Next Generation BIM
Damon Stevenson
InEight
11th November 2015
Who is InEight?
InEight combines proven ability with a unified vision to help
companies visualize, estimate, control and connect all aspects of their
capital and maintenance projects, from the back office to the jobsite,
across the project lifecycle.
• Domain Expertise Helping project-driven companies since 1989
• More than 20,000 users in over 500 companies across 33 countries
• Offices in UK, USA, India, Australia and Middle East (Opening Soon)
© 2015 InEight Inc. All rights reserved.
Focus on Project-Driven Industries
Oil & Gas
Need comprehensive,
integrated solutions that
provide real-time visibility
to optimize operational
budgets, create accurate
estimates, manage costs
and drive increased return
on capital.
Mining
Need detailed cost
estimating, performance
tracking, shift reporting and
feasibility data solutions
that help managers reach
production quickly and
efficiently.
EC&O
Need to standardize
construction processes
across the project lifecycle
and consolidate crucial
data to ensure all
stakeholders are aligned,
from back office to jobsite.
Utilities
Across power generation,
transmission, water,
natural gas and
telecommunications, these
companies need solutions
that provide a full
spectrum of project
lifecycle data to maintain
compliance and increase
return on capital.
What is a BIM Dimension (D)?
3D = visual representation of the project
4D = visual representation of the project with time
(3D model + project schedule)
5D = visual representation of the project with cost
(3D model + project control budget)
∞D = visual representation of the project with a business
system or project information important to your
companies operations
United States v United Kingdom
United States United Kingdom
More challenging – No national standard National standards driven by the UK government
Federal Agencies Fragmented Unified approach
Current Focus on Collaboration 2016 mandate – Level 2 : Collaboration
Next step - improving quality, integration, collaboration and the
information that BIM generates
Next step – Level 3 : Full Collaboration between all project
disciplines using a “Single Model”
Developing Next Generation BIM Solution
Customer Business Case for Developing a Software Solution for
BIM, Visual Procurement, Scheduling, Collaboration, Materials & Asset Management
Customer Profile
• Fortune 500 Company
• Multi-Disciplined
• Asset Owner/Operator
• Contractor
• Industries:
• Energy & Resources
• Infrastructure
• Civil Engineering
• Building
Solution Requirement
• Technology platform to support Open BIM architecture for
both internal and external collaboration
• Software flexible to support the import/add/modify/export
data in IFC format
• Fully integrated with their project procurement, project
controls, scheduling and asset management systems
• Configurable for supporting different project owners asset
management classifications
• Scalable, agnostic and suitable to different industries
Customers BHAG
“Big Hairy Audacious Goal”
To be the first company to achieve and put into practice:
“Full collaboration between all disciplines by means of using
a single, shared project model which is held in a centralized
repository. All parties can access and modify that same
model, and the benefit is that it removes the final layer of risk
for conflicting information.” - NBS definition of Level 3
Effectively using the model data gathered for efficient use on
the Owners Asset Management and Facilities Maintenance
business processes
Challenges
• Choosing Scalable Technology
• Aggregating multiple BIM models into a single unified IFC
file for collaboration between all stakeholders
• Level of detail contained within the BIM models
• Existing Procurement process too long
• Silo system approach creating:
• File conversion issues
• Format translations
• Manual inputs
Approach
• Reverse Engineered the “Final Deliverable” – Supply data
which is useful for the Asset Owners Operation/Management
• Execution Plan taking into account current industry limitations,
while delivering a future proof solution
• Created Phased SOW for the group solution w/ KPI’s:
• Easy to use for all users
• Accomodates multiple models
• Open architecture with flexibility to integrate with all major 3rd party
software solutions – Design, Back Office and Field
• Access for external users – including mobility solutions
• Visual workflows
Phase 1: Steel Fabrication Facility
Customer Business Case for Developing a Software Solution for
BIM, Visual Procurement, Scheduling, Fabrication & Materials Management
ineight.com
Phase 1 - Existing Procurement Process
ineight.com
BIM Server Classification
Project
Cost DB
Design
Authoring
Enterprise BIM
ineight.com
Enterprise BIM
BIM Server Classification
Procurement
DB
Design
Authoring
ineight.com
Customer Workflow
InfinyD Visual Procurement Module
• Team was able to build a quantities
report to summarize all sizes of W
beams for the Process module (20
different sizes)
• Quantities were then nested and
automatically classified with SAP
material masters (20 different
material codes)
• An SAP Shopping Cart was created
500 tons of A992 steel.
• Quantity was validated and approved
by the project team.
• 12,000 man hours saved
Summary
Data Sources: P6, SAP ERP & SRM
Current Phase: New Build Solution
Customer Business Case for Developing a BIM Solution for
Design, Construct and Operate for multiple industries
Energy & Resources
Building
Infrastructure
Civil Engineering
Different Markets = Different Formats/Standards
Challenge then becomes…
Quantities
Scheduling
Procurement
Project Controls
Resources
Field Management
Asset Management
Solution
Quantities
Scheduling
Procurement
Project Controls
Resources
Field Management
Asset Management
Required Value to be delivered
• Sustainable corporate/project BIM strategy
• Consolidation in general purpose 3D viewers
