Daniel D’Angelo, P.E.
Director, Office of Design
New York State Department of Transportation
June 4, 2008
Executive Briefing
2
1. What is design (process) and Design
(organization).
2. Strategic Planning and Performance
Management.
3. Workforce Development.
Objectives
3
Daniel D’Angelo, P.E. Background
• MO - Executive Management
Assistant to Chief Engineer (7 yrs),
• BS, Civil Engineering
University of Buffalo
• MBA, Organizational Leadership
Norwich University
• R3 - Syracuse (8 yrs)
Design Squad, CADD Manager
• R11 - NYC (4 yrs)
Route 9A West Side Highway, EIS Co-leader
• MO – Office of Design (1 yrs)
Director
• MO - Design Division (4 yrs)
Director DQAB
4
• Capital Project Delivery & Bridge
Safety Assurance
• Organization Overview
• Main Office and Regions
1. What is Design?
5
ConstructionPlanning
Design
Project
Planning and
Initiation
Scoping
Preliminary
Design
(Phases I-IV)
Final
Design
(Phases V-VI)
Construction
IPP
Identify Existing
Conditions,
Problems & Needs
Contextual
Assessment
Project objectives
Purpose & Need
Land Use
Capital Project Development Process
Site Conditions
Planning/Design
Asset Managers Regional
Director
Identify & define needs
6
ConstructionPlanning
Design
Project
Planning and
Initiation
Scoping
Preliminary
Design
(Phases I-IV)
Final
Design
(Phases V-VI)
Construction
Scope
Approval
Explore
Design
Conditions
Social
Transportation
Environmental
Economic
Contextual
Assessment
Project objectives
Purpose & Need
Land Use
Capital Project Development Process
Design
T&S
Site Conditions
Stru Env GeoLA Other
Identify problems & opportunities
7
ConstructionPlanning
Design
Project
Planning and
Initiation
Scoping
Preliminary
Design
(Phases I-IV)
Final
Design
(Phases V-VI)
Construction
Identify design alternatives & select final design solution
Design
Approval
Design
Approval
Final
Design
Report
Design
Alternatives
Determine
EA / EIS
Public
Input
Agency
Input
Capital Project Development Process
Design
T&S Stru Env GeoLA RE
8
ConstructionPlanning
Design
Project
Planning and
Initiation
Scoping
Preliminary
Design
(Phases I-IV)
Final
Design
(Phases V-VI)
Construction
Final contract documents (detailed design, specifications & estimate)
PS&E Let &
Award
Advanced
Detail
Plans
ROW /
MPT
Detailed
Design
Final
Design
PS&E/
Letting
Capital Project Development Process
Public
Input
Agency
Input
Design
T&S Stru Env GeoLA ConsRE
9
ConstructionPlanning
Design
Project
Planning and
Initiation
Scoping
Preliminary
Design
(Phases I-IV)
Final
Design
(Phases V-VI)
Construction
Project Completion
Construction
Start
Construction
Complete
Construction
Support
Capital Project Development Process
Public
Input
Construction
Support
T&S Stru Env GeoLA RE
Designers of record to support construction build out
Agency
Input
10
Project Scoping
Preliminary
Design/
Environmental
Studies
Final
Design
R.O.W.
Acquisition
Bid/Award
Construction
Support
2001 2002 2003 2005
6/02 05/03
2000
06/022/01
11/03 12/03
1/04
12/05
2004
11/01 11/03(24 Mo)
(16 Mo)
(12 Mo)
(1 ½ Mo)
(24 Mo)
Typical Project Development Schedule
Note: The chart illustrates Simple, Moderate and Many Complex Type Projects.
Other Complex / or ‘Mega’ Projects May Often Take Longer
6/00 3/01(9 Mo)
11
• Average number of projects 2002 – 07 293/year;
2007- 08 320 projects /year.
• There are currently 1,004 projects in development (as of 3/08)
Capital Projects
Source: PSS/ Trns.port Letting Data / Project Management
Projects Let Per Year
29
24
23
30
44
19
40
26
29
16
32
30
32
24
40
28
16
40
30
31
17
13
0
5
10
15
20
25
30
35
40
45
50
1 2 3 4 5 6 7 8 9 10 11
Region
Projects
Average 02-07
SFY 07-08
12
Resource Utilization Trends
Number of Projects costing more than $3M as a
percentage of the capital program
0.00%
5.00%
10.00%
15.00%
20.00%
25.00%
30.00%
35.00%
40.00%
45.00%
50.00%
1998 2000 2002 2004 2006 2008 2010 2012 2014
Fiscal Year
PercentageofTotalFYProgram
% of Projects
• More complex projects in future program.
Source: Consultant Management Bureau, Office of Design
13
14
Staffing Levels
Source: Budget Bureau
15
As of April 2008, the percent of Bridge Safety Assurance
staffing levels within the Office of Design’s total staffing
level equals 15%.
Staffing Levels
16
• Strategic/Operational Planning
• Performance Management
• Learning / Knowledge Based
Organizational Focus
> Identifying and Developing Strategic Advantages
> Responsiveness to Needs
> Customer Satisfaction
> Change Management
2. How We Got to Workforce Development
17
Main Office Strategic Direction and Priorities
using a Performance-Based approach
 Provide and Maintain Knowledge and Skills
 Provide and Maintain Tools
 Provide and Manage Resources
 Perform Quality Assurance
 Production (capital projects, PS&Es
visualization, photogrammetry, bid documents)
Strategic Planning
18
Strategic Planning
• Is planning for constant (sometimes
turbulent) change in increasingly complex and
dynamic environments.
• Identifies factors that have the most
significant influence on our ability to achieve
near term results and long term strategic
direction.
• Aligns process activities with goals.
• Sets direction - drives results!
19
Organizational change and being responsive to it most
effectively is part of the Office of Design’s strategic focus
History of Department Leadership & Strategies
20
0
10
20
30
40
50
60
70
1890 1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000
RHAA
AA
MBTA FWCA
HSBAA
FIFRA
CAA
AHPA
LWCF
CAA
WA CRA
SWDA
HBA
*NHPA
