Contract and Project Management




David Sowden, The University of Hull
10
57086
Contract and Project Management

Business Case




David Sowden, The University of Hull
Overview

• Business Case
 – What is a Business Case?
 – What should a Business Case contain?
 – Developing a Business Case
 – Developing path of a Business Case.




                                         3
What is a Business Case ?

• A description of the reasons for the project and justification for undertaking the
  project. Including:
   – estimated costs
   – the risks and
   – expected business benefits and savings.
• It should cover the entire scope of change to the business that will be affected by
  the project.
• It is the most important set of information for the project. it should drive the
  decision-making processes and is used continually to align the project progress.
• Business Cases should be developed inline with any organisation standards that
  might exist within the projects business environment.




                                           4
What should a Business Case contain?
                                                                           <Insert Project Name>                     Created/updated 06/08/12



• Summary                         57086
                                  Contract and Project Management Module
                                  Business Case
• Reasons                         Project Name:
                                  Date:                                                                 Release:               Draft/Final
                                  Author:

• Options                         Owner:

                                  Client:


• Benefits expected               Document Number:

                                  Note: This document is only valid on the day it was printed

  – Dis-benefits
• Risks                           Revision History
                                  Revision Date          Previous          Summary of Changes
                                                                                                Date of next revision:
                                                                                                                                         Changes
                                                         Revision Date                                                                   Marked



• Costs and timescale
                                  Approvals

• Investment appraisal            This document requires the following approvals. A signed copy should be placed in the project files.
                                  Name             Signature                            Title                         Date of Issue      Version




• Evaluation considerations
                                  Distribution
                                  This document has been distributed to:
                                  Name                                                  Title                          Date of Issue     Version




• (template available)

                              5   © University of Hull
                                                                                                                                         page 1 of 4
Role of a Business Case
• To capture the knowledge
  –lessons learnt (research)
• Receive funding and approval to
  move forward
• Focus on priorities within the
  proposed project
• Consistent message.

                          6
Who should write the Business Case?

• Everyone within the team
  should contribute to it’s
  development
• Ideally with this information
  1/2 people should actually
  write the final document




                                  7
When should the Business Case be written?

               Design Phase                           Implementation Phase




  Scope         Learn            Create            Plan           Implement




                Customers
  Boundaries                        Vision      Change mgmt         Change mgmt
                 Associates
    Issues                         Process       Systems dev     Systems Integration
               Benchmarking
  Objectives                     Technology      Training dev         Training
                Technology
   Schedule                       Org design     Org changes         Org design
               Best practices
    Budget                      Business Case   Pilot programs      Measurement
               Change mgmt




                                     8
Keep in mind when the Business Case is written?

• Make it interesting, though not personal
• Keep it clear and concise
• Minimise jargon, conjecture and
  acronyms
• Communicate all facts as part of the
  ‘story’
• Provide the reader with a ‘picture’ or
  vision of the end state
• Demonstrate the value the project
  brings to the Business, customer and the
  financial bottom line.


                                 9
Benefits to you of a Business Case
• Organisation of thoughts,
  activities and knowledge
• An objective review of ideas and
  facts of the project
• The ability to identify holes,
  inconsistencies or weakness in the
  effort
• An improved ability to
  communicate the purpose of the
  project
• Financial justification for the
  effort
• A great sense of accomplishment

                                    10
Summary of a Business Case
                                                                                                   EXAMPLE
     Project Name
Personalised systems supporting IPD* and CPD within a professional framework (CPD-Eng)
Outline Project Description:

This project will develop a personalised, ‘learner controlled’ online environment to support an
individual’s continuing professional development (CPD) and the staff CPD review process. At its
centre is a scalable, interoperable and robust access and identity management system that will
integrate and control access to personal e-portfolio technologies.

CPD-Eng will create a personalised continuing professional development pilot in the field of
Engineering, integrating and improving existing systems in the areas of reporting, resource and
process management. CPD-Eng will also support the relationships between the lifelong and
workbased learner, training institution(s), knowledge exchange, regulatory bodies (ECuk),
professional bodies and employers.

