Building the Next
Major Iron Ore Mine
in the Labrador Trough
Corporate Presentation
September 2013
| championironmines.com FSE: P02 OTCQX: CPMNF1
FORWARD-LOOKING STATEMENTS
Certain information contained herein regarding Champion Iron Mines Ltd., including
management’s assessment of future plans & operations, may constitute forward-looking
statements under applicable securities law & necessarily involve risks, including but not limited
to risks associated with mining exploration, operating costs, production costs, volatility of share
prices, currency fluctuations, imprecision of resource & reserve estimates, environmental risks
& ability to access sufficient capital from internal & external sources.
As a consequence, actual results may differ materially from those anticipated in any forward
looking statements. Plans, intentions or expectations disclosed in any forward-looking
statements or information should not be read as guarantees of future results or events, & will
not necessarily be accurate indications of whether or when or by which such results or events
will be achieved.
Except as required by law, Champion Iron Mines Ltd., expressly disclaims any intention &
undertakes no obligation to update any forward looking statements or information as conditions
change.
The historical mineral resources mentioned are strictly historical in nature & are non-compliant
to National Instrument 43-101 mineral resources & mineral reserves standards, & should
therefore not be relied upon. A qualified person has not done sufficient work to upgrade or
classify the historical mineral resources as current National Instrument NI-43-101 compliant.
2
About Champion Iron Mines
Fermont Holdings (755 km2)
 121 projects in the Fermont Iron Ore District
 Flagship Consolidated Fire Lake North (“CFLN”) Project
Preliminary Feasibility Study (“PFS”) announced Feb. 7, 2013
 5.1 billion tonnes of NI 43-101 compliant Mineral Resource
Estimates of iron ore
 910 million tonnes of Measured + Indicated Resources
 4,185 million tonnes of Inferred Mineral Resources
 100% direct interest; option to buy back 0.5% of the NSR
for C$1.5 million, resulting in a 2.5% NSR overall)
Attikamagen Project (310 km2)
 1.7 billion tonnes @ 31.3% FeT & a plan for a 2 Mtpa2 DSO project
 Champion Iron Mines holds a 44% interest
 Century Iron Mines Corp. subsidiary has a 56% interest & can earn up
to a 60% interest by spending further $3M on exploration
expenditures by May 20143
Advanced iron ore exploration & development projects located in
Canada’s principal iron ore district, the Labrador Trough
1. Champion signed a definitive option agreement with Cartier Iron to earn a 65% interest in 7 of its projects (Cluster 3)
2. As reported by Champion Iron’s JV Partner on Mar. 25, 2013 press release
3. Investment by WISCO of 25% ($60M) & Minmetals of 5% ($12M) 3
Québec’s Next
Major Iron Ore Mine
CFLN Preliminary Feasibilty Study
 Feb. 7, 2013 PFS indicated an average production rate of 9.3 Mtpa
of iron concentrate for the 20 year mine life
 First 5 year average: 9.8 Mtpa
 Net Present Value of $3.3B at a discounted cash flow rate of 8%
with an Internal Rate of Return of 30.9% & a payback period of 3.4
years
Established Fermont Iron Ore District
 Canada produces 47 Mtpa of iron ore concentrate & this is expected to
increase to a total of 200 Mtpa over the next 10 years if all proposed
development projects are realized
 Established rail, power & port infrastructure
- Competitive power rates are available
- Port of Sept-Îles is building a world-class 50 Mtpa multi-user
wharf project for the iron ore industry which is on schedule & on
budget
4
Capital Structure
Share Data & Cash Position as of September 2013.
Total Shares – Outstanding 137,400,000
Warrants Issued
2,222,222 at $1.50 in Yr 3 (expire Oct. 7, 2013)
7,000,000 at $3.00 (expire May 17, 2015) - Fancamp
15,000,000 at $0.25 (expire July 17, 2015) – Baotou
Outstanding
2,222,222
7,000,000
15,000,000
24,222,222
Options 8.69 M @ C$1.00 (avg. exercise price)
Total Shares – Fully Diluted 170,312,222
Outstanding Share Market
Capitalization
(based on $0.25 share price)
C$34M
Cash & Receivables C$15M
Management / Insiders Ownership ~ 26.7%
Analyst Coverage
5
Independent Board Oversight
Over 200 years of combined exploration & mine operations experience
Board of Directors
Tom Larsen
CHAIRMAN
Donald A. Sheldon, LLB., P.Eng.
DIRECTOR
Alexander Horvath, P.Eng.
DIRECTOR
William Harding, MBA, ICD.D
DIRECTOR
Francis Sauvé
DIRECTOR
Harry Burgess, P.Eng.
DIRECTOR
Paul Ankcorn
DIRECTOR
Jean Lafleur, P.Geo.
DIRECTOR
Management Team
Tom Larsen
PRESIDENT & CEO
Miles Nagamatsu
CHIEF FINANCIAL OFFICER
Beat Frei
DIRECTOR OF PROJECT FINANCE
Alexander Horvath, P.Eng.
EXECUTIVE VICE PRESIDENT, EXPLORATION & PROJECT DEVELOPMENT
Martin Bourgoin, P.Geo.
EXECUTIVE VICE PRESIDENT, OPERATIONS
Jean-Luc Chouinard, P.Eng., M.Sc.
VICE PRESIDENT, PROJECT DEVELOPMENT
Jeff Hussey, P.Geo.
VICE PRESIDENT, CORPORATE COMMUNICATIONS
Bruce Mitton, P.Geo.
VICE PRESIDENT, EXPLORATION
Jorge Estepa
VICE PRESIDENT, SECRETARY & TREASURER
Katrina “Kay” Chua
DIRECTOR OF INVESTOR RELATIONS
6
Committee Members
AUDIT Paul Ankcorn (COMMITTEE CHAIRMAN); Francis Sauvé; Harry Burgess
COMP & NOMINATION Alexander Horvath (COMMITTEE CHAIRMAN); Francis Sauvé; Paul Ankcorn
SPECIAL COMMITTEE William Harding (COMMITTEE CHAIRMAN); Francis Sauvé, Donald Sheldon
ENVIRONMENT, HEALTH & SAFETY Donald Sheldon (COMMITTEE CHAIRMAN); Tom Larsen
CORPORATE ADVISOR Doug Bache; Jérome Cliche
Why invest in Champion Iron Mines?
Favourable Operating
Environment
 Established iron ore mining district:
The southern Labrador Trough
 Favourable tax environment
(40% tax rebate on exploration
expenditures)
 Access to low-cost power & close to
rail & port infrastructure
 Québec is a very stable jurisdiction to
develop & operate mines
 The forecast for Iron ore prices over
the mid to long term remain positive
 Skilled labor work force in Québec
 Environmental: Iron ore beneficiation
includes crushing & grinding to
liberate the iron; followed by gravity
& magnetic separation of iron ore
from gangue minerals rather than the
use of reagents
Champion Iron Mines
Competitive Advantage
 Fermont Holdings: 12 iron ore
brownfield projects (755 km2)
 CFLN Preliminary Feasibility Study
of coarse grained specular hematite
surficial deposits
 Easier to liberate
 Deleterious elements in
concentrate are well below
industry specifications limits
 Team with experience in mine start-ups
including construction and
commissioning
 Upside potential for short, mid, & long
term growth is high with 5.1 billion
tonnes of iron ore resources
 Several de-risking initiatives underway
including a multi-user rail solution,
Environmental & Social Impact Study
near completion & permit applications
