SlideShare una empresa de Scribd logo
1 de 31
Descargar para leer sin conexión
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
KEY PROFESSIONAL DATES AND EXPERIENCES
After his degree in Naval and Mechanical Engineering
in the University of Genova (Italy) in 1963,
Carlo Avanzini has been active in the field of land and marine pipelines,
first in the field of oil P/Ls, then transferring his interests to civil pipelines.
From the early 70s, he has designed or has intervened as engineer and supervisor
in a wide range of projects in different countries, with own Companies
or as free-lance consultant teaming with engineering companies or colleagues
He brings as references projects in steel, HDPE, GRP in diameters up to 4000 mm.
International engineering support is given to HAWLE /NOVA SIRIA
on the application of Steel Compression Couplings
and, in GCC, to PROCO (USA) on the DuckBill Valves
for diffusers and coastal discharges
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
The cooperation on international projects
is in favor of engineering companies, material suppliers and contractors, and
includes design, preparation of specifications,
construction method statements, planning and supervision.
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
One of the first documented project was the design and supervision of the outfall
discharging pre-treated water from a paper factory in Silifke, Turkey
Concrete Coated Steel 900mm x 900m (1985)
Numerous marine and outfall projects, easy or very engaging,
successful or better forgotten are now past history, only
reminded in old faded out papers and photos
Locations, main data and photos of a few major projects in the last [25] years
are shown in the next slides; others are collected in my CV.
ISTANBUL ÜSKÜDAR OUTFALL (1989)
Steel, 1219.2mm, concrete coated,
275m long to -43m depth
Launched with short ramp in 3 sections joined
by rubber flexible joints, bottom pull from the
site through a cable return deviation block
anchored on the bottom at 350m distance
ISTANBUL BALTALIMANI OUTFALL(1989)
Steel, 2 x 1727,2.2mm, 300m long to -73m depth
Twin pipes launched with short ramp in 2 sections
joined by rubber flexible joints.
Bottom pull from opposite side of Bosphorus
at 1200m distance with a cable deviation block
midway on the bottom at -75m depth.
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
Substitution of a section of the shore approach
of the Marmara Gas Pipeline, damaged by the
underwater slippage of a clay lens.
The pressure of the landslide had buckled the pipe
upwards and caused a severe leak.
The project included the construction of the new
string, the cut and removal of the damaged length,
the bottom pull of the news string to the junction
point, lifting of the two ends for the off-barge dry-
welding of the sections .
The pipe was kept in position for welding by two
rotating clamps and supended for the alignment to
two cranes and two davits and finally
lowered in position.
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
ISTANBUL, MARMARA GAS MAIN (1990)
The third Istanbul main outfall ….
Steel, 2235.2mm, concrete coated,
2200m long with diffuser at -47m depth
Prefabrication executed on long ramp
with multiple welding and coating stations
Installation performed with bottom pull
from a barge anchored offshore.
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
ISTANBUL, TUZLA OUTFALLL(1992)
Offshore GRP pipelines for the cooling
water system of the Thermal Power Plant
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
Nova Siria
Compression Couplings
ND 2800 and 2400
were employed for the
first time for
underwater tie-ins
 4 x ND 2800 intake lines, 420m long
 4 x ND 2400 outfalls, 1250m long
SÜGOZÜ - ISKENDERUN GULF,
SOUTH TURKEY (2000)
The 4 concrete intake structures, with dimensions 9.8 x 7,5 x 8.35h
and weight in air ≈ 600 ton, were connected to the pipelines with a
slip-on 2800 reinforced rubber hose.
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
Outfall, GRP, ND 900, length 2150m
