SlideShare una empresa de Scribd logo
1 de 24
BIM for Manufacturers – Help with the Journey
Product Data Templates and COBie
BIM for Manufacturers and Manufacturing
Presented by
Matt Crunden
Training and BIM Manager
Legrand Electric Ltd
Product Data Templates
Product Data Templates
+ =
Product Data Templates
Product Data Templates
Product Data Templates
Product Data Templates
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
PDT Steering Group
Product Data Templates
Category eg: Cable Ladder
System or Powertrack System
Manufacturer data eg: Name,
website, link to tech data
Product specification data eg:
dimensions, available finishes
Product Data Templates
Performance data eg:
electrical
Sustainability eg: embodied
carbon, EPD’s
FM eg: O&M schedules
Product Data Templates
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
Plain Language Questions Plain Language Answers
Product Data Sheets
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
Plain Language Answers
Completed PDT =
Product Data Sheet
(PDS)
HOSTED ON
MANUFACTURER
WEBSITE
FREE TO DOWNLOAD
COMPLETED ONCE
COMPLETED BY ‘RANGE’
Product Data Sheets
PDT’s feed into COBie
PRODUCT INFORMATION
PROJECT INFORMATION
Product Data Sheets / Sets
Project value = £100m
25%
capex
75%
opex
2 years 40 years
COBie & FM
Automating Data Management
(PROJECT STAGE 2)
Product Data Sheets / Sets
Automating Data Management
(PROJECT STAGE 3)
Product Data Sheets / Sets
Automating Data Management
(PROJECT STAGE 4)
STRUCTURED DATA
(PAS 1192-2)
FIXED FORMAT
EASE OF USE
PLATFORM NEUTRAL
GEOGRAPHICALLY NEUTRAL
MULTI DISCIPLINE
MULTI SECTOR
Product Data Sheets / Sets
Product Data Templates
Data Templates
Developing templates to enable
manufacturers to easily provide
consistent and useable information
PDT’s
Examples out for consultation
COOLING COIL
HEATER BATTERY
PLATE HEAT EXCHANGER
RADIANT PANEL
UV STERILISER
TANK
Trade bodies
BIM4M2
Product Data Templates
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
Template Category
Template Version
Category Description
Classification System
Classification
Information Category Parameter Name Value Units Notes
Specifications Manufacturer Text
Specifications Manufacturer Website URL
Specifications Product Range Text
Specifications Product Model Number (Code) Text
Specifications CE Approval No. Text
Specifications Product Literature Webpage URL
Specifications Type Text This is a COBie field, other fields will be required in final PDTs.
Specifications Shape Text This is a COBie field, other fields will be required in final PDTs.
Specifications Material Text This is a COBie field, other fields will be required in final PDTs.
Specifications Overall Length mm
Specifications Overall Width mm
Specifications Overall Height mm
Specifications GrossWeight kg Equates to Operating Weight
Specifications Shipping Weight kg
Specifications Access Clearance Top mm
Specifications Access Clearance Bottom mm
Specifications Access Clearance Left mm
Specifications Access Clearance Right mm
Specifications Access Clearance Front mm
Specifications Access Clearance Rear mm
Specifications ReferenceStandard Text
Specifications Incoming Supply Electrical Voltage Volts
Specifications Incoming Supply Phase Number 1,3
Specifications Incoming Supply Electrical Frequency Hertz 50,60
Specifications Motor Enclosure Rating Text IP numbers
Specifications Motor Type Text
Specifications Number of Poles Number 1,3
Specifications Motor Efficiency Class (CEMEP) Text
Specifications Starting Method Text DoL,StarDelta, Soft
Specifications BMS Links Y/N
Sustainable Material BREEAM etc Embodied Carbon kgCO2
Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM
Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting
Sustainable Material BREEAM etc Green Guide for Specification Text A - E
Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification
Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body
Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product
Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA
Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA
Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data
Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes.
Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame.
Facilities/Asset Management ExpectedLife Years
Facilities/Asset Management WarrantyID Text
Dimensional Data
Performance Data
Electrical Data (if required)
Sustainability
Controls
Operations & Maintenance
Category
Value
v.
Manufacturer Data
Construction Data
Description
Product Data Templates
Create
• Professional body appoint Originating author
• Liaise with Manufacturers
Technical
Approval
• Refer to Peers
• Liaise with Professional body Technical Committee
Consultation
• Issue for draft use
• Gather feedback and enact where appropriate
Issue
• Final Technical Committee sign off
• Approved for use
Annual
Check
• Gather feedback and Review by Professional body
• Changes approved by Technical Committee
Product Data Templates
IDENTIFY NEED
REFER TO MASTER LIST
IS THERE SOMETHING SIMILAR
GO FOR IT !!!
Product Data Templates
MANUFACTURER
CONTRACTOR
DESIGNER
SPECIFIER
BUYER
FM
Product Data Templates
The Built Environment as part of a Smart, networked world
Product Data Templates (PDTs) and CObie - #BIM4M2help

