THE      LIVING PARKWAY




       An Innovative Plan for the Manchaca Expressway


( Living Parkway: a roadwaythe landscape it inhabitscontribute )
  to the natural processes of
                              designed to utilize and
ON-SITE CONDITIONS                             OFF-SITE IMPACTS
Native Vegetation
                                                           Barton Springs
                      Cave Invertebrates




         Clay Soils                        Barton Springs Salamander



     THE    LIVING PARKWAY
KARST LANDSCAPE




TYPICAL SECTION




   THE   LIVING PARKWAY
EMBANKMENT ROADWAY




 ROADWAY
EMBANKMENT                     ROADWAY
                              EMBANKMENT
 EXISTING
  GRADE                        EXISTING
                                GRADE
 TYPICAL SECTION




      THE    LIVING PARKWAY
VEGETATIVE SWALE




TYPICAL SECTION




   THE   LIVING PARKWAY
PERMEABLE FRICTION COURSE




TYPICAL SECTION




   THE   LIVING PARKWAY
PARKWAY ALIGNMENT




          FLINT RIDGE CAVE       POSSIBLE RECHARGE FEATURES




                             Living Parkway




   THE   LIVING PARKWAY
MOPAC INTERCHANGE
    PARKWAY ALIGNMENT




                                                                        BIOFILTERS




MOPAC INTERCHANGE           HIGHLY SENSITIVE ZONE                                    BLISS SPILLAR/FM 1626 INTERCHANGE




                                                       Living Parkway




           THE      LIVING PARKWAY
PARKWAY ALIGNMENT
                          BLISS SPILLAR/FM 1626 INTERCHANGE




MOPAC INTERCHANGE             HIGHLY SENSITIVEZONE                     BLISS SPILLAR/FM 1626 INTERCHANGE




                                                      Living Parkway




           THE      LIVING PARKWAY
PARKWAY ALIGNMENT


                              HIGHLY SENSITIVE ZONE




MOPAC INTERCHANGE           HIGHLY SENSITIVE ZONE                      BLISS SPILLAR/FM 1626 INTERCHANGE




                                                      Living Parkway




           THE      LIVING PARKWAY
HIGH SENSITIVITY ZONE OVERVIEW

  MODULE        MODULE                    MODULE   MODULE




                                  BEAR
                                 CREEK
                                 BRIDGE




   THE     LIVING PARKWAY
HIGH SENSITIVITY ZONE OVERVIEW

HIGH          HIGH         HIGH              HIGH    HIGH
POINT         POINT        POINT             POINT   POINT




                                     BEAR
                                    CREEK
                                    BRIDGE




        THE   LIVING PARKWAY
HIGH SENSITIVITY ZONE OVERVIEW

HIGH            HIGH        HIGH             HIGH            HIGH
POINT           POINT       POINT            POINT           POINT




         LOW              LOW
                                     BEAR             LOW             LOW
                                    CREEK            POINT
        POINT            POINT                                       POINT
                                    BRIDGE




          THE   LIVING PARKWAY
HIGH SENSITIVITY ZONE OVERVIEW

HIGH            HIGH        HIGH             HIGH            HIGH
POINT           POINT       POINT            POINT           POINT




         LOW     CLAY     LOW
                                     BEAR             LOW             LOW
                 CAPS               CREEK            POINT
        POINT            POINT                                       POINT
                                    BRIDGE




          THE   LIVING PARKWAY
HIGH SENSITIVITY ZONE OVERVIEW




   THE   LIVING PARKWAY
SECTION ALONG BIOFILTER




    THE   LIVING PARKWAY
3-SIDED CULVERT AT LOW POINT




SECTION ALONG BIOFILTER




    THE   LIVING PARKWAY
SECTION THROUGH BIOFILTER




SECTION ALONG BIOFILTER




    THE   LIVING PARKWAY
SECTION THROUGH BIOFILTER




SECTION ALONG BIOFILTER




    THE   LIVING PARKWAY
LIVING PARKWAY STORMWATER SYSTEMS POLLUTANT REMOVAL
                             QUANTITY          TOTAL SUSPENDED   PHOSPHORUS      NITROGEN       LEAD        BACTERIA
                             TREATED           SOLIDS REMOVAL     REMOVAL        REMOVAL      REMOVAL       REMOVAL
 PERMEABLE FRICTION         All Stormwater          75%             48%                  -      91%            -
 COURSE

