TYPE OF CONTRACTS
Contents
1.

Factors in Selecting Contract Types............................................................................................................................................ 3
i.

Price Competition .................................................................................................................................................................... 3

ii.

Price Analysis ........................................................................................................................................................................... 3

iii.

Cost Analysis ............................................................................................................................................................................ 3

iv.

Type and Complexity of the Requirement............................................................................................................................. 3

v.

Combining Contract Types ...................................................................................................................................................... 3

vi.

Urgency of the Requirement .................................................................................................................................................. 3

vii.

Period of Performance or Length of Production Run ....................................................................................................... 3

viii.

Contractor’s Technical Capability and Financial Responsibility ....................................................................................... 3

ix.

Adequacy of the Contractor's Accounting System................................................................................................................ 3

x.

Concurrent Contracts .............................................................................................................................................................. 3

xi.

Extent and Nature of Proposed Subcontracting ................................................................................................................... 3

xii.

Acquisition History .............................................................................................................................................................. 3

2.

Types of Contracts ....................................................................................................................................................................... 4
i.

Unit Price Contract .................................................................................................................................................................. 4

ii.

Fixed Price Contract/ Lumpsum Contract .............................................................................................................................. 4
-Sub Categories of Fixed Type Contract ..................................................................................................................................... 4
a. Fixed Price Contracts with Economic Price Adjustment ....................................................................................................... 4
b. Fixed Price Contracts with Economic Price Adjustment and Award Fee or Incentive........................................................ 4
c. Fixed Price Incentive Contracts ............................................................................................................................................... 4
d. Fixed Price Contracts with Prospective Price Redetermination........................................................................................... 6

1/7
My Purchasing Portfolio by Dayal Divyanshu e-mail dayal1005@gmail.com

iii.

Cost Reimbursement or Cost Plus Contracts......................................................................................................................... 6
Application ................................................................................................................................................................................... 6
-Sub categories of Cost Reimbursement/ Cost Plus Contracts................................................................................................. 6
a.

Cost Plus Fixed Percentage Contract ................................................................................................................................. 6

b.

Cost Plus Fixed Fee Contract .............................................................................................................................................. 6

c.

Cost Plus Fixed Fee with Guaranteed Maximum Price Contract ..................................................................................... 6

d.

Cost Plus Fixed Fee with Bonus Contract........................................................................................................................... 6

e.

Cost Plus Fixed Fee With Guaranteed Maximum Price and Bonus Contract .................................................................. 6

f.

Cost Plus Incentive Fee Contract (CPIF) ............................................................................................................................ 6

iv.

Implied Contract/ Quasi Contract .......................................................................................................................................... 7

v.

Unilateral Contract .................................................................................................................................................................. 7

vi.

Bilateral contract ..................................................................................................................................................................... 7

3.

2/7

Performance & Delivery Incentives............................................................................................................................................ 7
My Purchasing Portfolio by Dayal Divyanshu e-mail dayal1005@gmail.com

1. Factors in Selecting Contract Types
i. Price Competition


Results in realistic pricing.

ii. Price Analysis


Provides a basis for selecting the contract type.

iii. Cost Analysis



In the absence of effective price competition and if price analysis is not sufficient, the cost estimates of the contractor and the client
provides the basis for negotiating contract pricing arrangements.
It is essential that the uncertainties involved in performance and their possible impact upon costs be identified and evaluated.

iv. Type and Complexity of the Requirement



Complex requirements, particularly those unique to the client, usually result in greater risk assumption by the client.
For complex research and development contracts, when performance uncertainties or the likelihood of changes makes it difficult to
estimate performance costs in advance. As a requirement recurs or as quantity production begins, the cost risk should shift to the
contractor, and a fixed price contract should be considered.

v. Combining Contract Types


If the entire contract cannot be firm fixed price, the contracting officer shall consider whether or not a portion of the contract can
be established on a firm fixed price basis.

vi. Urgency of the Requirement


If urgency is a primary factor, the client may choose to assume a greater proportion of risk or it may offer incentives tailored to
performance outcomes to ensure timely contract performance.

vii. Period of Performance or Length of Production Run


In times of economic uncertainty, contracts extending over a relatively long period may require economic price adjustment or price
redetermination clauses.

viii. Contractor’s Technical Capability and Financial Responsibility
ix. Adequacy of the Contractor's Accounting System


Before agreeing on a contract type other than firm fixed price, the contracting officer shall ensure that the contractor’s accounting
system will permit timely development of all necessary cost data in the form required by the proposed contract type.

x. Concurrent Contracts


If performance under the proposed contract involves concurrent operations under other contracts, the impact of those contracts,
including their pricing arrangements, should be considered.

xi. Extent and Nature of Proposed Subcontracting


If the contractor proposes extensive subcontracting, a contract type reflecting the actual risks to the prime contractor should be
selected.

xii. Acquisition History


3/7

Contractor risk usually decreases as the requirement is repetitively acquired. Also, product descriptions or descriptions of services
to be performed can be defined more clearly.
My Purchasing Portfolio by Dayal Divyanshu e-mail dayal1005@gmail.com

2. Types of Contracts
i. Unit Price Contract
Based on estimated quantities of items included in the project and their unit prices. The final price of the project is dependent on
the quantities needed to carry out the work.

