Las Vegas is experiencing record numbers of visitors to
the city, creating unique infrastructure challenges for
the Clark County Department of Public Works (CCPW),
which manages construction projects throughout the Las
Vegas metro area. Like many counties that support a
major metropolitan area, Clark County faces a long list
of potential projects and needs to find clever ways to
increase efficiency while carefully controlling costs. With
a team of just three project managers, CCPW oversees
35 to 40 projects annually and manages a construction
budget of $350 million – ranging from a $120 million
airport beltway construction project to a $300,000
drainage build out and repair. Even while running a lean
operation, CCPW has been able to focus on project
quality and vendor relationships, earning them a
reputation as an owner that contractors and architects
want to do business with.
Finding a New Document
Management Process
Sometimes making a change requires a spark. When
support was discontinued for the document
management system previously used by the county’s
Department of Public Works, Mike Mamer, Assistant
Manager- Public Works, had a choice to make. The safe
options were to invest heavily in IT infrastructure and
Textura®
make the existing process work or revert back to
spreadsheets to track documents manually. On the
other hand, there was an opportunity to invest in
technology that would provide the Clark County
Department of Public Works a more effective document
management process and would support the county’s
needs for years to come. “It’s about succession,” Mamer
says. “We wanted to make sure the next generation was
in a good place, so they can focus on the quality of th
project.” Clark County leads Southern Nevada in
population and visitor growth, driving demand for
construction projects. Mamer and his team sought a
solution to increase work capacity and maintain quality
without increasing project staff or costs.
®
Textura®
The “Cloud-Based” Solution
Before Submittal Exchange®, Clark County’s document
management solution was stored on an internal server
and not accessible to the external project team. As a
result, Mamer estimates just 25 percent of documents
were uploaded to the system with the remaining
documents stored as paper copies. Not only time
consuming, this practice put the county at risk if
documents were lost or damaged. With Submittal
Exchange, all the documents are saved digitally and
archived at the end of the project. Now, the file cabinets
in Clark County’s construction office are empty and the
warehouse storing old documents is gone. “That was the
old way of doing business,” Mamer adds. “We figured if
we were going to be indirectly paying for the document
management system anyway, we might as well decide
how it is done.” There is a value to consistency and
owning the documentation.
Selecting Submittal Exchange and moving CCPW’s
document management system to the cloud helped
Mamer and his team eliminate disaster recovery
concerns, become the owner of record for all their
construction documents and make the entire project
team more effective. “We now have a great cloud-based
storage solution that gives you piece of mind that all of
the documents are at your fingertips,” Mamer says.
“Knowing that these documents are going to be
retrievable in the future is huge for government
agencies.”
The Clark County Department of Public Works
immediately saw improvements in efficiency, Mamer
said. By configuring Submittal Exchange to create more
“It’s about succession. We wanted to
make sure the next generation was in a
good place, so they can focus on the
quality of the project.”
®
© 2016 Textura Corporation
Textura®
than 30 logs including survey requests, submittals,
quality control and close outs Mamer’s team is able to
automate the approval workflows to ensure the team is
able to review necessary documents. Now they can
schedule due dates for critical documents, send
automated reminders for upcoming deadlines, identify if
someone from the project team is causing a delay and
intervene before it impacts the project schedule.
Why Clark County Chose
Submittal Exchange
Submittal Exchange’s Client Relationship Consultants
made the transition simple. Instead of implementing a
lengthy and cost-prohibitive migration from one large
enterprise software to another, CCPW worked closely
with the Client Relationship team to configure Submittal
Exchange to meet the specific needs of their civil
construction projects. Investing the time upfront
allowed CCPW to build a project template designed
specifically for them and allowed new projects to be set
up in about an hour. Knowing that the Submittal
Exchange support team would always be available to
provide unlimited training to the Clark County
Department of Public Works’ partners and to train new
Project Managers when the day comes for the current
team hang up their hard hats provides comfort that the
next generation would be in a good place where they
could focus on the quality of construction instead of
processes or IT challenges. With Submittal Exchange, the
Clark County Department of Public Works can continue
to meet the civil construction needs of the community
while saving time, improving efficiency and investing in
the future.
“Knowing that these documents are
going to be retrievable in the future
is huge for government agencies.”
®

Más contenido relacionado

Destacado

Liberacion comercial
Liberacion comercialLiberacion comercial
Liberacion comercialcarol2202
 
Métodos científicos
Métodos científicosMétodos científicos
Métodos científicosAbraham Cap
 
TIC - AIC All Hands Meeting - Effective Report Writing
TIC - AIC All Hands Meeting - Effective Report WritingTIC - AIC All Hands Meeting - Effective Report Writing
TIC - AIC All Hands Meeting - Effective Report WritingRenita M. Rhodes
 

Destacado (6)