 GRASSY SWALE               All Stormwater          65%            10-25%          0-15%       20-50%          -


 RAINWATER HARVESTING         First 1/8”            100%            100%               100%    100%           100%


 BIOFILTRATION               First 1-1.25”          97%             94%                83%       -            98%




PERMEABLE FRICTION COURSE       GRASSY SWALE                     UNDERGROUND CISTERN            BIOFILTER




            THE     LIVING PARKWAY
TRADITIONAL ROADWAY STORMWATER DIAGRAM


                            STORMWATER PIPING


CENTRALIZED                                                                          CENTRALIZED
STORM POND                                                                           STORM POND




     LIVING ROADWAY STORMWATER DIAGRAM




BIOFILTER       BIOFILTER       BIOFILTER       BIOFILTERS   BIOFILTER   BIOFILTER   BIOFILTER




              THE   LIVING PARKWAY
BEAR CREEK
                               Summer View




Winter View



      THE     LIVING PARKWAY
BRIDGE PLAN




                             SECTION




TRADITIONAL BRIDGE SECTION




   THE   LIVING PARKWAY
BRIDGE PLAN




                                                       SECTION




LIVING BRIDGE SECTION




                        1 Column Only in Flood Plain




   THE   LIVING PARKWAY
LIVING BRIDGE SECTION     MODULAR DESIGN




LIVING BRIDGE PROCESS




   THE   LIVING PARKWAY
THE   LIVING PARKWAY
BLISS SPILLAR/FM 1626 PLAN




      ELIMINATE          ENTRANCE
       U-TURN              / EXIT
                          RAMPS


                                    BIOFILTERS




                                                  SINGLE
                                                 INTERSECTION




            ELIMINATE
               FREE
              RIGHTS




   THE   LIVING PARKWAY
MOPAC INTERCHANGE PLAN




                         BIOFILTERS
    BYPASS
     LANES




                             ROUND-
                              ABOUT




   THE   LIVING PARKWAY
MOPAC INTERCHANGE PLAN

                                TOLL GANTRIES




                  PUBLIC ART
                  OPPORTUNITY




   THE   LIVING PARKWAY
TRAILS PLAN



              PROPOSED COA BIKE FACILITY




                   COA
               CONSERVATION
                  LAND




                                           BEAR CREEK BRIDGE




                                                               PROPOSED COA BIKE FACILITY




   THE   LIVING PARKWAY
TRAILS PLAN



              PROPOSED COA BIKE FACILITY




                   COA
               CONSERVATION
                  LAND




                                           BEAR CREEK BRIDGE




                                                               PROPOSED COA BIKE FACILITY




   THE   LIVING PARKWAY
TRAILS PLAN



              PROPOSED COA BIKE FACILITY




                   COA
               CONSERVATION
                  LAND




                                           BEAR CREEK BRIDGE




                                                               PROPOSED COA BIKE FACILITY




   THE   LIVING PARKWAY
TRAILS PLAN



              PROPOSED COA BIKE FACILITY




                   COA
               CONSERVATION
                  LAND




                                           BEAR CREEK BRIDGE




                                                               PROPOSED COA BIKE FACILITY




   THE   LIVING PARKWAY
COST ESTIMATE
                                                               LIVING PARKWAY WITH    LIVING PARKWAY
                                         TRADITIONAL ROADWAY   TRADITIONAL BRIDGE &   WITH LIVING BRIDGE &
  CONSTRUCTION ITEM                      COST                  IRRIGATION             RAINWATER TANKS
  SITE PREPARATION                            $2,700,000            $1,080,000             $1,080,000

