SlideShare una empresa de Scribd logo
1 de 12
Descargar para leer sin conexión
Family-Run Building & Refurbishment
Contractor in London, Hertfordshire &
Essex for over 30 years
Education
Projects
2 Call us today on 0208 805 2188 or email mail@woodbar.co.uk
The Company
Over 30 years of experience in all aspects of Construction
Management
Woodbar Limited was established in 1981 as a family run Building Contractor with
two generations of construction expertise.
We specialise in delivering new build & refurbishment contracts as a Main Contractor
in London, East Anglia & the South East.
We have two main offices: our Head Office is in Enfield North London, where the
company has been based for over 30 years, and our Central London office located
in the City of London which was opened in 2010 to support our continued growth in
Central & West London.
Delivering with confidence and certainty
We are accredited by Constructionline, Exor and the
Construction Health & Safety Scheme (CHAS). We are a
registered member of the Considerate Constructor scheme
and have received a platinum certificate for our commitment
to the CSCS scheme. We are a quality assured company,
having ISO9001 accreditation and are currently working
towards ISO14001 & OHSAS 18001 accreditation.
Contents
Page 4 Our Appoach to Education
Page 6 Case Study 1 - Fitzjohns Primary School
Page 7 Case Study 2 - Coopers Technical College
Page 8 Case Study 3 - Sion Manning RC Girls School
Page 9 Case Study 4 - Primrose Hill Primary School
Page 10 Case Study 5 - Park Walk Primary School
Page 11 Case Study 6 - Whitehorse Manor Junior School
Page 11 Case Study 7 - Kentish Town CE Primary School
3Visit us online at www.woodbar.co.uk
Innovation and added value delivered by our
experienced professional teams
We have a dynamic management structure and a highly
trained workforce, many of whom have been with the
company since its launch in 1981. It is this structure that allows
us to competently complete projects in excess of £2 million
without compromising the personal services that our clients
have become accustomed to.
We work closely with all our Clients, to identify their needs and
tailor solutions accordingly, with the objective of providing a
high quality, effective service at the right price.
We offer vast experience in our field. A strong innovative
approach to problem solving. Excellent project management,
and an exemplary health and safety record, with adaptability in
our approach to the contracts we undertake.
With over 30 years experience, we are financially stable with
no borrowings and can therefore offer our clients peace of
mind and security – a key consideration for many, given the
current economic climate.
Woodbar supporting the local community
“We would all like to thank you for your sponsorship of our
Greenpower car. After many months of building and testing
we entered our first race on the 23rd September. The weather
on the day was very wet and windy but great fun and an
exciting experience. Although our car was not the fastest it
ran well and kept going through the whole race. Our aim now
is to build an even faster car that can cover more distance.”
Our
Clients
Architects
AAB Architects
Arboreal Architecture
ARP Architects
Barron & Smith Architects
Cur La Tourelle Architects
Dannat Johnson Architects
Hayhurst & Co
Hunters
Knox Bhavan Architects LLP
M.A.Newson & Co
Meadowcroft Griffin Architects
Ramboll Whitbybird
Richmond Architectural
Sprunt
Tooley & Foster Partnership
Walker Bushe Architects
Wyatt McLaren LLP
Multi-disciplinary Consultants
Appleyards
Atkins
A.T.P. Group
The Clarklson Alliance
Bailey Garner LLP
Baqus Group
EC Harris LLP
Faithful & Gould
Gardiner & Theobald
Ian Sayer & Co
Ingleton Wood
Knight Frank LLP
Mouchel
NPS Group
Pellings LLP
Synergy LLP
V.B.Johnson
Watts Group PLC
Surveyors
Ainsley & Partners
Checkley & Co
Greenway & Lee Associates
HBSV Chartered Surveyors
Robert Martell & Partners
Local Authorities
Hertfordshire County Council,
Easts Herts
London Borough of Barnet
London Borough of Barking
& Dagenham
London Borough of Bexley
London Borough of Brent
London Borough of Bromley
London Borough of Camden
London Borough of Croydon
London Borough of Ealing
London Borough of Enfield
London Borough of Greenwich
London Borough of Haringey
London Borough of Hackney
London Borough of Islington
London Borough of
Hammersmith & Fulham
London Borough of Havering
London Borough of Harrow
London Borough of Hillingdon
London Borough of Lambeth
London Borough of Lewisham
London Borough of Merton
London Borough of Newham
London Borough of Redbridge
London Borough of Southwark
London Borough of Tower
Hamlets
London Borough of Waltham
Forest
London Borough of
Westminster
Royal Borough of Kensington
& Chelsea
Schools, Colleges & Universities
Argyle School
Barclay Infant School
Brecknock Primary School
Broadmead School
Brookfield School
Downshill Primary School
Eleanor Palmer School
Hayes Primary School
Holdbrook Primary
Immanuel College
Lauriston School
Little Stars Nursery
Ludwich Nursery
Montem Primary School
Park Walk School
Primrose Hill School
Southall & West London
College
Southgate School
Springmead Primary School
St Bede’s School
St Josephs School
St Michael’s School
Stanborough School
Star Primary School
Thomas Fairchild School
Thorp Hall School
Tower Hamletts College
University of Arts
Waverly school
Whitehorse Mannor Junior
School
Windmill School
Witehorse Junior School
4 Call us today on 0208 805 2188 or email mail@woodbar.co.uk
Our Approach to
Education
Our experience
Woodbar has a 20 year track record
for delivering the highest standards of
workmanship, quality, and Client service. We
work within occupied schools delivering a wide
range of refurbishment services, from class
room refurbishments, to the construction of
