SlideShare una empresa de Scribd logo
1 de 30
INTRODUCTION
TO METRO
SYSTEM
introduction of Indian
Metro Railway.
How it began
India's 1st and Asia's 5th metro rail was introduced in
Kolkata.
Over a length of 16.45 km and the work on this project
was sanctioned on 1.6.1972
The construction work started in 1973-74.After crossing
so many hurdles Calcutta Metro started its journey on
October 24, 1984
Why is it needed ?
Unprecedented growth of personal vehicles.
Growing traffic congestion.
Air pollution and traffic accidents has become a major
concern.
To avoid congestion at peak hours.
Time saving. Reduced fuel consumption.
INDIAN METRO
RAILWAY
EXISTING METRO RAILWAY
Kolkata Metro Rail.
Delhi Metro Rail.
FUTURE & PROPOSED METRO RAILWAY
Mumbai Metro Rail
Bangalore Metro Rail.
Hyderabad Metro Rail.
Chennai Metro Rail.
Kochi Metro Rail
CITY METRO RAIL
lack of adequate connectivity are becoming increasingly
eminent.
Delhi has taken the exemplary lead of developing the
Metro rail.
India is well on its way to create a world-class MRT
system as an integral part of community infrastructure
development in the country.
shift from private modes of conveyance to public
transport.
India is looking to create a world
class MRT system:
Growing cities, growing population and growing traffic
has invariably called for a shift from private modes of
conveyance to public transport.
MRTS in the world’s developing nations exist
successfully
India has lagged behing in this field but the reason
could be as follows:
lack of funds planning as is known that such projects
require huge capital investments
a long gestation period
complex technology
The lack of integration between various systems of
mass transportation
the absence of comprehensive traffic and
transportation planning.
Besides the existing and the upcoming
proposals for MRTS for
Pune, Chandigarh, Ahmedabad, Kanpur, Ludhiana, Bh
opal, Indore and Faridabad are being chalked out.
MRTS
A metro model for a county would have to depend on its
logistics, financial resources
Planning, construction, designing and management
of metros require :-extensive data, detailed
surveys, study of economic structure, profile of settlement
topography, travel preference, major traffic corridors.
System needs to be made self-reliant and self-contained to
minimize O&M (operations & maintenance) cost.
Technology with low initial cost but with high O & M cost
should be avoided.
Cost Factors
Metro projects are meant to cater to cities with more than
four million population
Larger the underground and elevated proposal, larger shall
be the cost involved.
Funding process is done through the PPP model (Public-
Private Partnership) as in Hyderabad and Mumbai or by
DMRC model by the state or the central government as in
Bengaluru, Chennai and Kolkata.
Correct process is the PPP model.
LPG (Liberalization, Privatization and Globalization) to
encourage private investors
BENEFITs OF METRO RAIL
Requires 1/5th energy per passenger km compared to
road-based transport system.
Causes less noise, no air pollution and eco friendly
transport system.
Occupies no road space if underground and only about
2.60 meters width of the road if elevated.
Reduces journey time.
Cost effective mass transport system.
Reducing traffic transport problems.
Disadvantages
Advantages
A cheap mode of transport, the MRTS helps in low
energy consumption
It is eco-friendly (runs on electricity, thus
minimizing air and sound pollution)
Averts the number of accidents
Is efficient in terms of space occupancy and provides
comfort with ultra-modern coaches and modern
systems like automatic ticketing, advanced signaling
systems, automatic train protection system and
integrated security systems.
Advantages contd…
Services like ATMs, food outlets, cafés and
convenience stores at these stations make the
journey more fruitful.
Also such stations lead to nearby economic
development.
The international standard for MRTS with a
maximum speed of 80kmph and average speed of
around 34kmph helps in saving of time.
With proper designing, the peak hour capacity
could be rated at 3-4 lakhs passengers per hour."
Disadvantages:
The only disadvantage of metros is the slight
congestion on roads at the time of construction
which has to be taken care of.
The cost factor is another disadvantage, the
solution for which is to integrate metros with
others systems considering the volume,
structure, availability of space and resources for
traffic and transportation.
Kolkata Metro
 The only metro service in the country functioning directly under the Indian Railways, the
foundation for this was laid as early as 1972.
 Delays due to non-availability of sufficient funds, shifting of underground utilities, court
injunctions and irregular supply of vital materials led to the commencement of services
being pushed to 1984, after which progressive construction followed leading to the
completion of the services of the entire stretch in 2005.
 Kolkata faced a transport problem with only 8% of the land being available for road
transport( 25-35% available in other cities)
 The metro has been quite a hit with the residents in Kolkata considering the number of
passengers which has expansively increased in the past years.
 Large scale expansion projects (covering 87 kms) have now been planned and in its
modernization program.
Modernization of the kolkata
metro includes:
State-of-the-Art Automatic Fare Collection
Passenger Control system with Radio Frequency
Identification based Flap Gates
Integrated Security System
new air-conditioned rakes
Automatic Signaling system.
Delhi Metro
The Delhi Metro Rail Corporation (DMRC) was
established to build a metro in two phases serving
Delhi, Gurgaon, Noida and Ghaziabad.
While the first phase covering 65.11km was opened in
2002 the second phase of 125km was recently
completed.
The first railway project in the world to be registered for
carbon credits by the United Nations, the Delhi Metro
achieved this by saving power by using regenerative
brakes in the trains, and reduced carbon emissions.
DMRC has also partnered with Google India (through
Google Transit) to provide train schedule and route
