1. Best practices for independent verification and
validation (IV&V) and risk management
Brad Ring
Keywords: blade servers, A/C data center solution, best
practices, program management, strategic planning, IT
infrastructure and fiber optic conduit integrity Technology
leadership, System
engineering, Transportation, tolling, ITS, intelligent
transportation system, fiber optic cable, system
integration, design review, requirements review, cap ex, op
ex, testing, review, schedule, scalability, maintainability.
Article extract:
Establish IV&V vendor at the initial point of project inception.
1
2. Methodology
Independent review of System Engineering Deliverables.
Integrated Master Schedule incorporating schedules.
Ongoing schedule risk analysis and reporting.
Perform On-site inspections.
2
4. Benefits of independent technical reviewer
1. Integrated Master Schedule integrates 4 different
schedules
2. tracks critical path to ensure we meet planned SCD.
3. Implemented Mandrel Test to improve fiber
installation.
4. Reviews and approves all system engineering
deliverables.