additional educational and sports facilities.
We understand that delivering projects within
education is not just about the construction, but
about managing the projects and delivering
a learning experience for all involved – our
Clients, the School and Students.
A dedicated and experienced Project
Management Team
Our team of skilled professionals provides tailored
solutions to meet the precise needs of the project.
Whether it is a classroom or laboratory refurbishment, or
the construction of additional teaching blocks and sports
facilities. When deadlines are pressing, we can offer
fast-track programmes and, from day one, a dedicated
project manager will ensure that work is completed on
time and on budget.
When working in schools we ensure that effective
communication protocols are established, to ensure that
the project runs smoothly without impeding the normal
running of the facility.
Engendering your learning environment
At Woodbar, we believe that a school or university embarking on a
construction project is a major commitment, and this needs to be
managed well, to allow the school to function throughout the project.
Disruption is kept to a minimum by establishing a Facilities
Management Plan to ensure that the necessary accommodation is
available at the required time. Noise is always kept to a minimum, and,
we will endeavour to schedule any exceptionally noisy aspect of the
project to out of school hours.
On a number of occasions when we have carried out long term works
within an occupied school, we have worked with the school staff to
allow the children to use the scheme as a study project. Whilst we
realise that these opportunities rely on the support of the teachers, we
are always keen to assist the school in providing unique educational
opportunities out of our building projects.
5Visit us online at www.woodbar.co.uk
Safety of staff and students comes first at all times
Woodbar understands the importance of security when working within
sensitive areas such as a school. To support the safety and security of
students, we employ rigorous audits of all the personnel involved in our
projects, and will ensure that all directly employed staff are CRB checked.
We take the management of Health and Safety of employees, sub-
contractors, teaching staff, students and visitors extremely seriously, and we
are proud of the outstanding record that we have attained, and will continue
to review our policies and practices to ensure that Health and Safety is at the
forefront of all that we do.
Exceeding our Environmental
responsibilities throughout our projects
Woodbar recognise the growing importance that this
has within Education.
Through the duration of our project, we work with our
Clients to develop their understanding and practices
and where appropriate, we can support them in
gaining Eco-Schools accreditation, ensuring they
are ahead of the Government’s sustainable school
programme by 2020.
6 Call us today on 0208 805 2188 or email mail@woodbar.co.uk
Case Study 1
Fitzjohns Primary School
The London Borough of Camden
Value £2.1m
Description
On a site surrounded on four sides by residences and another school, and with
the only access a narrow private road, we worked on the phased transformation
and extension of the buildings at Fitzjohns Primary School.
The complex programme was designed to cause minimum disruption to the
school, which has stayed open throughout.
The existing buildings provided insufficient space for the school to function
effectively. Central to our solution to this was the refurbishment of the original
Victorian hall, returning it to its former use. Internal partitions, added to make
classrooms, have been removed and the glorious original timber framing
restored.
A new feature ramp makes the hall fully accessible.
To expand the teaching accommodation, we created timber-clad classrooms
in pods that hug the boundaries of the site. They are linked to the existing
buildings by a lightweight carefully detailed canopy that unifies the spaces
around the central playground and its mature trees. The previous school hall has
been newly converted to a nursery class with a dedicated play area carved out
of the steep slope of the site.
Winner of the British
Council for School
Environments Award
2008 for the best
refurbishment/remodel,
primary/secondary.
7Visit us online at www.woodbar.co.uk
Case Study 2
Coopers Technical College
Value £1.4m
Description
Hidden behind a fence on Hawkwood Lane is a large old house, known as
Coopers, from which the adjacent school took its name. It has been quietly,
but decidedly, rotting over the last few decades. Most of the lead on the many
roofs had been stolen, resulting in water damage. A recent outbreak of dry rot
meant that the building has been in danger of collapsing, and in urgent need of
refurbishment.
The original 18th Century three storey section of the building is constructed of soft
red facing brickwork to the South East (rear) elevation, with large timber, vertical,
sliding sash, single glazed windows with glazing bars. The North West elevation,
facing Hawkwood Lane, is constructed of yellow London stock bricks, with a
painted stone string course, parapet and cornice. The photograph below shows the
eastern front of the house in the early 20th Century.
In February 2012 we were commissioned by the College to undertake an
extensive external refurbishment of the entire building. The work involved carrying
out structural repairs to the roof structures, renewing/upgrading most of the roof
coverings to meet current building regs, cleaning the brick & stonework, repairing
and repointing the masonry and repairing/restoring all of the existing metal &
timber windows.
In September 2012 the College then commissioned us to carry out the internal
refurbishment of the building. These works included renewing the M&E services