Vertical alignment control obtained with
concrete saddles.
Diffuser protected with concrete caps.
SAIDA, LEBANON, 2003
Concrete coated steel, 2235.2 mm, length 2308m
Welding and coating on inclined long ramp
Installation with bottom pull from pulling station on the
opposite coast
Slope changes obtained with rubber flexible couplings.
KADIKÖY OUTFALL, ISTANBUL, 2004
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
IGDAS TRANSMISSION GAS LINES TO PRINCESS ISLANDS (SEA OF
MARMARA, ISTANBUL, 2005)
Steel X52, 219,1,
concrete coated,
installed with bottom pull
4 sections between
land and the 4
islands
Main feeder 3580m
Transmissions to
other islands
respectively 1450m,
1370m, 2150m
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
The need of the substitution of the original diffuser
with a new taered one to be connected to the main
ND2500 GRP line required an intervention to be
performed with a time-limited interruption
of the plant.
The connection was studied on paper and a
combination of GRP short spools and of tailor-made
Compression Couplings, designed with 400 mm axial
tolerance and ± 3° allowable angular deflection been
realized in 8 hrs, practically without idisturbance
to the TPP operation.
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
AMBARLI, UNIMAR THERMAL P0WER PLANT (2005)
Waste W ater Outfall, GRP, ND 1800 with length 2000 m
Installed “pipe after pipe”
in trench with a diffuser
at -11m depth
Tie-ins and special
connections were realized
with Compression Couplimgs,
while the shore approach and
the line were protected with
mesh gabionse
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
MERSIN OUTFALL, SOUTHERN TURKEY
(2007)
After thre years, the diffuser suffered
extensive damages, causes [obviously!] unknown.
The pipe brought was brought to land, cleaned and
the components recovered as much as feasible.
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
MERSIN GRP DIFFUSER REPAIR (2010)
It has been interesting to see that
there have been a minimum fouling of
the internal surfaces.
Only local limpets groups vere present.
It was provided a
new section with one
port and the missing
length was
compensated with a
long, specially
designed steel
compression coupling.
BANDIRMA TPP / ATEC (2008)
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
Cooling water GRP pipelines – 2 x 2200 intake lines
200m long to -23 m depth and 1 x 2400 outfall
350m long with diffuser at -29m depth.
Onshore cooling water circuit,
GRP 4 x ND 2500
Supervision of the pipe production
and delivery, site lamination, installation
and testing.
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
AL KHALIJ TPP – LIBYA (2010)
Site observation of marine installation techniques [Geocean, FR]
GRP Discharge line ND 3500, 450m long
with special half buried short diffuser at -33m
stabilized with mattresses and gabions
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
BIGA (TR) NEW 2X600 MW
POWER PLANT (2010)
EAST DELTA ELECTRICITY PRODUCTION COMPANY
EL AIN EL SOKHNA SUPERCRITICAL
THERMAL POWER PLANT UNITS 1 & 2
2X650 MW GAS/OIL FIRED UNITS
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
EL AIN EL SOKHNA TPP
EGYPT (2011)
GRP, 3 x ND3000 intake pipelines
Supervision of pipe production and installation ob
behalf of PGESCo - Bechtel
Installation by Besix-Orascom
Design for the installation of the HDPE structural pipe
ND 2000 3700 m long
Pipe and ballast blocks supplied by the Russian client
The type of pipe and the blocks had been found not
suitable for a safe sinking, but the client insisted
nevertheless for the installation.
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
SOCHI OUTFALL, RUSSIA (2012)
[FIRST STAGE]
The project was stopped after the pipe failure
The pipe was tested in Germany and resulted not meeting
the standards
Prefabrication and towing
started to raise doubts on the
pipe’s real strength, but the
first string broke after
the start of the installation
of the ballast blocks
Ballast blocks and saddles,
as well as the compete