• Reduction in training effort of various BIM solutions
• Model and data control for consumption
• Non-disruptive to current landscape
• Flexibility to append data and generate meaningful
reports
• Centralised database for all Assets and Projects
• Basis for innovation
InfinyD for Business Processes
Validation, integration, version control and
flexible reporting of model’s gross quantities
linking it to the Estimate
Quantities
Scheduling
Procurement
Project Controls
Resources
Field Management
Asset Management
Highlights:
 Compares quantities from two versions of a model
 Supports NRM, CESMM, Uniclass etc classifications
 Reduces the need for perfect models
Results:
 More communication between estimators and designers
 Less time estimating
 More Confidence in estimate.
Project Lifecycle: PLAN – 3D Quantity Takeoff
Project Lifecycle: PLAN – 2D Quantity Takeoff
Project Lifecycle: Takeoff to ESTIMATE
InfinyD for Business Processes
Schedule based reporting gets the right
information, to the right people, at the right time.
Quantities
Scheduling
Procurement
Project Controls
Resources
Field Management
Asset Management
Highlights:
 Establish and maintain a connection between
project schedule and model
 Integrates with Primavera P6
 Evaluation of model quantities as a function of time
 Flexibility in project schedule level of granularity
Results:
 Reduction in man hours
required to maintain 4D
 Interactive experience in
communication of 4D
 More powerful than a 4D
simulation
Schedule Integration (4D)
Project Lifecycle: ESTIMATE & SCHEDULE
Project Lifecycle: BENCHMARK
InfinyD for Business Processes
Leveraging the model quantities and information
to aid or facilitate purchasing of commodities
Quantities
Scheduling
Procurement
Project Controls
Resources
Field Management
Asset Management
Highlights:
 Map model elements to material masters
 Use CITE classifications
 Linear Nesting
 Generate a purchase order
 Create a shopping cart
Results:
 More confidence in what’s been ordered
 Visual reporting is a bi-product
 10 week schedule reduction
Visual Procurement
InfinyD for Business Processes
Project control equals project certainty. Unified
visibly to scope (model), schedule & budget.
Quantities
Scheduling
Procurement
Project Controls
Resources
Field Management
Asset Management
Highlights:
 Establish and maintain a real time connection between
project control budget and model
 Evaluation of model and quantities as a element of
cost
 Flexibility in control budget level of granularity
Results:
 Interactive experience in communication of 5D
 Reporting across business proecess. Remaining
budget vs remaining schedule duration report
Example: Cost Integration (5D)
InfinyD for Business Processes
Assign and track project resources as a
component of project controls.
Quantities
Scheduling
Procurement
Project Controls
Resources
Field Management
Asset Management
Highlights:
 Append and control information to your models to
increase the value or relevance for your project
 Designer and/or Subcontractor responsibility
 Equipment required for installation
 PM, Site Super, Field Engineer responsibility
Results:
 Drives accountability to a resource
 Flushes out gaps in project responsibility
Resource Management
InfinyD for Business Processes
Centralizes the work planning effort, providing a
single source for accessing connected information
Quantities
Scheduling
Procurement
Project Controls
Resources
Field Management
Asset Management
Highlights:
 Accelerates effective planning, earlier in the lifecycle
 Real time status from Procurement, Schedule &
Project Control Systems, predicating installation
 Extreme visibility into constraint evaluation for planning
Results:
 Ultimate understanding in how the work is interrelated
 Better control of change management & plan mitigation
 Information is leveraged across systems, to create
better plans with far less manual effort.
MobilyD
InfinyD for Business Processes
Owners & Operators aspire to take the next step
in model consumption.
Quantities
Scheduling
Procurement
Project Controls
Resources
Field Management
Asset Management
Highlights:
 Meets the needs of construction project turnover requirements
 Received design, append Construction and Asset information
(data for the project lifecycle)
 Flexibility to define workflows specific to an owner/operator
 COBie compliant
Results:
 Improved communication with your customers and stakeholders
 Drastic reduction in man hours required at project closeout &
turnover
Project Lifecycle: TURNOVER
• Who is driving the process?
• Are all areas of equal
importance?
• Where does BIM fit into this
workflow?
Why are we doing BIM?
Common project workflow perception
Total LifeCycle Cost
• 20% Design/Construction
• 80% is OMR
• Let’s Flip the Discussion!
The InfinyD product was designed to
appeal to an Owner/Client’s
construction asset management
deliverable, enabling the contractor to
meet the requirements of the
deliverable, while attaining qualitative
and quantative ROI on their projects.
Why are we doing BIM?
Where are real savings realized?
Asset Management
• Easy of use supports nature of construction industry
• Same solution for various BIM workflows
• Facilitates effective communication with design partner
• Connection of disparate business process and technologies
• Emerging Owner/Client driven project requirements
Additional Value for the Contractor
Additional Value for the Project/Asset Owner
• Vehicle for early designer/contractor coordination
• Meaningful collaboration with project stakeholders
• Increased visibility of project operations (Project Certainty)
• Sustainable platform for OM&R lifecycle
• Logical progression and consolidation of project data for
Asset Management and Facilities Maintenance
• Enable existing asset management system and visual
workflows
Next Generation BIM
© 2015 InEight Inc. All rights reserved.

