PRELIMINARY COST APPRAISAL NO. ___
GFA (m2) CFA (m2)
Office 61,653 67,819
Other Commercial Uses - Retail 15,413 16,955
Basement Car Parks (Office) 2,817
Basement Car Parks(Retail/F&B) 704
Additional 70 Car Parking Lots for Public Use 875
Plot A2 F&B Kiosk 100
Total 77,067 89,269
Items Unit Qty Rate RM$ RM$
1 Plot A1 - Office
a) Grade A Office (Min. 80%of Max. GFA) CFA (m2) (67,819) (4,200) (284,840,000)
b) Basement Car Parks (225 lots @ 12.5 m2 per lot) CFA (m2) (2,817) (1,500) (4,230,000)
c) Associated External Works (allowance 2% of 1a) Item (5,696,800)
Sub-total (For Plot A1 - Office) GFA (ft2) (663,635) (444) (294,766,800)
2 Plot A1 - Other Commercial Use
a) Retails CFA (m2) (16,955) (2,955) (50,100,000)
TCOT Clause 4.16.3& 4.16.4
b) Basement Car Parks (56 lots @ 12.5 m2 per lot) CFA (m2) (704) (1,500) (1,060,000)
c) Associated External Works (allowance 2% of 2a) Item (1,002,000)
Sub-total (For Plot A1 - RETAILS) GFA (ft2) (165,909) (314) (52,162,000)
3 Plot A2 (At-Grade Open Space)
a) F&B Kiosk (Single-Storey Structure) (GFA=100m2) CFA (m2) (100) (3,600) (360,000)
b) Softscape with Lush Landscaping (Min. 40% of Site Area) m2 (1,512) (650) (980,000)
c) Amenities (i.e. Playground, Night Lighting, Park Furniture) (Allowance) item (60,352) TCOT Clause 4.20
Sub-total (For Plot A2 At-Grade Open Space) GFA(ft2) (16,275) (86) (1,400,352)
4 Cost Associated to Land Parcel (Allowance)
a) Greenery Replacement and Landscaping (Assume Sky Terraces/Roof Gardens, etc. (Single
Storey Volume))
m2 (3,233) (1,000) (3,230,000) TCOT Clause 4.7
b) Underground Pedestrian Network m 97 208,333 (20,208,301)
c) At-Grade Pedestrian Network m (191) (2,500) (477,500)
d) Above-Grade Pedestrian Network (2nd Storey)
i) Min. 4.0m wide pedestrian walkway at 2nd storey within the development on Plot A1
fronting Cecil Street and linking to the adjacent Bangkok Bank Building (Approx. 53m
length)
m (53) (75,000) (3,980,000) TCOT Clause 4.23.1
e) Additional 70 Car Parking Spaces for Public Use (70 lots @ 12.5 m2 per lot) CFA (m2) (875) (1,500) (1,310,000) TCOT Clause 4.27.2
f) Night Lighting Item (500,000) TCOT Clause 4.28
g) Road Improvement Works
h) Demolition Works
i) Demolish former Telok Ayer Performing Arts Centre (182 Cecil Street) and all the annex
buildings within Plot A1 and A2
Item (300,000) TCOT Clause 4.31.1(a)
ii) Demolish existing surface car park and kerbside car and motorcycle parking lots along
Telok Ayer Street
Item (50,000) TCOT Clause 4.31.1(b)
i) Min. 7.0m wide Covered Linkway to Connect the Proposed Development to the Existing Bus
Shelter Along Cecil Street (Approx. 18m length)
m2 (126) (325) (40,950) TCOT Clause 4.32.2
5 Others (Allowance)
a) Utilities Detection Works Item (30,000)
b) Site Survey/Investigation Item (20,000)
c) Geotechnical Investigation Works Item (50,000)
d) Hoarding and Signboard Item (90,000)
e) Cadastral Survey (Plot A1, A2 & A3) (Allowance) Item (20,000)
f) Utilities Connection Charges Item (100,000)
g) Services Diversion - As per Tender Documents excluding GST)
- Electricity (Clause 4.2.1) Item (100,000)
h) Traffic Impact Assessment Item (30,000)
i) Protection of Existing Roadside Trees Item (150,000)
Sub-total (For Cost Associated to Land Parcel (Item 4 & 5)) GFA (ft2) (831,594) (37) (30,686,751)
6 Green Mark Requirements
a) Green Mark / Green RE Platinum (Allowance of 8% of Item 1 to 2 above) Item (27,754,304)
Sub-total (For Green Mark Platinum Requirements) GFA (ft2) (831,594) (33) (27,754,304)
Total for Item 1 to 6 (Excluding Contingencies & Cost Escalations) (406,770,207)
Cost per sq m of GFA (77,257 m2)
GFA (m2) (77,257) (5,265)
Cost per sq ft of GFA (831,594 ft2)