  EMBANKMENT (FILL MATERIAL                     $500,00              $950,000               $950,000

  EXCAVATION (CUT MATERIAL)                    $300,000                 -                      -

  PAVEMENT                                    $18,000,000          $13,000,000            $15,000,000

  PFC ASPHALT                                      -               $10,000,000            $10,000,000

  STORM DRAIN SYSTEM                          $1,500,000                -                      -

  CONCRETE WATER QUALITY PONDS                $1,750,000                -                      -

  BIOFILTERS                                       -                $2,500,000             $2,500,000

  IRRIGATION FOR BIOFILTERS                        -                 $200,000                  -

  RAINWATER CAPTURE SYSTEM                         -                    -                  $1,250,000

  TRADITIONAL BRIDGE AT BEAR CREEK            $4,100,000            $4,100,000                 -

  LIVING BRIDGE AT BEAR CREEK                      -                    -                  $7,550,000

  TOLL FACILITY                                $650,000              $500,000               $500,000

  CONNECTION TO LOOP 1 WITH FLYOVER           $3,600,000                -                      -

  CONNECTION TO LOOP 1 WITH ROUNDABOUT             -                $2,220,000             $2,220,000

  BASE ROADWAY COST                           $18,300,000          $18,300,000            $18,300,000

  TOTAL COST                                 $51,400,000          $53,000,000            $59,350,000


    THE        LIVING PARKWAY
FLY OVER




    THE    LIVING PARKWAY
THE      LIVING PARKWAY




       An Innovative Plan for the Manchaca Expressway


( Living Parkway: a roadwaythe landscape it inhabitscontribute )
  to the natural processes of
                              designed to utilize and

Más contenido relacionado

Destacado

O governo de d. pedro i
O governo de d. pedro iO governo de d. pedro i
O governo de d. pedro i
Nana Tru
 
A confederação do equador
A confederação do equadorA confederação do equador
A confederação do equador
Victor Melo
 
Imperio periodoregencial
Imperio periodoregencialImperio periodoregencial
Imperio periodoregencial
Carlos Zaranza
 
D.Pedro E D.InêS De Castro Uma TráGica HistóRia De Amor
D.Pedro E D.InêS De Castro Uma TráGica HistóRia De AmorD.Pedro E D.InêS De Castro Uma TráGica HistóRia De Amor
D.Pedro E D.InêS De Castro Uma TráGica HistóRia De Amor
Juliana Campos
 
A Crise De 1383 1385
A Crise De 1383 1385A Crise De 1383 1385
A Crise De 1383 1385
guest6ebf5d0
 
Caso.atrapalo.com.janet carrillo.dif.y.posicionamiento
Caso.atrapalo.com.janet carrillo.dif.y.posicionamientoCaso.atrapalo.com.janet carrillo.dif.y.posicionamiento
Caso.atrapalo.com.janet carrillo.dif.y.posicionamiento
Janny Carrillo
 
Mapa conceptual Erika Rivera Wendy Cervantes
Mapa conceptual  Erika Rivera Wendy CervantesMapa conceptual  Erika Rivera Wendy Cervantes
Mapa conceptual Erika Rivera Wendy Cervantes
erika_rivera_chona
 
Instructional power point on unit 2 second steps
Instructional power point on unit 2 second stepsInstructional power point on unit 2 second steps
Instructional power point on unit 2 second steps
wtheteacher
 
Schulungskonzept botschafter workshops
Schulungskonzept botschafter workshopsSchulungskonzept botschafter workshops
Schulungskonzept botschafter workshops
Christian Urech
 
Guide 5 ingles
Guide 5 inglesGuide 5 ingles
Guide 5 ingles
tatis3456
 

Destacado (18)