Presentation1
Presentation1Presentation1
Presentation1
 
TrashCanBenchGrill
TrashCanBenchGrillTrashCanBenchGrill
TrashCanBenchGrill
 
Liberacion comercial
Liberacion comercialLiberacion comercial
Liberacion comercial
 
Métodos científicos
Métodos científicosMétodos científicos
Métodos científicos
 
TIC - AIC All Hands Meeting - Effective Report Writing
TIC - AIC All Hands Meeting - Effective Report WritingTIC - AIC All Hands Meeting - Effective Report Writing
TIC - AIC All Hands Meeting - Effective Report Writing
 
Untitleddocument
UntitleddocumentUntitleddocument
Untitleddocument
 

Último

Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"mphochane1998
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptNANDHAKUMARA10
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...Amil baba
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesRAJNEESHKUMAR341697
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxNadaHaitham1
 

Último (20)

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 

Clark County, DPW: Running Lean and Pristine?

  • 2. Las Vegas is experiencing record numbers of visitors to the city, creating unique infrastructure challenges for the Clark County Department of Public Works (CCPW), which manages construction projects throughout the Las Vegas metro area. Like many counties that support a major metropolitan area, Clark County faces a long list of potential projects and needs to find clever ways to increase efficiency while carefully controlling costs. With a team of just three project managers, CCPW oversees 35 to 40 projects annually and manages a construction budget of $350 million – ranging from a $120 million airport beltway construction project to a $300,000 drainage build out and repair. Even while running a lean operation, CCPW has been able to focus on project quality and vendor relationships, earning them a reputation as an owner that contractors and architects want to do business with. Finding a New Document Management Process Sometimes making a change requires a spark. When support was discontinued for the document management system previously used by the county’s Department of Public Works, Mike Mamer, Assistant Manager- Public Works, had a choice to make. The safe options were to invest heavily in IT infrastructure and Textura® make the existing process work or revert back to spreadsheets to track documents manually. On the other hand, there was an opportunity to invest in technology that would provide the Clark County Department of Public Works a more effective document management process and would support the county’s needs for years to come. “It’s about succession,” Mamer says. “We wanted to make sure the next generation was in a good place, so they can focus on the quality of th project.” Clark County leads Southern Nevada in population and visitor growth, driving demand for construction projects. Mamer and his team sought a solution to increase work capacity and maintain quality without increasing project staff or costs. ®
  • 3. Textura® The “Cloud-Based” Solution Before Submittal Exchange®, Clark County’s document management solution was stored on an internal server and not accessible to the external project team. As a result, Mamer estimates just 25 percent of documents were uploaded to the system with the remaining documents stored as paper copies. Not only time consuming, this practice put the county at risk if documents were lost or damaged. With Submittal Exchange, all the documents are saved digitally and archived at the end of the project. Now, the file cabinets in Clark County’s construction office are empty and the warehouse storing old documents is gone. “That was the old way of doing business,” Mamer adds. “We figured if we were going to be indirectly paying for the document management system anyway, we might as well decide how it is done.” There is a value to consistency and owning the documentation. Selecting Submittal Exchange and moving CCPW’s document management system to the cloud helped Mamer and his team eliminate disaster recovery concerns, become the owner of record for all their construction documents and make the entire project team more effective. “We now have a great cloud-based storage solution that gives you piece of mind that all of the documents are at your fingertips,” Mamer says. “Knowing that these documents are going to be retrievable in the future is huge for government agencies.” The Clark County Department of Public Works immediately saw improvements in efficiency, Mamer said. By configuring Submittal Exchange to create more “It’s about succession. We wanted to make sure the next generation was in a good place, so they can focus on the quality of the project.” ®
  • 4. © 2016 Textura Corporation Textura® than 30 logs including survey requests, submittals, quality control and close outs Mamer’s team is able to automate the approval workflows to ensure the team is able to review necessary documents. Now they can schedule due dates for critical documents, send automated reminders for upcoming deadlines, identify if someone from the project team is causing a delay and intervene before it impacts the project schedule. Why Clark County Chose Submittal Exchange Submittal Exchange’s Client Relationship Consultants made the transition simple. Instead of implementing a lengthy and cost-prohibitive migration from one large enterprise software to another, CCPW worked closely with the Client Relationship team to configure Submittal Exchange to meet the specific needs of their civil construction projects. Investing the time upfront allowed CCPW to build a project template designed specifically for them and allowed new projects to be set up in about an hour. Knowing that the Submittal Exchange support team would always be available to provide unlimited training to the Clark County Department of Public Works’ partners and to train new Project Managers when the day comes for the current team hang up their hard hats provides comfort that the next generation would be in a good place where they could focus on the quality of construction instead of processes or IT challenges. With Submittal Exchange, the Clark County Department of Public Works can continue to meet the civil construction needs of the community while saving time, improving efficiency and investing in the future. “Knowing that these documents are going to be retrievable in the future is huge for government agencies.” ®