SlideShare una empresa de Scribd logo
1 de 5
Descargar para leer sin conexión
SavethousandsofdollarsbyreducingStuckPipeincidentsonyourrig!
Petrosync Distinguished Instructor
StuckPipePreventionStuckPipePrevention
andFishingandFishing
Bringyourdatato
improve
techniquesand
learnfromthe
Expert!
Fayez Makkar
Drilling and Workover Consultant
Independent Professional Training & Coaching Professional
Over 35 years of experience in Petroleum Industry.
Extensive experience on workover, completion logging interpretation and design.
Accomplished Instructor with over 20 years of experience.
25th-29thMay2015| 23rd-27thNovember2015
KNOW how to predict and detect stuck pipe.
PREVENT stuck pipe incident to SAVE thousands of dollars in non-productive time.
UNDERSTAND the value and contribution of each team member in preventing stuck pipe incident.
LEARN how to predict and make contingency plan to prevent stuck pipe.
OBTAIN the knowledge on how to write the proper report for stuck pipe incidents.
Course Objectives
Specially Designed for
This course is specifically designed for, but not limited to employees in the oil and gas industry who holds the following
roles:
FOCUS TRAINING • REDUCE COST • ENHANCED RESULTS
Over the years, there has been a growing demand for hybrid training programs. It is an excellent option to maximize your training dollar for your
specific training needs. We make it possible to run a training program that is customized totally to your training needs at a fraction of an in-house
budget!
If you like to know more about this excellent program, please contact us on +65 6415 4500 or email general@petrosync.com
HYBRID TRAINING SOLUTIONS
Drilling Managers
Drilling Supervisors
Rig Managers
Drilling Superintendents
Senior Drillers
Drilling Engineers
Project Engineers
Operation Engineers
Tool Pushers
Supported by
Jakarta,Indonesia| Bangkok,Thailand
Preventing stuck pipe incidents can save thousands of dollars in non-productive time. Stuck Pipe Prevention covers topics which can
eliminate or greatly reduce stuck pipe incidents on your rig. Participants will learn the language of the well, also learn how to predict
and detect the stuck before it occurs.
This course emphasis the prevention of stuck pipe.The team concept is used throughout the course, explaining the contribution and
value of every crew member in the goal of keeping the pipe free. With your data, courses can be customized, and past stuck pipe
incidents can be analyzed to determine what was done incorrectly and where techniques can be improved. Everyone will gain an
excellent experience through the discussion and solving the cases histories more than 40 cases.
Petrosync Distinguished Instructor
Course Overview
STUCK PIPE PREVENTION and FISHING
25th - 29th May 2015 at Jakarta, Indonesia | 23rd - 27th November 2015 at Bangkok, Thailand
CLIENTLISTINCLUDES:
Saudi Aramco
Arabian Drilling Company (ADC)
Kuwait Petroleum Corporation (KPC)
Greater Nile Petroleum Operating Company (GNPOC)
White Nile Petroleum Operating Company (WNPOC)
Petro Energy E&P
Petrodar Operating Company
Abu Dhabi Marine Operating Company (ADMA-OPCO)
Iraq Drilling Company (IDC)
LISTOFPAPERSPRESENTEDININTERNATIONALCONFERENCE
SPE Kuwait International conference on 12/12/2011 - What's the optimum well geometry & reservoir parameters in fracture
carbonate reservoir subjected to steam stimulation? (SPE 150533)
Egypt international conference in 2000 - LWF logging while fishing
Italy International conference in1998 - LWF logging while fishing
Fayez Makkar is an independent drilling and workover consultant having more than 36 years of experience in
Petroleum industry. He has extensive background in workover, completion design and logging interpretation
in directional and horizontal wells. He also has experience in all types of drilling operations including deep
wells on both offshore and onshore oil, gas and H2S wells. His teaching experience began since 1992 and at the
moment he has taught more than 25 courses. He conducted several courses through TPS and NExT in Turkey.
Limited Attendees
The course has limited seats to ensure maximum learning and experience for all delegates.
Certificate of Attendance
YouwillreceiveaCertificateofAttendancebearingthesignaturesoftheTraineruponsuccessfulcompletionofthecourse.Thiscertificateisproof
of your continuing professional development.
Interactive Training
You will be attending training designed to share both the latest knowledge and practical experience through interactive sessions. This will
provide you with a deeper and more long-term understanding of your current issues.
High Quality Course Materials
Printed course manual will provide you with working materials throughout the course and will be an invaluable source of reference for you and
your colleagues afterward. You can follow course progress on your laptop with soft copies provided.
