Preliminary Construction & Traffic Planning
   Intro to Shop Local/Shop Eglinton Initiative




                                  June 27, 2012
Agenda
• Introductions

• Project Update

• Preliminary Crosstown Construction & Traffic Planning Overview
    –   Tunnelling Process
    –    Stations
    –    Allen Road

• Shop Eglinton, Shop Local Initiative

• Q&A, Discussion and Next Steps



                  7/3/2012   Preliminary Construction Planning
The Crosstown - 2012




                                                                     • 60% faster than current
                                                                       bus routes
                                                                   • 7 minutes from Eglinton
                                                                     West Station (Allen
Final number and location of stations subject to Provincial review   Road) to Yonge Street




                                  Preliminary Construction Plan
Update

• The first Tunnel Contract (Keele St to Yonge St) will be awarded this
  summer

• Detailed traffic plans will be developed after the contract is awarded

• Additional public meetings in Fall 2012 to discuss detailed construction
  plans for the first tunnelling contract

• The earliest utility work could begin on Eglinton in the vicinity of Allen
  Road is late 2012 (Eglinton @ Allen southbound & Keele Street)




                             Preliminary Construction Plan
Tunnel Construction Principles

• Package contracts to coordinate all work under same umbrella
  (utilities, city, transit)

• Maintain a minimum of one lane eastbound and westbound on
  Eglinton in construction zones

• Access to buildings from Eglinton remains open

• Only propose road closures if required for safety reasons or to
  provide exceptional time savings and reduction to long term
  disruption




                        Preliminary Construction Plan
Eglinton Bus Ridership
• Eglinton 32 & 34 buses carry 68,500 riders every
  weekday

• Transfers required at Eglinton West and Eglinton
  Stations (Allen & Yonge)

• Eglinton has amongst the
  highest ridership of all
  bus routes


                  Preliminary Construction Plan      6
Eglinton at Bathurst (looking west)




          Preliminary Construction Plan   7
Eglinton West Station




   Preliminary Construction Plan   8
Looking east from Oakwood




      Preliminary Construction Plan   9
Crosstown Construction Update

• Tunnel preparation work at
  Black Creek and Eglinton in
  Keelesdale Park


• Piling rigs are building concrete
  support walls for the future west
  tunnel launch shaft


• The west launch shaft will
  enable tunnelling works in late
  2012 towards Allen Road




                          Preliminary Construction Plan
West Launch Shaft
      Keelesdale Park near Black Creek Drive

Launch Shaft
• 60m long
• 20m wide
• 16m deep




                 Preliminary Construction Plan
Tunnel Construction Overview
• Relocate utilities at major intersections to maintain services (gas, water, cable)


• Construct “headwalls” (support walls formed by a series of concrete columns) at east
  and west ends of each future station location
   - 4-5 months per station location
   - Process called “Jet Grouting” when soil conditions allow – 3-4 months


• Concurrently, construct Tunnel launch and extraction shafts


• The tunnel machines are launched from Keelesdale Park (just west of Keele Street)
  and tunnel eastward through the station “headwalls”




                                Preliminary Construction Plan
Jet Grouting - Headwalls




   Typical Rig




                                         Jet Grouting Process


2–3m Diameter Jet Grout
Formed Soilcrete Columns


                           Preliminary Construction Plan
Tunnel Construction Overview Continued

• To maintain Subway Service throughout construction, tunnelling machines are
  extracted at the west side of Allen Road on Eglinton and re-launched from a new pit
  on the east side of Allen Road on Eglinton


• Tunnelling proceeds to Yonge Street, and a second extraction pit is built to remove and
  re-furbish the machines before they reach Eglinton Station


• Following this tunnelling work, the Crosstown Stations between Keele and Yonge will
  be constructed


• Stations will each take approximately 4 years to construct




                               Preliminary Construction Plan
Utility Relocation




 Preliminary Construction Plan
Utilities - Bathurst Intersection
                                       600mm                                                BELL/ROGERS
                                       WATERMAIN                                            CONDUITS (2)
STACKED
SANITARY                                                                                           225mm
SEWERS                                  1125mm STORM
                                                                                                   SANITARY
                                        SEWER
                                                                                                   SEWER



                        EGLINTON AVENUE WEST




                                          TELUS/GT DUCT                         300mm GASMAIN       BELL/ROGERS
                                          BANK (18)                             (TO BE              CONDUITS (20)




                                                              BATHURST STREET
PEVERIL HILL NORTH




                                                                                ABANDONED)
                     T.H.E.S. DUCT       150mm GASMAIN
                     BANK (12)           (ABANDONED)                             STACKED SANITARY SEWERS

                                        300mm COMBINED                                  EXISTING STORM SEWER
                                                                                        EXISTING SANITARY SEWER
                                        SEWER                                           EXISTING WATERMAIN
                                                                                        EXISTING COMBINED SEWER
                                                                                        EXISTING GASMAIN
                                                                                        EXISTING BELL/ROGER CONDUIT
                                                                                        EXISTING TELUS/GT CONDUIT
                                                                                        EXISTING T.H.E.S./COGECO DUCT
                                                                                        BANK




                            7/3/2012      Preliminary Construction Plan
Challenge of Underground Utilities




         Preliminary Construction Plan
Tunnel Drive Sequence



Launch Shaft




     Preliminary Construction Plan
Tunnel Drive Sequence




               Extraction Shaft




   Preliminary Construction Plan
Tunnel Drive Sequence




                  Leading Tunnel



Trailing Tunnel




                  Preliminary Construction Plan
Tunnel Drive Sequence

              Station
              Headwalls




   Preliminary Construction Plan
Tunnel Drive Sequence

              Mine-Through
              Headwalls




   Preliminary Construction Plan
Extraction Shaft Example
Spadina Subway Extension - Keele and Finch




            Preliminary Construction Plan
Extraction Shaft Example
Spadina Subway Extension - Keele south of Finch




               Preliminary Construction Plan
Eglinton and Allen - Existing




      Preliminary Construction Plan
Utility Relocation Work
                   Exact Lane Setup TBD




• Minimum one through lane in each direction on Eglinton
• Aiming to provide 3rd lane when safe to do so

                     Preliminary Construction Plan
Extraction & Launch Shaft Preparation
          Exact Lane Setup TBD