through the building, including demolition of the existing boiler house, Asbestos
removal and refurbishment of all internal areas of the Mansion house to provide
the College with a new Sixth Form College.
8 Call us today on 0208 805 2188 or email mail@woodbar.co.uk
Case Study 3
Sion Manning RC Girls School
Value £1m
Description
A visual arts college, Sion Manninng RC Girls’ School gained Lottery funding for this
extension - a dance studio with fitness suite. It is a building that is fully integrated
into the centre of the school site, with provision for independent community
access.
In 2006 we were commissioned by the London Borough of Kensington & Chelsea
to construct a new dance studio. The studio is a double height space composed
of two elements: a lightweight glazed volume floating above a dark masonry
base. Inside, linear light fittings hung through the glazed volume form a floating
suspended plane of light. Timber-faced acoustic panels resonate with the rich
tones of the timber floor, providing a counterpoint to the cool surface of a mirrored
wall. Wrapped around the studio are single storey changing facilities and the
fitness suite. The suite is a linear volume, one wall of which is washed in daylight
from a continuous rooflight. A large window punctuates one end of this space,
framing the view.
This project was undertaken on a very restricted site, with a fully occupied
& functional school and therefore particular attention had to be given to the
scheduling of deliveries and segregation of the working area from the children.
This project proved to be a success and we have since work on several other
projects for L.B.K.C & Cur La Tourelle Architects
9Visit us online at www.woodbar.co.uk
Case Study 4
Primrose Hill Primary School
Value £1.2m
Description
Primrose Hill Primary school is a Grade II listed Victorian Building in the heart
of the Primrose Hill Conservation area in Camden.
This classic three level Victorian school, originally housing Girls, Boys and
Infants on separate floors, needed complete re-modelling to work effectively
as a teaching establishment in the 21st Century.
While the Grade II listed school, at 3,000sqm, is a third bigger than is required
for the number on its roll, 10 of the 14 classrooms were well below the size
expected by the DfES. It also had an original assembly hall at each level, but
could not accommodate the whole school.
The kitchen, located on the first floor, was in need of replacement and
relocation, and the main entrance reception, on the ground floor, made access
of the school difficult.
Work was carried out in four phases linked with a decanting strategy designed
to minimise disruption to the children’s education.
The end result provides five new state-of-the-art classrooms of the correct
size and location, better siting of resource areas, revised assembly facilities,
a new kitchen and dining suite and a redesigned and rationalised entrance
and administration hub. The ground floor is now available for community use
without security issues.
10 Call us today on 0208 805 2188 or email mail@woodbar.co.uk
Case Study 5
Park Walk Primary School
Value £330,000
Description
Park Walk Primary School is a Grade 11 listed building in Chelsea, accessible to
people with disabilities in line with the Disability Discrimination Act.
The scheme removed the original concrete staircase, leaving a triple-height void,
2.5m wide x 4.5m deep, that was filled with a lift and two steel and resin bridges
that cross the space, at first and second-floor levels.
Each floor was colour-coded with animal graphics. The lift has a glass rear face, fitted
with strips of LEDs that illuminate vinyl graphics of nocturnal animals on the wall as
it moves.
A 3m x 2.5m rectangular roof light of toughened and laminated glass was installed
to draw in daylight.
Three animal graphics made from cut frosted film were applied to the internal face
of the glass, while a 1,800mm-diameter circle was cut out of the ceiling to create
the illusion that an ostrich, monkey and bear are peering in.
11Visit us online at www.woodbar.co.uk
Value £1m
Description
The key elements of our phased work at this school are
striking and playful additions to the existing accommodation,
and alterations to the existing buildings to make them fully
accessible. Kentish Town Primary is a mainstream school
with a number of physically disabled children in attendance
and a reputation for work in inclusive education.
In the first phase, we provided hygiene facilities throughout
the school. In the second, we extended the main building
to incorporate a new therapy suite and create additional
classroom space for children with dexterity problems who
need computer bases. In the third phase, we designed a
bold addition to link the original Arts & Crafts main building
to the infant block. This project featured a curved wall of
warm stock bricks, a timber pergola, red aluminium cladding
to the entry canopy, and an external play area under a
cantilevered canopy. Light is used to unify the spaces
throughout. The ICT suite is lit from above by a curved
rooflight, washing light over the main wall.
Case Study 6
Whitehorse Manor Junior School
Case Study 7
Kentish Town CE
Primary School
Value £134,000
Description
Removal of existing timber mezzanine floors and erection of new first floor
accommodation, new staircase, skylights, services and internal finishes.
“... a generous sense of
space and light ... Detailing
is robust and appropriate
to both the modern and
original buildings.”
Judge’s comments, Camden
Design Award 2004
Head Office
Woodbar House,
50 Alexandra,
Enfield,
EN3 7EH
Central London Office
1st Floor Broad Street House,
55 Old Broad Street,
London,
EC2M 1RX
t: 020 8805 2188
f: 020 8804 9555
e: mail@woodbar.co.uk
www.woodbar.co.uk