Petrosync Quality
Fayez Makkar
Drilling and Workover Consultant
Independent Professional Training & Coaching Professional
What is stuck pipe?
Primary cause of downtime
See warning signs and respond
Stuck pipe is almost always preventable
Definition
Causes
Mechanical
Formation problems
Human error—lack of communication
SAVE COST • IMPROVE PERFORMANCE • REDUCE
RISK
PetroSync understands that in current economic climate, getting an
excellent return on your training investment is critical for all our
clients. This excellent training can be conducted exclusively for your
organization.Thetrainingcanbetailoredtomeetyourspecificneeds
at your preferred location and time. We will meet you anywhere
around the globe.
If you like to know more about this excellent program, please contact
us on +65 6415 4500 or email general@petrosync.com
IN-HOUSE SOLUTIONS
STUCK PIPE PREVENTION and FISHING
25th - 29th May 2015 at Jakarta, Indonesia | 23rd - 27th November 2015 at Bangkok, Thailand
Course Agenda
Day One
PROGRAM SCHEDULE
Registration (Day 1)
Session I
Refreshment & Networking Session I
Session II
Lunch
Session III
Refreshment & Networking Session II
Session IV
End of Day
08:00-09:00
09:00-11:00
11:00-11:15
11:15-13:00
13:00-14:00
14:00-15:30
15:30-15:45
15:45-17:00
Types of sticking
Formational sticking
Differential sticking
Cause for most stuck pipe situations
Drilling overbalance most common cause
Geopressured formations
Reactive formations
Unconsolidated formations
Mobile formations
Fractured or faulted formations
Mechanical sticking
Key seating
Wellbore geometry
Under-gauge hole
Inadequate hole cleaning
Junk in the hole
Cement problems
Casing problems
Day Two
Differential sticking
Definition
Most common in sandstone and high permeability forma-
tions
Why circulate fluids in hole?
Remove cuttings
Seal the wellbore
Control well pressure
Mud formulation
Drilled overbalanced defined
Filter cake defined
Drill string flexing defined
Avoiding differential sticking
Rotate
Circulate
Move drill string up and down
Communicate
Differential sticking definition repeated
What causes stuck pipe?
Human factors
Lack of team work
Lack of communication
Lack of planning
Failure to read warning signs
Failure to follow procedures
Most stuck pipe situations happen at tour change
Use tour change form to record conditions and identify trends
Warning Signs
Three mechanisms—definitions and causes
Hole pack off or bridge mechanism
Differential mechanism
Geometry mechanism
The hole is talking—definitions and descriptions
Torque changes
String weight changes
Circulation rate changes
Pump pressure changes
Mud properties
Changes at the shakers
Your records indicate changes
Name the mechanism—simulation
Talk to others around the rig
Gather clues
Come up with a diagnosis
Day Three
STUCK PIPE PREVENTION and FISHING
25th - 29th May 2015 at Jakarta, Indonesia | 23rd - 27th November 2015 at Bangkok, Thailand
Prevention Plan
Review three sticking mechanisms—definitions and causes
Differential
Wellbore geometry
Hole pack off/bridging
Have a stuck pipe prevention plan
Team work and communication
Instructions from SSPP should be posted near the driller
Mud must be ready and conditioned properly when it re-
turns to the surface
Chemicals and mixing agents must be on hand to avoid
delays
Hydraulics are important
Shaker hand should communicate what’s shaking to the
driller
Mud logger examines cuttings communicate with the driller
CaseHistories
Fishing Operations
Twist Off Cases
Fracture of the drill pipe
Fracture of the threads joining the drill collars or the drill
pipe
Overshot
Free point indicator
Reserve twist
Small explosive charge
Addition of jars in the fishing string
Washing over
Plugging the hole
Side tracked hole (dog-leg)
Day Four
Broken bit cases
Break away of one of the conical cutters & leg down the hole
with all the bearing
Using magnet for fishing
Using hollow basket
Using explosive charge for too large pieces of metals
Using another bit
Differential freeing
50% chance of freeing stuck pipe in the first 4 hours—after
than 10%or less.
Quick and proper action by the driller and his team will free
pipe in first few minutes
Analyze the warning signs
Use freeing worksheet to help in decision making
Review of sample scenario and steps for freeing
CaseHistories
Fishing
Causes and prevention
Tool selection
Economics
Exercise
Hole Cleaning
Day Five
Group Discount is based on Standard Price
* For 7 or more delegates, please inquire for more attractive package.
* Important: Please note that registration without payment will incur a SGD 200 administration fee.
1st Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Company:____________________________________________ Industry : __________________________________
Address: _______________________________________________________Postcode: _________________________