Equador
EquadorEquador
Equador
 
O governo de d. pedro i
O governo de d. pedro iO governo de d. pedro i
O governo de d. pedro i
 
A confederação do equador
A confederação do equadorA confederação do equador
A confederação do equador
 
O mundo no início do século xx pibid
O mundo no início do século xx pibidO mundo no início do século xx pibid
O mundo no início do século xx pibid
 
Imperio periodoregencial
Imperio periodoregencialImperio periodoregencial
Imperio periodoregencial
 
D. Pedro e Inês de Castro
D. Pedro e Inês de CastroD. Pedro e Inês de Castro
D. Pedro e Inês de Castro
 
D.Pedro E D.InêS De Castro Uma TráGica HistóRia De Amor
D.Pedro E D.InêS De Castro Uma TráGica HistóRia De AmorD.Pedro E D.InêS De Castro Uma TráGica HistóRia De Amor
D.Pedro E D.InêS De Castro Uma TráGica HistóRia De Amor
 
A Crise De 1383 1385
A Crise De 1383 1385A Crise De 1383 1385
A Crise De 1383 1385
 
8 aula slide confederaçao do equador
8  aula slide confederaçao do equador8  aula slide confederaçao do equador
8 aula slide confederaçao do equador
 
Caso.atrapalo.com.janet carrillo.dif.y.posicionamiento
Caso.atrapalo.com.janet carrillo.dif.y.posicionamientoCaso.atrapalo.com.janet carrillo.dif.y.posicionamiento
Caso.atrapalo.com.janet carrillo.dif.y.posicionamiento
 
顛倒思考提
顛倒思考提顛倒思考提
顛倒思考提
 
2014 Global Traveler Study
2014 Global Traveler Study2014 Global Traveler Study
2014 Global Traveler Study
 
Mapa conceptual Erika Rivera Wendy Cervantes
Mapa conceptual  Erika Rivera Wendy CervantesMapa conceptual  Erika Rivera Wendy Cervantes
Mapa conceptual Erika Rivera Wendy Cervantes
 
Data preprocessing
Data preprocessingData preprocessing
Data preprocessing
 
Instructional power point on unit 2 second steps
Instructional power point on unit 2 second stepsInstructional power point on unit 2 second steps
Instructional power point on unit 2 second steps
 
Schulungskonzept botschafter workshops
Schulungskonzept botschafter workshopsSchulungskonzept botschafter workshops
Schulungskonzept botschafter workshops
 
Digital Marketing Approach - Master - Andrea Genovese
Digital Marketing Approach - Master - Andrea Genovese Digital Marketing Approach - Master - Andrea Genovese
Digital Marketing Approach - Master - Andrea Genovese
 
Guide 5 ingles
Guide 5 inglesGuide 5 ingles
Guide 5 ingles
 

Más de Central Texas Regional Mobility Authority

Más de Central Texas Regional Mobility Authority (6)

Jacobs Final Presentation for the Green Mobility Challenge
Jacobs Final Presentation for the Green Mobility ChallengeJacobs Final Presentation for the Green Mobility Challenge
Jacobs Final Presentation for the Green Mobility Challenge
 
Team 1765 Final Presentation for the Green Mobility Challenge
Team 1765 Final Presentation for the Green Mobility ChallengeTeam 1765 Final Presentation for the Green Mobility Challenge
Team 1765 Final Presentation for the Green Mobility Challenge
 
Texas A&M & Rice University Student Final Presentation for the Green Mobility...
Texas A&M & Rice University Student Final Presentation for the Green Mobility...Texas A&M & Rice University Student Final Presentation for the Green Mobility...
Texas A&M & Rice University Student Final Presentation for the Green Mobility...
 
