Material Requirements Planning
(MRP)
• INTRODUCTION OF MRP
MRP System Structure
(Input & Output)
MRP
system
inputs
MRP
system
outputs
Aggregate plan shows
overall quantities to
produce – without
specifying type
Major Inputs to MRP System:
1. Master Production Schedule (MPS)
• The MPS deals with end items (finished goods).
• The aggregate plan provides the general range of operation.
• MPS specifies exactly what need to be produced, not what
can be produced and when to produce.
MPS shows quantities
of each type, with
information about the
production time frame
• BOM is often called product structure file or product tree.
• Contains the complete product description, listing the
materials, parts, and components along with the sequence
in which the product is created
Major Inputs to MRP System:
2. Bill of Material (BOM)
Product
A – the
end item
Product A
consists of
2 B and 3
C
Part C consists
of 2 F, 5 G and
4 H
Part B
consists of
1 D and 4
E
Level 0
Level 1
Level 2
Basic
information
describing
the item
Informatio
n about
part
availability
Additional
information
that may
be useful
• Contains an extensive amount of information on every item that
is produced, ordered, or inventoried in the system
Major Inputs to MRP System:
3. Inventory Records File
MRP Logic & BOM (without lead time
consideration)- Worksheet p.1
• Product M is made of two units of N and three of
P. N is made of two units of R and four units of S.
R is made of one unit of S and three units of T. P is
made of two units of T and four units of U.
a.Show the bill of materials (product structure tree).
b.If 100 M are required, how many units of each
component are needed?
a. Show the bill of materials (product
structure tree).
M
N (2) P (3)
R (2) S (4) T (2) U (4)
S (1) T (3)
Level 0
Level 1
Level 2
Level 3
b. If 100 M are required, how many
units of each component are needed?
• M= 100
• N= 2M = 2X 100= 200
• P= 3M = 3 X 100= 300
• R= 2N = 2X 200= 400
• S= 4N + 1R= 4X 200+ 1X400= 800+ 400= 1,200
• T= 2P + 3R= 2X300+ 3X400= 600+ 1,200=1,800
• U= 4P = 4X300= 1,200
MRP Logic and BOM (with lead time
consideration)
B(4)
E(1)D(2)
C(2)
F(2)D(3)
A
Product Structure Tree for Assembly A
Lead Times
A 1 day
B 2 days
C 1 day
D 3 days
E 4 days
F 1 day
Demand
Day 10 50 A
Given the product structure tree for “A” and the lead time and
demand information below, provide a materials requirements
plan that defines the number of units of each component and
when they will be needed.
Lead Times
A 1 day
B 2 days
C 1 day
D 3 days
E 4 days
F 1 day
LT = 1 day
Day: 1 2 3 4 5 6 7 8 9 10
A Required 50
Order Placement 50
First, the number of units of “A” are scheduled backwards
to allow for their lead time. So, in the materials
requirement plan below, we have to place an order for 50
units of “A” in the 9th week to receive them in the 10th
week.
Next, we need to start scheduling the components that make up “A”. In
the case of component “B” we need 4 B’s for each A. Since we need 50
A’s, that means 200 B’s. And again, we back the schedule up for the
necessary 2 days of lead time.
Day: 1 2 3 4 5 6 7 8 9 10
A Required 50
Order Placement 50
B Required 200
Order Placement 200
LT = 2
B(4)
E(1)D(2)
C(2)
F(2)D(3)
A 4x50=200
A Required 50
LT=1 Order Placement
B Required
LT=2 Order Placement
C Required
LT=1 Order Placement
D Required
LT=3 Order Placement
E Required
LT=4 Order Placement
F Required
LT=1 Order Placement
B(4)
E(1)D(2)
C(2)
F(2)D(3)
A
Finally, repeating the process for all components, we have the
final materials requirements plan:
13
B=4A= 4x50=200
C=2A= 2x50=100
D=2B=2x200=400
E=1B= 1x200=200
D=3C= 3x100=300
F=2C= 2x100=200