Country: ________________________Email: __________________________________________________________
Attention Invoice to: ______________________________________________________________________________
Direct Line Number: ______________________________ Fax: _____________________________________________
PAYMENTMETHODS
DELEGATESDETAILS
Please note:
- Indicate if you have already registered by Phone Fax Email Web
I agree to PetroSync’s terms & conditions,payment terms and cancellation policy.
By Credit Card :
Please debit my credit card: Visa MasterCard
Card Number:
Name printed on card: _____________________________________________________________________
Expiry Date:
Security Code:
INVOICEDETAILS
Authorized Signature : ____________________________________________________________________________
Mrs Ms Dr OthersMr
DETAILS
PROGRAMMECONSULTANT
PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance.
2nd Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mrs Ms Dr OthersMr
3rd Delegate Name
Direct Line Number: Email:
Job Title: Department:
Head of Department:
Mrs Ms Dr OthersMr
INVESTMENT PACKAGES
COURSEDETAILS
AMEX
TERMSANDCONDITIONS
CHARGES&FEE(s)
- For Payment by Direct TelegraphicTransfer,
client has to bear both local and oversea
bank charges.
- For credit card payment, there is additional
4% credit card processsing fee.
DISCLAIMER
Please note that trainers and topics were confirmed at
the time of publishing; however, PetroSync may
necessitate substitutions, alterations or cancellations of
the trainers or topics. As such, PetroSync reserves the
right to change or cancel any part of its published
programme due to unforeseen circumstances. Any
substitutions or alterations will be updated on our web
page as soon as possible.
DATAPROTECTION
The information you provide will be safeguarded by
PetroSync that may be used to keep you informed of
relevant products and services. As an international
group we may transfer your data on a global basis for
the purpose indicated above. If you do not want us to
share your information with other reputable companies,
please tick this box
CANCELLATIONPOLICY
You may substitute delegates at any time as long as
reasonable advance notice is given to PetroSync. For
any cancellation received in writing not less than
fourteen (14) working days prior to the training course,
you will receive credit voucher less a SGD $200
administration fee and any related bank or credit card
charges.
Delegates who cancel less than fourteen (14) working
days of the training course, or who do not attend the
course, are liable to pay the full course fee and no
refunds will be granted.
In the event that PetroSync cancels or postpones an
event for any reason and that the delegate is unable or
unwilling to attend in on the rescheduled date, you will
receive a credit voucher for 100% of the contract fee
paid. You may use this credit voucher for another
PetroSync to be mutually agreed with PetroSync, which
must occur within a year from the date of postponement.
PetroSync is not responsible for any loss or damage as
a result of the cancellation policy. PetroSync will assume
no liability whatsoever in the event this event is
cancelled, rescheduled or postponed due to any Act of
God, fire, act of government or state, war, civil
commotion, insurrection, embargo, industrial action, or
any other reason beyond management control.
* To enjoy the promotion & discount offer, payment must be made before deadline
* Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other promotional offers.
Please accept our apologies for mail or email that is
incorrectly addressed.
Please email us at registration@petrosync.com and
inform us of any incorrect details. We will amend them
accordingly.
- If you have not received an acknowledgement before the training, please call us to confirm your booking.
Confirmation
InvestmentPackage Standard Price
25-29May2015
Jakarta,Indonesia
SGD$ 5,995
Group Discount (3 or more Delegates)Early Bird Offer
SGD$ 5,795
Title : Stuck Pipe Prevention and Fishing
Date : 25th - 29th May 2015 at Jakarta, Indonesia
23rd - 27th November 2015 at Bangkok, Thailand
SGD$ 5,695
Name : Mia .C
Email : registration@petrosync.com
Phone : +65 6415 4500
Fax : +65 6826 4322
By Direct Transfer : Please quote invoice number(s) on remittance advice
PetroSync Global Pte Ltd Bank details:
All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced amount.
Account Name: PetroSync Global Pte Ltd
Bank Name : DBS Bank Ltd
Bank Code : 7171 • Bank Swift Code : DBSSSGSGXXX • Branch code : 288
Account No : • SGD : 288-901898-0 • USD : 0288-002682-01-6
Bank Address : 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982
CERTIFICATEOFATTENDANCE
70% attendance is required for PetroSync’s Certificate
of Attendance
23-27Nov2015
Bangkok,Thailand

