INTERNSHIP REPORT 
T h e U n i v e r s i t y o f L a h o r e 
Page 3 
Submitted To: 
GM Elmetec 
Submitted By 
Imtiaz Ahmad Bsme01113115 
Umair Tariq Bsme01113126 
Khawar Saeed Bsme01113139 
Muaaz Ali Bsme01113094 
Haseeb Zahid Bsme01113037 
Hasan Jan Bsme01113031 
Irfan Ali Bsme01113098 
Muhammad Shoaib Mukhtar Bsme01113026 
Internship Department: 
Elmetec Transformer 
Department of Mechanical Engineering, 
The University of Lahore, Lahore
Elmetec Private Limited Lahore 
Currently The Best 
TABLE OF CONTENTS 
Dedication……………………………………………………………………………..5 
Acknowledgement…………………………………………………………………6 
Exclusive Summary…………………………………………………………………7 
Introduction……………….………………………………………………………….8 
Transformer…………………………………………………………………………..9 
Distribution Transformer……………………………………………………….11 
Internship Schadule……………………………………………………………….11 
Manufacturing Department…………………………………………………..12 
QC Department………………………………………………………………….….22 
PT & CT………………………………………………………………………………….25 
T h e U n i v e r s i t y o f L a h o r e 
Page 4
Elmetec Private Limited Lahore 
Currently The Best 
Dedication 
To all those who have supported, encouraged, challenged, and inspired us. And 
specially to our Beloved Parents, honorable teachers and friends for all their 
guidance, love & attention which has made it possible for us to make it up to this 
point and as well as the Internship Supervisors who bestowed us with the courage, 
the commitment and the awareness to follow the best possible route, by their 
unmatchable style and by best possible training. 
T h e U n i v e r s i t y o f L a h o r e 
Page 5
Elmetec Private Limited Lahore 
Currently The Best 
Acknowledgement 
All the praises are for the almighty, Allah who bestowed us with the ability and 
potential to complete this Internship. I also pay my gratitude to the Almighty for 
enabling me to complete this Internship Report within due course of time. 
Words are very few to express enormous humble obligations to my affectionate 
Parents for their prayers and strong determination to enabling us to achieve this 
job. 
we also appreciate the cordial co-operation from all my Internship Supervisors in 
the different departments of Elmetec and also of HR management for providing us 
requisite information and knowledge for compilation of our complete Internship. 
All the employers of Elmetec helped us a lot in performing all the activities and in 
gaining the practical knowledge of industry. They gave us best environment and 
knowledge to enhance our skills. 
T h e U n i v e r s i t y o f L a h o r e 
Page 6
Elmetec Private Limited Lahore 
Currently The Best 
Executive Summary 
Elmetec Private Limited is the pioneer manufacturer of electrical goods in 
Pakistan. The company has always been contributing towards the advancement 
and development of the engineering sector in Pakistan by introducing a range of 
quality electrical equipments by producing hundreds of engineers, skilled workers 
and technicians through its apprenticeship schemes and training programmes. 
We recently have done our internship in Elmetec, in which we got training from its 
Distribution Transformer unit. The internship basically revolved around the 
transformer design, manufacturing, I&QC and maintenance. The system, the style 
of working & the commitment of the employees in Elmetec is really exemplary. 
The difference between the success & failure is doing things right and doing things 
nearly right, & Elmetec has always tried for success & that is why it is known to be 
one of the leading companies in Pakistan. 
In this report we have given a very brief review of what we have seen and learnt 
during our internship. we have mentioned all these as we have made an internship 
as according to the schedule. This report will give its reader knowledge about the 
Elmetec and power division especially about transformer unit. 
we have made it possible to write each and every thing that we have learnt here. 
We have all our practical efforts in the form of this manuscript that’s the asset for 
our future career. 
T h e U n i v e r s i t y o f L a h o r e 
Page 7
Elmetec Private Limited Lahore 
Currently The Best 
T h e U n i v e r s i t y o f L a h o r e 
Page 8 
Introduction 
Elmetec (Pvt.) Ltd. was incorporated in 1999 and over the years it has developed into a leading 
manufacturer of Electrical Distribution Equipment in Pakistan. Elmetec has a professional team 
of engineering personnels and utilizes the services of highly experienced European Consultants 
& Engineers. 
Elmetec is an ISO 9001:2008, ISO 14001:2004, OHSAS 18001:2007 & certified from TUV 
NORD, Germany. It is a Pre-qualified/Registered Manufacturer of Water and Power 
Development Authority of Pakistan (WAPDA) and Distribution and Electric Supply Companies, 
for Distribution Transformers, Low Voltage/Medium Voltage Current Transformers, Potential 
Transformers & Switchgear. It is also an approved supplier of Karachi Electric Supply Company 
(KESC) and Govt. of Azad Jammu & Kashmir (AJK). It is registered with Pakistan Engineering 
Council (PEC) as well. 
Elmetec is a very progressive Indenting and Trading company of Pakistan. It represents foreign 
principals/manufacturers from different countries for supply of their products in Pakistan. It is 
a regular Supplier of Grid Station Equipment upto 500KV including Power Transformers, 
Circuit Breakers, Current Transformers (CTs), Potential Transformers (PTs), 
Disconnectors/Isolators and Capacitor Banks. 
Elmetec is also supplying equipment to Pakistan Railways. It represents suppliers of 
Locomotives, Wagons and Air Brake Systems. 
Elmetec in collaboration with leading Russian Companies in the Petroleum sector, offers various 
solutions for the Petroleum Industry for both upstream and downstream Companies. We provide 
state of the art material such as Oil drilling Rigs, Equipment including pumps, valves, pipeline, 
refurbished drilling bits with guarantee, down hole equipment etc. We also provide, through our 
Russian partners, all Oilfield related services and processing solutions for Refinery upgradation 
to meet Euro IV standards. We also provide solutions and equipment for fast track development 
of Marginal wells and Fields. Our Petroleum division can also provide training courses both in 
Pakistan and in Russia for all Upstream and downstream related activities.The division is 
manned by experts with over 40 years of Local and International experience in the Petroleum 
sector.
Elmetec Private Limited Lahore 
Currently The Best 
T h e U n i v e r s i t y o f L a h o r e 
Page 9 
Transformer 
A transformer makes use of Faraday's law and the ferromagnetic properties of an iron core to 
efficiently raise or lower AC voltages. It of course cannot increase power so that if the voltage is 
raised, the current is proportionally lowered and vice versa.
Elmetec Private Limited Lahore 
Currently The Best 
Complete Transformer 
Active Part of Transformer 
Elmetec (Electrical & Mechanical Technologies) Pvt. Ltd. manufactures 11 KV Distribution 
Transformers from 10 KVA to 630 KVA as per WAPDA specifications and all other capacities up 
to 5000 KVA. In addition to that, it also manufactures medium and low voltage switchgear 
incorporating Vacuum Circuit Breakers, Oil Circuit Breakers and Load Break Switches, 
Control & Relay Panels, Bus Tie Duct, Distribution Boards, Power Factor Improvement Plant 
(PFI), Draw Out Motor Control Centers, Overhead Bus Bars are the other products. Elmetec also 
manufactures Low & Medium Voltage Instrument Transformers. 
T h e U n i v e r s i t y o f L a h o r e 
Page 10
Elmetec Private Limited Lahore 
Currently The Best 
Elmetec transformers are available for various applications: 
 Distribution Transformers (Pole /Pad Mounted) 
T h e U n i v e r s i t y o f L a h o r e 
Page 11 
 Pole Mounted Substation 
Rated Output (KVA): 10,15,25,50,100,200 
 Indoor Substation 
Rated Output (KVA):250,400,500,630,750 ,1000,1250,1500 2000,2500 upto 5000KVA. 
 Pad Mounted Distribution Transformer 
Rated Output (KVA): Up to 630KVA 
 Auto Transformers 
Start of Internship at Elmetec 
On my first day at Elmetec, we were first briefed by the Mr. Mudassir. We were informed that 
we will be following a specific plan during our internship. All the internees were divided into 2 
groups. There were around 10 internees in total. Our group was given the following schedule: 
6 to 9 August 
Core stacking. 
11 to 13 August 
Core coil assembly . 
14 to 16 August 
H.V and L.V connections. 
18 to 20 August 
L.V and H.V windings shop.
Elmetec Private Limited Lahore 
Currently The Best 
T h e U n i v e r s i t y o f L a h o r e 
Page 12 
21 to 23 August 
P.T and C.T manufacturing Shop. 
25 to 27 August 
Tank manufacturing shop. 
28 to 29 August 
Paint shop. 
1 to 3 September 
Assembly section. 
4 to 5 september 
Testing. 
8 to 10 September 
Quality Control. 
Manufacturing Department 
It is the responsibility of the manufacturing department to manufacture different components 
of transformer and then assemble them to make a transformer. Production department has 
following sections: 
 Winding Section 
 Core Section 
 Tank Section 
 Assembly Section 
How manufacturing department starts manufacturing? First, customer gives order to the 
marketing and sales department. Marketing and sales department makes annual sales plan for 
WAPDA. Marketing and sales department sends this order to Production planning and control
Elmetec Private Limited Lahore 
Currently The Best 
department which makes a master production plan (Month wise). This plan is sent to Material 
planning section which makes Material requirement plan or Bill of material according to the 
master production plan. This plan is sent to the purchase department which buys material 
according to this plan. Material is received in store where quality inspectors from I&QC 
department check its quality than this material is sent to manufacturing department where 
manufacturing of transformer starts. 
T h e U n i v e r s i t y o f L a h o r e 
