COCOMO Model
Basic
Introduction
COCOMO is one of the most widely used software
estimation models in the world
It was developed by Barry Boehm in 1981
COCOMO predicts the effort and schedule for a software
product development based on inputs relating to the size of
the software and a number of cost drivers that affect
productivity
COCOMO Models
COCOMO has three different models that reflect the
complexity:
the Basic Model
the Intermediate Model
and the Detailed Model
The Development Modes: Project
Characteristics
Organic Mode
• Relatively small, simple software projects
• Small teams with good application experience work to a
set of less than rigid requirements
• Similar to the previously developed projects
• relatively small and requires little innovation
Semidetached Mode
• Intermediate (in size and complexity) software projects in
which teams with mixed experience levels must meet a mix
of rigid and less than rigid requirements.
Contd…
Embedded Mode
• Software projects that must be developed within a set of tight
hardware, software, and operational constraints.
COCOMO:
Some Assumptions
Primary cost driver is the number of Delivered Source
Instructions (DSI) / Delivered Line Of Code
developed by the project
COCOMO estimates assume that the project will enjoy
good management by both the developer and the
customer
Assumes the requirements specification is not
substantially changed after the plans and requirements
phase
Basic COCOMO
Basic COCOMO is good for quick, early, rough order of
magnitude estimates of software costs
It does not account for differences in hardware
constraints, personnel quality and experience, use of
modern tools and techniques, and other project attributes
known to have a significant influence on software costs,
which limits its accuracy
Basic COCOMO Model: Formula
E=ab (KLOC or KDSI) b
b
D=cb(E) d
b
P=E/D
where E is the effort applied in person-months, D is the
development time in chronological months, KLOC / KDSI
is the estimated number of delivered lines of code for the
project (expressed in thousands), and P is the number of
people required. The coefficients ab, bb, cb and db are given in
next slide.
Contd…
Software project ab bb cb db
Organic 2.4 1.05 2.5 0.38
Semi-detached 3.0 1.12 2.5 0.35
Embedded 3.6 1.20 2.5 0.32
Basic COCOMO Model: Equation
Mode Effort Schedule
Organic E=2.4*(KDSI)
1.05
TDEV=2.5*(E)
0.38
Semidetached E=3.0*(KDSI)
1.12
TDEV=2.5*(E)
0.35
Embedded E=3.6*(KDSI)
1.20
TDEV=2.5*(E)
0.32
Basic COCOMO Model: Limitation
Its accuracy is necessarily limited because of its lack of
factors which have a significant influence on software costs
The Basic COCOMO estimates are within a factor of 1.3
only 29% of the time, and within a factor of 2 only 60% of
the time
Basic COCOMO Model: Example
 We have determined our project fits the characteristics of Semi-Detached
mode
 We estimate our project will have 32,000 Delivered Source Instructions.
Using the formulas, we can estimate:
 Effort = 3.0*(32) 1.12
= 146 man-months
 Schedule = 2.5*(146) 0.35
= 14 months
 Productivity = 32,000 DSI / 146 MM
= 219 DSI/MM
 Average Staffing = 146 MM /14 months
= 10 FSP
Function Point Analysis
What is Function Point Analysis (FPA)?
 It is designed to estimate and measure the time, and thereby the cost, of
developing new software applications and maintaining existing software
applications.
 It is also useful in comparing and highlighting opportunities for productivity
improvements in software development.
 It was developed by A.J. Albrecht of the IBM Corporation in the early 1980s.
 The main other approach used for measuring the size, and therefore the time
required, of software project is lines of code (LOC) – which has a number of
inherent problems.
Function Point Analysis
How is Function Point Analysis done?
Working from the project design specifications, the following
system functions are measured (counted):
 Inputs
 Outputs
 Files
 Inquires
 Interfaces
Function Point Analysis
These function-point counts are then weighed (multiplied) by
their degree of complexity:
Simple Average Complex
Inputs 2 4 6
Outputs 3 5 7
Files 5 10 15
Inquires 2 4 6
Interfaces 4 7 10
Function Point Analysis
A simple example:
inputs
3 simple X 2 = 6
4 average X 4 = 16
1 complex X 6 = 6
outputs
6 average X 5 = 30
2 complex X 7 = 14
files
5 complex X 15 = 75
inquiries
8 average X 4 = 32
interfaces
3 average X 7 = 21
4 complex X 10 = 40
Unadjusted function points 240
Function Point Analysis
In addition to these individually weighted function points, there are factors that affect
the project and/or system as a whole. There are a number (~35) of these factors
that affect the size of the project effort, and each is ranked from “0”- no influence to
“5”- essential.
The following are some examples of these factors:
 Is high performance critical?
 Is the internal processing complex?
 Is the system to be used in multiple sites and/or by multiple organizations?
 Is the code designed to be reusable?
 Is the processing to be distributed?
 and so forth . . .
Function Point Analysis
Continuing our example . . .
Complex internal processing = 3
Code to be reusable = 2
High performance = 4
Multiple sites = 3
Distributed processing = 5
Project adjustment factor = 17
Adjustment calculation:
Adjusted FP = Unadjusted FP X [0.65 + (adjustment factor X 0.01)]
= 240 X [0.65 + ( 17 X 0.01)]
= 240 X [0.82]
= 197 Adjusted function points
Function Point Analysis
But how long will the project take and how much will it cost?
As previously measured, programmers in our organization
average 18 function points per month. Thus . . .
197 FP divided by 18 = 11 man-months
If the average programmer is paid $5,200 per month
(including benefits), then the [labor] cost of the project will
be . . .
11 man-months X $5,200 = $57,200
Function Point Analysis
Because function point analysis is independent of language used,
development platform, etc. it can be used to identify the
productivity benefits of . . .
One programming language over another
One development platform over another
One development methodology over another
One programming department over another
Before-and-after gains in investing in programmer training
And so forth . . .
Function Point Analysis
But there are problems and criticisms:
 Function point counts are affected by project size
 Difficult to apply to massively distributed systems or to systems with very
complex internal processing
 Difficult to define logical files from physical files
 The validity of the weights that Albrecht established – and the consistency
of their application – has been challenged
 Different companies will calculate function points slightly different, making
intercompany comparisons questionable