Más contenido relacionado

Similar a Woodbar Education Brochure

13287 OSBORNE AR lores spreads
13287 OSBORNE AR lores spreads13287 OSBORNE AR lores spreads
13287 OSBORNE AR lores spreadsJosie Piercy
 
High Res Capability Brochure standard downloadable V.3, Dec 2016
High Res Capability Brochure standard downloadable V.3, Dec 2016High Res Capability Brochure standard downloadable V.3, Dec 2016
High Res Capability Brochure standard downloadable V.3, Dec 2016Tom Scanlon
 
Devereux Architects - Education Presentation
Devereux Architects - Education PresentationDevereux Architects - Education Presentation
Devereux Architects - Education PresentationKimberleyW
 
SYS_CSR_0001 Q2 adi CSR brochure 2015
SYS_CSR_0001 Q2 adi CSR brochure 2015SYS_CSR_0001 Q2 adi CSR brochure 2015
SYS_CSR_0001 Q2 adi CSR brochure 2015Claire Frays
 
adi CSR brochure Item Ref- SYS_CSR_0001 Q2 2015 online
adi CSR brochure Item Ref- SYS_CSR_0001 Q2 2015 onlineadi CSR brochure Item Ref- SYS_CSR_0001 Q2 2015 online
adi CSR brochure Item Ref- SYS_CSR_0001 Q2 2015 onlineAlan Lusty
 
Introduction to the lakehouse group
Introduction to the lakehouse groupIntroduction to the lakehouse group
Introduction to the lakehouse groupLakehouse2012
 
Morgan Tucker Company Overview
Morgan Tucker Company OverviewMorgan Tucker Company Overview
Morgan Tucker Company OverviewMorgan Tucker Ltd
 
NJSR Architects : Practice Profile
NJSR Architects  : Practice ProfileNJSR Architects  : Practice Profile
NJSR Architects : Practice Profiledavidbslideshare
 
CapabilityStatement-ATBNSW_LR_SPREADS_FA2
CapabilityStatement-ATBNSW_LR_SPREADS_FA2CapabilityStatement-ATBNSW_LR_SPREADS_FA2
CapabilityStatement-ATBNSW_LR_SPREADS_FA2Mark McClean
 
Presentatie Royal HaskoningDHV - Bedrijvendagen TU Delft - 18 feb 2015
Presentatie Royal HaskoningDHV - Bedrijvendagen TU Delft - 18 feb 2015Presentatie Royal HaskoningDHV - Bedrijvendagen TU Delft - 18 feb 2015
Presentatie Royal HaskoningDHV - Bedrijvendagen TU Delft - 18 feb 2015Koos Gloudemans
 
Capita Symonds
Capita SymondsCapita Symonds
Capita Symondstankhan
 
Carey london-ltd-finding-a-better-way
Carey london-ltd-finding-a-better-wayCarey london-ltd-finding-a-better-way
Carey london-ltd-finding-a-better-waycareylondon
 
Charles Andrews Brochure
Charles Andrews Brochure Charles Andrews Brochure
Charles Andrews Brochure Charles Andrews
 
Whitescape State Education Case Study
Whitescape State Education Case StudyWhitescape State Education Case Study
Whitescape State Education Case StudyAndrew White
 
Lewis & Hickey - Education
Lewis & Hickey - EducationLewis & Hickey - Education
Lewis & Hickey - EducationTim Hall
 