Más contenido relacionado

Destacado

Practical Approach to Drilling Fluid Engineering Mia
Practical Approach to Drilling Fluid Engineering MiaPractical Approach to Drilling Fluid Engineering Mia
Practical Approach to Drilling Fluid Engineering Mia
Carla Karenina
 

Destacado (10)

ACD, Mia
ACD, MiaACD, Mia
ACD, Mia
 
Csa linging into old age
Csa linging into old ageCsa linging into old age
Csa linging into old age
 
Gender keywords
Gender keywordsGender keywords
Gender keywords
 
Practical Approach to Drilling Fluid Engineering Mia
Practical Approach to Drilling Fluid Engineering MiaPractical Approach to Drilling Fluid Engineering Mia
Practical Approach to Drilling Fluid Engineering Mia
 
Acceptance and Rejection Theory with Foster Child
Acceptance and Rejection Theory with Foster ChildAcceptance and Rejection Theory with Foster Child
Acceptance and Rejection Theory with Foster Child
 
Obsessive Compulsive and Related Disorders
Obsessive Compulsive and Related DisordersObsessive Compulsive and Related Disorders
Obsessive Compulsive and Related Disorders
 
Child sexual offenders counseling center
Child sexual offenders counseling centerChild sexual offenders counseling center
Child sexual offenders counseling center
 
Juvenile Sexual Offender Program using DBT
Juvenile Sexual Offender Program using DBTJuvenile Sexual Offender Program using DBT
Juvenile Sexual Offender Program using DBT
 
Sfbt with self harm
Sfbt with self harmSfbt with self harm
Sfbt with self harm
 
Malaikat dan tugasnya
Malaikat dan tugasnyaMalaikat dan tugasnya
Malaikat dan tugasnya
 

Similar a SPP 25-29 May 2015, Jakarta, Indonesia

Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )
Putri Kolopaking
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
Petro Nomics
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
Petro Nomics
 

Similar a SPP 25-29 May 2015, Jakarta, Indonesia (20)

PE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical ProfessionalsPE952 Drilling Essentials For New Engineers And Non-Technical Professionals
PE952 Drilling Essentials For New Engineers And Non-Technical Professionals
 
PetroSync - Coiled Tubing Technology
PetroSync - Coiled Tubing TechnologyPetroSync - Coiled Tubing Technology
PetroSync - Coiled Tubing Technology
 