underway
 Closest to the St. Lawrence Seaway &
electrical power infrastructure
7
Consolidated Fire Lake North Mineral Resource Estimates @ 15% FeT cut-off
Deposit
Measured
tonnes
(millions)
Grade
FeT%
Indicated
tonnes
(millions)
Grade
FeT%
Inferred
tonnes
(millions)
Grade
FeT%
FLN - West* 24 35.4 405 32.6 329 30.9
FLN - East* 3 34.2 262 29.6 192 28.7
FLN - Don Lake 0 21.4 52 26.5 188 25.3
Bellechasse 215 28.7
Oil Can - Oxide - - - - 972 33.2
Oil Can - Mixed 924 24.1
Total 27 35.0 719 31.0 2,821 28.8
*Total Resource under Preliminary Feasibility Study 1,215
Total Resource Tonnes (millions) 3,567
Other Fermont Holdings Mineral Resource Estimates @ 15% FeT cut-off
Harvey-Tuttle 947 23.2
Moire Lake 164 30.5 417 29.4
Other Fermont Projects Total Resources Tonnes
(millions) 27 35.0 883 30.9 4,185 27.6
Total Fermont Holdings Mineral Resources Tonnes
(millions) 5,095
Global Mineral Resources
NI 43-101 Compliant Mineral Resource Estimates
3.567 billion tonnes, out of the 5.1 billion tonnes of global resources, are within the confines
of the CFLN Project; which alone has the resource base potential to produce up to 30-40
Mtpa of iron concentrate; that could support an independent rail solution, if necessary. 8
9
Existing Rail Infrastructure
Québec North Shore & Labrador
Railway (“QNS&L”):
 CFLN PEA Base Case connection to
Bloom Lake railway required 94 km of rail
– including turnaround loop & sidings
 Champion proposed southern multi-user
railway option is 310 km long (see slide)
 QNS&L links to Sept-Îles & Pointe Noire
 Bloom Lake & QNS&L railways are
considered common carriers
 Common carriers allocate capacity on a
first-come, first-serve basis
Cartier Railway:
 Links Mont Wright to Port-Cartier
 Transports ore from ArcelorMittal’s Fire
Lake Mine northward to Mt. Wright
concentrator
 Privately owned by ArcelorMittal
 Within CFLN Project boundary
World Class Port of Sept-Îles Infrastructure
Expanding to Meet Demand
Pointe Noire Multi User Wharf
 Completion Mar. 31, 2014; 18 months prior
to “CFLN" startup
 Phase 1: 50 Mtpa for $220M Federal
Government announced $55M funding or
25% of project
 Phase 2: Planning for 100 Mtpa
Port of Sept-Îles
 RTZ-IOC shipping facility
Port-Cartier
 ArcelorMittal shipping facility
 $2.1B expansion is underway & will include
concentrator expansion with port & rail
infrastructure upgrades
 Located 62 km west of Sept-Îles
Pointe Noire
Sept-Iles
Courtesy of the Port de Sept Îles
China Max ship capacity 300kt
10
11
Site Layout of Consolidated Fire Lake North Project
Oil Can Project is only 6 km
from CFLN concentrator
12
OB
Dump
East
Waste
Rock
Dump
West
Pit
East
Pit
Tailings
Impoundment
Area
Water
Treatment
Concentrator
Permanent Camp
161 kV Electrical Substation
Construction Camp
Key Results
Feb. 2013 PFS
Pre-Tax Basis
Internal Rate of Return (IRR) (8% Discount Rate) 1 30.9%
Undiscounted Cash Flow $9.0B
Net Present Value @ 5% Discounted Cash Flow $4.7B
Net Present Value @ 8% Discounted Cash Flow $3.3B
Net Present Value @ 10% Discounted Cash Flow $2.6B
Payback Period (8% Discount Rate) 3.4 Years
CFLN East & West Deposit Development
February 2013 Preliminary Feasibility Study– Highlights
Pre-production Capital Expenditures: US$1,394.4M (Fire Lake North & Pointe Noire)
Direct Operating Costs2
US$34.58 per tonne (average 20 years);
US$27.99 per tonne (average years 1 to 5)
Price Assumptions US$115 per tonne of concentrate at 66% Fe (years 1 -5)
US$110 per tonne of concentrate at 66% Fe (years 6-20)
Mine-Life 19.6 years
Exchange Rate $1.00 USD to $1.00 CDN
Overall Stripping Ratio 2.74:1 for the current 20 year mine-life
1.56:1 (years 1-3 of production); 2.02:1 (years 1-5 of operation)
Mineral Resource Estimate (MRE)
East & West Pits
Measured & Indicated Resources 693.5 Mt grading 31.5% FeT (NI43-101)
Inferred Resources 521.6 Mt grading 30.1% FeT @ 15% FeT cut-off (NI43-101)
Proven & Probable Reserves
464.6 million tonnes grading 32.4% Fe at a 15% cut-off grade;
1. This includes railway capital repayment and interest
2. Direct operating costs excludes railway capital repayment & interest
13
OPERATING EXPENDITURES (US$/TONNE OF CONCENTRATE)
COST PARAMETERS AVERAGE 20 YEARS AVERAGE YEARS 1 to 5
Mining 18.89 12.76
Concentrating, crushing & processing 4.38 3.89
Site infrastructure, sales & general administration 4.05 3.66
Environmental tailings & management 0.13 0.12
Rail transport including lease for rolling stock 4.80 5.42
Port facilities 2.34 2.14
Total Direct Operating Cost 34.58 27.99
Railway capital repayment ($1,133.6M) 6.22 7.40
Railway interest payment ($592.6M) 3.25 7.29
Total Operating Cost 44.05 42.68
Consolidated Fire Lake North Project
Preliminary Feasibility Study
PRE-PRODUCTION CAPITAL EXPENDITURES (US$ MILLIONS)
Fire Lake North & Pointe Noire Railway
COST AREA
Total Capital
in
$ MILLIONS
COST AREA
Total Capital in
$ MILLIONS
DirectCosts
Mining 133.7
Railway 200.0Concentrator & FLN Site Infrastructure 687.7
Pointe Noire 158.2
IndirectCosts
Owner’s Cost 53.2
Rolling Stock Leasing 13.4
Engineering, Procurement, Construction & Mgmt. (EPCM) 106.5
Project Indirect Costs 140.5
Contingency 114.6
Sub-total 1,394.4 Sub-total 213.4
Grand Total (100% of the project) 1,607.9
14
Consolidated Fire Lake North
Project Schedule
CFLN Definition Drilling
Scoping Study
Updated PEA
Metallurgical Results - CFLN, Moire
Lake, Oil Can
Pre-Feasibility Study
Environmental and Social Impact
Assessment (ongoing)
Community Consultation
Oil Can Definition Drilling Planned
Feasibility Study
Permitting
Construction
Production
Legend:
2015 2016
Q2
2011 2012 2013 2014
Q1 Q2 Q3 Q4 Q1 Q4 Q1 Q2Q3
Completed milestones
Q3 Q4 Q1 Q2 Q3 Q4Q1 Q2 Q3 Q4 Q1 Q2Q4Q3
Critical point: Project Schedule will be revised and updated once the feasibility study of the railway solution is confirmed
 Preliminary Feasibility Study results released
Feb. 7, 2013
 Feasibility Study with 20 Mtpa production rate
scope underway
 West (3500m) & East (2400m) Pits are both
synformal fold closures that are open at depth
 Mineral Resource Estimate (MRE) announced
on Jan. 9, 2013 (COG 15% FeT):
Measured & Indicated Resources
693.5 M tonnes grading 31.5% total iron (FeT)
Inferred Resources
521.6 M tonnes grading 30.1% total iron (FeT)
 Several de-risking initiatives are underway
associated to CFLN project development
Consolidated Fire Lake North Project
Growth Through Development
16See www.championironmines.com for reports maps & assays
West Pit
Area
East Pit
Area
Don Lake
Area
High Grade, Coarse Specular Hematite Quartz Specular Hematite
Consolidated Fire Lake North Metallurgy
Press Release, August 1, 2012
 High quality sinter concentrate with very low deleterious elemental content
 Weight recovery @ 40%
 Liberates at 850 micron (-20 mesh) & produces a 65-66% iron concentrate