GFA (ft2) (831,594) (489)
7 Contingencies (Allowance at 5% of Item 1 to 7 above) Item 5% (20,340,000)
Total for Item 1 to 7 (Including Contingencies but Excluding Cost Escalations) (427,110,207)
Cost per sq m of GFA (77,257m2)
GFA (m2) (77,257) (5,528)
Cost per sq ft of GFA (831,594ft2)
GFA (ft2) (831,594) (514)
8 Cost Escalation (Assuming tender to be called in one year's time) Item 5% (21,360,000)
Total for Item 1 to 8 (Including Contingencies & Cost Escalation) (448,470,207)
Cost per sq m of GFA (77,257m2)
GFA (m2) (77,257) (5,805)
Cost per sq ft of GFA (831,594ft2)
GFA (ft2) (831,594) (539)
Things to note: (INTERNAL REFERENCE ONLY DO NOT SEND TO CLIENT)
1) Allowable development:
Commercial Use: Plot A1 and Plot A2 (below-grade area only)
At least 80% of the GFA (i.e. 61,730 m2) is to be for office use. The remaining GFA of 15,432 sqm can be for additional office use or other permitted uses, such as retail,
Food and Beverage (F&B) uses, of such types and quantum.
Residential use is not permitted in the development.
The successful tenderer shall not strata-subdivide the development.
Open Space Use: Plot A2 (at-grade area only)
Plot A2 is designated as an open space. Additional maximum permissible GFA of 100 sqm is allowed for a F&B kiosk within the at-grade open space. This maximum
permissible GFA of 100 sqm is not transferrable to other parts of the developments
Plot A3 (subterranean space below Telok Ayer Street)
Plot A3 is to be developed for part of an underground pedestrian walkway to Tanjong Pagar MRT Station only. No commercial GFA is allowed.
2) Borehole terminates at 18.05m to 18.15m
3) Max. building height:
High-rise zone (within Plot A1)
Max. 50 Storeys; Technical height control of 250.0m AMSL
Low-rise zone (within Plot A1)
a) Fronting Telok Ayer Street and adjacent to 21 McCallum Street (The Clift) and 180 Cecil Street (Bangkok Bank Building): Min. 19.0m (approx. 123.5m RL) and Max. 32.5
m (approx. 137.0m RL)
b) Fronting onto the Telok Ayer Chinese Methodist Church (TACMC) and the open space shall be set back at least 15.0m as indicated on the Control Plans. Within this
setback area, any structures if provided, shall have a height of about 10.5m (approx. 115.0m RL) to match the height of the lower window sill at the third storey of the
eastern facade of TACMC
Open Space (Plot A2)
If F&B kiosk is provided within the open space, subject to Max. 1 storey
4) Activity-generating uses such as retail, F&B, entertainment, sports and recreational uses (such as fitness centre, gymnasium, etc) and other similar uses shall be
provided at the following locations (Clause 4.4):
a) The 1st storey level of the development fronting Cecil Street, Telok Ayer Street and the building setback area
b) Underground pedestrian walkway within part of Plots A1 & A2 (along at least one side)
c) Encouraged to be provided at the 2nd storey pedestrian link, along at least one side
5) Outdoor Refreshment Areas (ORAs) are allowed within the Land Parcel (Plot A1). The GFA for ORAs will be computed as part of the Max. GFA (Clause 4.5)
6) Landscape Replacement Areas equivalent in area to the Site Area of the Land Parcel shall be incorporated (Clause 4.7). At least 40% is to be used for softscape (permanent
planting and the remaining areas can be used for hardscape)
7) No foundations/basement levels are allowed to be constructed within 3.0m from the common boundary with the TACMC (Clause 4.10a)
8) Min. Green Mark Platinum (Clause 5.4)
9) Required to provide additional 70 car parking lots (Clause 4.27.2)
10) Car parking spaces to be located within the basement levels of the development (Clause 4.27.3)

