The document summarizes a fiber optic network redesign for a transportation project. The original design had dual-sided duct banks along the roadway, but was redesigned to a single-sided duct bank to reduce costs and complexity. This eliminated 40 miles of civil works and technology on one side of the roadway. It reduced fiber splices and provided redundancy while saving $1.02 million and an estimated 230 man hours.