PetroSync - Formation Damage Prevention and Treatments
PetroSync - Formation Damage Prevention and TreatmentsPetroSync - Formation Damage Prevention and Treatments
PetroSync - Formation Damage Prevention and Treatments
 
PetroSync - Well Completion and Workover
PetroSync - Well Completion and WorkoverPetroSync - Well Completion and Workover
PetroSync - Well Completion and Workover
 
PetroSync - Drilling String Design
PetroSync - Drilling String DesignPetroSync - Drilling String Design
PetroSync - Drilling String Design
 
PetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling EngineerPetroSync - Drilling Engineering for Non-Drilling Engineer
PetroSync - Drilling Engineering for Non-Drilling Engineer
 
PetroSync - Advance Wireline Intervention Operation
PetroSync - Advance Wireline Intervention OperationPetroSync - Advance Wireline Intervention Operation
PetroSync - Advance Wireline Intervention Operation
 
PetroSync - Well Test Analysis
PetroSync - Well Test AnalysisPetroSync - Well Test Analysis
PetroSync - Well Test Analysis
 
PetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure AnalysisPetroSync - Gas Turbine Failure Analysis
PetroSync - Gas Turbine Failure Analysis
 
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )Asme section viii division 1 and 2   pressure vessel series ( CONFIRM RUN )
Asme section viii division 1 and 2 pressure vessel series ( CONFIRM RUN )
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
 
Oil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubaiOil and gas tank farm management may, dubai
Oil and gas tank farm management may, dubai
 
PetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
PetroSync - ASME VIII Division 1 & 2 Pressure vessel SeriesPetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
PetroSync - ASME VIII Division 1 & 2 Pressure vessel Series
 
PetroSync - Offshore Marine Operation
PetroSync - Offshore Marine OperationPetroSync - Offshore Marine Operation
PetroSync - Offshore Marine Operation
 
PetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling OperationPetroSync - HPHT Drilling Operation
PetroSync - HPHT Drilling Operation
 
PE950 Introduction To Exploration & Production For New Engineers And Non-Tech...
PE950 Introduction To Exploration & Production For New Engineers And Non-Tech...PE950 Introduction To Exploration & Production For New Engineers And Non-Tech...
PE950 Introduction To Exploration & Production For New Engineers And Non-Tech...
 
Deepwater Completions Operations
Deepwater Completions OperationsDeepwater Completions Operations
Deepwater Completions Operations
 
Mechanical and oil & gas
Mechanical and oil & gasMechanical and oil & gas
Mechanical and oil & gas
 
PetroSync - Water Injection for Production System
PetroSync - Water Injection for Production SystemPetroSync - Water Injection for Production System
PetroSync - Water Injection for Production System
 
PetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for ServicePetroSync - API 579 Fitness for Service
PetroSync - API 579 Fitness for Service
 