Más contenido relacionado

La actualidad más candente

EcoDomus recent Use Cases in US and Middle East
EcoDomus recent Use Cases in US and Middle EastEcoDomus recent Use Cases in US and Middle East
EcoDomus recent Use Cases in US and Middle East
The Hong Kong Institute of Building Information Modelling (HKIBIM)
 

La actualidad más candente (20)

Common data environment by iso 19650
Common data environment by iso 19650Common data environment by iso 19650
Common data environment by iso 19650
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modeling
 
5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM
5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM
5th Qatar BIM User Day, BIM Interoperability Issues: Lessons learned from PLM
 
Building information modelling - redefining the role of the project manager: ...
Building information modelling - redefining the role of the project manager: ...Building information modelling - redefining the role of the project manager: ...
Building information modelling - redefining the role of the project manager: ...
 
Economic-Benefits-BIM
Economic-Benefits-BIMEconomic-Benefits-BIM
Economic-Benefits-BIM
 
4 bim technology
4 bim technology4 bim technology
4 bim technology
 
EcoDomus recent Use Cases in US and Middle East
EcoDomus recent Use Cases in US and Middle EastEcoDomus recent Use Cases in US and Middle East
EcoDomus recent Use Cases in US and Middle East
 
BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information Modelling
 
BIG BIM little bim for Estimators - 50 Slides
BIG BIM little bim for Estimators - 50 SlidesBIG BIM little bim for Estimators - 50 Slides
BIG BIM little bim for Estimators - 50 Slides
 