information to mobile devices with Google Maps.
Delhi metro airport express:
The popular Delhi Airport Metro Express rail from the Indira
Gandhi International Airport to the city centre takes less than 20
minutes as opposed to one hour by road.
Its LCD screens equipped coaches imported from Spain are
entirely different from the trains on this line and have in-built
noise reduction features, padded fabric seats and provide flight
information for convenience of air travellers.
The trains are fitted with an event recorder which can withstand
high levels of temperature and impact.
The metro has been promoted as an integral part of community
infrastructure, and community artwork depicting the local way of
life at the stations in the form of decorative murals, panels and a
gallery showcasing artwork and handicrafts from across India.
The Delhi Metro though plagued by controversies in the
form of technical snags, overcrowding and accidents at
the construction sites has proved as a model for the
other metros in the country to follow.
Phases 3 and 4 will expand the total journey to 413.8km
and are scheduled to open in 2016 and 2020
respectively. With such a great pace of work, the Delhi
metro will soon become one of the fastest expanding
metro networks in the world.
Mumbai Metro
Mumbai's existing Suburban Railway and BEST bus system
have not been able to compete with the rapid population
growth.
The Mumbai MRTS saw the completion of the first phase, a
partnership between Mumbai Metropolitan Region
Development Authority (MMRDA) and Reliance
Infrastructure and Veolia Transport (France) in 2012 and
this entails a 12 km elevated metro with 12 stations enroute.
While the Suburban Railways provide a NS connect, this
corridor will provide the relief in the East West (EW)
connectivity, covering the journey in 21 minutes.
Phase 2 and Phase 3 would be totaling to a length of
146 km. Plans are on for a nine-line network by 2021 in
its three phases of development costing Rs.36,000
crore.
Skywalks have also been provided to connect the metro
and suburban railways stations.
Right from the construction stage, initiatives have been
on to make the Mumbai Metro Asia's first green metro.
Bengaluru Metro
Though a MRTS has been in consideration for long in the
Garden City, the foundation stone was finally laid in 2006.
Being operated by the Bangalore Metro Rail Corporation
Limited (BMRCL), a detailed project report of two double line
corridors with a total length of 33 km (elevated and
underground) with 32 stations has been prepared.
 The general consultants for the project:
o EW and NS corridors as part of Phase I of the project which is
estimated to complete by this year.
o The travel time from end to end on the EW corridor will be 33
minutes, and on the NS corridor will be 28 minutes.
o The second phase comprising 51km would involve the
extension of both the first two lines and the construction of an
additional line.
Cont…
While the stations are contemporary keeping in mind
Bengaluru's erstwhile architecture and materials, there
have been competitions floated for developing
communication concepts for the interior space of some
stations too.
Though at present 43 stations are being constructed
which would get completed by 2015 the DBR (Design
Basis report) issued by BMRCL shows an approval for
162 stations which means that in future, there would be
tributaries on the NS and EW corridors.
The only complaint that could possibly be related to this
metro is the lack of transparency and the shirking of
public involvement in the project.
Hyderabad Metro
Spanning over 71km, the phase 1 would include three traffic
corridors covering a total of 72 km and 66 stations.
A completely elevated system, prepared by DMRC. Designed
to cater to 50,000 people in one hour
Hyderabad Metro Rail Ltd (HMR) is the SPV set to look after
the project which has been allotted to L&T in PPP mode.
Hyderabad MRTS which is the country's first two-track
elevated city transit system, has been much delayed since
2008
The HMR is confident that by 2015 the entire project would
finish.
Cont..
The travel time for the metro rail is 45 minutes for
Corridor I, 22 minutes for Corridor II and 39 minutes
for Corridor III.
The metro stations are being designed keeping the local
architecture in mind. The Metro that will rest on
massive concrete pillars along the central median of the
roads will prove a boon for the city.
The Future
MRTS is the best way to decongest traffic. However, a number
of considerations should be kept in mind in order to run a
successful MRTS.
"Viability of metro projects depend upon correct
defining of traffic corridors, technology adapted,
availability of land, volume of traffic carried, capacity
utilization and acceptance of the mode by the
commuters,"
Conclusively, transport needs to be made an integral part of
urban design/master plan of the city as it cannot be delineated
to a separate entity. A multi-modal transportation system would
ensure the use of MRTS to its best potential.
Cont..
The uncertainty about MRTS, which has plagued the
importance of such systems in India seems to be
resolving.
Though the Kolkata metro was designed without a rule
book and the Delhi Metro was designed on international
norms
Training:
The National Mass Transit and Training Research
Institute (NMTTRI) in Mumbai (established by
MMRDA), is one of its kinds in Asia imparting training
and research on mass transit systems.
The annual training courses cater to key issues like
Public Transport Security, Safety and
Emergency/Disaster Management, Noise Pollution &
Abatement Measures for Urban Transportation,
Integrated Ticketing, and seamless Travel across Modes
and Intelligent Transportation System.
CONCLUSION
Even though the Metro systems are more reliable,
comfortable and safer than road-based systems & it
reduces congestion on the roads, the systems planned
in India show cost overrunning and under utilization of
capacity.
High capacity system does not necessarily generate
high demand.
Immense thought & planing is needed for such
expensive and expansive projects.
THANK
Y O U !

