The document summarizes a mapping project completed by Continental Mapping for a wastewater treatment facility outside of Las Vegas, Nevada. Continental Mapping was engaged to complete a comprehensive mapping effort of the 140 acre, highly complex site. They acquired high accuracy aerial imagery with 0.10 foot vertical accuracy and 2.5 cm ground sample distance, and collected 3D models of buildings, tanks, and other infrastructure to develop accurate maps and models of the existing site and support proposed improvements.