           Preliminary Construction Plan
Extract TBM & Re-Launch
(Ensure Subway Service is Maintained)




           Preliminary Construction Plan
Soil removal for Tunnelling




                              • 1 165 000 cubic
                                metres of soil to be
                                removed during
                                tunnelling

                              • Enough to fill the ACC
                                rink higher than the
                                CN Tower




      Preliminary Construction Plan
West Tunnelling – Keele Street to Yonge Street


    Preliminary Traffic Management Overview
Existing Conditions on Eglinton

• Rush Hours : 7am to 9am & 4pm to 6pm

• Most sections from Keele to Allen have one lane in each direction for
  general traffic in rush hours

• Most sections from Allen to Yonge have two lanes in each direction
  available for general traffic in rush hours

• In most sections during rush hours, the curb lane is for buses/taxis only

• Outside of rush hours, the curb lanes are used for on-street parking,
  generally leaving one lane per direction for moving traffic




                           Preliminary Construction Plan
Traffic Origin
            Eglinton Avenue Dufferin to Chaplin

• External traffic represents 45% of the auto trips (AM peak)

• 45% of traffic has an origin and destination outside the area & use Eglinton
  as a traffic corridor in AM peak

• PM peak period is similar, 42% external, 58% local




                            Preliminary Construction Plan
During Tunnel Construction

• One lane of traffic available on Eglinton both EB and WB all-day in
  active construction zones. Buses and general traffic will share this
  lane.

• Advance warning signs will be placed in the vicinity of the corridor.
  Changeable Message Signs and Static Signs.




                            Preliminary Construction Plan
Transit Services during Tunnel Construction

• Pedestrian and bus access to Eglinton West and Eglinton Stations will
  remain open
• Some local bus route detours may be required for key tunnelling
  activities (e.g. tunnel extraction shaft near Duplex Avenue)
• Eglinton buses will be monitored and additional buses added as
  needed to respond to changes in traffic conditions




                         Preliminary Construction Plan
Parking

• Currently, 3 hour paid parking is available on Eglinton Avenue West
  outside of weekday rush hours.

• In order to provide space for construction work, some of these spaces
  will be unavailable

• One-hour parking on some local roads will be extended to 3 hours, only
  while construction is impacting parking availability on Eglinton Avenue

• Parking on local roads will be enforced to discourage long-term
  parking and will be closely monitored by Toronto Police Services
  Parking Enforcement




                          Preliminary Construction Plan
Pedestrians/ Cyclists
• Front door access to Eglinton Avenue buildings maintained

• Minimum 1.5 metre sidewalk widths

• Some temporary closures of sections of sidewalk required. Where
  necessary, crossings will be available at traffic signals. One side open at
  all times.

• Bike lanes not currently provided on Eglinton

• During construction, cyclists will continue to share general traffic lanes

• Where space is available, wider lanes provided to accommodate all users



                           Preliminary Construction Plan
Allen Road Area

• Detailed Traffic management plans will be developed upon award of tunnel
  contract and presented at Fall 2012 follow-up meeting
• 2013 – Potential for occasional, off peak (overnight) Southbound Right
  Turn prohibitions from Allen to Eglinton for utility relocations at Extraction
  Shaft
• 2013 - Potential short duration Eastbound to Northbound left turn
  prohibitions from Eglinton onto Allen Road for decking installation at ramp




                          Preliminary Construction Plan
Allen Road
      Proposed Closure to Northbound Access at
                  Eglinton in 2014
• Potential closure of northbound access to Allen Road at Eglinton to
  expedite tunnelling

• Closure projected to reduce construction by approximately one year

• Northbound Allen access would remain open at Lawrence

• Closure would give contractor enough space for construction staging and
  movement of 150 trucks per day directly onto Allen Road

  – All prohibitions at Allen Road require City Council approval
  – Anticipated report timing is FALL 2012 Public Works Committee/City
    Council


                             Preliminary Construction Plan
Tunnel Launch Shaft
Sheppard Subway Example at Leslie




        Preliminary Construction Plan
13 Division – Working with Police
Temporary Property Requirements
                       • 5 metre area between
                         sidewalk and 13 Division
                         building
                       • Utility construction area
                       • Temporary sidewalk
                       • Tree removals are
                         unavoidable
                       • Sign removal/ relocation
                       • Tiebacks




          Preliminary Construction Plan
Cross Passages - 2014
• Cross passages are used for emergency evacuation of the tunnels and for
  access between the tunnels for maintenance

• Constructed by hand mining between the two tunnels

• Area needed on road for pumping equipment to dewater the area where the
  mining is conducted

• Bathurst to Yonge: Jet grouting is required. Street occupation similar to station
  headwalls

• Impact = 2 -3 months per location

• 1 lane per direction



                              Preliminary Construction Plan
Temporary Local Road Closures at Eglinton Avenue
Temporary closures at Eglinton intersections with some local streets will
unfortunately be required during different phases of tunnel construction to safely
complete work:

•   Yarrow Road (2012-2013 - 7 weeks)
•   Kane Avenue (2013 - 5 weeks)
•   Little Boulevard (2013 – 4 days)
•   Strathearn Road (2013 - 11 Weeks)
•   Flanders Road (2013 - 11 Weeks)
•   Peveril Hill North Road (2013 - 9 Weeks)
•   Chaplin Crescent Southbound Thru & Left (2013 - 9 Weeks)
•   Latimer Avenue (2013 - 9 Weeks)
•   Highbourne Road (2014 - 9 Weeks)
•   Maxwell Avenue (2015 - 17 Weeks)




                             Preliminary Construction Plan
Station Construction Overview
               Projected Start – 2015



• After tunneling is completed, station construction begins




                     Preliminary Construction Plan
Eglinton Pre-Construction - Existing Right of Way Use




                                Watermain




                   Preliminary Construction Plan
Station Construction
Stage 1A Piling - Divert Traffic & Construct Support of Excavation
   (Exact Construction Set-Up TBD by Location for all stages)




                                  Watermain




                     Preliminary Construction Plan
Station Construction
Stage 1B – Construct Centre Piles




                  Watermain




     Preliminary Construction Plan
Station Construction
Stage 2A - Construct Roadway Decking on one Side