Más contenido relacionado

La actualidad más candente

COBIE Overview
COBIE OverviewCOBIE Overview
COBIE Overview
istarkov
 
BASIC TERMS IN BIM-REVIT
BASIC TERMS IN BIM-REVITBASIC TERMS IN BIM-REVIT
BASIC TERMS IN BIM-REVIT
nilesh masne
 

La actualidad más candente (20)

Common data environment by iso 19650
Common data environment by iso 19650Common data environment by iso 19650
Common data environment by iso 19650
 
Customer projects Dlubal RFEM RSTAB
Customer projects Dlubal RFEM RSTAB Customer projects Dlubal RFEM RSTAB
Customer projects Dlubal RFEM RSTAB
 
Level of Information Need + ISO 19650 Appointment Workflow (and eSignature fo...
Level of Information Need + ISO 19650 Appointment Workflow (and eSignature fo...Level of Information Need + ISO 19650 Appointment Workflow (and eSignature fo...
Level of Information Need + ISO 19650 Appointment Workflow (and eSignature fo...
 
Revit Structure Training
Revit Structure TrainingRevit Structure Training
Revit Structure Training
 
IFC Workflow Guide
IFC Workflow GuideIFC Workflow Guide
IFC Workflow Guide
 
Bim lod
Bim lodBim lod
Bim lod
 
ISO 19650 - Episode 1 - ISO 19650 OIR+EIR+BEP++++ Templates Webinar
ISO 19650 - Episode 1 - ISO 19650 OIR+EIR+BEP++++ Templates WebinarISO 19650 - Episode 1 - ISO 19650 OIR+EIR+BEP++++ Templates Webinar
ISO 19650 - Episode 1 - ISO 19650 OIR+EIR+BEP++++ Templates Webinar
 
REVIT TEST.pdf
REVIT TEST.pdfREVIT TEST.pdf
REVIT TEST.pdf
 
Safety implementation in BIM
Safety implementation in BIMSafety implementation in BIM
Safety implementation in BIM
 
BIM training
BIM training BIM training
BIM training
 
BIM for Health & Safety: Virtually Sorted
BIM for Health & Safety: Virtually SortedBIM for Health & Safety: Virtually Sorted
BIM for Health & Safety: Virtually Sorted
 
COBIE Overview
COBIE OverviewCOBIE Overview
COBIE Overview
 
BIM Analysis
BIM AnalysisBIM Analysis
BIM Analysis
 
BASIC TERMS IN BIM-REVIT
BASIC TERMS IN BIM-REVITBASIC TERMS IN BIM-REVIT
BASIC TERMS IN BIM-REVIT
 
BIM
BIM BIM
BIM
 
Precast driven pile 450 x450
Precast driven pile 450 x450Precast driven pile 450 x450
Precast driven pile 450 x450
 
Revit BIM Engineering Solutions by TrueCADD
Revit BIM Engineering Solutions by TrueCADDRevit BIM Engineering Solutions by TrueCADD
Revit BIM Engineering Solutions by TrueCADD
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?
 
The NBS BIM Toolkit and Digital Plan of Work
The NBS BIM Toolkit and Digital Plan of WorkThe NBS BIM Toolkit and Digital Plan of Work
The NBS BIM Toolkit and Digital Plan of Work
 
BIM for Lifecycle Asset Management
BIM for Lifecycle Asset ManagementBIM for Lifecycle Asset Management
BIM for Lifecycle Asset Management
 

Destacado

BIM Presentation Germany R3
BIM Presentation Germany R3BIM Presentation Germany R3
BIM Presentation Germany R3
Clive Walsh
 
Revit Architecture
Revit ArchitectureRevit Architecture
Revit Architecture
niict
 

Destacado (18)

BIM: The Right Level of Content #BIM4M2help
BIM: The Right Level of Content #BIM4M2helpBIM: The Right Level of Content #BIM4M2help
BIM: The Right Level of Content #BIM4M2help
 