Hillway Final Presentation for the Green Mobility Challenge
Hillway Final Presentation for the Green Mobility ChallengeHillway Final Presentation for the Green Mobility Challenge
Hillway Final Presentation for the Green Mobility Challenge
 
AECOM Final Presentation for the Green Mobility Challenge
AECOM Final Presentation for the Green Mobility ChallengeAECOM Final Presentation for the Green Mobility Challenge
AECOM Final Presentation for the Green Mobility Challenge
 
Legislative incentives update
Legislative incentives updateLegislative incentives update
Legislative incentives update
 

Último

💕📲09602870969💓Girl Escort Services Udaipur Call Girls in Chittorgarh Haldighati
💕📲09602870969💓Girl Escort Services Udaipur Call Girls in Chittorgarh Haldighati💕📲09602870969💓Girl Escort Services Udaipur Call Girls in Chittorgarh Haldighati
💕📲09602870969💓Girl Escort Services Udaipur Call Girls in Chittorgarh Haldighati
Apsara Of India
 
sample sample sample sample sample sample
sample sample sample sample sample samplesample sample sample sample sample sample
sample sample sample sample sample sample
Casey Keith
 
sample sample sample sample sample sample
sample sample sample sample sample samplesample sample sample sample sample sample
sample sample sample sample sample sample
Casey Keith
 

Último (20)

2k Shots ≽ 9205541914 ≼ Call Girls In Uttam Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Uttam Nagar (Delhi)2k Shots ≽ 9205541914 ≼ Call Girls In Uttam Nagar (Delhi)
2k Shots ≽ 9205541914 ≼ Call Girls In Uttam Nagar (Delhi)
 
Genuine 8250077686 Hot and Beautiful 💕 Visakhapatnam Escorts call Girls
Genuine 8250077686 Hot and Beautiful 💕 Visakhapatnam Escorts call GirlsGenuine 8250077686 Hot and Beautiful 💕 Visakhapatnam Escorts call Girls
Genuine 8250077686 Hot and Beautiful 💕 Visakhapatnam Escorts call Girls
 
08448380779 Call Girls In Chirag Enclave Women Seeking Men
08448380779 Call Girls In Chirag Enclave Women Seeking Men08448380779 Call Girls In Chirag Enclave Women Seeking Men
08448380779 Call Girls In Chirag Enclave Women Seeking Men
 
Genesis 1:6 || Meditate the Scripture daily verse by verse
Genesis 1:6  ||  Meditate the Scripture daily verse by verseGenesis 1:6  ||  Meditate the Scripture daily verse by verse
Genesis 1:6 || Meditate the Scripture daily verse by verse
 
💕📲09602870969💓Girl Escort Services Udaipur Call Girls in Chittorgarh Haldighati
💕📲09602870969💓Girl Escort Services Udaipur Call Girls in Chittorgarh Haldighati💕📲09602870969💓Girl Escort Services Udaipur Call Girls in Chittorgarh Haldighati
💕📲09602870969💓Girl Escort Services Udaipur Call Girls in Chittorgarh Haldighati
 
Top 10 Traditional Indian Handicrafts.pptx
Top 10 Traditional Indian Handicrafts.pptxTop 10 Traditional Indian Handicrafts.pptx
Top 10 Traditional Indian Handicrafts.pptx
 
Are Vatican Museum Tickets and Private Tours Worth It
Are Vatican Museum Tickets and Private Tours Worth ItAre Vatican Museum Tickets and Private Tours Worth It
Are Vatican Museum Tickets and Private Tours Worth It
 
Hire 💕 8617697112 Reckong Peo Call Girls Service Call Girls Agency
Hire 💕 8617697112 Reckong Peo Call Girls Service Call Girls AgencyHire 💕 8617697112 Reckong Peo Call Girls Service Call Girls Agency
Hire 💕 8617697112 Reckong Peo Call Girls Service Call Girls Agency
 
Discover Mathura And Vrindavan A Spritual Journey.pdf
Discover Mathura And Vrindavan A Spritual Journey.pdfDiscover Mathura And Vrindavan A Spritual Journey.pdf
Discover Mathura And Vrindavan A Spritual Journey.pdf
 
sample sample sample sample sample sample
sample sample sample sample sample samplesample sample sample sample sample sample
sample sample sample sample sample sample
 