 Assuming a concentrate with 66% Fe ; No magnetic separation circuit required
 Alumina is 0.52% versus industry standard of 2%
 Silica content is < 5%
 Al2O3 : SiO2 ratio of 0.14 versus the upper industry specification limit of 1
 This very low alumina to silica ratio is an ideal blending product for steel mills
17
Fire Lake North Development Project
18
Fire Lake North Development Project
19
500
meters
Moiré Lake Project
Initial Mineral Resource Estimate: March 29, 2012
ArcelorMittalPropertyBoundary
Mineral Resource Estimate:
 Indicated Resources: 164 M tonnes
grading 30.5% FeT
 Inferred Resources: 417 M tonnes
grading 29.4% FeT
 DDH LM11-12: 503 M @ 31% FeT
 Kilometric synform with hematite &
magnetite outcrops at surface
 Adjacent to ArcelorMittal Mont-Wright mine
A
A’
20
500
meters
Moiré Lake Project
Infrastructure: Adjacent to Bloom Lake Railway (8km), road, & power
442 Mt @ 30.1% FeT;
Zone B: 285 Mt @ 30.1% FeT
21
Oil Can Project
Initial Mineral Resource Estimate
 Potential for low strip ratio < 1 : 1
 972 Mt of iron oxide grading 33.2% at a
15% iron cut-off
 924 Mt of mixed iron oxide-silicate
mineralization
 This deposit is open at depth
 Orientation metallurgical tests indicate
a relatively coarse liberation grind size
 Commercial grade magnetite sinter feed
concentrate can be produced
 2011 drill program returned long
magnetite-hematite iron formation
intersections up to 545 metres in length
 Inferred Resources drilled on 400 metre
sections
22To view a larger more detailed version of this map please visit:
http://www.championironmines.com/vns-site/page-oil_can.html
South & East Zones
Section 9800N (Facing North)
200 metres
OC11-02
IF
IF
Ovb
OC11-19 OC11-01OC11-08OC11-07OC11-05
East ZoneSouth Zone
163.1m @
30.5%
Assay Pending
401.5m @ 30.7%
incl. 213.5 @
33.1%
545.7m @ 33.7%
incl. 442.3 @
36.4%
197.2m @ 26.8%
incl. 145.5 @
28.1%
303.4m @ 34.7%
incl. 130.8m @
36.5%
Oil Can Project
Exploration Upside
23
190.9m @
30.6%
OC11-05
OC11-07
OC11-08
OC11-02
OC11-019
OC11-01
Central Zone
(Facing Northwest)
200 metres
OC11-10
OC11-03OC11-16
OC11-14
191.7m @
28.2%
472.2m @ 28.0%
incl. 119.6m @
35.2%
224.0m @ 28.1%
incl. 176.0m @
29.0%
311.4m @ 27.6%
incl. 269.0m @
29.2%
IF
Ovb
Oil Can Project
Exploration Upside
24
OC11-014
OC11-016
OC11-03
OC11-10
200 metres
North Zone
Section 5800E (Facing East)
OC11-04
IF
Ovb
OC11-09
OC11-12 OC11-13 OC11-15
221.2m @ 25.0%
incl. 128.9m @
28.7%
414.1m @ 25.1%
incl. 139.0m @
29.5%
141.5m @ 29.2%
Incl. 179.5m @
32.8%
Oil Can Project
Exploration Upside
25
OC11-012
OC11-09
292.5m @ 25.8%
incl. 113.8m @
30.4%
OC11-13
OC11-15
OC11-04
328.9m @ 31.5%
Incl. 111.1m @
32.9%
Feasibility Study Objectives:
• Reduce CFLN sustaining capital in the economic model.
• Continue metallurgical test work with the objective of eliminating the second AG mill ($100 million sustaining capital) in year.
• Continue negotiations with Hydro-Québec to find ways to reduce the $217.5 million participation in sustaining capital for the
construction of a new 315 kV power line.
• Review iron ore deposits at both CFLN and Oil Can to increase Measured & Indicated Resources and reduce the overall strip
ratio.
26
Consolidated Fire Lake North Project
Economic Projections based on PFS Metrics
Assumptions: 1Projections of an expansion plan at CFLN for a second concentrator production
line are listed in the table below. This projection of an 18-20 Mtpa production rate of iron
concentrate is not NI 43-101 compliant but rather is an estimation of mid term potential:
2Payback period at an 8% discounted rate is estimated from the production start of the 1st
concentrator production line, the payback for the 2nd line is 1.9 years after production start based
on the additional CAPEX for the 2nd line of US$587M including indirect costs, railway capital
repayment and interest.
IRR = 34.7%
NPV (M$) Payback (yrs)
Discount Rate
0% $18,441 M 3.9
5% $9,400 M 4.1
8% $6,465 M 4.32
10% $5,081 M 4.4
Why Invest in
Champion Iron Mines?
 Robust Economics: (CFLN NPV, US$3.3B @ 8%
DCF (PFS Feb. 2013); IRR 30.9%; 3.4 year
payback period
 12 Projects (755 km2) near 5 operating mines;
 5.1 billion tonnes of NI 43-101 compliant
resource
 Oil Can Deposit: Initial Resource Estimate 1,896 Mt
@ 28.7%
 High-Quality CFLN concentrate @ 66%Fe, with low
impurities
 Experienced team: Exploration, development,
construction, commissioning & operations
management
 Financed through to feasibility; Favourable tax
regime; Political support; & known operating
environment 27
Fire Lake North Exploration Camp
28
Coarse Specular Hematite in Drill Core Coarse Grained Specular Hematite
Thank You
FSE: P02; OTCQX: CPMNF
www.championironmines.com
20 Adelaide Street East, Suite 301, Toronto, ON M5C 2T6 | 416 866 2200 29
-
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1,400,000
1,600,000
1980 1985 1990 1995 2000 2005 2010
China
Japan
Rest of the
World
Global Steel Production Shows
Continued Demand for Iron Ore
China’s CAGR* is 9.88% over
the last 30 years vs. 2.30% for
total global steel production
over the same period.
Source: World Steel Association website
* CAGR: Compound Annual Growth Rate
Kilotonnes
30
Labrador Trough Annual Production
Iron Ore Production Upside
Company
Current Annual
Production
Future
Annual Forecast
IOC/RTZ 17 Mtpa 23 Mtpa
ArcelorMittal 16 Mtpa 24 Mtpa
Cliffs Natural Resources (Wuhan) 12 Mtpa 20 Mtpa
Labrador Iron Mines 2 Mtpa1 5 Mtpa1
Adriana Resources (Wuhan) 0 50 Mtpa2
New Millennium (Tata) 0
4 Mtpa1
24 Mtpa2
Century Iron Mines (Wuhan) 0
2 Mtpa1
20 Mtpa2
Champion Iron Mines Limited 0 ~20 Mtpa
Alderon Iron Ore Corp. (Hebei) 0 ~16 Mtpa
Total Current & Forecasted Production 47 ~208 Mtpa
1. Direct shipping ore
2. Taconite fine grained iron ore
31
Fermont Iron Ore District
(“FIOD”)
Historically the Fermont & Labrador
mining camps produced 33 Mtpa.
RTZ/IOC = 17 Mtpa
ArcelorMittal = 13 Mtpa
Wabush = 3 Mtpa
“ Marginal Era”:
For 30-40 years pre-2003
the price per tonne of concentrate
was $15- $30/tonne,
costs per tonne were similar.
Current 3 year moving average is
$115/tonne
Current Spot Price Average
~$130/tonne (Aug. 2013)
32
O’Keefe Purdy Project
Exploration Upside
33
Harvey Tuttle Project
 NI 43-101 Inferred Resource Estimate:
717 Mt @ 25% Fe; magnetite rich iron formation
 Intersected multiple significant iron formation
intervals in 2010 drill program
 Total of 13,165 m of drilling completed
 Less than 50% of the kilometric scale magnetic
anomalies have been tested
 25 km W-NW of CFLN
 Within conveying distance from CFLN planned
concentrator (20-30 km)
Advanced Exploration
Bellechasse Deposit
 Deposit located within CFLN
 NI 43-101 Resource Estimate: Inferred Resources
estimate; 215 Mt @ 29% Fe; potential for more
 Magnetite rich iron formation
 Adjacent to Hwy 389
 Synform geometry is favorable for open pit mining
34

