SlideShare una empresa de Scribd logo
1 de 25
Elements Of Civil Engineering
Subject Code: (2110004)
Topic : Chain Survey
Division: K
Group Members: 1).Patel Umang A. (Roll No.-23)
2).Patel Vishal S. (Roll No.-26)
3).Rana Devang H. (Roll No.-40)
4).Rathod Utam M. (Roll No.-42)
Guided By :- Prof. Neel K. Shah
 WHAT IS CHAIN SURVEING ?
• Chain surveying is the type of surveying in
which only linear measurements are taken in
the field.
• This type of surveying is done for surveys of
small extent to describe the boundaries of plot
of land to locate the existing features on them.
• It is the method of surveying in which the area
is divided into network of triangles and the
sides of the various triangles are measured
directly in the field with a chain or a tape and
no angular measurements are taken.
PRINCIPAL OF CHAIN SURVEYING
• The principal of chain surveying is to divide the
area into a number of triangles of suitable sides.
• As a triangles is the only simple plane of
geometrical figure which can be plotted from the
lengths of the three sides even if the angels are
not known.
• A network of triangles (triangulation) is
preferred to in chain surveying .
• If the area to be surveyed is triangular in shape
and if the lengths and sequence of its three
sides are recorded the plane of area can be easily
drawn.
TERMS RELATED WITH CHAIN SURVEYING
(1) SURVEY STATIONS
Survey stations are the points at the beginning
and at the end of the chain line. They may also
occur at any convenient position on the chain
line. Such stations may be :
(a) Main stations
(b) Subsidiary stations
(c) Tie stations
(a) Main stations :
Stations taken along the boundary of an area
as controlling points known as ‘main stations’.
The lines joining the main stations are called
‘main survey lines’. The main survey lines should
be cover the whole area to be surveyed. The
main stations are denoted by ‘ ’ with letters
A,B,C,D, etc.
(B) Subsidiary stations :
Stations which are on the main survey lines or
any other survey lines are known as ‘Subsidiary
stations’. These stations are taken to run
subsidiary lines for dividing the area into
triangles , for checking the accuracy of triangles
and for locating interior details.
these stations are denoted by ‘ ‘ with letters S1,
S2, S3, etc.
(c) Tie stations :
These are also subsidiary stations taken on the
main survey lines. Lines joining the tie stations
are known as ‘tie lines’.
Tie lines are taken to locate interior details. The
stations are denoted by ‘ ’ with letters T1 , T2 ,
T3 , etc.
(2) MAIN SURVEY LINES :
The lines joining the main stations are called
‘main survey lines’ or chain lines in fig. AB,BC,CD
and DA are the main survey lines.
(3) BASE LINE :
The line on which the framework of the survey is
built is known as the ‘base line’ . It is the most
important line of the survey . Generally , the
longest of the main survey line is considered as
the base line. This line should be measured very
carefully and accurately. In fig. BD is the base
line.
(4) CHECK LINE :
The line joining the apex point of a triangle to
some fixed points on its base is known as the
‘check line’. It is taken to check the accuracy of
the triangle . Sometimes this line is helps to
locate interior details . In fig. CS1 , AS2 are the
check lines.
(5) TIE – LINE :
A line joining tie stations is termed as a tie line. It
is run to take the interior details which are far
away from the main lines and also to avoid long
offsets. It can also serve as check line. In Fig.
T1 T2 is the tie line.
PROCEDURE
(1) Fix station A and B at some distance by fixing
wooden peg to determine horizontal distance
between them.
(2) Position of station A and B is fixed by
measuring their position from at least three
permanent objects and location sketch of
station A and B are drawn.
(3) The follower holds one handle of the chain in
contact with peg at station A.
(4) The leader takes the other handle of the chain,
arrows and ranging rod & walks in the forward
direction dragging chain with him.
(5) After the chain is stretched completely
along the line the follower steps on one
side of the line with the ranging rod
touching the handle.
(6) The follower directs to leader to stand exactly
in the line. The leader puts a scratch at the
position & inserts an arrow. He then moves
forward with the chain handle with the
remaining arrows and ranging rod till the
follower reaches the next arrow point.
Chain surveying.1

Más contenido relacionado

La actualidad más candente

Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
Dolat Ram
 

La actualidad más candente (20)

Classification of surveying
Classification of surveyingClassification of surveying
Classification of surveying
 
Levelling
LevellingLevelling
Levelling
 
Theodolite Traversing
Theodolite TraversingTheodolite Traversing
Theodolite Traversing
 