A= 50
Day: 1 2 3 4 5 6 7 8 9 10
Recap: Three Major Inputs for MRP
System
1. Data from the master production schedule (MPS) – end item (to be
produced)
2. Data from a bill of material (BOM) - product structure (end item and
its relationship with components)
3. Data from Inventory record file - inventory on hand and on order
MRP Explosion
• Explosion: The process of calculating the exact requirements
for each item managed by the system
Independent
Demand
item- End
Product A
Dependent
Demand
items: B, C,
D, E, F, G,
and H
BOM (Product Structure)
50 60 70A
Master Production Schedule (MPS)- Gross
Requirements for End items
Inventory Record file
MRP Terminology
• Gross Requirements: The total amount required for a particular
item.
• Scheduled Receipts: Existing orders that arrive at beginning of
period.
• Projected available balance: Amount of inventory expected as of
the end of a period
• Net requirements: The amount needed when the project available
balance in a period is not sufficient to cover the gross requirement
• Planned order receipt: the amount of an order that is required to
meet a net requirement; arrives at beginning of period.
• Planned order release: the planned order receipt offset by the
lead time
MRP Explosion Process
8. Repeat for all items in bill of materials
7. Net requirements, planned-order receipts, and planned-order releases are calculated as described in steps
2–4
6. Gross requirements for each level 1 item are calculated from the planned-order release schedule for the
parents of each level 1 item
5. Move to Level 1 items
4. Planned order releases are generated by offsetting to allow for lead time
3. Net requirements data is used to calculate when orders should be received to meet these
requirements
2. On-hand balance and schedule of orders are used to calculate the “net requirements”
1. The requirements for end items are retrieved from the master schedule
These are referred to as “gross requirements” by the MRP program
MRP Management
 MRP is a dynamic system
 Facilitates replanning when changes occur
 System nervousness can result from too many
changes
 Time fences put limits on replanning
 Pegging links each item to its parent allowing
effective analysis of changes
MRP and JIT
 MRP is a planning system that does not
do detailed scheduling
 MRP requires fixed lead times which
might actually vary with batch size
 JIT excels at rapidly moving small batches
of material through the system
MRP and JIT
• MRP is concerned with ordering raw materials and
planning resource deployments based on sales
forecasts.
• JIT focuses on production as it relates not to forecast
sales, but to actual orders in-hand.
Small Bucket Approach
1. MRP “buckets” are reduced to daily or hourly
 The most common planning period (time bucket) for MRP systems is weekly
2. Planned receipts are used internally to sequence production
3. Inventory is moved through the plant on a JIT basis
4. Completed products are moved to finished goods inventory which reduces
required quantities for subsequent planned orders
5. Back flushing based on the BOM is used to deduct inventory that was used in
production
Balanced Flow
 Used in repetitive operations
 MRP plans are
executed using
JIT techniques
based on “pull”
principles
 Flows are carefully
balanced with
small lot sizes
Finite Capacity Scheduling
 MRP systems do not consider capacity
during normal planning cycles
 Finite capacity scheduling (FCS)
recognizes actual capacity limits
 By merging MRP and FCS, a finite
schedule is created with feasible capacities
which facilitates rapid material movement
THANK
YOU!