Más contenido relacionado

La actualidad más candente

RMC November 2013 Corporate Presentation
RMC November 2013 Corporate PresentationRMC November 2013 Corporate Presentation
RMC November 2013 Corporate Presentation
reservoirminerals
 
Fortune Minerals - Investor Presentation - January 2014
Fortune Minerals -  Investor Presentation - January 2014Fortune Minerals -  Investor Presentation - January 2014
Fortune Minerals - Investor Presentation - January 2014
Company Spotlight
 
RMC Corporate Presentation - May 2014
RMC Corporate Presentation - May 2014RMC Corporate Presentation - May 2014
RMC Corporate Presentation - May 2014
reservoirminerals
 
RMC Corporate Presentation August 2014
RMC Corporate Presentation August 2014RMC Corporate Presentation August 2014
RMC Corporate Presentation August 2014
reservoirminerals
 
Fortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor PresentationFortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor Presentation
Company Spotlight
 
English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012
shosein2011
 
Huguenot Project Presentation
Huguenot Project PresentationHuguenot Project Presentation
Huguenot Project Presentation
ColonialCoal
 

La actualidad más candente (19)

November Investor Presentation
November Investor PresentationNovember Investor Presentation
November Investor Presentation
 
RMC Corporate November 2014
RMC Corporate November 2014RMC Corporate November 2014
RMC Corporate November 2014
 
160603 corporate presentation
160603 corporate presentation160603 corporate presentation
160603 corporate presentation
 
160530 corporate presentation
160530 corporate presentation160530 corporate presentation
160530 corporate presentation
 
RMC November 2013 Corporate Presentation
RMC November 2013 Corporate PresentationRMC November 2013 Corporate Presentation
RMC November 2013 Corporate Presentation
 
Reservoir Corporate PDAC
Reservoir Corporate PDACReservoir Corporate PDAC
Reservoir Corporate PDAC
 
Corporate Presentation - October 2014
Corporate Presentation - October 2014Corporate Presentation - October 2014
Corporate Presentation - October 2014
 
Fortune Minerals - Investor Presentation - January 2014
Fortune Minerals -  Investor Presentation - January 2014Fortune Minerals -  Investor Presentation - January 2014
Fortune Minerals - Investor Presentation - January 2014
 
RMC Corporate Presentation - May 2014
RMC Corporate Presentation - May 2014RMC Corporate Presentation - May 2014
RMC Corporate Presentation - May 2014
 
Corporate Presentation - November 2014
Corporate Presentation - November 2014Corporate Presentation - November 2014
Corporate Presentation - November 2014
 
RMC Corporate Presentation August 2014
RMC Corporate Presentation August 2014RMC Corporate Presentation August 2014
RMC Corporate Presentation August 2014
 
Fortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor PresentationFortune Minerals June 2012 Investor Presentation
Fortune Minerals June 2012 Investor Presentation
 
150918 corporate presentation
150918 corporate presentation150918 corporate presentation
150918 corporate presentation
 
Corporate Presentation - April 2015
Corporate Presentation - April 2015Corporate Presentation - April 2015
Corporate Presentation - April 2015
 
150928 corporate presentation
150928 corporate presentation150928 corporate presentation
150928 corporate presentation
 
150825 corporate presentation
150825 corporate presentation150825 corporate presentation
150825 corporate presentation
 
Corporate Presentation - June 2015
Corporate Presentation - June 2015Corporate Presentation - June 2015
Corporate Presentation - June 2015
 
English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012English champion iron mines sept 18th 2012
English champion iron mines sept 18th 2012
 
Huguenot Project Presentation
Huguenot Project PresentationHuguenot Project Presentation
Huguenot Project Presentation
 

Destacado

The secrets of awesome abs 4 weeks hard flat abs with the no brainer plan
The secrets of awesome abs   4 weeks hard flat abs with the no brainer planThe secrets of awesome abs   4 weeks hard flat abs with the no brainer plan
The secrets of awesome abs 4 weeks hard flat abs with the no brainer plan
volix
 
Nov. 2013 Champion Corporate Presentation - Chinese
Nov. 2013 Champion Corporate Presentation - ChineseNov. 2013 Champion Corporate Presentation - Chinese
Nov. 2013 Champion Corporate Presentation - Chinese
ChampionMines
 
Dhtic ensayo final
Dhtic ensayo finalDhtic ensayo final
Dhtic ensayo final
armando_h
 
Mar. 2013 Champion Corporate Presentation - Chinese
Mar. 2013 Champion Corporate Presentation - ChineseMar. 2013 Champion Corporate Presentation - Chinese
Mar. 2013 Champion Corporate Presentation - Chinese
ChampionMines
 
April 2013 Champion Corporate Presentation - Chinese
April 2013 Champion Corporate Presentation - ChineseApril 2013 Champion Corporate Presentation - Chinese
April 2013 Champion Corporate Presentation - Chinese
ChampionMines
 
May 2013 Champion Corporate Presentation - Chinese
May 2013 Champion Corporate Presentation - ChineseMay 2013 Champion Corporate Presentation - Chinese
May 2013 Champion Corporate Presentation - Chinese
ChampionMines
 
Medicina alternativa ozonoterapia
Medicina alternativa ozonoterapiaMedicina alternativa ozonoterapia
Medicina alternativa ozonoterapia
armando_h
 
December - Champion and Mamba Merger - Corporate Presentation
December - Champion and Mamba Merger - Corporate PresentationDecember - Champion and Mamba Merger - Corporate Presentation
December - Champion and Mamba Merger - Corporate Presentation
ChampionMines
 
Oct. 2013 Champion Corporate Presentation - Chinese
Oct. 2013 Champion Corporate Presentation - ChineseOct. 2013 Champion Corporate Presentation - Chinese
Oct. 2013 Champion Corporate Presentation - Chinese
ChampionMines
 

Destacado (14)

The secrets of awesome abs 4 weeks hard flat abs with the no brainer plan
The secrets of awesome abs   4 weeks hard flat abs with the no brainer planThe secrets of awesome abs   4 weeks hard flat abs with the no brainer plan
The secrets of awesome abs 4 weeks hard flat abs with the no brainer plan
 
Nov. 2013 Champion Corporate Presentation - Chinese
Nov. 2013 Champion Corporate Presentation - ChineseNov. 2013 Champion Corporate Presentation - Chinese
Nov. 2013 Champion Corporate Presentation - Chinese
 
Dhtic ensayo final
Dhtic ensayo finalDhtic ensayo final
Dhtic ensayo final
 
Mar. 2013 Champion Corporate Presentation - Chinese
Mar. 2013 Champion Corporate Presentation - ChineseMar. 2013 Champion Corporate Presentation - Chinese
Mar. 2013 Champion Corporate Presentation - Chinese
 
April 2013 Champion Corporate Presentation - Chinese
April 2013 Champion Corporate Presentation - ChineseApril 2013 Champion Corporate Presentation - Chinese
April 2013 Champion Corporate Presentation - Chinese
 
May 2013 Champion Corporate Presentation - Chinese
May 2013 Champion Corporate Presentation - ChineseMay 2013 Champion Corporate Presentation - Chinese
May 2013 Champion Corporate Presentation - Chinese
 
Medicina alternativa ozonoterapia
Medicina alternativa ozonoterapiaMedicina alternativa ozonoterapia
Medicina alternativa ozonoterapia
 
Ddo views
Ddo viewsDdo views
Ddo views
 
December - Champion and Mamba Merger - Corporate Presentation
December - Champion and Mamba Merger - Corporate PresentationDecember - Champion and Mamba Merger - Corporate Presentation
December - Champion and Mamba Merger - Corporate Presentation
 
Subscriber views
Subscriber viewsSubscriber views
Subscriber views
 
Agbar tower revised
Agbar tower revisedAgbar tower revised
Agbar tower revised
 
Oct. 2013 Champion Corporate Presentation - Chinese
Oct. 2013 Champion Corporate Presentation - ChineseOct. 2013 Champion Corporate Presentation - Chinese
Oct. 2013 Champion Corporate Presentation - Chinese
 
Sop ddo login to cra system
Sop   ddo login to cra systemSop   ddo login to cra system
Sop ddo login to cra system
 
ndc14 포춘시리즈개발자의 풀타임인디개발생존기
ndc14 포춘시리즈개발자의 풀타임인디개발생존기ndc14 포춘시리즈개발자의 풀타임인디개발생존기
ndc14 포춘시리즈개발자의 풀타임인디개발생존기
 

Similar a Sept. 2013 Champion Corporate Presentation - English

Investor presentationjul2013
Investor presentationjul2013Investor presentationjul2013
Investor presentationjul2013
Company Spotlight
 
Fortune minerals march 2012 investor presentation
Fortune minerals march 2012 investor presentationFortune minerals march 2012 investor presentation
Fortune minerals march 2012 investor presentation
Company Spotlight
 
12 champion iron mines oct. 25th
12 champion iron mines oct. 25th12 champion iron mines oct. 25th
12 champion iron mines oct. 25th
shosein2011
 
Fortune Minerals Investor Presentation - January 2014
Fortune Minerals Investor Presentation - January 2014Fortune Minerals Investor Presentation - January 2014
Fortune Minerals Investor Presentation - January 2014
Company Spotlight
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
shosein2011
 
Royal gold slides final october 30 2014
Royal gold slides   final october 30 2014Royal gold slides   final october 30 2014
Royal gold slides final october 30 2014
RoyalGold
 
Reservoir Minerals Presentation - June 2013
Reservoir Minerals Presentation - June 2013Reservoir Minerals Presentation - June 2013
Reservoir Minerals Presentation - June 2013
reservoirminerals
 
Fortune Minerals Investor Presentation November 2013
Fortune Minerals  Investor Presentation November 2013Fortune Minerals  Investor Presentation November 2013
Fortune Minerals Investor Presentation November 2013
Company Spotlight
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
shosein2011
 
April 2012 Fortune Minerals Investor Presentation
April 2012 Fortune Minerals Investor PresentationApril 2012 Fortune Minerals Investor Presentation
April 2012 Fortune Minerals Investor Presentation
Company Spotlight
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
shosein2011
 

Similar a Sept. 2013 Champion Corporate Presentation - English (19)

Reservoir Minerals Presentation - March 2016
Reservoir Minerals Presentation - March 2016Reservoir Minerals Presentation - March 2016
Reservoir Minerals Presentation - March 2016
 
150720 corporate presentation
150720 corporate presentation150720 corporate presentation
150720 corporate presentation
 
Reservoir Minerals Corporate Presentation 2015
Reservoir Minerals Corporate Presentation 2015Reservoir Minerals Corporate Presentation 2015
Reservoir Minerals Corporate Presentation 2015
 
Investor Presentation
Investor PresentationInvestor Presentation
Investor Presentation
 
Investor presentationjul2013
Investor presentationjul2013Investor presentationjul2013
Investor presentationjul2013
 
Fortune minerals march 2012 investor presentation
Fortune minerals march 2012 investor presentationFortune minerals march 2012 investor presentation
Fortune minerals march 2012 investor presentation
 
12 champion iron mines oct. 25th
12 champion iron mines oct. 25th12 champion iron mines oct. 25th
12 champion iron mines oct. 25th
 
Rmc december2013
Rmc december2013Rmc december2013
Rmc december2013
 
Fortune Minerals Investor Presentation - January 2014
Fortune Minerals Investor Presentation - January 2014Fortune Minerals Investor Presentation - January 2014
Fortune Minerals Investor Presentation - January 2014
 
160111 corp presentation
160111 corp presentation160111 corp presentation
160111 corp presentation
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
Royal gold slides final october 30 2014
Royal gold slides   final october 30 2014Royal gold slides   final october 30 2014
Royal gold slides final october 30 2014
 
Reservoir Minerals Presentation - June 2013
Reservoir Minerals Presentation - June 2013Reservoir Minerals Presentation - June 2013
Reservoir Minerals Presentation - June 2013
 
Fortune Minerals Investor Presentation November 2013
Fortune Minerals  Investor Presentation November 2013Fortune Minerals  Investor Presentation November 2013
Fortune Minerals Investor Presentation November 2013
 
Reservoir Minerals Presentation - August 2013
Reservoir Minerals Presentation - August 2013Reservoir Minerals Presentation - August 2013
Reservoir Minerals Presentation - August 2013
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
April 2012 Fortune Minerals Investor Presentation
April 2012 Fortune Minerals Investor PresentationApril 2012 Fortune Minerals Investor Presentation
April 2012 Fortune Minerals Investor Presentation
 
English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012English champion iron_mines_october 9, 2012
English champion iron_mines_october 9, 2012
 
Marketing Presentation
Marketing PresentationMarketing Presentation
Marketing Presentation
 

Más de ChampionMines

Champion & Mumba Business Combination Presentation
Champion & Mumba Business Combination PresentationChampion & Mumba Business Combination Presentation
Champion & Mumba Business Combination Presentation
ChampionMines
 
Feb. 2013 Champion Corporate Presentation - French
Feb. 2013 Champion Corporate Presentation - FrenchFeb. 2013 Champion Corporate Presentation - French
Feb. 2013 Champion Corporate Presentation - French
ChampionMines
 
Nov. 2013 Champion Corporate Presentation - French
Nov. 2013 Champion Corporate Presentation - FrenchNov. 2013 Champion Corporate Presentation - French
Nov. 2013 Champion Corporate Presentation - French
ChampionMines
 
Nov. 2013 Champion Corporate Presentation - German
Nov. 2013 Champion Corporate Presentation - GermanNov. 2013 Champion Corporate Presentation - German
Nov. 2013 Champion Corporate Presentation - German
ChampionMines
 
May 2013 Champion Corporate Presentation - German
May 2013 Champion Corporate Presentation - GermanMay 2013 Champion Corporate Presentation - German
May 2013 Champion Corporate Presentation - German
ChampionMines
 
May 2013 Champion Corporate Presentation - French
May 2013 Champion Corporate Presentation - FrenchMay 2013 Champion Corporate Presentation - French
May 2013 Champion Corporate Presentation - French
ChampionMines
 
April 2013 Champion Corporate Presentation - German
April 2013 Champion Corporate Presentation - GermanApril 2013 Champion Corporate Presentation - German
April 2013 Champion Corporate Presentation - German
ChampionMines
 
April 2013 Champion Corporate Presentation - French
April 2013 Champion Corporate Presentation - FrenchApril 2013 Champion Corporate Presentation - French
April 2013 Champion Corporate Presentation - French
ChampionMines
 

Más de ChampionMines (8)

Champion & Mumba Business Combination Presentation
Champion & Mumba Business Combination PresentationChampion & Mumba Business Combination Presentation
Champion & Mumba Business Combination Presentation
 
Feb. 2013 Champion Corporate Presentation - French
Feb. 2013 Champion Corporate Presentation - FrenchFeb. 2013 Champion Corporate Presentation - French
Feb. 2013 Champion Corporate Presentation - French
 
Nov. 2013 Champion Corporate Presentation - French
Nov. 2013 Champion Corporate Presentation - FrenchNov. 2013 Champion Corporate Presentation - French
Nov. 2013 Champion Corporate Presentation - French
 
Nov. 2013 Champion Corporate Presentation - German
Nov. 2013 Champion Corporate Presentation - GermanNov. 2013 Champion Corporate Presentation - German
Nov. 2013 Champion Corporate Presentation - German
 
May 2013 Champion Corporate Presentation - German
May 2013 Champion Corporate Presentation - GermanMay 2013 Champion Corporate Presentation - German
May 2013 Champion Corporate Presentation - German
 
May 2013 Champion Corporate Presentation - French
May 2013 Champion Corporate Presentation - FrenchMay 2013 Champion Corporate Presentation - French
May 2013 Champion Corporate Presentation - French
 
April 2013 Champion Corporate Presentation - German
April 2013 Champion Corporate Presentation - GermanApril 2013 Champion Corporate Presentation - German
April 2013 Champion Corporate Presentation - German
 
April 2013 Champion Corporate Presentation - French
April 2013 Champion Corporate Presentation - FrenchApril 2013 Champion Corporate Presentation - French
April 2013 Champion Corporate Presentation - French
 

Último

一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
xzxvi5zp
 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
Probe Gold
 
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Klinik kandungan
 
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
sovco
 

Último (20)

SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024
 
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
一比一原版(Acadia毕业证书)加拿大阿卡迪亚大学毕业证学历认证可查认证
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdf
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 Presentation
 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results Presentation
 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
 
Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024
 
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdfITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
 
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
Jual obat aborsi Tawangmangu ( 085657271886 ) Cytote pil telat bulan penggugu...
 