Más contenido relacionado

La actualidad más candente

Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the trackT.Naga Anusha
 
Railways for urban transportation
Railways for urban transportationRailways for urban transportation
Railways for urban transportationgayathrysatheesan1
 
highway development in india
highway development in indiahighway development in india
highway development in indiaPrathi Baa
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)RAMPRASAD KUMAWAT
 
Signalling in Railways
Signalling in RailwaysSignalling in Railways
Signalling in RailwaysAnupama Jha
 
Implementation of METRO rail using PLC and SCADA
Implementation of METRO rail using PLC and SCADAImplementation of METRO rail using PLC and SCADA
Implementation of METRO rail using PLC and SCADAmanogna gwen
 
Integrated multi modal transportation system
Integrated multi modal transportation system Integrated multi modal transportation system
Integrated multi modal transportation system Aditya Gupta
 
Railway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control systemRailway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control systemBathla Tuition Centre
 
modern methods of railway track maintanence
modern methods of railway track maintanencemodern methods of railway track maintanence
modern methods of railway track maintanencekrishnacp
 
Mass transit system
Mass transit systemMass transit system
Mass transit systemSagar Kaptan
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackKHUSHBU SHAH
 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPTVikas Sukhwal
 
Basics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBasics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBhaskar Kumar Dan
 
Chapter 3 station,yards,points and crossing,signalling and interlocking
Chapter 3 station,yards,points and crossing,signalling and interlockingChapter 3 station,yards,points and crossing,signalling and interlocking
Chapter 3 station,yards,points and crossing,signalling and interlockingdhara dattani
 
Corrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in railsCorrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in railsSagar Kaptan
 

La actualidad más candente (20)

Geometric design of the track
Geometric design of the trackGeometric design of the track
Geometric design of the track
 
Railways for urban transportation
Railways for urban transportationRailways for urban transportation
Railways for urban transportation
 
highway development in india
highway development in indiahighway development in india
highway development in india
 
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)Permanent Way of Railway & Components ?(part -1,2,3,4,5)
Permanent Way of Railway & Components ?(part -1,2,3,4,5)
 
Signalling in Railways
Signalling in RailwaysSignalling in Railways
Signalling in Railways
 
Implementation of METRO rail using PLC and SCADA
Implementation of METRO rail using PLC and SCADAImplementation of METRO rail using PLC and SCADA
Implementation of METRO rail using PLC and SCADA
 
Integrated multi modal transportation system
Integrated multi modal transportation system Integrated multi modal transportation system
Integrated multi modal transportation system
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Railway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control systemRailway Engineering: signaling, interlocking, train control system
Railway Engineering: signaling, interlocking, train control system
 
BRTS
BRTSBRTS
BRTS
 
modern methods of railway track maintanence
modern methods of railway track maintanencemodern methods of railway track maintanence
modern methods of railway track maintanence
 
Mass transit system
Mass transit systemMass transit system
Mass transit system
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway track
 
Highway construction PPT
Highway construction PPTHighway construction PPT
Highway construction PPT
 
Signals on Railway
Signals on RailwaySignals on Railway
Signals on Railway
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Basics of Metro Railway Signalling system
Basics of Metro Railway Signalling systemBasics of Metro Railway Signalling system
Basics of Metro Railway Signalling system
 
Chapter 3 station,yards,points and crossing,signalling and interlocking
Chapter 3 station,yards,points and crossing,signalling and interlockingChapter 3 station,yards,points and crossing,signalling and interlocking
Chapter 3 station,yards,points and crossing,signalling and interlocking
 
Corrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in railsCorrugated (roaring), Hogging, Buckling, Kinks in rails
Corrugated (roaring), Hogging, Buckling, Kinks in rails
 
Taxiway design
Taxiway designTaxiway design
Taxiway design
 

Similar a Introduction to metro system (1).pptx

Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India pptNikita James
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro raillibin paul
 
Delhi metro rail corporation secondary research
Delhi metro rail corporation secondary researchDelhi metro rail corporation secondary research
Delhi metro rail corporation secondary researchSunil Dayma
 
36551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp0136551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp01Akshay Gaikwad
 
Metro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaMetro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaBhavya Jaiswal
 
Marketing plan of DMRC
Marketing plan of DMRCMarketing plan of DMRC
Marketing plan of DMRCArun Singh
 
Nagpur Metro Indicator
Nagpur Metro IndicatorNagpur Metro Indicator
Nagpur Metro Indicatorijtsrd
 
Hyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-sHyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-sAbi Abagun
 
Transport infrastructure in india
Transport infrastructure in indiaTransport infrastructure in india
Transport infrastructure in indiaHarsh Chudasama
 
Delhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysisDelhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysisPiyusha Rustagi
 

Similar a Introduction to metro system (1).pptx (20)

Metro Rail in India ppt
Metro Rail in India pptMetro Rail in India ppt
Metro Rail in India ppt
 
36551105 delhi-metro
36551105 delhi-metro36551105 delhi-metro
36551105 delhi-metro
 
Chennai metro rail
Chennai metro railChennai metro rail
Chennai metro rail
 
Delhi metro rail corporation secondary research
Delhi metro rail corporation secondary researchDelhi metro rail corporation secondary research
Delhi metro rail corporation secondary research
 
36551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp0136551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp01
 
Metro
MetroMetro
Metro
 
12
1212
12
 
Metro and monorail infrastructure development in india
Metro and monorail infrastructure development in indiaMetro and monorail infrastructure development in india
Metro and monorail infrastructure development in india
 
Marketing plan of DMRC
Marketing plan of DMRCMarketing plan of DMRC
Marketing plan of DMRC
 