Bim implementation
  Bim implementation   Bim implementation
Bim implementation
 
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM5th Qatar BIM User Day, Understanding stakeholder roles in BIM
5th Qatar BIM User Day, Understanding stakeholder roles in BIM
 
RICS perspective on project managers and BIM - Matthew Saunders
RICS perspective on project managers and BIM - Matthew SaundersRICS perspective on project managers and BIM - Matthew Saunders
RICS perspective on project managers and BIM - Matthew Saunders
 
Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)Change Management For Building Information Modelling (BIM)
Change Management For Building Information Modelling (BIM)
 
CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)CM - An introduction to Building Information Modelling (BIM)
CM - An introduction to Building Information Modelling (BIM)
 
BIM: an overview
BIM: an overviewBIM: an overview
BIM: an overview
 
Capstone Presentation on 4D Building Information Modeling (BIM)
Capstone Presentation on 4D Building Information Modeling (BIM) Capstone Presentation on 4D Building Information Modeling (BIM)
Capstone Presentation on 4D Building Information Modeling (BIM)
 
bim and project controls
 bim and project controls bim and project controls
bim and project controls
 
What does BIM mean to a maintenance technician? Beyond the hype, a practical ...
What does BIM mean to a maintenance technician? Beyond the hype, a practical ...What does BIM mean to a maintenance technician? Beyond the hype, a practical ...
What does BIM mean to a maintenance technician? Beyond the hype, a practical ...
 
BIM and VDC for Megaproject Construction Projects
BIM and VDC for Megaproject Construction ProjectsBIM and VDC for Megaproject Construction Projects
BIM and VDC for Megaproject Construction Projects
 
PLS 2016: How does the BIM process fit with street lighting design and mainte...
PLS 2016: How does the BIM process fit with street lighting design and mainte...PLS 2016: How does the BIM process fit with street lighting design and mainte...
PLS 2016: How does the BIM process fit with street lighting design and mainte...
 

Similar a ETDP 2015 D2 Next Generation Bim - InEight

Sustainability In Government - Bim Webinar
Sustainability In Government - Bim WebinarSustainability In Government - Bim Webinar
Sustainability In Government - Bim Webinar
4 All of Us
 
Software app slides
Software app slidesSoftware app slides
Software app slides
ahmong4
 

Similar a ETDP 2015 D2 Next Generation Bim - InEight (20)

5D BIM's Role in Project Cost Estimation.pdf
5D BIM's Role in Project Cost Estimation.pdf5D BIM's Role in Project Cost Estimation.pdf
5D BIM's Role in Project Cost Estimation.pdf
 
Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15Innovation in practice presentation 10 06-15
Innovation in practice presentation 10 06-15
 
ShapeDo - Design Change Management - Construction Software
ShapeDo - Design Change Management - Construction SoftwareShapeDo - Design Change Management - Construction Software
ShapeDo - Design Change Management - Construction Software
 
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
 
Gail Freedman PMP - resume
Gail Freedman PMP - resumeGail Freedman PMP - resume
Gail Freedman PMP - resume
 
Sustainability In Government - Bim Webinar
Sustainability In Government - Bim WebinarSustainability In Government - Bim Webinar
Sustainability In Government - Bim Webinar
 
BIM Implementation for Construction Projects and Developers
BIM Implementation for Construction Projects and DevelopersBIM Implementation for Construction Projects and Developers
BIM Implementation for Construction Projects and Developers
 
Digital Transformation 2018
Digital Transformation 2018Digital Transformation 2018
Digital Transformation 2018
 
NW BIM 2018 2 MGF
NW BIM 2018 2 MGFNW BIM 2018 2 MGF
NW BIM 2018 2 MGF
 
Cynoteck - Salesforce Presentation - Consulting Services
Cynoteck  -  Salesforce Presentation - Consulting ServicesCynoteck  -  Salesforce Presentation - Consulting Services
Cynoteck - Salesforce Presentation - Consulting Services
 
1 andrew thomas, room 4
1   andrew thomas, room 41   andrew thomas, room 4
1 andrew thomas, room 4
 
Integrating Advanced Analytics with Autodesk Solutions
Integrating Advanced Analytics with Autodesk SolutionsIntegrating Advanced Analytics with Autodesk Solutions
Integrating Advanced Analytics with Autodesk Solutions
 
Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...Application of Building Information Modelling Software’s for Planning and Sch...
Application of Building Information Modelling Software’s for Planning and Sch...
 