Page 13 
1. Winding Section 
In the winding section L.V and H.V windings of the coil are made. 
 Raw Mater ial 
For L.V winding 
 Paper insulated flat copper wire (For 10KVA to 50KVA) 
 Copper foil (For 100KVA and above) 
For H.V winding 
 Enamel copper wire (For 10KVA to 200KVA) 
 Paper insulated flat copper wire (400KVA and above) 
 Type of Insulation Mater ial 
 Diamond dotted paper (For insulation between layers of windings) 
 Press pan sheet (For end collars) 
 Creep paper pipe (For insulation of terminal of tap changer) 
 Craft paper (Used for insulation in disc winding) 
 Thermo ducts 
 Types of Windings
Elmetec Private Limited Lahore 
Currently The Best 
T h e U n i v e r s i t y o f L a h o r e 
Page 14 
 Disc winding 
 Packet winding 
 Layer winding 
 Foil winding 
File and layer winding are used in LV.File, packet and disc winding is used in HV.Disc and 
packet winding are easy to repair. 
 Machines Used 
 Slitting machine is used for the cutting of bundles of insulation material. 
 H.V P.I copper winders are used for the winding of P.I copper wire for 
transformers of the rating 400KVA and above. 
 H.V enamel copper winders are used for the winding of enamel copper wire 
for the transformer of the rating 10KVA to 400KVA. 
 Standard Ratings of WAPDA 
Standard ratings of WAPDA are 10KVA, 15KVA, 25KVA, 50KVA, 100KVA, 200KVA, 400KVA, 
630KVA 
HV winding is done over LV winding, both are insulated from each other. Connections are made 
from start and end in LV and HV winding. But in HV we give taping connection at different 
places according to design. On HV winding we used DDP paper to insulate it from tank. Oil is 
also used for this purpose. Winding turns are according to design. At the end of this section 
testing of winding is done using transformer turns ratio (TTR) meter which gives no. of turns. 
we check it according to design. 
2. Core Section 
In the core section upper, side and yoke limbs of the core are made.
Elmetec Private Limited Lahore 
Currently The Best 
T h e U n i v e r s i t y o f L a h o r e 
Page 15 
 Raw Material 
Raw material used for the making of core is M4 grade silicone steel sheet which is an alloy of 
iron and silicon. Silicon is used to increase the permeability of iron. 
 Machines 
 Slitting machine is used to cut the big roll of silicon steel sheet in required sizes 
(widths) according to the rating of transformer. 
 Power press machines are used to make limbs. They are operated manually. 
 After cutting of limbs V punching is done on the yoke limb which is called yoke 
notching. 
 PLC cutting machines are also used to make limbs. There are two PLC machines. 
SDRI machine has a capacity of 40,000 limbs per day. L.A.E machine has a capacity of 
60,000 limbs per day. In CNC machines length, width and angle are given as input. 
 L.A.E measuring table is used to check errors in angle, width and length.
Elmetec Private Limited Lahore 
Currently The Best 
T h e U n i v e r s i t y o f L a h o r e 
Page 16 
 Iron Losses 
Iron losses are the flux losses in core. Major factors in iron losses are; 
 Quality of material. 
 Bur. 
 Air gap. 
To reduce iron losses 
 Material should be of good quality. 
 Limbs should be bur free. 
 Limbs should be rust free. 
 Weight of core should be according to Tr. Design 
After cutting of the limbs, they are stacked in a way that there is no air gap between the limbs. 
All the limbs are joined except the upper yoke limb which is filled in the assembly section. Outer 
side of the core is varnished to avoid rusting. Core is tightened using upper and lower pressing 
beams. Then its goes to assembly section.
Elmetec Private Limited Lahore 
Currently The Best 
T h e U n i v e r s i t y o f L a h o r e 
Page 17
Elmetec Private Limited Lahore 
Currently The Best 
Silicon sheet 
Slitting of bundles 
Cutting 
Side limb Center limb Yoke limb 
Core stacking 
Testing 
Checking of core 
Stock 
Process Flow Chart of Core Section 
T h e U n i v e r s i t y o f L a h o r e 
Page 18
Elmetec Private Limited Lahore 
Currently The Best 
T h e U n i v e r s i t y o f L a h o r e 
Page 19 
3. Assembly Section 
In the assembly section there are many processes in which all the components of the 
transformer are put together to form a transformer. Important processes in the assembly 
section are; 
 Core Coil Assembly 
In the core coil assembly coil is fitted in the core and upper yoke limb is inserted to complete 
the core, then core is tightened using upper and lower pressing beams. For coil to coil 
insulation and core to coil insulation press pan sheet is used. For insulation between bottoms 
pressing beam and coil wooden base is used. 
 Before Connection Test (BCT) 
In the BCT area turns ratio of the coil is checked using TTR meter. 
 H.T, L.T Connections 
In this section Y-Delta connections are made. Tap changer is connected with the coil. 
Connections are made according to work order specifications given by the design department. 
Taping is done on these connections to avoid any short circuit.
Elmetec Private Limited Lahore 
Currently The Best 
T h e U n i v e r s i t y o f L a h o r e 
Page 20 
 After Connection Test (ACT) 
In the ACT area turns ratio of the transformer is checked using TTR meter. 
 Furnace 
After ACT transformer is kept in the furnace for 48 to 72 hours according to its rating. It is done 
to evaporate all the moisture from core or coil. Temperature of the furnace is 120o to 130o. 
 Cover Plate Assembly 
In this section H.T, L.T bushings, through bolts, eye bolts connectors, arcing horns and other 
parts are inserted in cover plate. 
 Pre Tanking Section 
When transformer is unloaded from the furnace it is inserted in the tank as quickly as possible 
to avoid the getting of moisture in the live part. Live part of the transformer should be inserted 
in the tank in 50mins to 1 ½ hours. 
 Oil Filling Section
Elmetec Private Limited Lahore 
Currently The Best 
In oil filling section oil is filled in the tank under vacuum. Amount of oil to be filled can be found 
from bill of quantity (BOQ). For 10kv to 200kv oil filling chambers are used and for transformers 
above 200kv oil is filled manually. 
Supply of coils Supply of core and 
Assembly of 
cover plate 
T h e U n i v e r s i t y o f L a h o r e 
Page 21 
 Settling Area 
After oil filling every transformer is kept for 12 hours in the settling area to check for oil leakage 
and oil level. 
Core coil 
assembly 
upper yoke limbs 
Before Connections 
connections test 
Oil filling 
After 
connections 
test 
Furnace 
Unloading
Elmetec Private Limited Lahore 
Currently The Best 
Process Flow Chart of Assembly Section 
T h e U n i v e r s i t y o f L a h o r e 
Page 22 
4. Tank Section 
In the tanking section cover plate, tank, and other mechanical components of the transformer 
are made. Tank has following parts; 
 Frame 
 Cover plate 
 Bottom 
 Side plate 
 Fin Walls
Elmetec Private Limited Lahore 
Currently The Best 
T h e U n i v e r s i t y o f L a h o r e 
Page 23 
 Conservator 
 Raw Material 
Raw material for tank and other components are 
 MS sheet (Mild steel sheet) 
 MSCR sheet (Mild steel cold rolled sheet) 
 Component Welding 
In this area lifting lugs, carrying beams and studs are welded using arc welding. 
 Frame Punching and Welding Machine 
Frame is punched and then welded in this machine.MIG welding is used in this machine. 
 Fin Welding 
After fin folding they are welded. MIG welding is used in this machine. 
 Bottom Side Plate Welding 
In this section bottom and side plates are welded together. 
 Tank Assembly 
Here all the parts of the tank are joint together. 
 Tank Welding 
Tank is welded to stop leakage.
Elmetec Private Limited Lahore 
Currently The Best 
T h e U n i v e r s i t y o f L a h o r e 
Page 24 
Inspection and quality Control 
Inspection and quality control department ensures; material purchased by the purchase 
department is according to the criteria suggested by IEC in their recommendations(Incoming), 
during the manufacturing of transformers all the components of transformer are according to 
transformer design(in processing),do all the quality tests so that transformer does not fail in 
real conditions(Testing). Inspection and quality control department is further divided into three 
sections 
 Incoming 
 In processing 
 Testing 
1. Incoming Section: 
Incoming section is responsible for the checking of all the material which is purchased to ensure 
that all the material is according to international standards. When the material is purchased it 
first comes in the receiving where it is inward gate pass (IGP) number. Incoming section checks 
through the system if material has arrived, then quality inspectors from the incoming go to the 
store and check the material if material is according to standards set by IEC than material is 
approved otherwise it is rejected and supplier compliant application form(SCAF) is sent to 
supplier. 
 Tests on Di fferent Mater ials to Check there Qual i ty 
 Bird Protection Test 
This test is used to check the thickness of paint so that cover plate will not short. In this 
test 8kv voltage is applied to the cover plate for 1 minute if cover plate does not stand 
it for I minute than it is rejected. 
 Micron Meter 
Micron meter is also used to check the thickness of paint on cover plate. The reading 
should be greater than .25mm according to IEC recommendations. 
 Mandrill Test 
This test is used to check the quality of enamel on enamel copper wire. For mandrill 
test all sizes of enamel copper wire will be wound over its own diameter for at least 8 
to 10 turns and will be checked for zero cracks. 
 Heat Shock Test
Elmetec Private Limited Lahore 
Currently The Best 
This test is used to check the quality of enamel on enamel copper wire. The sample 
prepared for the mandrill test is placed in electric oven at temperature 155 Co to 166 Co 
for ½ hour and again mandrill test will be performed for test compliance. 
T h e U n i v e r s i t y o f L a h o r e 
Page 25 
 Break Down Test 