Metro project
Metro project Metro project
Metro project
 
Nagpur Metro Indicator
Nagpur Metro IndicatorNagpur Metro Indicator
Nagpur Metro Indicator
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Hyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-sHyderabad apac-const-dec13-bro-s
Hyderabad apac-const-dec13-bro-s
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Metro project in inda
Metro project in indaMetro project in inda
Metro project in inda
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Delhi metro
Delhi metroDelhi metro
Delhi metro
 
Delhi metro case study
Delhi metro case studyDelhi metro case study
Delhi metro case study
 
Transport infrastructure in india
Transport infrastructure in indiaTransport infrastructure in india
Transport infrastructure in india
 
Delhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysisDelhi Metro: A comprehensive analysis
Delhi Metro: A comprehensive analysis
 

Más de BalpreetSingh47890

Más de BalpreetSingh47890 (8)

Chapter1 (1).ppt
Chapter1 (1).pptChapter1 (1).ppt
Chapter1 (1).ppt
 
tunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdftunnelsppt-170126104231-converted (1)-converted.pdf
tunnelsppt-170126104231-converted (1)-converted.pdf
 
Ch - 1.pptx
Ch - 1.pptxCh - 1.pptx
Ch - 1.pptx
 
unit 3.pptx
unit 3.pptxunit 3.pptx
unit 3.pptx
 
unit 3 2.pptx
unit 3 2.pptxunit 3 2.pptx
unit 3 2.pptx
 
LAW_Ch01.ppt
LAW_Ch01.pptLAW_Ch01.ppt
LAW_Ch01.ppt
 
metro system and engineering.pptx
metro system and engineering.pptxmetro system and engineering.pptx
metro system and engineering.pptx
 
Balpreet Singh ppt.ppt
Balpreet Singh ppt.pptBalpreet Singh ppt.ppt
Balpreet Singh ppt.ppt
 

Último

Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 

Último (20)

Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 

Introduction to metro system (1).pptx

  • 2. introduction of Indian Metro Railway. How it began India's 1st and Asia's 5th metro rail was introduced in Kolkata. Over a length of 16.45 km and the work on this project was sanctioned on 1.6.1972 The construction work started in 1973-74.After crossing so many hurdles Calcutta Metro started its journey on October 24, 1984
  • 3. Why is it needed ? Unprecedented growth of personal vehicles. Growing traffic congestion. Air pollution and traffic accidents has become a major concern. To avoid congestion at peak hours. Time saving. Reduced fuel consumption.
  • 4. INDIAN METRO RAILWAY EXISTING METRO RAILWAY Kolkata Metro Rail. Delhi Metro Rail. FUTURE & PROPOSED METRO RAILWAY Mumbai Metro Rail Bangalore Metro Rail. Hyderabad Metro Rail. Chennai Metro Rail. Kochi Metro Rail
  • 5. CITY METRO RAIL lack of adequate connectivity are becoming increasingly eminent. Delhi has taken the exemplary lead of developing the Metro rail. India is well on its way to create a world-class MRT system as an integral part of community infrastructure development in the country. shift from private modes of conveyance to public transport.
  • 6. India is looking to create a world class MRT system: Growing cities, growing population and growing traffic has invariably called for a shift from private modes of conveyance to public transport. MRTS in the world’s developing nations exist successfully India has lagged behing in this field but the reason could be as follows:
  • 7. lack of funds planning as is known that such projects require huge capital investments a long gestation period complex technology The lack of integration between various systems of mass transportation the absence of comprehensive traffic and transportation planning.
  • 8. Besides the existing and the upcoming proposals for MRTS for Pune, Chandigarh, Ahmedabad, Kanpur, Ludhiana, Bh opal, Indore and Faridabad are being chalked out.
  • 9. MRTS A metro model for a county would have to depend on its logistics, financial resources Planning, construction, designing and management of metros require :-extensive data, detailed surveys, study of economic structure, profile of settlement topography, travel preference, major traffic corridors. System needs to be made self-reliant and self-contained to minimize O&M (operations & maintenance) cost. Technology with low initial cost but with high O & M cost should be avoided.
  • 10. Cost Factors Metro projects are meant to cater to cities with more than four million population Larger the underground and elevated proposal, larger shall be the cost involved. Funding process is done through the PPP model (Public- Private Partnership) as in Hyderabad and Mumbai or by DMRC model by the state or the central government as in Bengaluru, Chennai and Kolkata. Correct process is the PPP model. LPG (Liberalization, Privatization and Globalization) to encourage private investors
  • 11. BENEFITs OF METRO RAIL Requires 1/5th energy per passenger km compared to road-based transport system. Causes less noise, no air pollution and eco friendly transport system. Occupies no road space if underground and only about 2.60 meters width of the road if elevated. Reduces journey time. Cost effective mass transport system. Reducing traffic transport problems.
  • 12. Disadvantages Advantages A cheap mode of transport, the MRTS helps in low energy consumption It is eco-friendly (runs on electricity, thus minimizing air and sound pollution) Averts the number of accidents Is efficient in terms of space occupancy and provides comfort with ultra-modern coaches and modern systems like automatic ticketing, advanced signaling systems, automatic train protection system and integrated security systems.
  • 13. Advantages contd… Services like ATMs, food outlets, cafés and convenience stores at these stations make the journey more fruitful. Also such stations lead to nearby economic development. The international standard for MRTS with a maximum speed of 80kmph and average speed of around 34kmph helps in saving of time. With proper designing, the peak hour capacity could be rated at 3-4 lakhs passengers per hour."
  • 14. Disadvantages: The only disadvantage of metros is the slight congestion on roads at the time of construction which has to be taken care of. The cost factor is another disadvantage, the solution for which is to integrate metros with others systems considering the volume, structure, availability of space and resources for traffic and transportation.
  • 15. Kolkata Metro  The only metro service in the country functioning directly under the Indian Railways, the foundation for this was laid as early as 1972.  Delays due to non-availability of sufficient funds, shifting of underground utilities, court injunctions and irregular supply of vital materials led to the commencement of services being pushed to 1984, after which progressive construction followed leading to the completion of the services of the entire stretch in 2005.  Kolkata faced a transport problem with only 8% of the land being available for road transport( 25-35% available in other cities)  The metro has been quite a hit with the residents in Kolkata considering the number of passengers which has expansively increased in the past years.  Large scale expansion projects (covering 87 kms) have now been planned and in its modernization program.
  • 16. Modernization of the kolkata metro includes: State-of-the-Art Automatic Fare Collection Passenger Control system with Radio Frequency Identification based Flap Gates Integrated Security System new air-conditioned rakes Automatic Signaling system.
  • 17. Delhi Metro The Delhi Metro Rail Corporation (DMRC) was established to build a metro in two phases serving Delhi, Gurgaon, Noida and Ghaziabad. While the first phase covering 65.11km was opened in 2002 the second phase of 125km was recently completed. The first railway project in the world to be registered for carbon credits by the United Nations, the Delhi Metro achieved this by saving power by using regenerative brakes in the trains, and reduced carbon emissions. DMRC has also partnered with Google India (through Google Transit) to provide train schedule and route information to mobile devices with Google Maps.
  • 18. Delhi metro airport express: The popular Delhi Airport Metro Express rail from the Indira Gandhi International Airport to the city centre takes less than 20 minutes as opposed to one hour by road. Its LCD screens equipped coaches imported from Spain are entirely different from the trains on this line and have in-built noise reduction features, padded fabric seats and provide flight information for convenience of air travellers. The trains are fitted with an event recorder which can withstand high levels of temperature and impact. The metro has been promoted as an integral part of community infrastructure, and community artwork depicting the local way of life at the stations in the form of decorative murals, panels and a gallery showcasing artwork and handicrafts from across India.
  • 19. The Delhi Metro though plagued by controversies in the form of technical snags, overcrowding and accidents at the construction sites has proved as a model for the other metros in the country to follow. Phases 3 and 4 will expand the total journey to 413.8km and are scheduled to open in 2016 and 2020 respectively. With such a great pace of work, the Delhi metro will soon become one of the fastest expanding metro networks in the world.
  • 20. Mumbai Metro Mumbai's existing Suburban Railway and BEST bus system have not been able to compete with the rapid population growth. The Mumbai MRTS saw the completion of the first phase, a partnership between Mumbai Metropolitan Region Development Authority (MMRDA) and Reliance Infrastructure and Veolia Transport (France) in 2012 and this entails a 12 km elevated metro with 12 stations enroute. While the Suburban Railways provide a NS connect, this corridor will provide the relief in the East West (EW) connectivity, covering the journey in 21 minutes.
  • 21. Phase 2 and Phase 3 would be totaling to a length of 146 km. Plans are on for a nine-line network by 2021 in its three phases of development costing Rs.36,000 crore. Skywalks have also been provided to connect the metro and suburban railways stations. Right from the construction stage, initiatives have been on to make the Mumbai Metro Asia's first green metro.
  • 22. Bengaluru Metro Though a MRTS has been in consideration for long in the Garden City, the foundation stone was finally laid in 2006. Being operated by the Bangalore Metro Rail Corporation Limited (BMRCL), a detailed project report of two double line corridors with a total length of 33 km (elevated and underground) with 32 stations has been prepared.  The general consultants for the project: o EW and NS corridors as part of Phase I of the project which is estimated to complete by this year. o The travel time from end to end on the EW corridor will be 33 minutes, and on the NS corridor will be 28 minutes. o The second phase comprising 51km would involve the extension of both the first two lines and the construction of an additional line.
  • 23. Cont… While the stations are contemporary keeping in mind Bengaluru's erstwhile architecture and materials, there have been competitions floated for developing communication concepts for the interior space of some stations too. Though at present 43 stations are being constructed which would get completed by 2015 the DBR (Design Basis report) issued by BMRCL shows an approval for 162 stations which means that in future, there would be tributaries on the NS and EW corridors. The only complaint that could possibly be related to this metro is the lack of transparency and the shirking of public involvement in the project.
  • 24. Hyderabad Metro Spanning over 71km, the phase 1 would include three traffic corridors covering a total of 72 km and 66 stations. A completely elevated system, prepared by DMRC. Designed to cater to 50,000 people in one hour Hyderabad Metro Rail Ltd (HMR) is the SPV set to look after the project which has been allotted to L&T in PPP mode. Hyderabad MRTS which is the country's first two-track elevated city transit system, has been much delayed since 2008 The HMR is confident that by 2015 the entire project would finish.
  • 25. Cont.. The travel time for the metro rail is 45 minutes for Corridor I, 22 minutes for Corridor II and 39 minutes for Corridor III. The metro stations are being designed keeping the local architecture in mind. The Metro that will rest on massive concrete pillars along the central median of the roads will prove a boon for the city.
  • 26. The Future MRTS is the best way to decongest traffic. However, a number of considerations should be kept in mind in order to run a successful MRTS. "Viability of metro projects depend upon correct defining of traffic corridors, technology adapted, availability of land, volume of traffic carried, capacity utilization and acceptance of the mode by the commuters," Conclusively, transport needs to be made an integral part of urban design/master plan of the city as it cannot be delineated to a separate entity. A multi-modal transportation system would ensure the use of MRTS to its best potential.
  • 27. Cont.. The uncertainty about MRTS, which has plagued the importance of such systems in India seems to be resolving. Though the Kolkata metro was designed without a rule book and the Delhi Metro was designed on international norms
  • 28. Training: The National Mass Transit and Training Research Institute (NMTTRI) in Mumbai (established by MMRDA), is one of its kinds in Asia imparting training and research on mass transit systems. The annual training courses cater to key issues like Public Transport Security, Safety and Emergency/Disaster Management, Noise Pollution & Abatement Measures for Urban Transportation, Integrated Ticketing, and seamless Travel across Modes and Intelligent Transportation System.
  • 29. CONCLUSION Even though the Metro systems are more reliable, comfortable and safer than road-based systems & it reduces congestion on the roads, the systems planned in India show cost overrunning and under utilization of capacity. High capacity system does not necessarily generate high demand. Immense thought & planing is needed for such expensive and expansive projects.