GENERAL NOTES
1. VERIFY ALL DIMENSIONS IN THE FIELD. DO NOT SCALE DRAWINGS.
2. IT SHALL BE EACH TRADE CONTRACTORS RESPONSIBILITY TO VISIT THE SITE
AND FAMILIARIZE HIMSELF/HERSELF WITH ALL EXISTING CONDITIONS. EACH
CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND
OTHERWISE VERIFY ALL DIMENSIONS AND EXISTING CONSTRUCTION
CONDITIONS INDICATED AND/OR SHOWN ON THE DRAWINGS. SHOULD ANY
ERROR OR INCONSISTENCY EXIST, THE CONTRACTOR SHALL NOT PROCEED
WITH THE WORK AFFECTED THEREBY UNTIL REPORTING THE SAME TO THE
ARCHITECT AND THE OWNERS REPRESENTATIVE FOR CLARIFICATION
AND/OR CORRECTION.
3. DIMENSIONS FOLLOWED BY +/- SHALL BE REVIEWED AND ALL NECESSARY
ADJUSTMENTS MADE PRIOR TO FABRICATION AND/OR INSTALLATION OF
WORK. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES BEFORE
PROCEEDING WITH THE WORK.
4. ALL EXISTING CONSTRUCTION AND SURFACES WHICH ARE TO REMAIN BUT
ARE AFFECTED BY THE WORK UNDER THIS CONTRACT SHALL BE RESTORED
AND REFINISHED TO MATCH THE CONSTRUCTION, FINISH AND ALIGNMENT OF
THE EXISTING ADJACENT CONSTRUCTION AND FINISHES.
5. PROVIDE FIRE WATCH DURING FIELD CUTTING AND WELDING OPERATIONS,
MEETING OWNER'S REQUIREMENTS.
6. THE CONTRACTOR SHALL VERIFY THE EXISTENCE AND LOCATION OF ALL
UTILITIES IN WORK AREAS PRIOR TO PROCEEDING WITH CONSTRUCTION.
ALL DISCREPANCIES SHALL BE DOCUMENTED AND FORWARDED TO
ARCHITECT AND OWNER OR OWNER'S REPRESENTATIVE FOR ACTION.
7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INVESTIGATE FIELD
CONDITIONS AND PROVIDE, AS NEEDED, TEMPORARY SUPPORTS, SHORING,
AND/OR PROTECTION OF EXISTING STRUCTURES AND UNDERGROUND
UTILITIES DURING EXECUTION OF WORK.
8. ALL WORK TO CONFORM TO THE REQUIREMENTS OF THE LOCAL AND STATE
CODES.
9. RELEVANT DIMENSIONS AND ELEVATIONS FOR EQUIPMENT INSTALLATIONS
SHALL BE VERIFIED AGAINST MANUFACTURER'S CERTIFIED EQUIPMENT
DRAWINGS.
10. ALL PENETRATIONS TO FLOORS, CEILINGS, AND WALLS SHALL BE SEALED
AND FIRE STOPPED TO A FIRE RATING EQUAL TO THE CONSTRUCTION BEING
PENETRATED AT NEWLY CREATED ROOMS.
11. DRAWINGS THAT DO NOT BEAR THE MARK ISSUED FOR CONSTRUCTION
SHALL NOT BE USED FOR CONSTRUCTION PURPOSES.
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
As indicated
9/24/20121:25:24PM
A0.00
Cover Sheet
12-51
Palmer Woods
09/25/12
CM,SL
SL
17550 Fairway Dr.
Detroit, MI 48221
17550 FAIRWAY DRIVE
DETROIT, MI 48221
INDEX OF DRAWINGS
SHEET
NUMBER SHEET NAME
SHEET
ISSUE
DATE
A0.00 Cover Sheet 09/25/12
A0.01 Demolition Plan - First Level 09/25/12
A0.02 Demolition Plan - Second Floor 09/25/12
A1.01 First Floor Plan 09/25/12
A1.02 Second Floor Plan 09/25/12
A1.03 ROOF PLAN 09/25/12
A3.01 North + West Elevations 09/25/12
A3.01D Demo North + West Elevation 09/25/12
A3.02 South + East Elevations 09/25/12
A3.02D Demo South + East Elevations 09/25/12
A5.1 ENLARGED PLANS & INTERIOR ELEVATIONS 09/25/12
A5.2 ENLARGED PLANS & INTERIOR ELEVATIONS 09/25/12
A6.1 DETAILS SHEET 09/25/12
S1.0 SITE PLAN 09/25/12
3/64" = 1'-0"
KEY PLAN
SITE LOCATION MAP
PROJECT INFORMATION
RENOVATION OF KITCHEN, MASTERSUITE AND ADDING A SECOND
STORY BALCONY TO AN EXISTING 4,000 SQ.FT HOME IN PALMER
WOODS GOLF COURSE SUBDIVION. CONVERTING A 5 BEDROOM
RESIDENCE INTO A 3 BEDROOM ON THE SECOND LEVEL. RENOVATION
INCLUDES 1,995 SQ.FT OF THE TOTAL 4,000 SQ. FT RESIDENTIAL
SPACE, RESIDENTIAL USE (R1).
SITE
GOLF
COURSE
Burkeen Construction
39740 Warren Rd. Canton, MI
(734) 673-7111
CONTRACTOR:
ERA Majestic Realty
23350 Greenfield, Suite 101
Oak Park, MI
(313) 399-9538
REAL ESTATE DEELOPER
Date: Submitted for:
9/25/2012 PERMITS
UP
UP
UP
9'-10"
EXISTING GARAGE TO REMAIL
STONE VENEER AND SIDING TO BE REMOVED
REMOVE EXISTING PILASTER
EXISTING PLUMBING SEWER
& WATER LINES TO REMAIN
REMOVE & CAP EXISTING
PLUMBING LINES BELOW
FLOOR LINE
EXISTING PORCH TO REMAIN
REMOVE EXISTING COUNTER TOP,
BASE CABINETS AND SOFFIT ABOVE
RELOCATE EXISTING
SINK
SALVAGE EXISTING
WALL CABINETS
(TYP)
DEMOLISH EXISTING HEAT RADIATOR AND
ASSOCIATED COMPONENTS. SEE MECHANICAL
CONTRATOR'S DRAWINGS FOR ADDITIONAL
SCOPE.
REMOVE PLUMBING AT EXISTING SINK. SEE
PLUMBING CONTRACTOR'S DRAWINGS FOR
ADDITIONAL SCOPE.
REMOVE EXISTING PIPING AT SINK AS REQUIRED
TO FACILITATE NEW WORK. SEE PLUMBING
CONTRACTOR FOR ADDITIONAL SCOPE.
PATCH & REPAIR ANY HOLES, GAPS OR OPENINGS
IN FLOOR CREATED FROM DEMOLITION OF
EXISTING PARTITION.
REMOVE EXISTING DOORS, AND DOOR FRAME AT
CERTAIN LOCATIONS. SALVAGE DOOR AND
RETURN TO OWNER.
DEMOLITION NOTES:
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
As indicated
9/24/20121:25:35PM
A0.01
Demolition Plan - First
Level
12-51
Palmer Woods
09/25/12
Author
Checker
17550 Fairway Dr.
Detroit, MI 48221
1/4" = 1'-0"
1
DEMOLITION FIRST FLOOR PLAN
EXISTING BRICK
PATIO TO REMAIN
EXISTING BRICK
WINDOW WELL
TO REMAIN
DEMO EXISTING
BOW WINDOW
REMOVE LOAD BEARING
WALL AND SHORE PER
STRUCTURAL DRAWINGS
N.I.C.
N.I.C.N.I.C.
REMOVE LOAD
BEARING WALL
AND SHORE PER
STRUCTURAL
DRAWINGS
EXTERIOR WINDOWS
REMOVED FOR
WINDOW REPLACEMENT
(TYP.) FIRST LEVEL PLAN
18 TOTAL - VERIFY IN FIELD
STUDYLIVING ROOM
LIBRARY
WINDOWS REMOVED FOR
REPLACMENT TO SAME SIZED
WINDOWS.
N.I.C.
BATH
Date: Submitted for:
DN
DN
UP
8'-10"
DEMOLISH EXISTING HEAT RADIATOR AND
ASSOCIATED COMPONENTS. SEE MECHANICAL
CONTRATOR'S DRAWINGS FOR ADDITIONAL
SCOPE.
REMOVE PLUMBING AT EXISTING SINK. SEE
PLUMBING CONTRACTOR'S DRAWINGS FOR
ADDITIONAL SCOPE.
REMOVE EXISTING PIPING AT SINK AS REQUIRED
TO FACILITATE NEW WORK. SEE PLUMBING
CONTRACTOR FOR ADDITIONAL SCOPE.
PATCH & REPAIR ANY HOLES, GAPS OR OPENINGS
IN FLOOR CREATED FROM DEMOLITION OF
EXISTING PARTITION.
REMOVE EXISTING DOORS, AND DOOR FRAME AT
CERTAIN LOCATIONS. SALVAGE DOOR AND
RETURN TO OWNER.
DEMOLITION NOTES:
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
As indicated