The specimen of wire approximately 600mm is doubled and twisted for a distance of 
125mm.The tension of wire pair while being twisted and a number of twists will be as 
per specification (IEC-60317 and BS-4516).Enamel is removed from the wire at one pair 
of ends and test voltage is applied between the conductors through high port test set 
as per specification (IEC-60317). Note the reading where break down has occurred. 
 Peel Off Test 
This test is applicable to sizes over 1.0mm. A sample of the wire of about 500mm 
length is placed in tester consisting of two fixing devices 500mm apart on the same 
axis. One of these is able to rotate. Specific weight is attached on the fix side of device 
as mentioned in specification by IEC-60317. By means of a scraper on opposite sides of 
wire. 
The rotating device is driven at 60 to 100 revolutions per minute. The number of 
revolutions of fixing device is calculated from R=175/d. After applying specified number 
of revolutions chipping off of the enamel is checked. Zero chipping off is required to 
qualify for enamel copper wire. 
 Iron Loss Test 
Iron losses of the silicon sheet (alloy of iron and silicon) are found using direct reading iron loss 
tester. First diameter of the sheet is measured using micrometer screw gauge. Diameter is fed 
in the iron loss tester. Tester is energized for ½ hour and then iron losses are found. If 1.5 Tesla 
are applied in tester than losses should not exceed .89 Tesla. 
2. In Processing Section 
In processing section ensures that during the manufacturing of transformers all the 
components of transformers are according to design specifications. It is also responsible for 
the testing of oil to check its quality. 
 Oi l Tests to Check i ts Qual i ty 
There are seven tests done in oil testing lab to check the quality of oil. If the oil fails in 
one of these tests than it is rejected not used in transformers. Seven tests are
Elmetec Private Limited Lahore 
Currently The Best 
T h e U n i v e r s i t y o f L a h o r e 
Page 26 
I. Visual Inspection 
II. Specific Gravity 
III. Viscosity 
IV. Flash Point 
V. Dielectric Strength 
VI. Acidity Value 
VII. Pour Point 
3. Testing 
It is the responsibility of the testing section that the transformer does not fail in real 
conditions. To check that it will not fail in real environment a number of tests are done on 
the transformer before it is ready to dispatch. There are three types of tests which are done 
on a transformer. 
i. Routine Tests 
ii. Type Tests 
Routine Tests 
Tests which are performed on each and every transformer are called routine tests. Every 
transformer must pass these tests before dispatch. Test included in routine tests are 
I. Transformer Turns Ratio Test (TTR Test) 
II. Winding Resistance Test 
III. Insulation Resistance Test (Meager Test) 
IV. Induced Voltage Test 
V. High Voltage Test (Separate source voltage) 
VI. No Load Losses (Open circuit test) 
VII. On Load Losses (Short circuit test) 
VIII. Dielectric Tests 
Type Tests 
Tests which are done on samples taken from a whole lot are called type tests. Tests included in 
type tests are
Elmetec Private Limited Lahore 
Currently The Best 
T h e U n i v e r s i t y o f L a h o r e 
Page 27 
Impulse Voltage With-Stand Test 
Temprature Rise Test 
Short Circuit Test 
INSTRUMENT TRANSFORMERS 
Voltage Transformers (MV) 
Introduction 
Voltage Transformers consist of primary and secondary windings which are electrically isolated 
but coupled magnetically by a core. Their role in electrical systems is of primary importance as 
they bstep downbthe voltage of a system to measurable values, such as 110 V or 100 V, thus 
enabling Standardization of equipment.
Elmetec Private Limited Lahore 
Currently The Best 
T h e U n i v e r s i t y o f L a h o r e 
Page 28 
ERRORS OF TRANSFORMATION 
Errors are introduced in the operations of the Voltage Transformer because some voltage drops 
in the primary and secondary winding due to leakage reactance, winding resistance and 
magnetization of the core. This creates a (voltage) ratio error and phase error. Elmetec design 
Voltage Transformer with minimum voltage drop, which is due to the resistance of the winding 
and other losses of the transformer, by using best quality copper wire and electrical steel M-4. 
The Voltage Transformers are encapsulated with high quality resin under vacuum, which 
ensures the insulation of LV from HV, but also keeps the partial discharge at a low level as 
required by the international Standards. 
VOLTAGE TRANSFORMERS MEASURING 
A voltage Transformer with typical accuracy class: 0.1, 0.2, 0.5, 1.0 and 3.0 used mainly for 
measuring through meters and similar apparatus. 
PROTECTIONS 
A Voltage Transformer with typical accuracy class 3P, 6P are used mainly for protection Relays. 
Basic Features 
Reliable operation under ambient temperature of -20 C to + 55 C. 
- Capable of withstanding short time thermal and dynamic stresses. 
- Capable of withstanding impulse voltage up to 110 kV.
Elmetec Private Limited Lahore 
Currently The Best 
- Voltage transformer has been designed so that it can be installed in any MV panel. 
T h e U n i v e r s i t y o f L a h o r e 
Page 29 
- LV terminal can be sealed. 
- A comprehensive range of ratio, burden and accuracy class is available as required in various 
International & Local Standards. 
- A strict quality control is enforced at various stages of production to ensure compliance of the 
VTs. with assigned ratings. 
- All material and components used in the manufacture of VTs. are subject to strict receiving 
inspection. 
- Guarantee of the performance of Medium Voltage VTs. according to rating plate data. 
Construction 
Elmetec produce custom-made VTs according to WAPDA, IEC, BSS, ANSI or any other 
Local/International Standard specifications. These Voltage Transformers are single pole, double 
pole and three poles. 
Current Transformers 
Introduction 
A Current Transformer is the principal measuring device for protection and metering schemes 
in any power system. The primary current of the CT is transformed into the required secondary 
current, usually 5A or 1A. Not only is the accuracy of the transformation of prime importance, 
but also the isolating function. This means no matter what the system voltage on the primary 
circuit, the secondary circuit need to be insulated only for a low voltage.
Elmetec Private Limited Lahore 
Currently The Best 
T h e U n i v e r s i t y o f L a h o r e 
Page 30 
PRINCIPAL OF OPERATION 
The Current Transformer works on the principle of available flux. In the bidealbCurrent 
Transformer, secondary current would be exactly equal (when multiplied by the turns ratio) 
and opposite to the primary current. But some of the primary current or the primary 
ampere-turns is utilized for magnetizing the core, thus leaving less than the actual primary 
ampere turns to be btransformedbinto the secondary ampere-turns. This introduces an error 
in the ratio of the Current Transformer, which is classified as current (ratio) error and phase 
error. 
This error is measured at rated burden, specified power factors and rated frequency. Elmetec 
designs take care of various factors to keep the errors with in the specified limits. 
Basic Features 
- Reliable operation under ambient temperature of -20 C to + 55 C. 
- Capable of withstanding short time thermal and dynamic stresses. 
- Capable of withstanding impulse voltage up to 110 kV.
Elmetec Private Limited Lahore 
Currently The Best 
- Current transformer has been designed so that it can be installed in any MV panel. 
T h e U n i v e r s i t y o f L a h o r e 
Page 31 
- LV terminal can be sealed. 
- A comprehensive range of ratio, burden and accuracy class is available as 
required in various international & Local Standards. 
- A strict quality control is enforced at various stages of production to ensure 
compliance of the CTs with assigned Ratings. 
- All material and components used in the manufacturing of CTs are subject to 
strict receiving inspection. 
- Guarantee of the performance of medium voltage CTs are according to rating 
plate data. 
Construction 
Elmetec produces custom made CTs according to WAPDA, IEC, BSS, ANSI or any other 
Local/International Standard specifications. 
Current Trannsformer (LV) 
Introduction 
Elmetec produces a comprehensive range of Low Voltage Current Transformers according to 
International/Local Standards. A variety of designs are available to suit individual requirements. 
Ring Type (bus bar mounted) CTs with different sizes of windows are available that provides 
easy mounting for any position in LV Switchgear. 
Construction 
All current transformers are constructed from high-grade material and are individually tested 
for compliance with the specifications. A team of qualified and experienced staff is assigned for 
the design and testing of current transformers. Strict quality control is exercised to provide a 
reliable product.
Elmetec Private Limited Lahore 
Currently The Best 
T h e U n i v e r s i t y o f L a h o r e 
Page 32 
Application 
Elmetec Low Voltage Current Transformers are indoor type and used for the operation of 
Ammeter. Protection Relays, Kilo Watt-Hour Meters, Earth Fault Relays and other purposes. 
Basic Features 
- Reliable operation under ambient temperature of - 20 C to +55 C 
- Capable of withstanding short time thermal and dynamic stresses. 
- LV terminal can be sealed. 
- Can either be mounted direct on the bus-bars or any other locations 
with the help of mounting feet supplied loose. 
- A comprehensive range of ratio, burden, and accuracy class is available 
as required in various International & local standards. 
- A strict quality control is enforced at various stages of production to 
ensure compliance of the CTs with rating assigned. 
- All material and component used in the manufacturing of CTs are 
subject to strict receiving inspection. 
- Accuracy tests have been performed at Research & Test Laboratory, 
Rawat. 
- Test certificates are provided on request.