CPD-Eng will provide the innovative, personalised infrastructure that will support the work-based
learner through a new suite of flexible pathways to professional qualifications for the engineering
professional, integrating real and online worlds and enabling learning to take place 'whenever and
wherever'.
(Footnote * Initial/Qualifying professional development - The structured professional development undertaken by an individual in order to meet the
requirements for registration with a professional body. Continuing professional development. - The systematic maintenance, improvement and
broadening of knowledge and skills, and the development of personal qualities necessary for the execution of professional duties throughout working
life.)
TASK



Review your Business Case

Más contenido relacionado

La actualidad más candente

Solution Validation & Assessments - A practical Approach
Solution Validation & Assessments - A practical ApproachSolution Validation & Assessments - A practical Approach
Solution Validation & Assessments - A practical ApproachJulen Mohanty
 
Mature agile teams essential patterns v4 - half day workshop
Mature agile teams   essential patterns v4 - half day workshopMature agile teams   essential patterns v4 - half day workshop
Mature agile teams essential patterns v4 - half day workshopdrewz lin
 
Build, Buy or Ally: Joe Deklic, Cisco Canada
Build, Buy or Ally: Joe Deklic, Cisco CanadaBuild, Buy or Ally: Joe Deklic, Cisco Canada
Build, Buy or Ally: Joe Deklic, Cisco CanadaASAP Toronto Chapter
 
What is this thing called Agile?
What is this thing called Agile?What is this thing called Agile?
What is this thing called Agile?John Goodpasture
 
Lean product development implementation
Lean product development implementationLean product development implementation
Lean product development implementationITZHAK123
 
IIBA Facilitation Skills For Business Analysis v2
IIBA Facilitation Skills For Business Analysis v2IIBA Facilitation Skills For Business Analysis v2
IIBA Facilitation Skills For Business Analysis v2Rick Walters
 

La actualidad más candente (7)

Solution Validation & Assessments - A practical Approach
Solution Validation & Assessments - A practical ApproachSolution Validation & Assessments - A practical Approach
Solution Validation & Assessments - A practical Approach
 
Mature agile teams essential patterns v4 - half day workshop
Mature agile teams   essential patterns v4 - half day workshopMature agile teams   essential patterns v4 - half day workshop
Mature agile teams essential patterns v4 - half day workshop
 
Build, Buy or Ally: Joe Deklic, Cisco Canada
Build, Buy or Ally: Joe Deklic, Cisco CanadaBuild, Buy or Ally: Joe Deklic, Cisco Canada
Build, Buy or Ally: Joe Deklic, Cisco Canada
 
Agile Release & Iteration Planning
Agile Release & Iteration Planning   Agile Release & Iteration Planning
Agile Release & Iteration Planning
 
What is this thing called Agile?
What is this thing called Agile?What is this thing called Agile?
What is this thing called Agile?
 
Lean product development implementation
Lean product development implementationLean product development implementation
Lean product development implementation
 
IIBA Facilitation Skills For Business Analysis v2
IIBA Facilitation Skills For Business Analysis v2IIBA Facilitation Skills For Business Analysis v2
IIBA Facilitation Skills For Business Analysis v2
 

Similar a 57086 10 business_case

The Digital Creative Process
The Digital Creative ProcessThe Digital Creative Process
The Digital Creative Processstorybridge
 
Software Outsourcing: Outsource Your Project or Build a Team
Software Outsourcing: Outsource Your Project or Build a TeamSoftware Outsourcing: Outsource Your Project or Build a Team
Software Outsourcing: Outsource Your Project or Build a TeamSoftheme
 
Flevy.com - Pricing a Consulting Project
Flevy.com - Pricing a Consulting ProjectFlevy.com - Pricing a Consulting Project
Flevy.com - Pricing a Consulting ProjectDavid Tracy
 
Technical Webinar: By the (Play) Book: The Agile Practice at OutSystems
Technical Webinar: By the (Play) Book: The Agile Practice at OutSystemsTechnical Webinar: By the (Play) Book: The Agile Practice at OutSystems
Technical Webinar: By the (Play) Book: The Agile Practice at OutSystemsOutSystems
 