It is not unusual to combine a unit price contract for parts of the project with a lump Sum/ fixed price contract or other types of
contracts.
Application

This contract is only suitable for construction and supplier projects where the different types of items, but not their numbers, can
be accurately identified in the contract documents.


ii. Fixed Price Contract/ Lumpsum Contract
Provides for a firm price or, in appropriate cases, an adjustable price.
Fixed price contract providing for an adjustable price may include a ceiling price, a target price (including target cost), or both.

This contract type places upon the contractor maximum risk and full responsibility for all costs and resulting profit or loss.
Application

Acquiring commercial items or for acquiring other supplies or services on the basis of reasonably definite functional or detailed
specifications, when reasonable prices can be established at the outset.



-Sub Categories of Fixed Type Contract
a. Fixed Price Contracts with Economic Price Adjustment

A fixed-price contract with economic price adjustment provides for upward and downward revision of the stated contract price
upon the occurrence of specified contingencies.
Economic price adjustments are of three general types
1.
Adjustments based on established prices: These price adjustments are based on increases or decreases from an agreed upon level
in published or otherwise established prices of specific items or the contract end items.
2.
Adjustments based on actual costs of labor or material: These price adjustments are based on increases or decreases in specified
costs of labor or material that the contractor actually experiences during contract performance.
3.
Adjustments based on cost indexes of labor or material: These price adjustments are based on increases or decreases in labor or
material cost standards or indexes that are specifically identified in the contract.
b. Fixed Price Contracts with Economic Price Adjustment and Award Fee or Incentive

The contracting officer may use a fixed price contract with economic price adjustment in conjunction with an award fee incentive
and performance or delivery incentives when the award fee or incentive is based solely on factors other than cost.

The basis for all award fee determinations shall be documented in the contract file to include, at a minimum, a determination that
overall cost, schedule and technical performance in aggregate is or is not at a satisfactory level.

Provides for evaluation period(s) to be conducted at stated intervals during the contract period of performance so that the
contractor will periodically be informed of the quality of its performance and the areas in which improvement is expected (e.g. six
months, nine months, twelve months, or at specific milestones).

Defines the total award fee pool amount and how this amount is allocated across each evaluation period.
c. Fixed Price Incentive Contracts

A fixed price incentive contract is a fixed price contract that provides for adjusting profit and establishing the final contract price by
a formula based on the relationship of final negotiated total cost to total target cost.

Point of Total Assumption (PTA) is a term used to evaluate the fixed price incentive (FPI) contract price and the final fee to be paid
to the contractor.

PTA is a point on the cost line of the profit cost curve determined by the contract elements associated with a fixed price plus
incentive firm target contract above which the seller effectively bears all the costs of a cost overrun. In addition, once the costs on
an FPI contract reach PTA, the maximum amount the buyer will pay is the ceiling price. Note, however, that between the cost at
PTA and when the cost equals the ceiling price, the seller is still in a profitable position; only when costs exceed the ceiling price
then the seller is in a loss position.
4/7
My Purchasing Portfolio by Dayal Divyanshu e-mail dayal1005@gmail.com

-Calculation of Point of Total Assumption (PTA)
Any FPI contract specifies following costs:
1.

Target Cost.

2.

Target Profit.

3.

Target Price.

4.

Ceiling Price.

5.

One or more share ratios.

The PTA is the difference between the ceiling and target prices, divided by the buyer's portion of the share ratio for that price range,
plus the target cost.

PTA = ((Ceiling Price - Target Price)/buyer's Share Ratio) + Target Cost
Example on calculation of PTA


Target Cost:

USD 2,000,000



Target Profit:

USD 200,000




Target Price:
Ceiling Price:

USD 2,200,000 ( Target cost + Target profit)
USD 2,450,000



Share Ratio:

80% buyer & 20% seller for overruns and 50% & 50% for under runs

PTA = ((2,450,000 - 2,200,000)/ 0.80) + 2,000,000 = 2,312,500.
Example on calculation of profit
 A Fixed Price Plus Incentive Fee (FPI) Contract has a target cost of USD 130,000, a target profit of USD 15,000, a target price of USD
145,000, a ceiling price of USD 160,000, and a share ratio of 80/20. The actual cost of the project was USD 150,000. How much
profit does the seller make?
Calculations:


PTA = (160,000 – 145,000)/0.80 + 130,000 = USD 148,750.



Total cost at the point of total assumption is = USD 148,750.



Over run at point of total consumption = (Total Cost at PTA - Target Cost)
(148,750 – 130,000)= USD 18,750.








Buyer share = (0.80 x 18,750)= USD 15,000.
Seller share = (0.20 x 18,750)= USD 3,750.
Note, the cost up to that point was agreed to be split between parties.
If total cost equals PTA, then seller would have a profit reduced by (target profit – sellers overrun share) = (15,000 – 3,750) = USD
11,250

Now, with the actual total cost of USD 150,000, every dollar above cost USD 148,750 (Total cost at PTA) will be taken directly from the
sellers profit. So, the final profit will be = 11,250 – (150,000-148,750) = USD 10,000

5/7
My Purchasing Portfolio by Dayal Divyanshu e-mail dayal1005@gmail.com

d. Fixed Price Contracts with Prospective Price Redetermination

A firm fixed price for an initial period of contract deliveries or performance and prospective price redetermination at a stated time
during performance of the price for subsequent periods of performance.