BIM - Gaining Competitive Advantage
BIM - Gaining Competitive Advantage   BIM - Gaining Competitive Advantage
BIM - Gaining Competitive Advantage
 
BIM - How to Do it? #BIM4M2help
BIM - How to Do it? #BIM4M2helpBIM - How to Do it? #BIM4M2help
BIM - How to Do it? #BIM4M2help
 
BIM Software and Hosting Options - what package should you use #BIM4M2help
BIM Software and Hosting Options - what package should you use #BIM4M2helpBIM Software and Hosting Options - what package should you use #BIM4M2help
BIM Software and Hosting Options - what package should you use #BIM4M2help
 
Data Templates - #BIM4M2help
Data Templates - #BIM4M2helpData Templates - #BIM4M2help
Data Templates - #BIM4M2help
 
Why Manufacturers Need BIM - #BIM4M2help
Why Manufacturers Need BIM - #BIM4M2helpWhy Manufacturers Need BIM - #BIM4M2help
Why Manufacturers Need BIM - #BIM4M2help
 
BIM - What the Client wants from Manufacturers #BIM4M2help
BIM - What the Client wants from Manufacturers #BIM4M2helpBIM - What the Client wants from Manufacturers #BIM4M2help
BIM - What the Client wants from Manufacturers #BIM4M2help
 
BIM: What does the Contractor want from the Manufacturer? #BIM4M2help
BIM: What does the Contractor want from the Manufacturer? #BIM4M2helpBIM: What does the Contractor want from the Manufacturer? #BIM4M2help
BIM: What does the Contractor want from the Manufacturer? #BIM4M2help
 
Client Case Study - Sandwell Council
Client Case Study - Sandwell Council Client Case Study - Sandwell Council
Client Case Study - Sandwell Council
 
BIM - what 2016 means for Manufacturers
BIM - what 2016 means for ManufacturersBIM - what 2016 means for Manufacturers
BIM - what 2016 means for Manufacturers
 
BIM - Contractors and Manufacturers working together
BIM - Contractors and Manufacturers working togetherBIM - Contractors and Manufacturers working together
BIM - Contractors and Manufacturers working together
 
An Introduction to BIM for Manufacturers
An Introduction to BIM for ManufacturersAn Introduction to BIM for Manufacturers
An Introduction to BIM for Manufacturers
 
Architecture presentation 5
Architecture presentation 5Architecture presentation 5
Architecture presentation 5
 
BIM Presentation Germany R3
BIM Presentation Germany R3BIM Presentation Germany R3
BIM Presentation Germany R3
 
BIFM Merseyside Networking Group - BIM & Facilities Management
BIFM Merseyside Networking Group - BIM & Facilities ManagementBIFM Merseyside Networking Group - BIM & Facilities Management
BIFM Merseyside Networking Group - BIM & Facilities Management
 
Revit Architecture
Revit ArchitectureRevit Architecture
Revit Architecture
 
Revit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) PresentationRevit and Building Information Modeling (BIM) Presentation
Revit and Building Information Modeling (BIM) Presentation
 
Building Information Modeling (BIM)
Building Information Modeling (BIM)Building Information Modeling (BIM)
Building Information Modeling (BIM)
 

Similar a Product Data Templates (PDTs) and CObie - #BIM4M2help

Segue Presentation 4.15a.09
Segue Presentation 4.15a.09Segue Presentation 4.15a.09
Segue Presentation 4.15a.09
pfrasso
 
Punith_Resume_Diploma_EC
Punith_Resume_Diploma_ECPunith_Resume_Diploma_EC
Punith_Resume_Diploma_EC
Punith Gowda
 
Aes Corporate Presentation
Aes Corporate PresentationAes Corporate Presentation
Aes Corporate Presentation
carriestalker
 
Wind turbine reliability
Wind turbine reliabilityWind turbine reliability
Wind turbine reliability
karthik451
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale
 
LAI International | A Manufacturing Capabilities Overview
LAI International | A Manufacturing Capabilities OverviewLAI International | A Manufacturing Capabilities Overview
LAI International | A Manufacturing Capabilities Overview
LAI International | The Precision Manufacturing Experts.
 

Similar a Product Data Templates (PDTs) and CObie - #BIM4M2help (20)

Digitalisation of the Construction Industry and its Supply Chain #SPRAConfere...
Digitalisation of the Construction Industry and its Supply Chain #SPRAConfere...Digitalisation of the Construction Industry and its Supply Chain #SPRAConfere...
Digitalisation of the Construction Industry and its Supply Chain #SPRAConfere...
 