                          Watermain




             Preliminary Construction Plan
Station Construction
Stage 2B – Construct opposite side Decking & Support of Excavation




                                  Watermain




                     Preliminary Construction Plan
Station Construction
Stage 3: Construct Station Box under the Roadway Decking




                              Watermain




                 Preliminary Construction Plan
Station Construction
Station Complete – Restore Roadway, Utilities & Traffic




                            Watermain




                Preliminary Construction Plan
Monitoring Construction Noise & Vibration

• Noise levels monitored and must comply with City of Toronto Noise by-law

• Noise by-law allows:
   • Civil construction 7 am to 11 pm, 7 days per week
   • Continuous underground tunnelling work

• Sound barrier to be installed in TTC East Commuter Parking Lot

• Vibration levels monitored and must comply with Municipal Code section
  363-3.6

• If limits exceeded, contractor required to take action to reduce noise and
  vibration to within specified limits


                           Preliminary Construction Planning
Future “Shop Eglinton” Program to
                Support Local Businesses

• Grassroots program to be developed for 2013 to support local
  businesses through construction


• Local business & community involvement for brainstorming


• Sign-up tonight to become involved & Support your Business
  Improvement Areas




                7/3/2012   Preliminary Construction Planning
Next Steps


a) Fall Meetings in advance of construction
   (Review and input on traffic and construction staging plans)

b) Construction Liaison Groups
   Smaller groups (10 local representatives per station with local councillor)
   give input, questions & concerns directly to construction team

c) Contact Community Liaisons with specific local issues & recommendations
   for investigation as well as for meetings




                               Preliminary Construction Plan
The Crosstown Team
            Please Get in Touch with Us!
Devin Horne, Franca Di Giovanni,        Community Office Hours — 2012
Denise Jayawardene                      Monday, Wednesday, Friday:
E-mail: eglintontransit@ttc.ca          9:00 a.m. – 5:00 p.m.
Online: www.thecrosstown.ca             Tuesday & Thursday: by appointment
Tel: 416-338-6310
Fax: 416-397-8193
TTY: 416-481-2523
Visit our West Community
Office at
1848 Eglinton Avenue West
(at Dufferin)




                            Preliminary Construction Plan
THANK YOU




 Preliminary Construction Plan
Additional Information




      Preliminary Construction Plan
Extract TBM & Re-Launch
(Future LRT concept under Subway)




          Preliminary Construction Plan
Additional Background Information




         Preliminary Construction Plan
Approach to Traffic Management

•   Existing Conditions as Baseline vs. Construction Conditions
•   Pedestrians, vehicles, & transit (allocation of space)
•   Level of service at signalized intersections
•   Levels of through traffic vs. local traffic
•   On-street Parking Strategy

Strategies
• Adjustments to signal timing
• Monitoring and preventing local infiltration through residential streets
• Signage program across City and nearby 400 series Highways




                           Preliminary Construction Plan
Traffic Study Methodology
• City of Toronto Planning Department participates in Transportation Tomorrow
  Survey of travel patterns in Toronto and the GTA (5% sampling of GTA households
  approximately 150,000 interviews)

• Data reflects trip origin and destination information

• Intersection turning movement counts from City of Toronto

• Reviewed City of Toronto Transportation Model

• Undertook counts at un-signalized intersections where counts were not available

• Analysis with specialized transportation software using established methodology




                              Preliminary Construction Plan
Existing Conditions
        Dufferin to Chaplin & Chaplin to Yonge


Existing capacity constraints – Dufferin to Chaplin

• Westbound Eglinton to southbound Oakwood (PM peak)
• Allen Road southbound off-ramp during AM peak
• Northbound left at Spadina Road and Eglinton during PM peak




                           Preliminary Construction Plan
Pedestrians & Transit

Pedestrian Activity
• Ensure safe crossing spaces
• Re-routings when necessary with effective signage
• Between Allen and Chaplin increased pedestrian activity is found at key points such as Allen
  Road and Bathurst street
• Allen Road SB 5027 pedestrian crossing during peak 8 hours
• Bathurst has 3788 pedestrian crossings during peak 8 hours

Transit Service & Bus ridership
• Maintain efficient service throughout construction for 68 500 daily Eglinton bus riders

• Bus ridership on the 7 Bathurst 3000 daily commuters through the intersection




                                  Preliminary Construction Plan
Ministry of Transportation (MTO)
 Highway 401 /Allen Road Ramp Improvements

• MTO is rehabilitating 8 structures in the Highway 401 and Allen Road
  Interchange
• Bridge improvements have been broken into 2 contracts
• Contract 1 (Bridges 4 and 24) Contract 2 (Bridges 5, 6, 12, 16 19 22)
• Construction for Contract 1 commenced in Spring 2012
• Completion for Contract 1: late Fall 2012
• Construction schedule for Contract 2 TBD




                            Preliminary Construction Plan
Ministry of Transportation (MTO)
Highway 401 /Allen Road Ramp Improvements




              Preliminary Construction Plan
MTO - Highway 401 /Allen Road Ramp
                   Construction Details
• Lane reductions on the 401 to Allen Road ramps and bridges
• Periodic overnight ramp/bridge closures
• Advance traffic warning signs will be posted in the area to advise the public of
  traffic restriction and lane closures
• Construction is planned to take place during daytime hours from Monday to
  Friday
• Extended working hours (periodic night time work) & weekend work required to
  complete construction on schedule.

Project information:
Mr. Sam Molai, P.Eng., Senior Structural Engineer   Mr. Larry NG, Project Manager
Ministry of Transportation, Central Region          Design SNC Lavalin
tel: 416-235-5506                                   tel: 416-252-5315 Ext 2711
e-mail: Sam.Molai@ontario.ca




                                 Preliminary Construction Plan
City of Toronto – Long Term Planning
       Allen Road Environmental Assessment
• The City of Toronto is studying ways to improve Allen Road

• The study will follow a provincially mandated Environmental
  Assessment process.