Más contenido relacionado

La actualidad más candente

Putnam Resource allocation model.ppt
Putnam Resource allocation model.pptPutnam Resource allocation model.ppt
Putnam Resource allocation model.pptAnupamaSharma80
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)ShudipPal
 
Cost estimation using cocomo model
Cost estimation using cocomo modelCost estimation using cocomo model
Cost estimation using cocomo modelNitesh Bichwani
 
Cocomo model
Cocomo modelCocomo model
Cocomo modelMZ5512
 
Line of Code (LOC) Matric and Function Point Matric
Line of Code (LOC) Matric and Function Point MatricLine of Code (LOC) Matric and Function Point Matric
Line of Code (LOC) Matric and Function Point MatricAnkush Singh
 
Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)AmanSharma1172
 
Hard versus Soft real time system
Hard versus Soft real time systemHard versus Soft real time system
Hard versus Soft real time systemKamal Acharya
 
Software project estimation
Software project estimationSoftware project estimation
Software project estimationinayat khan
 
Software estimation
Software estimationSoftware estimation
Software estimationMd Shakir
 
Software Engineering (Project Planning & Estimation)
Software Engineering (Project Planning &  Estimation)Software Engineering (Project Planning &  Estimation)
Software Engineering (Project Planning & Estimation)ShudipPal
 
Formal Specification in Software Engineering SE9
Formal Specification in Software Engineering SE9Formal Specification in Software Engineering SE9
Formal Specification in Software Engineering SE9koolkampus
 

La actualidad más candente (20)

Software cost estimation
Software cost estimationSoftware cost estimation
Software cost estimation
 
COCOMO model
COCOMO modelCOCOMO model
COCOMO model
 
Putnam Resource allocation model.ppt
Putnam Resource allocation model.pptPutnam Resource allocation model.ppt
Putnam Resource allocation model.ppt
 
Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)Software Engineering (Project Scheduling)
Software Engineering (Project Scheduling)
 
Cost estimation using cocomo model
Cost estimation using cocomo modelCost estimation using cocomo model
Cost estimation using cocomo model
 
Cocomo model
Cocomo modelCocomo model
Cocomo model
 
Interactive debugging system
Interactive debugging systemInteractive debugging system
Interactive debugging system
 
Cocomo model
Cocomo modelCocomo model
Cocomo model
 
Software Reliability
Software ReliabilitySoftware Reliability
Software Reliability
 
Line of Code (LOC) Matric and Function Point Matric
Line of Code (LOC) Matric and Function Point MatricLine of Code (LOC) Matric and Function Point Matric
Line of Code (LOC) Matric and Function Point Matric
 
Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)Constructive Cost Model - II (COCOMO-II)
Constructive Cost Model - II (COCOMO-II)
 
Hard versus Soft real time system
Hard versus Soft real time systemHard versus Soft real time system
Hard versus Soft real time system
 
Software project estimation
Software project estimationSoftware project estimation
Software project estimation
 
Software scope
Software scopeSoftware scope
Software scope
 
Software estimation
Software estimationSoftware estimation
Software estimation
 
Software metrics
Software metricsSoftware metrics
Software metrics
 
Software quality
Software qualitySoftware quality
Software quality
 
Software Engineering (Project Planning & Estimation)
Software Engineering (Project Planning &  Estimation)Software Engineering (Project Planning &  Estimation)
Software Engineering (Project Planning & Estimation)
 
Formal Specification in Software Engineering SE9
Formal Specification in Software Engineering SE9Formal Specification in Software Engineering SE9
Formal Specification in Software Engineering SE9
 
Cocomo
CocomoCocomo
Cocomo
 

Destacado

Monografía tics
Monografía tics Monografía tics
Monografía tics Yazmin Salas
 
Platja d'en Bossa
Platja d'en BossaPlatja d'en Bossa
Platja d'en Bossaadaura
 
Com ha de ser la guia natural del projecte?
Com ha de ser la guia natural del projecte?Com ha de ser la guia natural del projecte?
Com ha de ser la guia natural del projecte?adaura
 
Response Marketing || Pause Project V5
Response Marketing || Pause Project V5Response Marketing || Pause Project V5
Response Marketing || Pause Project V5Response Marketing
 
Bazaarvoice: Unleash the Power of Consumer Generated Content for SEO Gains #L...
Bazaarvoice: Unleash the Power of Consumer Generated Content for SEO Gains #L...Bazaarvoice: Unleash the Power of Consumer Generated Content for SEO Gains #L...
Bazaarvoice: Unleash the Power of Consumer Generated Content for SEO Gains #L...Rio SEO
 
HCM CPP User Group introduction
HCM CPP User Group introductionHCM CPP User Group introduction
HCM CPP User Group introductionLê Phong Vũ
 
Maven 3 : уличная магия
Maven 3 : уличная магияMaven 3 : уличная магия
Maven 3 : уличная магияAleksey Solntsev
 
προτεινόμενες εκπαιδευτικές επισκέψεις
προτεινόμενες εκπαιδευτικές επισκέψειςπροτεινόμενες εκπαιδευτικές επισκέψεις
προτεινόμενες εκπαιδευτικές επισκέψειςDina Prsn
 
Hypothyroidism pathology presentation2
Hypothyroidism pathology presentation2Hypothyroidism pathology presentation2
Hypothyroidism pathology presentation2Jordan Squires
 
Instantly Transform Into a Master Communicator Using 21 Secrets of Effective ...
Instantly Transform Into a Master Communicator Using 21 Secrets of Effective ...Instantly Transform Into a Master Communicator Using 21 Secrets of Effective ...
Instantly Transform Into a Master Communicator Using 21 Secrets of Effective ...Ateneo Graduate School of Business
 
Cronología de la Genética. Tipos de Genética. Métodos Diagnósticos.
Cronología de la Genética. Tipos de Genética. Métodos Diagnósticos.Cronología de la Genética. Tipos de Genética. Métodos Diagnósticos.
Cronología de la Genética. Tipos de Genética. Métodos Diagnósticos.Samantha Garay
 
Grups treball 2n trimestre
Grups treball 2n trimestreGrups treball 2n trimestre
Grups treball 2n trimestreadaura
 
Секреты сборки мусора в Java
Секреты сборки мусора в JavaСекреты сборки мусора в Java
Секреты сборки мусора в Javaaragozin
 
Becoming equality defenders
Becoming equality defendersBecoming equality defenders
Becoming equality defendersMar Jurado
 

Destacado (16)

Monografía tics
Monografía tics Monografía tics
Monografía tics
 
Car's inspection
Car's inspectionCar's inspection
Car's inspection
 
Platja d'en Bossa
Platja d'en BossaPlatja d'en Bossa
Platja d'en Bossa
 
Com ha de ser la guia natural del projecte?
Com ha de ser la guia natural del projecte?Com ha de ser la guia natural del projecte?
Com ha de ser la guia natural del projecte?
 