Delivering operational efficiency in the new dawn of complex BIM data through...
Delivering operational efficiency in the new dawn of complex BIM data through...Delivering operational efficiency in the new dawn of complex BIM data through...
Delivering operational efficiency in the new dawn of complex BIM data through...
 
Virtual design and construction
Virtual design and constructionVirtual design and construction
Virtual design and construction
 
Software Presentation Slides
Software Presentation SlidesSoftware Presentation Slides
Software Presentation Slides
 
Software
Software Software
Software
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 
3D Models for Construction Estimating
3D Models for Construction Estimating3D Models for Construction Estimating
3D Models for Construction Estimating
 
Software app slides
Software app slidesSoftware app slides
Software app slides
 

Más de Comit Projects Ltd

Más de Comit Projects Ltd (20)

COMIT Community Day at O2 - September 2019, Full Slidedeck
COMIT Community Day at O2 - September 2019, Full SlidedeckCOMIT Community Day at O2 - September 2019, Full Slidedeck
COMIT Community Day at O2 - September 2019, Full Slidedeck
 
Success through Failure: The Paradox of Innovation
Success through Failure: The Paradox of InnovationSuccess through Failure: The Paradox of Innovation
Success through Failure: The Paradox of Innovation
 
Waste to Wealth #COMIT2019
Waste to Wealth #COMIT2019Waste to Wealth #COMIT2019
Waste to Wealth #COMIT2019
 
Design Engineer Construct for the World's Infrastructure #COMIT2019
Design Engineer Construct for the World's Infrastructure #COMIT2019Design Engineer Construct for the World's Infrastructure #COMIT2019
Design Engineer Construct for the World's Infrastructure #COMIT2019
 
KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019
KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019
KISS: The Key to Igniting Digital Change Among Field Workers #COMIT2019
 
Immersive Learning for Tunnelling and Highways #COMIT2019
Immersive Learning for Tunnelling and Highways #COMIT2019Immersive Learning for Tunnelling and Highways #COMIT2019
Immersive Learning for Tunnelling and Highways #COMIT2019
 
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
Integrated Nuclear Digital Environment -Optimising the Lifecycle of Nuclear P...
 
Tiger (AO4) AWP Implementation #COMIT2019
Tiger (AO4) AWP Implementation #COMIT2019Tiger (AO4) AWP Implementation #COMIT2019
Tiger (AO4) AWP Implementation #COMIT2019
 
The use of Asset Management and BIM to Generate Information Requirements #COM...
The use of Asset Management and BIM to Generate Information Requirements #COM...The use of Asset Management and BIM to Generate Information Requirements #COM...
The use of Asset Management and BIM to Generate Information Requirements #COM...
 
It's all a Matter of Educating #COMIT2019
It's all a Matter of Educating #COMIT2019It's all a Matter of Educating #COMIT2019
It's all a Matter of Educating #COMIT2019
 
Greater Efficiency in Design for Project Delivery #COMIT2019
Greater Efficiency in Design for Project Delivery #COMIT2019Greater Efficiency in Design for Project Delivery #COMIT2019
Greater Efficiency in Design for Project Delivery #COMIT2019
 
Automated Construction - Why manufacturing is the future of the sector #COMIT...
Automated Construction - Why manufacturing is the future of the sector #COMIT...Automated Construction - Why manufacturing is the future of the sector #COMIT...
Automated Construction - Why manufacturing is the future of the sector #COMIT...
 