Más contenido relacionado

La actualidad más candente

Manufaturing transformer
Manufaturing transformerManufaturing transformer
Manufaturing transformersuman
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substationAshutosh Srivastava
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersLiving Online
 
Presentation on Distribution Transformer by nirob dhilon chowdhury
Presentation on Distribution Transformer by nirob dhilon chowdhuryPresentation on Distribution Transformer by nirob dhilon chowdhury
Presentation on Distribution Transformer by nirob dhilon chowdhuryNirob Chowdhury
 
Summer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul MehraSummer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul MehraRahul Mehra
 
Electric substation
Electric substation Electric substation
Electric substation ANNU KUMAR
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substationsvishalgohel12195
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformerssiddharam kantoli
 
Transformer Parts and functions
Transformer Parts and functionsTransformer Parts and functions
Transformer Parts and functionsSourabh sharma
 
substation internship report
substation internship report substation internship report
substation internship report Arun Thapa
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training pptShubham Patel
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationraiamitesh8
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationankesh kumar
 
Electrical and Electronics Engineering (EEE Internship presentation
Electrical and Electronics Engineering (EEE Internship presentationElectrical and Electronics Engineering (EEE Internship presentation
Electrical and Electronics Engineering (EEE Internship presentationEngr. Md. Ashikur Rahman Ashik
 

La actualidad más candente (20)

Manufaturing transformer
Manufaturing transformerManufaturing transformer
Manufaturing transformer
 
Report on industrial summer training on 220 kv substation
Report  on industrial summer training on 220 kv substationReport  on industrial summer training on 220 kv substation
Report on industrial summer training on 220 kv substation
 
33/11 KV SUBSTATION
33/11 KV SUBSTATION33/11 KV SUBSTATION
33/11 KV SUBSTATION
 
132 33kv substation
132 33kv substation132 33kv substation
132 33kv substation
 
Installation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of TransformersInstallation, Testing and Troubleshooting of Transformers
Installation, Testing and Troubleshooting of Transformers
 
Presentation on Distribution Transformer by nirob dhilon chowdhury
Presentation on Distribution Transformer by nirob dhilon chowdhuryPresentation on Distribution Transformer by nirob dhilon chowdhury
Presentation on Distribution Transformer by nirob dhilon chowdhury
 
33kv substation
33kv substation33kv substation
33kv substation
 
Summer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul MehraSummer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul Mehra
 
Electric substation
Electric substation Electric substation
Electric substation
 
Substation overview
Substation overviewSubstation overview
Substation overview
 
Presentation on substations
Presentation on substationsPresentation on substations
Presentation on substations
 
Ppt on protection of power transformers
Ppt on protection of power transformersPpt on protection of power transformers
Ppt on protection of power transformers
 
Transformer Parts and functions
Transformer Parts and functionsTransformer Parts and functions
Transformer Parts and functions
 
substation internship report
substation internship report substation internship report
substation internship report
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
66 kv substation
66 kv substation66 kv substation
66 kv substation
 