Segue Presentation 4.15a.09
Segue Presentation 4.15a.09Segue Presentation 4.15a.09
Segue Presentation 4.15a.09
 
Punith_Resume_Diploma_EC
Punith_Resume_Diploma_ECPunith_Resume_Diploma_EC
Punith_Resume_Diploma_EC
 
Aes Corporate Presentation
Aes Corporate PresentationAes Corporate Presentation
Aes Corporate Presentation
 
Wind turbine reliability
Wind turbine reliabilityWind turbine reliability
Wind turbine reliability
 
DSS RAJESH
DSS RAJESHDSS RAJESH
DSS RAJESH
 
Popular Systems, Coimbatore, Electrical Components
Popular Systems, Coimbatore, Electrical ComponentsPopular Systems, Coimbatore, Electrical Components
Popular Systems, Coimbatore, Electrical Components
 
Full Material Declarations: Removing Barriers to Environmental Data Reporting
Full Material Declarations: Removing Barriers to Environmental Data ReportingFull Material Declarations: Removing Barriers to Environmental Data Reporting
Full Material Declarations: Removing Barriers to Environmental Data Reporting
 
Advanced technical services unipower power point 101018
Advanced technical services unipower power point 101018Advanced technical services unipower power point 101018
Advanced technical services unipower power point 101018
 
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)Shrikant Kathale-Design Engineer CV (8 Years Exp.)
Shrikant Kathale-Design Engineer CV (8 Years Exp.)
 
Assessing Performance In Energy Sector PowerPoint Presentation Slides
Assessing Performance In Energy Sector PowerPoint Presentation SlidesAssessing Performance In Energy Sector PowerPoint Presentation Slides
Assessing Performance In Energy Sector PowerPoint Presentation Slides
 
LAI International | A Manufacturing Capabilities Overview
LAI International | A Manufacturing Capabilities OverviewLAI International | A Manufacturing Capabilities Overview
LAI International | A Manufacturing Capabilities Overview
 
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
US EPA's Electronic Reporting Tool and Compliance and Emissions Data Reportin...
 
Spec 2300 Common and Unique Design Features
Spec 2300 Common and Unique Design FeaturesSpec 2300 Common and Unique Design Features
Spec 2300 Common and Unique Design Features
 
Performance Measurement In Energy Sector PowerPoint Presentation Slides
Performance Measurement In Energy Sector PowerPoint Presentation SlidesPerformance Measurement In Energy Sector PowerPoint Presentation Slides
Performance Measurement In Energy Sector PowerPoint Presentation Slides
 
Emcs
EmcsEmcs
Emcs
 
OEM Wiring Harness & ODM Custom Cable Assembly & Wire Harness Manufacturer
OEM Wiring Harness & ODM Custom Cable Assembly & Wire Harness ManufacturerOEM Wiring Harness & ODM Custom Cable Assembly & Wire Harness Manufacturer
OEM Wiring Harness & ODM Custom Cable Assembly & Wire Harness Manufacturer
 
Broadcom AFEM-8072 – Mid and High Band LTE RF Front-End Module (FEM) - teardo...
Broadcom AFEM-8072 – Mid and High Band LTE RF Front-End Module (FEM) - teardo...Broadcom AFEM-8072 – Mid and High Band LTE RF Front-End Module (FEM) - teardo...
Broadcom AFEM-8072 – Mid and High Band LTE RF Front-End Module (FEM) - teardo...
 
Engineering Services Capabilities
Engineering Services CapabilitiesEngineering Services Capabilities
Engineering Services Capabilities
 
Mazda Star Barcelona
Mazda Star BarcelonaMazda Star Barcelona
Mazda Star Barcelona
 

Último

Low Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 21 (Gurgaon)
Low Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 21 (Gurgaon)Low Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 21 (Gurgaon)
Low Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 21 (Gurgaon)
delhi24hrs1
 
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
ApartmentWala1
 
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
delhi24hrs1
 
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
ApartmentWala1
 
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
asmaqueen5
 
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
asmaqueen5
 
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
asmaqueen5
 
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...
asmaqueen5
 
Escort—>Call GiRls In Mori Gate Delhi —>8447779280—Service Escorts In South D...
Escort—>Call GiRls In Mori Gate Delhi —>8447779280—Service Escorts In South D...Escort—>Call GiRls In Mori Gate Delhi —>8447779280—Service Escorts In South D...
Escort—>Call GiRls In Mori Gate Delhi —>8447779280—Service Escorts In South D...
asmaqueen5
 
Low Rate Call girls in Sant Nagar{Delhi }8447779280} Service Escorts In South...
Low Rate Call girls in Sant Nagar{Delhi }8447779280} Service Escorts In South...Low Rate Call girls in Sant Nagar{Delhi }8447779280} Service Escorts In South...
Low Rate Call girls in Sant Nagar{Delhi }8447779280} Service Escorts In South...
asmaqueen5
 
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor PresentationMEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ - Mainstreet Equity Corp.
 