Más contenido relacionado

La actualidad más candente

Alamo Heights Council Meeting 05.28.19 Item #5 PPT Austin Hwy Design Review
Alamo Heights Council Meeting 05.28.19 Item #5  PPT Austin Hwy Design ReviewAlamo Heights Council Meeting 05.28.19 Item #5  PPT Austin Hwy Design Review
Alamo Heights Council Meeting 05.28.19 Item #5 PPT Austin Hwy Design Reviewahcitycouncil
 
Primavera Project Manager And Construction Projects
Primavera Project Manager And Construction ProjectsPrimavera Project Manager And Construction Projects
Primavera Project Manager And Construction Projectsbeverly0bennett8
 
ECA Presentation
ECA PresentationECA Presentation
ECA PresentationLee Pei Gie
 
Sherwin williams-land-use-programming
Sherwin williams-land-use-programmingSherwin williams-land-use-programming
Sherwin williams-land-use-programmingE'ville Eye
 
Lennar sherwin-williams-park-design
Lennar sherwin-williams-park-designLennar sherwin-williams-park-design
Lennar sherwin-williams-park-designE'ville Eye
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentationguest2d44ee
 
Compass Compression Cold Weather Modularization
Compass Compression Cold Weather ModularizationCompass Compression Cold Weather Modularization
Compass Compression Cold Weather Modularizationm_johnson_compass
 
Blake Lapthorn's Rural Breakfast Slides 2014
Blake Lapthorn's Rural Breakfast Slides 2014Blake Lapthorn's Rural Breakfast Slides 2014
Blake Lapthorn's Rural Breakfast Slides 2014Blake Morgan
 
Lmc lpas-sherwin-williams-fdp
Lmc lpas-sherwin-williams-fdpLmc lpas-sherwin-williams-fdp
Lmc lpas-sherwin-williams-fdpE'ville Eye
 
Deep Retrofit: Adding value to deep retrofit
Deep Retrofit: Adding value to deep retrofit Deep Retrofit: Adding value to deep retrofit
Deep Retrofit: Adding value to deep retrofit SustainableEnergyAut
 

La actualidad más candente (15)

Alamo Heights Council Meeting 05.28.19 Item #5 PPT Austin Hwy Design Review
Alamo Heights Council Meeting 05.28.19 Item #5  PPT Austin Hwy Design ReviewAlamo Heights Council Meeting 05.28.19 Item #5  PPT Austin Hwy Design Review
Alamo Heights Council Meeting 05.28.19 Item #5 PPT Austin Hwy Design Review
 
Primavera Project Manager And Construction Projects
Primavera Project Manager And Construction ProjectsPrimavera Project Manager And Construction Projects
Primavera Project Manager And Construction Projects
 
AH CCM 5.11.20
AH CCM 5.11.20AH CCM 5.11.20
AH CCM 5.11.20
 
curriculum vitae
curriculum vitaecurriculum vitae
curriculum vitae
 
ECA Presentation
ECA PresentationECA Presentation
ECA Presentation
 
Projects list
Projects listProjects list
Projects list
 
Sherwin williams-land-use-programming
Sherwin williams-land-use-programmingSherwin williams-land-use-programming
Sherwin williams-land-use-programming
 
Lennar sherwin-williams-park-design
Lennar sherwin-williams-park-designLennar sherwin-williams-park-design
Lennar sherwin-williams-park-design
 