9/24/20121:25:42PM
A0.02
Demolition Plan -
Second Floor
12-51
Palmer Woods
09/25/12
Author
Checker
17550 Fairway Dr.
Detroit, MI 48221
1/4" = 1'-0"
1
DEMOLITION SECOND LEVEL PLAN
REMOVE EXISTING
CANOPY + ROOF
REMOVE EXISTING
LOW SLOPED ROOF
OVER GARAGE
EXTERIOR WINDOWS
REMOVED FOR
WINDOW REPLACEMENT
(TYP.) SECOND LEVEL
24 TOTAL - VERIFY IN FIELD
BEDROOM #2
N.I.C.
BEDROOM #1
N.I.C.
BEDROOM #3 BEDROOM #4
REMOVE LOAD
BEARING WALL
AND SHORE PER
STRUCTURAL
DRAWINGS
BEDROOM #5
REMOVE NON-LOAD BEARING WALLS
(TYP.) FOR MASTER SUITE NEW LAYOUT
Date: Submitted for:
UP
REF.
UP
UP
19' - 1"
19'-6"
20' - 11"
2'-7"
28'-5"
13' - 4"
13' - 2"
4'-0"
Library
1
227 SF
Sun Room
3
1S
A5.1
1
2
A1.03
A6.1
5
A6.1
3
A6.1
1
10
A6.1
17
A6.1
2
A6.1
---
-
99
1J
A6.1
12
112
14' - 7"
12'-8"
54
RISE WINDOW WELL
TO BE FLUSH WITH
PATIO SURFACE
224 SF
Kitchen
10
181 SF
Dining Room
11
Living Room
12
95 SF
Foyer
13
97
EXISTING FIREPLACE
TO REMAIN
NEW
PATIO
EXISTING
PATIO
9' - 3"
1'-5"6'-1"1'-3"
0' - 10" 2' - 9"
1'-3"2'-7"1'-5"6'-9"
EXISTING PLUMBING
LINES TO REMAIN (TYP)
PATCH & REPAIR
EXISTING FLOOR
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
1/4" = 1'-0"
9/24/20121:26:04PM
A1.01
First Floor Plan
12-51
Palmer Woods
09/25/12
C. B., C. M., S.L.
S. Little
17550 Fairway Dr.
Detroit, MI 48221
1/4" = 1'-0"
1
New First Floor
NEW BRICK PATIO
TO MATCH SIMILIARLY
TO EXISTING
NEW CONCRETE
PAVER PATIO TO
MATCH OPPOSITE
HAND
Date: Submitted for:
DN
DN
UP
D W
1
A4.1
7'-8"
242 SF
Master Closet
4
379 SF
Master Suite
5
Bath
6
Bed Room
7
Bath
8
Bed Room
9
A5.2
1
2
A1.03
17
A6.1
51 52
7'-7"
34' - 7"
OPEN UP EXISTING
CHIMNEY TO NEW
DOUBLE SIDED
FIREPLACE
47
48
NEW PORCH
CANOPY (BELOW)
NEW RAIL 2'-0" &
BALUSTER FENCING
ON TOP OF FLAT ROOF
102 SF
Master Suite
14
N.I.C.
N.I.C.
N.I.C.
59
60
1' - 6"
5' - 0"
3'-11"
NEW GARAGE ROOF
HIP 4:12 PITCH
(BELOW)
NEW DECORATIVE RAILING
3'-6" HEIGHT
NEW BALCONY
NEW LAUNDRY
CLOSET
62
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
1/4" = 1'-0"
9/24/20121:26:23PM
A1.02
Second Floor Plan
12-51
Palmer Woods
09/25/12
C. B., C. M., S. L.
S. Little
17550 Fairway Dr.
Detroit, MI 48221
1/4" = 1'-0"
1
NEW Second Floor
Date: Submitted for:
First Floor
0' - 0"
Second Floor
9' - 3"
Foundation
-1' - 3"
Ceiling 1
8' - 4"1' - 0"
12" OVERHANG
EXISTING GARAGE
ENGINEERED TRUSS
RE: STRUCTURAL SHEETS
26' - 6"
23'-6"
21' - 1"
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
1/4" = 1'-0"
9/24/20121:26:32PM
A1.03
ROOF PLAN
12-51
Palmer Woods
09/25/12
Author
Checker
17550 Fairway Dr.
Detroit, MI 48221
1/4" = 1'-0"
2
SECTION THRU NEW ROOF
1/4" = 1'-0"
3
Garage Roof Framing
Date: Submitted for:
First Floor
0' - 0"
Second Floor
9' - 3"
Roof
18' - 6"
Foundation
-1' - 3"
Ceiling 1
8' - 4"
Ceiling 2
17' - 7"
REMOVE EXISTING
BAY WINDOW
REMOVE PORTION
OF EXISTING MASONRY
TO MATCH NEW COIN
INSTALLATION
REMOVE EXISTING SIDING
(TYP)
REMOVE EXISTING
PILASTER & CANOPY
First Floor
0' - 0"
Second Floor
9' - 3"
Roof
18' - 6"
Ceiling 1
8' - 4"
Ceiling 2
17' - 7"
REMOVE WINDOW & BRICKS
& SALVAGE BRICKS BELOW
WINDOW
REMOVE EXISTING
SIDING
WINDOW REPLACEMENT FOR
ALL WINDOWS & DOORS (TYP.)
REMOVE EXISTING BRICK, PICTURE WINDOW,
& FRAME. MAKE SURE TO SALVAGE BRICKS
BELOW WINDOW
CREATE OPENING
FOR NEW DOOR
REMOVE EXISTING DOOR
REPLACE WITH NEW CASEMENT
WINDOW
REMOVE EXISTING SIDING
(TYP)
DEMOLISH EXISTING HEAT RADIATOR AND
ASSOCIATED COMPONENTS. SEE MECHANICAL
CONTRATOR'S DRAWINGS FOR ADDITIONAL
SCOPE.
REMOVE PLUMBING AT EXISTING SINK. SEE
PLUMBING CONTRACTOR'S DRAWINGS FOR
ADDITIONAL SCOPE.
REMOVE EXISTING PIPING AT SINK AS REQUIRED
TO FACILITATE NEW WORK. SEE PLUMBING
CONTRACTOR FOR ADDITIONAL SCOPE.
PATCH & REPAIR ANY HOLES, GAPS OR OPENINGS
IN FLOOR CREATED FROM DEMOLITION OF
EXISTING PARTITION.
REMOVE EXISTING DOORS, AND DOOR FRAME AT
CERTAIN LOCATIONS. SALVAGE DOOR AND
RETURN TO OWNER.
DEMOLITION NOTES:
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
As indicated
9/24/20121:27:50PM
A3.02D
Demo South + East
Elevations
12-51
Palmer Woods
09/25/12
C. B., C. M., S. L.
S. Little
17550 Fairway Dr.
Detroit, MI 48221
1/4" = 1'-0"
1
DEMOLITION SOUTH ELEVATION
1/4" = 1'-0"
2
Demolition East Elevation
Date: Submitted for:
NOTE: SEE SHEET A3.01D
FOR TYPICAL DEMOLITION NOTES
First Floor
0' - 0"
Second Floor
9' - 3"
Roof
18' - 6"
Ceiling 1
8' - 4"
Ceiling 2
17' - 7"
112
NEW LIMESTONE
VENEER
NEW LIMESTONE
DECORATIVE COIN
TYP
NEW EIFS
WALL SYSTEM
NEW BAY WINDOW
2'-0"
First Floor
0' - 0"
Second Floor
9' - 3"
Roof
18' - 6"
Ceiling 1
8' - 4"
Ceiling 2
17' - 7"
NEW EIFS
WALL SYSTEM
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
1/4" = 1'-0"
9/24/20121:27:03PM
A3.01
North + West
Elevations
12-51
Palmer Woods
09/25/12
Author
Checker
17550 Fairway Dr.
Detroit, MI 48221
1/4" = 1'-0"
3
New West
1/4" = 1'-0"
4
New North Elevation
NEW POST, TOP &
BOTTOM RAILING, AND
BALUSTER FENCE
2'-0" HEIGHT
NEW REPLACEMENT
WINDOWS TYPICAL
NEW FIBERGLASS
STRUCTURAL COLUMN
& DECK (ALSO SEE
DECK MANUFACTURER
DRAWINGS.
NEW GUTTER &
DOWNSPOUT
NEW REPLACEMENT
WINDOWS (TYPICAL)
NEW EIFS EXTERIOR
WALL SYSTEM
NEW LIMESTONE
VENEER SURFACE
WITH STONE CAP
NEW EIFS EXTERIOR
WALL SYSTEM
Date: Submitted for:
First Floor
0' - 0"
Second Floor
9' - 3"
Roof
18' - 6"
Ceiling 1
8' - 4"
Ceiling 2
17' - 7" NEW ROOF SHINGLES
12
4
99 971S
5152
1R
1R
NEW VINYL RAILING
TO MATCH EXISTING
NEW DECORATIVE
RAIL 3'-6"
NEW STRUCTURAL
POST W/ VINYL COVER
LIMESTONE VENEER WAINSCOTT
3'-8"
NEW EIFS WALL SYSTEM
NEW STONE
SILL
First Floor
0' - 0"
Second Floor
9' - 3"
Roof
18' - 6"
Ceiling 1
8' - 4"
Ceiling 2
17' - 7"
NEW DECORATIVE
EXTERIOR WALL COIN
EVERY 3RD & 6TH COURSE
IN HEIGHT
0'-8"0'-8"
NEW EIFS WALL SYSTEM
1' - 4"
0' - 8"
NEW LIMESTONE
VENEER
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
1/4" = 1'-0"