Transformer ppt
Transformer pptTransformer ppt
Transformer ppt
 
SUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substationSUBSTATION OVERVIEW - A presentation on substation
SUBSTATION OVERVIEW - A presentation on substation
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substation
 
Electrical and Electronics Engineering (EEE Internship presentation
Electrical and Electronics Engineering (EEE Internship presentationElectrical and Electronics Engineering (EEE Internship presentation
Electrical and Electronics Engineering (EEE Internship presentation
 

Similar a Transformer manufacturing and Internship Report

Company Profile - South Asian Electrical Concern.doc
Company Profile - South Asian Electrical Concern.docCompany Profile - South Asian Electrical Concern.doc
Company Profile - South Asian Electrical Concern.docRaja Kamran
 
Peco distribution-transformer
Peco distribution-transformerPeco distribution-transformer
Peco distribution-transformercomsats
 
Energypac Engineering New Corporate Presentation
Energypac Engineering New Corporate PresentationEnergypac Engineering New Corporate Presentation
Energypac Engineering New Corporate Presentationsample_m2000
 
QEQESHA CC PROFILE Rev 15
QEQESHA CC PROFILE Rev 15QEQESHA CC PROFILE Rev 15
QEQESHA CC PROFILE Rev 15Hennie Oelofse
 
Introduction Letter - Kalpa Electrikal Pvt. Ltd
Introduction Letter - Kalpa Electrikal Pvt. LtdIntroduction Letter - Kalpa Electrikal Pvt. Ltd
Introduction Letter - Kalpa Electrikal Pvt. LtdPrasanta Adhikary
 
Shashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu
 
Al tehene profile2021
Al tehene profile2021Al tehene profile2021
Al tehene profile2021LIWORTHXTATON
 
ALi Othman CV - Sep 2016
ALi Othman CV - Sep 2016ALi Othman CV - Sep 2016
ALi Othman CV - Sep 2016Ali Othman
 
HARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILEHARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILEHARTEK POWER
 
Company profile -Electrical 12
Company profile -Electrical  12Company profile -Electrical  12
Company profile -Electrical 12shaikh afroj
 
Field service engineer
Field service engineerField service engineer
Field service engineerJafar Khan
 
WEGH Group 2010
WEGH Group 2010WEGH Group 2010
WEGH Group 2010WEGH Group
 

Similar a Transformer manufacturing and Internship Report (20)

PPPL PROFILE
PPPL PROFILEPPPL PROFILE
PPPL PROFILE
 
Company Profile - South Asian Electrical Concern.doc
Company Profile - South Asian Electrical Concern.docCompany Profile - South Asian Electrical Concern.doc
Company Profile - South Asian Electrical Concern.doc
 
Peco distribution-transformer
Peco distribution-transformerPeco distribution-transformer
Peco distribution-transformer
 
Energypac Engineering New Corporate Presentation
Energypac Engineering New Corporate PresentationEnergypac Engineering New Corporate Presentation
Energypac Engineering New Corporate Presentation
 
FT PROFILE NEW1
FT PROFILE NEW1FT PROFILE NEW1
FT PROFILE NEW1
 
PEL Report
PEL ReportPEL Report
PEL Report
 
ElKotby Presentation
ElKotby PresentationElKotby Presentation
ElKotby Presentation
 
Taneko Company Profile
Taneko Company ProfileTaneko Company Profile
Taneko Company Profile
 
QEQESHA CC PROFILE Rev 15
QEQESHA CC PROFILE Rev 15QEQESHA CC PROFILE Rev 15
QEQESHA CC PROFILE Rev 15
 
Introduction Letter - Kalpa Electrikal Pvt. Ltd
Introduction Letter - Kalpa Electrikal Pvt. LtdIntroduction Letter - Kalpa Electrikal Pvt. Ltd
Introduction Letter - Kalpa Electrikal Pvt. Ltd
 
Shashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_India
 
Al tehene profile2021
Al tehene profile2021Al tehene profile2021
Al tehene profile2021
 
ALi Othman CV - Sep 2016
ALi Othman CV - Sep 2016ALi Othman CV - Sep 2016
ALi Othman CV - Sep 2016
 
HARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILEHARTEK POWER - POWER SYSTEM PROFILE
HARTEK POWER - POWER SYSTEM PROFILE
 
DLW training report
DLW  training reportDLW  training report
DLW training report
 
Company profile -Electrical 12
Company profile -Electrical  12Company profile -Electrical  12
Company profile -Electrical 12
 
Field service engineer
Field service engineerField service engineer
Field service engineer
 
Rack tech profile
Rack tech profileRack tech profile
Rack tech profile
 
ElKotbyPresentation
ElKotbyPresentationElKotbyPresentation
ElKotbyPresentation
 
WEGH Group 2010
WEGH Group 2010WEGH Group 2010
WEGH Group 2010
 

Último

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...tanu pandey
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 

Último (20)