The initial period should be the longest period for which it is possible to negotiate a fair and reasonable firm fixed price. Each
subsequent pricing period should be at least 12 months.
Application

A fixed price contract with prospective price redetermination may be used in acquisitions of quantity production or services for
which it is possible to negotiate a fair and reasonable firm fixed price for an initial period, but not for subsequent periods of
contract performance.

iii. Cost Reimbursement or Cost Plus Contracts
Cost reimbursement types of contracts provide for payment of allowable incurred costs to the extent prescribed in the contract.
These contracts establish an estimate of total cost for the purpose of obligating funds and establishing a ceiling that the contractor
may not exceed (except at its own risk) without the prior approval of the contracting officer.
Application
Cost reimbursement contracts to be used only when circumstances do not allow the agency to define its requirements sufficiently to
allow for a fixed price type contract.



-Sub categories of Cost Reimbursement/ Cost Plus Contracts
a. Cost Plus Fixed Percentage Contract
Compensation is based on a percentage of the cost.
b. Cost Plus Fixed Fee Contract
Compensation is based on a fixed sum independent of the final project cost. The client agrees to reimburse the contractor's actual costs,
regardless of amount, and in addition pay a negotiated fee independent of the amount of the actual costs.
c. Cost Plus Fixed Fee with Guaranteed Maximum Price Contract
Compensation is based on a fixed sum. The total project cost should not exceed an agreed upper limit.
d. Cost Plus Fixed Fee with Bonus Contract
Compensation is based on a fixed sum and bonus given if the project finishes below budget, ahead of schedule or based on other agreed
parameters as stipulated in contract.
e. Cost Plus Fixed Fee With Guaranteed Maximum Price and Bonus Contract
Compensation is based on a fixed sum. The total project cost will not exceed an agreed upper limit and a bonus is given if the project is
finished below budget, ahead of schedule or based on other agreed parameters as stipulated in contract.
f. Cost Plus Incentive Fee Contract (CPIF)

A cost reimbursement contract that provides for an initially negotiated fee to be adjusted later by a formula based on the
relationship of total allowable costs to total target costs.

Unlike a cost plus contract, the cost in excess of the target cost is only partially paid according to a Buyer/Seller ratio. The seller's
profit decreases when exceeding the target cost. Similarly, the seller's profit increases when actual costs are below the target cost
defined in the contract.

Incentive contracts allow sharing of the risks between the contractor and the client. The contractor is reimbursed all its justifiable
costs in addition to a calculated fee.

6/7
My Purchasing Portfolio by Dayal Divyanshu e-mail dayal1005@gmail.com

The basic elements of a CPIF contract
Major Costs in CPIF calculation (Similar to the costs terminologies in fixed price contract)
 Target cost.


Actual cost.



Target fee: The Target Fee varies between the Minimum Fee and the Maximum Fee according to a formula tied to the Actual Cost
(e.g. Target Fee could be 10% of the Actual Cost).





Sharing ratio: The agreed upon cost sharing proportion, normally expressed in percentage (e.g. 85% for the client / 15% for the
contractor). It is often different for cost overruns and cost underruns.
Other components of incentive fee contracting include

Maximum Fee: the highest fee that may be earned, usually expressed as a percentage.


Minimum Fee: the lowest fee that may be earned, usually expressed as a percentage.



The Final Fee (profit of the contractor) is expressed as follows:



Final Fee = Target Fee + (Target Cost - Actual Cost) * Contractor Share



The Final Price of the contract is expressed as follows:



Final Price = Actual Cost + Final Fee

For example, assume a CPIF with:



Target Cost = USD 1,000.
Target Fee = USD 100.
Benefit/Cost Sharing Ratio for cost overruns = 80% Client / 20% Contractor.
Benefit/Cost Sharing Ratio for cost underruns = 60% Client / 40% Contractor.



If actual cost: USD 1,100.



Client will pay to the contractor: 1,100 + 100 + (1,000 - 1,100) * 0.2 = 1,180 (contractor earns USD 80 instead of USD 100).



If the Actual Cost is lower than the Target Cost: USD900



Client will pay to the contractor: 900 + 100 + (1,000 - 900) * 0.4 = 1,040 (contractor earns USD 140 instead of USD 100).





iv. Implied Contract/ Quasi Contract
A contract is implied if the circumstances imply that parties have reached an agreement even though they have not done so expressly.

v. Unilateral Contract
One party makes a promise, but the other side does not promise anything. In these cases, those accepting the offer are not required to
communicate their acceptance to the offer.

vi. Bilateral contract
An agreement in which each of the parties to the contract makes a promise or set of promises to each other.

3. Performance & Delivery Incentives
Performance incentives may be considered in connection with specific product characteristics (e.g., a missile range, an aircraft speed, an
engine thrust, or vehicle maneuverability) of the contractor’s performance. These incentives should be designed to relate profit or fee to
results achieved by the contractor, compared with specified targets. Delivery incentives should be considered when improvement from
a required delivery schedule is a significant objective.
7/7

Más contenido relacionado

La actualidad más candente

Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
guestdb5e498
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
Vj NiroSh
 
Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)
Fakhar-un -Nisa
 

La actualidad más candente (20)

Construction contract
Construction contract Construction contract
Construction contract
 
Contract Management
Contract ManagementContract Management
Contract Management
 
Types of Contract in Construction Management
Types of Contract in Construction ManagementTypes of Contract in Construction Management
Types of Contract in Construction Management
 
5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts5 Popular Types of Construction Contracts
5 Popular Types of Construction Contracts
 
Construction tender process
Construction tender processConstruction tender process
Construction tender process
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
Contracts
ContractsContracts
Contracts
 
Tenders for construction
Tenders for constructionTenders for construction
Tenders for construction
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.
 