9/24/20121:27:37PM
A3.02
South + East
Elevations
12-51
Palmer Woods
09/25/12
Author
Checker
17550 Fairway Dr.
Detroit, MI 48221
1/4" = 1'-0"
3
New East
1/4" = 1'-0"
4
New South Elevation
Date: Submitted for:
REF.
A5.14
INTERIOR
ELEV.1C
5
INTERIOR
ELEV. 1D
2
INTERIOR
ELEV.1A
3
INTERIOR
ELEV. 1B
4' - 2"3' - 9"
16'-11"
7'-8"8'-0"1'-3"
6'-8"10'-3"
5'-0"8'-6"3'-5"
First Floor
0' - 0"
Ceiling 1
8' - 4"
First Floor
0' - 0"
Ceiling 1
8' - 4"
First Floor
0' - 0"
Ceiling 1
8' - 4"
First Floor
0' - 0"
Ceiling 1
8' - 4"
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
As indicated
9/24/20121:27:59PM
A5.1
ENLARGED PLANS &
INTERIOR
ELEVATIONS
12-51
Palmer Woods
09/25/12
Author
Checker
17550 Fairway Dr.
Detroit, MI 48221
1/2" = 1'-0"
1
ENLARGED KITCHEN PLAN
1/4" = 1'-0"
2
INTERIOR ELEV. 1A
1/4" = 1'-0"
3
INTERIOR ELEV. 1B
1/4" = 1'-0"
4
INTERIOR ELEV. 1C
1/4" = 1'-0"
5
INTERIOR ELEV. 1D
6
3D View 9
Date: Submitted for:
A5.2
2
INERIOR ELEV.
2A
2B
INTERIOR
ELEV2B
4
INTERIOR
ELEV. 2C
5
INTERIOR
ELEV.2D
A6.1
19
INTERIO
R
DO
O
R
ELEVATIO
N
SHOWER
Second Floor
9' - 3"
Ceiling 2
17' - 7"
Second Floor
9' - 3"
Ceiling 2
17' - 7"
Second Floor
9' - 3"
Ceiling 2
17' - 7"
Second Floor
9' - 3"
Ceiling 2
17' - 7"
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
As indicated
9/24/20121:28:32PM
A5.2
ENLARGED PLANS &
INTERIOR
ELEVATIONS
12-51
Palmer Woods
09/25/12
Author
Checker
17550 Fairway Dr.
Detroit, MI 48221
1/2" = 1'-0"
1
ENLARGED MASTER BATH PLANS
1/4" = 1'-0"
2
INERIOR ELEV. 2A
1/4" = 1'-0"
2B
INTERIOR ELEV 2B
1/4" = 1'-0"
4
INTERIOR ELEV. 2C
1/4" = 1'-0"
5
INTERIOR ELEV. 2D
Date: Submitted for:
3
BATHROOM VIEW 1
EXISTING
WALL
FLASHING
SEALANT &
BACKER ROD
SEALANT
WEATHER STRIP
AIRSPACE
EXISTING
MASONRY
FLASHING
MTL CLAD
FRAME
SEALANT
WD
NAILER
SEALANT &
BACKER ROD
WINDOW
TRIM
EXTRUDED ALUMINUM
FLASHING
JOINT SEALANT &
BACKER RODJOINT
SEALANT
WD NAILER
WINDOW
TRIM
WD CASING
EXISTING CONSTRUCTION
GRAPHIC ONLY
First Floor
0' - 0"
WD STUD
5/8" GYP BD
BRICK SILL
DRAINAGE MATERIAL
WEEP VENT
NEW WINDOW
SEALANT, BACKER ROD
& SHIM WHERE REQ'D
EXISTING WALL EXISTING MASONRY
FLASHING
3/4" PLYWOOD
First Floor
0' - 0"
Second Floor
9' - 3"
Foundation
-1' - 3"
Ceiling 1
8' - 4"
A6.1
7
A6.1
8
EXISTING
WALL
PREFAB
BAY WINDOW
RE: MANUFACTURER INSTALL
4" BATT INSULATION
LAMINATE
SILL
ANCHOR SUPPORT
EXISTING WALL
Second Floor
9' - 3"
Ceiling 1
8' - 4"
MTL THRESHOLD
FLASHING
JOIST
RE STRUCTURAL
DOOR
EXISTING
MASONRY
COMPOSITE
WD DECKING
SLOPE
0.25
First Floor
0' - 0"
First Floor
0' - 0"
Second Floor
9' - 3"
Roof
18' - 6"
Ceiling 1
8' - 4"
Ceiling 2
17' - 7"
A6.1
15
A6.1
16
A6.1
26
EXISTING
WALL
EXISTING
ROOF
First Floor
0' - 0"
Second Floor
9' - 3"
Roof
18' - 6"
Ceiling 1
8' - 4"
Ceiling 2
17' - 7"
A6.1
13
A6.1
14
NEW DECORATIVE
RAILING
EXISTING WALL
NEW STONE VENEER
ON FACE OF
RETAINING WALL
93 91 95 5857
112
110 59
1S1J
EIFS WALL SYSTEM
3/4" PLYWOOD
STONE SILL
STONE VENEER
& MTL LATH
2X4 WOOD STUD
FLASHING
DRIP EDGE
2 LAYERS ASPHALT
IMPREGNATED GRADE “D”
CONSTRUCTION PAPER
EIFS TERMINATION BAR
FLASHING & SEALANT
5/8" GYP BD
Ceiling 1
8' - 4"
EIFS WALL SYSTEM
3/4" PLYWOOD
2X4 WOOD STUD
EIFS TERMINATION BAR
SEALANT & BACKER ROD
5/8" GYP BD
ASPHALT SHINGLE
NOTE: REFER TO STRUCTURAL ROOF FRAMING SHEET
EXTRUDED ALUMINUM
FLASHING
SEALANT & BACKER ROD
WOOD CASING
DOOR
WOOD HEADER
88
440 BurroughsSt.
Detroit, MI 48202
ph. 313.486.1908
Scale
Project number
Date
Drawn by
Checked by
Client:
Project:
CentricdesignStudio
Location:
Consultants:
Seal:
Sheet Title:
As indicated
9/24/20121:28:48PM
A6.1
DETAILS SHEET
12-51
Palmer Woods
09/25/12
Author
Checker
17550 Fairway Dr.
Detroit, MI 48221
1" = 1'-0"
1
Callout (4) of New First Floor 1" = 1'-0"
3
DETAIL @ NEW SIDELIGHT & FRENCH
DOOR
1" = 1'-0"
5
Callout Window Jamb Detail 1
1" = 1'-0"
7
DETAIL @ NEW WINDOW HEAD
1" = 1'-0"
8
TYPICAL CASEMENT WINDOW SILL
3/4" = 1'-0"
10
TYPICAL NEW CASEMENT WINDOW
SECTION
1" = 1'-0"
12
Bay Window Intermitten
1" = 1'-0"
13
Bay Window Head
1" = 1'-0"
14
Bay Window Sill
1" = 1'-0"
15
Callout of French Door Sill @ Second Floor
1" = 1'-0"
16
Callout of French Door Sill Section
1/4" = 1'-0"
17
French Door Section
1/4" = 1'-0"
2
Bay Window Section
Door Schedule
Door
Number
Door
Type
Door
Size Manufacturer Model Frame Type Fire Rating
Details
Description
Finish
Head Jamb Sill Door Frame Comments
47 57 28" x 80" Pella -
Windows &
Doors
Interior
Door
48 57 28" x 80" Pella -
Windows &
Doors
Interior
Door
50 91 1'-6" X
6'-9 1/2"
Pella -
Windows &
Doors
In-Swing -
Sidelight
Unit
51 95 3'-4" X
7'-0"
Pella -
Windows &
Doors
In-Swing -
Right Hand
Operation
52 95 3'-4" X
7'-0"
Pella -
Windows &
Doors
In-Swing -
Right Hand
Operation
54 58 48" x 84" Pella -
Windows &
Doors
Interior
Bi-Fold
Door
55 91 1'-6" X
6'-9 1/2"
Pella -
Windows &
Doors
In-Swing -
Sidelight
Unit
57 91 1'-6" X
6'-9 1/2"
Pella -
Windows &
Doors
In-Swing -
Sidelight
Unit
58 91 1'-6" X
6'-9 1/2"
Pella -
Windows &
Doors
In-Swing -
Sidelight
Unit
59 110 4'-8" x
82"
60 59 60" x 84"
61 111 Curtain
Wall Sgl
Glass
62 88 Small
Closet
97 93 6'-0" X
6'-10"
Pella -
Windows &
Doors
In-Swing
French -
Active /
Passive
Units
99 93 6'-0" X
6'-10"
Pella -
Windows &
Doors
In-Swing
French -
Active /
Passive
Units
Grand total: 15
Window Schedule
Type
Mark
Rough Opening
Manufacturer Model Material Finish
Detail Glazing Head
Height CommentsWidth Height Head Jamb Sill Thickness Type
1J 3' - 0" 6' - 10" Pella
Windows &
Doors
4056 7' - 4"
1S 3' - 4" 6' - 4" Pella
Windows &
Doors
4056 6' - 10"
112 8' - 2" 5' - 6" Kolbe &
Kolbe
Millwork Co.,
Inc.
30KU
N13-1
3-13
8' - 0"
Grand total: 3
1 1/2" = 1'-0"
24
EIFS WALL SECTION DETAIL
1 1/2" = 1'-0"
25
EIFIS DETAIL @ GARAGE EAVE
1" = 1'-0"
26
Callout of French Door Head Section
Date: Submitted for:

Más contenido relacionado

La actualidad más candente

2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit set2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit setSadaf Mohammadi
 
Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603Shin Kameyama
 
KASSIN TRELLIS
KASSIN TRELLISKASSIN TRELLIS
KASSIN TRELLISSean Roper
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseGrant Hepburn
 
Linked In Portfolio Presentation - Residential- wspecs
Linked In Portfolio Presentation - Residential- wspecsLinked In Portfolio Presentation - Residential- wspecs
Linked In Portfolio Presentation - Residential- wspecsClaire Gudmanz
 
One House Project Drawing
One House Project DrawingOne House Project Drawing
One House Project DrawingHassankhosa
 
Brouches of Jaypee Green
Brouches of Jaypee GreenBrouches of Jaypee Green
Brouches of Jaypee GreenRakesh Agarwal
 
Final year Revit project
Final year Revit projectFinal year Revit project
Final year Revit projectMark Thornton
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology ProjectTomcully18
 
Item # 6 - 820 Cambridge Oval
Item # 6 - 820 Cambridge OvalItem # 6 - 820 Cambridge Oval
Item # 6 - 820 Cambridge Ovalahcitycouncil
 
Biomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovationBiomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovationE'ville Eye
 
General civil note 1
General civil note 1General civil note 1
General civil note 1Shweyee Win
 
Item # 12 - Notice of Intent - Katherine Court
Item # 12 - Notice of Intent - Katherine CourtItem # 12 - Notice of Intent - Katherine Court
Item # 12 - Notice of Intent - Katherine Courtahcitycouncil
 
Item # 4 - 730 Corona
Item # 4 - 730 CoronaItem # 4 - 730 Corona
Item # 4 - 730 Coronaahcitycouncil
 
Final Construction Documents
Final Construction DocumentsFinal Construction Documents
Final Construction DocumentsKaitlin Mergler
 

La actualidad más candente (20)

2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit set2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit set
 
502 north market
502 north market502 north market
502 north market
 
20150330_R4D_Permit Set
20150330_R4D_Permit Set20150330_R4D_Permit Set
20150330_R4D_Permit Set
 
Lowe's Carmel, IN
Lowe's   Carmel, INLowe's   Carmel, IN
Lowe's Carmel, IN
 
Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603Doc 3 Building 1_S kameyama_1409603
Doc 3 Building 1_S kameyama_1409603
 
KASSIN TRELLIS
KASSIN TRELLISKASSIN TRELLIS
KASSIN TRELLIS
 
Logic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson HouseLogic Bundle Mgmt House + Site - Patterson House
Logic Bundle Mgmt House + Site - Patterson House
 
Linked In Portfolio Presentation - Residential- wspecs
Linked In Portfolio Presentation - Residential- wspecsLinked In Portfolio Presentation - Residential- wspecs
Linked In Portfolio Presentation - Residential- wspecs
 
One House Project Drawing
One House Project DrawingOne House Project Drawing
One House Project Drawing
 
Dick Smith
Dick SmithDick Smith
Dick Smith
 
Brouches of Jaypee Green
Brouches of Jaypee GreenBrouches of Jaypee Green
Brouches of Jaypee Green
 
Final year Revit project
Final year Revit projectFinal year Revit project
Final year Revit project
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
 
Item # 6 - 820 Cambridge Oval
Item # 6 - 820 Cambridge OvalItem # 6 - 820 Cambridge Oval
Item # 6 - 820 Cambridge Oval
 
Biomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovationBiomed realty-emeryville-center-innovation
Biomed realty-emeryville-center-innovation
 
General civil note 1
General civil note 1General civil note 1
General civil note 1
 
Item # 12 - Notice of Intent - Katherine Court
Item # 12 - Notice of Intent - Katherine CourtItem # 12 - Notice of Intent - Katherine Court
Item # 12 - Notice of Intent - Katherine Court
 
Item # 4 - 730 Corona
Item # 4 - 730 CoronaItem # 4 - 730 Corona
Item # 4 - 730 Corona
 
Final Construction Documents
Final Construction DocumentsFinal Construction Documents
Final Construction Documents
 
AH CCM 5.11.20
AH CCM 5.11.20AH CCM 5.11.20
AH CCM 5.11.20
 

Destacado

Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30
Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30
Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30Damon Thomas
 
Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...
Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...
Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...Aadhar Homes
 
Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30
Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30
Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30Damon Thomas
 
Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30
Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30
Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30Damon Thomas
 
Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31
Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31
Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31Damon Thomas
 
Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31
Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31
Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31Damon Thomas
 

Destacado (6)

Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30
Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30
Construction Progress for TechTown 1st Floor Renovation | June 1 - June 30
 
Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...
Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...
Exclusive details of CHD 106 Golf Avenue in Sector-106, Gurgaon such as price...
 
Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30
Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30
Construction Progress for TechTown 1st Floor Renovation | Sept 1 - Sept 30
 
Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30
Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30
Construction Progress for TechTown 1st Floor Renovation | Nov 1 - Nov 30
 
Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31
Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31
Construction Progress for TechTown 1st Floor Renovation | May 1 - May 31
 
Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31
Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31
Construction Progress for TechTown 1st Floor Renovation | July 1 - July 31
 

Similar a Bryant Residence

Item # 5 - 119 Grant (Compatibility Only)
Item # 5 - 119 Grant (Compatibility Only)Item # 5 - 119 Grant (Compatibility Only)
Item # 5 - 119 Grant (Compatibility Only)ahcitycouncil
 
House Shaw Floorplan Final 03
House Shaw Floorplan Final 03House Shaw Floorplan Final 03
House Shaw Floorplan Final 03Terence Botha
 
BURTON REMODEL 10-07-16
BURTON REMODEL 10-07-16BURTON REMODEL 10-07-16
BURTON REMODEL 10-07-16Cesar Salinas
 
01 architectural cycle 2 interactive
01 architectural   cycle 2 interactive01 architectural   cycle 2 interactive
01 architectural cycle 2 interactivesergencad sergencad
 
DCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfDCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfRoshelleStahl1
 
PROYECTO EN ILUSTRATOR
PROYECTO EN ILUSTRATORPROYECTO EN ILUSTRATOR
PROYECTO EN ILUSTRATORpanderistas17
 
Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,NIZAM ISMAIL
 
CE 444 Contracts and SpecificationsAssignment 7 - Conduct a 95
CE 444 Contracts and SpecificationsAssignment 7 -  Conduct a 95CE 444 Contracts and SpecificationsAssignment 7 -  Conduct a 95
CE 444 Contracts and SpecificationsAssignment 7 - Conduct a 95MaximaSheffield592
 
Royal Museum Alor Setar
Royal Museum Alor SetarRoyal Museum Alor Setar
Royal Museum Alor Setarshacjhow
 
Measured drawings
Measured drawingsMeasured drawings
Measured drawingsjiuaN59
 
House by the Waters
House by the WatersHouse by the Waters
House by the WatersYi Jie Ng
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdfMin Khant Kyaw
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdfMin Khant Kyaw
 

Similar a Bryant Residence (20)

Lombard House
Lombard HouseLombard House
Lombard House
 
Item # 5 - 119 Grant (Compatibility Only)
Item # 5 - 119 Grant (Compatibility Only)Item # 5 - 119 Grant (Compatibility Only)
Item # 5 - 119 Grant (Compatibility Only)
 
House Shaw Floorplan Final 03
House Shaw Floorplan Final 03House Shaw Floorplan Final 03
House Shaw Floorplan Final 03
 
BURTON REMODEL 10-07-16
BURTON REMODEL 10-07-16BURTON REMODEL 10-07-16
BURTON REMODEL 10-07-16
 
01 architectural cycle 2 interactive
01 architectural   cycle 2 interactive01 architectural   cycle 2 interactive
01 architectural cycle 2 interactive
 
DCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdfDCES_Classroom_Building_100_CDs.pdf
DCES_Classroom_Building_100_CDs.pdf
 
Blank Sheets
Blank SheetsBlank Sheets
Blank Sheets
 
PROYECTO EN ILUSTRATOR
PROYECTO EN ILUSTRATORPROYECTO EN ILUSTRATOR
PROYECTO EN ILUSTRATOR
 
72715-A1
72715-A172715-A1
72715-A1
 
IS252_PAA
IS252_PAAIS252_PAA
IS252_PAA
 
Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,Final Docket For LP Store Chennai,
Final Docket For LP Store Chennai,
 
MSH_SITE PLAN
MSH_SITE PLANMSH_SITE PLAN
MSH_SITE PLAN
 
CE 444 Contracts and SpecificationsAssignment 7 - Conduct a 95
CE 444 Contracts and SpecificationsAssignment 7 -  Conduct a 95CE 444 Contracts and SpecificationsAssignment 7 -  Conduct a 95
CE 444 Contracts and SpecificationsAssignment 7 - Conduct a 95
 
Royal Museum Alor Setar
Royal Museum Alor SetarRoyal Museum Alor Setar
Royal Museum Alor Setar
 
Measured drawings
Measured drawingsMeasured drawings
Measured drawings
 
SAMPLE PORTFOLIO
SAMPLE PORTFOLIOSAMPLE PORTFOLIO
SAMPLE PORTFOLIO
 
House by the Waters
House by the WatersHouse by the Waters
House by the Waters
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
 
72742-A1[1]
72742-A1[1]72742-A1[1]
72742-A1[1]
 

Último

Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...ictsugar
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMintel Group
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 

Último (20)

Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...Global Scenario On Sustainable  and Resilient Coconut Industry by Dr. Jelfina...
Global Scenario On Sustainable and Resilient Coconut Industry by Dr. Jelfina...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Greater Noida ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Market Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 EditionMarket Sizes Sample Report - 2024 Edition
Market Sizes Sample Report - 2024 Edition
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 