HM Infrastructure & Projects Team
HM Infrastructure & Projects TeamHM Infrastructure & Projects Team
HM Infrastructure & Projects TeamEuan Pirie
 
HM Infrastructure and Projects Credentials Brochure
HM Infrastructure and Projects Credentials BrochureHM Infrastructure and Projects Credentials Brochure
HM Infrastructure and Projects Credentials BrochureCatriona Strachan
 

Similar a Woodbar Education Brochure (20)

13287 OSBORNE AR lores spreads
13287 OSBORNE AR lores spreads13287 OSBORNE AR lores spreads
13287 OSBORNE AR lores spreads
 
Company Brochure
Company BrochureCompany Brochure
Company Brochure
 
High Res Capability Brochure standard downloadable V.3, Dec 2016
High Res Capability Brochure standard downloadable V.3, Dec 2016High Res Capability Brochure standard downloadable V.3, Dec 2016
High Res Capability Brochure standard downloadable V.3, Dec 2016
 
Devereux Architects - Education Presentation
Devereux Architects - Education PresentationDevereux Architects - Education Presentation
Devereux Architects - Education Presentation
 
SYS_CSR_0001 Q2 adi CSR brochure 2015
SYS_CSR_0001 Q2 adi CSR brochure 2015SYS_CSR_0001 Q2 adi CSR brochure 2015
SYS_CSR_0001 Q2 adi CSR brochure 2015
 
adi CSR brochure Item Ref- SYS_CSR_0001 Q2 2015 online
adi CSR brochure Item Ref- SYS_CSR_0001 Q2 2015 onlineadi CSR brochure Item Ref- SYS_CSR_0001 Q2 2015 online
adi CSR brochure Item Ref- SYS_CSR_0001 Q2 2015 online
 
Introduction to the lakehouse group
Introduction to the lakehouse groupIntroduction to the lakehouse group
Introduction to the lakehouse group
 
Morgan Tucker Company Overview
Morgan Tucker Company OverviewMorgan Tucker Company Overview
Morgan Tucker Company Overview
 
NJSR Architects : Practice Profile
NJSR Architects  : Practice ProfileNJSR Architects  : Practice Profile
NJSR Architects : Practice Profile
 
CapabilityStatement-ATBNSW_LR_SPREADS_FA2
CapabilityStatement-ATBNSW_LR_SPREADS_FA2CapabilityStatement-ATBNSW_LR_SPREADS_FA2
CapabilityStatement-ATBNSW_LR_SPREADS_FA2
 
Presentatie Royal HaskoningDHV - Bedrijvendagen TU Delft - 18 feb 2015
Presentatie Royal HaskoningDHV - Bedrijvendagen TU Delft - 18 feb 2015Presentatie Royal HaskoningDHV - Bedrijvendagen TU Delft - 18 feb 2015
Presentatie Royal HaskoningDHV - Bedrijvendagen TU Delft - 18 feb 2015
 
Apprenticeship Infomation
Apprenticeship InfomationApprenticeship Infomation
Apprenticeship Infomation
 
Capita Symonds
Capita SymondsCapita Symonds
Capita Symonds
 
Carey london-ltd-finding-a-better-way
Carey london-ltd-finding-a-better-wayCarey london-ltd-finding-a-better-way
Carey london-ltd-finding-a-better-way
 
Charles Andrews Brochure
Charles Andrews Brochure Charles Andrews Brochure
Charles Andrews Brochure
 
Whitescape State Education Case Study
Whitescape State Education Case StudyWhitescape State Education Case Study
Whitescape State Education Case Study
 
Lewis & Hickey - Education
Lewis & Hickey - EducationLewis & Hickey - Education
Lewis & Hickey - Education
 
Annual Report
Annual ReportAnnual Report
Annual Report
 
HM Infrastructure & Projects Team
HM Infrastructure & Projects TeamHM Infrastructure & Projects Team
HM Infrastructure & Projects Team
 
HM Infrastructure and Projects Credentials Brochure
HM Infrastructure and Projects Credentials BrochureHM Infrastructure and Projects Credentials Brochure
HM Infrastructure and Projects Credentials Brochure
 

Woodbar Education Brochure

  • 1. Family-Run Building & Refurbishment Contractor in London, Hertfordshire & Essex for over 30 years Education Projects
  • 2. 2 Call us today on 0208 805 2188 or email mail@woodbar.co.uk The Company Over 30 years of experience in all aspects of Construction Management Woodbar Limited was established in 1981 as a family run Building Contractor with two generations of construction expertise. We specialise in delivering new build & refurbishment contracts as a Main Contractor in London, East Anglia & the South East. We have two main offices: our Head Office is in Enfield North London, where the company has been based for over 30 years, and our Central London office located in the City of London which was opened in 2010 to support our continued growth in Central & West London. Delivering with confidence and certainty We are accredited by Constructionline, Exor and the Construction Health & Safety Scheme (CHAS). We are a registered member of the Considerate Constructor scheme and have received a platinum certificate for our commitment to the CSCS scheme. We are a quality assured company, having ISO9001 accreditation and are currently working towards ISO14001 & OHSAS 18001 accreditation. Contents Page 4 Our Appoach to Education Page 6 Case Study 1 - Fitzjohns Primary School Page 7 Case Study 2 - Coopers Technical College Page 8 Case Study 3 - Sion Manning RC Girls School Page 9 Case Study 4 - Primrose Hill Primary School Page 10 Case Study 5 - Park Walk Primary School Page 11 Case Study 6 - Whitehorse Manor Junior School Page 11 Case Study 7 - Kentish Town CE Primary School
  • 3. 3Visit us online at www.woodbar.co.uk Innovation and added value delivered by our experienced professional teams We have a dynamic management structure and a highly trained workforce, many of whom have been with the company since its launch in 1981. It is this structure that allows us to competently complete projects in excess of £2 million without compromising the personal services that our clients have become accustomed to. We work closely with all our Clients, to identify their needs and tailor solutions accordingly, with the objective of providing a high quality, effective service at the right price. We offer vast experience in our field. A strong innovative approach to problem solving. Excellent project management, and an exemplary health and safety record, with adaptability in our approach to the contracts we undertake. With over 30 years experience, we are financially stable with no borrowings and can therefore offer our clients peace of mind and security – a key consideration for many, given the current economic climate. Woodbar supporting the local community “We would all like to thank you for your sponsorship of our Greenpower car. After many months of building and testing we entered our first race on the 23rd September. The weather on the day was very wet and windy but great fun and an exciting experience. Although our car was not the fastest it ran well and kept going through the whole race. Our aim now is to build an even faster car that can cover more distance.” Our Clients Architects AAB Architects Arboreal Architecture ARP Architects Barron & Smith Architects Cur La Tourelle Architects Dannat Johnson Architects Hayhurst & Co Hunters Knox Bhavan Architects LLP M.A.Newson & Co Meadowcroft Griffin Architects Ramboll Whitbybird Richmond Architectural Sprunt Tooley & Foster Partnership Walker Bushe Architects Wyatt McLaren LLP Multi-disciplinary Consultants Appleyards Atkins A.T.P. Group The Clarklson Alliance Bailey Garner LLP Baqus Group EC Harris LLP Faithful & Gould Gardiner & Theobald Ian Sayer & Co Ingleton Wood Knight Frank LLP Mouchel NPS Group Pellings LLP Synergy LLP V.B.Johnson Watts Group PLC Surveyors Ainsley & Partners Checkley & Co Greenway & Lee Associates HBSV Chartered Surveyors Robert Martell & Partners Local Authorities Hertfordshire County Council, Easts Herts London Borough of Barnet London Borough of Barking & Dagenham London Borough of Bexley London Borough of Brent London Borough of Bromley London Borough of Camden London Borough of Croydon London Borough of Ealing London Borough of Enfield London Borough of Greenwich London Borough of Haringey London Borough of Hackney London Borough of Islington London Borough of Hammersmith & Fulham London Borough of Havering London Borough of Harrow London Borough of Hillingdon London Borough of Lambeth London Borough of Lewisham London Borough of Merton London Borough of Newham London Borough of Redbridge London Borough of Southwark London Borough of Tower Hamlets London Borough of Waltham Forest London Borough of Westminster Royal Borough of Kensington & Chelsea Schools, Colleges & Universities Argyle School Barclay Infant School Brecknock Primary School Broadmead School Brookfield School Downshill Primary School Eleanor Palmer School Hayes Primary School Holdbrook Primary Immanuel College Lauriston School Little Stars Nursery Ludwich Nursery Montem Primary School Park Walk School Primrose Hill School Southall & West London College Southgate School Springmead Primary School St Bede’s School St Josephs School St Michael’s School Stanborough School Star Primary School Thomas Fairchild School Thorp Hall School Tower Hamletts College University of Arts Waverly school Whitehorse Mannor Junior School Windmill School Witehorse Junior School
  • 4. 4 Call us today on 0208 805 2188 or email mail@woodbar.co.uk Our Approach to Education Our experience Woodbar has a 20 year track record for delivering the highest standards of workmanship, quality, and Client service. We work within occupied schools delivering a wide range of refurbishment services, from class room refurbishments, to the construction of additional educational and sports facilities. We understand that delivering projects within education is not just about the construction, but about managing the projects and delivering a learning experience for all involved – our Clients, the School and Students. A dedicated and experienced Project Management Team Our team of skilled professionals provides tailored solutions to meet the precise needs of the project. Whether it is a classroom or laboratory refurbishment, or the construction of additional teaching blocks and sports facilities. When deadlines are pressing, we can offer fast-track programmes and, from day one, a dedicated project manager will ensure that work is completed on time and on budget. When working in schools we ensure that effective communication protocols are established, to ensure that the project runs smoothly without impeding the normal running of the facility. Engendering your learning environment At Woodbar, we believe that a school or university embarking on a construction project is a major commitment, and this needs to be managed well, to allow the school to function throughout the project. Disruption is kept to a minimum by establishing a Facilities Management Plan to ensure that the necessary accommodation is available at the required time. Noise is always kept to a minimum, and, we will endeavour to schedule any exceptionally noisy aspect of the project to out of school hours. On a number of occasions when we have carried out long term works within an occupied school, we have worked with the school staff to allow the children to use the scheme as a study project. Whilst we realise that these opportunities rely on the support of the teachers, we are always keen to assist the school in providing unique educational opportunities out of our building projects.
  • 5. 5Visit us online at www.woodbar.co.uk Safety of staff and students comes first at all times Woodbar understands the importance of security when working within sensitive areas such as a school. To support the safety and security of students, we employ rigorous audits of all the personnel involved in our projects, and will ensure that all directly employed staff are CRB checked. We take the management of Health and Safety of employees, sub- contractors, teaching staff, students and visitors extremely seriously, and we are proud of the outstanding record that we have attained, and will continue to review our policies and practices to ensure that Health and Safety is at the forefront of all that we do. Exceeding our Environmental responsibilities throughout our projects Woodbar recognise the growing importance that this has within Education. Through the duration of our project, we work with our Clients to develop their understanding and practices and where appropriate, we can support them in gaining Eco-Schools accreditation, ensuring they are ahead of the Government’s sustainable school programme by 2020.
  • 6. 6 Call us today on 0208 805 2188 or email mail@woodbar.co.uk Case Study 1 Fitzjohns Primary School The London Borough of Camden Value £2.1m Description On a site surrounded on four sides by residences and another school, and with the only access a narrow private road, we worked on the phased transformation and extension of the buildings at Fitzjohns Primary School. The complex programme was designed to cause minimum disruption to the school, which has stayed open throughout. The existing buildings provided insufficient space for the school to function effectively. Central to our solution to this was the refurbishment of the original Victorian hall, returning it to its former use. Internal partitions, added to make classrooms, have been removed and the glorious original timber framing restored. A new feature ramp makes the hall fully accessible. To expand the teaching accommodation, we created timber-clad classrooms in pods that hug the boundaries of the site. They are linked to the existing buildings by a lightweight carefully detailed canopy that unifies the spaces around the central playground and its mature trees. The previous school hall has been newly converted to a nursery class with a dedicated play area carved out of the steep slope of the site. Winner of the British Council for School Environments Award 2008 for the best refurbishment/remodel, primary/secondary.
  • 7. 7Visit us online at www.woodbar.co.uk Case Study 2 Coopers Technical College Value £1.4m Description Hidden behind a fence on Hawkwood Lane is a large old house, known as Coopers, from which the adjacent school took its name. It has been quietly, but decidedly, rotting over the last few decades. Most of the lead on the many roofs had been stolen, resulting in water damage. A recent outbreak of dry rot meant that the building has been in danger of collapsing, and in urgent need of refurbishment. The original 18th Century three storey section of the building is constructed of soft red facing brickwork to the South East (rear) elevation, with large timber, vertical, sliding sash, single glazed windows with glazing bars. The North West elevation, facing Hawkwood Lane, is constructed of yellow London stock bricks, with a painted stone string course, parapet and cornice. The photograph below shows the eastern front of the house in the early 20th Century. In February 2012 we were commissioned by the College to undertake an extensive external refurbishment of the entire building. The work involved carrying out structural repairs to the roof structures, renewing/upgrading most of the roof coverings to meet current building regs, cleaning the brick & stonework, repairing and repointing the masonry and repairing/restoring all of the existing metal & timber windows. In September 2012 the College then commissioned us to carry out the internal refurbishment of the building. These works included renewing the M&E services through the building, including demolition of the existing boiler house, Asbestos removal and refurbishment of all internal areas of the Mansion house to provide the College with a new Sixth Form College.