• Study investigating current challenges and opportunities in the Allen
  Road corridor from Eglinton to just south of Transit Road

• Currently, a Terms of Reference (Study Framework/Work Plan) is being
  developed to guide future work




                          Preliminary Construction Plan
Allen Road Environmental Assessment


For more information, please contact:

Jason Diceman
Tel: 416-392-3787
E-mail: AllenRdStudy@toronto.ca

Web Site:
www.toronto.ca/involved/projects/allenrdstudy




                            Preliminary Construction Plan
Diamond Lane Offpeak - East to Bathurst




            Preliminary Construction Plan

Más contenido relacionado

La actualidad más candente

Hill roads and Drainage
Hill roads and DrainageHill roads and Drainage
Hill roads and Drainageholegajendra
 
Gallows Road and Prosperity Avenue Improvements
Gallows Road and Prosperity Avenue ImprovementsGallows Road and Prosperity Avenue Improvements
Gallows Road and Prosperity Avenue ImprovementsFairfax County
 
62617938 launching-girder
62617938 launching-girder62617938 launching-girder
62617938 launching-girderlotuseye
 
Martin Goodman Trail West – Project Overview
Martin Goodman Trail West – Project OverviewMartin Goodman Trail West – Project Overview
Martin Goodman Trail West – Project OverviewWaterfrontTO
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Hitesh Khanna
 
Report - District 10 Snowmobile Bridge - February 14, 2011
Report - District 10 Snowmobile Bridge - February 14, 2011Report - District 10 Snowmobile Bridge - February 14, 2011
Report - District 10 Snowmobile Bridge - February 14, 2011Mark Steenhof
 
Hill road construction
Hill road constructionHill road construction
Hill road constructionGeet KH
 
Highway engineering at high altitudes
Highway engineering at high altitudesHighway engineering at high altitudes
Highway engineering at high altitudesPrashant Shekhar
 
Assessment and reinforcement of the 20 existing bridges in the Bozoum-Bossang...
Assessment and reinforcement of the 20 existing bridges in the Bozoum-Bossang...Assessment and reinforcement of the 20 existing bridges in the Bozoum-Bossang...
Assessment and reinforcement of the 20 existing bridges in the Bozoum-Bossang...jacoposiracusa
 
Gallery in Concrete Gravity Dam
Gallery in Concrete Gravity DamGallery in Concrete Gravity Dam
Gallery in Concrete Gravity DamManish Khandelwal
 
Michalis presentation_2015
Michalis presentation_2015Michalis presentation_2015
Michalis presentation_2015ILIAS MICHALIS
 
Maintenence of road
Maintenence of roadMaintenence of road
Maintenence of roadholegajendra
 
Inspection,Repair and Strengthening of PSC Bridge.
Inspection,Repair and Strengthening of PSC  Bridge.Inspection,Repair and Strengthening of PSC  Bridge.
Inspection,Repair and Strengthening of PSC Bridge.Mohammad Furqan
 
Case study bridge construction upto pier and road construction
Case study   bridge construction upto pier and road constructionCase study   bridge construction upto pier and road construction
Case study bridge construction upto pier and road constructionSatish Kambaliya
 
PHC pile Installation methods
PHC  pile Installation methodsPHC  pile Installation methods
PHC pile Installation methodsHalim Rahman
 

La actualidad más candente (20)

Hill roads and Drainage
Hill roads and DrainageHill roads and Drainage
Hill roads and Drainage
 
Gallows Road and Prosperity Avenue Improvements
Gallows Road and Prosperity Avenue ImprovementsGallows Road and Prosperity Avenue Improvements
Gallows Road and Prosperity Avenue Improvements
 
62617938 launching-girder
62617938 launching-girder62617938 launching-girder
62617938 launching-girder
 
Martin Goodman Trail West – Project Overview
Martin Goodman Trail West – Project OverviewMartin Goodman Trail West – Project Overview
Martin Goodman Trail West – Project Overview
 
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunne...
 
Report - District 10 Snowmobile Bridge - February 14, 2011
Report - District 10 Snowmobile Bridge - February 14, 2011Report - District 10 Snowmobile Bridge - February 14, 2011
Report - District 10 Snowmobile Bridge - February 14, 2011
 
Directional drilling
Directional drillingDirectional drilling
Directional drilling
 
Hill road construction
Hill road constructionHill road construction
Hill road construction
 
Highway engineering at high altitudes
Highway engineering at high altitudesHighway engineering at high altitudes
Highway engineering at high altitudes
 
Cut and cover
Cut and coverCut and cover
Cut and cover
 
Hill roads
Hill roadsHill roads
Hill roads
 
Assessment and reinforcement of the 20 existing bridges in the Bozoum-Bossang...
Assessment and reinforcement of the 20 existing bridges in the Bozoum-Bossang...Assessment and reinforcement of the 20 existing bridges in the Bozoum-Bossang...
Assessment and reinforcement of the 20 existing bridges in the Bozoum-Bossang...
 
Gallery in Concrete Gravity Dam
Gallery in Concrete Gravity DamGallery in Concrete Gravity Dam
Gallery in Concrete Gravity Dam
 
Michalis presentation_2015
Michalis presentation_2015Michalis presentation_2015
Michalis presentation_2015
 
Maintenence of road
Maintenence of roadMaintenence of road
Maintenence of road
 
Tunnel engineering
  Tunnel engineering  Tunnel engineering
Tunnel engineering
 
Inspection,Repair and Strengthening of PSC Bridge.
Inspection,Repair and Strengthening of PSC  Bridge.Inspection,Repair and Strengthening of PSC  Bridge.
Inspection,Repair and Strengthening of PSC Bridge.
 
