SlideShare una empresa de Scribd logo
1 de 10
Descargar para leer sin conexión
Page 1
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
Presented by
Philippe PELLERIN Experimental Test Pilot – Airbus
SESAR JU– Initial 4D “On time !”
Initial 4D Operation
Once the A/C enters the ATC arrival horizon, at least 40' before landing:
1. ATC uplinks to A/C the route clearance to follow down to runway - (via CPDLC).
2. Crew loads the route clearance into the FMS and updates FMS winds and temperatures data (via
AOC datalink function) A/C downlink of 4D predicted trajectory (ADS-C)
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
AOC datalink function). A/C downlink of 4D predicted trajectory (ADS-C).
3. ATC requests Reliable RTA interval for merge point (via ADS-C). A/C downlinks Reliable RTA
interval (via ADS-C).
4. ATC uplinks feasible RTA.
5. Crew inserts RTA in FMS as active data. A/C downlinks A/C 4D predicted trajectory (via ADS-C).
6. 4D trajectory agreed by crew and ATC Descent can be flown in full managed.
ATC Arrival HORIZON
4DT RTA interval
13:52:53
13:50:56
13:48:56
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
FAF
IAF
MP
FAF
IAF
MP
4DT RTA interval
RTA WPT
14:03:56
13:47:36
13:57:21
14:02:43
14:08:35
14:13:53
13:55:25
14:00:49
14:06:40
14:11:58
13:55:10
13:53:49
14:01:32
14:06:45
Page 2
Page 2
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Main contributors to the success of the flight
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Page 3
Main contributors to the success of the flight
Aircraft : A 320 MSN 001 fitted with :
- test installation (recorders)
- prototype FANS B
- development FMS
ATCOs : NORACON and MUAC
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Board System Providers :
Thales (FMS + FANS B)
Honeywell (FMS)
Airbus (FANS B)
Page 4
Ground System Providers :
Indra (Maastricht)
Thales (Malmö)
Page 3
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Necessary evolutions of the FMS for I4D
 Improved RTA in descent:
 Accuracy +/- 10s with 95% reliability.
I d th d li
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
 Improved weather modeling:
 10 winds in descent.
 10 temperatures in descent.
 Reliable RTA interval function:
 Available onboard for any waypoint (RTA page).
 Reliable RTA interval reported through ADS-C.
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
 Datalink:
 CPDLC: new RTA messages (1 sec resolution + tolerance value).
 ADS-C: downlink of the 4D trajectory.
Page 5
Page 5
FMS evolutions (HMI)

D E S C E N T T EM P
S A T / A L T
4 0 ° / F L 3 2 0

D E S C E N T W I N D
T R U W I N D / A L T A L T N W I N D
SESAR – Initial 4D On time ! Amsterdam 6 March 2012