Bryant Residence

  • 1. UP UP GENERAL NOTES 1. VERIFY ALL DIMENSIONS IN THE FIELD. DO NOT SCALE DRAWINGS. 2. IT SHALL BE EACH TRADE CONTRACTORS RESPONSIBILITY TO VISIT THE SITE AND FAMILIARIZE HIMSELF/HERSELF WITH ALL EXISTING CONDITIONS. EACH CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND OTHERWISE VERIFY ALL DIMENSIONS AND EXISTING CONSTRUCTION CONDITIONS INDICATED AND/OR SHOWN ON THE DRAWINGS. SHOULD ANY ERROR OR INCONSISTENCY EXIST, THE CONTRACTOR SHALL NOT PROCEED WITH THE WORK AFFECTED THEREBY UNTIL REPORTING THE SAME TO THE ARCHITECT AND THE OWNERS REPRESENTATIVE FOR CLARIFICATION AND/OR CORRECTION. 3. DIMENSIONS FOLLOWED BY +/- SHALL BE REVIEWED AND ALL NECESSARY ADJUSTMENTS MADE PRIOR TO FABRICATION AND/OR INSTALLATION OF WORK. NOTIFY ARCHITECT/ENGINEER OF ANY DISCREPANCIES BEFORE PROCEEDING WITH THE WORK. 4. ALL EXISTING CONSTRUCTION AND SURFACES WHICH ARE TO REMAIN BUT ARE AFFECTED BY THE WORK UNDER THIS CONTRACT SHALL BE RESTORED AND REFINISHED TO MATCH THE CONSTRUCTION, FINISH AND ALIGNMENT OF THE EXISTING ADJACENT CONSTRUCTION AND FINISHES. 5. PROVIDE FIRE WATCH DURING FIELD CUTTING AND WELDING OPERATIONS, MEETING OWNER'S REQUIREMENTS. 6. THE CONTRACTOR SHALL VERIFY THE EXISTENCE AND LOCATION OF ALL UTILITIES IN WORK AREAS PRIOR TO PROCEEDING WITH CONSTRUCTION. ALL DISCREPANCIES SHALL BE DOCUMENTED AND FORWARDED TO ARCHITECT AND OWNER OR OWNER'S REPRESENTATIVE FOR ACTION. 7. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INVESTIGATE FIELD CONDITIONS AND PROVIDE, AS NEEDED, TEMPORARY SUPPORTS, SHORING, AND/OR PROTECTION OF EXISTING STRUCTURES AND UNDERGROUND UTILITIES DURING EXECUTION OF WORK. 8. ALL WORK TO CONFORM TO THE REQUIREMENTS OF THE LOCAL AND STATE CODES. 9. RELEVANT DIMENSIONS AND ELEVATIONS FOR EQUIPMENT INSTALLATIONS SHALL BE VERIFIED AGAINST MANUFACTURER'S CERTIFIED EQUIPMENT DRAWINGS. 10. ALL PENETRATIONS TO FLOORS, CEILINGS, AND WALLS SHALL BE SEALED AND FIRE STOPPED TO A FIRE RATING EQUAL TO THE CONSTRUCTION BEING PENETRATED AT NEWLY CREATED ROOMS. 11. DRAWINGS THAT DO NOT BEAR THE MARK ISSUED FOR CONSTRUCTION SHALL NOT BE USED FOR CONSTRUCTION PURPOSES. 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 Scale Project number Date Drawn by Checked by Client: Project: CentricdesignStudio Location: Consultants: Seal: Sheet Title: As indicated 9/24/20121:25:24PM A0.00 Cover Sheet 12-51 Palmer Woods 09/25/12 CM,SL SL 17550 Fairway Dr. Detroit, MI 48221 17550 FAIRWAY DRIVE DETROIT, MI 48221 INDEX OF DRAWINGS SHEET NUMBER SHEET NAME SHEET ISSUE DATE A0.00 Cover Sheet 09/25/12 A0.01 Demolition Plan - First Level 09/25/12 A0.02 Demolition Plan - Second Floor 09/25/12 A1.01 First Floor Plan 09/25/12 A1.02 Second Floor Plan 09/25/12 A1.03 ROOF PLAN 09/25/12 A3.01 North + West Elevations 09/25/12 A3.01D Demo North + West Elevation 09/25/12 A3.02 South + East Elevations 09/25/12 A3.02D Demo South + East Elevations 09/25/12 A5.1 ENLARGED PLANS & INTERIOR ELEVATIONS 09/25/12 A5.2 ENLARGED PLANS & INTERIOR ELEVATIONS 09/25/12 A6.1 DETAILS SHEET 09/25/12 S1.0 SITE PLAN 09/25/12 3/64" = 1'-0" KEY PLAN SITE LOCATION MAP PROJECT INFORMATION RENOVATION OF KITCHEN, MASTERSUITE AND ADDING A SECOND STORY BALCONY TO AN EXISTING 4,000 SQ.FT HOME IN PALMER WOODS GOLF COURSE SUBDIVION. CONVERTING A 5 BEDROOM RESIDENCE INTO A 3 BEDROOM ON THE SECOND LEVEL. RENOVATION INCLUDES 1,995 SQ.FT OF THE TOTAL 4,000 SQ. FT RESIDENTIAL SPACE, RESIDENTIAL USE (R1). SITE GOLF COURSE Burkeen Construction 39740 Warren Rd. Canton, MI (734) 673-7111 CONTRACTOR: ERA Majestic Realty 23350 Greenfield, Suite 101 Oak Park, MI (313) 399-9538 REAL ESTATE DEELOPER Date: Submitted for: 9/25/2012 PERMITS
  • 2. UP UP UP 9'-10" EXISTING GARAGE TO REMAIL STONE VENEER AND SIDING TO BE REMOVED REMOVE EXISTING PILASTER EXISTING PLUMBING SEWER & WATER LINES TO REMAIN REMOVE & CAP EXISTING PLUMBING LINES BELOW FLOOR LINE EXISTING PORCH TO REMAIN REMOVE EXISTING COUNTER TOP, BASE CABINETS AND SOFFIT ABOVE RELOCATE EXISTING SINK SALVAGE EXISTING WALL CABINETS (TYP) DEMOLISH EXISTING HEAT RADIATOR AND ASSOCIATED COMPONENTS. SEE MECHANICAL CONTRATOR'S DRAWINGS FOR ADDITIONAL SCOPE. REMOVE PLUMBING AT EXISTING SINK. SEE PLUMBING CONTRACTOR'S DRAWINGS FOR ADDITIONAL SCOPE. REMOVE EXISTING PIPING AT SINK AS REQUIRED TO FACILITATE NEW WORK. SEE PLUMBING CONTRACTOR FOR ADDITIONAL SCOPE. PATCH & REPAIR ANY HOLES, GAPS OR OPENINGS IN FLOOR CREATED FROM DEMOLITION OF EXISTING PARTITION. REMOVE EXISTING DOORS, AND DOOR FRAME AT CERTAIN LOCATIONS. SALVAGE DOOR AND RETURN TO OWNER. DEMOLITION NOTES: 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 Scale Project number Date Drawn by Checked by Client: Project: CentricdesignStudio Location: Consultants: Seal: Sheet Title: As indicated 9/24/20121:25:35PM A0.01 Demolition Plan - First Level 12-51 Palmer Woods 09/25/12 Author Checker 17550 Fairway Dr. Detroit, MI 48221 1/4" = 1'-0" 1 DEMOLITION FIRST FLOOR PLAN EXISTING BRICK PATIO TO REMAIN EXISTING BRICK WINDOW WELL TO REMAIN DEMO EXISTING BOW WINDOW REMOVE LOAD BEARING WALL AND SHORE PER STRUCTURAL DRAWINGS N.I.C. N.I.C.N.I.C. REMOVE LOAD BEARING WALL AND SHORE PER STRUCTURAL DRAWINGS EXTERIOR WINDOWS REMOVED FOR WINDOW REPLACEMENT (TYP.) FIRST LEVEL PLAN 18 TOTAL - VERIFY IN FIELD STUDYLIVING ROOM LIBRARY WINDOWS REMOVED FOR REPLACMENT TO SAME SIZED WINDOWS. N.I.C. BATH Date: Submitted for:
  • 3. DN DN UP 8'-10" DEMOLISH EXISTING HEAT RADIATOR AND ASSOCIATED COMPONENTS. SEE MECHANICAL CONTRATOR'S DRAWINGS FOR ADDITIONAL SCOPE. REMOVE PLUMBING AT EXISTING SINK. SEE PLUMBING CONTRACTOR'S DRAWINGS FOR ADDITIONAL SCOPE. REMOVE EXISTING PIPING AT SINK AS REQUIRED TO FACILITATE NEW WORK. SEE PLUMBING CONTRACTOR FOR ADDITIONAL SCOPE. PATCH & REPAIR ANY HOLES, GAPS OR OPENINGS IN FLOOR CREATED FROM DEMOLITION OF EXISTING PARTITION. REMOVE EXISTING DOORS, AND DOOR FRAME AT CERTAIN LOCATIONS. SALVAGE DOOR AND RETURN TO OWNER. DEMOLITION NOTES: 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 Scale Project number Date Drawn by Checked by Client: Project: CentricdesignStudio Location: Consultants: Seal: Sheet Title: As indicated 9/24/20121:25:42PM A0.02 Demolition Plan - Second Floor 12-51 Palmer Woods 09/25/12 Author Checker 17550 Fairway Dr. Detroit, MI 48221 1/4" = 1'-0" 1 DEMOLITION SECOND LEVEL PLAN REMOVE EXISTING CANOPY + ROOF REMOVE EXISTING LOW SLOPED ROOF OVER GARAGE EXTERIOR WINDOWS REMOVED FOR WINDOW REPLACEMENT (TYP.) SECOND LEVEL 24 TOTAL - VERIFY IN FIELD BEDROOM #2 N.I.C. BEDROOM #1 N.I.C. BEDROOM #3 BEDROOM #4 REMOVE LOAD BEARING WALL AND SHORE PER STRUCTURAL DRAWINGS BEDROOM #5 REMOVE NON-LOAD BEARING WALLS (TYP.) FOR MASTER SUITE NEW LAYOUT Date: Submitted for:
  • 4. UP REF. UP UP 19' - 1" 19'-6" 20' - 11" 2'-7" 28'-5" 13' - 4" 13' - 2" 4'-0" Library 1 227 SF Sun Room 3 1S A5.1 1 2 A1.03 A6.1 5 A6.1 3 A6.1 1 10 A6.1 17 A6.1 2 A6.1 --- - 99 1J A6.1 12 112 14' - 7" 12'-8" 54 RISE WINDOW WELL TO BE FLUSH WITH PATIO SURFACE 224 SF Kitchen 10 181 SF Dining Room 11 Living Room 12 95 SF Foyer 13 97 EXISTING FIREPLACE TO REMAIN NEW PATIO EXISTING PATIO 9' - 3" 1'-5"6'-1"1'-3" 0' - 10" 2' - 9" 1'-3"2'-7"1'-5"6'-9" EXISTING PLUMBING LINES TO REMAIN (TYP) PATCH & REPAIR EXISTING FLOOR 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 Scale Project number Date Drawn by Checked by Client: Project: CentricdesignStudio Location: Consultants: Seal: Sheet Title: 1/4" = 1'-0" 9/24/20121:26:04PM A1.01 First Floor Plan 12-51 Palmer Woods 09/25/12 C. B., C. M., S.L. S. Little 17550 Fairway Dr. Detroit, MI 48221 1/4" = 1'-0" 1 New First Floor NEW BRICK PATIO TO MATCH SIMILIARLY TO EXISTING NEW CONCRETE PAVER PATIO TO MATCH OPPOSITE HAND Date: Submitted for:
  • 5. DN DN UP D W 1 A4.1 7'-8" 242 SF Master Closet 4 379 SF Master Suite 5 Bath 6 Bed Room 7 Bath 8 Bed Room 9 A5.2 1 2 A1.03 17 A6.1 51 52 7'-7" 34' - 7" OPEN UP EXISTING CHIMNEY TO NEW DOUBLE SIDED FIREPLACE 47 48 NEW PORCH CANOPY (BELOW) NEW RAIL 2'-0" & BALUSTER FENCING ON TOP OF FLAT ROOF 102 SF Master Suite 14 N.I.C. N.I.C. N.I.C. 59 60 1' - 6" 5' - 0" 3'-11" NEW GARAGE ROOF HIP 4:12 PITCH (BELOW) NEW DECORATIVE RAILING 3'-6" HEIGHT NEW BALCONY NEW LAUNDRY CLOSET 62 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 Scale Project number Date Drawn by Checked by Client: Project: CentricdesignStudio Location: Consultants: Seal: Sheet Title: 1/4" = 1'-0" 9/24/20121:26:23PM A1.02 Second Floor Plan 12-51 Palmer Woods 09/25/12 C. B., C. M., S. L. S. Little 17550 Fairway Dr. Detroit, MI 48221 1/4" = 1'-0" 1 NEW Second Floor Date: Submitted for:
  • 6. First Floor 0' - 0" Second Floor 9' - 3" Foundation -1' - 3" Ceiling 1 8' - 4"1' - 0" 12" OVERHANG EXISTING GARAGE ENGINEERED TRUSS RE: STRUCTURAL SHEETS 26' - 6" 23'-6" 21' - 1" 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 Scale Project number Date Drawn by Checked by Client: Project: CentricdesignStudio Location: Consultants: Seal: Sheet Title: 1/4" = 1'-0" 9/24/20121:26:32PM A1.03 ROOF PLAN 12-51 Palmer Woods 09/25/12 Author Checker 17550 Fairway Dr. Detroit, MI 48221 1/4" = 1'-0" 2 SECTION THRU NEW ROOF 1/4" = 1'-0" 3 Garage Roof Framing Date: Submitted for:
  • 7. First Floor 0' - 0" Second Floor 9' - 3" Roof 18' - 6" Foundation -1' - 3" Ceiling 1 8' - 4" Ceiling 2 17' - 7" REMOVE EXISTING BAY WINDOW REMOVE PORTION OF EXISTING MASONRY TO MATCH NEW COIN INSTALLATION REMOVE EXISTING SIDING (TYP) REMOVE EXISTING PILASTER & CANOPY First Floor 0' - 0" Second Floor 9' - 3" Roof 18' - 6" Ceiling 1 8' - 4" Ceiling 2 17' - 7" REMOVE WINDOW & BRICKS & SALVAGE BRICKS BELOW WINDOW REMOVE EXISTING SIDING WINDOW REPLACEMENT FOR ALL WINDOWS & DOORS (TYP.) REMOVE EXISTING BRICK, PICTURE WINDOW, & FRAME. MAKE SURE TO SALVAGE BRICKS BELOW WINDOW CREATE OPENING FOR NEW DOOR REMOVE EXISTING DOOR REPLACE WITH NEW CASEMENT WINDOW REMOVE EXISTING SIDING (TYP) DEMOLISH EXISTING HEAT RADIATOR AND ASSOCIATED COMPONENTS. SEE MECHANICAL CONTRATOR'S DRAWINGS FOR ADDITIONAL SCOPE. REMOVE PLUMBING AT EXISTING SINK. SEE PLUMBING CONTRACTOR'S DRAWINGS FOR ADDITIONAL SCOPE. REMOVE EXISTING PIPING AT SINK AS REQUIRED TO FACILITATE NEW WORK. SEE PLUMBING CONTRACTOR FOR ADDITIONAL SCOPE. PATCH & REPAIR ANY HOLES, GAPS OR OPENINGS IN FLOOR CREATED FROM DEMOLITION OF EXISTING PARTITION. REMOVE EXISTING DOORS, AND DOOR FRAME AT CERTAIN LOCATIONS. SALVAGE DOOR AND RETURN TO OWNER. DEMOLITION NOTES: 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 Scale Project number Date Drawn by Checked by Client: Project: CentricdesignStudio Location: Consultants: Seal: Sheet Title: As indicated 9/24/20121:27:50PM A3.02D Demo South + East Elevations 12-51 Palmer Woods 09/25/12 C. B., C. M., S. L. S. Little 17550 Fairway Dr. Detroit, MI 48221 1/4" = 1'-0" 1 DEMOLITION SOUTH ELEVATION 1/4" = 1'-0" 2 Demolition East Elevation Date: Submitted for: NOTE: SEE SHEET A3.01D FOR TYPICAL DEMOLITION NOTES
  • 8. First Floor 0' - 0" Second Floor 9' - 3" Roof 18' - 6" Ceiling 1 8' - 4" Ceiling 2 17' - 7" 112 NEW LIMESTONE VENEER NEW LIMESTONE DECORATIVE COIN TYP NEW EIFS WALL SYSTEM NEW BAY WINDOW 2'-0" First Floor 0' - 0" Second Floor 9' - 3" Roof 18' - 6" Ceiling 1 8' - 4" Ceiling 2 17' - 7" NEW EIFS WALL SYSTEM 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 Scale Project number Date Drawn by Checked by Client: Project: CentricdesignStudio Location: Consultants: Seal: Sheet Title: 1/4" = 1'-0" 9/24/20121:27:03PM A3.01 North + West Elevations 12-51 Palmer Woods 09/25/12 Author Checker 17550 Fairway Dr. Detroit, MI 48221 1/4" = 1'-0" 3 New West 1/4" = 1'-0" 4 New North Elevation NEW POST, TOP & BOTTOM RAILING, AND BALUSTER FENCE 2'-0" HEIGHT NEW REPLACEMENT WINDOWS TYPICAL NEW FIBERGLASS STRUCTURAL COLUMN & DECK (ALSO SEE DECK MANUFACTURER DRAWINGS. NEW GUTTER & DOWNSPOUT NEW REPLACEMENT WINDOWS (TYPICAL) NEW EIFS EXTERIOR WALL SYSTEM NEW LIMESTONE VENEER SURFACE WITH STONE CAP NEW EIFS EXTERIOR WALL SYSTEM Date: Submitted for:
  • 9. First Floor 0' - 0" Second Floor 9' - 3" Roof 18' - 6" Ceiling 1 8' - 4" Ceiling 2 17' - 7" NEW ROOF SHINGLES 12 4 99 971S 5152 1R 1R NEW VINYL RAILING TO MATCH EXISTING NEW DECORATIVE RAIL 3'-6" NEW STRUCTURAL POST W/ VINYL COVER LIMESTONE VENEER WAINSCOTT 3'-8" NEW EIFS WALL SYSTEM NEW STONE SILL First Floor 0' - 0" Second Floor 9' - 3" Roof 18' - 6" Ceiling 1 8' - 4" Ceiling 2 17' - 7" NEW DECORATIVE EXTERIOR WALL COIN EVERY 3RD & 6TH COURSE IN HEIGHT 0'-8"0'-8" NEW EIFS WALL SYSTEM 1' - 4" 0' - 8" NEW LIMESTONE VENEER 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 Scale Project number Date Drawn by Checked by Client: Project: CentricdesignStudio Location: Consultants: Seal: Sheet Title: 1/4" = 1'-0" 9/24/20121:27:37PM A3.02 South + East Elevations 12-51 Palmer Woods 09/25/12 Author Checker 17550 Fairway Dr. Detroit, MI 48221 1/4" = 1'-0" 3 New East 1/4" = 1'-0" 4 New South Elevation Date: Submitted for:
  • 10. REF. A5.14 INTERIOR ELEV.1C 5 INTERIOR ELEV. 1D 2 INTERIOR ELEV.1A 3 INTERIOR ELEV. 1B 4' - 2"3' - 9" 16'-11" 7'-8"8'-0"1'-3" 6'-8"10'-3" 5'-0"8'-6"3'-5" First Floor 0' - 0" Ceiling 1 8' - 4" First Floor 0' - 0" Ceiling 1 8' - 4" First Floor 0' - 0" Ceiling 1 8' - 4" First Floor 0' - 0" Ceiling 1 8' - 4" 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 Scale Project number Date Drawn by Checked by Client: Project: CentricdesignStudio Location: Consultants: Seal: Sheet Title: As indicated 9/24/20121:27:59PM A5.1 ENLARGED PLANS & INTERIOR ELEVATIONS 12-51 Palmer Woods 09/25/12 Author Checker 17550 Fairway Dr. Detroit, MI 48221 1/2" = 1'-0" 1 ENLARGED KITCHEN PLAN 1/4" = 1'-0" 2 INTERIOR ELEV. 1A 1/4" = 1'-0" 3 INTERIOR ELEV. 1B 1/4" = 1'-0" 4 INTERIOR ELEV. 1C 1/4" = 1'-0" 5 INTERIOR ELEV. 1D 6 3D View 9 Date: Submitted for:
  • 11. A5.2 2 INERIOR ELEV. 2A 2B INTERIOR ELEV2B 4 INTERIOR ELEV. 2C 5 INTERIOR ELEV.2D A6.1 19 INTERIO R DO O R ELEVATIO N SHOWER Second Floor 9' - 3" Ceiling 2 17' - 7" Second Floor 9' - 3" Ceiling 2 17' - 7" Second Floor 9' - 3" Ceiling 2 17' - 7" Second Floor 9' - 3" Ceiling 2 17' - 7" 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 Scale Project number Date Drawn by Checked by Client: Project: CentricdesignStudio Location: Consultants: Seal: Sheet Title: As indicated 9/24/20121:28:32PM A5.2 ENLARGED PLANS & INTERIOR ELEVATIONS 12-51 Palmer Woods 09/25/12 Author Checker 17550 Fairway Dr. Detroit, MI 48221 1/2" = 1'-0" 1 ENLARGED MASTER BATH PLANS 1/4" = 1'-0" 2 INERIOR ELEV. 2A 1/4" = 1'-0" 2B INTERIOR ELEV 2B 1/4" = 1'-0" 4 INTERIOR ELEV. 2C 1/4" = 1'-0" 5 INTERIOR ELEV. 2D Date: Submitted for: 3 BATHROOM VIEW 1
  • 12. EXISTING WALL FLASHING SEALANT & BACKER ROD SEALANT WEATHER STRIP AIRSPACE EXISTING MASONRY FLASHING MTL CLAD FRAME SEALANT WD NAILER SEALANT & BACKER ROD WINDOW TRIM EXTRUDED ALUMINUM FLASHING JOINT SEALANT & BACKER RODJOINT SEALANT WD NAILER WINDOW TRIM WD CASING EXISTING CONSTRUCTION GRAPHIC ONLY First Floor 0' - 0" WD STUD 5/8" GYP BD BRICK SILL DRAINAGE MATERIAL WEEP VENT NEW WINDOW SEALANT, BACKER ROD & SHIM WHERE REQ'D EXISTING WALL EXISTING MASONRY FLASHING 3/4" PLYWOOD First Floor 0' - 0" Second Floor 9' - 3" Foundation -1' - 3" Ceiling 1 8' - 4" A6.1 7 A6.1 8 EXISTING WALL PREFAB BAY WINDOW RE: MANUFACTURER INSTALL 4" BATT INSULATION LAMINATE SILL ANCHOR SUPPORT EXISTING WALL Second Floor 9' - 3" Ceiling 1 8' - 4" MTL THRESHOLD FLASHING JOIST RE STRUCTURAL DOOR EXISTING MASONRY COMPOSITE WD DECKING SLOPE 0.25 First Floor 0' - 0" First Floor 0' - 0" Second Floor 9' - 3" Roof 18' - 6" Ceiling 1 8' - 4" Ceiling 2 17' - 7" A6.1 15 A6.1 16 A6.1 26 EXISTING WALL EXISTING ROOF First Floor 0' - 0" Second Floor 9' - 3" Roof 18' - 6" Ceiling 1 8' - 4" Ceiling 2 17' - 7" A6.1 13 A6.1 14 NEW DECORATIVE RAILING EXISTING WALL NEW STONE VENEER ON FACE OF RETAINING WALL 93 91 95 5857 112 110 59 1S1J EIFS WALL SYSTEM 3/4" PLYWOOD STONE SILL STONE VENEER & MTL LATH 2X4 WOOD STUD FLASHING DRIP EDGE 2 LAYERS ASPHALT IMPREGNATED GRADE “D” CONSTRUCTION PAPER EIFS TERMINATION BAR FLASHING & SEALANT 5/8" GYP BD Ceiling 1 8' - 4" EIFS WALL SYSTEM 3/4" PLYWOOD 2X4 WOOD STUD EIFS TERMINATION BAR SEALANT & BACKER ROD 5/8" GYP BD ASPHALT SHINGLE NOTE: REFER TO STRUCTURAL ROOF FRAMING SHEET EXTRUDED ALUMINUM FLASHING SEALANT & BACKER ROD WOOD CASING DOOR WOOD HEADER 88 440 BurroughsSt. Detroit, MI 48202 ph. 313.486.1908 Scale Project number Date Drawn by Checked by Client: Project: CentricdesignStudio Location: Consultants: Seal: Sheet Title: As indicated 9/24/20121:28:48PM A6.1 DETAILS SHEET 12-51 Palmer Woods 09/25/12 Author Checker 17550 Fairway Dr. Detroit, MI 48221 1" = 1'-0" 1 Callout (4) of New First Floor 1" = 1'-0" 3 DETAIL @ NEW SIDELIGHT & FRENCH DOOR 1" = 1'-0" 5 Callout Window Jamb Detail 1 1" = 1'-0" 7 DETAIL @ NEW WINDOW HEAD 1" = 1'-0" 8 TYPICAL CASEMENT WINDOW SILL 3/4" = 1'-0" 10 TYPICAL NEW CASEMENT WINDOW SECTION 1" = 1'-0" 12 Bay Window Intermitten 1" = 1'-0" 13 Bay Window Head 1" = 1'-0" 14 Bay Window Sill 1" = 1'-0" 15 Callout of French Door Sill @ Second Floor 1" = 1'-0" 16 Callout of French Door Sill Section 1/4" = 1'-0" 17 French Door Section 1/4" = 1'-0" 2 Bay Window Section Door Schedule Door Number Door Type Door Size Manufacturer Model Frame Type Fire Rating Details Description Finish Head Jamb Sill Door Frame Comments 47 57 28" x 80" Pella - Windows & Doors Interior Door 48 57 28" x 80" Pella - Windows & Doors Interior Door 50 91 1'-6" X 6'-9 1/2" Pella - Windows & Doors In-Swing - Sidelight Unit 51 95 3'-4" X 7'-0" Pella - Windows & Doors In-Swing - Right Hand Operation 52 95 3'-4" X 7'-0" Pella - Windows & Doors In-Swing - Right Hand Operation 54 58 48" x 84" Pella - Windows & Doors Interior Bi-Fold Door 55 91 1'-6" X 6'-9 1/2" Pella - Windows & Doors In-Swing - Sidelight Unit 57 91 1'-6" X 6'-9 1/2" Pella - Windows & Doors In-Swing - Sidelight Unit 58 91 1'-6" X 6'-9 1/2" Pella - Windows & Doors In-Swing - Sidelight Unit 59 110 4'-8" x 82" 60 59 60" x 84" 61 111 Curtain Wall Sgl Glass 62 88 Small Closet 97 93 6'-0" X 6'-10" Pella - Windows & Doors In-Swing French - Active / Passive Units 99 93 6'-0" X 6'-10" Pella - Windows & Doors In-Swing French - Active / Passive Units Grand total: 15 Window Schedule Type Mark Rough Opening Manufacturer Model Material Finish Detail Glazing Head Height CommentsWidth Height Head Jamb Sill Thickness Type 1J 3' - 0" 6' - 10" Pella Windows & Doors 4056 7' - 4" 1S 3' - 4" 6' - 4" Pella Windows & Doors 4056 6' - 10" 112 8' - 2" 5' - 6" Kolbe & Kolbe Millwork Co., Inc. 30KU N13-1 3-13 8' - 0" Grand total: 3 1 1/2" = 1'-0" 24 EIFS WALL SECTION DETAIL 1 1/2" = 1'-0" 25 EIFIS DETAIL @ GARAGE EAVE 1" = 1'-0" 26 Callout of French Door Head Section Date: Submitted for: