SlideShare una empresa de Scribd logo
1 de 7
Descargar para leer sin conexión
Curriculum Vitae
Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 1
CHEE WONG – Civil & Structural Engineer
PE (Mal), NPER (Aust), BE (Civil)
A: 59 Balgownie Cres, Parkinson, QLD 4115
H: 07 3272 6441
M: +6012 7130 197 (currently working in Malaysia)
E : cswong63@gmail.com (preferred); or cswong@ecoworld.my
Summary
With extensive experience in all aspects of project engineering and management,
regularly demonstrating capabilities in implementing projects from design phase
through to practical completion. Instrumental in liaising closely with multi-
disciplinary teams, coordinating engineering and construction activities, influencing
all phases of the projects.
Strengths include delivering a wide range of structures and infrastructure projects
on time and within budget. Possesses significant experience in both Australia and
Malaysia design and inspections in building & civil structures, foundations & piling,
access road, water and waste water pipelines, sewage treatment plants and also
building services.
A conscientious and dedicated team player enjoys identifying issues and
generating practical solutions to ensure the successful completion of all projects.
Liaises closely with stakeholders to ensure requirements from all parties are well
informed and satisfied. A proven ability to understand the specific needs of a
project through utilising an extensive range of transferrable skills and
comprehensive knowledge of project development.
Education and Professional Registrations
 BE (Civil) University of New South Wales, Australia
 Member of The Institution of Engineers Australia – NPER and CPEng
 Registered Professional Engineer of Queensland - RPEQ
 Registered Professional Engineer of Board of Engineers Malaysia - PE
 Member of the Institution of Engineers Malaysia - MIEM
Professional Experience
EcoMajestic of Ecoworld Development Group Bhd. (Malaysia)
Jul2016 - Present
Township Developments on land area of more than 1500 acres (EcoMajestic & EcoForest)
As assist. GM in EcoMajestic – Managing/Facilitating
1. Technical Departments, namely Project Planning, Project Implementation and Contract
Administration. This includes management of external Consultants and Contractors
2. Ecoworld Residence Club - Handing over vacant possession and customer management
3. Sales and Marketing Departments - provide the necessary as required and help in
promotion of sales of properties
Curriculum Vitae
Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 2
EcoSprings & EcoMajestic of Ecoworld Development Group Bhd. (Malaysia)
Nov2013 – Jun2016
Township Development on a land area of more than 1000 acres
As Senior Project Manager/Technical Head in project implementation – managing project schedule
and workforce for stages of targeted completion times as well as managing design-construction
interphase works in residential and commercial construction works.
Key responsibilities included:
 Project management for work package which included, but not limited to, quality
checks according to technical specifications & drawings for earthworks, access
road, drainage, pipelines, civil & building structural works and work progress
monitoring. Also on recordings and reporting and stakeholders management;
 Design-Construction interface works on design approach and construction drawings
details with Designer and Contractors
 Review and complete QA documentation from Contractor as detailed in Project
Quality Plan which includes Safe Working Method Statement’s (SWMS), Work
Method Statement’s (WMS), Inspection Test Plans (ITPs), Workshop &
Construction drawings, Test Results, Request for Information (RFI) and Non
Conformance Reports (NCRs);
 Review Contractor’s work progress; Liaise & chair site meetings with multi-
disciplinary Consultants and Contractors;
 Provide work progress updates, reporting and recordings of the construction works
to Contract Administrator and Finance Department;
 Discuss and issue Site Instructions, Contract Notices and Variation of Work to the
Contractor;
 Resolve design/construction site constraints and concerns;
 Working closely with HSE Officer and Supervisors implementing and enforcing HSE
requirements around all workplaces
Career Gap Year Dec2012-Oct2013
GHD Pty. Ltd. Oct-Nov2012
Yelgun to Chinderah Road Upgrade (RMS-NSW) – Structural Inspector
Bridge Structures Rectification – Abutment, Bearing Pads, Approach Slabs
As Structural Inspector on rectification works for 3 nos of bridges at end of defect liability
period.
Responsibility included detail studies, liaison, discussion, site inspections, verifications,
recording and reporting progressively of the rectified structural components for Client
(RMS) according to requirements in Construction Drawings from an Independent
Engineering Consultant with Principal Contractor (Abi Group) and RMS Representatives.
GHD Pty. Ltd. 2011-2012
Gladstone Area Water Board (GAWB)
Curtis Island Water and Sewerage Infrastructure (FIFO work)
Construction of the potable water supply and sewerage services to and from Curtis Island
with HDPE pipelines including associated infrastructures. A site-based Project Engineer
(representing the Client, GAWB) responsible for structures, civil & buildings inspections
and quality control, resolution of site issues for the project during the Construction Phase.
Key responsibilities included:
Curriculum Vitae
Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 3
 Project management for work package which included, but not limited to, QA/QC
checks according to technical specifications & drawings for earthworks, access
road, drainage, pipelines, civil & building structural works and work progress
monitoring. Also on recordings and reporting and stakeholders management;