- 4 0 ° / F L 3 2 0
- 3 5 ° / F L 2 7 0
- 3 3 ° / F L 2 3 0
- 3 5 ° / F L 2 0 0
- 2 5 ° / F L 1 5 0
< R E T U R N

0 6 0 ° / 0 6 0 / F L 3 2 0 0 1 0 ° / 0 6 5
F L 3 3 0
0 5 5 ° / 0 5 8 / F L 3 0 0
W I N D
0 4 0 ° / 0 5 5 / F L 2 7 0 R E QU E S T *
P R E V
0 2 0 ° / 0 5 0 / F L 2 5 0 P H A S E >
0 1 5 ° / 0 4 5 / F L 2 0 0
< R E T U R N
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Extended descent wind levels New descent temperature page
Page 6
Page 4
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
FMS evolutions (HMI)
R T A
A T W P T D I S T R T A
RTA in descent phase
R T A
A T W P T D I S T R T A
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
D E V R O 4 2 [ ]
M A N A G E D E T A
2 8 0 1 5 : 3 8 : 1 5
A C T M O D E
M A N A G E D
V M A X U T C
3 1 0 / 0 . 7 9 1 4 : 5 0 : 0 0
R E L I A B L E R T A
1 5 : 3 7 : 0 5 / 1 5 : 5 1 : 5 1
< R E T U R N
D E V R O 4 2 1 5 : 4 0 : 0 0
M A N A G E D E T A
2 8 0 1 5 : 4 0 : 0 2
A C T M O D E
M A N A G E D
V M A X U T C
3 1 0 / 0 . 7 9 1 4 : 5 0 : 0 0
A C C U R
+ / - 1 0
< R E T U R N
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
MAX RTA speed
(tuned manually)
Display of 95% RTA
reliability interval
Display of RTA
tolerance
Page 7
FMS evolutions (HMI)
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
« R » for RTA managed speed RTA displayed with a 1 second
resolution
Page 8
Page 5
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Flight Trial
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Page 9
Flight Trial
• Legs 1-3: Honeywell FMS
• Leg 1 : Take off at 06h30 UTC on Feb 10th from Toulouse
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
• Leg 2 : Flight within MUAC airspace (1 metering point en-route)
• Leg 3 : Transfer MUAC to NORACON
Approach to Copenhaguen (1 metering point around FL80)
Approach to Stockholm (1 metering point around FL80)
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Landing in Stockholm
Page 10
Page 6
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Flight Trial
• Legs 4-6: Thales FMS
• Leg 4 : Take off from Stockholm
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
Approach to Stockholm (1 metering point around FL80)
• Leg 5 : Approach to Copenhaguen (1 metering point around FL80)
• Leg 6 : Transfer NORACON to MUAC
Flight back to Toulouse (1 metering point en-route)
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Flight back to Toulouse (1 metering point en route)
Landing in Toulouse at 16h15
Page 11
Achieved times
Position Time of Insertion RTA entered Achieved Delta
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
REVLA 07.54 08.27.00 08.27.06 +6
KUBIS 08.38 09.00.00 09.00.02 +2
SA620 09.27 09.56.15 19.56.14 -1
SA489 12.39 13.03.36 13.03.39 +3
CH446 13.24 13.50.03 13.50.04 +1
WOODY 14 07 14 37 32 14 37 34 2
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
WOODY 14.07 14.37.32 14.37.34 +2
Page 12
Page 7
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Main observations
• RTA
• All 6 RTAs were met within the required 10 seconds.
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
• CPDLC
• Uplinked routes and time constraints processed correctly.
• ADS-C
• Provision of airborne data (trajectory predictions and ETA
window) to the ground worked all ok.
• Worth noting that for the first time, ADSC was routed via
ATN i t d f ACARS
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
ATN instead of ACARS
• Weather
• Meteo updates consistently processed by crew.
Page 13
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
Expected benefits
• Thanks to management through RTA, CTOT could be
discarded
• Less delays on ground
• More flexibility for airlines
• Better management of the arrivals
• No more holdings
• Less fuel burn
• Less delays
• Possibility to fly close-to-CDA descents
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Page 14
• Less noise
Page 8
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
2010 2011 2012 2013 2014
Overall I4D validation plan
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
Previous studies:
BASIC 4D
Evaluations on
EPOPEE
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
i4D Step A
Flight Trial
Coupled
simulators
Initial developments air
+ ground
Page 15
2010 2011 2012 2013 2014
Overall I4D validation plan
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
Coupled
simulators
i4D Step B
Flight Trial TBC
Previous studies:
BASIC 4D
Evaluations on
EPOPEE
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
i4D Step A
Flight Trial
Coupled
simulators
p
Initial developments air
+ ground
Ground systems
2nd generation
(Step A outputs)
Page 16
Page 9
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
2010 2011 2012 2013
Flight Trial
Coupled
2014
Overall I4D validation plan
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
i4D Step C
p
simulators
Coupled
simulators
i4D Step B
Ground systems 3rd generation Airborne
systems 2nd generation
(Step A + B outputs)
Flight Trial TBC
Previous studies:
BASIC 4D
Evaluations on
EPOPEE
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
i4D Step A
Flight Trial
Coupled
simulators
p
Initial developments air
+ ground
Ground systems
2nd generation
(Step A outputs)
Page 17
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
Conclusions
• The I4D flight contributed to demonstrate the technical
and operational feasibility of the concept by
and operational feasibility of the concept by
• Maturing the technical definition and the system design
• Providing a first exposure to operational community
• The I4D flight is the result of a successful enhanced
collaborative work (ground industry, airborne industry,
ANSPs)
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Page 18
Page 10
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
RTA : 00:20:00 Time : 00:19:57
RTA : 00:20:00 Time : 00:19:58
RTA : 00:20:00 Time : 00:19:59
RTA : 00:20:00 Time : 00:20:00
RTA : 00:20:00 Time : 00:19:57
RTA : 00:20:00 Time : 00:19:58
RTA : 00:20:00 Time : 00:19:59
RTA : 00:20:00 Time : 00:20:00
On Time !
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Page 19
Thank you for your attention
SESAR – Initial 4D On time ! Amsterdam 6 March 2012
© AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. This document and all information contained herein is the sole property of AIRBUS S.A.S. No intellectual property rights are granted by the
delivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS S.A.S. This document and its content shall not be
used for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressed in good faith. Where the supporting
grounds for these statements are not shown, AIRBUS S.A.S. will be pleased to explain the basis thereof.
AIRBUS, its logo, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M are registered trademarks.
© AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.
Page 20