Classification of contracts
Classification of contractsClassification of contracts
Classification of contracts
 
Tenders and procedure of tendering
Tenders and procedure of tenderingTenders and procedure of tendering
Tenders and procedure of tendering
 
Cost estimates & contract documents ce224 pdf
Cost estimates & contract documents   ce224 pdfCost estimates & contract documents   ce224 pdf
Cost estimates & contract documents ce224 pdf
 
Notes unit 2A.ppt
Notes unit 2A.pptNotes unit 2A.ppt
Notes unit 2A.ppt
 
Tender and tender document
Tender and tender documentTender and tender document
Tender and tender document
 
Contract payment and variation
Contract payment and variationContract payment and variation
Contract payment and variation
 
Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)Claims 20.1 (Flow chart)
Claims 20.1 (Flow chart)
 
01_Introduction_to_Estimation.pdf
01_Introduction_to_Estimation.pdf01_Introduction_to_Estimation.pdf
01_Introduction_to_Estimation.pdf
 
Types and forms of contracts
Types and forms of contracts Types and forms of contracts
Types and forms of contracts
 
Tenders
TendersTenders
Tenders
 
Tendering presenation
Tendering presenationTendering presenation
Tendering presenation
 

Similar a Type of Contracts.

Wb consultant 4a
Wb consultant 4aWb consultant 4a
Wb consultant 4a
Joy Irman
 
IAS 11
IAS 11IAS 11
IAS 11
RS P
 

Similar a Type of Contracts. (20)

Project procuremenet contract in ethiopia
Project procuremenet contract in ethiopiaProject procuremenet contract in ethiopia
Project procuremenet contract in ethiopia
 
Pai 3-03
Pai 3-03Pai 3-03
Pai 3-03
 
The Basics of Contracting
The Basics of ContractingThe Basics of Contracting
The Basics of Contracting
 
The International Journal of Engineering and Science (The IJES)
 The International Journal of Engineering and Science (The IJES) The International Journal of Engineering and Science (The IJES)
The International Journal of Engineering and Science (The IJES)
 
Contract Types
Contract TypesContract Types
Contract Types
 
TOPIC3.pdf
TOPIC3.pdfTOPIC3.pdf
TOPIC3.pdf
 
Wb consultant 4a
Wb consultant 4aWb consultant 4a
Wb consultant 4a
 
Construction contract
Construction contractConstruction contract
Construction contract
 
Chapter -Two (2).pdf
Chapter -Two (2).pdfChapter -Two (2).pdf
Chapter -Two (2).pdf
 
Project contracting
Project contracting Project contracting
Project contracting
 
IAS 11
IAS 11IAS 11
IAS 11
 
Advance 1020 1045
Advance 1020 1045Advance 1020 1045
Advance 1020 1045
 
Contract finance facility presentation
Contract finance facility presentationContract finance facility presentation
Contract finance facility presentation
 
Revenue Recognition Serial - Part 2: Step 1 - Identifying the Contract(s) wit...
Revenue Recognition Serial - Part 2: Step 1 - Identifying the Contract(s) wit...Revenue Recognition Serial - Part 2: Step 1 - Identifying the Contract(s) wit...
Revenue Recognition Serial - Part 2: Step 1 - Identifying the Contract(s) wit...
 
Top 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should KnowTop 20 Standard Contract Clauses Every Manager Should Know
Top 20 Standard Contract Clauses Every Manager Should Know
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
10 Essentials For An Effective Construction Contract
10 Essentials For An Effective Construction Contract10 Essentials For An Effective Construction Contract
10 Essentials For An Effective Construction Contract
 
Business negotiations for purchasing and supply chain management
Business negotiations for purchasing and supply chain managementBusiness negotiations for purchasing and supply chain management
Business negotiations for purchasing and supply chain management
 
Cost Plus Contract
Cost Plus ContractCost Plus Contract
Cost Plus Contract
 
ICDS : Construction Contracts
ICDS : Construction ContractsICDS : Construction Contracts
ICDS : Construction Contracts
 

Más de Divyanshu Dayal

4. Indian Taxation. Service Tax
4. Indian Taxation. Service Tax4. Indian Taxation. Service Tax
4. Indian Taxation. Service Tax
Divyanshu Dayal
 
3. Indian Taxation. Value Added Tax (VAT)
3. Indian Taxation. Value Added Tax (VAT)3. Indian Taxation. Value Added Tax (VAT)
3. Indian Taxation. Value Added Tax (VAT)
Divyanshu Dayal
 

Más de Divyanshu Dayal (20)

incoterms-2010
incoterms-2010incoterms-2010
incoterms-2010
 
RESUME WITH A SOUL
RESUME WITH A SOULRESUME WITH A SOUL
RESUME WITH A SOUL
 
The Per Mile Costs of Operating Automobiles and Trucks
The Per Mile Costs of Operating Automobiles and TrucksThe Per Mile Costs of Operating Automobiles and Trucks
The Per Mile Costs of Operating Automobiles and Trucks
 
Technical Analysis Of The Financial Markets- A Comprehensive Guide To Trading...
Technical Analysis Of The Financial Markets- A Comprehensive Guide To Trading...Technical Analysis Of The Financial Markets- A Comprehensive Guide To Trading...
Technical Analysis Of The Financial Markets- A Comprehensive Guide To Trading...
 