Más contenido relacionado

La actualidad más candente

Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP. shoaibzaheer1
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planningNaushii Khan
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentationjhanakshah
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec domsBabasab Patil
 
Master Scheduling
Master SchedulingMaster Scheduling
Master Schedulingpilly_leon
 
Materials requirement planning
Materials requirement planningMaterials requirement planning
Materials requirement planningAnila Vanguri
 
Material Requirement Planning (MRP)
Material Requirement Planning (MRP)Material Requirement Planning (MRP)
Material Requirement Planning (MRP) Konok Mondal
 
MRP IN SERVICES & ERP
MRP IN SERVICES & ERPMRP IN SERVICES & ERP
MRP IN SERVICES & ERPMaria AL
 
Master production schedule
Master production scheduleMaster production schedule
Master production scheduleyashbhhardwaj260
 
inventory control & ABC analysis ppt
inventory control & ABC analysis pptinventory control & ABC analysis ppt
inventory control & ABC analysis ppthyderali123
 
manufacturing resource planning
manufacturing resource planningmanufacturing resource planning
manufacturing resource planningDinesh Nikam
 

La actualidad más candente (20)

Material requirement planning, MRP.
Material requirement planning, MRP. Material requirement planning, MRP.
Material requirement planning, MRP.
 
Mrp ii
Mrp iiMrp ii
Mrp ii
 
material requirement planning
material requirement planningmaterial requirement planning
material requirement planning
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 
Kanban system presentation
Kanban system presentationKanban system presentation
Kanban system presentation
 
MRP and ERP
MRP and ERPMRP and ERP
MRP and ERP
 
Mrp structure
Mrp structureMrp structure
Mrp structure
 
Mrp
MrpMrp
Mrp
 
Production Planning And Control
Production Planning And ControlProduction Planning And Control
Production Planning And Control
 
Master Scheduling
Master SchedulingMaster Scheduling
Master Scheduling
 
Materials requirement planning
Materials requirement planningMaterials requirement planning
Materials requirement planning
 
Material Requirement Planning (MRP)
Material Requirement Planning (MRP)Material Requirement Planning (MRP)
Material Requirement Planning (MRP)
 
MRP IN SERVICES & ERP
MRP IN SERVICES & ERPMRP IN SERVICES & ERP
MRP IN SERVICES & ERP
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
MRP-II
MRP-IIMRP-II
MRP-II
 
Master production schedule
Master production scheduleMaster production schedule
Master production schedule
 
inventory control & ABC analysis ppt
inventory control & ABC analysis pptinventory control & ABC analysis ppt
inventory control & ABC analysis ppt
 
manufacturing resource planning
manufacturing resource planningmanufacturing resource planning
manufacturing resource planning
 

Similar a MATERIAL REQUIREMENTS PLANNING (MRP)

Session 5
Session 5Session 5
Session 5thangv
 
Module11. Material requirement plan..pdf
Module11. Material requirement plan..pdfModule11. Material requirement plan..pdf
Module11. Material requirement plan..pdfJOHN PAUL ROBERTO
 
Scps -materials_requirements_planning
Scps  -materials_requirements_planningScps  -materials_requirements_planning
Scps -materials_requirements_planningDaniel Romero
 
18ME56-OM_ Module 5 - MRP, Purchase and SCM.pdf
18ME56-OM_ Module 5 - MRP, Purchase and SCM.pdf18ME56-OM_ Module 5 - MRP, Purchase and SCM.pdf
18ME56-OM_ Module 5 - MRP, Purchase and SCM.pdfDr. Bhimsen Soragaon
 
08. 444444444444444444444444444444MRP.ppt
08. 444444444444444444444444444444MRP.ppt08. 444444444444444444444444444444MRP.ppt
08. 444444444444444444444444444444MRP.pptDarrajBrahim1
 
Managing production across supply chain
Managing production across supply chainManaging production across supply chain
Managing production across supply chainSushant Kumar Sinha
 
Material Requisite Planning
Material Requisite PlanningMaterial Requisite Planning
Material Requisite Planningajithsrc
 
Managing productions across Supply Chain
Managing productions across Supply ChainManaging productions across Supply Chain
Managing productions across Supply ChainSushovan Bej
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBDrDeeptiSharma12
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)Mostafa Ewees
 

Similar a MATERIAL REQUIREMENTS PLANNING (MRP) (20)

Mrpmep
MrpmepMrpmep
Mrpmep
 
Session 5
Session 5Session 5
Session 5
 
Chapter 5_OM
Chapter 5_OMChapter 5_OM
Chapter 5_OM
 
Heizer 14
Heizer 14Heizer 14
Heizer 14
 
Ch16 mrp
Ch16 mrpCh16 mrp
Ch16 mrp
 
Module11. Material requirement plan..pdf
Module11. Material requirement plan..pdfModule11. Material requirement plan..pdf
Module11. Material requirement plan..pdf
 
Mrp
MrpMrp
Mrp
 
Mrp
MrpMrp
Mrp
 
Scps -materials_requirements_planning
Scps  -materials_requirements_planningScps  -materials_requirements_planning
Scps -materials_requirements_planning
 
18ME56-OM_ Module 5 - MRP, Purchase and SCM.pdf
18ME56-OM_ Module 5 - MRP, Purchase and SCM.pdf18ME56-OM_ Module 5 - MRP, Purchase and SCM.pdf
18ME56-OM_ Module 5 - MRP, Purchase and SCM.pdf
 