Más contenido relacionado

Similar a ATM I4D Flight Trial by Chief Pilot

Airbus Defence and Space Perspective on Technological Development, June 2016
Airbus Defence and Space Perspective on Technological Development, June 2016Airbus Defence and Space Perspective on Technological Development, June 2016
Airbus Defence and Space Perspective on Technological Development, June 2016ICSA, LLC
 
Technology and Innovation: An Airbus Defence and Space Perspective
Technology and Innovation: An Airbus Defence and Space PerspectiveTechnology and Innovation: An Airbus Defence and Space Perspective
Technology and Innovation: An Airbus Defence and Space PerspectiveICSA, LLC
 
Sensor Integration and Data Fusion from a High Definition Helicopter Mapping ...
Sensor Integration and Data Fusion from a High Definition Helicopter Mapping ...Sensor Integration and Data Fusion from a High Definition Helicopter Mapping ...
Sensor Integration and Data Fusion from a High Definition Helicopter Mapping ...MattBethel1
 
The PROuD project - Flying into the future with the PBN flight procedures
The PROuD project - Flying into the future with the PBN flight procedures The PROuD project - Flying into the future with the PBN flight procedures
The PROuD project - Flying into the future with the PBN flight procedures PROuD Project
 
FAMILIARIZATION WITH AVIONICS SUITE
FAMILIARIZATION WITH AVIONICS SUITE FAMILIARIZATION WITH AVIONICS SUITE
FAMILIARIZATION WITH AVIONICS SUITE MIbrar4
 
FANS 1/A Presentation Minnesota Business Aircraft Association
FANS 1/A Presentation Minnesota Business Aircraft AssociationFANS 1/A Presentation Minnesota Business Aircraft Association
FANS 1/A Presentation Minnesota Business Aircraft AssociationJo Kremsreiter
 
Remote Tower Press Briefing Farnborough 2014
Remote Tower Press Briefing Farnborough 2014Remote Tower Press Briefing Farnborough 2014
Remote Tower Press Briefing Farnborough 2014Saab AB
 
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92SESAR Joint Undertaking
 
LATAM_CDA uso del FMS para descenso continuo
LATAM_CDA uso del FMS para descenso continuoLATAM_CDA uso del FMS para descenso continuo
LATAM_CDA uso del FMS para descenso continuolimachimamanigalo
 
India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...
India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...
India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...SITA
 
Improved Safety and Efficiency through the initial application of Data Link E...
Improved Safety and Efficiency through the initial application of Data Link E...Improved Safety and Efficiency through the initial application of Data Link E...
Improved Safety and Efficiency through the initial application of Data Link E...rsanAkbaba
 
AKKA Technologies Singapore Services
AKKA Technologies Singapore ServicesAKKA Technologies Singapore Services
AKKA Technologies Singapore ServicesPierre-Yves LAZIES
 
Erica The European Tiltrotor
Erica The European TiltrotorErica The European Tiltrotor
Erica The European Tiltrotorahmad bassiouny
 
iPad pilot proficiency check: How to fly like a pro with your iPad
iPad pilot proficiency check: How to fly like a pro with your iPadiPad pilot proficiency check: How to fly like a pro with your iPad
iPad pilot proficiency check: How to fly like a pro with your iPadSporty's Pilot Shop
 
At a glance COMPOSITE INDUSTRIE repair presentation Vers 8 26-1-2017
At a glance COMPOSITE INDUSTRIE repair presentation Vers 8 26-1-2017At a glance COMPOSITE INDUSTRIE repair presentation Vers 8 26-1-2017
At a glance COMPOSITE INDUSTRIE repair presentation Vers 8 26-1-2017Nicola BONTULOVIC
 