installation calculations and
procedures were
completely redesigned
The installation of line and
diffuser was completed
without problems.
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
SOCHI OUTFALL (RUSSIA) – RESTARTED
IN 2013 WITH NEW DESIGN
First 2000 m of the outfall have been substituted by a
tunnel. The remaining 1413 m were delivered as
HDPE ND 2000 (extruded)
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
SAMSUN OTV CCPP POWER PLANT –
COOLING WATER PIPELINES (2011/2012)
Intake and discharge sealines in GRP, 3 x ND 2400
length 860m and 2 x ND 3200 length 600m including
diffuser.
GRP intake structures
with OD 14m
Structural HDPE ID 3000mm, length 3700m inclusive
of diffuser wirh 250 T ports at -11m
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
LA TABOADA OUTFALL, LIMA, PERU (2010/2012)
MAR DEL PLATA, ARGENTINA (2012)
Outfall, HDPE ND 2.000 mm, length 4110 m
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
HDPE pipes, ballasted.
Intake line ND 1400 with
GRP intake structure;
Outfall line ND 900 with multiport diffuser
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
IZDEMIR ALIAGA
COOLING WATER
LINES (2013)
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
LA CHIRA OUTFALL , LIMA, PERU
(2012, RESTARTED 2013/2014)
Structured HDPE ID 2400mm
3600m long inclusive of
diffuser at -60m depth
2012
2016
2015
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
PRESENTATION OF CAPABILITIES
GRP, ND 4000, length 700 m
discharge line for
4 parallel diffuser branches,
each with 7 ports
ATLAS THERMAL POWER PLANT,
ISKENDERUN, TURKEY (2014)
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
PRESENTATION OF CAPABILITIES
Due to the long time cooperation with Cal Hayes,
the Manager of Proco Proflex Division, and the
long experience of Carlo Avanzini in the use of
Duck Bill Valves in sewerage systems and in
coastal and marine environment, Proco has
entrusted to AME the exclusivity for the
technical and commercial assistance of its
products in the GCC.
Clients interested in PROCO PRODUCTS may
refer to [avanzini@mideastfze.com] for
technical information and quotations.
TECHNICAL AND MARKETING SUPPORT TO
PROCO [USA]
website: http://www.procoproducts.com
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
PRESENTATION OF CAPABILITIES
Since several years, many Nova Siria applications,
particularly in the field of marine pipelines, have
been designed by Avanzini.
At present, the cooperation with Nova Siria
continues as AME giving its consultancy and
technical assistance to Hawle Mid East.
Clients interested in Nova Siria products shall
refer for technical information and quotations to
Hawle Mid East FZE
(E-Mail: sharjah@hawle.com ; Web: www.hawle.com
or www.novasiria.it for an outline of the products)
In case of technical questions on the applications,
engineers and contractors may contact Carlo
Avanzini at avanzini@mideastfze.com with copy to
Hawle ME
TECHNICAL CONSULTANCY ON COMPRESSION
COUPLINGS’
SPECIAL LAND AND MARINE APPLICATIONS
OF NOVA SIRIA/HAWLE MID EAST
Carlo Avanzini is the Organizer and Coordinator of
MWWD CONFERENCES
E-Mail: carlo.avanzini@mwwd.org
Web: www.mwwd.org
Professional registration @ Chambers of Engineers, Genova, Italy, No C.E. 8679A
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
MWWD CONFERENCE ORGANIZATION
Managing Director
AVANZINI MIDDLE EAST (FZE)
Saif Zone - Q1-04-033/A – P.O.Box 121256 – Sharjah – U.A.E.
Incorporated @ No. 14905
E-Mail avanzini@mideast.com Mob. 00971.50.9391572
Professional Engineer
Marine Engineering And Consulting
Cemil Topuzlu Cad. 26/1 Ciftehavuzlar, Istanbul, Turkey
E-Mail: carlo.avanzini@sealinecons.com Mob. 0090.542.3580445
Organizer and Coordinator
MWWD CONFERENCES
E-Mail: carlo.avanzini@mwwd.org
Dr. Eng. Carlo Avanzini
Degree Naval Architecture, Naval and Mechanical Engineering, University of
Genova, Dept. of Naval Engineering, 1963
Professional registration @ Chambers of Engineers, Genova, Italy, C.E. 8679A
AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.