*4(f)
FAHA
FAHA
FAHA
*CAA
*WSRA
EAA
*NEPA
RRA
URA
WBA
*CWA
CZMA
*ESA
SDWA
FNWA
MSFCMA
RCRA
CWA
*EO11990
EO11998
ARPA
*CERCLA
ANILCA
LAA
FPPA
CBRA
HSWA
SDWA
EWRA
CWA
URA
STURAA
STURAA
NAGPRA
CZARA
ADA
CAA
ISTEA
SNRTA
EO12898
EO13007
SDWA
EO13061
EO13089
*TEA-21
EO13112
EO13148
EO13186
CAA
Federal Environmental Legislation
and Executive Orders Affecting
Transportation
CUMULATIVENUMBEROFLAWSAND
AMENDMENTS
YEAR
Prepared by FHWA Office of Natural Environment, May 2001
• Denotes Legislation/E.O. with the Most Significant Impact
(CAA, CERCLA, CWA, ESA, NEPA, NHPA, TEA-21, WSRA, 4(f ), EO 11990)
21
Organizational Direction & Alignment
• Strategic Planning aligns process activities with goals
which helps us to achieve desired results.
• Regional Design Meetings - Communication &
Coordination
22
‘The Office of Design (Regional Design Groups
and the Main Office) has a highly skilled and
proficient workforce which provides
maximum value and quality in the
development and delivery of capital projects’
Office of Design Strategic Goal
23
• Ensures the Office of Design best serves its
customers, achieves optimum results,
manages its resources most effectively and
is accountable.
• A philosophy of continuous improvement.
• A methodology to better understand and
communicate what we are trying to achieve,
how we are doing, what we are learning and
how we are improving.
Performance Management
24
• Performance Management ethic based
on strategy mapping and balanced
scorecard approach.
• Quarterly Reports, published since
March 07, are available on the Office
of Design’s Performance Management
IntraDOT link.
Performance Management
25
Office of Design’s ‘Balanced Scorecard’
Learning and Growth
Internal Processes
Customer
Business / Financial Results
Learning and Growth
Workforce Development Information Technology Organizational Effectiveness
Project Development
Schedule Achievement
Quality
Internal Processes
ExternalInternal
Customer
Efficiency of Resource Utilization per Project Type
Business / Financial Results
26
Learning
& Growth
Internal
Processes
Customer
Business /
Financial
Perspectives
Office of Design’s Detailed Indicators & Measures
Strategy
Output / million $ Construction
Responsiveness to needs and requests
Providing products and services as agreed upon
Meeting agreed upon expectations
Percent milestone dates met vs. planned
Public involvement expectations identified & met
Project development quality & completeness
Constructability: buildable & biddable
Guidance: current, appropriate and relevant
Knowledge skills & proficiency
Have appropriate tools
Provide effective, timely services
Effective communication & coordination
Efficiency/Effectiveness
Measures
Resource Utilization
Internal
External
PS&E Schedule
Achievement
Quality
Workforce Development
Information Technology
Organizational
Effectiveness
Indicators
27
3. Workforce Development
• What it is
• What it is not
• Where we are
• Where we are going
28
Workforce Development Program
• To ensure that 93% of
project development
staff have the
necessary and most
current skills to
develop and deliver
quality, timely and
cost effective capital
projects by 2009.
Objective…
29
Workforce Development Program
• Focuses on the critical competencies
(knowledge, skill and behavior) that drive
performance in design.
• Focuses on 3 strategic workforce (job family)
groups:
- Squad/Team Member
- Squad/Team Leader
- Consultant Job Manager
Key points…
30
Workforce Development Program
• Includes a combination of technical,
business and leadership competencies.
• Measures proficiency levels as “basic”,
“experienced” and “expert”.
• Proficiency levels provide objectivity and
make the model more practical.
31
Workforce Development Program
• Provides a basis to measure current
performance.
• Identifies clear objectives for future
development.
• The program is not static and will be reviewed
and refined on a periodic, as-needed basis.
32
Workforce Development Program
• Provides employees with opportunities to develop
skills and knowledge in a timely manner.
• Provides employees with opportunities to set
career goals that are consistent with both personal
and Regional needs.
• Provides employees with the most current skills
necessary in order to keep up with the many
technological, procedural and strategic changes
affecting the Department today.
Employee Benefits:
33
• Aligns skills with business needs.
• Improved training management and
coordination.
• Most cost effective and efficient use of limited
training resources
Management Benefits:
Workforce Development Program
34
Workforce Development Program
• 88 Technical.
• 15 Business/leadership.
• 5 Required classes.
Competencies:
• Developed and written in collaboration with all
11 Regional design groups
35
Workforce Development Program
How it works…
36
Workforce Development Program
• Automated Tool accessed through the Intradot
37
Workforce Development Program
• Initially collect data, repeat in 6 months and then update
once a year
• Multiple
Personal,
Supervisor and
Regional reports
can be
generated.
38
Summary
1. What is design (process) and Design
(organization).
2. Strategic Planning and Performance
Management.
3. Workforce Development.
39
• Mobility & Reliability
• Economic Development
• Sustainability and Smart Growth
• Community Vitality
• Quality-of-Life
• Land Use Practices
• Environmental Conditions
• Energy
Innovative,
Quality
Design
Effects:

Más contenido relacionado

Destacado

LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...LTC @ CSUSB
 
Public Private Partnerships in Florida
Public Private Partnerships in FloridaPublic Private Partnerships in Florida
Public Private Partnerships in Floridabeckerpoliakoff
 
(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309Avtansh Ghai
 
Outsourcing Contract Negotiations - Structure, Process & Tools
Outsourcing Contract Negotiations - Structure, Process & ToolsOutsourcing Contract Negotiations - Structure, Process & Tools
Outsourcing Contract Negotiations - Structure, Process & Toolsknowlan
 
Architect-Led Design-Build: a PRACTICAL business plan
Architect-Led Design-Build:  a PRACTICAL business planArchitect-Led Design-Build:  a PRACTICAL business plan
Architect-Led Design-Build: a PRACTICAL business planJeremy Baker
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposalrexcris
 

Destacado (6)

LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
LTC, Jack R. Widmeyer Transportation Research Conference, Going to San Bernar...
 
Public Private Partnerships in Florida
Public Private Partnerships in FloridaPublic Private Partnerships in Florida
Public Private Partnerships in Florida
 
(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309(3.4.1.2)station design guidelines final 122309
(3.4.1.2)station design guidelines final 122309
 
Outsourcing Contract Negotiations - Structure, Process & Tools
Outsourcing Contract Negotiations - Structure, Process & ToolsOutsourcing Contract Negotiations - Structure, Process & Tools
Outsourcing Contract Negotiations - Structure, Process & Tools
 
Architect-Led Design-Build: a PRACTICAL business plan
Architect-Led Design-Build:  a PRACTICAL business planArchitect-Led Design-Build:  a PRACTICAL business plan
Architect-Led Design-Build: a PRACTICAL business plan
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
 

Similar a DDA Commisioner presentation 060308_final

STIB Corporate PMO - QRP presentation - 2013 11 28
STIB Corporate PMO - QRP presentation - 2013 11 28STIB Corporate PMO - QRP presentation - 2013 11 28
STIB Corporate PMO - QRP presentation - 2013 11 28Stefano Vicenzi
 
City Planning Retrospective of Joseph A. Colón.ppsx
City Planning Retrospective of Joseph A. Colón.ppsxCity Planning Retrospective of Joseph A. Colón.ppsx
City Planning Retrospective of Joseph A. Colón.ppsxJoseph A. Colón
 
Planning And Development Department Strategic Operational Plan
Planning And Development Department Strategic Operational PlanPlanning And Development Department Strategic Operational Plan
Planning And Development Department Strategic Operational PlanFrank Miles
 
Regional Bicycle and Pedestrian Planning Framework
Regional Bicycle and Pedestrian Planning FrameworkRegional Bicycle and Pedestrian Planning Framework
Regional Bicycle and Pedestrian Planning FrameworkRPO America
 
ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...
ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...
ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...Fosu Anthony
 
Shaker Heights City School District Technology Plan, 2015-2020
Shaker Heights City School District Technology Plan, 2015-2020Shaker Heights City School District Technology Plan, 2015-2020
Shaker Heights City School District Technology Plan, 2015-2020David Shakno
 
Jim Proce ICMA-CM - 2015 Bond Election - Rowlett Texas
Jim Proce ICMA-CM - 2015 Bond Election - Rowlett TexasJim Proce ICMA-CM - 2015 Bond Election - Rowlett Texas
Jim Proce ICMA-CM - 2015 Bond Election - Rowlett TexasJim Proce
 
Үндэсний газрын мэдээллийн системийн хөгжүүлэлт тайван улсын жишээ
Үндэсний газрын мэдээллийн системийн хөгжүүлэлт тайван улсын жишээҮндэсний газрын мэдээллийн системийн хөгжүүлэлт тайван улсын жишээ
Үндэсний газрын мэдээллийн системийн хөгжүүлэлт тайван улсын жишээСумъяа Алтангэрэл
 