Doing It On Your Own: When to Call in the Consultants, When to Leave Them Out
Doing It On Your Own: When to Call in the Consultants, When to Leave Them OutDoing It On Your Own: When to Call in the Consultants, When to Leave Them Out
Doing It On Your Own: When to Call in the Consultants, When to Leave Them OutNTEN
 
Applying both of waterfall and iterative development
Applying both of waterfall and iterative developmentApplying both of waterfall and iterative development
Applying both of waterfall and iterative developmentDeny Prasetia
 
Time management
Time management Time management
Time management Pm Joe
 
Scaling Agile - Multiple Team Dynamics
Scaling Agile - Multiple Team DynamicsScaling Agile - Multiple Team Dynamics
Scaling Agile - Multiple Team DynamicsVersionOne
 
Introduction to Agile Software Development Process
Introduction to Agile Software Development ProcessIntroduction to Agile Software Development Process
Introduction to Agile Software Development ProcessSoftware Park Thailand
 
Aayush Sinha_8.4Yrs_PO_BA
Aayush Sinha_8.4Yrs_PO_BAAayush Sinha_8.4Yrs_PO_BA
Aayush Sinha_8.4Yrs_PO_BAaayush sinha
 
MDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdfMDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdfamirashraf61
 
Business architecture &amp; agile architecture
Business architecture &amp; agile architectureBusiness architecture &amp; agile architecture
Business architecture &amp; agile architectureKrzysztof Tomkiewicz
 
An introduction to architecture and architects
An introduction to architecture and architectsAn introduction to architecture and architects
An introduction to architecture and architectswweinmeyer79
 
Framework for a Strategic Priority Council
Framework for a Strategic Priority CouncilFramework for a Strategic Priority Council
Framework for a Strategic Priority CouncilGherda Stephens
 
Tackling the Fallacy of Agile
Tackling the Fallacy of Agile Tackling the Fallacy of Agile
Tackling the Fallacy of Agile BSGAfrica
 

Similar a 57086 10 business_case (20)

The Digital Creative Process
The Digital Creative ProcessThe Digital Creative Process
The Digital Creative Process
 
Software Outsourcing: Outsource Your Project or Build a Team
Software Outsourcing: Outsource Your Project or Build a TeamSoftware Outsourcing: Outsource Your Project or Build a Team
Software Outsourcing: Outsource Your Project or Build a Team
 
Flevy.com - Pricing a Consulting Project
Flevy.com - Pricing a Consulting ProjectFlevy.com - Pricing a Consulting Project
Flevy.com - Pricing a Consulting Project
 
Technical Webinar: By the (Play) Book: The Agile Practice at OutSystems
Technical Webinar: By the (Play) Book: The Agile Practice at OutSystemsTechnical Webinar: By the (Play) Book: The Agile Practice at OutSystems
Technical Webinar: By the (Play) Book: The Agile Practice at OutSystems
 
Doing It On Your Own: When to Call in the Consultants, When to Leave Them Out
Doing It On Your Own: When to Call in the Consultants, When to Leave Them OutDoing It On Your Own: When to Call in the Consultants, When to Leave Them Out
Doing It On Your Own: When to Call in the Consultants, When to Leave Them Out
 
Applying both of waterfall and iterative development
Applying both of waterfall and iterative developmentApplying both of waterfall and iterative development
Applying both of waterfall and iterative development
 
Time management
Time management Time management
Time management
 
Scaling Agile - Multiple Team Dynamics
Scaling Agile - Multiple Team DynamicsScaling Agile - Multiple Team Dynamics
Scaling Agile - Multiple Team Dynamics
 
What is Collaborative Productivity?
What is Collaborative Productivity?What is Collaborative Productivity?
What is Collaborative Productivity?
 
