHow to Configure Tech Docs
How to Configure Tech DocsAras
 
Techniques for Gathering Agile Requirements
Techniques for Gathering Agile RequirementsTechniques for Gathering Agile Requirements
Techniques for Gathering Agile RequirementsAras
 
Whats New in Visual Collaboration 2016
Whats New in Visual Collaboration 2016Whats New in Visual Collaboration 2016
Whats New in Visual Collaboration 2016Aras
 

Más de Aras (20)

Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods IndustryImplementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
Implementing PLM in the Fast-Paced, Innovation Driven Prepared Foods Industry
 
Client Technology Directions
Client Technology DirectionsClient Technology Directions
Client Technology Directions
 
Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016Aras Vision and Roadmap 2016
Aras Vision and Roadmap 2016
 
Aras Community Update 2016
Aras Community Update 2016Aras Community Update 2016
Aras Community Update 2016
 
MBSE and the Business of Engineering
MBSE and the Business of EngineeringMBSE and the Business of Engineering
MBSE and the Business of Engineering
 
Beyond ECAD Connectors
Beyond ECAD ConnectorsBeyond ECAD Connectors
Beyond ECAD Connectors
 
The PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic VisionThe PLM Journey of Justifying Change with Strategic Vision
The PLM Journey of Justifying Change with Strategic Vision
 
The Impact of IoT on Product Design
The Impact of IoT on Product DesignThe Impact of IoT on Product Design
The Impact of IoT on Product Design
 
Enterprise Agile Deployment
Enterprise Agile DeploymentEnterprise Agile Deployment
Enterprise Agile Deployment
 
Taking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next LevelTaking Manufacturing Process Planning to the Next Level
Taking Manufacturing Process Planning to the Next Level
 
Quality Systems
Quality SystemsQuality Systems
Quality Systems
 
The Power of Self Service Reporting
The Power of Self Service ReportingThe Power of Self Service Reporting
The Power of Self Service Reporting
 
Making users More Productive with Enterprise Search
Making users More Productive with Enterprise SearchMaking users More Productive with Enterprise Search
Making users More Productive with Enterprise Search
 
Understanding the New Content Modeling Framework
Understanding the New Content Modeling FrameworkUnderstanding the New Content Modeling Framework
Understanding the New Content Modeling Framework
 
Technical Documentation for Technical Publications
Technical Documentation for Technical PublicationsTechnical Documentation for Technical Publications
Technical Documentation for Technical Publications
 
Supplier Exchange Portal
Supplier Exchange PortalSupplier Exchange Portal
Supplier Exchange Portal
 
Quality Planning for Product Risk Management
Quality Planning for Product Risk ManagementQuality Planning for Product Risk Management
Quality Planning for Product Risk Management
 
How to Configure Tech Docs
How to Configure Tech DocsHow to Configure Tech Docs
How to Configure Tech Docs
 
Techniques for Gathering Agile Requirements
Techniques for Gathering Agile RequirementsTechniques for Gathering Agile Requirements
Techniques for Gathering Agile Requirements
 
Whats New in Visual Collaboration 2016
Whats New in Visual Collaboration 2016Whats New in Visual Collaboration 2016
Whats New in Visual Collaboration 2016
 

Último

John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangaloreamitlee9823
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLkapoorjyoti4444
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...lizamodels9
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperityhemanthkumar470700
 

Último (20)

John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service BangaloreCall Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
Call Girls Hebbal Just Call 👗 7737669865 👗 Top Class Call Girl Service Bangalore
 
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabiunwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
unwanted pregnancy Kit [+918133066128] Abortion Pills IN Dubai UAE Abudhabi
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 