TSOULOUFAS-FULL CV-en DEC2015
TSOULOUFAS-FULL CV-en DEC2015TSOULOUFAS-FULL CV-en DEC2015
TSOULOUFAS-FULL CV-en DEC2015THEMIS TSOULOUFAS
 
An overview of the Ghana national M&E system
An overview of the Ghana national M&E systemAn overview of the Ghana national M&E system
An overview of the Ghana national M&E systemFIDAfrique-IFADAfrica
 
An introduction of ADB-funded Technical Assistance (TA) for “Improving Paymen...
An introduction of ADB-funded Technical Assistance (TA) for “Improving Paymen...An introduction of ADB-funded Technical Assistance (TA) for “Improving Paymen...
An introduction of ADB-funded Technical Assistance (TA) for “Improving Paymen...CIFOR-ICRAF
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&tNishant Pandey
 
PPC.MASTER.RESUME.WITH.CIP.SBEDA.v2
PPC.MASTER.RESUME.WITH.CIP.SBEDA.v2PPC.MASTER.RESUME.WITH.CIP.SBEDA.v2
PPC.MASTER.RESUME.WITH.CIP.SBEDA.v2Gabriel Perez
 
TDA/SAP PROCESS: A Revision to the Methodology and Training Course (IWC6 Pres...
TDA/SAP PROCESS: A Revision to the Methodology and Training Course (IWC6 Pres...TDA/SAP PROCESS: A Revision to the Methodology and Training Course (IWC6 Pres...
TDA/SAP PROCESS: A Revision to the Methodology and Training Course (IWC6 Pres...Iwl Pcu
 
City of Eugene OR Strategic Plan FY 2017
City of Eugene OR Strategic Plan FY 2017City of Eugene OR Strategic Plan FY 2017
City of Eugene OR Strategic Plan FY 2017Tracy Quintana
 

Similar a DDA Commisioner presentation 060308_final (20)

STIB Corporate PMO - QRP presentation - 2013 11 28
STIB Corporate PMO - QRP presentation - 2013 11 28STIB Corporate PMO - QRP presentation - 2013 11 28
STIB Corporate PMO - QRP presentation - 2013 11 28
 
Website project summary pages 131107
Website project summary pages 131107Website project summary pages 131107
Website project summary pages 131107
 
Nonyane - Mathebula Beau - June 2015
Nonyane - Mathebula Beau - June 2015Nonyane - Mathebula Beau - June 2015
Nonyane - Mathebula Beau - June 2015
 
City Planning Retrospective of Joseph A. Colón.ppsx
City Planning Retrospective of Joseph A. Colón.ppsxCity Planning Retrospective of Joseph A. Colón.ppsx
City Planning Retrospective of Joseph A. Colón.ppsx
 
Planning And Development Department Strategic Operational Plan
Planning And Development Department Strategic Operational PlanPlanning And Development Department Strategic Operational Plan
Planning And Development Department Strategic Operational Plan
 
Regional Bicycle and Pedestrian Planning Framework
Regional Bicycle and Pedestrian Planning FrameworkRegional Bicycle and Pedestrian Planning Framework
Regional Bicycle and Pedestrian Planning Framework
 
ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...
ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...
ANALYSIS OF PLAN IMPLEMENTATION AND MANAGEMENT EXPERIENCES OF ASANTE AKIM NOR...
 
Shaker Heights City School District Technology Plan, 2015-2020
Shaker Heights City School District Technology Plan, 2015-2020Shaker Heights City School District Technology Plan, 2015-2020
Shaker Heights City School District Technology Plan, 2015-2020
 
Coastal Road Project
Coastal Road ProjectCoastal Road Project
Coastal Road Project
 
Jim Proce ICMA-CM - 2015 Bond Election - Rowlett Texas
Jim Proce ICMA-CM - 2015 Bond Election - Rowlett TexasJim Proce ICMA-CM - 2015 Bond Election - Rowlett Texas
Jim Proce ICMA-CM - 2015 Bond Election - Rowlett Texas
 
Үндэсний газрын мэдээллийн системийн хөгжүүлэлт тайван улсын жишээ
Үндэсний газрын мэдээллийн системийн хөгжүүлэлт тайван улсын жишээҮндэсний газрын мэдээллийн системийн хөгжүүлэлт тайван улсын жишээ
Үндэсний газрын мэдээллийн системийн хөгжүүлэлт тайван улсын жишээ
 
TSOULOUFAS-FULL CV-en DEC2015
TSOULOUFAS-FULL CV-en DEC2015TSOULOUFAS-FULL CV-en DEC2015
TSOULOUFAS-FULL CV-en DEC2015
 
An overview of the Ghana national M&E system
An overview of the Ghana national M&E systemAn overview of the Ghana national M&E system
An overview of the Ghana national M&E system
 
An introduction of ADB-funded Technical Assistance (TA) for “Improving Paymen...
An introduction of ADB-funded Technical Assistance (TA) for “Improving Paymen...An introduction of ADB-funded Technical Assistance (TA) for “Improving Paymen...
An introduction of ADB-funded Technical Assistance (TA) for “Improving Paymen...
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
 
TDR resume 02-20-15
TDR resume 02-20-15TDR resume 02-20-15
TDR resume 02-20-15
 
PPC.MASTER.RESUME.WITH.CIP.SBEDA.v2
PPC.MASTER.RESUME.WITH.CIP.SBEDA.v2PPC.MASTER.RESUME.WITH.CIP.SBEDA.v2
PPC.MASTER.RESUME.WITH.CIP.SBEDA.v2
 
TDA/SAP PROCESS: A Revision to the Methodology and Training Course (IWC6 Pres...
TDA/SAP PROCESS: A Revision to the Methodology and Training Course (IWC6 Pres...TDA/SAP PROCESS: A Revision to the Methodology and Training Course (IWC6 Pres...
TDA/SAP PROCESS: A Revision to the Methodology and Training Course (IWC6 Pres...
 