Gorakhpur Call Girls 8250092165 Low Price Escorts Service in Your Area
Gorakhpur Call Girls 8250092165 Low Price Escorts Service in Your AreaGorakhpur Call Girls 8250092165 Low Price Escorts Service in Your Area
Gorakhpur Call Girls 8250092165 Low Price Escorts Service in Your Area
 
Teekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings Presentation
 
Teekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings ResultsTeekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings Results
 
Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024
 
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
一比一原版(EUR毕业证书)鹿特丹伊拉斯姆斯大学毕业证原件一模一样
 
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
 
Dubai Call Girls/// Hot Afternoon O525547819 Call Girls In Dubai
Dubai Call Girls/// Hot Afternoon O525547819 Call Girls In DubaiDubai Call Girls/// Hot Afternoon O525547819 Call Girls In Dubai
Dubai Call Girls/// Hot Afternoon O525547819 Call Girls In Dubai
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdf
 
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girls
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call GirlsPremium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girls
Premium Call Girls In Kapurthala} 9332606886❤️VVIP Sonya Call Girls
 

Sept. 2013 Champion Corporate Presentation - English

  • 1. Building the Next Major Iron Ore Mine in the Labrador Trough Corporate Presentation September 2013 | championironmines.com FSE: P02 OTCQX: CPMNF1
  • 2. FORWARD-LOOKING STATEMENTS Certain information contained herein regarding Champion Iron Mines Ltd., including management’s assessment of future plans & operations, may constitute forward-looking statements under applicable securities law & necessarily involve risks, including but not limited to risks associated with mining exploration, operating costs, production costs, volatility of share prices, currency fluctuations, imprecision of resource & reserve estimates, environmental risks & ability to access sufficient capital from internal & external sources. As a consequence, actual results may differ materially from those anticipated in any forward looking statements. Plans, intentions or expectations disclosed in any forward-looking statements or information should not be read as guarantees of future results or events, & will not necessarily be accurate indications of whether or when or by which such results or events will be achieved. Except as required by law, Champion Iron Mines Ltd., expressly disclaims any intention & undertakes no obligation to update any forward looking statements or information as conditions change. The historical mineral resources mentioned are strictly historical in nature & are non-compliant to National Instrument 43-101 mineral resources & mineral reserves standards, & should therefore not be relied upon. A qualified person has not done sufficient work to upgrade or classify the historical mineral resources as current National Instrument NI-43-101 compliant. 2
  • 3. About Champion Iron Mines Fermont Holdings (755 km2)  121 projects in the Fermont Iron Ore District  Flagship Consolidated Fire Lake North (“CFLN”) Project Preliminary Feasibility Study (“PFS”) announced Feb. 7, 2013  5.1 billion tonnes of NI 43-101 compliant Mineral Resource Estimates of iron ore  910 million tonnes of Measured + Indicated Resources  4,185 million tonnes of Inferred Mineral Resources  100% direct interest; option to buy back 0.5% of the NSR for C$1.5 million, resulting in a 2.5% NSR overall) Attikamagen Project (310 km2)  1.7 billion tonnes @ 31.3% FeT & a plan for a 2 Mtpa2 DSO project  Champion Iron Mines holds a 44% interest  Century Iron Mines Corp. subsidiary has a 56% interest & can earn up to a 60% interest by spending further $3M on exploration expenditures by May 20143 Advanced iron ore exploration & development projects located in Canada’s principal iron ore district, the Labrador Trough 1. Champion signed a definitive option agreement with Cartier Iron to earn a 65% interest in 7 of its projects (Cluster 3) 2. As reported by Champion Iron’s JV Partner on Mar. 25, 2013 press release 3. Investment by WISCO of 25% ($60M) & Minmetals of 5% ($12M) 3
  • 4. Québec’s Next Major Iron Ore Mine CFLN Preliminary Feasibilty Study  Feb. 7, 2013 PFS indicated an average production rate of 9.3 Mtpa of iron concentrate for the 20 year mine life  First 5 year average: 9.8 Mtpa  Net Present Value of $3.3B at a discounted cash flow rate of 8% with an Internal Rate of Return of 30.9% & a payback period of 3.4 years Established Fermont Iron Ore District  Canada produces 47 Mtpa of iron ore concentrate & this is expected to increase to a total of 200 Mtpa over the next 10 years if all proposed development projects are realized  Established rail, power & port infrastructure - Competitive power rates are available - Port of Sept-Îles is building a world-class 50 Mtpa multi-user wharf project for the iron ore industry which is on schedule & on budget 4
  • 5. Capital Structure Share Data & Cash Position as of September 2013. Total Shares – Outstanding 137,400,000 Warrants Issued 2,222,222 at $1.50 in Yr 3 (expire Oct. 7, 2013) 7,000,000 at $3.00 (expire May 17, 2015) - Fancamp 15,000,000 at $0.25 (expire July 17, 2015) – Baotou Outstanding 2,222,222 7,000,000 15,000,000 24,222,222 Options 8.69 M @ C$1.00 (avg. exercise price) Total Shares – Fully Diluted 170,312,222 Outstanding Share Market Capitalization (based on $0.25 share price) C$34M Cash & Receivables C$15M Management / Insiders Ownership ~ 26.7% Analyst Coverage 5
  • 6. Independent Board Oversight Over 200 years of combined exploration & mine operations experience Board of Directors Tom Larsen CHAIRMAN Donald A. Sheldon, LLB., P.Eng. DIRECTOR Alexander Horvath, P.Eng. DIRECTOR William Harding, MBA, ICD.D DIRECTOR Francis Sauvé DIRECTOR Harry Burgess, P.Eng. DIRECTOR Paul Ankcorn DIRECTOR Jean Lafleur, P.Geo. DIRECTOR Management Team Tom Larsen PRESIDENT & CEO Miles Nagamatsu CHIEF FINANCIAL OFFICER Beat Frei DIRECTOR OF PROJECT FINANCE Alexander Horvath, P.Eng. EXECUTIVE VICE PRESIDENT, EXPLORATION & PROJECT DEVELOPMENT Martin Bourgoin, P.Geo. EXECUTIVE VICE PRESIDENT, OPERATIONS Jean-Luc Chouinard, P.Eng., M.Sc. VICE PRESIDENT, PROJECT DEVELOPMENT Jeff Hussey, P.Geo. VICE PRESIDENT, CORPORATE COMMUNICATIONS Bruce Mitton, P.Geo. VICE PRESIDENT, EXPLORATION Jorge Estepa VICE PRESIDENT, SECRETARY & TREASURER Katrina “Kay” Chua DIRECTOR OF INVESTOR RELATIONS 6 Committee Members AUDIT Paul Ankcorn (COMMITTEE CHAIRMAN); Francis Sauvé; Harry Burgess COMP & NOMINATION Alexander Horvath (COMMITTEE CHAIRMAN); Francis Sauvé; Paul Ankcorn SPECIAL COMMITTEE William Harding (COMMITTEE CHAIRMAN); Francis Sauvé, Donald Sheldon ENVIRONMENT, HEALTH & SAFETY Donald Sheldon (COMMITTEE CHAIRMAN); Tom Larsen CORPORATE ADVISOR Doug Bache; Jérome Cliche