 RPEQ for steel & concrete building structures – including certification sign off and
completion of Form 16;
 Design-Construction interface works on design approach and construction drawings
details with Designer and Contractors
 Review and complete QA documentation from Contractor which includes Safe
Working Method Statement’s (SWMS), Work Method Statement’s (WMS),
Inspection Test Plans (ITPs), Workshop & Construction drawings, Test Results,
Request for Information (RFI) and Non Conformance Reports (NCRs);
 Liaise, chair & minute site meetings with Stakeholder and Contractors;
 Provide work progress updates, reporting and recordings of the construction works;
 Discuss and issue Site Instructions, Contract Notices and Variation of Work to the
Contractor;
 Resolve design/construction site concerns.
 Continuous collaboration with both Client-side and Main Contractor’s Safety
Officers on safety concerns and good practices around workplaces as safety is
everybody’s responsibility
Achievements:
 Worked collaboratively with the design and construction teams to enhance and
develop a mutually beneficial outcome for the company and client;
 Good coordination with a team of Engineers of various disciplines (Chemical,
Water, Electrical, Mechanical and Civil);
 Excellent working relationship with the Principal Contractor and Sub-Contractors
(Pipelines, Piling, Plumbing, Electrical, Mechanical, Structural and Civil) ensuring
work progress, resolving site constraints with practical solutions involving design
changes and material sourcing;
 Resolved design construction issues and developed solutions which met Client and
Stakeholders’ requirements;
 Improved and completed QA documentations such as reviews, signoffs, Site
Instructions & Variation Work records;
 RPEQ signoff for all building structures
 Coordination with Safety Officer and Environmental Engineer for both the team and
the contractors during construction phase to ensure site safety is understood and
requirements adhered to. Observed and reported on work procedures as required;
 Complete record of work progress by way of progress reports and photographs etc.
GHD Pty. Ltd. 2010-2011
Northern Network Alliance (NNA)
Northern Pipeline Interconnector (NPI Stage 2)
Water supply pipeline construction from Brisbane to Noosa, as part of the SEQ Water
Grid, for drought mitigation. The Project stretched from North Pine areas to Noosa. Stage
2 was the construction of 48kms of 1200mm diameter mild steel cement lined pipe from
Eudlo to Noosa. Construction included Facilities such as water quality boosting stations,
pump stations, reservoirs, chemical dosing and other associated buildings in Cooroy,
Nambour, Ferntree, Chevallum, Landsborough, Eudlo, Narangba and North Pine.
Curriculum Vitae
Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 4
Performed three site-based roles –
 Independent Quality Verifier (on behalf of the Client, LinkWater) for pipelines and
facilities construction with associated infrastructures, roads and drainage etc.
 RPEQ Structural Inspector (on behalf of the Alliance) for all steel and reinforced
concrete structural works.
 Coordinate and oversee CCTV inspections of all pipelines to confirm pipe
cleanliness and general joint integrity fulfilling requirements by LinkWater.
Key responsibilities included:
 FORM 16 certification involving inspection to both sub-structures and super-
structures of all buildings, pits, blockwalls and retaining walls etc. which consist of
reinforced concrete, steel and aluminum members;
 Quality verification involving inspections of structures for all the sites to ascertain
construction methodologies, materials and processes used are in accordance with
the design documentation, relevant Specifications and Construction Execution
Procedures, as well as QA Documentation, ITP’s and Verification Checklists for
Civil, Structural Works and Pipelines;
 Check and comment on Alliance’s QA documentation process and progress;
 Observe site construction methods, and report any deviation from SWMS, WMS
and HSE policies and procedures. Take immediate action if deemed necessary;
 Prepare monthly reports on Quality Verification of the Alliance work for the Client;
 Lead, coordinate and report on CCTV inspection works on pipeline cleanliness for
all laid pipes.
Achievements:
 Developed time saving processes by reducing double handling, identifying required
rectifications through inspections and monitoring during the preconstruction phase;
 Built a strong rapport between the Client, Construction Quality team and
Construction teams through fostering good coordination, and cooperation by
working closely with all parties and resolving difference in opinion. Took time to
explain the concepts and fundamental principles behind the requirements, and
motivated the team by showing appreciation and reporting work done well;
 Signed off and issued Form 16 for structural works of all constructed buildings
GHD Pty. Ltd. 2009-2010
Department of Defence
Oakey Multi-Role Helicopter Facilities
Construction of hangars and facilities structures (both concrete & steel) with associated
infrastructures and building services (mechanical & electrical) for Oakey Army Aviation Centre.
Worked as a Coordinator (design-construction interface) on multi-discipline project, coordinating
and responding to RFI. Responsible for Checking on structural details during the construction
phase.
Key Responsibilities included:
 Coordinated responses to Contractor’s RFI’s in a timely and precise manner
through organised discussions/negotiation with members of Design Team
consisting of Architects and various engineering disciplines;
 Conducted reviews on structural Workshop Drawings which included meetings with
fabricators to clarify design intent, product and finish requirements;