City of Eugene OR Strategic Plan FY 2017
City of Eugene OR Strategic Plan FY 2017City of Eugene OR Strategic Plan FY 2017
City of Eugene OR Strategic Plan FY 2017
 
Denise van Rooyen
Denise van RooyenDenise van Rooyen
Denise van Rooyen
 

DDA Commisioner presentation 060308_final

  • 1. 1 Daniel D’Angelo, P.E. Director, Office of Design New York State Department of Transportation June 4, 2008 Executive Briefing
  • 2. 2 1. What is design (process) and Design (organization). 2. Strategic Planning and Performance Management. 3. Workforce Development. Objectives
  • 3. 3 Daniel D’Angelo, P.E. Background • MO - Executive Management Assistant to Chief Engineer (7 yrs), • BS, Civil Engineering University of Buffalo • MBA, Organizational Leadership Norwich University • R3 - Syracuse (8 yrs) Design Squad, CADD Manager • R11 - NYC (4 yrs) Route 9A West Side Highway, EIS Co-leader • MO – Office of Design (1 yrs) Director • MO - Design Division (4 yrs) Director DQAB
  • 4. 4 • Capital Project Delivery & Bridge Safety Assurance • Organization Overview • Main Office and Regions 1. What is Design?
  • 5. 5 ConstructionPlanning Design Project Planning and Initiation Scoping Preliminary Design (Phases I-IV) Final Design (Phases V-VI) Construction IPP Identify Existing Conditions, Problems & Needs Contextual Assessment Project objectives Purpose & Need Land Use Capital Project Development Process Site Conditions Planning/Design Asset Managers Regional Director Identify & define needs
  • 6. 6 ConstructionPlanning Design Project Planning and Initiation Scoping Preliminary Design (Phases I-IV) Final Design (Phases V-VI) Construction Scope Approval Explore Design Conditions Social Transportation Environmental Economic Contextual Assessment Project objectives Purpose & Need Land Use Capital Project Development Process Design T&S Site Conditions Stru Env GeoLA Other Identify problems & opportunities
  • 7. 7 ConstructionPlanning Design Project Planning and Initiation Scoping Preliminary Design (Phases I-IV) Final Design (Phases V-VI) Construction Identify design alternatives & select final design solution Design Approval Design Approval Final Design Report Design Alternatives Determine EA / EIS Public Input Agency Input Capital Project Development Process Design T&S Stru Env GeoLA RE
  • 8. 8 ConstructionPlanning Design Project Planning and Initiation Scoping Preliminary Design (Phases I-IV) Final Design (Phases V-VI) Construction Final contract documents (detailed design, specifications & estimate) PS&E Let & Award Advanced Detail Plans ROW / MPT Detailed Design Final Design PS&E/ Letting Capital Project Development Process Public Input Agency Input Design T&S Stru Env GeoLA ConsRE
  • 9. 9 ConstructionPlanning Design Project Planning and Initiation Scoping Preliminary Design (Phases I-IV) Final Design (Phases V-VI) Construction Project Completion Construction Start Construction Complete Construction Support Capital Project Development Process Public Input Construction Support T&S Stru Env GeoLA RE Designers of record to support construction build out Agency Input
  • 10. 10 Project Scoping Preliminary Design/ Environmental Studies Final Design R.O.W. Acquisition Bid/Award Construction Support 2001 2002 2003 2005 6/02 05/03 2000 06/022/01 11/03 12/03 1/04 12/05 2004 11/01 11/03(24 Mo) (16 Mo) (12 Mo) (1 ½ Mo) (24 Mo) Typical Project Development Schedule Note: The chart illustrates Simple, Moderate and Many Complex Type Projects. Other Complex / or ‘Mega’ Projects May Often Take Longer 6/00 3/01(9 Mo)
  • 11. 11 • Average number of projects 2002 – 07 293/year; 2007- 08 320 projects /year. • There are currently 1,004 projects in development (as of 3/08) Capital Projects Source: PSS/ Trns.port Letting Data / Project Management Projects Let Per Year 29 24 23 30 44 19 40 26 29 16 32 30 32 24 40 28 16 40 30 31 17 13 0 5 10 15 20 25 30 35 40 45 50 1 2 3 4 5 6 7 8 9 10 11 Region Projects Average 02-07 SFY 07-08
  • 12. 12 Resource Utilization Trends Number of Projects costing more than $3M as a percentage of the capital program 0.00% 5.00% 10.00% 15.00% 20.00% 25.00% 30.00% 35.00% 40.00% 45.00% 50.00% 1998 2000 2002 2004 2006 2008 2010 2012 2014 Fiscal Year PercentageofTotalFYProgram % of Projects • More complex projects in future program. Source: Consultant Management Bureau, Office of Design
  • 13. 13
  • 15. 15 As of April 2008, the percent of Bridge Safety Assurance staffing levels within the Office of Design’s total staffing level equals 15%. Staffing Levels
  • 16. 16 • Strategic/Operational Planning • Performance Management • Learning / Knowledge Based Organizational Focus > Identifying and Developing Strategic Advantages > Responsiveness to Needs > Customer Satisfaction > Change Management 2. How We Got to Workforce Development
  • 17. 17 Main Office Strategic Direction and Priorities using a Performance-Based approach  Provide and Maintain Knowledge and Skills  Provide and Maintain Tools  Provide and Manage Resources  Perform Quality Assurance  Production (capital projects, PS&Es visualization, photogrammetry, bid documents) Strategic Planning
  • 18. 18 Strategic Planning • Is planning for constant (sometimes turbulent) change in increasingly complex and dynamic environments. • Identifies factors that have the most significant influence on our ability to achieve near term results and long term strategic direction. • Aligns process activities with goals. • Sets direction - drives results!
  • 19. 19 Organizational change and being responsive to it most effectively is part of the Office of Design’s strategic focus History of Department Leadership & Strategies