SPP 25-29 May 2015, Jakarta, Indonesia

  • 1. SavethousandsofdollarsbyreducingStuckPipeincidentsonyourrig! Petrosync Distinguished Instructor StuckPipePreventionStuckPipePrevention andFishingandFishing Bringyourdatato improve techniquesand learnfromthe Expert! Fayez Makkar Drilling and Workover Consultant Independent Professional Training & Coaching Professional Over 35 years of experience in Petroleum Industry. Extensive experience on workover, completion logging interpretation and design. Accomplished Instructor with over 20 years of experience. 25th-29thMay2015| 23rd-27thNovember2015 KNOW how to predict and detect stuck pipe. PREVENT stuck pipe incident to SAVE thousands of dollars in non-productive time. UNDERSTAND the value and contribution of each team member in preventing stuck pipe incident. LEARN how to predict and make contingency plan to prevent stuck pipe. OBTAIN the knowledge on how to write the proper report for stuck pipe incidents. Course Objectives Specially Designed for This course is specifically designed for, but not limited to employees in the oil and gas industry who holds the following roles: FOCUS TRAINING • REDUCE COST • ENHANCED RESULTS Over the years, there has been a growing demand for hybrid training programs. It is an excellent option to maximize your training dollar for your specific training needs. We make it possible to run a training program that is customized totally to your training needs at a fraction of an in-house budget! If you like to know more about this excellent program, please contact us on +65 6415 4500 or email general@petrosync.com HYBRID TRAINING SOLUTIONS Drilling Managers Drilling Supervisors Rig Managers Drilling Superintendents Senior Drillers Drilling Engineers Project Engineers Operation Engineers Tool Pushers Supported by Jakarta,Indonesia| Bangkok,Thailand
  • 2. Preventing stuck pipe incidents can save thousands of dollars in non-productive time. Stuck Pipe Prevention covers topics which can eliminate or greatly reduce stuck pipe incidents on your rig. Participants will learn the language of the well, also learn how to predict and detect the stuck before it occurs. This course emphasis the prevention of stuck pipe.The team concept is used throughout the course, explaining the contribution and value of every crew member in the goal of keeping the pipe free. With your data, courses can be customized, and past stuck pipe incidents can be analyzed to determine what was done incorrectly and where techniques can be improved. Everyone will gain an excellent experience through the discussion and solving the cases histories more than 40 cases. Petrosync Distinguished Instructor Course Overview STUCK PIPE PREVENTION and FISHING 25th - 29th May 2015 at Jakarta, Indonesia | 23rd - 27th November 2015 at Bangkok, Thailand CLIENTLISTINCLUDES: Saudi Aramco Arabian Drilling Company (ADC) Kuwait Petroleum Corporation (KPC) Greater Nile Petroleum Operating Company (GNPOC) White Nile Petroleum Operating Company (WNPOC) Petro Energy E&P Petrodar Operating Company Abu Dhabi Marine Operating Company (ADMA-OPCO) Iraq Drilling Company (IDC) LISTOFPAPERSPRESENTEDININTERNATIONALCONFERENCE SPE Kuwait International conference on 12/12/2011 - What's the optimum well geometry & reservoir parameters in fracture carbonate reservoir subjected to steam stimulation? (SPE 150533) Egypt international conference in 2000 - LWF logging while fishing Italy International conference in1998 - LWF logging while fishing Fayez Makkar is an independent drilling and workover consultant having more than 36 years of experience in Petroleum industry. He has extensive background in workover, completion design and logging interpretation in directional and horizontal wells. He also has experience in all types of drilling operations including deep wells on both offshore and onshore oil, gas and H2S wells. His teaching experience began since 1992 and at the moment he has taught more than 25 courses. He conducted several courses through TPS and NExT in Turkey. Limited Attendees The course has limited seats to ensure maximum learning and experience for all delegates. Certificate of Attendance YouwillreceiveaCertificateofAttendancebearingthesignaturesoftheTraineruponsuccessfulcompletionofthecourse.Thiscertificateisproof of your continuing professional development. Interactive Training You will be attending training designed to share both the latest knowledge and practical experience through interactive sessions. This will provide you with a deeper and more long-term understanding of your current issues. High Quality Course Materials Printed course manual will provide you with working materials throughout the course and will be an invaluable source of reference for you and your colleagues afterward. You can follow course progress on your laptop with soft copies provided. Petrosync Quality Fayez Makkar Drilling and Workover Consultant Independent Professional Training & Coaching Professional