Más contenido relacionado

La actualidad más candente

Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technologyRemya Rajeev
 
Armtec - Introduction to Soil Steel Structures & End Treatments
Armtec - Introduction to Soil Steel Structures & End TreatmentsArmtec - Introduction to Soil Steel Structures & End Treatments
Armtec - Introduction to Soil Steel Structures & End TreatmentsCommunications Branding
 
civil enginnering industrial training report
civil enginnering industrial training report civil enginnering industrial training report
civil enginnering industrial training report KRISHNA MURARI
 
Trenchless technologies comparing thrust boring with horizontal directional ...
Trenchless technologies  comparing thrust boring with horizontal directional ...Trenchless technologies  comparing thrust boring with horizontal directional ...
Trenchless technologies comparing thrust boring with horizontal directional ...Tobiloba Omitola
 
Trenchless Technology for Laying Underground pipes.
Trenchless Technology for  Laying Underground pipes.Trenchless Technology for  Laying Underground pipes.
Trenchless Technology for Laying Underground pipes.Himanshu Rao
 
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipeDSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipeDeltares
 
Melbourne Pipeline Protection
Melbourne Pipeline ProtectionMelbourne Pipeline Protection
Melbourne Pipeline ProtectionSikko Krol
 
Keep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentKeep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentCommunications Branding
 
PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY MD AMANULLAH
 
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...Communications Branding
 
OTC Asia 2014 Petronas
OTC Asia 2014 PetronasOTC Asia 2014 Petronas
OTC Asia 2014 PetronasSteven Kennedy
 

La actualidad más candente (20)

Anese brochure
Anese brochure Anese brochure
Anese brochure
 
Trenchless Technology
Trenchless TechnologyTrenchless Technology
Trenchless Technology
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
subsea
subseasubsea
subsea
 
Armtec - Introduction to Soil Steel Structures & End Treatments
Armtec - Introduction to Soil Steel Structures & End TreatmentsArmtec - Introduction to Soil Steel Structures & End Treatments
Armtec - Introduction to Soil Steel Structures & End Treatments
 
Bihac WS Project
Bihac WS ProjectBihac WS Project
Bihac WS Project
 
Derventa City WW Project
Derventa City WW ProjectDerventa City WW Project
Derventa City WW Project
 
civil enginnering industrial training report
civil enginnering industrial training report civil enginnering industrial training report
civil enginnering industrial training report
 
Trenchless technologies comparing thrust boring with horizontal directional ...
Trenchless technologies  comparing thrust boring with horizontal directional ...Trenchless technologies  comparing thrust boring with horizontal directional ...
Trenchless technologies comparing thrust boring with horizontal directional ...
 
Trenchless Technology for Laying Underground pipes.
Trenchless Technology for  Laying Underground pipes.Trenchless Technology for  Laying Underground pipes.
Trenchless Technology for Laying Underground pipes.
 
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipeDSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
DSD-NL 2014 - Geo Klantendag - 1. leidinginstallatie met direct pipe
 
Melbourne Pipeline Protection
Melbourne Pipeline ProtectionMelbourne Pipeline Protection
Melbourne Pipeline Protection
 
Site Report
Site ReportSite Report
Site Report
 
Keep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater TreatmentKeep it clean! – An Introduction to Stormwater Treatment
Keep it clean! – An Introduction to Stormwater Treatment
 
Mining Operations Optimize Dewatering Processes
Mining Operations Optimize Dewatering ProcessesMining Operations Optimize Dewatering Processes
Mining Operations Optimize Dewatering Processes
 
PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY PPT ON TRENCHLESS TECHNOLOGY
PPT ON TRENCHLESS TECHNOLOGY
 
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
Keep it Running! – Surface Drainage 201 – Design Basics for Modular Trench Dr...
 
TRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGYTRENCHLESS TECHNOLOGY
TRENCHLESS TECHNOLOGY
 
OTC Asia 2014 Petronas
OTC Asia 2014 PetronasOTC Asia 2014 Petronas
OTC Asia 2014 Petronas
 

Similar a AME OUTLINES

Immersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, IndiaImmersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, IndiaAbhay Ocean India ltd.
 
SPC HDPE BROCHURE NEW
SPC HDPE BROCHURE NEWSPC HDPE BROCHURE NEW
SPC HDPE BROCHURE NEWLia Collatz
 
Cathodic prevention of steel rebars in concrete the international outlook
Cathodic prevention of steel rebars in concrete the international outlookCathodic prevention of steel rebars in concrete the international outlook
Cathodic prevention of steel rebars in concrete the international outlookSimone Tremolada
 
Fire Seal Full Presentation
Fire Seal Full PresentationFire Seal Full Presentation
Fire Seal Full Presentationmaxibarrios
 
Case Study_Lake Windermere Great Britain_GB
Case Study_Lake Windermere Great Britain_GBCase Study_Lake Windermere Great Britain_GB
Case Study_Lake Windermere Great Britain_GBStefanie Straubert
 
ADC PRS Study-Paper OGJ- June 2014
ADC PRS Study-Paper OGJ- June 2014ADC PRS Study-Paper OGJ- June 2014
ADC PRS Study-Paper OGJ- June 2014Xavier MICHEL
 