Change Management Options

  • 1. aras.comCopyright © 2013 Aras. All Rights Reserved. DOMOREA C E 2 0 1 3
  • 2. aras.comCopyright © 2013 Aras. All Rights Reserved. A C E 2 0 1 3 Change Management Options Figuring out which Change workflow is for you Simple, Express, CMII or Custom
  • 3. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 3 Agenda  Aras Change Management Philosophy  CMII Change Process: PR, ERC, ECN  Simple Change Process: ECO & MCO  Express Change Process: ECO & Impact Matrix  Document Change Process: DCO  Optional Custom Change Processes  Custom Change Process Examples  Summary
  • 4. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 4 Why Change Management ?  As soon as there is a need for managing revisions of a data object you need to think about managing the changes between revisions.  Scenario 1 - If you deal with a single object that has revisions, change management is usually very simple.  Scenario 2 - If you deal with data objects that have revisions that are related to other data objects that have revisions (revisioned structures), you are introducing the principles of configuration management and change management can get very complex. In addition to revisions the behavior of relationship (fixed or float) must be managed, as well. Doc 1000 – Rev A Doc 1000 – Rev B Doc 1000 – Rev C
  • 5. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 5 The Impact of Enterprise Changes  Functional Impact – Do other items need to be changed ?  Price Impact – Will the price of this item and other affected items change ?  Timing Impact – Will it delay or speed up other activities ?  Cross-Functional Impact – Who needs to be informed and agree ?  Customers, Partners ?  Purchasing, Supply Chain, Manufacturing, QA ?  And more … Planning and Executing a Change can quickly impact many different organizations in your company. Decision making and approvals sign-offs will require additional coordination.  Any Change will create Effort and Cost  New Design, New Prototype …  Documentation Change …  New Tooling …  Meetings, Reviews …
  • 6. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 6 How to Plan a Change ?  Do planning and approvals outside of PLM: and then only run „Change Orders“ in Aras to execute on the planned changes and document(s) changed.  In this case the Simple Change Process or Manual Revision & Release are what you want to use.  Do planning as part of the Change Management Process inside PLM: and document the planning & approvals, as well as, execution of „Change Orders“ in Aras.  In this case change mechanisms that support planning and documenting your change actions & decisions and that allow change impact analysis are what you want to use. Either CMII, Express Change Process or Custom.  Aras provides Out-of-the-Box (OOTB) Functionality that supports both approaches.
  • 7. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 7 Aras Change Processes: Out-of-the-Box (OOTB)  CMII Change Process: PR  ECR  ECN  Simple Change Process: ECO & MCO  Express Change Process: ECO with Impact Matrix  Document Change Process: DCO  Manual Revision & Release: No Process  By Permissions  The owner of a Part or a Document has the security permissions to revise and release without a workflow
  • 8. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 8 CMII Change Process  The CMII Change Management principles define multiple stages for a Change process.  CMII defines specific users roles responsible for each of the stages.  At a high level: Multiple PRs can be mapped to an ECR and multiple ECRs can be mapped to an ECN that finalizes the Change process. PR PR PR PR PR PR PR PR ECR ECR ECN Anyone can raise a Problem Report Change Specialist 1 (role) Coordinates PR‘s and ECR‘s Change Review Board (CRB) Reviews and approves Change Implementation Board (CIB) Validates and approves Change Specialist 2 (role) Coordinates ECN‘s
  • 9. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 9 CMII Changes: PR & ECR Simple Workflow for PRs ECR is used to document Change Impact, Criticality, Change Cost, and Timing to determine a Go or NoGo decision by members of the Change Review Board (CRB) ECR Workflow includes review activities for the CRB
  • 10. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 10 CMII Changes: ECN Then, an ECN is used to document implemented changes and effectivity date. The versioning of affected items takes place here. The Change Implementation Board (CIB) approves the completed changes. With the release of an ECN all affected items are also released to their planned new revisions.
  • 11. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 11 Simple Change Process: ECO & MCO  Offers a streamlined approach to managing changes  Can be used in parallel with CMII change process  Engineering Change Order (ECO)  Used to add, update or delete parts and documents in three state changes.  ECO is shorter than the CMII process by removing the PR and ECR steps from the process.  Both Parts and Document (and CAD) items can be driven by this ECO  Manufacturing Change Order (MCO)  Used to edit an Approved Manufacturers List (the AML tab on Parts) after a Part has been released.  Does not increment revision sequence.
  • 12. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 12 Simple ECO Form & Workflow Simple ECO allows for optional Reviews and Fast Track. Changes to Part, Document and CAD items can be managed together. The Signoffs tab provides quick access to the Workflow History and to pending workflow activities of the current user.