Similar a ATM I4D Flight Trial by Chief Pilot (20)

Airbus Defence and Space Perspective on Technological Development, June 2016
Airbus Defence and Space Perspective on Technological Development, June 2016Airbus Defence and Space Perspective on Technological Development, June 2016
Airbus Defence and Space Perspective on Technological Development, June 2016
 
Technology and Innovation: An Airbus Defence and Space Perspective
Technology and Innovation: An Airbus Defence and Space PerspectiveTechnology and Innovation: An Airbus Defence and Space Perspective
Technology and Innovation: An Airbus Defence and Space Perspective
 
Sensor Integration and Data Fusion from a High Definition Helicopter Mapping ...
Sensor Integration and Data Fusion from a High Definition Helicopter Mapping ...Sensor Integration and Data Fusion from a High Definition Helicopter Mapping ...
Sensor Integration and Data Fusion from a High Definition Helicopter Mapping ...
 
The PROuD project - Flying into the future with the PBN flight procedures
The PROuD project - Flying into the future with the PBN flight procedures The PROuD project - Flying into the future with the PBN flight procedures
The PROuD project - Flying into the future with the PBN flight procedures
 
FAMILIARIZATION WITH AVIONICS SUITE
FAMILIARIZATION WITH AVIONICS SUITE FAMILIARIZATION WITH AVIONICS SUITE
FAMILIARIZATION WITH AVIONICS SUITE
 
ATM system history
ATM system historyATM system history
ATM system history
 
CASAM Project
CASAM ProjectCASAM Project
CASAM Project
 
FANS 1/A Presentation Minnesota Business Aircraft Association
FANS 1/A Presentation Minnesota Business Aircraft AssociationFANS 1/A Presentation Minnesota Business Aircraft Association
FANS 1/A Presentation Minnesota Business Aircraft Association
 
radwanS CV AGL
radwanS CV AGLradwanS CV AGL
radwanS CV AGL
 
Remote Tower Press Briefing Farnborough 2014
Remote Tower Press Briefing Farnborough 2014Remote Tower Press Briefing Farnborough 2014
Remote Tower Press Briefing Farnborough 2014
 
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92
SESAR at World ATM Congress 2016 - InteroperabilityWac 2016 iop draft v0.92
 
LATAM_CDA uso del FMS para descenso continuo
LATAM_CDA uso del FMS para descenso continuoLATAM_CDA uso del FMS para descenso continuo
LATAM_CDA uso del FMS para descenso continuo
 
Secretaria de Aviação Civil - SESAR Experience and Deployment
Secretaria de Aviação Civil - SESAR Experience and DeploymentSecretaria de Aviação Civil - SESAR Experience and Deployment
Secretaria de Aviação Civil - SESAR Experience and Deployment
 
India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...
India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...
India Aviation ICT Forum 2013 - Manish Sinha, Deputy COO, Hyderabad Internati...
 
Improved Safety and Efficiency through the initial application of Data Link E...
Improved Safety and Efficiency through the initial application of Data Link E...Improved Safety and Efficiency through the initial application of Data Link E...
Improved Safety and Efficiency through the initial application of Data Link E...
 
AKKA Technologies Singapore Services
AKKA Technologies Singapore ServicesAKKA Technologies Singapore Services
AKKA Technologies Singapore Services
 
Erica The European Tiltrotor
Erica The European TiltrotorErica The European Tiltrotor
Erica The European Tiltrotor
 
iPad pilot proficiency check: How to fly like a pro with your iPad
iPad pilot proficiency check: How to fly like a pro with your iPadiPad pilot proficiency check: How to fly like a pro with your iPad
iPad pilot proficiency check: How to fly like a pro with your iPad
 
job desc.rehman
job desc.rehmanjob desc.rehman
job desc.rehman
 
At a glance COMPOSITE INDUSTRIE repair presentation Vers 8 26-1-2017
At a glance COMPOSITE INDUSTRIE repair presentation Vers 8 26-1-2017At a glance COMPOSITE INDUSTRIE repair presentation Vers 8 26-1-2017
At a glance COMPOSITE INDUSTRIE repair presentation Vers 8 26-1-2017
 