Mod subaqueous flowtite
Mod subaqueous flowtiteMod subaqueous flowtite
Mod subaqueous flowtitelcs13262
 
Kostajnica City - WS/WW Project
Kostajnica City - WS/WW ProjectKostajnica City - WS/WW Project
Kostajnica City - WS/WW ProjectVladimir Popovic
 
Kostajnica, ws, ww project
Kostajnica, ws, ww projectKostajnica, ws, ww project
Kostajnica, ws, ww projectVladimir Popovic
 
Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvAlexander Decker
 
Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014Mohammed wahab
 
2376 robor ductile_iron_brochure5
2376 robor ductile_iron_brochure52376 robor ductile_iron_brochure5
2376 robor ductile_iron_brochure5Joshua Ting
 
Prysmian HV Cables, Joints & Terminations - 66kV 132kV
Prysmian HV Cables, Joints & Terminations - 66kV 132kVPrysmian HV Cables, Joints & Terminations - 66kV 132kV
Prysmian HV Cables, Joints & Terminations - 66kV 132kVThorne & Derrick International
 
ZSM-Connection_Brochure_english
ZSM-Connection_Brochure_englishZSM-Connection_Brochure_english
ZSM-Connection_Brochure_englishChris Munnick
 
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedure
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief ProcedureTechnical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedure
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedurepaperpublications3
 
Immersed tunnels
Immersed tunnelsImmersed tunnels
Immersed tunnelsarravindsai
 
Agricultural Hose / Farm Hose / Agricultural Tubing / Agricultural Hose Assem...
Agricultural Hose / Farm Hose / Agricultural Tubing / Agricultural Hose Assem...Agricultural Hose / Farm Hose / Agricultural Tubing / Agricultural Hose Assem...
Agricultural Hose / Farm Hose / Agricultural Tubing / Agricultural Hose Assem...JGB Enterprises, Inc.
 

Similar a AME OUTLINES (20)

Immersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, IndiaImmersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, India
 
SPC HDPE BROCHURE NEW
SPC HDPE BROCHURE NEWSPC HDPE BROCHURE NEW
SPC HDPE BROCHURE NEW
 
Hydraulic Systems
Hydraulic SystemsHydraulic Systems
Hydraulic Systems
 
Eutit
EutitEutit
Eutit
 
Cathodic prevention of steel rebars in concrete the international outlook
Cathodic prevention of steel rebars in concrete the international outlookCathodic prevention of steel rebars in concrete the international outlook
Cathodic prevention of steel rebars in concrete the international outlook
 
Fire Seal Full Presentation
Fire Seal Full PresentationFire Seal Full Presentation
Fire Seal Full Presentation
 
Case Study_Lake Windermere Great Britain_GB
Case Study_Lake Windermere Great Britain_GBCase Study_Lake Windermere Great Britain_GB
Case Study_Lake Windermere Great Britain_GB
 
ADC PRS Study-Paper OGJ- June 2014
ADC PRS Study-Paper OGJ- June 2014ADC PRS Study-Paper OGJ- June 2014
ADC PRS Study-Paper OGJ- June 2014
 
Mod subaqueous flowtite
Mod subaqueous flowtiteMod subaqueous flowtite
Mod subaqueous flowtite
 
Kostajnica City - WS/WW Project
Kostajnica City - WS/WW ProjectKostajnica City - WS/WW Project
Kostajnica City - WS/WW Project
 
Kostajnica, ws, ww project
Kostajnica, ws, ww projectKostajnica, ws, ww project
Kostajnica, ws, ww project
 
Installation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kvInstallation, testing and jointing of lt and ht power cables up to 33 kv
Installation, testing and jointing of lt and ht power cables up to 33 kv
 
Pipes and bends
Pipes and bendsPipes and bends
Pipes and bends
 
Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014Dcl hdd presentation 9 2-2014
Dcl hdd presentation 9 2-2014
 
2376 robor ductile_iron_brochure5
2376 robor ductile_iron_brochure52376 robor ductile_iron_brochure5
2376 robor ductile_iron_brochure5
 