Technical Analysis Of The Financial Markets- A Comprehensive Guide To Trading...
Technical Analysis Of The Financial Markets- A Comprehensive Guide To Trading...Technical Analysis Of The Financial Markets- A Comprehensive Guide To Trading...
Technical Analysis Of The Financial Markets- A Comprehensive Guide To Trading...
 
Development of Consulting Rate Structures and Contracts
Development of Consulting Rate Structures and ContractsDevelopment of Consulting Rate Structures and Contracts
Development of Consulting Rate Structures and Contracts
 
Purchasing Management
Purchasing ManagementPurchasing Management
Purchasing Management
 
International Classification for Standards (Material Classification and Codif...
International Classification for Standards (Material Classification and Codif...International Classification for Standards (Material Classification and Codif...
International Classification for Standards (Material Classification and Codif...
 
Business Guide on Indonesia by Embassy of Indian in Jakarta (2007)
Business Guide on Indonesia by Embassy of Indian in Jakarta (2007)Business Guide on Indonesia by Embassy of Indian in Jakarta (2007)
Business Guide on Indonesia by Embassy of Indian in Jakarta (2007)
 
Coal Facts 2013 Demand Supply
Coal Facts 2013 Demand SupplyCoal Facts 2013 Demand Supply
Coal Facts 2013 Demand Supply
 
Mining Law in Asia
Mining Law in AsiaMining Law in Asia
Mining Law in Asia
 
Price Adjustment in Long Term Coal Contracts- MIT (1987)
Price Adjustment in Long Term Coal Contracts- MIT (1987)Price Adjustment in Long Term Coal Contracts- MIT (1987)
Price Adjustment in Long Term Coal Contracts- MIT (1987)
 
How to Export From India- An Introduction
How to Export From India- An IntroductionHow to Export From India- An Introduction
How to Export From India- An Introduction
 
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
Clause 14.9 Payment of Retention Money-Understanding Clauses in FIDIC ‘Condit...
 
Purchasing Organization and Sourcing Strategy.
Purchasing Organization and Sourcing Strategy.Purchasing Organization and Sourcing Strategy.
Purchasing Organization and Sourcing Strategy.
 
Legal Regulatory and Contractual Policy Frame Work in Public Private Partners...
Legal Regulatory and Contractual Policy Frame Work in Public Private Partners...Legal Regulatory and Contractual Policy Frame Work in Public Private Partners...
Legal Regulatory and Contractual Policy Frame Work in Public Private Partners...
 
Resume
ResumeResume
Resume
 
4. Indian Taxation. Service Tax
4. Indian Taxation. Service Tax4. Indian Taxation. Service Tax
4. Indian Taxation. Service Tax
 
3. Indian Taxation. Value Added Tax (VAT)
3. Indian Taxation. Value Added Tax (VAT)3. Indian Taxation. Value Added Tax (VAT)
3. Indian Taxation. Value Added Tax (VAT)
 
2. Indian Taxation. Customs Duty.
2. Indian Taxation. Customs Duty.2. Indian Taxation. Customs Duty.
2. Indian Taxation. Customs Duty.
 

Último

Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
seri bangash
 
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
Khaled Al Awadi
 

Último (20)

Potato Flakes Manufacturing Plant Project Report.pdf
Potato Flakes Manufacturing Plant Project Report.pdfPotato Flakes Manufacturing Plant Project Report.pdf
Potato Flakes Manufacturing Plant Project Report.pdf
 
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
 
IPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best ServiceIPTV Subscription UK: Your Guide to Choosing the Best Service
IPTV Subscription UK: Your Guide to Choosing the Best Service
 
Creative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team PresentationsCreative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team Presentations
 
Hyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings releaseHyundai capital 2024 1quarter Earnings release
Hyundai capital 2024 1quarter Earnings release
 
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
8 Questions B2B Commercial Teams Can Ask To Help Product Discovery
 
Vendors of country report usefull datass
Vendors of country report usefull datassVendors of country report usefull datass
Vendors of country report usefull datass
 
Pitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckPitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deck
 
The Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdfThe Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdf
 
Using Generative AI for Content Marketing
Using Generative AI for Content MarketingUsing Generative AI for Content Marketing
Using Generative AI for Content Marketing
 
A Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob BadgettA Brief Introduction About Jacob Badgett
A Brief Introduction About Jacob Badgett
 
What Does A 3-Band Wedding Band Mean?
What Does A 3-Band Wedding Band Mean?What Does A 3-Band Wedding Band Mean?
What Does A 3-Band Wedding Band Mean?
 
Understanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and EmployeesUnderstanding UAE Labour Law: Key Points for Employers and Employees
Understanding UAE Labour Law: Key Points for Employers and Employees
 
sales plan presentation by mckinsey alum
sales plan presentation by mckinsey alumsales plan presentation by mckinsey alum
sales plan presentation by mckinsey alum
 
HR and Employment law update: May 2024.
HR and Employment law update:  May 2024.HR and Employment law update:  May 2024.
HR and Employment law update: May 2024.
 