Más de Bruce Ware, PMI Certified PM Professional (7)

ERASMUS Strategic Deconfliction to Benefit SESAR Presentation 2009
ERASMUS Strategic Deconfliction to Benefit SESAR Presentation 2009ERASMUS Strategic Deconfliction to Benefit SESAR Presentation 2009
ERASMUS Strategic Deconfliction to Benefit SESAR Presentation 2009
 
CASSIS Controlled Time of Arrival Flight Trials: Results and Analysis Present...
CASSIS Controlled Time of Arrival Flight Trials: Results and Analysis Present...CASSIS Controlled Time of Arrival Flight Trials: Results and Analysis Present...
CASSIS Controlled Time of Arrival Flight Trials: Results and Analysis Present...
 
PHARE - Compilation
PHARE - CompilationPHARE - Compilation
PHARE - Compilation
 
4D Trajectories and Automation
4D Trajectories and Automation4D Trajectories and Automation
4D Trajectories and Automation
 
ATM Concept 4D ASAS and TFM
ATM Concept 4D ASAS and TFMATM Concept 4D ASAS and TFM
ATM Concept 4D ASAS and TFM
 
NorthernCross Demo 2009
NorthernCross Demo 2009NorthernCross Demo 2009
NorthernCross Demo 2009
 
CATS Contract of Objectives presentation
CATS Contract of Objectives presentationCATS Contract of Objectives presentation
CATS Contract of Objectives presentation
 

Último

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsJoaquim Jorge
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...Neo4j
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingEdi Saputra
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityPrincipled Technologies
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodJuan lago vázquez
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024SynarionITSolutions
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoffsammart93
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?Igalia
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...Martijn de Jong
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherRemote DBA Services
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAndrey Devyatkin
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesBoston Institute of Analytics
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024The Digital Insurer
 

Último (20)

Artificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and MythsArtificial Intelligence: Facts and Myths
Artificial Intelligence: Facts and Myths
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Boost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivityBoost PC performance: How more available memory can improve productivity
Boost PC performance: How more available memory can improve productivity
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024Top 10 Most Downloaded Games on Play Store in 2024
Top 10 Most Downloaded Games on Play Store in 2024
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
Bajaj Allianz Life Insurance Company - Insurer Innovation Award 2024
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
HTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation StrategiesHTML Injection Attacks: Impact and Mitigation Strategies
HTML Injection Attacks: Impact and Mitigation Strategies
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 