  • 20. 20 0 10 20 30 40 50 60 70 1890 1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 RHAA AA MBTA FWCA HSBAA FIFRA CAA AHPA LWCF CAA WA CRA SWDA HBA *NHPA *4(f) FAHA FAHA FAHA *CAA *WSRA EAA *NEPA RRA URA WBA *CWA CZMA *ESA SDWA FNWA MSFCMA RCRA CWA *EO11990 EO11998 ARPA *CERCLA ANILCA LAA FPPA CBRA HSWA SDWA EWRA CWA URA STURAA STURAA NAGPRA CZARA ADA CAA ISTEA SNRTA EO12898 EO13007 SDWA EO13061 EO13089 *TEA-21 EO13112 EO13148 EO13186 CAA Federal Environmental Legislation and Executive Orders Affecting Transportation CUMULATIVENUMBEROFLAWSAND AMENDMENTS YEAR Prepared by FHWA Office of Natural Environment, May 2001 • Denotes Legislation/E.O. with the Most Significant Impact (CAA, CERCLA, CWA, ESA, NEPA, NHPA, TEA-21, WSRA, 4(f ), EO 11990)
  • 21. 21 Organizational Direction & Alignment • Strategic Planning aligns process activities with goals which helps us to achieve desired results. • Regional Design Meetings - Communication & Coordination
  • 22. 22 ‘The Office of Design (Regional Design Groups and the Main Office) has a highly skilled and proficient workforce which provides maximum value and quality in the development and delivery of capital projects’ Office of Design Strategic Goal
  • 23. 23 • Ensures the Office of Design best serves its customers, achieves optimum results, manages its resources most effectively and is accountable. • A philosophy of continuous improvement. • A methodology to better understand and communicate what we are trying to achieve, how we are doing, what we are learning and how we are improving. Performance Management
  • 24. 24 • Performance Management ethic based on strategy mapping and balanced scorecard approach. • Quarterly Reports, published since March 07, are available on the Office of Design’s Performance Management IntraDOT link. Performance Management
  • 25. 25 Office of Design’s ‘Balanced Scorecard’ Learning and Growth Internal Processes Customer Business / Financial Results Learning and Growth Workforce Development Information Technology Organizational Effectiveness Project Development Schedule Achievement Quality Internal Processes ExternalInternal Customer Efficiency of Resource Utilization per Project Type Business / Financial Results
  • 26. 26 Learning & Growth Internal Processes Customer Business / Financial Perspectives Office of Design’s Detailed Indicators & Measures Strategy Output / million $ Construction Responsiveness to needs and requests Providing products and services as agreed upon Meeting agreed upon expectations Percent milestone dates met vs. planned Public involvement expectations identified & met Project development quality & completeness Constructability: buildable & biddable Guidance: current, appropriate and relevant Knowledge skills & proficiency Have appropriate tools Provide effective, timely services Effective communication & coordination Efficiency/Effectiveness Measures Resource Utilization Internal External PS&E Schedule Achievement Quality Workforce Development Information Technology Organizational Effectiveness Indicators
  • 27. 27 3. Workforce Development • What it is • What it is not • Where we are • Where we are going
  • 28. 28 Workforce Development Program • To ensure that 93% of project development staff have the necessary and most current skills to develop and deliver quality, timely and cost effective capital projects by 2009. Objective…
  • 29. 29 Workforce Development Program • Focuses on the critical competencies (knowledge, skill and behavior) that drive performance in design. • Focuses on 3 strategic workforce (job family) groups: - Squad/Team Member - Squad/Team Leader - Consultant Job Manager Key points…
  • 30. 30 Workforce Development Program • Includes a combination of technical, business and leadership competencies. • Measures proficiency levels as “basic”, “experienced” and “expert”. • Proficiency levels provide objectivity and make the model more practical.
  • 31. 31 Workforce Development Program • Provides a basis to measure current performance. • Identifies clear objectives for future development. • The program is not static and will be reviewed and refined on a periodic, as-needed basis.
  • 32. 32 Workforce Development Program • Provides employees with opportunities to develop skills and knowledge in a timely manner. • Provides employees with opportunities to set career goals that are consistent with both personal and Regional needs. • Provides employees with the most current skills necessary in order to keep up with the many technological, procedural and strategic changes affecting the Department today. Employee Benefits:
  • 33. 33 • Aligns skills with business needs. • Improved training management and coordination. • Most cost effective and efficient use of limited training resources Management Benefits: Workforce Development Program
  • 34. 34 Workforce Development Program • 88 Technical. • 15 Business/leadership. • 5 Required classes. Competencies: • Developed and written in collaboration with all 11 Regional design groups
  • 36. 36 Workforce Development Program • Automated Tool accessed through the Intradot
  • 37. 37 Workforce Development Program • Initially collect data, repeat in 6 months and then update once a year • Multiple Personal, Supervisor and Regional reports can be generated.
  • 38. 38 Summary 1. What is design (process) and Design (organization). 2. Strategic Planning and Performance Management. 3. Workforce Development.
  • 39. 39 • Mobility & Reliability • Economic Development • Sustainability and Smart Growth • Community Vitality • Quality-of-Life • Land Use Practices • Environmental Conditions • Energy Innovative, Quality Design Effects:

Notas del editor

  1. Opening Remarks
  2. How does DOT choose which projects to fund? (Source: NYSDOT Internet) This is a complex process that starts with a "transportation need." This might include things such as a high-accident location, connections needed for a new residential or commercial development, a road or bridge in need of rehabilitation, or changes to promote better air quality. These needs surface through local and regional planning studies. Which projects get funded at what time also depends on variables such as the amount and source of money available to the State or a municipality, or what other work is scheduled for the same area. The final capital program is in the form of an agreement between the DOT, the Governor's Office, the Legislature, and the Federal Government. Let the Project Development process begin… https://www.nysdot.gov/portal/page/portal/about-nysdot/faq/projects-to-fund
  3. How does DOT choose which projects to fund? (Source: NYSDOT Internet) This is a complex process that starts with a "transportation need." This might include things such as a high-accident location, connections needed for a new residential or commercial development, a road or bridge in need of rehabilitation, or changes to promote better air quality. These needs surface through local and regional planning studies. Which projects get funded at what time also depends on variables such as the amount and source of money available to the State or a municipality, or what other work is scheduled for the same area. The final capital program is in the form of an agreement between the DOT, the Governor's Office, the Legislature, and the Federal Government. Let the Project Development process begin… https://www.nysdot.gov/portal/page/portal/about-nysdot/faq/projects-to-fund
  4. How does DOT choose which projects to fund? (Source: NYSDOT Internet) This is a complex process that starts with a "transportation need." This might include things such as a high-accident location, connections needed for a new residential or commercial development, a road or bridge in need of rehabilitation, or changes to promote better air quality. These needs surface through local and regional planning studies. Which projects get funded at what time also depends on variables such as the amount and source of money available to the State or a municipality, or what other work is scheduled for the same area. The final capital program is in the form of an agreement between the DOT, the Governor's Office, the Legislature, and the Federal Government. Let the Project Development process begin… https://www.nysdot.gov/portal/page/portal/about-nysdot/faq/projects-to-fund
  5. How does DOT choose which projects to fund? (Source: NYSDOT Internet) This is a complex process that starts with a "transportation need." This might include things such as a high-accident location, connections needed for a new residential or commercial development, a road or bridge in need of rehabilitation, or changes to promote better air quality. These needs surface through local and regional planning studies. Which projects get funded at what time also depends on variables such as the amount and source of money available to the State or a municipality, or what other work is scheduled for the same area. The final capital program is in the form of an agreement between the DOT, the Governor's Office, the Legislature, and the Federal Government. Let the Project Development process begin… https://www.nysdot.gov/portal/page/portal/about-nysdot/faq/projects-to-fund
  6. How does DOT choose which projects to fund? (Source: NYSDOT Internet) This is a complex process that starts with a "transportation need." This might include things such as a high-accident location, connections needed for a new residential or commercial development, a road or bridge in need of rehabilitation, or changes to promote better air quality. These needs surface through local and regional planning studies. Which projects get funded at what time also depends on variables such as the amount and source of money available to the State or a municipality, or what other work is scheduled for the same area. The final capital program is in the form of an agreement between the DOT, the Governor's Office, the Legislature, and the Federal Government. Let the Project Development process begin… https://www.nysdot.gov/portal/page/portal/about-nysdot/faq/projects-to-fund
  7. Example of a typical project (85-90%) of all projects (with plans) conform with this model
  8. Review slide and discuss: Average numbers of projects on the rise over 5 yr avg. Level of complexity, Added process requirements (ROW, Env. Permitting, Public Involvement…)
  9. Briefly describe the Office: details of each Bureau will follow
  10. Discuss that the number of projects and their complexity has increased.… From 1996 to 2008 the Office of Design has experienced a 22% reduction in staffing levels (from 1800 to 1200 / 1300 ) - While staffing levels have gone down significantly - And staff experience has diminished… Yet expectations and requirements continue to increase… Majority of new hires are young & inexperienced (compounding the situation)
  11. Considerable change and priority shifts have occurred of the past 18 years. The pace of change has quickened All the while capital projects, the core means for achieving the Department’s goals continue to be delivered