  • 3. What is stuck pipe? Primary cause of downtime See warning signs and respond Stuck pipe is almost always preventable Definition Causes Mechanical Formation problems Human error—lack of communication SAVE COST • IMPROVE PERFORMANCE • REDUCE RISK PetroSync understands that in current economic climate, getting an excellent return on your training investment is critical for all our clients. This excellent training can be conducted exclusively for your organization.Thetrainingcanbetailoredtomeetyourspecificneeds at your preferred location and time. We will meet you anywhere around the globe. If you like to know more about this excellent program, please contact us on +65 6415 4500 or email general@petrosync.com IN-HOUSE SOLUTIONS STUCK PIPE PREVENTION and FISHING 25th - 29th May 2015 at Jakarta, Indonesia | 23rd - 27th November 2015 at Bangkok, Thailand Course Agenda Day One PROGRAM SCHEDULE Registration (Day 1) Session I Refreshment & Networking Session I Session II Lunch Session III Refreshment & Networking Session II Session IV End of Day 08:00-09:00 09:00-11:00 11:00-11:15 11:15-13:00 13:00-14:00 14:00-15:30 15:30-15:45 15:45-17:00 Types of sticking Formational sticking Differential sticking Cause for most stuck pipe situations Drilling overbalance most common cause Geopressured formations Reactive formations Unconsolidated formations Mobile formations Fractured or faulted formations Mechanical sticking Key seating Wellbore geometry Under-gauge hole Inadequate hole cleaning Junk in the hole Cement problems Casing problems Day Two Differential sticking Definition Most common in sandstone and high permeability forma- tions Why circulate fluids in hole? Remove cuttings Seal the wellbore Control well pressure Mud formulation Drilled overbalanced defined Filter cake defined Drill string flexing defined Avoiding differential sticking Rotate Circulate Move drill string up and down Communicate Differential sticking definition repeated What causes stuck pipe? Human factors Lack of team work Lack of communication Lack of planning Failure to read warning signs Failure to follow procedures Most stuck pipe situations happen at tour change Use tour change form to record conditions and identify trends
  • 4. Warning Signs Three mechanisms—definitions and causes Hole pack off or bridge mechanism Differential mechanism Geometry mechanism The hole is talking—definitions and descriptions Torque changes String weight changes Circulation rate changes Pump pressure changes Mud properties Changes at the shakers Your records indicate changes Name the mechanism—simulation Talk to others around the rig Gather clues Come up with a diagnosis Day Three STUCK PIPE PREVENTION and FISHING 25th - 29th May 2015 at Jakarta, Indonesia | 23rd - 27th November 2015 at Bangkok, Thailand Prevention Plan Review three sticking mechanisms—definitions and causes Differential Wellbore geometry Hole pack off/bridging Have a stuck pipe prevention plan Team work and communication Instructions from SSPP should be posted near the driller Mud must be ready and conditioned properly when it re- turns to the surface Chemicals and mixing agents must be on hand to avoid delays Hydraulics are important Shaker hand should communicate what’s shaking to the driller Mud logger examines cuttings communicate with the driller CaseHistories Fishing Operations Twist Off Cases Fracture of the drill pipe Fracture of the threads joining the drill collars or the drill pipe Overshot Free point indicator Reserve twist Small explosive charge Addition of jars in the fishing string Washing over Plugging the hole Side tracked hole (dog-leg) Day Four Broken bit cases Break away of one of the conical cutters & leg down the hole with all the bearing Using magnet for fishing Using hollow basket Using explosive charge for too large pieces of metals Using another bit Differential freeing 50% chance of freeing stuck pipe in the first 4 hours—after than 10%or less. Quick and proper action by the driller and his team will free pipe in first few minutes Analyze the warning signs Use freeing worksheet to help in decision making Review of sample scenario and steps for freeing CaseHistories Fishing Causes and prevention Tool selection Economics Exercise Hole Cleaning Day Five