Prysmian HV Cables, Joints & Terminations - 66kV 132kV
Prysmian HV Cables, Joints & Terminations - 66kV 132kVPrysmian HV Cables, Joints & Terminations - 66kV 132kV
Prysmian HV Cables, Joints & Terminations - 66kV 132kV
 
ZSM-Connection_Brochure_english
ZSM-Connection_Brochure_englishZSM-Connection_Brochure_english
ZSM-Connection_Brochure_english
 
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedure
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief ProcedureTechnical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedure
Technical Aspects of EHV XLPE Cable End Termination and on Site Brief Procedure
 
Immersed tunnels
Immersed tunnelsImmersed tunnels
Immersed tunnels
 
Agricultural Hose / Farm Hose / Agricultural Tubing / Agricultural Hose Assem...
Agricultural Hose / Farm Hose / Agricultural Tubing / Agricultural Hose Assem...Agricultural Hose / Farm Hose / Agricultural Tubing / Agricultural Hose Assem...
Agricultural Hose / Farm Hose / Agricultural Tubing / Agricultural Hose Assem...
 

AME OUTLINES

  • 1.
  • 2. AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
  • 3. AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. KEY PROFESSIONAL DATES AND EXPERIENCES After his degree in Naval and Mechanical Engineering in the University of Genova (Italy) in 1963, Carlo Avanzini has been active in the field of land and marine pipelines, first in the field of oil P/Ls, then transferring his interests to civil pipelines. From the early 70s, he has designed or has intervened as engineer and supervisor in a wide range of projects in different countries, with own Companies or as free-lance consultant teaming with engineering companies or colleagues He brings as references projects in steel, HDPE, GRP in diameters up to 4000 mm.
  • 4. International engineering support is given to HAWLE /NOVA SIRIA on the application of Steel Compression Couplings and, in GCC, to PROCO (USA) on the DuckBill Valves for diffusers and coastal discharges AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. The cooperation on international projects is in favor of engineering companies, material suppliers and contractors, and includes design, preparation of specifications, construction method statements, planning and supervision.
  • 5. AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. One of the first documented project was the design and supervision of the outfall discharging pre-treated water from a paper factory in Silifke, Turkey Concrete Coated Steel 900mm x 900m (1985) Numerous marine and outfall projects, easy or very engaging, successful or better forgotten are now past history, only reminded in old faded out papers and photos Locations, main data and photos of a few major projects in the last [25] years are shown in the next slides; others are collected in my CV.
  • 6. ISTANBUL ÜSKÜDAR OUTFALL (1989) Steel, 1219.2mm, concrete coated, 275m long to -43m depth Launched with short ramp in 3 sections joined by rubber flexible joints, bottom pull from the site through a cable return deviation block anchored on the bottom at 350m distance ISTANBUL BALTALIMANI OUTFALL(1989) Steel, 2 x 1727,2.2mm, 300m long to -73m depth Twin pipes launched with short ramp in 2 sections joined by rubber flexible joints. Bottom pull from opposite side of Bosphorus at 1200m distance with a cable deviation block midway on the bottom at -75m depth. AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
  • 7. Substitution of a section of the shore approach of the Marmara Gas Pipeline, damaged by the underwater slippage of a clay lens. The pressure of the landslide had buckled the pipe upwards and caused a severe leak. The project included the construction of the new string, the cut and removal of the damaged length, the bottom pull of the news string to the junction point, lifting of the two ends for the off-barge dry- welding of the sections . The pipe was kept in position for welding by two rotating clamps and supended for the alignment to two cranes and two davits and finally lowered in position. AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. ISTANBUL, MARMARA GAS MAIN (1990)
  • 8. The third Istanbul main outfall …. Steel, 2235.2mm, concrete coated, 2200m long with diffuser at -47m depth Prefabrication executed on long ramp with multiple welding and coating stations Installation performed with bottom pull from a barge anchored offshore. AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. ISTANBUL, TUZLA OUTFALLL(1992)