Case study bridge construction upto pier and road construction
Case study   bridge construction upto pier and road constructionCase study   bridge construction upto pier and road construction
Case study bridge construction upto pier and road construction
 
Flyover construction
Flyover constructionFlyover construction
Flyover construction
 
PHC pile Installation methods
PHC  pile Installation methodsPHC  pile Installation methods
PHC pile Installation methods
 

Similar a Online Consultation: Preliminary Construction and Traffic Management Planning

Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...Crosstown TO
 
Leaside open house sep 2014 Slides
Leaside open house sep 2014 SlidesLeaside open house sep 2014 Slides
Leaside open house sep 2014 SlidesCrosstown TO
 
Leaside open house sep 2014 slides
Leaside open house sep 2014   slidesLeaside open house sep 2014   slides
Leaside open house sep 2014 slidesCrosstown TO
 
Leaside & Laird Construction Liaison Committee Meeting - September 2017
Leaside & Laird Construction Liaison Committee Meeting - September 2017Leaside & Laird Construction Liaison Committee Meeting - September 2017
Leaside & Laird Construction Liaison Committee Meeting - September 2017Crosstown TO
 
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - October ...
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - October ...Eglinton and Mount Pleasant Construction Liaison Committee Meeting - October ...
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - October ...Crosstown TO
 
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018Crosstown TO
 
Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Crosstown TO
 
Eglinton and Mount Pleasant CLC - March 10, 2021
Eglinton and Mount Pleasant CLC - March 10, 2021Eglinton and Mount Pleasant CLC - March 10, 2021
Eglinton and Mount Pleasant CLC - March 10, 2021Crosstown TO
 
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017Crosstown TO
 
Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingCrosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingCrosstown TO
 
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Crosstown TO
 
IES Academy Fluid Machine by S K Mondal.ppt
IES Academy Fluid Machine by S K Mondal.pptIES Academy Fluid Machine by S K Mondal.ppt
IES Academy Fluid Machine by S K Mondal.pptSubbuSuni
 
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017Crosstown TO
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Rajesh Prasad
 
THE CUNENE RIVER BRIDGE IN ANGOLA (2009)
THE CUNENE RIVER BRIDGE IN ANGOLA (2009)THE CUNENE RIVER BRIDGE IN ANGOLA (2009)
THE CUNENE RIVER BRIDGE IN ANGOLA (2009)Juan Jorge
 
West Open House - Progress Update Sept 2014
West Open House - Progress Update Sept 2014West Open House - Progress Update Sept 2014
West Open House - Progress Update Sept 2014Crosstown TO
 
Eglinton Crosstown Update
Eglinton Crosstown UpdateEglinton Crosstown Update
Eglinton Crosstown UpdateCrosstown TO
 

Similar a Online Consultation: Preliminary Construction and Traffic Management Planning (20)

Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...
 
Leaside open house sep 2014 Slides
Leaside open house sep 2014 SlidesLeaside open house sep 2014 Slides
Leaside open house sep 2014 Slides
 
Leaside open house sep 2014 slides
Leaside open house sep 2014   slidesLeaside open house sep 2014   slides
Leaside open house sep 2014 slides
 
Leaside & Laird Construction Liaison Committee Meeting - September 2017
Leaside & Laird Construction Liaison Committee Meeting - September 2017Leaside & Laird Construction Liaison Committee Meeting - September 2017
Leaside & Laird Construction Liaison Committee Meeting - September 2017
 
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - October ...
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - October ...Eglinton and Mount Pleasant Construction Liaison Committee Meeting - October ...
Eglinton and Mount Pleasant Construction Liaison Committee Meeting - October ...
 
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
Chaplin & Avenue Stations Construction Liaison Committee Meeting - January 2018
 
Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020
 
Eglinton and Mount Pleasant CLC - March 10, 2021
Eglinton and Mount Pleasant CLC - March 10, 2021Eglinton and Mount Pleasant CLC - March 10, 2021
Eglinton and Mount Pleasant CLC - March 10, 2021
 
ECS Food For Thought_ presentation Final2
ECS Food For Thought_ presentation Final2ECS Food For Thought_ presentation Final2
ECS Food For Thought_ presentation Final2
 
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017
 
Pharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee MeetingPharmacy to Kennedy Construction Liaison Committee Meeting
Pharmacy to Kennedy Construction Liaison Committee Meeting
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee MeetingBrentcliffe - Victoria Park Construction Liaison Committee Meeting
Brentcliffe - Victoria Park Construction Liaison Committee Meeting
 
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
Chaplin & Avenue Construction Liaison Committee Meeting - November 2017
 
IES Academy Fluid Machine by S K Mondal.ppt
IES Academy Fluid Machine by S K Mondal.pptIES Academy Fluid Machine by S K Mondal.ppt
IES Academy Fluid Machine by S K Mondal.ppt
 
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
Chaplin-Avenue Construction Liaison Committee Meeting - October 2017
 
Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...Uses of special kind of technologies for implementation of special kind of st...
Uses of special kind of technologies for implementation of special kind of st...
 
Alan sutton
Alan suttonAlan sutton
Alan sutton
 
THE CUNENE RIVER BRIDGE IN ANGOLA (2009)
THE CUNENE RIVER BRIDGE IN ANGOLA (2009)THE CUNENE RIVER BRIDGE IN ANGOLA (2009)
THE CUNENE RIVER BRIDGE IN ANGOLA (2009)
 
West Open House - Progress Update Sept 2014
West Open House - Progress Update Sept 2014West Open House - Progress Update Sept 2014
West Open House - Progress Update Sept 2014
 
Eglinton Crosstown Update
Eglinton Crosstown UpdateEglinton Crosstown Update
Eglinton Crosstown Update
 

Más de Crosstown TO

Western Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdfWestern Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdfCrosstown TO
 
Western Works CLC - May 16, 2023
 Western Works CLC - May 16, 2023 Western Works CLC - May 16, 2023
Western Works CLC - May 16, 2023Crosstown TO
 
Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023 Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023 Crosstown TO
 
Leaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfLeaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfCrosstown TO
 
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfEglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfCrosstown TO
 
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptxChaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptxCrosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCrosstown TO
 
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxPharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxCrosstown TO
 
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCrosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCrosstown TO
 
Chaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxChaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxCrosstown TO
 
Leaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfLeaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfCrosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCrosstown TO
 
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfEglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfCrosstown TO
 
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxChaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxCrosstown TO
 
Chaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxChaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxCrosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCrosstown TO
 
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfEglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfCrosstown TO
 
Leaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdfLeaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdfCrosstown TO
 
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCrosstown TO
 

Más de Crosstown TO (20)

Western Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdfWestern Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdf
 
Western Works CLC - May 16, 2023
 Western Works CLC - May 16, 2023 Western Works CLC - May 16, 2023
Western Works CLC - May 16, 2023
 
Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023 Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023
 
Leaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfLeaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdf
 
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfEglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
 
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptxChaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
 
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
 
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxPharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
 
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
 
Chaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxChaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptx
 
Leaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfLeaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdf
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
 
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfEglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
 