ATM I4D Flight Trial by Chief Pilot

  • 1. Page 1 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. SESAR – Initial 4D On time ! Amsterdam 6 March 2012 Presented by Philippe PELLERIN Experimental Test Pilot – Airbus SESAR JU– Initial 4D “On time !” Initial 4D Operation Once the A/C enters the ATC arrival horizon, at least 40' before landing: 1. ATC uplinks to A/C the route clearance to follow down to runway - (via CPDLC). 2. Crew loads the route clearance into the FMS and updates FMS winds and temperatures data (via AOC datalink function) A/C downlink of 4D predicted trajectory (ADS-C) SESAR – Initial 4D On time ! Amsterdam 6 March 2012 AOC datalink function). A/C downlink of 4D predicted trajectory (ADS-C). 3. ATC requests Reliable RTA interval for merge point (via ADS-C). A/C downlinks Reliable RTA interval (via ADS-C). 4. ATC uplinks feasible RTA. 5. Crew inserts RTA in FMS as active data. A/C downlinks A/C 4D predicted trajectory (via ADS-C). 6. 4D trajectory agreed by crew and ATC Descent can be flown in full managed. ATC Arrival HORIZON 4DT RTA interval 13:52:53 13:50:56 13:48:56 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. FAF IAF MP FAF IAF MP 4DT RTA interval RTA WPT 14:03:56 13:47:36 13:57:21 14:02:43 14:08:35 14:13:53 13:55:25 14:00:49 14:06:40 14:11:58 13:55:10 13:53:49 14:01:32 14:06:45 Page 2
  • 2. Page 2 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Main contributors to the success of the flight SESAR – Initial 4D On time ! Amsterdam 6 March 2012 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Page 3 Main contributors to the success of the flight Aircraft : A 320 MSN 001 fitted with : - test installation (recorders) - prototype FANS B - development FMS ATCOs : NORACON and MUAC SESAR – Initial 4D On time ! Amsterdam 6 March 2012 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Board System Providers : Thales (FMS + FANS B) Honeywell (FMS) Airbus (FANS B) Page 4 Ground System Providers : Indra (Maastricht) Thales (Malmö)
  • 3. Page 3 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Necessary evolutions of the FMS for I4D  Improved RTA in descent:  Accuracy +/- 10s with 95% reliability. I d th d li SESAR – Initial 4D On time ! Amsterdam 6 March 2012  Improved weather modeling:  10 winds in descent.  10 temperatures in descent.  Reliable RTA interval function:  Available onboard for any waypoint (RTA page).  Reliable RTA interval reported through ADS-C. © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document.  Datalink:  CPDLC: new RTA messages (1 sec resolution + tolerance value).  ADS-C: downlink of the 4D trajectory. Page 5 Page 5 FMS evolutions (HMI)  D E S C E N T T EM P S A T / A L T 4 0 ° / F L 3 2 0  D E S C E N T W I N D T R U W I N D / A L T A L T N W I N D SESAR – Initial 4D On time ! Amsterdam 6 March 2012  - 4 0 ° / F L 3 2 0 - 3 5 ° / F L 2 7 0 - 3 3 ° / F L 2 3 0 - 3 5 ° / F L 2 0 0 - 2 5 ° / F L 1 5 0 < R E T U R N  0 6 0 ° / 0 6 0 / F L 3 2 0 0 1 0 ° / 0 6 5 F L 3 3 0 0 5 5 ° / 0 5 8 / F L 3 0 0 W I N D 0 4 0 ° / 0 5 5 / F L 2 7 0 R E QU E S T * P R E V 0 2 0 ° / 0 5 0 / F L 2 5 0 P H A S E > 0 1 5 ° / 0 4 5 / F L 2 0 0 < R E T U R N © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Extended descent wind levels New descent temperature page Page 6
  • 4. Page 4 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. FMS evolutions (HMI) R T A A T W P T D I S T R T A RTA in descent phase R T A A T W P T D I S T R T A SESAR – Initial 4D On time ! Amsterdam 6 March 2012 D E V R O 4 2 [ ] M A N A G E D E T A 2 8 0 1 5 : 3 8 : 1 5 A C T M O D E M A N A G E D V M A X U T C 3 1 0 / 0 . 7 9 1 4 : 5 0 : 0 0 R E L I A B L E R T A 1 5 : 3 7 : 0 5 / 1 5 : 5 1 : 5 1 < R E T U R N D E V R O 4 2 1 5 : 4 0 : 0 0 M A N A G E D E T A 2 8 0 1 5 : 4 0 : 0 2 A C T M O D E M A N A G E D V M A X U T C 3 1 0 / 0 . 7 9 1 4 : 5 0 : 0 0 A C C U R + / - 1 0 < R E T U R N © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. MAX RTA speed (tuned manually) Display of 95% RTA reliability interval Display of RTA tolerance Page 7 FMS evolutions (HMI) SESAR – Initial 4D On time ! Amsterdam 6 March 2012 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. « R » for RTA managed speed RTA displayed with a 1 second resolution Page 8
  • 5. Page 5 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Flight Trial SESAR – Initial 4D On time ! Amsterdam 6 March 2012 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Page 9 Flight Trial • Legs 1-3: Honeywell FMS • Leg 1 : Take off at 06h30 UTC on Feb 10th from Toulouse SESAR – Initial 4D On time ! Amsterdam 6 March 2012 • Leg 2 : Flight within MUAC airspace (1 metering point en-route) • Leg 3 : Transfer MUAC to NORACON Approach to Copenhaguen (1 metering point around FL80) Approach to Stockholm (1 metering point around FL80) © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Landing in Stockholm Page 10
  • 6. Page 6 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Flight Trial • Legs 4-6: Thales FMS • Leg 4 : Take off from Stockholm SESAR – Initial 4D On time ! Amsterdam 6 March 2012 Approach to Stockholm (1 metering point around FL80) • Leg 5 : Approach to Copenhaguen (1 metering point around FL80) • Leg 6 : Transfer NORACON to MUAC Flight back to Toulouse (1 metering point en-route) © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Flight back to Toulouse (1 metering point en route) Landing in Toulouse at 16h15 Page 11 Achieved times Position Time of Insertion RTA entered Achieved Delta SESAR – Initial 4D On time ! Amsterdam 6 March 2012 REVLA 07.54 08.27.00 08.27.06 +6 KUBIS 08.38 09.00.00 09.00.02 +2 SA620 09.27 09.56.15 19.56.14 -1 SA489 12.39 13.03.36 13.03.39 +3 CH446 13.24 13.50.03 13.50.04 +1 WOODY 14 07 14 37 32 14 37 34 2 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. WOODY 14.07 14.37.32 14.37.34 +2 Page 12
  • 7. Page 7 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Main observations • RTA • All 6 RTAs were met within the required 10 seconds. SESAR – Initial 4D On time ! Amsterdam 6 March 2012 • CPDLC • Uplinked routes and time constraints processed correctly. • ADS-C • Provision of airborne data (trajectory predictions and ETA window) to the ground worked all ok. • Worth noting that for the first time, ADSC was routed via ATN i t d f ACARS © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. ATN instead of ACARS • Weather • Meteo updates consistently processed by crew. Page 13 SESAR – Initial 4D On time ! Amsterdam 6 March 2012 Expected benefits • Thanks to management through RTA, CTOT could be discarded • Less delays on ground • More flexibility for airlines • Better management of the arrivals • No more holdings • Less fuel burn • Less delays • Possibility to fly close-to-CDA descents © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Page 14 • Less noise
  • 8. Page 8 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. 2010 2011 2012 2013 2014 Overall I4D validation plan SESAR – Initial 4D On time ! Amsterdam 6 March 2012 Previous studies: BASIC 4D Evaluations on EPOPEE © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. i4D Step A Flight Trial Coupled simulators Initial developments air + ground Page 15 2010 2011 2012 2013 2014 Overall I4D validation plan SESAR – Initial 4D On time ! Amsterdam 6 March 2012 Coupled simulators i4D Step B Flight Trial TBC Previous studies: BASIC 4D Evaluations on EPOPEE © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. i4D Step A Flight Trial Coupled simulators p Initial developments air + ground Ground systems 2nd generation (Step A outputs) Page 16
  • 9. Page 9 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. 2010 2011 2012 2013 Flight Trial Coupled 2014 Overall I4D validation plan SESAR – Initial 4D On time ! Amsterdam 6 March 2012 i4D Step C p simulators Coupled simulators i4D Step B Ground systems 3rd generation Airborne systems 2nd generation (Step A + B outputs) Flight Trial TBC Previous studies: BASIC 4D Evaluations on EPOPEE © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. i4D Step A Flight Trial Coupled simulators p Initial developments air + ground Ground systems 2nd generation (Step A outputs) Page 17 SESAR – Initial 4D On time ! Amsterdam 6 March 2012 Conclusions • The I4D flight contributed to demonstrate the technical and operational feasibility of the concept by and operational feasibility of the concept by • Maturing the technical definition and the system design • Providing a first exposure to operational community • The I4D flight is the result of a successful enhanced collaborative work (ground industry, airborne industry, ANSPs) © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Page 18
  • 10. Page 10 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. SESAR – Initial 4D On time ! Amsterdam 6 March 2012 RTA : 00:20:00 Time : 00:19:57 RTA : 00:20:00 Time : 00:19:58 RTA : 00:20:00 Time : 00:19:59 RTA : 00:20:00 Time : 00:20:00 RTA : 00:20:00 Time : 00:19:57 RTA : 00:20:00 Time : 00:19:58 RTA : 00:20:00 Time : 00:19:59 RTA : 00:20:00 Time : 00:20:00 On Time ! © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Page 19 Thank you for your attention SESAR – Initial 4D On time ! Amsterdam 6 March 2012 © AIRBUS S.A.S. All rights reserved. Confidential and proprietary document. This document and all information contained herein is the sole property of AIRBUS S.A.S. No intellectual property rights are granted by the delivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS S.A.S. This document and its content shall not be used for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressed in good faith. Where the supporting grounds for these statements are not shown, AIRBUS S.A.S. will be pleased to explain the basis thereof. AIRBUS, its logo, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M are registered trademarks. © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Page 20