 Attended regular meetings with external Project Managers and Contractors to
provide resolutions and clarifications on RFIs and requirements;
 Check and redesign structural details, as necessary, to suit site condition, which
included coordination of multi-disciplinary drawings.
Curriculum Vitae
Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 5
Achievements:
 Established and managed a RFI reply process minimising time taken to provide a
response through prioritisation, negotiation, monitoring, understanding
fundamentals of requirements and coordination among team members;
 Communicated directly with fabricators (with prior agreement of Principal
Contractor) on details and requirements to successfully provide clarification on
doubts/discrepancies to prevent unnecessary time lost. This created a smoother
work process in both fabrication and construction stages to improve project
progress.
Previous Professional Experience
Project Director – Perunding YSL Sdn. Bhd. (Malaysia) 1995-2008
Project managements in both design phase and construction phase of the civil & structural
engineering aspects which comprised of water and waste water systems, pumping
stations, sewage treatment plants, drainage systems, roads and structures in residential,
commercial, industrial & recreational developments by renowned Developers like Sunway
City Bhd. and YTL Corporation Bhd. and others.
Key Responsibilities included:
 Design & drawings reviews, certifications/sign-offs. Submissions to and obtain
approvals from Local Councils and/or Public Works Department;
 Close liaison/dealings with Client, Stakeholders, Government Authorities,
Architects, M&E Engineers, Principal and Specialist Contractors;
 Technical specification preparation, tender documentation, tender evaluation and
contract administration works;
 Chaired or attended regular Client-Consultant meetings and Site meetings on
progress of works, provide resolutions, clarifications and specific requirements;
 Periodical site inspections and discussions with Clients’ Representatives,
Authorities’ Inspectors/Certifiers and Contractors. Work included handing over
constructed infrastructures, like roads, drainage, water and sewerage systems, to
relevant Local Councils and Utilities Departments;
 Managed RFI responses, design/drawing amendments initiated by Client and/or
Contractor on changes in concepts or site constraints;
 Final signing-off of inspected works for both infrastructures and building structures
as required for Certificate of Occupancies issued by relevant Authorities;
 Managed a team of 15 people consisted of Engineers, Technical Assistance,
Drafters and Administration Assistance.
Achievements:
 Worked collaboratively with various teams of multi-discipline professionals to
enhance and develop a mutually beneficial outcome for the company and Clients.
Majority of the Clients were repeat-Client as they had the confidence and trust built
up through the way issues were managed;
Curriculum Vitae
Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 6
 Maintained good working relationship with the Principal and Specialist Contractors
and Sub-Contractors ensuring work progress, resolving site constraints with
practical solutions;
 Built excellent rapport with Government Authorities through fulfillment of
obligations, good QA management and well informed reporting;
 Ensured Clients’ requirements were not compromised;
 Encouraged Design Engineers to continuously improve the design and drawing details with
feedback and onsite discussions with experienced tradesmen.
Design/Project Engineer – Zath Perunding Sdn. Bhd. (Malaysia) 1990-1994
Diligently worked as Design & Project Engineer from design through to completion of
construction in the aspects of water reticulation systems, roads & drainage and structures
for developments of residential and commercials.
Key Responsibilities included:
 Design & drawings productions, submissions to, liaison and obtain approvals from
Local Councils and/or Public Works Department;
 Close liaison/dealings with Client, Stakeholders, Government Authorities,
Architects, M&E Engineers, Principal and Specialist Contractors;
 Attended regular Client-Consultant meetings and Site meetings on progress of
works, provide resolutions, clarifications and specific requirements;
 Periodical site inspections and discussions with Clients’ Representatives,
Authorities’ Inspectors/Certifiers and Contractors. Work included handing over
constructed infrastructures, like roads, drainage, water and sewerage systems, to
relevant Local Councils and Utilities Departments;
 Managed RFI responses, design/drawing amendments initiated by Client and/or
Contractor due to changes in concepts or site constraints;
 Preparation of QA documentations for inspected works of both infrastructures and
building structures for submissions to relevant Authorities;
 Managed a handful of Technical Assistance, Drafters and Administration
Assistance.
Achievements:
 Worked well with various teams of multi-discipline professionals to enhance and
develop a mutually beneficial outcome for the company and Clients.
 Maintained good working relationship with the Principal and Specialist Contractors
and Sub-Contractors ensuring work progress, resolving site constraints with
practical solutions;
 Ensured Clients’ requirements were not compromised;
 Continuous improvements in design and drawing details through feedback and onsite
discussions with experienced tradesmen;
 Successful in attaining Professional Engineer status (in year 1994) which has the capacity
to sign off project/development submissions to Government Authorities.
Languages
 English
 Chinese
 Bahasa Malaysia
Curriculum Vitae
Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 7
Interests
 Travel
 Cooking
Referees
 Available on request

Más contenido relacionado

La actualidad más candente (19)

Piping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malikPiping supervisor Cv.mohamad anwar malik
Piping supervisor Cv.mohamad anwar malik
 
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
 
joy S resume
joy S resumejoy S resume
joy S resume
 
Resume
ResumeResume
Resume
 
Ummar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCXUmmar Shaik Updted CV.DOCX
Ummar Shaik Updted CV.DOCX
 
Cv of Mr. Jefferson Tomas Tulabot _ 24 July 2019
Cv of Mr. Jefferson Tomas Tulabot _  24 July 2019Cv of Mr. Jefferson Tomas Tulabot _  24 July 2019
Cv of Mr. Jefferson Tomas Tulabot _ 24 July 2019
 
Latest HVAC Supervisor
Latest HVAC SupervisorLatest HVAC Supervisor
Latest HVAC Supervisor
 
Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016
 
John Keenan - Resume
John Keenan - ResumeJohn Keenan - Resume
John Keenan - Resume
 
Resume
Resume Resume
Resume
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
Boutin Marcel Resume (2)
Boutin Marcel Resume (2)Boutin Marcel Resume (2)
Boutin Marcel Resume (2)
 
_Mark_Maudsley_CV_2015
_Mark_Maudsley_CV_2015_Mark_Maudsley_CV_2015
_Mark_Maudsley_CV_2015
 
OMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cvOMIJIE ehinomen prince Reviewed cv
OMIJIE ehinomen prince Reviewed cv
 
Resume
ResumeResume
Resume
 
Christopher Kinnon Resume
Christopher Kinnon ResumeChristopher Kinnon Resume
Christopher Kinnon Resume
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
Sam's current resume-2
Sam's current resume-2Sam's current resume-2
Sam's current resume-2
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 

Destacado

Prezentacja iv nowa_17.04.2016
Prezentacja iv nowa_17.04.2016Prezentacja iv nowa_17.04.2016
Prezentacja iv nowa_17.04.2016Adam Abramowicz
 
Ryczałtowy ZUS - zabójca miejsc pracy w Polsce
Ryczałtowy ZUS - zabójca miejsc pracy w PolsceRyczałtowy ZUS - zabójca miejsc pracy w Polsce
Ryczałtowy ZUS - zabójca miejsc pracy w PolsceAdam Abramowicz
 
Dissertation Final (submitted)
Dissertation Final (submitted)Dissertation Final (submitted)
Dissertation Final (submitted)SM Khuda
 
Andrew goodwin’s music video theory
Andrew goodwin’s music video theoryAndrew goodwin’s music video theory
Andrew goodwin’s music video theoryKyneil Grant
 
Create Product Pages That Convert
Create Product Pages That  ConvertCreate Product Pages That  Convert
Create Product Pages That ConvertBlue Stout
 
Presentación tarea virtual 2
Presentación tarea virtual 2Presentación tarea virtual 2
Presentación tarea virtual 2josue gabriel
 
Modulo 3. Presentaciòn sesion 2. Junio 11
Modulo 3. Presentaciòn sesion 2. Junio 11Modulo 3. Presentaciòn sesion 2. Junio 11
Modulo 3. Presentaciòn sesion 2. Junio 11lina calderon
 
Diseño de ambientes virtuales para el aprendizaje
Diseño de ambientes virtuales para el aprendizajeDiseño de ambientes virtuales para el aprendizaje
Diseño de ambientes virtuales para el aprendizajelina calderon
 
Review of Original Music Video
Review of Original Music VideoReview of Original Music Video
Review of Original Music Videoy10rodriguescampbe
 
Front Desk Agent Compliments Porfolio
Front Desk Agent Compliments PorfolioFront Desk Agent Compliments Porfolio
Front Desk Agent Compliments PorfolioEric Strasser
 
Kings Lynn Museum Case Study
Kings Lynn Museum Case StudyKings Lynn Museum Case Study
Kings Lynn Museum Case StudyDavid Lister
 
Преддипломная практика по специальности Педагогика дополнительного образования
Преддипломная практика по специальности Педагогика дополнительного образованияПреддипломная практика по специальности Педагогика дополнительного образования
Преддипломная практика по специальности Педагогика дополнительного образованияАнна Колледж
 

Destacado (20)

Original copies
Original copiesOriginal copies
Original copies
 
Prezentacja iv nowa_17.04.2016
Prezentacja iv nowa_17.04.2016Prezentacja iv nowa_17.04.2016
Prezentacja iv nowa_17.04.2016
 
Ryczałtowy ZUS - zabójca miejsc pracy w Polsce
Ryczałtowy ZUS - zabójca miejsc pracy w PolsceRyczałtowy ZUS - zabójca miejsc pracy w Polsce
Ryczałtowy ZUS - zabójca miejsc pracy w Polsce
 
Dissertation Final (submitted)
Dissertation Final (submitted)Dissertation Final (submitted)
Dissertation Final (submitted)
 
Andrew goodwin’s music video theory
Andrew goodwin’s music video theoryAndrew goodwin’s music video theory
Andrew goodwin’s music video theory
 
Create Product Pages That Convert
Create Product Pages That  ConvertCreate Product Pages That  Convert
Create Product Pages That Convert
 
Apt opinion
Apt opinionApt opinion
Apt opinion
 
Presentación tarea virtual 2
Presentación tarea virtual 2Presentación tarea virtual 2
Presentación tarea virtual 2
 
Deficiência visual
Deficiência visualDeficiência visual
Deficiência visual
 
Modulo 3. Presentaciòn sesion 2. Junio 11
Modulo 3. Presentaciòn sesion 2. Junio 11Modulo 3. Presentaciòn sesion 2. Junio 11
Modulo 3. Presentaciòn sesion 2. Junio 11
 
Diseño de ambientes virtuales para el aprendizaje
Diseño de ambientes virtuales para el aprendizajeDiseño de ambientes virtuales para el aprendizaje
Diseño de ambientes virtuales para el aprendizaje
 
Original copies
Original copiesOriginal copies
Original copies
 
Review of Original Music Video
Review of Original Music VideoReview of Original Music Video
Review of Original Music Video
 
Strain Maganement PPT
Strain Maganement PPTStrain Maganement PPT
Strain Maganement PPT
 
Front Desk Agent Compliments Porfolio
Front Desk Agent Compliments PorfolioFront Desk Agent Compliments Porfolio
Front Desk Agent Compliments Porfolio
 
Dem2006 -mirar_el_arte_con_ojos_matematicos
Dem2006  -mirar_el_arte_con_ojos_matematicosDem2006  -mirar_el_arte_con_ojos_matematicos
Dem2006 -mirar_el_arte_con_ojos_matematicos
 
Kings Lynn Museum Case Study
Kings Lynn Museum Case StudyKings Lynn Museum Case Study
Kings Lynn Museum Case Study
 
Satan's New Job
Satan's New JobSatan's New Job
Satan's New Job
 
ilp
ilpilp
ilp
 
Преддипломная практика по специальности Педагогика дополнительного образования
Преддипломная практика по специальности Педагогика дополнительного образованияПреддипломная практика по специальности Педагогика дополнительного образования
Преддипломная практика по специальности Педагогика дополнительного образования
 

Similar a Chee Wong - CV DEC2016 (20)

Bill resume
Bill resumeBill resume
Bill resume
 
Site civil engineer fiazuddin
Site civil engineer fiazuddinSite civil engineer fiazuddin
Site civil engineer fiazuddin
 
CV J McGowan
CV J McGowanCV J McGowan
CV J McGowan
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
Royce_Brown Resume-82115
Royce_Brown Resume-82115Royce_Brown Resume-82115
Royce_Brown Resume-82115
 
DHAKSHINA MURTHY RESUME normal
DHAKSHINA MURTHY RESUME normalDHAKSHINA MURTHY RESUME normal
DHAKSHINA MURTHY RESUME normal
 
Erin Kingston - CV
Erin Kingston - CVErin Kingston - CV
Erin Kingston - CV
 
Aromal_CV.PDF
Aromal_CV.PDFAromal_CV.PDF
Aromal_CV.PDF
 
Cv
CvCv
Cv
 
CV
CVCV
CV
 
Khan.CV
Khan.CVKhan.CV
Khan.CV
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 
Resume of Mohammad Kamruzzaman
Resume of Mohammad KamruzzamanResume of Mohammad Kamruzzaman
Resume of Mohammad Kamruzzaman
 
CV sultan(Q)
CV sultan(Q)CV sultan(Q)
CV sultan(Q)
 
number 1 Res 2013 Rod Taylor-2
number 1 Res 2013    Rod  Taylor-2number 1 Res 2013    Rod  Taylor-2
number 1 Res 2013 Rod Taylor-2
 
CV
CVCV
CV
 
Brent Maskell Resume May 2016
Brent Maskell Resume May 2016Brent Maskell Resume May 2016
Brent Maskell Resume May 2016
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
CV
CVCV
CV
 
CV
CVCV
CV
 

Chee Wong - CV DEC2016

  • 1. Curriculum Vitae Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 1 CHEE WONG – Civil & Structural Engineer PE (Mal), NPER (Aust), BE (Civil) A: 59 Balgownie Cres, Parkinson, QLD 4115 H: 07 3272 6441 M: +6012 7130 197 (currently working in Malaysia) E : cswong63@gmail.com (preferred); or cswong@ecoworld.my Summary With extensive experience in all aspects of project engineering and management, regularly demonstrating capabilities in implementing projects from design phase through to practical completion. Instrumental in liaising closely with multi- disciplinary teams, coordinating engineering and construction activities, influencing all phases of the projects. Strengths include delivering a wide range of structures and infrastructure projects on time and within budget. Possesses significant experience in both Australia and Malaysia design and inspections in building & civil structures, foundations & piling, access road, water and waste water pipelines, sewage treatment plants and also building services. A conscientious and dedicated team player enjoys identifying issues and generating practical solutions to ensure the successful completion of all projects. Liaises closely with stakeholders to ensure requirements from all parties are well informed and satisfied. A proven ability to understand the specific needs of a project through utilising an extensive range of transferrable skills and comprehensive knowledge of project development. Education and Professional Registrations  BE (Civil) University of New South Wales, Australia  Member of The Institution of Engineers Australia – NPER and CPEng  Registered Professional Engineer of Queensland - RPEQ  Registered Professional Engineer of Board of Engineers Malaysia - PE  Member of the Institution of Engineers Malaysia - MIEM Professional Experience EcoMajestic of Ecoworld Development Group Bhd. (Malaysia) Jul2016 - Present Township Developments on land area of more than 1500 acres (EcoMajestic & EcoForest) As assist. GM in EcoMajestic – Managing/Facilitating 1. Technical Departments, namely Project Planning, Project Implementation and Contract Administration. This includes management of external Consultants and Contractors 2. Ecoworld Residence Club - Handing over vacant possession and customer management 3. Sales and Marketing Departments - provide the necessary as required and help in promotion of sales of properties
  • 2. Curriculum Vitae Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 2 EcoSprings & EcoMajestic of Ecoworld Development Group Bhd. (Malaysia) Nov2013 – Jun2016 Township Development on a land area of more than 1000 acres As Senior Project Manager/Technical Head in project implementation – managing project schedule and workforce for stages of targeted completion times as well as managing design-construction interphase works in residential and commercial construction works. Key responsibilities included:  Project management for work package which included, but not limited to, quality checks according to technical specifications & drawings for earthworks, access road, drainage, pipelines, civil & building structural works and work progress monitoring. Also on recordings and reporting and stakeholders management;  Design-Construction interface works on design approach and construction drawings details with Designer and Contractors  Review and complete QA documentation from Contractor as detailed in Project Quality Plan which includes Safe Working Method Statement’s (SWMS), Work Method Statement’s (WMS), Inspection Test Plans (ITPs), Workshop & Construction drawings, Test Results, Request for Information (RFI) and Non Conformance Reports (NCRs);  Review Contractor’s work progress; Liaise & chair site meetings with multi- disciplinary Consultants and Contractors;  Provide work progress updates, reporting and recordings of the construction works to Contract Administrator and Finance Department;  Discuss and issue Site Instructions, Contract Notices and Variation of Work to the Contractor;  Resolve design/construction site constraints and concerns;  Working closely with HSE Officer and Supervisors implementing and enforcing HSE requirements around all workplaces Career Gap Year Dec2012-Oct2013 GHD Pty. Ltd. Oct-Nov2012 Yelgun to Chinderah Road Upgrade (RMS-NSW) – Structural Inspector Bridge Structures Rectification – Abutment, Bearing Pads, Approach Slabs As Structural Inspector on rectification works for 3 nos of bridges at end of defect liability period. Responsibility included detail studies, liaison, discussion, site inspections, verifications, recording and reporting progressively of the rectified structural components for Client (RMS) according to requirements in Construction Drawings from an Independent Engineering Consultant with Principal Contractor (Abi Group) and RMS Representatives. GHD Pty. Ltd. 2011-2012 Gladstone Area Water Board (GAWB) Curtis Island Water and Sewerage Infrastructure (FIFO work) Construction of the potable water supply and sewerage services to and from Curtis Island with HDPE pipelines including associated infrastructures. A site-based Project Engineer (representing the Client, GAWB) responsible for structures, civil & buildings inspections and quality control, resolution of site issues for the project during the Construction Phase. Key responsibilities included:
  • 3. Curriculum Vitae Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 3  Project management for work package which included, but not limited to, QA/QC checks according to technical specifications & drawings for earthworks, access road, drainage, pipelines, civil & building structural works and work progress monitoring. Also on recordings and reporting and stakeholders management;  RPEQ for steel & concrete building structures – including certification sign off and completion of Form 16;  Design-Construction interface works on design approach and construction drawings details with Designer and Contractors  Review and complete QA documentation from Contractor which includes Safe Working Method Statement’s (SWMS), Work Method Statement’s (WMS), Inspection Test Plans (ITPs), Workshop & Construction drawings, Test Results, Request for Information (RFI) and Non Conformance Reports (NCRs);  Liaise, chair & minute site meetings with Stakeholder and Contractors;  Provide work progress updates, reporting and recordings of the construction works;  Discuss and issue Site Instructions, Contract Notices and Variation of Work to the Contractor;  Resolve design/construction site concerns.  Continuous collaboration with both Client-side and Main Contractor’s Safety Officers on safety concerns and good practices around workplaces as safety is everybody’s responsibility Achievements:  Worked collaboratively with the design and construction teams to enhance and develop a mutually beneficial outcome for the company and client;  Good coordination with a team of Engineers of various disciplines (Chemical, Water, Electrical, Mechanical and Civil);  Excellent working relationship with the Principal Contractor and Sub-Contractors (Pipelines, Piling, Plumbing, Electrical, Mechanical, Structural and Civil) ensuring work progress, resolving site constraints with practical solutions involving design changes and material sourcing;  Resolved design construction issues and developed solutions which met Client and Stakeholders’ requirements;  Improved and completed QA documentations such as reviews, signoffs, Site Instructions & Variation Work records;  RPEQ signoff for all building structures  Coordination with Safety Officer and Environmental Engineer for both the team and the contractors during construction phase to ensure site safety is understood and requirements adhered to. Observed and reported on work procedures as required;  Complete record of work progress by way of progress reports and photographs etc. GHD Pty. Ltd. 2010-2011 Northern Network Alliance (NNA) Northern Pipeline Interconnector (NPI Stage 2) Water supply pipeline construction from Brisbane to Noosa, as part of the SEQ Water Grid, for drought mitigation. The Project stretched from North Pine areas to Noosa. Stage 2 was the construction of 48kms of 1200mm diameter mild steel cement lined pipe from Eudlo to Noosa. Construction included Facilities such as water quality boosting stations, pump stations, reservoirs, chemical dosing and other associated buildings in Cooroy, Nambour, Ferntree, Chevallum, Landsborough, Eudlo, Narangba and North Pine.
  • 4. Curriculum Vitae Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 4 Performed three site-based roles –  Independent Quality Verifier (on behalf of the Client, LinkWater) for pipelines and facilities construction with associated infrastructures, roads and drainage etc.  RPEQ Structural Inspector (on behalf of the Alliance) for all steel and reinforced concrete structural works.  Coordinate and oversee CCTV inspections of all pipelines to confirm pipe cleanliness and general joint integrity fulfilling requirements by LinkWater. Key responsibilities included:  FORM 16 certification involving inspection to both sub-structures and super- structures of all buildings, pits, blockwalls and retaining walls etc. which consist of reinforced concrete, steel and aluminum members;  Quality verification involving inspections of structures for all the sites to ascertain construction methodologies, materials and processes used are in accordance with the design documentation, relevant Specifications and Construction Execution Procedures, as well as QA Documentation, ITP’s and Verification Checklists for Civil, Structural Works and Pipelines;  Check and comment on Alliance’s QA documentation process and progress;  Observe site construction methods, and report any deviation from SWMS, WMS and HSE policies and procedures. Take immediate action if deemed necessary;  Prepare monthly reports on Quality Verification of the Alliance work for the Client;  Lead, coordinate and report on CCTV inspection works on pipeline cleanliness for all laid pipes. Achievements:  Developed time saving processes by reducing double handling, identifying required rectifications through inspections and monitoring during the preconstruction phase;  Built a strong rapport between the Client, Construction Quality team and Construction teams through fostering good coordination, and cooperation by working closely with all parties and resolving difference in opinion. Took time to explain the concepts and fundamental principles behind the requirements, and motivated the team by showing appreciation and reporting work done well;  Signed off and issued Form 16 for structural works of all constructed buildings GHD Pty. Ltd. 2009-2010 Department of Defence Oakey Multi-Role Helicopter Facilities Construction of hangars and facilities structures (both concrete & steel) with associated infrastructures and building services (mechanical & electrical) for Oakey Army Aviation Centre. Worked as a Coordinator (design-construction interface) on multi-discipline project, coordinating and responding to RFI. Responsible for Checking on structural details during the construction phase. Key Responsibilities included:  Coordinated responses to Contractor’s RFI’s in a timely and precise manner through organised discussions/negotiation with members of Design Team consisting of Architects and various engineering disciplines;  Conducted reviews on structural Workshop Drawings which included meetings with fabricators to clarify design intent, product and finish requirements;  Attended regular meetings with external Project Managers and Contractors to provide resolutions and clarifications on RFIs and requirements;  Check and redesign structural details, as necessary, to suit site condition, which included coordination of multi-disciplinary drawings.
  • 5. Curriculum Vitae Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 5 Achievements:  Established and managed a RFI reply process minimising time taken to provide a response through prioritisation, negotiation, monitoring, understanding fundamentals of requirements and coordination among team members;  Communicated directly with fabricators (with prior agreement of Principal Contractor) on details and requirements to successfully provide clarification on doubts/discrepancies to prevent unnecessary time lost. This created a smoother work process in both fabrication and construction stages to improve project progress. Previous Professional Experience Project Director – Perunding YSL Sdn. Bhd. (Malaysia) 1995-2008 Project managements in both design phase and construction phase of the civil & structural engineering aspects which comprised of water and waste water systems, pumping stations, sewage treatment plants, drainage systems, roads and structures in residential, commercial, industrial & recreational developments by renowned Developers like Sunway City Bhd. and YTL Corporation Bhd. and others. Key Responsibilities included:  Design & drawings reviews, certifications/sign-offs. Submissions to and obtain approvals from Local Councils and/or Public Works Department;  Close liaison/dealings with Client, Stakeholders, Government Authorities, Architects, M&E Engineers, Principal and Specialist Contractors;  Technical specification preparation, tender documentation, tender evaluation and contract administration works;  Chaired or attended regular Client-Consultant meetings and Site meetings on progress of works, provide resolutions, clarifications and specific requirements;  Periodical site inspections and discussions with Clients’ Representatives, Authorities’ Inspectors/Certifiers and Contractors. Work included handing over constructed infrastructures, like roads, drainage, water and sewerage systems, to relevant Local Councils and Utilities Departments;  Managed RFI responses, design/drawing amendments initiated by Client and/or Contractor on changes in concepts or site constraints;  Final signing-off of inspected works for both infrastructures and building structures as required for Certificate of Occupancies issued by relevant Authorities;  Managed a team of 15 people consisted of Engineers, Technical Assistance, Drafters and Administration Assistance. Achievements:  Worked collaboratively with various teams of multi-discipline professionals to enhance and develop a mutually beneficial outcome for the company and Clients. Majority of the Clients were repeat-Client as they had the confidence and trust built up through the way issues were managed;
  • 6. Curriculum Vitae Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 6  Maintained good working relationship with the Principal and Specialist Contractors and Sub-Contractors ensuring work progress, resolving site constraints with practical solutions;  Built excellent rapport with Government Authorities through fulfillment of obligations, good QA management and well informed reporting;  Ensured Clients’ requirements were not compromised;  Encouraged Design Engineers to continuously improve the design and drawing details with feedback and onsite discussions with experienced tradesmen. Design/Project Engineer – Zath Perunding Sdn. Bhd. (Malaysia) 1990-1994 Diligently worked as Design & Project Engineer from design through to completion of construction in the aspects of water reticulation systems, roads & drainage and structures for developments of residential and commercials. Key Responsibilities included:  Design & drawings productions, submissions to, liaison and obtain approvals from Local Councils and/or Public Works Department;  Close liaison/dealings with Client, Stakeholders, Government Authorities, Architects, M&E Engineers, Principal and Specialist Contractors;  Attended regular Client-Consultant meetings and Site meetings on progress of works, provide resolutions, clarifications and specific requirements;  Periodical site inspections and discussions with Clients’ Representatives, Authorities’ Inspectors/Certifiers and Contractors. Work included handing over constructed infrastructures, like roads, drainage, water and sewerage systems, to relevant Local Councils and Utilities Departments;  Managed RFI responses, design/drawing amendments initiated by Client and/or Contractor due to changes in concepts or site constraints;  Preparation of QA documentations for inspected works of both infrastructures and building structures for submissions to relevant Authorities;  Managed a handful of Technical Assistance, Drafters and Administration Assistance. Achievements:  Worked well with various teams of multi-discipline professionals to enhance and develop a mutually beneficial outcome for the company and Clients.  Maintained good working relationship with the Principal and Specialist Contractors and Sub-Contractors ensuring work progress, resolving site constraints with practical solutions;  Ensured Clients’ requirements were not compromised;  Continuous improvements in design and drawing details through feedback and onsite discussions with experienced tradesmen;  Successful in attaining Professional Engineer status (in year 1994) which has the capacity to sign off project/development submissions to Government Authorities. Languages  English  Chinese  Bahasa Malaysia
  • 7. Curriculum Vitae Chee Wong Mobile: +6012 7130 197 E-mail: cswong63@gmail.com Page 7 Interests  Travel  Cooking Referees  Available on request