  • 8. 8 Call us today on 0208 805 2188 or email mail@woodbar.co.uk Case Study 3 Sion Manning RC Girls School Value £1m Description A visual arts college, Sion Manninng RC Girls’ School gained Lottery funding for this extension - a dance studio with fitness suite. It is a building that is fully integrated into the centre of the school site, with provision for independent community access. In 2006 we were commissioned by the London Borough of Kensington & Chelsea to construct a new dance studio. The studio is a double height space composed of two elements: a lightweight glazed volume floating above a dark masonry base. Inside, linear light fittings hung through the glazed volume form a floating suspended plane of light. Timber-faced acoustic panels resonate with the rich tones of the timber floor, providing a counterpoint to the cool surface of a mirrored wall. Wrapped around the studio are single storey changing facilities and the fitness suite. The suite is a linear volume, one wall of which is washed in daylight from a continuous rooflight. A large window punctuates one end of this space, framing the view. This project was undertaken on a very restricted site, with a fully occupied & functional school and therefore particular attention had to be given to the scheduling of deliveries and segregation of the working area from the children. This project proved to be a success and we have since work on several other projects for L.B.K.C & Cur La Tourelle Architects
  • 9. 9Visit us online at www.woodbar.co.uk Case Study 4 Primrose Hill Primary School Value £1.2m Description Primrose Hill Primary school is a Grade II listed Victorian Building in the heart of the Primrose Hill Conservation area in Camden. This classic three level Victorian school, originally housing Girls, Boys and Infants on separate floors, needed complete re-modelling to work effectively as a teaching establishment in the 21st Century. While the Grade II listed school, at 3,000sqm, is a third bigger than is required for the number on its roll, 10 of the 14 classrooms were well below the size expected by the DfES. It also had an original assembly hall at each level, but could not accommodate the whole school. The kitchen, located on the first floor, was in need of replacement and relocation, and the main entrance reception, on the ground floor, made access of the school difficult. Work was carried out in four phases linked with a decanting strategy designed to minimise disruption to the children’s education. The end result provides five new state-of-the-art classrooms of the correct size and location, better siting of resource areas, revised assembly facilities, a new kitchen and dining suite and a redesigned and rationalised entrance and administration hub. The ground floor is now available for community use without security issues.
  • 10. 10 Call us today on 0208 805 2188 or email mail@woodbar.co.uk Case Study 5 Park Walk Primary School Value £330,000 Description Park Walk Primary School is a Grade 11 listed building in Chelsea, accessible to people with disabilities in line with the Disability Discrimination Act. The scheme removed the original concrete staircase, leaving a triple-height void, 2.5m wide x 4.5m deep, that was filled with a lift and two steel and resin bridges that cross the space, at first and second-floor levels. Each floor was colour-coded with animal graphics. The lift has a glass rear face, fitted with strips of LEDs that illuminate vinyl graphics of nocturnal animals on the wall as it moves. A 3m x 2.5m rectangular roof light of toughened and laminated glass was installed to draw in daylight. Three animal graphics made from cut frosted film were applied to the internal face of the glass, while a 1,800mm-diameter circle was cut out of the ceiling to create the illusion that an ostrich, monkey and bear are peering in.
  • 11. 11Visit us online at www.woodbar.co.uk Value £1m Description The key elements of our phased work at this school are striking and playful additions to the existing accommodation, and alterations to the existing buildings to make them fully accessible. Kentish Town Primary is a mainstream school with a number of physically disabled children in attendance and a reputation for work in inclusive education. In the first phase, we provided hygiene facilities throughout the school. In the second, we extended the main building to incorporate a new therapy suite and create additional classroom space for children with dexterity problems who need computer bases. In the third phase, we designed a bold addition to link the original Arts & Crafts main building to the infant block. This project featured a curved wall of warm stock bricks, a timber pergola, red aluminium cladding to the entry canopy, and an external play area under a cantilevered canopy. Light is used to unify the spaces throughout. The ICT suite is lit from above by a curved rooflight, washing light over the main wall. Case Study 6 Whitehorse Manor Junior School Case Study 7 Kentish Town CE Primary School Value £134,000 Description Removal of existing timber mezzanine floors and erection of new first floor accommodation, new staircase, skylights, services and internal finishes. “... a generous sense of space and light ... Detailing is robust and appropriate to both the modern and original buildings.” Judge’s comments, Camden Design Award 2004
  • 12. Head Office Woodbar House, 50 Alexandra, Enfield, EN3 7EH Central London Office 1st Floor Broad Street House, 55 Old Broad Street, London, EC2M 1RX t: 020 8805 2188 f: 020 8804 9555 e: mail@woodbar.co.uk www.woodbar.co.uk