A Digital Future for the Infrastructure Industry #COMIT2019
A Digital Future for the Infrastructure Industry #COMIT2019A Digital Future for the Infrastructure Industry #COMIT2019
A Digital Future for the Infrastructure Industry #COMIT2019
 
Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...
Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...
Wizardry - Creating Magical Changes in the full lifecycle of Infrastructure #...
 
Cross Functional working defines our future #COMIT2019
Cross Functional working defines our future #COMIT2019Cross Functional working defines our future #COMIT2019
Cross Functional working defines our future #COMIT2019
 
New technologies & techniques in remote surveying #COMIT2019
New technologies & techniques in remote surveying #COMIT2019New technologies & techniques in remote surveying #COMIT2019
New technologies & techniques in remote surveying #COMIT2019
 
Kings Scholar Pond - The Bridge in a Bottle #COMIT2019
Kings Scholar Pond - The Bridge in a Bottle #COMIT2019Kings Scholar Pond - The Bridge in a Bottle #COMIT2019
Kings Scholar Pond - The Bridge in a Bottle #COMIT2019
 
Making the Most of the Construction Tech Funding Boom #COMIT2019
Making the Most of the Construction Tech Funding Boom #COMIT2019Making the Most of the Construction Tech Funding Boom #COMIT2019
Making the Most of the Construction Tech Funding Boom #COMIT2019
 
Using drones to survey our past, HS2 London #COMIT2019
Using drones to survey our past, HS2 London #COMIT2019Using drones to survey our past, HS2 London #COMIT2019
Using drones to survey our past, HS2 London #COMIT2019
 
Digital Contracts - The Emperor's New Clothes? #COMIT2019
Digital Contracts - The Emperor's New Clothes? #COMIT2019Digital Contracts - The Emperor's New Clothes? #COMIT2019
Digital Contracts - The Emperor's New Clothes? #COMIT2019
 

Último

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Victor Rentea
 

Último (20)

Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
Modular Monolith - a Practical Alternative to Microservices @ Devoxx UK 2024
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf[BuildWithAI] Introduction to Gemini.pdf
[BuildWithAI] Introduction to Gemini.pdf
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
Apidays New York 2024 - APIs in 2030: The Risk of Technological Sleepwalk by ...
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
Apidays New York 2024 - Passkeys: Developing APIs to enable passwordless auth...
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
MS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectorsMS Copilot expands with MS Graph connectors
MS Copilot expands with MS Graph connectors
 