  12. 51Hugh CareyJanuary 1, 1975 -December 31, 1982DemocraticMaryanne Krupsak2Mario Cuomo 52Mario CuomoJanuary 1, 1983- December 31, 1994DemocraticAlfred DelBello3Warren M. Anderson(Acting)Stan Lundine 53George PatakiJanuary 1, 1995- December 31, 2006RepublicanBetsy McCaughey Ross3Mary O. Donohue 54Eliot SpitzerJanuary 1, 2007 -March 17, 2008DemocraticDavid Paterson½[23] 55David PatersonMarch 17, 2008IncumbentDemocraticJoseph Bruno(Acting)½[13][24]
  13. The strategic planning process fundamentals
  14. The Office of Design’s Strategic Goal is predicated upon the framework of: A performance management approach based on strategy mapping and the Balanced Scorecard methodology (Kaplan and Norton, 1992). The Balanced Scorecard approach links strategic direction with goals, actions and results in a cause and effect relationship. The Balanced Scorecard identifies four primary ‘perspectives’ in which to measure overall performance. The perspectives and indicators, identified in parenthesis, are: Business/financial, (Resource Utilization); Customer, (Internal and External); Internal Processes, (Project Development Schedule Achievement, Quality); and Innovation, Learning & Growth, (Workforce Development, Information Technology, Organizational Effectiveness) illustrated in figure 3. Capital project development and delivery is a Department mission critical function. The project development process advances projects from the approved Initial Project Proposal (IPP) through scoping, preliminary design and completion of plans, specifications and estimates (PS&E). The effect that any implemented project may have on Priority Result Areas is directly related to its type, complexity and objective as decided by programming units prior to it becoming part of the Statewide Transportation Improvement Program (STIP).
  15. Identify and share successes / best practices; benchmarking and improvement opportunities Long term value development Long term knowledge, skill and proficiency The Performance Improvement Model (Cycle)
  16. Core Indicators and measures were carefully selected based on strategic direction, mission, planning, value and their cause and effect relationships as a means to best determine if and how strategic goals and objectives are being (or have been) achieved. 1) The Office of Design has been working very hard to define and align its strategic direction; define, measure and manage its performance; and become a learning organization that identifies it's core competency areas to ensure staff are well supported in having state-of-the-art knowledge and skills. The Office's strategic goal states its purpose very well: 'The Office of Design (Regional Design Groups and the Main Office) has a highly skilled and proficient workforce which provides maximum value and quality in the development and delivery of capital projects.' These challenging, yet fundamental business practices are what helps all of us ensure we are accountable and doing all we can to continue to build the trust of the public, our stakeholders and political constituents as we develop and deliver great public works. 2) Executive leadership strongly supports what the Office of Design is achieving in these areas and has worked so hard at. It has set the bar high for other functional areas to emulate and for this we appreciate your efforts and leadership. 3) Establishing a clear direction and sense of purpose positions us well for the challenges and changes that can and will arise. By taking this approach we have a competitive advantage that readies us to successfully meet and respond to the demands and responsibilities that we pride ourselves in.. 4) Working everyday towards such a well developed strategic goal helps ensure we achieve the kinds of results we are proud of. Dedicated staff such as yourselves are the biggest reason why we are able to accomplish so much....
  17. Conceptual illustration of what ‘perspectives’ are and how they ‘build’ value
  18. A VALUE ADDED philosophy, strategy and approach This graphic illustrates the various linkages and corresponding levels of detail / line of sight from perspectives to indicators to leading and lagging measures
  19. Regions have lost key experienced staff through retirements and attrition. Squad leader/ team leaders with less than 2 years (R1, R2, R11) 25% new staff with 2 years or less experience The Office of Design’s WfD Program is a formal, directed, managed activity that the literature indicates, has a big impact on whether and how fast learning and knowledge occurs(1). When learning and knowledge is a systematically directed activity (not just a by-product of normal production) greater improvement is achieved in a shorter period of time. 1. ‘Measuring and Managing Technical Knowledge’, R.E. Bohn, Sloan Management Review, MIT, 1994.
  20. Read slide and discuss
  21. Read slide and discuss
  22. Read slide and discuss
  23. Read slide and discuss
  24. Read slide and discuss workflow / process
  25. Review 3 - 4 key points as ‘take-aways’ Core Roles and Responsibilities Direction and Leadership (highlights) A Knowledgeable, Skilled, Collaborative, Diverse, Innovative, Proficient & Team Oriented Office
  26. Some of the results - and their outcomes – based on project delivered.