08448380779 Call Girls In Shahdara Women Seeking Men
08448380779 Call Girls In Shahdara Women Seeking Men08448380779 Call Girls In Shahdara Women Seeking Men
08448380779 Call Girls In Shahdara Women Seeking Men
 
High Profile 🔝 8250077686 📞 Call Girls Service in Siri Fort🍑
High Profile 🔝 8250077686 📞 Call Girls Service in Siri Fort🍑High Profile 🔝 8250077686 📞 Call Girls Service in Siri Fort🍑
High Profile 🔝 8250077686 📞 Call Girls Service in Siri Fort🍑
 
DEHRADUN, uttarakhand, Uttarakhand tourism .pptx
DEHRADUN, uttarakhand, Uttarakhand tourism .pptxDEHRADUN, uttarakhand, Uttarakhand tourism .pptx
DEHRADUN, uttarakhand, Uttarakhand tourism .pptx
 
9 Days Kenya Ultimate Safari Odyssey with Kibera Holiday Safaris
9 Days Kenya Ultimate Safari Odyssey with Kibera Holiday Safaris9 Days Kenya Ultimate Safari Odyssey with Kibera Holiday Safaris
9 Days Kenya Ultimate Safari Odyssey with Kibera Holiday Safaris
 
Jhargram call girls 📞 8617697112 At Low Cost Cash Payment Booking
Jhargram call girls 📞 8617697112 At Low Cost Cash Payment BookingJhargram call girls 📞 8617697112 At Low Cost Cash Payment Booking
Jhargram call girls 📞 8617697112 At Low Cost Cash Payment Booking
 
Genuine 8250077686 Hot and Beautiful 💕 Chennai Escorts call Girls
Genuine 8250077686 Hot and Beautiful 💕 Chennai Escorts call GirlsGenuine 8250077686 Hot and Beautiful 💕 Chennai Escorts call Girls
Genuine 8250077686 Hot and Beautiful 💕 Chennai Escorts call Girls
 
sample sample sample sample sample sample
sample sample sample sample sample samplesample sample sample sample sample sample
sample sample sample sample sample sample
 
Top travel agency in panchkula - Best travel agents in panchkula
Top  travel agency in panchkula - Best travel agents in panchkulaTop  travel agency in panchkula - Best travel agents in panchkula
Top travel agency in panchkula - Best travel agents in panchkula
 
"Embark on the Ultimate Adventure: Top 10 Must-Visit Destinations for Thrill-...
"Embark on the Ultimate Adventure: Top 10 Must-Visit Destinations for Thrill-..."Embark on the Ultimate Adventure: Top 10 Must-Visit Destinations for Thrill-...
"Embark on the Ultimate Adventure: Top 10 Must-Visit Destinations for Thrill-...
 
08448380779 Call Girls In Chhattarpur Women Seeking Men
08448380779 Call Girls In Chhattarpur Women Seeking Men08448380779 Call Girls In Chhattarpur Women Seeking Men
08448380779 Call Girls In Chhattarpur Women Seeking Men
 