Plane Table Survey
Plane Table SurveyPlane Table Survey
Plane Table Survey
 
Compass Surveying
Compass Surveying Compass Surveying
Compass Surveying
 
chain surveying
chain surveyingchain surveying
chain surveying
 
Contouring
ContouringContouring
Contouring
 
Chain surveying
Chain surveyingChain surveying
Chain surveying
 
Tacheometry ppt
Tacheometry pptTacheometry ppt
Tacheometry ppt
 
Theodolite surveying
Theodolite surveying Theodolite surveying
Theodolite surveying
 
Introduction on instruments used for chaining
Introduction on instruments used for chainingIntroduction on instruments used for chaining
Introduction on instruments used for chaining
 
Area & Volume
Area & VolumeArea & Volume
Area & Volume
 
Theodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversingTheodolite traversing, purpose and principles of theodolite traversing
Theodolite traversing, purpose and principles of theodolite traversing
 
Perpendicular Offset
Perpendicular Offset Perpendicular Offset
Perpendicular Offset
 
traversing of survey
traversing of surveytraversing of survey
traversing of survey
 
Linear Measurements
Linear MeasurementsLinear Measurements
Linear Measurements
 
Compass surveying
Compass surveyingCompass surveying
Compass surveying
 
Theodolite Surveying
Theodolite Surveying Theodolite Surveying
Theodolite Surveying
 
Trigonometric levelling
Trigonometric levellingTrigonometric levelling
Trigonometric levelling
 
Theodolite angle measurement
Theodolite angle measurementTheodolite angle measurement
Theodolite angle measurement
 

Similar a Chain surveying.1

S2 3.1 tape and offset surveying
S2 3.1 tape and offset surveyingS2 3.1 tape and offset surveying
S2 3.1 tape and offset surveying
Est
 
1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx
Janak82
 
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.ppt
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.pptChain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.ppt
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.ppt
ImashaSJayathissa
 

Similar a Chain surveying.1 (20)

Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying Surveying - Module I - Introduction to surveying
Surveying - Module I - Introduction to surveying
 
30838893 chain-survey
30838893 chain-survey30838893 chain-survey
30838893 chain-survey
 
Ce6304 surveying i-2015_07_16_10_57_06_997
Ce6304 surveying i-2015_07_16_10_57_06_997Ce6304 surveying i-2015_07_16_10_57_06_997
Ce6304 surveying i-2015_07_16_10_57_06_997
 
Surveying and levelling
Surveying and levellingSurveying and levelling
Surveying and levelling
 
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYINGDEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
DEFINITIONS, PRINCIPLES AND CHAIN SURVEYING
 
Classification of Surveying.pptx
Classification of Surveying.pptxClassification of Surveying.pptx
Classification of Surveying.pptx
 
lecture3.pptx
lecture3.pptxlecture3.pptx
lecture3.pptx
 
S2 3.1 tape and offset surveying
S2 3.1 tape and offset surveyingS2 3.1 tape and offset surveying
S2 3.1 tape and offset surveying
 
handbook of civil engineering
handbook of civil engineeringhandbook of civil engineering
handbook of civil engineering
 
Surveying i
Surveying iSurveying i
Surveying i
 
Profiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sectionsProfiles (longitudinal section) & cross sections
Profiles (longitudinal section) & cross sections
 
Basic Civil and Mechanical Engineering
Basic Civil and Mechanical EngineeringBasic Civil and Mechanical Engineering
Basic Civil and Mechanical Engineering
 
Basic civil
Basic civilBasic civil
Basic civil
 
Chain Surveying 2020.ppt
 Chain Surveying 2020.ppt Chain Surveying 2020.ppt
Chain Surveying 2020.ppt
 
73941338 surveying-lab-manual-1
73941338 surveying-lab-manual-173941338 surveying-lab-manual-1
73941338 surveying-lab-manual-1
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
Chapter 1
Chapter 1Chapter 1
Chapter 1
 
1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx1.5_Basic Engineering_Day 7.pptx
1.5_Basic Engineering_Day 7.pptx
 
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.ppt
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.pptChain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.ppt
Chain SURVEYING Aaaaaaaaaaaaaaaaaaaaaa1.ppt
 
btech3rd-CE-Surveying lab-I.pdf
btech3rd-CE-Surveying lab-I.pdfbtech3rd-CE-Surveying lab-I.pdf
btech3rd-CE-Surveying lab-I.pdf
 

Último

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 

Último (20)

Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)Introduction to Multilingual Retrieval Augmented Generation (RAG)
Introduction to Multilingual Retrieval Augmented Generation (RAG)
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
Platformless Horizons for Digital Adaptability
Platformless Horizons for Digital AdaptabilityPlatformless Horizons for Digital Adaptability
Platformless Horizons for Digital Adaptability
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
Navigating the Deluge_ Dubai Floods and the Resilience of Dubai International...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot ModelMcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Mcleodganj Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
CNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In PakistanCNIC Information System with Pakdata Cf In Pakistan
CNIC Information System with Pakdata Cf In Pakistan
 