  • 9. Offshore GRP pipelines for the cooling water system of the Thermal Power Plant AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. Nova Siria Compression Couplings ND 2800 and 2400 were employed for the first time for underwater tie-ins  4 x ND 2800 intake lines, 420m long  4 x ND 2400 outfalls, 1250m long SÜGOZÜ - ISKENDERUN GULF, SOUTH TURKEY (2000) The 4 concrete intake structures, with dimensions 9.8 x 7,5 x 8.35h and weight in air ≈ 600 ton, were connected to the pipelines with a slip-on 2800 reinforced rubber hose.
  • 10. AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. Outfall, GRP, ND 900, length 2150m Vertical alignment control obtained with concrete saddles. Diffuser protected with concrete caps. SAIDA, LEBANON, 2003
  • 11. Concrete coated steel, 2235.2 mm, length 2308m Welding and coating on inclined long ramp Installation with bottom pull from pulling station on the opposite coast Slope changes obtained with rubber flexible couplings. KADIKÖY OUTFALL, ISTANBUL, 2004 AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
  • 12. IGDAS TRANSMISSION GAS LINES TO PRINCESS ISLANDS (SEA OF MARMARA, ISTANBUL, 2005) Steel X52, 219,1, concrete coated, installed with bottom pull 4 sections between land and the 4 islands Main feeder 3580m Transmissions to other islands respectively 1450m, 1370m, 2150m AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
  • 13. The need of the substitution of the original diffuser with a new taered one to be connected to the main ND2500 GRP line required an intervention to be performed with a time-limited interruption of the plant. The connection was studied on paper and a combination of GRP short spools and of tailor-made Compression Couplings, designed with 400 mm axial tolerance and ± 3° allowable angular deflection been realized in 8 hrs, practically without idisturbance to the TPP operation. AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. AMBARLI, UNIMAR THERMAL P0WER PLANT (2005)
  • 14. Waste W ater Outfall, GRP, ND 1800 with length 2000 m Installed “pipe after pipe” in trench with a diffuser at -11m depth Tie-ins and special connections were realized with Compression Couplimgs, while the shore approach and the line were protected with mesh gabionse AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. MERSIN OUTFALL, SOUTHERN TURKEY (2007)
  • 15. After thre years, the diffuser suffered extensive damages, causes [obviously!] unknown. The pipe brought was brought to land, cleaned and the components recovered as much as feasible. AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. MERSIN GRP DIFFUSER REPAIR (2010) It has been interesting to see that there have been a minimum fouling of the internal surfaces. Only local limpets groups vere present. It was provided a new section with one port and the missing length was compensated with a long, specially designed steel compression coupling.
  • 16. BANDIRMA TPP / ATEC (2008) AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. Cooling water GRP pipelines – 2 x 2200 intake lines 200m long to -23 m depth and 1 x 2400 outfall 350m long with diffuser at -29m depth.
  • 17. Onshore cooling water circuit, GRP 4 x ND 2500 Supervision of the pipe production and delivery, site lamination, installation and testing. AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. AL KHALIJ TPP – LIBYA (2010) Site observation of marine installation techniques [Geocean, FR]
  • 18. GRP Discharge line ND 3500, 450m long with special half buried short diffuser at -33m stabilized with mattresses and gabions AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. BIGA (TR) NEW 2X600 MW POWER PLANT (2010)
  • 19. EAST DELTA ELECTRICITY PRODUCTION COMPANY EL AIN EL SOKHNA SUPERCRITICAL THERMAL POWER PLANT UNITS 1 & 2 2X650 MW GAS/OIL FIRED UNITS AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. EL AIN EL SOKHNA TPP EGYPT (2011) GRP, 3 x ND3000 intake pipelines Supervision of pipe production and installation ob behalf of PGESCo - Bechtel Installation by Besix-Orascom
  • 20. Design for the installation of the HDPE structural pipe ND 2000 3700 m long Pipe and ballast blocks supplied by the Russian client The type of pipe and the blocks had been found not suitable for a safe sinking, but the client insisted nevertheless for the installation. AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. SOCHI OUTFALL, RUSSIA (2012) [FIRST STAGE] The project was stopped after the pipe failure The pipe was tested in Germany and resulted not meeting the standards Prefabrication and towing started to raise doubts on the pipe’s real strength, but the first string broke after the start of the installation of the ballast blocks