Klatz Associates Final Presentation for the Green Mobility Challenge

  • 1.
  • 2. THE LIVING PARKWAY An Innovative Plan for the Manchaca Expressway ( Living Parkway: a roadwaythe landscape it inhabitscontribute ) to the natural processes of designed to utilize and
  • 3. ON-SITE CONDITIONS OFF-SITE IMPACTS Native Vegetation Barton Springs Cave Invertebrates Clay Soils Barton Springs Salamander THE LIVING PARKWAY
  • 4. KARST LANDSCAPE TYPICAL SECTION THE LIVING PARKWAY
  • 5. EMBANKMENT ROADWAY ROADWAY EMBANKMENT ROADWAY EMBANKMENT EXISTING GRADE EXISTING GRADE TYPICAL SECTION THE LIVING PARKWAY
  • 6. VEGETATIVE SWALE TYPICAL SECTION THE LIVING PARKWAY
  • 7. PERMEABLE FRICTION COURSE TYPICAL SECTION THE LIVING PARKWAY
  • 8. PARKWAY ALIGNMENT FLINT RIDGE CAVE POSSIBLE RECHARGE FEATURES Living Parkway THE LIVING PARKWAY
  • 9. MOPAC INTERCHANGE PARKWAY ALIGNMENT BIOFILTERS MOPAC INTERCHANGE HIGHLY SENSITIVE ZONE BLISS SPILLAR/FM 1626 INTERCHANGE Living Parkway THE LIVING PARKWAY
  • 10. PARKWAY ALIGNMENT BLISS SPILLAR/FM 1626 INTERCHANGE MOPAC INTERCHANGE HIGHLY SENSITIVEZONE BLISS SPILLAR/FM 1626 INTERCHANGE Living Parkway THE LIVING PARKWAY
  • 11. PARKWAY ALIGNMENT HIGHLY SENSITIVE ZONE MOPAC INTERCHANGE HIGHLY SENSITIVE ZONE BLISS SPILLAR/FM 1626 INTERCHANGE Living Parkway THE LIVING PARKWAY
  • 12. HIGH SENSITIVITY ZONE OVERVIEW MODULE MODULE MODULE MODULE BEAR CREEK BRIDGE THE LIVING PARKWAY
  • 13. HIGH SENSITIVITY ZONE OVERVIEW HIGH HIGH HIGH HIGH HIGH POINT POINT POINT POINT POINT BEAR CREEK BRIDGE THE LIVING PARKWAY
  • 14. HIGH SENSITIVITY ZONE OVERVIEW HIGH HIGH HIGH HIGH HIGH POINT POINT POINT POINT POINT LOW LOW BEAR LOW LOW CREEK POINT POINT POINT POINT BRIDGE THE LIVING PARKWAY
  • 15. HIGH SENSITIVITY ZONE OVERVIEW HIGH HIGH HIGH HIGH HIGH POINT POINT POINT POINT POINT LOW CLAY LOW BEAR LOW LOW CAPS CREEK POINT POINT POINT POINT BRIDGE THE LIVING PARKWAY
  • 16. HIGH SENSITIVITY ZONE OVERVIEW THE LIVING PARKWAY
  • 17. SECTION ALONG BIOFILTER THE LIVING PARKWAY
  • 18. 3-SIDED CULVERT AT LOW POINT SECTION ALONG BIOFILTER THE LIVING PARKWAY
  • 19. SECTION THROUGH BIOFILTER SECTION ALONG BIOFILTER THE LIVING PARKWAY
  • 20. SECTION THROUGH BIOFILTER SECTION ALONG BIOFILTER THE LIVING PARKWAY
  • 21. LIVING PARKWAY STORMWATER SYSTEMS POLLUTANT REMOVAL QUANTITY TOTAL SUSPENDED PHOSPHORUS NITROGEN LEAD BACTERIA TREATED SOLIDS REMOVAL REMOVAL REMOVAL REMOVAL REMOVAL PERMEABLE FRICTION All Stormwater 75% 48% - 91% - COURSE GRASSY SWALE All Stormwater 65% 10-25% 0-15% 20-50% - RAINWATER HARVESTING First 1/8” 100% 100% 100% 100% 100% BIOFILTRATION First 1-1.25” 97% 94% 83% - 98% PERMEABLE FRICTION COURSE GRASSY SWALE UNDERGROUND CISTERN BIOFILTER THE LIVING PARKWAY