Introduction to Agile Software Development Process
Introduction to Agile Software Development ProcessIntroduction to Agile Software Development Process
Introduction to Agile Software Development Process
 
Enfoucs Requirement Suite™
Enfoucs Requirement Suite™Enfoucs Requirement Suite™
Enfoucs Requirement Suite™
 
Aayush Sinha_8.4Yrs_PO_BA
Aayush Sinha_8.4Yrs_PO_BAAayush Sinha_8.4Yrs_PO_BA
Aayush Sinha_8.4Yrs_PO_BA
 
Quality & Risk Management Challenges When Acquiring Enterprise Systems
Quality & Risk Management Challenges When Acquiring Enterprise SystemsQuality & Risk Management Challenges When Acquiring Enterprise Systems
Quality & Risk Management Challenges When Acquiring Enterprise Systems
 
MDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdfMDP2206-2217-Lec2.pdf
MDP2206-2217-Lec2.pdf
 
Digital project process
Digital project processDigital project process
Digital project process
 
Business architecture &amp; agile architecture
Business architecture &amp; agile architectureBusiness architecture &amp; agile architecture
Business architecture &amp; agile architecture
 
An introduction to architecture and architects
An introduction to architecture and architectsAn introduction to architecture and architects
An introduction to architecture and architects
 
Framework for a Strategic Priority Council
Framework for a Strategic Priority CouncilFramework for a Strategic Priority Council
Framework for a Strategic Priority Council
 
Tackling the Fallacy of Agile
Tackling the Fallacy of Agile Tackling the Fallacy of Agile
Tackling the Fallacy of Agile
 
Benefits of EPM
Benefits of EPMBenefits of EPM
Benefits of EPM
 

Más de Engineering Department (20)

Glossary
GlossaryGlossary
Glossary
 
57086 23 goldratt
57086 23 goldratt57086 23 goldratt
57086 23 goldratt
 
57086 22 comic_relief
57086 22 comic_relief57086 22 comic_relief
57086 22 comic_relief
 
57086 20 quality_review
57086 20 quality_review57086 20 quality_review
57086 20 quality_review
 
57086 19 change_controltechniques
57086 19 change_controltechniques57086 19 change_controltechniques
57086 19 change_controltechniques
 
57086 18 product-based_planning
57086 18 product-based_planning57086 18 product-based_planning
57086 18 product-based_planning
 
57086 17 change_control_01
57086 17 change_control_0157086 17 change_control_01
57086 17 change_control_01
 
57086 16 configuration_management
57086 16 configuration_management57086 16 configuration_management
57086 16 configuration_management
 
57086 15 quality
57086 15 quality57086 15 quality
57086 15 quality
 
57086 14 management_ofrisk
57086 14 management_ofrisk57086 14 management_ofrisk
57086 14 management_ofrisk
 
57086 13 controls
57086 13 controls57086 13 controls
57086 13 controls
 
57086 12 plans
57086 12 plans57086 12 plans
57086 12 plans
 
57086 09 planning
57086 09 planning57086 09 planning
57086 09 planning
 
57086 11 organisation
57086 11 organisation57086 11 organisation
57086 11 organisation
 
57086 08 closing_a_project
57086 08 closing_a_project57086 08 closing_a_project
57086 08 closing_a_project
 
57086 07 managing_a_stageboundary
57086 07 managing_a_stageboundary57086 07 managing_a_stageboundary
57086 07 managing_a_stageboundary
 
57086 05 managing_productdelivery
57086 05 managing_productdelivery57086 05 managing_productdelivery
57086 05 managing_productdelivery
 
57086 05 controlling_a_stage
57086 05 controlling_a_stage57086 05 controlling_a_stage
57086 05 controlling_a_stage
 
58086 04 directing_a_project
58086 04 directing_a_project58086 04 directing_a_project
58086 04 directing_a_project
 
57086 03 initiating_a_project
57086 03 initiating_a_project57086 03 initiating_a_project
57086 03 initiating_a_project
 

Último

Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with CultureSeta Wicaksana
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfAmzadHosen3
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Centuryrwgiffor
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...Aggregage
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 

Último (20)

VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pillsMifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
Mifty kit IN Salmiya (+918133066128) Abortion pills IN Salmiyah Cytotec pills
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 