  • 21. Ballast blocks and saddles, as well as the compete installation calculations and procedures were completely redesigned The installation of line and diffuser was completed without problems. AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. SOCHI OUTFALL (RUSSIA) – RESTARTED IN 2013 WITH NEW DESIGN First 2000 m of the outfall have been substituted by a tunnel. The remaining 1413 m were delivered as HDPE ND 2000 (extruded)
  • 22. AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. SAMSUN OTV CCPP POWER PLANT – COOLING WATER PIPELINES (2011/2012) Intake and discharge sealines in GRP, 3 x ND 2400 length 860m and 2 x ND 3200 length 600m including diffuser. GRP intake structures with OD 14m
  • 23. Structural HDPE ID 3000mm, length 3700m inclusive of diffuser wirh 250 T ports at -11m AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. LA TABOADA OUTFALL, LIMA, PERU (2010/2012)
  • 24. MAR DEL PLATA, ARGENTINA (2012) Outfall, HDPE ND 2.000 mm, length 4110 m AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.
  • 25. HDPE pipes, ballasted. Intake line ND 1400 with GRP intake structure; Outfall line ND 900 with multiport diffuser AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. IZDEMIR ALIAGA COOLING WATER LINES (2013)
  • 26. AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. LA CHIRA OUTFALL , LIMA, PERU (2012, RESTARTED 2013/2014) Structured HDPE ID 2400mm 3600m long inclusive of diffuser at -60m depth 2012 2016 2015
  • 27. AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. PRESENTATION OF CAPABILITIES GRP, ND 4000, length 700 m discharge line for 4 parallel diffuser branches, each with 7 ports ATLAS THERMAL POWER PLANT, ISKENDERUN, TURKEY (2014)
  • 28. AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. PRESENTATION OF CAPABILITIES Due to the long time cooperation with Cal Hayes, the Manager of Proco Proflex Division, and the long experience of Carlo Avanzini in the use of Duck Bill Valves in sewerage systems and in coastal and marine environment, Proco has entrusted to AME the exclusivity for the technical and commercial assistance of its products in the GCC. Clients interested in PROCO PRODUCTS may refer to [avanzini@mideastfze.com] for technical information and quotations. TECHNICAL AND MARKETING SUPPORT TO PROCO [USA] website: http://www.procoproducts.com
  • 29. AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. PRESENTATION OF CAPABILITIES Since several years, many Nova Siria applications, particularly in the field of marine pipelines, have been designed by Avanzini. At present, the cooperation with Nova Siria continues as AME giving its consultancy and technical assistance to Hawle Mid East. Clients interested in Nova Siria products shall refer for technical information and quotations to Hawle Mid East FZE (E-Mail: sharjah@hawle.com ; Web: www.hawle.com or www.novasiria.it for an outline of the products) In case of technical questions on the applications, engineers and contractors may contact Carlo Avanzini at avanzini@mideastfze.com with copy to Hawle ME TECHNICAL CONSULTANCY ON COMPRESSION COUPLINGS’ SPECIAL LAND AND MARINE APPLICATIONS OF NOVA SIRIA/HAWLE MID EAST
  • 30. Carlo Avanzini is the Organizer and Coordinator of MWWD CONFERENCES E-Mail: carlo.avanzini@mwwd.org Web: www.mwwd.org Professional registration @ Chambers of Engineers, Genova, Italy, No C.E. 8679A AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E. MWWD CONFERENCE ORGANIZATION
  • 31. Managing Director AVANZINI MIDDLE EAST (FZE) Saif Zone - Q1-04-033/A – P.O.Box 121256 – Sharjah – U.A.E. Incorporated @ No. 14905 E-Mail avanzini@mideast.com Mob. 00971.50.9391572 Professional Engineer Marine Engineering And Consulting Cemil Topuzlu Cad. 26/1 Ciftehavuzlar, Istanbul, Turkey E-Mail: carlo.avanzini@sealinecons.com Mob. 0090.542.3580445 Organizer and Coordinator MWWD CONFERENCES E-Mail: carlo.avanzini@mwwd.org Dr. Eng. Carlo Avanzini Degree Naval Architecture, Naval and Mechanical Engineering, University of Genova, Dept. of Naval Engineering, 1963 Professional registration @ Chambers of Engineers, Genova, Italy, C.E. 8679A AVANZINI MIDDLE EAST FZE – SHARJAH, U.A.E.