  • 22. TRADITIONAL ROADWAY STORMWATER DIAGRAM STORMWATER PIPING CENTRALIZED CENTRALIZED STORM POND STORM POND LIVING ROADWAY STORMWATER DIAGRAM BIOFILTER BIOFILTER BIOFILTER BIOFILTERS BIOFILTER BIOFILTER BIOFILTER THE LIVING PARKWAY
  • 23. BEAR CREEK Summer View Winter View THE LIVING PARKWAY
  • 24. BRIDGE PLAN SECTION TRADITIONAL BRIDGE SECTION THE LIVING PARKWAY
  • 25. BRIDGE PLAN SECTION LIVING BRIDGE SECTION 1 Column Only in Flood Plain THE LIVING PARKWAY
  • 26. LIVING BRIDGE SECTION MODULAR DESIGN LIVING BRIDGE PROCESS THE LIVING PARKWAY
  • 27. THE LIVING PARKWAY
  • 28. BLISS SPILLAR/FM 1626 PLAN ELIMINATE ENTRANCE U-TURN / EXIT RAMPS BIOFILTERS SINGLE INTERSECTION ELIMINATE FREE RIGHTS THE LIVING PARKWAY
  • 29. MOPAC INTERCHANGE PLAN BIOFILTERS BYPASS LANES ROUND- ABOUT THE LIVING PARKWAY
  • 30. MOPAC INTERCHANGE PLAN TOLL GANTRIES PUBLIC ART OPPORTUNITY THE LIVING PARKWAY
  • 31. TRAILS PLAN PROPOSED COA BIKE FACILITY COA CONSERVATION LAND BEAR CREEK BRIDGE PROPOSED COA BIKE FACILITY THE LIVING PARKWAY
  • 32. TRAILS PLAN PROPOSED COA BIKE FACILITY COA CONSERVATION LAND BEAR CREEK BRIDGE PROPOSED COA BIKE FACILITY THE LIVING PARKWAY
  • 33. TRAILS PLAN PROPOSED COA BIKE FACILITY COA CONSERVATION LAND BEAR CREEK BRIDGE PROPOSED COA BIKE FACILITY THE LIVING PARKWAY
  • 34. TRAILS PLAN PROPOSED COA BIKE FACILITY COA CONSERVATION LAND BEAR CREEK BRIDGE PROPOSED COA BIKE FACILITY THE LIVING PARKWAY
  • 35. COST ESTIMATE LIVING PARKWAY WITH LIVING PARKWAY TRADITIONAL ROADWAY TRADITIONAL BRIDGE & WITH LIVING BRIDGE & CONSTRUCTION ITEM COST IRRIGATION RAINWATER TANKS SITE PREPARATION $2,700,000 $1,080,000 $1,080,000 EMBANKMENT (FILL MATERIAL $500,00 $950,000 $950,000 EXCAVATION (CUT MATERIAL) $300,000 - - PAVEMENT $18,000,000 $13,000,000 $15,000,000 PFC ASPHALT - $10,000,000 $10,000,000 STORM DRAIN SYSTEM $1,500,000 - - CONCRETE WATER QUALITY PONDS $1,750,000 - - BIOFILTERS - $2,500,000 $2,500,000 IRRIGATION FOR BIOFILTERS - $200,000 - RAINWATER CAPTURE SYSTEM - - $1,250,000 TRADITIONAL BRIDGE AT BEAR CREEK $4,100,000 $4,100,000 - LIVING BRIDGE AT BEAR CREEK - - $7,550,000 TOLL FACILITY $650,000 $500,000 $500,000 CONNECTION TO LOOP 1 WITH FLYOVER $3,600,000 - - CONNECTION TO LOOP 1 WITH ROUNDABOUT - $2,220,000 $2,220,000 BASE ROADWAY COST $18,300,000 $18,300,000 $18,300,000 TOTAL COST $51,400,000 $53,000,000 $59,350,000 THE LIVING PARKWAY
  • 36. FLY OVER THE LIVING PARKWAY
  • 37. THE LIVING PARKWAY An Innovative Plan for the Manchaca Expressway ( Living Parkway: a roadwaythe landscape it inhabitscontribute ) to the natural processes of designed to utilize and