  • 5. Group Discount is based on Standard Price * For 7 or more delegates, please inquire for more attractive package. * Important: Please note that registration without payment will incur a SGD 200 administration fee. 1st Delegate Name Direct Line Number: Email: Job Title: Department: Head of Department: Company:____________________________________________ Industry : __________________________________ Address: _______________________________________________________Postcode: _________________________ Country: ________________________Email: __________________________________________________________ Attention Invoice to: ______________________________________________________________________________ Direct Line Number: ______________________________ Fax: _____________________________________________ PAYMENTMETHODS DELEGATESDETAILS Please note: - Indicate if you have already registered by Phone Fax Email Web I agree to PetroSync’s terms & conditions,payment terms and cancellation policy. By Credit Card : Please debit my credit card: Visa MasterCard Card Number: Name printed on card: _____________________________________________________________________ Expiry Date: Security Code: INVOICEDETAILS Authorized Signature : ____________________________________________________________________________ Mrs Ms Dr OthersMr DETAILS PROGRAMMECONSULTANT PAYMENT TERMS : Payment is due in full at the time of registration. Full payment is mandatory for event attendance. 2nd Delegate Name Direct Line Number: Email: Job Title: Department: Head of Department: Mrs Ms Dr OthersMr 3rd Delegate Name Direct Line Number: Email: Job Title: Department: Head of Department: Mrs Ms Dr OthersMr INVESTMENT PACKAGES COURSEDETAILS AMEX TERMSANDCONDITIONS CHARGES&FEE(s) - For Payment by Direct TelegraphicTransfer, client has to bear both local and oversea bank charges. - For credit card payment, there is additional 4% credit card processsing fee. DISCLAIMER Please note that trainers and topics were confirmed at the time of publishing; however, PetroSync may necessitate substitutions, alterations or cancellations of the trainers or topics. As such, PetroSync reserves the right to change or cancel any part of its published programme due to unforeseen circumstances. Any substitutions or alterations will be updated on our web page as soon as possible. DATAPROTECTION The information you provide will be safeguarded by PetroSync that may be used to keep you informed of relevant products and services. As an international group we may transfer your data on a global basis for the purpose indicated above. If you do not want us to share your information with other reputable companies, please tick this box CANCELLATIONPOLICY You may substitute delegates at any time as long as reasonable advance notice is given to PetroSync. For any cancellation received in writing not less than fourteen (14) working days prior to the training course, you will receive credit voucher less a SGD $200 administration fee and any related bank or credit card charges. Delegates who cancel less than fourteen (14) working days of the training course, or who do not attend the course, are liable to pay the full course fee and no refunds will be granted. In the event that PetroSync cancels or postpones an event for any reason and that the delegate is unable or unwilling to attend in on the rescheduled date, you will receive a credit voucher for 100% of the contract fee paid. You may use this credit voucher for another PetroSync to be mutually agreed with PetroSync, which must occur within a year from the date of postponement. PetroSync is not responsible for any loss or damage as a result of the cancellation policy. PetroSync will assume no liability whatsoever in the event this event is cancelled, rescheduled or postponed due to any Act of God, fire, act of government or state, war, civil commotion, insurrection, embargo, industrial action, or any other reason beyond management control. * To enjoy the promotion & discount offer, payment must be made before deadline * Prices include lunches, refreshments and materials. Promotion & discount cannot be combined with other promotional offers. Please accept our apologies for mail or email that is incorrectly addressed. Please email us at registration@petrosync.com and inform us of any incorrect details. We will amend them accordingly. - If you have not received an acknowledgement before the training, please call us to confirm your booking. Confirmation InvestmentPackage Standard Price 25-29May2015 Jakarta,Indonesia SGD$ 5,995 Group Discount (3 or more Delegates)Early Bird Offer SGD$ 5,795 Title : Stuck Pipe Prevention and Fishing Date : 25th - 29th May 2015 at Jakarta, Indonesia 23rd - 27th November 2015 at Bangkok, Thailand SGD$ 5,695 Name : Mia .C Email : registration@petrosync.com Phone : +65 6415 4500 Fax : +65 6826 4322 By Direct Transfer : Please quote invoice number(s) on remittance advice PetroSync Global Pte Ltd Bank details: All bank charges to be borne by payer. Please ensure that PetroSync Global Pte Ltd receives the full invoiced amount. Account Name: PetroSync Global Pte Ltd Bank Name : DBS Bank Ltd Bank Code : 7171 • Bank Swift Code : DBSSSGSGXXX • Branch code : 288 Account No : • SGD : 288-901898-0 • USD : 0288-002682-01-6 Bank Address : 12 Marina Boulevard, Level 3. Marina Bay Financial Centre Tower 3. Singapore 018982 CERTIFICATEOFATTENDANCE 70% attendance is required for PetroSync’s Certificate of Attendance 23-27Nov2015 Bangkok,Thailand