  • 7. Why invest in Champion Iron Mines? Favourable Operating Environment  Established iron ore mining district: The southern Labrador Trough  Favourable tax environment (40% tax rebate on exploration expenditures)  Access to low-cost power & close to rail & port infrastructure  Québec is a very stable jurisdiction to develop & operate mines  The forecast for Iron ore prices over the mid to long term remain positive  Skilled labor work force in Québec  Environmental: Iron ore beneficiation includes crushing & grinding to liberate the iron; followed by gravity & magnetic separation of iron ore from gangue minerals rather than the use of reagents Champion Iron Mines Competitive Advantage  Fermont Holdings: 12 iron ore brownfield projects (755 km2)  CFLN Preliminary Feasibility Study of coarse grained specular hematite surficial deposits  Easier to liberate  Deleterious elements in concentrate are well below industry specifications limits  Team with experience in mine start-ups including construction and commissioning  Upside potential for short, mid, & long term growth is high with 5.1 billion tonnes of iron ore resources  Several de-risking initiatives underway including a multi-user rail solution, Environmental & Social Impact Study near completion & permit applications underway  Closest to the St. Lawrence Seaway & electrical power infrastructure 7
  • 8. Consolidated Fire Lake North Mineral Resource Estimates @ 15% FeT cut-off Deposit Measured tonnes (millions) Grade FeT% Indicated tonnes (millions) Grade FeT% Inferred tonnes (millions) Grade FeT% FLN - West* 24 35.4 405 32.6 329 30.9 FLN - East* 3 34.2 262 29.6 192 28.7 FLN - Don Lake 0 21.4 52 26.5 188 25.3 Bellechasse 215 28.7 Oil Can - Oxide - - - - 972 33.2 Oil Can - Mixed 924 24.1 Total 27 35.0 719 31.0 2,821 28.8 *Total Resource under Preliminary Feasibility Study 1,215 Total Resource Tonnes (millions) 3,567 Other Fermont Holdings Mineral Resource Estimates @ 15% FeT cut-off Harvey-Tuttle 947 23.2 Moire Lake 164 30.5 417 29.4 Other Fermont Projects Total Resources Tonnes (millions) 27 35.0 883 30.9 4,185 27.6 Total Fermont Holdings Mineral Resources Tonnes (millions) 5,095 Global Mineral Resources NI 43-101 Compliant Mineral Resource Estimates 3.567 billion tonnes, out of the 5.1 billion tonnes of global resources, are within the confines of the CFLN Project; which alone has the resource base potential to produce up to 30-40 Mtpa of iron concentrate; that could support an independent rail solution, if necessary. 8
  • 9. 9 Existing Rail Infrastructure Québec North Shore & Labrador Railway (“QNS&L”):  CFLN PEA Base Case connection to Bloom Lake railway required 94 km of rail – including turnaround loop & sidings  Champion proposed southern multi-user railway option is 310 km long (see slide)  QNS&L links to Sept-Îles & Pointe Noire  Bloom Lake & QNS&L railways are considered common carriers  Common carriers allocate capacity on a first-come, first-serve basis Cartier Railway:  Links Mont Wright to Port-Cartier  Transports ore from ArcelorMittal’s Fire Lake Mine northward to Mt. Wright concentrator  Privately owned by ArcelorMittal  Within CFLN Project boundary
  • 10. World Class Port of Sept-Îles Infrastructure Expanding to Meet Demand Pointe Noire Multi User Wharf  Completion Mar. 31, 2014; 18 months prior to “CFLN" startup  Phase 1: 50 Mtpa for $220M Federal Government announced $55M funding or 25% of project  Phase 2: Planning for 100 Mtpa Port of Sept-Îles  RTZ-IOC shipping facility Port-Cartier  ArcelorMittal shipping facility  $2.1B expansion is underway & will include concentrator expansion with port & rail infrastructure upgrades  Located 62 km west of Sept-Îles Pointe Noire Sept-Iles Courtesy of the Port de Sept Îles China Max ship capacity 300kt 10
  • 11. 11
  • 12. Site Layout of Consolidated Fire Lake North Project Oil Can Project is only 6 km from CFLN concentrator 12 OB Dump East Waste Rock Dump West Pit East Pit Tailings Impoundment Area Water Treatment Concentrator Permanent Camp 161 kV Electrical Substation Construction Camp
  • 13. Key Results Feb. 2013 PFS Pre-Tax Basis Internal Rate of Return (IRR) (8% Discount Rate) 1 30.9% Undiscounted Cash Flow $9.0B Net Present Value @ 5% Discounted Cash Flow $4.7B Net Present Value @ 8% Discounted Cash Flow $3.3B Net Present Value @ 10% Discounted Cash Flow $2.6B Payback Period (8% Discount Rate) 3.4 Years CFLN East & West Deposit Development February 2013 Preliminary Feasibility Study– Highlights Pre-production Capital Expenditures: US$1,394.4M (Fire Lake North & Pointe Noire) Direct Operating Costs2 US$34.58 per tonne (average 20 years); US$27.99 per tonne (average years 1 to 5) Price Assumptions US$115 per tonne of concentrate at 66% Fe (years 1 -5) US$110 per tonne of concentrate at 66% Fe (years 6-20) Mine-Life 19.6 years Exchange Rate $1.00 USD to $1.00 CDN Overall Stripping Ratio 2.74:1 for the current 20 year mine-life 1.56:1 (years 1-3 of production); 2.02:1 (years 1-5 of operation) Mineral Resource Estimate (MRE) East & West Pits Measured & Indicated Resources 693.5 Mt grading 31.5% FeT (NI43-101) Inferred Resources 521.6 Mt grading 30.1% FeT @ 15% FeT cut-off (NI43-101) Proven & Probable Reserves 464.6 million tonnes grading 32.4% Fe at a 15% cut-off grade; 1. This includes railway capital repayment and interest 2. Direct operating costs excludes railway capital repayment & interest 13
  • 14. OPERATING EXPENDITURES (US$/TONNE OF CONCENTRATE) COST PARAMETERS AVERAGE 20 YEARS AVERAGE YEARS 1 to 5 Mining 18.89 12.76 Concentrating, crushing & processing 4.38 3.89 Site infrastructure, sales & general administration 4.05 3.66 Environmental tailings & management 0.13 0.12 Rail transport including lease for rolling stock 4.80 5.42 Port facilities 2.34 2.14 Total Direct Operating Cost 34.58 27.99 Railway capital repayment ($1,133.6M) 6.22 7.40 Railway interest payment ($592.6M) 3.25 7.29 Total Operating Cost 44.05 42.68 Consolidated Fire Lake North Project Preliminary Feasibility Study PRE-PRODUCTION CAPITAL EXPENDITURES (US$ MILLIONS) Fire Lake North & Pointe Noire Railway COST AREA Total Capital in $ MILLIONS COST AREA Total Capital in $ MILLIONS DirectCosts Mining 133.7 Railway 200.0Concentrator & FLN Site Infrastructure 687.7 Pointe Noire 158.2 IndirectCosts Owner’s Cost 53.2 Rolling Stock Leasing 13.4 Engineering, Procurement, Construction & Mgmt. (EPCM) 106.5 Project Indirect Costs 140.5 Contingency 114.6 Sub-total 1,394.4 Sub-total 213.4 Grand Total (100% of the project) 1,607.9 14
  • 15. Consolidated Fire Lake North Project Schedule CFLN Definition Drilling Scoping Study Updated PEA Metallurgical Results - CFLN, Moire Lake, Oil Can Pre-Feasibility Study Environmental and Social Impact Assessment (ongoing) Community Consultation Oil Can Definition Drilling Planned Feasibility Study Permitting Construction Production Legend: 2015 2016 Q2 2011 2012 2013 2014 Q1 Q2 Q3 Q4 Q1 Q4 Q1 Q2Q3 Completed milestones Q3 Q4 Q1 Q2 Q3 Q4Q1 Q2 Q3 Q4 Q1 Q2Q4Q3 Critical point: Project Schedule will be revised and updated once the feasibility study of the railway solution is confirmed
  • 16.  Preliminary Feasibility Study results released Feb. 7, 2013  Feasibility Study with 20 Mtpa production rate scope underway  West (3500m) & East (2400m) Pits are both synformal fold closures that are open at depth  Mineral Resource Estimate (MRE) announced on Jan. 9, 2013 (COG 15% FeT): Measured & Indicated Resources 693.5 M tonnes grading 31.5% total iron (FeT) Inferred Resources 521.6 M tonnes grading 30.1% total iron (FeT)  Several de-risking initiatives are underway associated to CFLN project development Consolidated Fire Lake North Project Growth Through Development 16See www.championironmines.com for reports maps & assays West Pit Area East Pit Area Don Lake Area