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 

Transformer manufacturing and Internship Report

  • 1. Elmetec Private Limited Lahore 14 Internship Report The University of Lahore
  • 2. Elmetec Private Limited Lahore Currently The Best T h e U n i v e r s i t y o f L a h o r e Page 2
  • 3. Elmetec Private Limited Lahore Currently The Best INTERNSHIP REPORT T h e U n i v e r s i t y o f L a h o r e Page 3 Submitted To: GM Elmetec Submitted By Imtiaz Ahmad Bsme01113115 Umair Tariq Bsme01113126 Khawar Saeed Bsme01113139 Muaaz Ali Bsme01113094 Haseeb Zahid Bsme01113037 Hasan Jan Bsme01113031 Irfan Ali Bsme01113098 Muhammad Shoaib Mukhtar Bsme01113026 Internship Department: Elmetec Transformer Department of Mechanical Engineering, The University of Lahore, Lahore
  • 4. Elmetec Private Limited Lahore Currently The Best TABLE OF CONTENTS Dedication……………………………………………………………………………..5 Acknowledgement…………………………………………………………………6 Exclusive Summary…………………………………………………………………7 Introduction……………….………………………………………………………….8 Transformer…………………………………………………………………………..9 Distribution Transformer……………………………………………………….11 Internship Schadule……………………………………………………………….11 Manufacturing Department…………………………………………………..12 QC Department………………………………………………………………….….22 PT & CT………………………………………………………………………………….25 T h e U n i v e r s i t y o f L a h o r e Page 4
  • 5. Elmetec Private Limited Lahore Currently The Best Dedication To all those who have supported, encouraged, challenged, and inspired us. And specially to our Beloved Parents, honorable teachers and friends for all their guidance, love & attention which has made it possible for us to make it up to this point and as well as the Internship Supervisors who bestowed us with the courage, the commitment and the awareness to follow the best possible route, by their unmatchable style and by best possible training. T h e U n i v e r s i t y o f L a h o r e Page 5
  • 6. Elmetec Private Limited Lahore Currently The Best Acknowledgement All the praises are for the almighty, Allah who bestowed us with the ability and potential to complete this Internship. I also pay my gratitude to the Almighty for enabling me to complete this Internship Report within due course of time. Words are very few to express enormous humble obligations to my affectionate Parents for their prayers and strong determination to enabling us to achieve this job. we also appreciate the cordial co-operation from all my Internship Supervisors in the different departments of Elmetec and also of HR management for providing us requisite information and knowledge for compilation of our complete Internship. All the employers of Elmetec helped us a lot in performing all the activities and in gaining the practical knowledge of industry. They gave us best environment and knowledge to enhance our skills. T h e U n i v e r s i t y o f L a h o r e Page 6
  • 7. Elmetec Private Limited Lahore Currently The Best Executive Summary Elmetec Private Limited is the pioneer manufacturer of electrical goods in Pakistan. The company has always been contributing towards the advancement and development of the engineering sector in Pakistan by introducing a range of quality electrical equipments by producing hundreds of engineers, skilled workers and technicians through its apprenticeship schemes and training programmes. We recently have done our internship in Elmetec, in which we got training from its Distribution Transformer unit. The internship basically revolved around the transformer design, manufacturing, I&QC and maintenance. The system, the style of working & the commitment of the employees in Elmetec is really exemplary. The difference between the success & failure is doing things right and doing things nearly right, & Elmetec has always tried for success & that is why it is known to be one of the leading companies in Pakistan. In this report we have given a very brief review of what we have seen and learnt during our internship. we have mentioned all these as we have made an internship as according to the schedule. This report will give its reader knowledge about the Elmetec and power division especially about transformer unit. we have made it possible to write each and every thing that we have learnt here. We have all our practical efforts in the form of this manuscript that’s the asset for our future career. T h e U n i v e r s i t y o f L a h o r e Page 7
  • 8. Elmetec Private Limited Lahore Currently The Best T h e U n i v e r s i t y o f L a h o r e Page 8 Introduction Elmetec (Pvt.) Ltd. was incorporated in 1999 and over the years it has developed into a leading manufacturer of Electrical Distribution Equipment in Pakistan. Elmetec has a professional team of engineering personnels and utilizes the services of highly experienced European Consultants & Engineers. Elmetec is an ISO 9001:2008, ISO 14001:2004, OHSAS 18001:2007 & certified from TUV NORD, Germany. It is a Pre-qualified/Registered Manufacturer of Water and Power Development Authority of Pakistan (WAPDA) and Distribution and Electric Supply Companies, for Distribution Transformers, Low Voltage/Medium Voltage Current Transformers, Potential Transformers & Switchgear. It is also an approved supplier of Karachi Electric Supply Company (KESC) and Govt. of Azad Jammu & Kashmir (AJK). It is registered with Pakistan Engineering Council (PEC) as well. Elmetec is a very progressive Indenting and Trading company of Pakistan. It represents foreign principals/manufacturers from different countries for supply of their products in Pakistan. It is a regular Supplier of Grid Station Equipment upto 500KV including Power Transformers, Circuit Breakers, Current Transformers (CTs), Potential Transformers (PTs), Disconnectors/Isolators and Capacitor Banks. Elmetec is also supplying equipment to Pakistan Railways. It represents suppliers of Locomotives, Wagons and Air Brake Systems. Elmetec in collaboration with leading Russian Companies in the Petroleum sector, offers various solutions for the Petroleum Industry for both upstream and downstream Companies. We provide state of the art material such as Oil drilling Rigs, Equipment including pumps, valves, pipeline, refurbished drilling bits with guarantee, down hole equipment etc. We also provide, through our Russian partners, all Oilfield related services and processing solutions for Refinery upgradation to meet Euro IV standards. We also provide solutions and equipment for fast track development of Marginal wells and Fields. Our Petroleum division can also provide training courses both in Pakistan and in Russia for all Upstream and downstream related activities.The division is manned by experts with over 40 years of Local and International experience in the Petroleum sector.
  • 9. Elmetec Private Limited Lahore Currently The Best T h e U n i v e r s i t y o f L a h o r e Page 9 Transformer A transformer makes use of Faraday's law and the ferromagnetic properties of an iron core to efficiently raise or lower AC voltages. It of course cannot increase power so that if the voltage is raised, the current is proportionally lowered and vice versa.
  • 10. Elmetec Private Limited Lahore Currently The Best Complete Transformer Active Part of Transformer Elmetec (Electrical & Mechanical Technologies) Pvt. Ltd. manufactures 11 KV Distribution Transformers from 10 KVA to 630 KVA as per WAPDA specifications and all other capacities up to 5000 KVA. In addition to that, it also manufactures medium and low voltage switchgear incorporating Vacuum Circuit Breakers, Oil Circuit Breakers and Load Break Switches, Control & Relay Panels, Bus Tie Duct, Distribution Boards, Power Factor Improvement Plant (PFI), Draw Out Motor Control Centers, Overhead Bus Bars are the other products. Elmetec also manufactures Low & Medium Voltage Instrument Transformers. T h e U n i v e r s i t y o f L a h o r e Page 10
  • 11. Elmetec Private Limited Lahore Currently The Best Elmetec transformers are available for various applications:  Distribution Transformers (Pole /Pad Mounted) T h e U n i v e r s i t y o f L a h o r e Page 11  Pole Mounted Substation Rated Output (KVA): 10,15,25,50,100,200  Indoor Substation Rated Output (KVA):250,400,500,630,750 ,1000,1250,1500 2000,2500 upto 5000KVA.  Pad Mounted Distribution Transformer Rated Output (KVA): Up to 630KVA  Auto Transformers Start of Internship at Elmetec On my first day at Elmetec, we were first briefed by the Mr. Mudassir. We were informed that we will be following a specific plan during our internship. All the internees were divided into 2 groups. There were around 10 internees in total. Our group was given the following schedule: 6 to 9 August Core stacking. 11 to 13 August Core coil assembly . 14 to 16 August H.V and L.V connections. 18 to 20 August L.V and H.V windings shop.
  • 12. Elmetec Private Limited Lahore Currently The Best T h e U n i v e r s i t y o f L a h o r e Page 12 21 to 23 August P.T and C.T manufacturing Shop. 25 to 27 August Tank manufacturing shop. 28 to 29 August Paint shop. 1 to 3 September Assembly section. 4 to 5 september Testing. 8 to 10 September Quality Control. Manufacturing Department It is the responsibility of the manufacturing department to manufacture different components of transformer and then assemble them to make a transformer. Production department has following sections:  Winding Section  Core Section  Tank Section  Assembly Section How manufacturing department starts manufacturing? First, customer gives order to the marketing and sales department. Marketing and sales department makes annual sales plan for WAPDA. Marketing and sales department sends this order to Production planning and control