Response Marketing || Pause Project V5
Response Marketing || Pause Project V5Response Marketing || Pause Project V5
Response Marketing || Pause Project V5
 
Bazaarvoice: Unleash the Power of Consumer Generated Content for SEO Gains #L...
Bazaarvoice: Unleash the Power of Consumer Generated Content for SEO Gains #L...Bazaarvoice: Unleash the Power of Consumer Generated Content for SEO Gains #L...
Bazaarvoice: Unleash the Power of Consumer Generated Content for SEO Gains #L...
 
HCM CPP User Group introduction
HCM CPP User Group introductionHCM CPP User Group introduction
HCM CPP User Group introduction
 
Maven 3 : уличная магия
Maven 3 : уличная магияMaven 3 : уличная магия
Maven 3 : уличная магия
 
προτεινόμενες εκπαιδευτικές επισκέψεις
προτεινόμενες εκπαιδευτικές επισκέψειςπροτεινόμενες εκπαιδευτικές επισκέψεις
προτεινόμενες εκπαιδευτικές επισκέψεις
 
Hypothyroidism pathology presentation2
Hypothyroidism pathology presentation2Hypothyroidism pathology presentation2
Hypothyroidism pathology presentation2
 
Instantly Transform Into a Master Communicator Using 21 Secrets of Effective ...
Instantly Transform Into a Master Communicator Using 21 Secrets of Effective ...Instantly Transform Into a Master Communicator Using 21 Secrets of Effective ...
Instantly Transform Into a Master Communicator Using 21 Secrets of Effective ...
 
Cronología de la Genética. Tipos de Genética. Métodos Diagnósticos.
Cronología de la Genética. Tipos de Genética. Métodos Diagnósticos.Cronología de la Genética. Tipos de Genética. Métodos Diagnósticos.
Cronología de la Genética. Tipos de Genética. Métodos Diagnósticos.
 
Tsp branch and-bound
Tsp branch and-boundTsp branch and-bound
Tsp branch and-bound
 
Grups treball 2n trimestre
Grups treball 2n trimestreGrups treball 2n trimestre
Grups treball 2n trimestre
 
Секреты сборки мусора в Java
Секреты сборки мусора в JavaСекреты сборки мусора в Java
Секреты сборки мусора в Java
 
Becoming equality defenders
Becoming equality defendersBecoming equality defenders
Becoming equality defenders
 

Similar a COCOMO Model

Exp 02-COCOMO (1).pptx
Exp 02-COCOMO (1).pptxExp 02-COCOMO (1).pptx
Exp 02-COCOMO (1).pptxYagnaGummadi
 
Software Engineering Fundamentals in Computer Science
Software Engineering Fundamentals in Computer ScienceSoftware Engineering Fundamentals in Computer Science
Software Engineering Fundamentals in Computer ScienceArti Parab Academics
 
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICCOCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICSneha Padhiar
 
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICCOCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICSneha Padhiar
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSneha Padhiar
 
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation modelsSe 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation modelsbabak danyal
 
SE_Sec-A_Lecture-10.pdf
SE_Sec-A_Lecture-10.pdfSE_Sec-A_Lecture-10.pdf
SE_Sec-A_Lecture-10.pdfDISHANTBALOTRA
 
Software Estimation Part II
Software Estimation Part IISoftware Estimation Part II
Software Estimation Part IIsslovepk
 
Cocomo model (muskan soni)
Cocomo model (muskan soni)Cocomo model (muskan soni)
Cocomo model (muskan soni)MuskanSony
 
OOSE Unit 2 PPT.ppt
OOSE Unit 2 PPT.pptOOSE Unit 2 PPT.ppt
OOSE Unit 2 PPT.pptitadmin33
 
COCOMO methods for software size estimation
COCOMO methods for software size estimationCOCOMO methods for software size estimation
COCOMO methods for software size estimationPramod Parajuli
 
CS8494 SOFTWARE ENGINEERING Unit-5
CS8494 SOFTWARE ENGINEERING Unit-5CS8494 SOFTWARE ENGINEERING Unit-5
CS8494 SOFTWARE ENGINEERING Unit-5SIMONTHOMAS S
 
LatestCOCOMO model presentation for college students .pptx
LatestCOCOMO model presentation for college students .pptxLatestCOCOMO model presentation for college students .pptx
LatestCOCOMO model presentation for college students .pptxaditiibaghla16
 
Software cost estimation
Software cost estimationSoftware cost estimation
Software cost estimationdeep sharma
 

Similar a COCOMO Model (20)