Último (20)

Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024
 
Low Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 21 (Gurgaon)
Low Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 21 (Gurgaon)Low Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 21 (Gurgaon)
Low Rate ✨➥9582086666▻✨Call Girls In Gurgaon Sector 21 (Gurgaon)
 
construction material procurement in India
construction material procurement in Indiaconstruction material procurement in India
construction material procurement in India
 
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
 
Yedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing TurkeyYedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing Turkey
 
Nyati Elite NIBM Road Pune E Brochure.pdf
Nyati Elite NIBM Road Pune E Brochure.pdfNyati Elite NIBM Road Pune E Brochure.pdf
Nyati Elite NIBM Road Pune E Brochure.pdf
 
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
Low Rate ✨➥9711108085▻✨Call Girls In East Of Kailash (E.K) (Delhi)
 
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
 
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
 
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
~Call Girls In Roop Nagar {8447779280}(Low Price) Escort Service In Delhi
 
Real Estate Finance and Investments (2019).pdf
Real Estate Finance and Investments (2019).pdfReal Estate Finance and Investments (2019).pdf
Real Estate Finance and Investments (2019).pdf
 
Bridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdfBridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdf
 
Top tourism places in Dubai - Inch & Brick Realty
Top tourism places in Dubai - Inch & Brick RealtyTop tourism places in Dubai - Inch & Brick Realty
Top tourism places in Dubai - Inch & Brick Realty
 
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
 
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...
 
Escort—>Call GiRls In Mori Gate Delhi —>8447779280—Service Escorts In South D...
Escort—>Call GiRls In Mori Gate Delhi —>8447779280—Service Escorts In South D...Escort—>Call GiRls In Mori Gate Delhi —>8447779280—Service Escorts In South D...
Escort—>Call GiRls In Mori Gate Delhi —>8447779280—Service Escorts In South D...
 
Low Rate Call girls in Sant Nagar{Delhi }8447779280} Service Escorts In South...
Low Rate Call girls in Sant Nagar{Delhi }8447779280} Service Escorts In South...Low Rate Call girls in Sant Nagar{Delhi }8447779280} Service Escorts In South...
Low Rate Call girls in Sant Nagar{Delhi }8447779280} Service Escorts In South...
 
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor PresentationMEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
MEQ Mainstreet Equity Corp Q2 2024 Investor Presentation
 
Prestige Sancoale Goa Residneces Brochure.pdf
Prestige Sancoale Goa Residneces Brochure.pdfPrestige Sancoale Goa Residneces Brochure.pdf
Prestige Sancoale Goa Residneces Brochure.pdf
 
Jaipur Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Jaipur Escorts 🥰 8617370543 Call Girls Offer VIP Hot GirlsJaipur Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
Jaipur Escorts 🥰 8617370543 Call Girls Offer VIP Hot Girls
 

Product Data Templates (PDTs) and CObie - #BIM4M2help

  • 1. BIM for Manufacturers – Help with the Journey Product Data Templates and COBie BIM for Manufacturers and Manufacturing Presented by Matt Crunden Training and BIM Manager Legrand Electric Ltd
  • 7. Product Data Templates Template Category Template Version Category Description Classification System Classification Information Category Parameter Name Value Units Notes Specifications Manufacturer Text Specifications Manufacturer Website URL Specifications Product Range Text Specifications Product Model Number (Code) Text Specifications CE Approval No. Text Specifications Product Literature Webpage URL Specifications Type Text This is a COBie field, other fields will be required in final PDTs. Specifications Shape Text This is a COBie field, other fields will be required in final PDTs. Specifications Material Text This is a COBie field, other fields will be required in final PDTs. Specifications Overall Length mm Specifications Overall Width mm Specifications Overall Height mm Specifications GrossWeight kg Equates to Operating Weight Specifications Shipping Weight kg Specifications Access Clearance Top mm Specifications Access Clearance Bottom mm Specifications Access Clearance Left mm Specifications Access Clearance Right mm Specifications Access Clearance Front mm Specifications Access Clearance Rear mm Specifications ReferenceStandard Text Specifications Incoming Supply Electrical Voltage Volts Specifications Incoming Supply Phase Number 1,3 Specifications Incoming Supply Electrical Frequency Hertz 50,60 Specifications Motor Enclosure Rating Text IP numbers Specifications Motor Type Text Specifications Number of Poles Number 1,3 Specifications Motor Efficiency Class (CEMEP) Text Specifications Starting Method Text DoL,StarDelta, Soft Specifications BMS Links Y/N Sustainable Material BREEAM etc Embodied Carbon kgCO2 Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting Sustainable Material BREEAM etc Green Guide for Specification Text A - E Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management ExpectedLife Years Facilities/Asset Management WarrantyID Text Dimensional Data Performance Data Electrical Data (if required) Sustainability Controls Operations & Maintenance Category Value v. Manufacturer Data Construction Data Description PDT Steering Group
  • 8. Product Data Templates Category eg: Cable Ladder System or Powertrack System Manufacturer data eg: Name, website, link to tech data Product specification data eg: dimensions, available finishes
  • 9. Product Data Templates Performance data eg: electrical Sustainability eg: embodied carbon, EPD’s FM eg: O&M schedules
  • 10. Product Data Templates Template Category Template Version Category Description Classification System Classification Information Category Parameter Name Value Units Notes Specifications Manufacturer Text Specifications Manufacturer Website URL Specifications Product Range Text Specifications Product Model Number (Code) Text Specifications CE Approval No. Text Specifications Product Literature Webpage URL Specifications Type Text This is a COBie field, other fields will be required in final PDTs. Specifications Shape Text This is a COBie field, other fields will be required in final PDTs. Specifications Material Text This is a COBie field, other fields will be required in final PDTs. Specifications Overall Length mm Specifications Overall Width mm Specifications Overall Height mm Specifications GrossWeight kg Equates to Operating Weight Specifications Shipping Weight kg Specifications Access Clearance Top mm Specifications Access Clearance Bottom mm Specifications Access Clearance Left mm Specifications Access Clearance Right mm Specifications Access Clearance Front mm Specifications Access Clearance Rear mm Specifications ReferenceStandard Text Specifications Incoming Supply Electrical Voltage Volts Specifications Incoming Supply Phase Number 1,3 Specifications Incoming Supply Electrical Frequency Hertz 50,60 Specifications Motor Enclosure Rating Text IP numbers Specifications Motor Type Text Specifications Number of Poles Number 1,3 Specifications Motor Efficiency Class (CEMEP) Text Specifications Starting Method Text DoL,StarDelta, Soft Specifications BMS Links Y/N Sustainable Material BREEAM etc Embodied Carbon kgCO2 Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting Sustainable Material BREEAM etc Green Guide for Specification Text A - E Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management ExpectedLife Years Facilities/Asset Management WarrantyID Text Dimensional Data Performance Data Electrical Data (if required) Sustainability Controls Operations & Maintenance Category Value v. Manufacturer Data Construction Data Description Plain Language Questions Plain Language Answers