ETDP 2015 D2 Next Generation Bim - InEight

  • 1. Next Generation BIM Damon Stevenson InEight 11th November 2015
  • 2. Who is InEight? InEight combines proven ability with a unified vision to help companies visualize, estimate, control and connect all aspects of their capital and maintenance projects, from the back office to the jobsite, across the project lifecycle. • Domain Expertise Helping project-driven companies since 1989 • More than 20,000 users in over 500 companies across 33 countries • Offices in UK, USA, India, Australia and Middle East (Opening Soon) © 2015 InEight Inc. All rights reserved.
  • 3. Focus on Project-Driven Industries Oil & Gas Need comprehensive, integrated solutions that provide real-time visibility to optimize operational budgets, create accurate estimates, manage costs and drive increased return on capital. Mining Need detailed cost estimating, performance tracking, shift reporting and feasibility data solutions that help managers reach production quickly and efficiently. EC&O Need to standardize construction processes across the project lifecycle and consolidate crucial data to ensure all stakeholders are aligned, from back office to jobsite. Utilities Across power generation, transmission, water, natural gas and telecommunications, these companies need solutions that provide a full spectrum of project lifecycle data to maintain compliance and increase return on capital.
  • 4. What is a BIM Dimension (D)? 3D = visual representation of the project 4D = visual representation of the project with time (3D model + project schedule) 5D = visual representation of the project with cost (3D model + project control budget) ∞D = visual representation of the project with a business system or project information important to your companies operations
  • 5. United States v United Kingdom United States United Kingdom More challenging – No national standard National standards driven by the UK government Federal Agencies Fragmented Unified approach Current Focus on Collaboration 2016 mandate – Level 2 : Collaboration Next step - improving quality, integration, collaboration and the information that BIM generates Next step – Level 3 : Full Collaboration between all project disciplines using a “Single Model”
  • 6. Developing Next Generation BIM Solution Customer Business Case for Developing a Software Solution for BIM, Visual Procurement, Scheduling, Collaboration, Materials & Asset Management
  • 7. Customer Profile • Fortune 500 Company • Multi-Disciplined • Asset Owner/Operator • Contractor • Industries: • Energy & Resources • Infrastructure • Civil Engineering • Building
  • 8. Solution Requirement • Technology platform to support Open BIM architecture for both internal and external collaboration • Software flexible to support the import/add/modify/export data in IFC format • Fully integrated with their project procurement, project controls, scheduling and asset management systems • Configurable for supporting different project owners asset management classifications • Scalable, agnostic and suitable to different industries
  • 10. “Big Hairy Audacious Goal” To be the first company to achieve and put into practice: “Full collaboration between all disciplines by means of using a single, shared project model which is held in a centralized repository. All parties can access and modify that same model, and the benefit is that it removes the final layer of risk for conflicting information.” - NBS definition of Level 3 Effectively using the model data gathered for efficient use on the Owners Asset Management and Facilities Maintenance business processes
  • 11. Challenges • Choosing Scalable Technology • Aggregating multiple BIM models into a single unified IFC file for collaboration between all stakeholders • Level of detail contained within the BIM models • Existing Procurement process too long • Silo system approach creating: • File conversion issues • Format translations • Manual inputs
  • 12. Approach • Reverse Engineered the “Final Deliverable” – Supply data which is useful for the Asset Owners Operation/Management • Execution Plan taking into account current industry limitations, while delivering a future proof solution • Created Phased SOW for the group solution w/ KPI’s: • Easy to use for all users • Accomodates multiple models • Open architecture with flexibility to integrate with all major 3rd party software solutions – Design, Back Office and Field • Access for external users – including mobility solutions • Visual workflows
  • 13. Phase 1: Steel Fabrication Facility Customer Business Case for Developing a Software Solution for BIM, Visual Procurement, Scheduling, Fabrication & Materials Management
  • 14. ineight.com Phase 1 - Existing Procurement Process
  • 15. ineight.com BIM Server Classification Project Cost DB Design Authoring Enterprise BIM
  • 16. ineight.com Enterprise BIM BIM Server Classification Procurement DB Design Authoring
  • 18. InfinyD Visual Procurement Module • Team was able to build a quantities report to summarize all sizes of W beams for the Process module (20 different sizes) • Quantities were then nested and automatically classified with SAP material masters (20 different material codes) • An SAP Shopping Cart was created 500 tons of A992 steel. • Quantity was validated and approved by the project team. • 12,000 man hours saved Summary Data Sources: P6, SAP ERP & SRM
  • 19. Current Phase: New Build Solution Customer Business Case for Developing a BIM Solution for Design, Construct and Operate for multiple industries
  • 20. Energy & Resources Building Infrastructure Civil Engineering Different Markets = Different Formats/Standards
  • 21. Challenge then becomes… Quantities Scheduling Procurement Project Controls Resources Field Management Asset Management