Exp 02-COCOMO (1).pptx
Exp 02-COCOMO (1).pptxExp 02-COCOMO (1).pptx
Exp 02-COCOMO (1).pptx
 
Metrics
MetricsMetrics
Metrics
 
Software Engineering Fundamentals in Computer Science
Software Engineering Fundamentals in Computer ScienceSoftware Engineering Fundamentals in Computer Science
Software Engineering Fundamentals in Computer Science
 
COCOMO MODEL
COCOMO MODELCOCOMO MODEL
COCOMO MODEL
 
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICCOCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
 
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERICCOCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
COCOMO FP COST ESTIMATION TECHNIQUES:NUMERIC
 
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATIONSOFTWARE ESTIMATION COCOMO AND FP CALCULATION
SOFTWARE ESTIMATION COCOMO AND FP CALCULATION
 
cost-estimation-tutorial
cost-estimation-tutorialcost-estimation-tutorial
cost-estimation-tutorial
 
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation modelsSe 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
Se 381 - lec 25 - 32 - 12 may29 - program size and cost estimation models
 
SE_Sec-A_Lecture-10.pdf
SE_Sec-A_Lecture-10.pdfSE_Sec-A_Lecture-10.pdf
SE_Sec-A_Lecture-10.pdf
 
Software Estimation Part II
Software Estimation Part IISoftware Estimation Part II
Software Estimation Part II
 
LECT9.ppt
LECT9.pptLECT9.ppt
LECT9.ppt
 
5. COCOMO.pdf
5. COCOMO.pdf5. COCOMO.pdf
5. COCOMO.pdf
 
Cocomo model (muskan soni)
Cocomo model (muskan soni)Cocomo model (muskan soni)
Cocomo model (muskan soni)
 
OOSE Unit 2 PPT.ppt
OOSE Unit 2 PPT.pptOOSE Unit 2 PPT.ppt
OOSE Unit 2 PPT.ppt
 
COCOMO methods for software size estimation
COCOMO methods for software size estimationCOCOMO methods for software size estimation
COCOMO methods for software size estimation
 
CS8494 SOFTWARE ENGINEERING Unit-5
CS8494 SOFTWARE ENGINEERING Unit-5CS8494 SOFTWARE ENGINEERING Unit-5
CS8494 SOFTWARE ENGINEERING Unit-5
 
COCOMO.pptx
COCOMO.pptxCOCOMO.pptx
COCOMO.pptx
 
LatestCOCOMO model presentation for college students .pptx
LatestCOCOMO model presentation for college students .pptxLatestCOCOMO model presentation for college students .pptx
LatestCOCOMO model presentation for college students .pptx
 
Software cost estimation
Software cost estimationSoftware cost estimation
Software cost estimation
 

Último

Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 

Último (20)

Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 

COCOMO Model

  • 2. Introduction COCOMO is one of the most widely used software estimation models in the world It was developed by Barry Boehm in 1981 COCOMO predicts the effort and schedule for a software product development based on inputs relating to the size of the software and a number of cost drivers that affect productivity
  • 3. COCOMO Models COCOMO has three different models that reflect the complexity: the Basic Model the Intermediate Model and the Detailed Model
  • 4. The Development Modes: Project Characteristics Organic Mode • Relatively small, simple software projects • Small teams with good application experience work to a set of less than rigid requirements • Similar to the previously developed projects • relatively small and requires little innovation Semidetached Mode • Intermediate (in size and complexity) software projects in which teams with mixed experience levels must meet a mix of rigid and less than rigid requirements.
  • 5. Contd… Embedded Mode • Software projects that must be developed within a set of tight hardware, software, and operational constraints.
  • 6. COCOMO: Some Assumptions Primary cost driver is the number of Delivered Source Instructions (DSI) / Delivered Line Of Code developed by the project COCOMO estimates assume that the project will enjoy good management by both the developer and the customer Assumes the requirements specification is not substantially changed after the plans and requirements phase
  • 7. Basic COCOMO Basic COCOMO is good for quick, early, rough order of magnitude estimates of software costs It does not account for differences in hardware constraints, personnel quality and experience, use of modern tools and techniques, and other project attributes known to have a significant influence on software costs, which limits its accuracy
  • 8. Basic COCOMO Model: Formula E=ab (KLOC or KDSI) b b D=cb(E) d b P=E/D where E is the effort applied in person-months, D is the development time in chronological months, KLOC / KDSI is the estimated number of delivered lines of code for the project (expressed in thousands), and P is the number of people required. The coefficients ab, bb, cb and db are given in next slide.
  • 9. Contd… Software project ab bb cb db Organic 2.4 1.05 2.5 0.38 Semi-detached 3.0 1.12 2.5 0.35 Embedded 3.6 1.20 2.5 0.32
  • 10. Basic COCOMO Model: Equation Mode Effort Schedule Organic E=2.4*(KDSI) 1.05 TDEV=2.5*(E) 0.38 Semidetached E=3.0*(KDSI) 1.12 TDEV=2.5*(E) 0.35 Embedded E=3.6*(KDSI) 1.20 TDEV=2.5*(E) 0.32
  • 11. Basic COCOMO Model: Limitation Its accuracy is necessarily limited because of its lack of factors which have a significant influence on software costs The Basic COCOMO estimates are within a factor of 1.3 only 29% of the time, and within a factor of 2 only 60% of the time
  • 12. Basic COCOMO Model: Example  We have determined our project fits the characteristics of Semi-Detached mode  We estimate our project will have 32,000 Delivered Source Instructions. Using the formulas, we can estimate:  Effort = 3.0*(32) 1.12 = 146 man-months  Schedule = 2.5*(146) 0.35 = 14 months  Productivity = 32,000 DSI / 146 MM = 219 DSI/MM  Average Staffing = 146 MM /14 months = 10 FSP
  • 13. Function Point Analysis What is Function Point Analysis (FPA)?  It is designed to estimate and measure the time, and thereby the cost, of developing new software applications and maintaining existing software applications.  It is also useful in comparing and highlighting opportunities for productivity improvements in software development.  It was developed by A.J. Albrecht of the IBM Corporation in the early 1980s.  The main other approach used for measuring the size, and therefore the time required, of software project is lines of code (LOC) – which has a number of inherent problems.
  • 14. Function Point Analysis How is Function Point Analysis done? Working from the project design specifications, the following system functions are measured (counted):  Inputs  Outputs  Files  Inquires  Interfaces
  • 15. Function Point Analysis These function-point counts are then weighed (multiplied) by their degree of complexity: Simple Average Complex Inputs 2 4 6 Outputs 3 5 7 Files 5 10 15 Inquires 2 4 6 Interfaces 4 7 10
  • 16. Function Point Analysis A simple example: inputs 3 simple X 2 = 6 4 average X 4 = 16 1 complex X 6 = 6 outputs 6 average X 5 = 30 2 complex X 7 = 14 files 5 complex X 15 = 75 inquiries 8 average X 4 = 32 interfaces 3 average X 7 = 21 4 complex X 10 = 40 Unadjusted function points 240
  • 17. Function Point Analysis In addition to these individually weighted function points, there are factors that affect the project and/or system as a whole. There are a number (~35) of these factors that affect the size of the project effort, and each is ranked from “0”- no influence to “5”- essential. The following are some examples of these factors:  Is high performance critical?  Is the internal processing complex?  Is the system to be used in multiple sites and/or by multiple organizations?  Is the code designed to be reusable?  Is the processing to be distributed?  and so forth . . .
  • 18. Function Point Analysis Continuing our example . . . Complex internal processing = 3 Code to be reusable = 2 High performance = 4 Multiple sites = 3 Distributed processing = 5 Project adjustment factor = 17 Adjustment calculation: Adjusted FP = Unadjusted FP X [0.65 + (adjustment factor X 0.01)] = 240 X [0.65 + ( 17 X 0.01)] = 240 X [0.82] = 197 Adjusted function points
  • 19. Function Point Analysis But how long will the project take and how much will it cost? As previously measured, programmers in our organization average 18 function points per month. Thus . . . 197 FP divided by 18 = 11 man-months If the average programmer is paid $5,200 per month (including benefits), then the [labor] cost of the project will be . . . 11 man-months X $5,200 = $57,200
  • 20. Function Point Analysis Because function point analysis is independent of language used, development platform, etc. it can be used to identify the productivity benefits of . . . One programming language over another One development platform over another One development methodology over another One programming department over another Before-and-after gains in investing in programmer training And so forth . . .
  • 21. Function Point Analysis But there are problems and criticisms:  Function point counts are affected by project size  Difficult to apply to massively distributed systems or to systems with very complex internal processing  Difficult to define logical files from physical files  The validity of the weights that Albrecht established – and the consistency of their application – has been challenged  Different companies will calculate function points slightly different, making intercompany comparisons questionable