  • 11. Product Data Sheets Template Category Template Version Category Description Classification System Classification Information Category Parameter Name Value Units Notes Specifications Manufacturer Text Specifications Manufacturer Website URL Specifications Product Range Text Specifications Product Model Number (Code) Text Specifications CE Approval No. Text Specifications Product Literature Webpage URL Specifications Type Text This is a COBie field, other fields will be required in final PDTs. Specifications Shape Text This is a COBie field, other fields will be required in final PDTs. Specifications Material Text This is a COBie field, other fields will be required in final PDTs. Specifications Overall Length mm Specifications Overall Width mm Specifications Overall Height mm Specifications GrossWeight kg Equates to Operating Weight Specifications Shipping Weight kg Specifications Access Clearance Top mm Specifications Access Clearance Bottom mm Specifications Access Clearance Left mm Specifications Access Clearance Right mm Specifications Access Clearance Front mm Specifications Access Clearance Rear mm Specifications ReferenceStandard Text Specifications Incoming Supply Electrical Voltage Volts Specifications Incoming Supply Phase Number 1,3 Specifications Incoming Supply Electrical Frequency Hertz 50,60 Specifications Motor Enclosure Rating Text IP numbers Specifications Motor Type Text Specifications Number of Poles Number 1,3 Specifications Motor Efficiency Class (CEMEP) Text Specifications Starting Method Text DoL,StarDelta, Soft Specifications BMS Links Y/N Sustainable Material BREEAM etc Embodied Carbon kgCO2 Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting Sustainable Material BREEAM etc Green Guide for Specification Text A - E Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management ExpectedLife Years Facilities/Asset Management WarrantyID Text Dimensional Data Performance Data Electrical Data (if required) Sustainability Controls Operations & Maintenance Category Value v. Manufacturer Data Construction Data Description Plain Language Answers Completed PDT = Product Data Sheet (PDS) HOSTED ON MANUFACTURER WEBSITE FREE TO DOWNLOAD COMPLETED ONCE COMPLETED BY ‘RANGE’
  • 13. PDT’s feed into COBie PRODUCT INFORMATION PROJECT INFORMATION Product Data Sheets / Sets
  • 14. Project value = £100m 25% capex 75% opex 2 years 40 years COBie & FM
  • 15. Automating Data Management (PROJECT STAGE 2) Product Data Sheets / Sets
  • 16. Automating Data Management (PROJECT STAGE 3) Product Data Sheets / Sets
  • 17. Automating Data Management (PROJECT STAGE 4) STRUCTURED DATA (PAS 1192-2) FIXED FORMAT EASE OF USE PLATFORM NEUTRAL GEOGRAPHICALLY NEUTRAL MULTI DISCIPLINE MULTI SECTOR Product Data Sheets / Sets
  • 18. Product Data Templates Data Templates Developing templates to enable manufacturers to easily provide consistent and useable information PDT’s Examples out for consultation COOLING COIL HEATER BATTERY PLATE HEAT EXCHANGER RADIANT PANEL UV STERILISER TANK Trade bodies BIM4M2
  • 19. Product Data Templates Template Category Template Version Category Description Classification System Classification Information Category Parameter Name Value Units Notes Specifications Manufacturer Text Specifications Manufacturer Website URL Specifications Product Range Text Specifications Product Model Number (Code) Text Specifications CE Approval No. Text Specifications Product Literature Webpage URL Specifications Type Text This is a COBie field, other fields will be required in final PDTs. Specifications Shape Text This is a COBie field, other fields will be required in final PDTs. Specifications Material Text This is a COBie field, other fields will be required in final PDTs. Specifications Overall Length mm Specifications Overall Width mm Specifications Overall Height mm Specifications GrossWeight kg Equates to Operating Weight Specifications Shipping Weight kg Specifications Access Clearance Top mm Specifications Access Clearance Bottom mm Specifications Access Clearance Left mm Specifications Access Clearance Right mm Specifications Access Clearance Front mm Specifications Access Clearance Rear mm Specifications ReferenceStandard Text Specifications Incoming Supply Electrical Voltage Volts Specifications Incoming Supply Phase Number 1,3 Specifications Incoming Supply Electrical Frequency Hertz 50,60 Specifications Motor Enclosure Rating Text IP numbers Specifications Motor Type Text Specifications Number of Poles Number 1,3 Specifications Motor Efficiency Class (CEMEP) Text Specifications Starting Method Text DoL,StarDelta, Soft Specifications BMS Links Y/N Sustainable Material BREEAM etc Embodied Carbon kgCO2 Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting Sustainable Material BREEAM etc Green Guide for Specification Text A - E Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management ExpectedLife Years Facilities/Asset Management WarrantyID Text Dimensional Data Performance Data Electrical Data (if required) Sustainability Controls Operations & Maintenance Category Value v. Manufacturer Data Construction Data Description Template Category Template Version Category Description Classification System Classification Information Category Parameter Name Value Units Notes Specifications Manufacturer Text Specifications Manufacturer Website URL Specifications Product Range Text Specifications Product Model Number (Code) Text Specifications CE Approval No. Text Specifications Product Literature Webpage URL Specifications Type Text This is a COBie field, other fields will be required in final PDTs. Specifications Shape Text This is a COBie field, other fields will be required in final PDTs. Specifications Material Text This is a COBie field, other fields will be required in final PDTs. Specifications Overall Length mm Specifications Overall Width mm Specifications Overall Height mm Specifications GrossWeight kg Equates to Operating Weight Specifications Shipping Weight kg Specifications Access Clearance Top mm Specifications Access Clearance Bottom mm Specifications Access Clearance Left mm Specifications Access Clearance Right mm Specifications Access Clearance Front mm Specifications Access Clearance Rear mm Specifications ReferenceStandard Text Specifications Incoming Supply Electrical Voltage Volts Specifications Incoming Supply Phase Number 1,3 Specifications Incoming Supply Electrical Frequency Hertz 50,60 Specifications Motor Enclosure Rating Text IP numbers Specifications Motor Type Text Specifications Number of Poles Number 1,3 Specifications Motor Efficiency Class (CEMEP) Text Specifications Starting Method Text DoL,StarDelta, Soft Specifications BMS Links Y/N Sustainable Material BREEAM etc Embodied Carbon kgCO2 Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting Sustainable Material BREEAM etc Green Guide for Specification Text A - E Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management ExpectedLife Years Facilities/Asset Management WarrantyID Text Dimensional Data Performance Data Electrical Data (if required) Sustainability Controls Operations & Maintenance Category Value v. Manufacturer Data Construction Data Description Template Category Template Version Category Description Classification System Classification Information Category Parameter Name Value Units Notes Specifications Manufacturer Text Specifications Manufacturer Website URL Specifications Product Range Text Specifications Product Model Number (Code) Text Specifications CE Approval No. Text Specifications Product Literature Webpage URL Specifications Type Text This is a COBie field, other fields will be required in final PDTs. Specifications Shape Text This is a COBie field, other fields will be required in final PDTs. Specifications Material Text This is a COBie field, other fields will be required in final PDTs. Specifications Overall Length mm Specifications Overall Width mm Specifications Overall Height mm Specifications GrossWeight kg Equates to Operating Weight Specifications Shipping Weight kg Specifications Access Clearance Top mm Specifications Access Clearance Bottom mm Specifications Access Clearance Left mm Specifications Access Clearance Right mm Specifications Access Clearance Front mm Specifications Access Clearance Rear mm Specifications ReferenceStandard Text Specifications Incoming Supply Electrical Voltage Volts Specifications Incoming Supply Phase Number 1,3 Specifications Incoming Supply Electrical Frequency Hertz 50,60 Specifications Motor Enclosure Rating Text IP numbers Specifications Motor Type Text Specifications Number of Poles Number 1,3 Specifications Motor Efficiency Class (CEMEP) Text Specifications Starting Method Text DoL,StarDelta, Soft Specifications BMS Links Y/N Sustainable Material BREEAM etc Embodied Carbon kgCO2 Sustainable Material BREEAM etc Life Cycle Analysis Number BREEAM Sustainable Material BREEAM etc Location of Manufacturer GridRef Northing,Easting Sustainable Material BREEAM etc Green Guide for Specification Text A - E Sustainable Material BREEAM etc Environmental Product Declaration Text 3rd Party Verification Sustainable Material BREEAM etc Responsible Sourcing of Materials Text Endorsing body Sustainable Material ETL URL to Energy Technology List URL Hyperlink to ETL webpage for product Sustainable Material LEED v.4 Responsible Extraction of Materials Text TBA Sustainable Material LEED v.4 Material Ingredient Reporting Text TBA Facilities/Asset Management URL to O&M Manual Text Hyperlink to Manufacturer O&M Data Facilities/Asset Management Daily Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Weekly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Quarterly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management 6 Monthly Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Annually Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Bespoke Timeframe Text Maintenance tasks or SFG2012 codes. Facilities/Asset Management Maintenance Required: 0-300hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 301-600hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 601-1000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 1001-2000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 2001-4000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintenance Required: 4001-8000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management Maintance Required: 8001-12000hrs Text Maintenance tasks required during this time frame. Facilities/Asset Management ExpectedLife Years Facilities/Asset Management WarrantyID Text Dimensional Data Performance Data Electrical Data (if required) Sustainability Controls Operations & Maintenance Category Value v. Manufacturer Data Construction Data Description
  • 20. Product Data Templates Create • Professional body appoint Originating author • Liaise with Manufacturers Technical Approval • Refer to Peers • Liaise with Professional body Technical Committee Consultation • Issue for draft use • Gather feedback and enact where appropriate Issue • Final Technical Committee sign off • Approved for use Annual Check • Gather feedback and Review by Professional body • Changes approved by Technical Committee
  • 21. Product Data Templates IDENTIFY NEED REFER TO MASTER LIST IS THERE SOMETHING SIMILAR GO FOR IT !!!
  • 23. Product Data Templates The Built Environment as part of a Smart, networked world