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxChaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
 
Chaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxChaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptx
 
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
 
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfEglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
 
Leaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdfLeaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdf
 
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
 

Último

WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...apidays
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsRoshan Dwivedi
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024The Digital Insurer
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxKatpro Technologies
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024The Digital Insurer
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processorsdebabhi2
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 

Último (20)

WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live StreamsTop 5 Benefits OF Using Muvi Live Paywall For Live Streams
Top 5 Benefits OF Using Muvi Live Paywall For Live Streams
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024Finology Group – Insurtech Innovation Award 2024
Finology Group – Insurtech Innovation Award 2024
 
Exploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone ProcessorsExploring the Future Potential of AI-Enabled Smartphone Processors
Exploring the Future Potential of AI-Enabled Smartphone Processors
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 

Online Consultation: Preliminary Construction and Traffic Management Planning

  • 1. Preliminary Construction & Traffic Planning Intro to Shop Local/Shop Eglinton Initiative June 27, 2012
  • 2. Agenda • Introductions • Project Update • Preliminary Crosstown Construction & Traffic Planning Overview – Tunnelling Process – Stations – Allen Road • Shop Eglinton, Shop Local Initiative • Q&A, Discussion and Next Steps 7/3/2012 Preliminary Construction Planning
  • 3. The Crosstown - 2012 • 60% faster than current bus routes • 7 minutes from Eglinton West Station (Allen Final number and location of stations subject to Provincial review Road) to Yonge Street Preliminary Construction Plan
  • 4. Update • The first Tunnel Contract (Keele St to Yonge St) will be awarded this summer • Detailed traffic plans will be developed after the contract is awarded • Additional public meetings in Fall 2012 to discuss detailed construction plans for the first tunnelling contract • The earliest utility work could begin on Eglinton in the vicinity of Allen Road is late 2012 (Eglinton @ Allen southbound & Keele Street) Preliminary Construction Plan
  • 5. Tunnel Construction Principles • Package contracts to coordinate all work under same umbrella (utilities, city, transit) • Maintain a minimum of one lane eastbound and westbound on Eglinton in construction zones • Access to buildings from Eglinton remains open • Only propose road closures if required for safety reasons or to provide exceptional time savings and reduction to long term disruption Preliminary Construction Plan
  • 6. Eglinton Bus Ridership • Eglinton 32 & 34 buses carry 68,500 riders every weekday • Transfers required at Eglinton West and Eglinton Stations (Allen & Yonge) • Eglinton has amongst the highest ridership of all bus routes Preliminary Construction Plan 6
  • 7. Eglinton at Bathurst (looking west) Preliminary Construction Plan 7
  • 8. Eglinton West Station Preliminary Construction Plan 8
  • 9. Looking east from Oakwood Preliminary Construction Plan 9
  • 10. Crosstown Construction Update • Tunnel preparation work at Black Creek and Eglinton in Keelesdale Park • Piling rigs are building concrete support walls for the future west tunnel launch shaft • The west launch shaft will enable tunnelling works in late 2012 towards Allen Road Preliminary Construction Plan
  • 11. West Launch Shaft Keelesdale Park near Black Creek Drive Launch Shaft • 60m long • 20m wide • 16m deep Preliminary Construction Plan
  • 12. Tunnel Construction Overview • Relocate utilities at major intersections to maintain services (gas, water, cable) • Construct “headwalls” (support walls formed by a series of concrete columns) at east and west ends of each future station location - 4-5 months per station location - Process called “Jet Grouting” when soil conditions allow – 3-4 months • Concurrently, construct Tunnel launch and extraction shafts • The tunnel machines are launched from Keelesdale Park (just west of Keele Street) and tunnel eastward through the station “headwalls” Preliminary Construction Plan
  • 13. Jet Grouting - Headwalls Typical Rig Jet Grouting Process 2–3m Diameter Jet Grout Formed Soilcrete Columns Preliminary Construction Plan
  • 14. Tunnel Construction Overview Continued • To maintain Subway Service throughout construction, tunnelling machines are extracted at the west side of Allen Road on Eglinton and re-launched from a new pit on the east side of Allen Road on Eglinton • Tunnelling proceeds to Yonge Street, and a second extraction pit is built to remove and re-furbish the machines before they reach Eglinton Station • Following this tunnelling work, the Crosstown Stations between Keele and Yonge will be constructed • Stations will each take approximately 4 years to construct Preliminary Construction Plan
  • 15. Utility Relocation Preliminary Construction Plan
  • 16. Utilities - Bathurst Intersection 600mm BELL/ROGERS WATERMAIN CONDUITS (2) STACKED SANITARY 225mm SEWERS 1125mm STORM SANITARY SEWER SEWER EGLINTON AVENUE WEST TELUS/GT DUCT 300mm GASMAIN BELL/ROGERS BANK (18) (TO BE CONDUITS (20) BATHURST STREET PEVERIL HILL NORTH ABANDONED) T.H.E.S. DUCT 150mm GASMAIN BANK (12) (ABANDONED) STACKED SANITARY SEWERS 300mm COMBINED EXISTING STORM SEWER EXISTING SANITARY SEWER SEWER EXISTING WATERMAIN EXISTING COMBINED SEWER EXISTING GASMAIN EXISTING BELL/ROGER CONDUIT EXISTING TELUS/GT CONDUIT EXISTING T.H.E.S./COGECO DUCT BANK 7/3/2012 Preliminary Construction Plan
  • 17. Challenge of Underground Utilities Preliminary Construction Plan
  • 18. Tunnel Drive Sequence Launch Shaft Preliminary Construction Plan
  • 19. Tunnel Drive Sequence Extraction Shaft Preliminary Construction Plan
  • 20. Tunnel Drive Sequence Leading Tunnel Trailing Tunnel Preliminary Construction Plan
  • 21. Tunnel Drive Sequence Station Headwalls Preliminary Construction Plan
  • 22. Tunnel Drive Sequence Mine-Through Headwalls Preliminary Construction Plan