  • 13. Elmetec Private Limited Lahore Currently The Best department which makes a master production plan (Month wise). This plan is sent to Material planning section which makes Material requirement plan or Bill of material according to the master production plan. This plan is sent to the purchase department which buys material according to this plan. Material is received in store where quality inspectors from I&QC department check its quality than this material is sent to manufacturing department where manufacturing of transformer starts. T h e U n i v e r s i t y o f L a h o r e Page 13 1. Winding Section In the winding section L.V and H.V windings of the coil are made.  Raw Mater ial For L.V winding  Paper insulated flat copper wire (For 10KVA to 50KVA)  Copper foil (For 100KVA and above) For H.V winding  Enamel copper wire (For 10KVA to 200KVA)  Paper insulated flat copper wire (400KVA and above)  Type of Insulation Mater ial  Diamond dotted paper (For insulation between layers of windings)  Press pan sheet (For end collars)  Creep paper pipe (For insulation of terminal of tap changer)  Craft paper (Used for insulation in disc winding)  Thermo ducts  Types of Windings
  • 14. Elmetec Private Limited Lahore Currently The Best T h e U n i v e r s i t y o f L a h o r e Page 14  Disc winding  Packet winding  Layer winding  Foil winding File and layer winding are used in LV.File, packet and disc winding is used in HV.Disc and packet winding are easy to repair.  Machines Used  Slitting machine is used for the cutting of bundles of insulation material.  H.V P.I copper winders are used for the winding of P.I copper wire for transformers of the rating 400KVA and above.  H.V enamel copper winders are used for the winding of enamel copper wire for the transformer of the rating 10KVA to 400KVA.  Standard Ratings of WAPDA Standard ratings of WAPDA are 10KVA, 15KVA, 25KVA, 50KVA, 100KVA, 200KVA, 400KVA, 630KVA HV winding is done over LV winding, both are insulated from each other. Connections are made from start and end in LV and HV winding. But in HV we give taping connection at different places according to design. On HV winding we used DDP paper to insulate it from tank. Oil is also used for this purpose. Winding turns are according to design. At the end of this section testing of winding is done using transformer turns ratio (TTR) meter which gives no. of turns. we check it according to design. 2. Core Section In the core section upper, side and yoke limbs of the core are made.
  • 15. Elmetec Private Limited Lahore Currently The Best T h e U n i v e r s i t y o f L a h o r e Page 15  Raw Material Raw material used for the making of core is M4 grade silicone steel sheet which is an alloy of iron and silicon. Silicon is used to increase the permeability of iron.  Machines  Slitting machine is used to cut the big roll of silicon steel sheet in required sizes (widths) according to the rating of transformer.  Power press machines are used to make limbs. They are operated manually.  After cutting of limbs V punching is done on the yoke limb which is called yoke notching.  PLC cutting machines are also used to make limbs. There are two PLC machines. SDRI machine has a capacity of 40,000 limbs per day. L.A.E machine has a capacity of 60,000 limbs per day. In CNC machines length, width and angle are given as input.  L.A.E measuring table is used to check errors in angle, width and length.
  • 16. Elmetec Private Limited Lahore Currently The Best T h e U n i v e r s i t y o f L a h o r e Page 16  Iron Losses Iron losses are the flux losses in core. Major factors in iron losses are;  Quality of material.  Bur.  Air gap. To reduce iron losses  Material should be of good quality.  Limbs should be bur free.  Limbs should be rust free.  Weight of core should be according to Tr. Design After cutting of the limbs, they are stacked in a way that there is no air gap between the limbs. All the limbs are joined except the upper yoke limb which is filled in the assembly section. Outer side of the core is varnished to avoid rusting. Core is tightened using upper and lower pressing beams. Then its goes to assembly section.
  • 17. Elmetec Private Limited Lahore Currently The Best T h e U n i v e r s i t y o f L a h o r e Page 17
  • 18. Elmetec Private Limited Lahore Currently The Best Silicon sheet Slitting of bundles Cutting Side limb Center limb Yoke limb Core stacking Testing Checking of core Stock Process Flow Chart of Core Section T h e U n i v e r s i t y o f L a h o r e Page 18
  • 19. Elmetec Private Limited Lahore Currently The Best T h e U n i v e r s i t y o f L a h o r e Page 19 3. Assembly Section In the assembly section there are many processes in which all the components of the transformer are put together to form a transformer. Important processes in the assembly section are;  Core Coil Assembly In the core coil assembly coil is fitted in the core and upper yoke limb is inserted to complete the core, then core is tightened using upper and lower pressing beams. For coil to coil insulation and core to coil insulation press pan sheet is used. For insulation between bottoms pressing beam and coil wooden base is used.  Before Connection Test (BCT) In the BCT area turns ratio of the coil is checked using TTR meter.  H.T, L.T Connections In this section Y-Delta connections are made. Tap changer is connected with the coil. Connections are made according to work order specifications given by the design department. Taping is done on these connections to avoid any short circuit.
  • 20. Elmetec Private Limited Lahore Currently The Best T h e U n i v e r s i t y o f L a h o r e Page 20  After Connection Test (ACT) In the ACT area turns ratio of the transformer is checked using TTR meter.  Furnace After ACT transformer is kept in the furnace for 48 to 72 hours according to its rating. It is done to evaporate all the moisture from core or coil. Temperature of the furnace is 120o to 130o.  Cover Plate Assembly In this section H.T, L.T bushings, through bolts, eye bolts connectors, arcing horns and other parts are inserted in cover plate.  Pre Tanking Section When transformer is unloaded from the furnace it is inserted in the tank as quickly as possible to avoid the getting of moisture in the live part. Live part of the transformer should be inserted in the tank in 50mins to 1 ½ hours.  Oil Filling Section
  • 21. Elmetec Private Limited Lahore Currently The Best In oil filling section oil is filled in the tank under vacuum. Amount of oil to be filled can be found from bill of quantity (BOQ). For 10kv to 200kv oil filling chambers are used and for transformers above 200kv oil is filled manually. Supply of coils Supply of core and Assembly of cover plate T h e U n i v e r s i t y o f L a h o r e Page 21  Settling Area After oil filling every transformer is kept for 12 hours in the settling area to check for oil leakage and oil level. Core coil assembly upper yoke limbs Before Connections connections test Oil filling After connections test Furnace Unloading
  • 22. Elmetec Private Limited Lahore Currently The Best Process Flow Chart of Assembly Section T h e U n i v e r s i t y o f L a h o r e Page 22 4. Tank Section In the tanking section cover plate, tank, and other mechanical components of the transformer are made. Tank has following parts;  Frame  Cover plate  Bottom  Side plate  Fin Walls
  • 23. Elmetec Private Limited Lahore Currently The Best T h e U n i v e r s i t y o f L a h o r e Page 23  Conservator  Raw Material Raw material for tank and other components are  MS sheet (Mild steel sheet)  MSCR sheet (Mild steel cold rolled sheet)  Component Welding In this area lifting lugs, carrying beams and studs are welded using arc welding.  Frame Punching and Welding Machine Frame is punched and then welded in this machine.MIG welding is used in this machine.  Fin Welding After fin folding they are welded. MIG welding is used in this machine.  Bottom Side Plate Welding In this section bottom and side plates are welded together.  Tank Assembly Here all the parts of the tank are joint together.  Tank Welding Tank is welded to stop leakage.
  • 24. Elmetec Private Limited Lahore Currently The Best T h e U n i v e r s i t y o f L a h o r e Page 24 Inspection and quality Control Inspection and quality control department ensures; material purchased by the purchase department is according to the criteria suggested by IEC in their recommendations(Incoming), during the manufacturing of transformers all the components of transformer are according to transformer design(in processing),do all the quality tests so that transformer does not fail in real conditions(Testing). Inspection and quality control department is further divided into three sections  Incoming  In processing  Testing 1. Incoming Section: Incoming section is responsible for the checking of all the material which is purchased to ensure that all the material is according to international standards. When the material is purchased it first comes in the receiving where it is inward gate pass (IGP) number. Incoming section checks through the system if material has arrived, then quality inspectors from the incoming go to the store and check the material if material is according to standards set by IEC than material is approved otherwise it is rejected and supplier compliant application form(SCAF) is sent to supplier.  Tests on Di fferent Mater ials to Check there Qual i ty  Bird Protection Test This test is used to check the thickness of paint so that cover plate will not short. In this test 8kv voltage is applied to the cover plate for 1 minute if cover plate does not stand it for I minute than it is rejected.  Micron Meter Micron meter is also used to check the thickness of paint on cover plate. The reading should be greater than .25mm according to IEC recommendations.  Mandrill Test This test is used to check the quality of enamel on enamel copper wire. For mandrill test all sizes of enamel copper wire will be wound over its own diameter for at least 8 to 10 turns and will be checked for zero cracks.  Heat Shock Test
  • 25. Elmetec Private Limited Lahore Currently The Best This test is used to check the quality of enamel on enamel copper wire. The sample prepared for the mandrill test is placed in electric oven at temperature 155 Co to 166 Co for ½ hour and again mandrill test will be performed for test compliance. T h e U n i v e r s i t y o f L a h o r e Page 25  Break Down Test The specimen of wire approximately 600mm is doubled and twisted for a distance of 125mm.The tension of wire pair while being twisted and a number of twists will be as per specification (IEC-60317 and BS-4516).Enamel is removed from the wire at one pair of ends and test voltage is applied between the conductors through high port test set as per specification (IEC-60317). Note the reading where break down has occurred.  Peel Off Test This test is applicable to sizes over 1.0mm. A sample of the wire of about 500mm length is placed in tester consisting of two fixing devices 500mm apart on the same axis. One of these is able to rotate. Specific weight is attached on the fix side of device as mentioned in specification by IEC-60317. By means of a scraper on opposite sides of wire. The rotating device is driven at 60 to 100 revolutions per minute. The number of revolutions of fixing device is calculated from R=175/d. After applying specified number of revolutions chipping off of the enamel is checked. Zero chipping off is required to qualify for enamel copper wire.  Iron Loss Test Iron losses of the silicon sheet (alloy of iron and silicon) are found using direct reading iron loss tester. First diameter of the sheet is measured using micrometer screw gauge. Diameter is fed in the iron loss tester. Tester is energized for ½ hour and then iron losses are found. If 1.5 Tesla are applied in tester than losses should not exceed .89 Tesla. 2. In Processing Section In processing section ensures that during the manufacturing of transformers all the components of transformers are according to design specifications. It is also responsible for the testing of oil to check its quality.  Oi l Tests to Check i ts Qual i ty There are seven tests done in oil testing lab to check the quality of oil. If the oil fails in one of these tests than it is rejected not used in transformers. Seven tests are
  • 26. Elmetec Private Limited Lahore Currently The Best T h e U n i v e r s i t y o f L a h o r e Page 26 I. Visual Inspection II. Specific Gravity III. Viscosity IV. Flash Point V. Dielectric Strength VI. Acidity Value VII. Pour Point 3. Testing It is the responsibility of the testing section that the transformer does not fail in real conditions. To check that it will not fail in real environment a number of tests are done on the transformer before it is ready to dispatch. There are three types of tests which are done on a transformer. i. Routine Tests ii. Type Tests Routine Tests Tests which are performed on each and every transformer are called routine tests. Every transformer must pass these tests before dispatch. Test included in routine tests are I. Transformer Turns Ratio Test (TTR Test) II. Winding Resistance Test III. Insulation Resistance Test (Meager Test) IV. Induced Voltage Test V. High Voltage Test (Separate source voltage) VI. No Load Losses (Open circuit test) VII. On Load Losses (Short circuit test) VIII. Dielectric Tests Type Tests Tests which are done on samples taken from a whole lot are called type tests. Tests included in type tests are
  • 27. Elmetec Private Limited Lahore Currently The Best T h e U n i v e r s i t y o f L a h o r e Page 27 Impulse Voltage With-Stand Test Temprature Rise Test Short Circuit Test INSTRUMENT TRANSFORMERS Voltage Transformers (MV) Introduction Voltage Transformers consist of primary and secondary windings which are electrically isolated but coupled magnetically by a core. Their role in electrical systems is of primary importance as they bstep downbthe voltage of a system to measurable values, such as 110 V or 100 V, thus enabling Standardization of equipment.
  • 28. Elmetec Private Limited Lahore Currently The Best T h e U n i v e r s i t y o f L a h o r e Page 28 ERRORS OF TRANSFORMATION Errors are introduced in the operations of the Voltage Transformer because some voltage drops in the primary and secondary winding due to leakage reactance, winding resistance and magnetization of the core. This creates a (voltage) ratio error and phase error. Elmetec design Voltage Transformer with minimum voltage drop, which is due to the resistance of the winding and other losses of the transformer, by using best quality copper wire and electrical steel M-4. The Voltage Transformers are encapsulated with high quality resin under vacuum, which ensures the insulation of LV from HV, but also keeps the partial discharge at a low level as required by the international Standards. VOLTAGE TRANSFORMERS MEASURING A voltage Transformer with typical accuracy class: 0.1, 0.2, 0.5, 1.0 and 3.0 used mainly for measuring through meters and similar apparatus. PROTECTIONS A Voltage Transformer with typical accuracy class 3P, 6P are used mainly for protection Relays. Basic Features Reliable operation under ambient temperature of -20 C to + 55 C. - Capable of withstanding short time thermal and dynamic stresses. - Capable of withstanding impulse voltage up to 110 kV.
  • 29. Elmetec Private Limited Lahore Currently The Best - Voltage transformer has been designed so that it can be installed in any MV panel. T h e U n i v e r s i t y o f L a h o r e Page 29 - LV terminal can be sealed. - A comprehensive range of ratio, burden and accuracy class is available as required in various International & Local Standards. - A strict quality control is enforced at various stages of production to ensure compliance of the VTs. with assigned ratings. - All material and components used in the manufacture of VTs. are subject to strict receiving inspection. - Guarantee of the performance of Medium Voltage VTs. according to rating plate data. Construction Elmetec produce custom-made VTs according to WAPDA, IEC, BSS, ANSI or any other Local/International Standard specifications. These Voltage Transformers are single pole, double pole and three poles. Current Transformers Introduction A Current Transformer is the principal measuring device for protection and metering schemes in any power system. The primary current of the CT is transformed into the required secondary current, usually 5A or 1A. Not only is the accuracy of the transformation of prime importance, but also the isolating function. This means no matter what the system voltage on the primary circuit, the secondary circuit need to be insulated only for a low voltage.
  • 30. Elmetec Private Limited Lahore Currently The Best T h e U n i v e r s i t y o f L a h o r e Page 30 PRINCIPAL OF OPERATION The Current Transformer works on the principle of available flux. In the bidealbCurrent Transformer, secondary current would be exactly equal (when multiplied by the turns ratio) and opposite to the primary current. But some of the primary current or the primary ampere-turns is utilized for magnetizing the core, thus leaving less than the actual primary ampere turns to be btransformedbinto the secondary ampere-turns. This introduces an error in the ratio of the Current Transformer, which is classified as current (ratio) error and phase error. This error is measured at rated burden, specified power factors and rated frequency. Elmetec designs take care of various factors to keep the errors with in the specified limits. Basic Features - Reliable operation under ambient temperature of -20 C to + 55 C. - Capable of withstanding short time thermal and dynamic stresses. - Capable of withstanding impulse voltage up to 110 kV.
  • 31. Elmetec Private Limited Lahore Currently The Best - Current transformer has been designed so that it can be installed in any MV panel. T h e U n i v e r s i t y o f L a h o r e Page 31 - LV terminal can be sealed. - A comprehensive range of ratio, burden and accuracy class is available as required in various international & Local Standards. - A strict quality control is enforced at various stages of production to ensure compliance of the CTs with assigned Ratings. - All material and components used in the manufacturing of CTs are subject to strict receiving inspection. - Guarantee of the performance of medium voltage CTs are according to rating plate data. Construction Elmetec produces custom made CTs according to WAPDA, IEC, BSS, ANSI or any other Local/International Standard specifications. Current Trannsformer (LV) Introduction Elmetec produces a comprehensive range of Low Voltage Current Transformers according to International/Local Standards. A variety of designs are available to suit individual requirements. Ring Type (bus bar mounted) CTs with different sizes of windows are available that provides easy mounting for any position in LV Switchgear. Construction All current transformers are constructed from high-grade material and are individually tested for compliance with the specifications. A team of qualified and experienced staff is assigned for the design and testing of current transformers. Strict quality control is exercised to provide a reliable product.
  • 32. Elmetec Private Limited Lahore Currently The Best T h e U n i v e r s i t y o f L a h o r e Page 32 Application Elmetec Low Voltage Current Transformers are indoor type and used for the operation of Ammeter. Protection Relays, Kilo Watt-Hour Meters, Earth Fault Relays and other purposes. Basic Features - Reliable operation under ambient temperature of - 20 C to +55 C - Capable of withstanding short time thermal and dynamic stresses. - LV terminal can be sealed. - Can either be mounted direct on the bus-bars or any other locations with the help of mounting feet supplied loose. - A comprehensive range of ratio, burden, and accuracy class is available as required in various International & local standards. - A strict quality control is enforced at various stages of production to ensure compliance of the CTs with rating assigned. - All material and component used in the manufacturing of CTs are subject to strict receiving inspection. - Accuracy tests have been performed at Research & Test Laboratory, Rawat. - Test certificates are provided on request.