  • 17. High Grade, Coarse Specular Hematite Quartz Specular Hematite Consolidated Fire Lake North Metallurgy Press Release, August 1, 2012  High quality sinter concentrate with very low deleterious elemental content  Weight recovery @ 40%  Liberates at 850 micron (-20 mesh) & produces a 65-66% iron concentrate  Assuming a concentrate with 66% Fe ; No magnetic separation circuit required  Alumina is 0.52% versus industry standard of 2%  Silica content is < 5%  Al2O3 : SiO2 ratio of 0.14 versus the upper industry specification limit of 1  This very low alumina to silica ratio is an ideal blending product for steel mills 17
  • 18. Fire Lake North Development Project 18
  • 19. Fire Lake North Development Project 19
  • 20. 500 meters Moiré Lake Project Initial Mineral Resource Estimate: March 29, 2012 ArcelorMittalPropertyBoundary Mineral Resource Estimate:  Indicated Resources: 164 M tonnes grading 30.5% FeT  Inferred Resources: 417 M tonnes grading 29.4% FeT  DDH LM11-12: 503 M @ 31% FeT  Kilometric synform with hematite & magnetite outcrops at surface  Adjacent to ArcelorMittal Mont-Wright mine A A’ 20
  • 21. 500 meters Moiré Lake Project Infrastructure: Adjacent to Bloom Lake Railway (8km), road, & power 442 Mt @ 30.1% FeT; Zone B: 285 Mt @ 30.1% FeT 21
  • 22. Oil Can Project Initial Mineral Resource Estimate  Potential for low strip ratio < 1 : 1  972 Mt of iron oxide grading 33.2% at a 15% iron cut-off  924 Mt of mixed iron oxide-silicate mineralization  This deposit is open at depth  Orientation metallurgical tests indicate a relatively coarse liberation grind size  Commercial grade magnetite sinter feed concentrate can be produced  2011 drill program returned long magnetite-hematite iron formation intersections up to 545 metres in length  Inferred Resources drilled on 400 metre sections 22To view a larger more detailed version of this map please visit: http://www.championironmines.com/vns-site/page-oil_can.html
  • 23. South & East Zones Section 9800N (Facing North) 200 metres OC11-02 IF IF Ovb OC11-19 OC11-01OC11-08OC11-07OC11-05 East ZoneSouth Zone 163.1m @ 30.5% Assay Pending 401.5m @ 30.7% incl. 213.5 @ 33.1% 545.7m @ 33.7% incl. 442.3 @ 36.4% 197.2m @ 26.8% incl. 145.5 @ 28.1% 303.4m @ 34.7% incl. 130.8m @ 36.5% Oil Can Project Exploration Upside 23 190.9m @ 30.6% OC11-05 OC11-07 OC11-08 OC11-02 OC11-019 OC11-01
  • 24. Central Zone (Facing Northwest) 200 metres OC11-10 OC11-03OC11-16 OC11-14 191.7m @ 28.2% 472.2m @ 28.0% incl. 119.6m @ 35.2% 224.0m @ 28.1% incl. 176.0m @ 29.0% 311.4m @ 27.6% incl. 269.0m @ 29.2% IF Ovb Oil Can Project Exploration Upside 24 OC11-014 OC11-016 OC11-03 OC11-10
  • 25. 200 metres North Zone Section 5800E (Facing East) OC11-04 IF Ovb OC11-09 OC11-12 OC11-13 OC11-15 221.2m @ 25.0% incl. 128.9m @ 28.7% 414.1m @ 25.1% incl. 139.0m @ 29.5% 141.5m @ 29.2% Incl. 179.5m @ 32.8% Oil Can Project Exploration Upside 25 OC11-012 OC11-09 292.5m @ 25.8% incl. 113.8m @ 30.4% OC11-13 OC11-15 OC11-04 328.9m @ 31.5% Incl. 111.1m @ 32.9%
  • 26. Feasibility Study Objectives: • Reduce CFLN sustaining capital in the economic model. • Continue metallurgical test work with the objective of eliminating the second AG mill ($100 million sustaining capital) in year. • Continue negotiations with Hydro-Québec to find ways to reduce the $217.5 million participation in sustaining capital for the construction of a new 315 kV power line. • Review iron ore deposits at both CFLN and Oil Can to increase Measured & Indicated Resources and reduce the overall strip ratio. 26 Consolidated Fire Lake North Project Economic Projections based on PFS Metrics Assumptions: 1Projections of an expansion plan at CFLN for a second concentrator production line are listed in the table below. This projection of an 18-20 Mtpa production rate of iron concentrate is not NI 43-101 compliant but rather is an estimation of mid term potential: 2Payback period at an 8% discounted rate is estimated from the production start of the 1st concentrator production line, the payback for the 2nd line is 1.9 years after production start based on the additional CAPEX for the 2nd line of US$587M including indirect costs, railway capital repayment and interest. IRR = 34.7% NPV (M$) Payback (yrs) Discount Rate 0% $18,441 M 3.9 5% $9,400 M 4.1 8% $6,465 M 4.32 10% $5,081 M 4.4
  • 27. Why Invest in Champion Iron Mines?  Robust Economics: (CFLN NPV, US$3.3B @ 8% DCF (PFS Feb. 2013); IRR 30.9%; 3.4 year payback period  12 Projects (755 km2) near 5 operating mines;  5.1 billion tonnes of NI 43-101 compliant resource  Oil Can Deposit: Initial Resource Estimate 1,896 Mt @ 28.7%  High-Quality CFLN concentrate @ 66%Fe, with low impurities  Experienced team: Exploration, development, construction, commissioning & operations management  Financed through to feasibility; Favourable tax regime; Political support; & known operating environment 27
  • 28. Fire Lake North Exploration Camp 28 Coarse Specular Hematite in Drill Core Coarse Grained Specular Hematite
  • 29. Thank You FSE: P02; OTCQX: CPMNF www.championironmines.com 20 Adelaide Street East, Suite 301, Toronto, ON M5C 2T6 | 416 866 2200 29
  • 30. - 200,000 400,000 600,000 800,000 1,000,000 1,200,000 1,400,000 1,600,000 1980 1985 1990 1995 2000 2005 2010 China Japan Rest of the World Global Steel Production Shows Continued Demand for Iron Ore China’s CAGR* is 9.88% over the last 30 years vs. 2.30% for total global steel production over the same period. Source: World Steel Association website * CAGR: Compound Annual Growth Rate Kilotonnes 30
  • 31. Labrador Trough Annual Production Iron Ore Production Upside Company Current Annual Production Future Annual Forecast IOC/RTZ 17 Mtpa 23 Mtpa ArcelorMittal 16 Mtpa 24 Mtpa Cliffs Natural Resources (Wuhan) 12 Mtpa 20 Mtpa Labrador Iron Mines 2 Mtpa1 5 Mtpa1 Adriana Resources (Wuhan) 0 50 Mtpa2 New Millennium (Tata) 0 4 Mtpa1 24 Mtpa2 Century Iron Mines (Wuhan) 0 2 Mtpa1 20 Mtpa2 Champion Iron Mines Limited 0 ~20 Mtpa Alderon Iron Ore Corp. (Hebei) 0 ~16 Mtpa Total Current & Forecasted Production 47 ~208 Mtpa 1. Direct shipping ore 2. Taconite fine grained iron ore 31
  • 32. Fermont Iron Ore District (“FIOD”) Historically the Fermont & Labrador mining camps produced 33 Mtpa. RTZ/IOC = 17 Mtpa ArcelorMittal = 13 Mtpa Wabush = 3 Mtpa “ Marginal Era”: For 30-40 years pre-2003 the price per tonne of concentrate was $15- $30/tonne, costs per tonne were similar. Current 3 year moving average is $115/tonne Current Spot Price Average ~$130/tonne (Aug. 2013) 32
  • 34. Harvey Tuttle Project  NI 43-101 Inferred Resource Estimate: 717 Mt @ 25% Fe; magnetite rich iron formation  Intersected multiple significant iron formation intervals in 2010 drill program  Total of 13,165 m of drilling completed  Less than 50% of the kilometric scale magnetic anomalies have been tested  25 km W-NW of CFLN  Within conveying distance from CFLN planned concentrator (20-30 km) Advanced Exploration Bellechasse Deposit  Deposit located within CFLN  NI 43-101 Resource Estimate: Inferred Resources estimate; 215 Mt @ 29% Fe; potential for more  Magnetite rich iron formation  Adjacent to Hwy 389  Synform geometry is favorable for open pit mining 34