57086 10 business_case

  • 1. 10 57086 Contract and Project Management David Sowden, The University of Hull
  • 2. 10 57086 Contract and Project Management Business Case David Sowden, The University of Hull
  • 3. Overview • Business Case – What is a Business Case? – What should a Business Case contain? – Developing a Business Case – Developing path of a Business Case. 3
  • 4. What is a Business Case ? • A description of the reasons for the project and justification for undertaking the project. Including: – estimated costs – the risks and – expected business benefits and savings. • It should cover the entire scope of change to the business that will be affected by the project. • It is the most important set of information for the project. it should drive the decision-making processes and is used continually to align the project progress. • Business Cases should be developed inline with any organisation standards that might exist within the projects business environment. 4
  • 5. What should a Business Case contain? <Insert Project Name> Created/updated 06/08/12 • Summary 57086 Contract and Project Management Module Business Case • Reasons Project Name: Date: Release: Draft/Final Author: • Options Owner: Client: • Benefits expected Document Number: Note: This document is only valid on the day it was printed – Dis-benefits • Risks Revision History Revision Date Previous Summary of Changes Date of next revision: Changes Revision Date Marked • Costs and timescale Approvals • Investment appraisal This document requires the following approvals. A signed copy should be placed in the project files. Name Signature Title Date of Issue Version • Evaluation considerations Distribution This document has been distributed to: Name Title Date of Issue Version • (template available) 5 © University of Hull page 1 of 4
  • 6. Role of a Business Case • To capture the knowledge –lessons learnt (research) • Receive funding and approval to move forward • Focus on priorities within the proposed project • Consistent message. 6
  • 7. Who should write the Business Case? • Everyone within the team should contribute to it’s development • Ideally with this information 1/2 people should actually write the final document 7
  • 8. When should the Business Case be written? Design Phase Implementation Phase Scope Learn Create Plan Implement Customers Boundaries Vision Change mgmt Change mgmt Associates Issues Process Systems dev Systems Integration Benchmarking Objectives Technology Training dev Training Technology Schedule Org design Org changes Org design Best practices Budget Business Case Pilot programs Measurement Change mgmt 8
  • 9. Keep in mind when the Business Case is written? • Make it interesting, though not personal • Keep it clear and concise • Minimise jargon, conjecture and acronyms • Communicate all facts as part of the ‘story’ • Provide the reader with a ‘picture’ or vision of the end state • Demonstrate the value the project brings to the Business, customer and the financial bottom line. 9
  • 10. Benefits to you of a Business Case • Organisation of thoughts, activities and knowledge • An objective review of ideas and facts of the project • The ability to identify holes, inconsistencies or weakness in the effort • An improved ability to communicate the purpose of the project • Financial justification for the effort • A great sense of accomplishment 10
  • 11. Summary of a Business Case EXAMPLE Project Name Personalised systems supporting IPD* and CPD within a professional framework (CPD-Eng) Outline Project Description: This project will develop a personalised, ‘learner controlled’ online environment to support an individual’s continuing professional development (CPD) and the staff CPD review process. At its centre is a scalable, interoperable and robust access and identity management system that will integrate and control access to personal e-portfolio technologies. CPD-Eng will create a personalised continuing professional development pilot in the field of Engineering, integrating and improving existing systems in the areas of reporting, resource and process management. CPD-Eng will also support the relationships between the lifelong and workbased learner, training institution(s), knowledge exchange, regulatory bodies (ECuk), professional bodies and employers. CPD-Eng will provide the innovative, personalised infrastructure that will support the work-based learner through a new suite of flexible pathways to professional qualifications for the engineering professional, integrating real and online worlds and enabling learning to take place 'whenever and wherever'. (Footnote * Initial/Qualifying professional development - The structured professional development undertaken by an individual in order to meet the requirements for registration with a professional body. Continuing professional development. - The systematic maintenance, improvement and broadening of knowledge and skills, and the development of personal qualities necessary for the execution of professional duties throughout working life.)