  • 23. Required Value to be delivered • Sustainable corporate/project BIM strategy • Consolidation in general purpose 3D viewers • Reduction in training effort of various BIM solutions • Model and data control for consumption • Non-disruptive to current landscape • Flexibility to append data and generate meaningful reports • Centralised database for all Assets and Projects • Basis for innovation
  • 24. InfinyD for Business Processes Validation, integration, version control and flexible reporting of model’s gross quantities linking it to the Estimate Quantities Scheduling Procurement Project Controls Resources Field Management Asset Management Highlights:  Compares quantities from two versions of a model  Supports NRM, CESMM, Uniclass etc classifications  Reduces the need for perfect models Results:  More communication between estimators and designers  Less time estimating  More Confidence in estimate.
  • 25. Project Lifecycle: PLAN – 3D Quantity Takeoff
  • 26. Project Lifecycle: PLAN – 2D Quantity Takeoff
  • 28. InfinyD for Business Processes Schedule based reporting gets the right information, to the right people, at the right time. Quantities Scheduling Procurement Project Controls Resources Field Management Asset Management Highlights:  Establish and maintain a connection between project schedule and model  Integrates with Primavera P6  Evaluation of model quantities as a function of time  Flexibility in project schedule level of granularity Results:  Reduction in man hours required to maintain 4D  Interactive experience in communication of 4D  More powerful than a 4D simulation
  • 32. InfinyD for Business Processes Leveraging the model quantities and information to aid or facilitate purchasing of commodities Quantities Scheduling Procurement Project Controls Resources Field Management Asset Management Highlights:  Map model elements to material masters  Use CITE classifications  Linear Nesting  Generate a purchase order  Create a shopping cart Results:  More confidence in what’s been ordered  Visual reporting is a bi-product  10 week schedule reduction
  • 34. InfinyD for Business Processes Project control equals project certainty. Unified visibly to scope (model), schedule & budget. Quantities Scheduling Procurement Project Controls Resources Field Management Asset Management Highlights:  Establish and maintain a real time connection between project control budget and model  Evaluation of model and quantities as a element of cost  Flexibility in control budget level of granularity Results:  Interactive experience in communication of 5D  Reporting across business proecess. Remaining budget vs remaining schedule duration report
  • 36. InfinyD for Business Processes Assign and track project resources as a component of project controls. Quantities Scheduling Procurement Project Controls Resources Field Management Asset Management Highlights:  Append and control information to your models to increase the value or relevance for your project  Designer and/or Subcontractor responsibility  Equipment required for installation  PM, Site Super, Field Engineer responsibility Results:  Drives accountability to a resource  Flushes out gaps in project responsibility
  • 38. InfinyD for Business Processes Centralizes the work planning effort, providing a single source for accessing connected information Quantities Scheduling Procurement Project Controls Resources Field Management Asset Management Highlights:  Accelerates effective planning, earlier in the lifecycle  Real time status from Procurement, Schedule & Project Control Systems, predicating installation  Extreme visibility into constraint evaluation for planning Results:  Ultimate understanding in how the work is interrelated  Better control of change management & plan mitigation  Information is leveraged across systems, to create better plans with far less manual effort.
  • 40. InfinyD for Business Processes Owners & Operators aspire to take the next step in model consumption. Quantities Scheduling Procurement Project Controls Resources Field Management Asset Management Highlights:  Meets the needs of construction project turnover requirements  Received design, append Construction and Asset information (data for the project lifecycle)  Flexibility to define workflows specific to an owner/operator  COBie compliant Results:  Improved communication with your customers and stakeholders  Drastic reduction in man hours required at project closeout & turnover
  • 42. • Who is driving the process? • Are all areas of equal importance? • Where does BIM fit into this workflow? Why are we doing BIM? Common project workflow perception
  • 43. Total LifeCycle Cost • 20% Design/Construction • 80% is OMR • Let’s Flip the Discussion! The InfinyD product was designed to appeal to an Owner/Client’s construction asset management deliverable, enabling the contractor to meet the requirements of the deliverable, while attaining qualitative and quantative ROI on their projects. Why are we doing BIM? Where are real savings realized?
  • 45. • Easy of use supports nature of construction industry • Same solution for various BIM workflows • Facilitates effective communication with design partner • Connection of disparate business process and technologies • Emerging Owner/Client driven project requirements Additional Value for the Contractor
  • 46. Additional Value for the Project/Asset Owner • Vehicle for early designer/contractor coordination • Meaningful collaboration with project stakeholders • Increased visibility of project operations (Project Certainty) • Sustainable platform for OM&R lifecycle • Logical progression and consolidation of project data for Asset Management and Facilities Maintenance • Enable existing asset management system and visual workflows
  • 47. Next Generation BIM © 2015 InEight Inc. All rights reserved.