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 AmsterdamDEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
DEV meet-up UiPath Document Understanding May 7 2024 Amsterdam
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
Biography Of Angeliki Cooney | Senior Vice President Life Sciences | Albany, ...
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
WSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering DevelopersWSO2's API Vision: Unifying Control, Empowering Developers
WSO2's API Vision: Unifying Control, Empowering Developers
 
Exploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with MilvusExploring Multimodal Embeddings with Milvus
Exploring Multimodal Embeddings with Milvus
 

Chain surveying.1

  • 1. Elements Of Civil Engineering Subject Code: (2110004) Topic : Chain Survey Division: K
  • 2. Group Members: 1).Patel Umang A. (Roll No.-23) 2).Patel Vishal S. (Roll No.-26) 3).Rana Devang H. (Roll No.-40) 4).Rathod Utam M. (Roll No.-42) Guided By :- Prof. Neel K. Shah
  • 3.  WHAT IS CHAIN SURVEING ? • Chain surveying is the type of surveying in which only linear measurements are taken in the field. • This type of surveying is done for surveys of small extent to describe the boundaries of plot of land to locate the existing features on them.
  • 4. • It is the method of surveying in which the area is divided into network of triangles and the sides of the various triangles are measured directly in the field with a chain or a tape and no angular measurements are taken.
  • 5.
  • 6.
  • 7. PRINCIPAL OF CHAIN SURVEYING • The principal of chain surveying is to divide the area into a number of triangles of suitable sides. • As a triangles is the only simple plane of geometrical figure which can be plotted from the lengths of the three sides even if the angels are not known.
  • 8. • A network of triangles (triangulation) is preferred to in chain surveying . • If the area to be surveyed is triangular in shape and if the lengths and sequence of its three sides are recorded the plane of area can be easily drawn.
  • 9. TERMS RELATED WITH CHAIN SURVEYING
  • 10. (1) SURVEY STATIONS Survey stations are the points at the beginning and at the end of the chain line. They may also occur at any convenient position on the chain line. Such stations may be : (a) Main stations (b) Subsidiary stations (c) Tie stations
  • 11. (a) Main stations : Stations taken along the boundary of an area as controlling points known as ‘main stations’. The lines joining the main stations are called ‘main survey lines’. The main survey lines should be cover the whole area to be surveyed. The main stations are denoted by ‘ ’ with letters A,B,C,D, etc.
  • 12.
  • 13. (B) Subsidiary stations : Stations which are on the main survey lines or any other survey lines are known as ‘Subsidiary stations’. These stations are taken to run subsidiary lines for dividing the area into triangles , for checking the accuracy of triangles and for locating interior details. these stations are denoted by ‘ ‘ with letters S1, S2, S3, etc.
  • 14. (c) Tie stations : These are also subsidiary stations taken on the main survey lines. Lines joining the tie stations are known as ‘tie lines’. Tie lines are taken to locate interior details. The stations are denoted by ‘ ’ with letters T1 , T2 , T3 , etc.
  • 15. (2) MAIN SURVEY LINES : The lines joining the main stations are called ‘main survey lines’ or chain lines in fig. AB,BC,CD and DA are the main survey lines.
  • 16. (3) BASE LINE : The line on which the framework of the survey is built is known as the ‘base line’ . It is the most important line of the survey . Generally , the longest of the main survey line is considered as the base line. This line should be measured very carefully and accurately. In fig. BD is the base line.
  • 17.
  • 18. (4) CHECK LINE : The line joining the apex point of a triangle to some fixed points on its base is known as the ‘check line’. It is taken to check the accuracy of the triangle . Sometimes this line is helps to locate interior details . In fig. CS1 , AS2 are the check lines.
  • 19. (5) TIE – LINE : A line joining tie stations is termed as a tie line. It is run to take the interior details which are far away from the main lines and also to avoid long offsets. It can also serve as check line. In Fig. T1 T2 is the tie line.
  • 21. (1) Fix station A and B at some distance by fixing wooden peg to determine horizontal distance between them. (2) Position of station A and B is fixed by measuring their position from at least three permanent objects and location sketch of station A and B are drawn.
  • 22. (3) The follower holds one handle of the chain in contact with peg at station A. (4) The leader takes the other handle of the chain, arrows and ranging rod & walks in the forward direction dragging chain with him.
  • 23. (5) After the chain is stretched completely along the line the follower steps on one side of the line with the ranging rod touching the handle.
  • 24. (6) The follower directs to leader to stand exactly in the line. The leader puts a scratch at the position & inserts an arrow. He then moves forward with the chain handle with the remaining arrows and ranging rod till the follower reaches the next arrow point.