08. 444444444444444444444444444444MRP.ppt
08. 444444444444444444444444444444MRP.ppt08. 444444444444444444444444444444MRP.ppt
08. 444444444444444444444444444444MRP.ppt
 
Managing production across supply chain
Managing production across supply chainManaging production across supply chain
Managing production across supply chain
 
Material Requisite Planning
Material Requisite PlanningMaterial Requisite Planning
Material Requisite Planning
 
Managing productions across Supply Chain
Managing productions across Supply ChainManaging productions across Supply Chain
Managing productions across Supply Chain
 
5 MRP.ppt
5 MRP.ppt5 MRP.ppt
5 MRP.ppt
 
5 MRP.ppt
5 MRP.ppt5 MRP.ppt
5 MRP.ppt
 
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IBSession 6-7-8 MRP.pptx PPC MBA Sem IV IB
Session 6-7-8 MRP.pptx PPC MBA Sem IV IB
 
MRP
MRPMRP
MRP
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
 
Material requirement planning
Material requirement planningMaterial requirement planning
Material requirement planning
 

Más de Dipesh Pandey

CREATIVE DESTRUCTION
CREATIVE DESTRUCTIONCREATIVE DESTRUCTION
CREATIVE DESTRUCTIONDipesh Pandey
 
EMPLOYEE REWARDS AND RELATIONS
EMPLOYEE REWARDS AND RELATIONSEMPLOYEE REWARDS AND RELATIONS
EMPLOYEE REWARDS AND RELATIONSDipesh Pandey
 
Nepal: Company Perspectives - International Trade Centre (ITC) Series on Non-...
Nepal: Company Perspectives - International Trade Centre (ITC) Series on Non-...Nepal: Company Perspectives - International Trade Centre (ITC) Series on Non-...
Nepal: Company Perspectives - International Trade Centre (ITC) Series on Non-...Dipesh Pandey
 
Study of International Business Prospects for Merorug
Study of International Business Prospects for MerorugStudy of International Business Prospects for Merorug
Study of International Business Prospects for MerorugDipesh Pandey
 
PORTFOLIO SIMULATION
PORTFOLIO SIMULATIONPORTFOLIO SIMULATION
PORTFOLIO SIMULATIONDipesh Pandey
 
Business Environment Analysis of Saral Pvt. Ltd.
Business Environment Analysis of Saral Pvt. Ltd.Business Environment Analysis of Saral Pvt. Ltd.
Business Environment Analysis of Saral Pvt. Ltd.Dipesh Pandey
 
FOREIGN CURRENCY REVALUATION
FOREIGN CURRENCY REVALUATIONFOREIGN CURRENCY REVALUATION
FOREIGN CURRENCY REVALUATIONDipesh Pandey
 
Financial Factors, Qualitative Factors and Investment Practices
Financial Factors, Qualitative Factors and Investment PracticesFinancial Factors, Qualitative Factors and Investment Practices
Financial Factors, Qualitative Factors and Investment PracticesDipesh Pandey
 
Profit is not Always the Point
Profit is not Always the PointProfit is not Always the Point
Profit is not Always the PointDipesh Pandey
 
Game Theory Analysis on NTC and Ncell
Game Theory Analysis on NTC and NcellGame Theory Analysis on NTC and Ncell
Game Theory Analysis on NTC and NcellDipesh Pandey
 
Marketing Research Process
Marketing Research ProcessMarketing Research Process
Marketing Research ProcessDipesh Pandey
 
Channel Management Decisions
Channel Management DecisionsChannel Management Decisions
Channel Management DecisionsDipesh Pandey
 
Costing of Products and Services
Costing of Products and ServicesCosting of Products and Services
Costing of Products and ServicesDipesh Pandey
 
CVP Analysis for Multi-Product Firms and Limitations of CVP Analysis
CVP Analysis for Multi-Product Firms and Limitations of CVP AnalysisCVP Analysis for Multi-Product Firms and Limitations of CVP Analysis
CVP Analysis for Multi-Product Firms and Limitations of CVP AnalysisDipesh Pandey
 
ALDI: A Low Cost Retailer's Business Practices
ALDI: A Low Cost Retailer's Business PracticesALDI: A Low Cost Retailer's Business Practices
ALDI: A Low Cost Retailer's Business PracticesDipesh Pandey
 
A Comparative Financial Performance Analysis of Insurance and Hospitality Sec...
A Comparative Financial Performance Analysis of Insurance and Hospitality Sec...A Comparative Financial Performance Analysis of Insurance and Hospitality Sec...
A Comparative Financial Performance Analysis of Insurance and Hospitality Sec...Dipesh Pandey
 
Contribution of IFC for the Growth of Philippines Economy
Contribution of IFC for the Growth of Philippines EconomyContribution of IFC for the Growth of Philippines Economy
Contribution of IFC for the Growth of Philippines EconomyDipesh Pandey
 
Marine and Goods in Transit Insurance
Marine and Goods in Transit InsuranceMarine and Goods in Transit Insurance
Marine and Goods in Transit InsuranceDipesh Pandey
 

Más de Dipesh Pandey (20)

CREATIVE DESTRUCTION
CREATIVE DESTRUCTIONCREATIVE DESTRUCTION
CREATIVE DESTRUCTION
 
EMPLOYEE REWARDS AND RELATIONS
EMPLOYEE REWARDS AND RELATIONSEMPLOYEE REWARDS AND RELATIONS
EMPLOYEE REWARDS AND RELATIONS
 
Nepal: Company Perspectives - International Trade Centre (ITC) Series on Non-...
Nepal: Company Perspectives - International Trade Centre (ITC) Series on Non-...Nepal: Company Perspectives - International Trade Centre (ITC) Series on Non-...
Nepal: Company Perspectives - International Trade Centre (ITC) Series on Non-...
 
Study of International Business Prospects for Merorug
Study of International Business Prospects for MerorugStudy of International Business Prospects for Merorug
Study of International Business Prospects for Merorug
 
PORTFOLIO SIMULATION
PORTFOLIO SIMULATIONPORTFOLIO SIMULATION
PORTFOLIO SIMULATION
 
Business Environment Analysis of Saral Pvt. Ltd.
Business Environment Analysis of Saral Pvt. Ltd.Business Environment Analysis of Saral Pvt. Ltd.
Business Environment Analysis of Saral Pvt. Ltd.
 
Income Tax Return
Income Tax ReturnIncome Tax Return
Income Tax Return
 
FOREIGN CURRENCY REVALUATION
FOREIGN CURRENCY REVALUATIONFOREIGN CURRENCY REVALUATION
FOREIGN CURRENCY REVALUATION
 
Financial Factors, Qualitative Factors and Investment Practices
Financial Factors, Qualitative Factors and Investment PracticesFinancial Factors, Qualitative Factors and Investment Practices
Financial Factors, Qualitative Factors and Investment Practices
 
Profit is not Always the Point
Profit is not Always the PointProfit is not Always the Point
Profit is not Always the Point
 
Bond Valuation
Bond ValuationBond Valuation
Bond Valuation
 
Game Theory Analysis on NTC and Ncell
Game Theory Analysis on NTC and NcellGame Theory Analysis on NTC and Ncell
Game Theory Analysis on NTC and Ncell
 
Marketing Research Process
Marketing Research ProcessMarketing Research Process
Marketing Research Process
 
Channel Management Decisions
Channel Management DecisionsChannel Management Decisions
Channel Management Decisions
 
Costing of Products and Services
Costing of Products and ServicesCosting of Products and Services
Costing of Products and Services
 
CVP Analysis for Multi-Product Firms and Limitations of CVP Analysis
CVP Analysis for Multi-Product Firms and Limitations of CVP AnalysisCVP Analysis for Multi-Product Firms and Limitations of CVP Analysis
CVP Analysis for Multi-Product Firms and Limitations of CVP Analysis
 
ALDI: A Low Cost Retailer's Business Practices
ALDI: A Low Cost Retailer's Business PracticesALDI: A Low Cost Retailer's Business Practices
ALDI: A Low Cost Retailer's Business Practices
 
A Comparative Financial Performance Analysis of Insurance and Hospitality Sec...
A Comparative Financial Performance Analysis of Insurance and Hospitality Sec...A Comparative Financial Performance Analysis of Insurance and Hospitality Sec...
A Comparative Financial Performance Analysis of Insurance and Hospitality Sec...
 
Contribution of IFC for the Growth of Philippines Economy
Contribution of IFC for the Growth of Philippines EconomyContribution of IFC for the Growth of Philippines Economy
Contribution of IFC for the Growth of Philippines Economy
 
Marine and Goods in Transit Insurance
Marine and Goods in Transit InsuranceMarine and Goods in Transit Insurance
Marine and Goods in Transit Insurance
 

Último

2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptxMaritesTamaniVerdade
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfAyushMahapatra5
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfChris Hunter
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...Poonam Aher Patil
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701bronxfugly43
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibitjbellavia9
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxVishalSingh1417
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfPoh-Sun Goh
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 

Último (20)

2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Class 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdfClass 11th Physics NEET formula sheet pdf
Class 11th Physics NEET formula sheet pdf
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701ComPTIA Overview | Comptia Security+ Book SY0-701
ComPTIA Overview | Comptia Security+ Book SY0-701
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 

MATERIAL REQUIREMENTS PLANNING (MRP)

  • 1. MATERIAL REQUIREMENT PLANNING Kathmandu University School Of Management (KUSOM) Subject: Managing Operations and Technology Term/Trimester: MBA Second Term Year: 2017 Presented by: Dipesh Raj Pandey Roll - 17321
  • 3. MRP System Structure (Input & Output) MRP system inputs MRP system outputs
  • 4. Aggregate plan shows overall quantities to produce – without specifying type Major Inputs to MRP System: 1. Master Production Schedule (MPS) • The MPS deals with end items (finished goods). • The aggregate plan provides the general range of operation. • MPS specifies exactly what need to be produced, not what can be produced and when to produce. MPS shows quantities of each type, with information about the production time frame
  • 5. • BOM is often called product structure file or product tree. • Contains the complete product description, listing the materials, parts, and components along with the sequence in which the product is created Major Inputs to MRP System: 2. Bill of Material (BOM) Product A – the end item Product A consists of 2 B and 3 C Part C consists of 2 F, 5 G and 4 H Part B consists of 1 D and 4 E Level 0 Level 1 Level 2
  • 6. Basic information describing the item Informatio n about part availability Additional information that may be useful • Contains an extensive amount of information on every item that is produced, ordered, or inventoried in the system Major Inputs to MRP System: 3. Inventory Records File
  • 7. MRP Logic & BOM (without lead time consideration)- Worksheet p.1 • Product M is made of two units of N and three of P. N is made of two units of R and four units of S. R is made of one unit of S and three units of T. P is made of two units of T and four units of U. a.Show the bill of materials (product structure tree). b.If 100 M are required, how many units of each component are needed?
  • 8. a. Show the bill of materials (product structure tree). M N (2) P (3) R (2) S (4) T (2) U (4) S (1) T (3) Level 0 Level 1 Level 2 Level 3
  • 9. b. If 100 M are required, how many units of each component are needed? • M= 100 • N= 2M = 2X 100= 200 • P= 3M = 3 X 100= 300 • R= 2N = 2X 200= 400 • S= 4N + 1R= 4X 200+ 1X400= 800+ 400= 1,200 • T= 2P + 3R= 2X300+ 3X400= 600+ 1,200=1,800 • U= 4P = 4X300= 1,200
  • 10. MRP Logic and BOM (with lead time consideration) B(4) E(1)D(2) C(2) F(2)D(3) A Product Structure Tree for Assembly A Lead Times A 1 day B 2 days C 1 day D 3 days E 4 days F 1 day Demand Day 10 50 A Given the product structure tree for “A” and the lead time and demand information below, provide a materials requirements plan that defines the number of units of each component and when they will be needed. Lead Times A 1 day B 2 days C 1 day D 3 days E 4 days F 1 day
  • 11. LT = 1 day Day: 1 2 3 4 5 6 7 8 9 10 A Required 50 Order Placement 50 First, the number of units of “A” are scheduled backwards to allow for their lead time. So, in the materials requirement plan below, we have to place an order for 50 units of “A” in the 9th week to receive them in the 10th week.
  • 12. Next, we need to start scheduling the components that make up “A”. In the case of component “B” we need 4 B’s for each A. Since we need 50 A’s, that means 200 B’s. And again, we back the schedule up for the necessary 2 days of lead time. Day: 1 2 3 4 5 6 7 8 9 10 A Required 50 Order Placement 50 B Required 200 Order Placement 200 LT = 2 B(4) E(1)D(2) C(2) F(2)D(3) A 4x50=200
  • 13. A Required 50 LT=1 Order Placement B Required LT=2 Order Placement C Required LT=1 Order Placement D Required LT=3 Order Placement E Required LT=4 Order Placement F Required LT=1 Order Placement B(4) E(1)D(2) C(2) F(2)D(3) A Finally, repeating the process for all components, we have the final materials requirements plan: 13 B=4A= 4x50=200 C=2A= 2x50=100 D=2B=2x200=400 E=1B= 1x200=200 D=3C= 3x100=300 F=2C= 2x100=200 A= 50 Day: 1 2 3 4 5 6 7 8 9 10
  • 14. Recap: Three Major Inputs for MRP System 1. Data from the master production schedule (MPS) – end item (to be produced) 2. Data from a bill of material (BOM) - product structure (end item and its relationship with components) 3. Data from Inventory record file - inventory on hand and on order
  • 15. MRP Explosion • Explosion: The process of calculating the exact requirements for each item managed by the system Independent Demand item- End Product A Dependent Demand items: B, C, D, E, F, G, and H BOM (Product Structure)
  • 16. 50 60 70A Master Production Schedule (MPS)- Gross Requirements for End items Inventory Record file
  • 17. MRP Terminology • Gross Requirements: The total amount required for a particular item. • Scheduled Receipts: Existing orders that arrive at beginning of period. • Projected available balance: Amount of inventory expected as of the end of a period • Net requirements: The amount needed when the project available balance in a period is not sufficient to cover the gross requirement • Planned order receipt: the amount of an order that is required to meet a net requirement; arrives at beginning of period. • Planned order release: the planned order receipt offset by the lead time
  • 18. MRP Explosion Process 8. Repeat for all items in bill of materials 7. Net requirements, planned-order receipts, and planned-order releases are calculated as described in steps 2–4 6. Gross requirements for each level 1 item are calculated from the planned-order release schedule for the parents of each level 1 item 5. Move to Level 1 items 4. Planned order releases are generated by offsetting to allow for lead time 3. Net requirements data is used to calculate when orders should be received to meet these requirements 2. On-hand balance and schedule of orders are used to calculate the “net requirements” 1. The requirements for end items are retrieved from the master schedule These are referred to as “gross requirements” by the MRP program
  • 19. MRP Management  MRP is a dynamic system  Facilitates replanning when changes occur  System nervousness can result from too many changes  Time fences put limits on replanning  Pegging links each item to its parent allowing effective analysis of changes
  • 20. MRP and JIT  MRP is a planning system that does not do detailed scheduling  MRP requires fixed lead times which might actually vary with batch size  JIT excels at rapidly moving small batches of material through the system
  • 21. MRP and JIT • MRP is concerned with ordering raw materials and planning resource deployments based on sales forecasts. • JIT focuses on production as it relates not to forecast sales, but to actual orders in-hand.
  • 22. Small Bucket Approach 1. MRP “buckets” are reduced to daily or hourly  The most common planning period (time bucket) for MRP systems is weekly 2. Planned receipts are used internally to sequence production 3. Inventory is moved through the plant on a JIT basis 4. Completed products are moved to finished goods inventory which reduces required quantities for subsequent planned orders 5. Back flushing based on the BOM is used to deduct inventory that was used in production
  • 23. Balanced Flow  Used in repetitive operations  MRP plans are executed using JIT techniques based on “pull” principles  Flows are carefully balanced with small lot sizes
  • 24. Finite Capacity Scheduling  MRP systems do not consider capacity during normal planning cycles  Finite capacity scheduling (FCS) recognizes actual capacity limits  By merging MRP and FCS, a finite schedule is created with feasible capacities which facilitates rapid material movement