  • 13. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 13 Express Change Process Different ECO Option that inc Impact Matrix  Can be used in parallel with CMII and/or Simple ECO change process.  An additional planning step is included on the workflow.  During planning an intelligent “Impact Matrix” allows to define and plan change actions.  The Impact Matrix:  Provides an interactive user interface for where-used / impact analysis  Utilizes new item actions: Release, Revise, Renumber, Supersede, Obsolete, Review, None  And it supports relationship actions: Add, Modify, Delete  For additional access control – a team can be assigned (team manager, members and guests)  Like with Simple ECO the Signoffs tab is enabled for quick access to the Workflow history and current workflow activities.
  • 14. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 14 Express ECO Form Impact Matrix and Workflow
  • 15. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 15 Document Change Process: DCO  Can be used in parallel with CMII and/or Simple ECO and/or Express ECO.  This Change Process is designed to be used for changes to Document or CAD items.  Like Express ECO it utilizes Team access controls and the quick access to the Workflow on the Signoffs tab.  Benefits  Can be used to do a „mass“ release of a list of Documents in one process. With reviews.  Can be used to do change revisions of a list of Documents in one process. With reviews.
  • 16. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 16 Need a Custom Change Process? If the OOTB Change Processes (ECR, ECO etc.) DO NOT FULFILL your company‘s specific change management requirements, then you still have options:  Adapt existing Change Process. Common extensions include:  Additional access control logic  will not impact the versioning behavior of the change process  Add more Properties or Sub-Forms with checking logic  will not impact the versioning behavior of the change process  Add new or different Assignees to existing workflow activities  easy to do  Add new Workflow Activities  you may need to extend existing workflow business logic  Add steps to the change process Life Cycle Map  you may need to extend existing business logic of the lifecycle map driving the Affeected Items mechanism  Build your own Change Process (own Forms, Lifecycles and Workflows – It‘s Not Hard)  If your new process does not need to be used interchangeably with the OOTB change forms and workflow, then you are pretty free to add any new form, workflow , business logic.  If your new process does need to be used interchangeably, you will need to connect to the functionality of the OOTB processes and match your data model with the „Affected Item“ concept and the concept of flagging pending changes.
  • 17. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 17 Custom Change Examples Special circumstances, competitive practices, complexity may create need for custom change process  Lear – Engineering driven Automotive  Spontech Spine – QA driven Med Devices  Xerox – Time-to-Market driven Electronics
  • 18. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 18 Lear Change Workflows Slide 18 Main Workflow Additonal Sub-Flow for complex changes
  • 19. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 19 Lear Change Form Slide 19 Multiple Programs, Multiple Locations Impacted based on Affected Items
  • 20. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 20 Spontech Spine One Main CM Form many Sub-Forms and Sub-Workflows Main CM Analysis Dispo Actions Change Plan Action Item Single Item Change Order Affected Documents All sub workflows of „Single Item Changes“ and „Action Items“ must be closed before Main CM workflow can close Adhoc Actions Affected Parts Sub-Forms on Tabs Sub-Workflows Sub-Workflows
  • 21. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 21 Spontech Spine Change Form
  • 22. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 22 Xerox Change Workflow Many Optional Steps to Handle Wide Range of Scenarios
  • 23. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 23 Summary  The core behavior for versioning and revisions can be turned on (and off) with just a simple flag on an Item Type (manual or automatic).  OOTB Item Types: Part, Document, CAD have versioning turned on by default.  Your custom Item Type can easily be defined as versionable items.  Relationship behavior can be configured to be „fix“ or „float“ for a wide variety of complex configuration management requirements. Addl rules can be customized.  The core behaviour for versions & revisions can be extended by customizing the „Version“ event and/or the related life cycle states and/or workflow activities logic.  To get started quickly, you can choose to use any of the OOTB change forms and processes in Aras. (like ECR, ECO, DCO etc.)  You can easily build your own change forms, lifecycles and workflows for more specialized change processes and change collaboration scenarios. Everything is Possible: from very simple version control to highly specialized and complex change and configuration management procedures, as required.
  • 24. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 24  Integrated „Help“ Just Ask Innovator  Search for: PR, ECR, ECO, or CMII  Aras Training  Configuring Solutions Course http://www.aras.com/university/training-classes.aspx  Online Learning - Product Engineering Essentials http://www.aras.com/SubscriberPortal/ (for Subscribers)  Educational Organizations  Institute of Configuration Management http://www.icmhq.com  Configuration Management Process Improvement Center http://www.cmpic.com/ More Information
  • 25. aras.comCopyright © 2013 Aras. All Rights Reserved. Slide 25 Q & A