  • 23. Extraction Shaft Example Spadina Subway Extension - Keele and Finch Preliminary Construction Plan
  • 24. Extraction Shaft Example Spadina Subway Extension - Keele south of Finch Preliminary Construction Plan
  • 25. Eglinton and Allen - Existing Preliminary Construction Plan
  • 26. Utility Relocation Work Exact Lane Setup TBD • Minimum one through lane in each direction on Eglinton • Aiming to provide 3rd lane when safe to do so Preliminary Construction Plan
  • 27. Extraction & Launch Shaft Preparation Exact Lane Setup TBD Preliminary Construction Plan
  • 28. Extract TBM & Re-Launch (Ensure Subway Service is Maintained) Preliminary Construction Plan
  • 29. Soil removal for Tunnelling • 1 165 000 cubic metres of soil to be removed during tunnelling • Enough to fill the ACC rink higher than the CN Tower Preliminary Construction Plan
  • 30. West Tunnelling – Keele Street to Yonge Street Preliminary Traffic Management Overview
  • 31. Existing Conditions on Eglinton • Rush Hours : 7am to 9am & 4pm to 6pm • Most sections from Keele to Allen have one lane in each direction for general traffic in rush hours • Most sections from Allen to Yonge have two lanes in each direction available for general traffic in rush hours • In most sections during rush hours, the curb lane is for buses/taxis only • Outside of rush hours, the curb lanes are used for on-street parking, generally leaving one lane per direction for moving traffic Preliminary Construction Plan
  • 32. Traffic Origin Eglinton Avenue Dufferin to Chaplin • External traffic represents 45% of the auto trips (AM peak) • 45% of traffic has an origin and destination outside the area & use Eglinton as a traffic corridor in AM peak • PM peak period is similar, 42% external, 58% local Preliminary Construction Plan
  • 33. During Tunnel Construction • One lane of traffic available on Eglinton both EB and WB all-day in active construction zones. Buses and general traffic will share this lane. • Advance warning signs will be placed in the vicinity of the corridor. Changeable Message Signs and Static Signs. Preliminary Construction Plan
  • 34. Transit Services during Tunnel Construction • Pedestrian and bus access to Eglinton West and Eglinton Stations will remain open • Some local bus route detours may be required for key tunnelling activities (e.g. tunnel extraction shaft near Duplex Avenue) • Eglinton buses will be monitored and additional buses added as needed to respond to changes in traffic conditions Preliminary Construction Plan
  • 35. Parking • Currently, 3 hour paid parking is available on Eglinton Avenue West outside of weekday rush hours. • In order to provide space for construction work, some of these spaces will be unavailable • One-hour parking on some local roads will be extended to 3 hours, only while construction is impacting parking availability on Eglinton Avenue • Parking on local roads will be enforced to discourage long-term parking and will be closely monitored by Toronto Police Services Parking Enforcement Preliminary Construction Plan
  • 36. Pedestrians/ Cyclists • Front door access to Eglinton Avenue buildings maintained • Minimum 1.5 metre sidewalk widths • Some temporary closures of sections of sidewalk required. Where necessary, crossings will be available at traffic signals. One side open at all times. • Bike lanes not currently provided on Eglinton • During construction, cyclists will continue to share general traffic lanes • Where space is available, wider lanes provided to accommodate all users Preliminary Construction Plan
  • 37. Allen Road Area • Detailed Traffic management plans will be developed upon award of tunnel contract and presented at Fall 2012 follow-up meeting • 2013 – Potential for occasional, off peak (overnight) Southbound Right Turn prohibitions from Allen to Eglinton for utility relocations at Extraction Shaft • 2013 - Potential short duration Eastbound to Northbound left turn prohibitions from Eglinton onto Allen Road for decking installation at ramp Preliminary Construction Plan
  • 38. Allen Road Proposed Closure to Northbound Access at Eglinton in 2014 • Potential closure of northbound access to Allen Road at Eglinton to expedite tunnelling • Closure projected to reduce construction by approximately one year • Northbound Allen access would remain open at Lawrence • Closure would give contractor enough space for construction staging and movement of 150 trucks per day directly onto Allen Road – All prohibitions at Allen Road require City Council approval – Anticipated report timing is FALL 2012 Public Works Committee/City Council Preliminary Construction Plan
  • 39. Tunnel Launch Shaft Sheppard Subway Example at Leslie Preliminary Construction Plan
  • 40. 13 Division – Working with Police Temporary Property Requirements • 5 metre area between sidewalk and 13 Division building • Utility construction area • Temporary sidewalk • Tree removals are unavoidable • Sign removal/ relocation • Tiebacks Preliminary Construction Plan
  • 41. Cross Passages - 2014 • Cross passages are used for emergency evacuation of the tunnels and for access between the tunnels for maintenance • Constructed by hand mining between the two tunnels • Area needed on road for pumping equipment to dewater the area where the mining is conducted • Bathurst to Yonge: Jet grouting is required. Street occupation similar to station headwalls • Impact = 2 -3 months per location • 1 lane per direction Preliminary Construction Plan
  • 42. Temporary Local Road Closures at Eglinton Avenue Temporary closures at Eglinton intersections with some local streets will unfortunately be required during different phases of tunnel construction to safely complete work: • Yarrow Road (2012-2013 - 7 weeks) • Kane Avenue (2013 - 5 weeks) • Little Boulevard (2013 – 4 days) • Strathearn Road (2013 - 11 Weeks) • Flanders Road (2013 - 11 Weeks) • Peveril Hill North Road (2013 - 9 Weeks) • Chaplin Crescent Southbound Thru & Left (2013 - 9 Weeks) • Latimer Avenue (2013 - 9 Weeks) • Highbourne Road (2014 - 9 Weeks) • Maxwell Avenue (2015 - 17 Weeks) Preliminary Construction Plan
  • 43. Station Construction Overview Projected Start – 2015 • After tunneling is completed, station construction begins Preliminary Construction Plan
  • 44. Eglinton Pre-Construction - Existing Right of Way Use Watermain Preliminary Construction Plan
  • 45. Station Construction Stage 1A Piling - Divert Traffic & Construct Support of Excavation (Exact Construction Set-Up TBD by Location for all stages) Watermain Preliminary Construction Plan
  • 46. Station Construction Stage 1B – Construct Centre Piles Watermain Preliminary Construction Plan