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...NewBase   24 May  2024  Energy News issue - 1727 by Khaled Al Awadi_compresse...
NewBase 24 May 2024 Energy News issue - 1727 by Khaled Al Awadi_compresse...
 
State of D2C in India: A Logistics Update
State of D2C in India: A Logistics UpdateState of D2C in India: A Logistics Update
State of D2C in India: A Logistics Update
 
Evolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdfEvolution and Growth of Supply chain.pdf
Evolution and Growth of Supply chain.pdf
 
Cracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptxCracking the Change Management Code Main New.pptx
Cracking the Change Management Code Main New.pptx
 

Type of Contracts.

  • 1. My Purchasing Portfolio by Dayal Divyanshu e-mail dayal1005@gmail.com TYPE OF CONTRACTS Contents 1. Factors in Selecting Contract Types............................................................................................................................................ 3 i. Price Competition .................................................................................................................................................................... 3 ii. Price Analysis ........................................................................................................................................................................... 3 iii. Cost Analysis ............................................................................................................................................................................ 3 iv. Type and Complexity of the Requirement............................................................................................................................. 3 v. Combining Contract Types ...................................................................................................................................................... 3 vi. Urgency of the Requirement .................................................................................................................................................. 3 vii. Period of Performance or Length of Production Run ....................................................................................................... 3 viii. Contractor’s Technical Capability and Financial Responsibility ....................................................................................... 3 ix. Adequacy of the Contractor's Accounting System................................................................................................................ 3 x. Concurrent Contracts .............................................................................................................................................................. 3 xi. Extent and Nature of Proposed Subcontracting ................................................................................................................... 3 xii. Acquisition History .............................................................................................................................................................. 3 2. Types of Contracts ....................................................................................................................................................................... 4 i. Unit Price Contract .................................................................................................................................................................. 4 ii. Fixed Price Contract/ Lumpsum Contract .............................................................................................................................. 4 -Sub Categories of Fixed Type Contract ..................................................................................................................................... 4 a. Fixed Price Contracts with Economic Price Adjustment ....................................................................................................... 4 b. Fixed Price Contracts with Economic Price Adjustment and Award Fee or Incentive........................................................ 4 c. Fixed Price Incentive Contracts ............................................................................................................................................... 4 d. Fixed Price Contracts with Prospective Price Redetermination........................................................................................... 6 1/7
  • 2. My Purchasing Portfolio by Dayal Divyanshu e-mail dayal1005@gmail.com iii. Cost Reimbursement or Cost Plus Contracts......................................................................................................................... 6 Application ................................................................................................................................................................................... 6 -Sub categories of Cost Reimbursement/ Cost Plus Contracts................................................................................................. 6 a. Cost Plus Fixed Percentage Contract ................................................................................................................................. 6 b. Cost Plus Fixed Fee Contract .............................................................................................................................................. 6 c. Cost Plus Fixed Fee with Guaranteed Maximum Price Contract ..................................................................................... 6 d. Cost Plus Fixed Fee with Bonus Contract........................................................................................................................... 6 e. Cost Plus Fixed Fee With Guaranteed Maximum Price and Bonus Contract .................................................................. 6 f. Cost Plus Incentive Fee Contract (CPIF) ............................................................................................................................ 6 iv. Implied Contract/ Quasi Contract .......................................................................................................................................... 7 v. Unilateral Contract .................................................................................................................................................................. 7 vi. Bilateral contract ..................................................................................................................................................................... 7 3. 2/7 Performance & Delivery Incentives............................................................................................................................................ 7
  • 3. My Purchasing Portfolio by Dayal Divyanshu e-mail dayal1005@gmail.com 1. Factors in Selecting Contract Types i. Price Competition  Results in realistic pricing. ii. Price Analysis  Provides a basis for selecting the contract type. iii. Cost Analysis   In the absence of effective price competition and if price analysis is not sufficient, the cost estimates of the contractor and the client provides the basis for negotiating contract pricing arrangements. It is essential that the uncertainties involved in performance and their possible impact upon costs be identified and evaluated. iv. Type and Complexity of the Requirement   Complex requirements, particularly those unique to the client, usually result in greater risk assumption by the client. For complex research and development contracts, when performance uncertainties or the likelihood of changes makes it difficult to estimate performance costs in advance. As a requirement recurs or as quantity production begins, the cost risk should shift to the contractor, and a fixed price contract should be considered. v. Combining Contract Types  If the entire contract cannot be firm fixed price, the contracting officer shall consider whether or not a portion of the contract can be established on a firm fixed price basis. vi. Urgency of the Requirement  If urgency is a primary factor, the client may choose to assume a greater proportion of risk or it may offer incentives tailored to performance outcomes to ensure timely contract performance. vii. Period of Performance or Length of Production Run  In times of economic uncertainty, contracts extending over a relatively long period may require economic price adjustment or price redetermination clauses. viii. Contractor’s Technical Capability and Financial Responsibility ix. Adequacy of the Contractor's Accounting System  Before agreeing on a contract type other than firm fixed price, the contracting officer shall ensure that the contractor’s accounting system will permit timely development of all necessary cost data in the form required by the proposed contract type. x. Concurrent Contracts  If performance under the proposed contract involves concurrent operations under other contracts, the impact of those contracts, including their pricing arrangements, should be considered. xi. Extent and Nature of Proposed Subcontracting  If the contractor proposes extensive subcontracting, a contract type reflecting the actual risks to the prime contractor should be selected. xii. Acquisition History  3/7 Contractor risk usually decreases as the requirement is repetitively acquired. Also, product descriptions or descriptions of services to be performed can be defined more clearly.
  • 4. My Purchasing Portfolio by Dayal Divyanshu e-mail dayal1005@gmail.com 2. Types of Contracts i. Unit Price Contract Based on estimated quantities of items included in the project and their unit prices. The final price of the project is dependent on the quantities needed to carry out the work.  It is not unusual to combine a unit price contract for parts of the project with a lump Sum/ fixed price contract or other types of contracts. Application  This contract is only suitable for construction and supplier projects where the different types of items, but not their numbers, can be accurately identified in the contract documents.  ii. Fixed Price Contract/ Lumpsum Contract Provides for a firm price or, in appropriate cases, an adjustable price. Fixed price contract providing for an adjustable price may include a ceiling price, a target price (including target cost), or both.  This contract type places upon the contractor maximum risk and full responsibility for all costs and resulting profit or loss. Application  Acquiring commercial items or for acquiring other supplies or services on the basis of reasonably definite functional or detailed specifications, when reasonable prices can be established at the outset.   -Sub Categories of Fixed Type Contract a. Fixed Price Contracts with Economic Price Adjustment  A fixed-price contract with economic price adjustment provides for upward and downward revision of the stated contract price upon the occurrence of specified contingencies. Economic price adjustments are of three general types 1. Adjustments based on established prices: These price adjustments are based on increases or decreases from an agreed upon level in published or otherwise established prices of specific items or the contract end items. 2. Adjustments based on actual costs of labor or material: These price adjustments are based on increases or decreases in specified costs of labor or material that the contractor actually experiences during contract performance. 3. Adjustments based on cost indexes of labor or material: These price adjustments are based on increases or decreases in labor or material cost standards or indexes that are specifically identified in the contract. b. Fixed Price Contracts with Economic Price Adjustment and Award Fee or Incentive  The contracting officer may use a fixed price contract with economic price adjustment in conjunction with an award fee incentive and performance or delivery incentives when the award fee or incentive is based solely on factors other than cost.  The basis for all award fee determinations shall be documented in the contract file to include, at a minimum, a determination that overall cost, schedule and technical performance in aggregate is or is not at a satisfactory level.  Provides for evaluation period(s) to be conducted at stated intervals during the contract period of performance so that the contractor will periodically be informed of the quality of its performance and the areas in which improvement is expected (e.g. six months, nine months, twelve months, or at specific milestones).  Defines the total award fee pool amount and how this amount is allocated across each evaluation period. c. Fixed Price Incentive Contracts  A fixed price incentive contract is a fixed price contract that provides for adjusting profit and establishing the final contract price by a formula based on the relationship of final negotiated total cost to total target cost.  Point of Total Assumption (PTA) is a term used to evaluate the fixed price incentive (FPI) contract price and the final fee to be paid to the contractor.  PTA is a point on the cost line of the profit cost curve determined by the contract elements associated with a fixed price plus incentive firm target contract above which the seller effectively bears all the costs of a cost overrun. In addition, once the costs on an FPI contract reach PTA, the maximum amount the buyer will pay is the ceiling price. Note, however, that between the cost at PTA and when the cost equals the ceiling price, the seller is still in a profitable position; only when costs exceed the ceiling price then the seller is in a loss position. 4/7
  • 5. My Purchasing Portfolio by Dayal Divyanshu e-mail dayal1005@gmail.com -Calculation of Point of Total Assumption (PTA) Any FPI contract specifies following costs: 1. Target Cost. 2. Target Profit. 3. Target Price. 4. Ceiling Price. 5. One or more share ratios. The PTA is the difference between the ceiling and target prices, divided by the buyer's portion of the share ratio for that price range, plus the target cost. PTA = ((Ceiling Price - Target Price)/buyer's Share Ratio) + Target Cost Example on calculation of PTA  Target Cost: USD 2,000,000  Target Profit: USD 200,000   Target Price: Ceiling Price: USD 2,200,000 ( Target cost + Target profit) USD 2,450,000  Share Ratio: 80% buyer & 20% seller for overruns and 50% & 50% for under runs PTA = ((2,450,000 - 2,200,000)/ 0.80) + 2,000,000 = 2,312,500. Example on calculation of profit  A Fixed Price Plus Incentive Fee (FPI) Contract has a target cost of USD 130,000, a target profit of USD 15,000, a target price of USD 145,000, a ceiling price of USD 160,000, and a share ratio of 80/20. The actual cost of the project was USD 150,000. How much profit does the seller make? Calculations:  PTA = (160,000 – 145,000)/0.80 + 130,000 = USD 148,750.  Total cost at the point of total assumption is = USD 148,750.  Over run at point of total consumption = (Total Cost at PTA - Target Cost) (148,750 – 130,000)= USD 18,750.      Buyer share = (0.80 x 18,750)= USD 15,000. Seller share = (0.20 x 18,750)= USD 3,750. Note, the cost up to that point was agreed to be split between parties. If total cost equals PTA, then seller would have a profit reduced by (target profit – sellers overrun share) = (15,000 – 3,750) = USD 11,250 Now, with the actual total cost of USD 150,000, every dollar above cost USD 148,750 (Total cost at PTA) will be taken directly from the sellers profit. So, the final profit will be = 11,250 – (150,000-148,750) = USD 10,000 5/7
  • 6. My Purchasing Portfolio by Dayal Divyanshu e-mail dayal1005@gmail.com d. Fixed Price Contracts with Prospective Price Redetermination  A firm fixed price for an initial period of contract deliveries or performance and prospective price redetermination at a stated time during performance of the price for subsequent periods of performance.  The initial period should be the longest period for which it is possible to negotiate a fair and reasonable firm fixed price. Each subsequent pricing period should be at least 12 months. Application  A fixed price contract with prospective price redetermination may be used in acquisitions of quantity production or services for which it is possible to negotiate a fair and reasonable firm fixed price for an initial period, but not for subsequent periods of contract performance. iii. Cost Reimbursement or Cost Plus Contracts Cost reimbursement types of contracts provide for payment of allowable incurred costs to the extent prescribed in the contract. These contracts establish an estimate of total cost for the purpose of obligating funds and establishing a ceiling that the contractor may not exceed (except at its own risk) without the prior approval of the contracting officer. Application Cost reimbursement contracts to be used only when circumstances do not allow the agency to define its requirements sufficiently to allow for a fixed price type contract.   -Sub categories of Cost Reimbursement/ Cost Plus Contracts a. Cost Plus Fixed Percentage Contract Compensation is based on a percentage of the cost. b. Cost Plus Fixed Fee Contract Compensation is based on a fixed sum independent of the final project cost. The client agrees to reimburse the contractor's actual costs, regardless of amount, and in addition pay a negotiated fee independent of the amount of the actual costs. c. Cost Plus Fixed Fee with Guaranteed Maximum Price Contract Compensation is based on a fixed sum. The total project cost should not exceed an agreed upper limit. d. Cost Plus Fixed Fee with Bonus Contract Compensation is based on a fixed sum and bonus given if the project finishes below budget, ahead of schedule or based on other agreed parameters as stipulated in contract. e. Cost Plus Fixed Fee With Guaranteed Maximum Price and Bonus Contract Compensation is based on a fixed sum. The total project cost will not exceed an agreed upper limit and a bonus is given if the project is finished below budget, ahead of schedule or based on other agreed parameters as stipulated in contract. f. Cost Plus Incentive Fee Contract (CPIF)  A cost reimbursement contract that provides for an initially negotiated fee to be adjusted later by a formula based on the relationship of total allowable costs to total target costs.  Unlike a cost plus contract, the cost in excess of the target cost is only partially paid according to a Buyer/Seller ratio. The seller's profit decreases when exceeding the target cost. Similarly, the seller's profit increases when actual costs are below the target cost defined in the contract.  Incentive contracts allow sharing of the risks between the contractor and the client. The contractor is reimbursed all its justifiable costs in addition to a calculated fee. 6/7
  • 7. My Purchasing Portfolio by Dayal Divyanshu e-mail dayal1005@gmail.com The basic elements of a CPIF contract Major Costs in CPIF calculation (Similar to the costs terminologies in fixed price contract)  Target cost.  Actual cost.  Target fee: The Target Fee varies between the Minimum Fee and the Maximum Fee according to a formula tied to the Actual Cost (e.g. Target Fee could be 10% of the Actual Cost).   Sharing ratio: The agreed upon cost sharing proportion, normally expressed in percentage (e.g. 85% for the client / 15% for the contractor). It is often different for cost overruns and cost underruns. Other components of incentive fee contracting include  Maximum Fee: the highest fee that may be earned, usually expressed as a percentage.  Minimum Fee: the lowest fee that may be earned, usually expressed as a percentage.  The Final Fee (profit of the contractor) is expressed as follows:  Final Fee = Target Fee + (Target Cost - Actual Cost) * Contractor Share  The Final Price of the contract is expressed as follows:  Final Price = Actual Cost + Final Fee For example, assume a CPIF with:  Target Cost = USD 1,000. Target Fee = USD 100. Benefit/Cost Sharing Ratio for cost overruns = 80% Client / 20% Contractor. Benefit/Cost Sharing Ratio for cost underruns = 60% Client / 40% Contractor.  If actual cost: USD 1,100.  Client will pay to the contractor: 1,100 + 100 + (1,000 - 1,100) * 0.2 = 1,180 (contractor earns USD 80 instead of USD 100).  If the Actual Cost is lower than the Target Cost: USD900  Client will pay to the contractor: 900 + 100 + (1,000 - 900) * 0.4 = 1,040 (contractor earns USD 140 instead of USD 100).    iv. Implied Contract/ Quasi Contract A contract is implied if the circumstances imply that parties have reached an agreement even though they have not done so expressly. v. Unilateral Contract One party makes a promise, but the other side does not promise anything. In these cases, those accepting the offer are not required to communicate their acceptance to the offer. vi. Bilateral contract An agreement in which each of the parties to the contract makes a promise or set of promises to each other. 3. Performance & Delivery Incentives Performance incentives may be considered in connection with specific product characteristics (e.g., a missile range, an aircraft speed, an engine thrust, or vehicle maneuverability) of the contractor’s performance. These incentives should be designed to relate profit or fee to results achieved by the contractor, compared with specified targets. Delivery incentives should be considered when improvement from a required delivery schedule is a significant objective. 7/7