  • 47. Station Construction Stage 2A - Construct Roadway Decking on one Side Watermain Preliminary Construction Plan
  • 48. Station Construction Stage 2B – Construct opposite side Decking & Support of Excavation Watermain Preliminary Construction Plan
  • 49. Station Construction Stage 3: Construct Station Box under the Roadway Decking Watermain Preliminary Construction Plan
  • 50. Station Construction Station Complete – Restore Roadway, Utilities & Traffic Watermain Preliminary Construction Plan
  • 51. Monitoring Construction Noise & Vibration • Noise levels monitored and must comply with City of Toronto Noise by-law • Noise by-law allows: • Civil construction 7 am to 11 pm, 7 days per week • Continuous underground tunnelling work • Sound barrier to be installed in TTC East Commuter Parking Lot • Vibration levels monitored and must comply with Municipal Code section 363-3.6 • If limits exceeded, contractor required to take action to reduce noise and vibration to within specified limits Preliminary Construction Planning
  • 52. Future “Shop Eglinton” Program to Support Local Businesses • Grassroots program to be developed for 2013 to support local businesses through construction • Local business & community involvement for brainstorming • Sign-up tonight to become involved & Support your Business Improvement Areas 7/3/2012 Preliminary Construction Planning
  • 53. Next Steps a) Fall Meetings in advance of construction (Review and input on traffic and construction staging plans) b) Construction Liaison Groups Smaller groups (10 local representatives per station with local councillor) give input, questions & concerns directly to construction team c) Contact Community Liaisons with specific local issues & recommendations for investigation as well as for meetings Preliminary Construction Plan
  • 54. The Crosstown Team Please Get in Touch with Us! Devin Horne, Franca Di Giovanni, Community Office Hours — 2012 Denise Jayawardene Monday, Wednesday, Friday: E-mail: eglintontransit@ttc.ca 9:00 a.m. – 5:00 p.m. Online: www.thecrosstown.ca Tuesday & Thursday: by appointment Tel: 416-338-6310 Fax: 416-397-8193 TTY: 416-481-2523 Visit our West Community Office at 1848 Eglinton Avenue West (at Dufferin) Preliminary Construction Plan
  • 55. THANK YOU Preliminary Construction Plan
  • 56. Additional Information Preliminary Construction Plan
  • 57. Extract TBM & Re-Launch (Future LRT concept under Subway) Preliminary Construction Plan
  • 58. Additional Background Information Preliminary Construction Plan
  • 59. Approach to Traffic Management • Existing Conditions as Baseline vs. Construction Conditions • Pedestrians, vehicles, & transit (allocation of space) • Level of service at signalized intersections • Levels of through traffic vs. local traffic • On-street Parking Strategy Strategies • Adjustments to signal timing • Monitoring and preventing local infiltration through residential streets • Signage program across City and nearby 400 series Highways Preliminary Construction Plan
  • 60. Traffic Study Methodology • City of Toronto Planning Department participates in Transportation Tomorrow Survey of travel patterns in Toronto and the GTA (5% sampling of GTA households approximately 150,000 interviews) • Data reflects trip origin and destination information • Intersection turning movement counts from City of Toronto • Reviewed City of Toronto Transportation Model • Undertook counts at un-signalized intersections where counts were not available • Analysis with specialized transportation software using established methodology Preliminary Construction Plan
  • 61. Existing Conditions Dufferin to Chaplin & Chaplin to Yonge Existing capacity constraints – Dufferin to Chaplin • Westbound Eglinton to southbound Oakwood (PM peak) • Allen Road southbound off-ramp during AM peak • Northbound left at Spadina Road and Eglinton during PM peak Preliminary Construction Plan
  • 62. Pedestrians & Transit Pedestrian Activity • Ensure safe crossing spaces • Re-routings when necessary with effective signage • Between Allen and Chaplin increased pedestrian activity is found at key points such as Allen Road and Bathurst street • Allen Road SB 5027 pedestrian crossing during peak 8 hours • Bathurst has 3788 pedestrian crossings during peak 8 hours Transit Service & Bus ridership • Maintain efficient service throughout construction for 68 500 daily Eglinton bus riders • Bus ridership on the 7 Bathurst 3000 daily commuters through the intersection Preliminary Construction Plan
  • 63. Ministry of Transportation (MTO) Highway 401 /Allen Road Ramp Improvements • MTO is rehabilitating 8 structures in the Highway 401 and Allen Road Interchange • Bridge improvements have been broken into 2 contracts • Contract 1 (Bridges 4 and 24) Contract 2 (Bridges 5, 6, 12, 16 19 22) • Construction for Contract 1 commenced in Spring 2012 • Completion for Contract 1: late Fall 2012 • Construction schedule for Contract 2 TBD Preliminary Construction Plan
  • 64. Ministry of Transportation (MTO) Highway 401 /Allen Road Ramp Improvements Preliminary Construction Plan
  • 65. MTO - Highway 401 /Allen Road Ramp Construction Details • Lane reductions on the 401 to Allen Road ramps and bridges • Periodic overnight ramp/bridge closures • Advance traffic warning signs will be posted in the area to advise the public of traffic restriction and lane closures • Construction is planned to take place during daytime hours from Monday to Friday • Extended working hours (periodic night time work) & weekend work required to complete construction on schedule. Project information: Mr. Sam Molai, P.Eng., Senior Structural Engineer Mr. Larry NG, Project Manager Ministry of Transportation, Central Region Design SNC Lavalin tel: 416-235-5506 tel: 416-252-5315 Ext 2711 e-mail: Sam.Molai@ontario.ca Preliminary Construction Plan
  • 66. City of Toronto – Long Term Planning Allen Road Environmental Assessment • The City of Toronto is studying ways to improve Allen Road • The study will follow a provincially mandated Environmental Assessment process. • Study investigating current challenges and opportunities in the Allen Road corridor from Eglinton to just south of Transit Road • Currently, a Terms of Reference (Study Framework/Work Plan) is being developed to guide future work Preliminary Construction Plan
  • 67. Allen Road Environmental Assessment For more information, please contact: Jason Diceman Tel: 416-392-3787 E-mail: AllenRdStudy@toronto.ca Web Site: www.toronto.ca/involved/projects/allenrdstudy Preliminary Construction Plan
  • 68. Diamond Lane Offpeak - East to Bathurst Preliminary Construction Plan