RS MOBILE STAGE presentation
RS MOBILE STAGE presentationRS MOBILE STAGE presentation
RS MOBILE STAGE presentation
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentation
 
Compass Compression Cold Weather Modularization
Compass Compression Cold Weather ModularizationCompass Compression Cold Weather Modularization
Compass Compression Cold Weather Modularization
 
Blake Lapthorn's Rural Breakfast Slides 2014
Blake Lapthorn's Rural Breakfast Slides 2014Blake Lapthorn's Rural Breakfast Slides 2014
Blake Lapthorn's Rural Breakfast Slides 2014
 
f7
f7f7
f7
 
Lmc lpas-sherwin-williams-fdp
Lmc lpas-sherwin-williams-fdpLmc lpas-sherwin-williams-fdp
Lmc lpas-sherwin-williams-fdp
 
Deep Retrofit: Adding value to deep retrofit
Deep Retrofit: Adding value to deep retrofit Deep Retrofit: Adding value to deep retrofit
Deep Retrofit: Adding value to deep retrofit
 

Similar a BE Cost Plan

Be presentation rev
Be presentation revBe presentation rev
Be presentation revYong Sy
 
Far , setback , fire system , sprinkle , handicap
Far , setback , fire system , sprinkle , handicapFar , setback , fire system , sprinkle , handicap
Far , setback , fire system , sprinkle , handicapisrafitulislam
 
Highlights of revised draft dcr 2034
Highlights of revised draft dcr 2034Highlights of revised draft dcr 2034
Highlights of revised draft dcr 2034MahendraNatuskar1
 
Maharashtra State_Building bye laws (Gist)
Maharashtra State_Building bye laws (Gist)Maharashtra State_Building bye laws (Gist)
Maharashtra State_Building bye laws (Gist)Khyati Tewari
 
CREATING-BUILDING-PLANS-AS-PER-NBCP-RULE-7-8.pptx
CREATING-BUILDING-PLANS-AS-PER-NBCP-RULE-7-8.pptxCREATING-BUILDING-PLANS-AS-PER-NBCP-RULE-7-8.pptx
CREATING-BUILDING-PLANS-AS-PER-NBCP-RULE-7-8.pptxadamrosstoledobrione1
 
20181205 gci price list 1
20181205 gci price list 120181205 gci price list 1
20181205 gci price list 1YauHoHung
 
1260700786 rule viii light&ventlatn(anotatd)
1260700786 rule viii light&ventlatn(anotatd)1260700786 rule viii light&ventlatn(anotatd)
1260700786 rule viii light&ventlatn(anotatd)JAMES MICHAEL BACUNA
 
MCHI DRAFT DCR 2034 24.08.2016 by Manoj Daisaria (1).pdf
MCHI DRAFT DCR 2034 24.08.2016 by Manoj Daisaria (1).pdfMCHI DRAFT DCR 2034 24.08.2016 by Manoj Daisaria (1).pdf
MCHI DRAFT DCR 2034 24.08.2016 by Manoj Daisaria (1).pdfshaheryarkhance
 
Amrapali Spring Meadows,NOIDA ext. 1/2/3 Bhk @ 9910296802
Amrapali Spring Meadows,NOIDA ext. 1/2/3 Bhk @ 9910296802Amrapali Spring Meadows,NOIDA ext. 1/2/3 Bhk @ 9910296802
Amrapali Spring Meadows,NOIDA ext. 1/2/3 Bhk @ 9910296802Saurav Aggarwal
 
Feasibility Report Format
Feasibility Report FormatFeasibility Report Format
Feasibility Report FormatRohit Digra
 
Designing of sprinkler irrigation system
Designing of sprinkler irrigation systemDesigning of sprinkler irrigation system
Designing of sprinkler irrigation systemEngr Mehmood
 
Brouches of Jaypee Green
Brouches of Jaypee GreenBrouches of Jaypee Green
Brouches of Jaypee GreenRakesh Agarwal
 
Feasibility of ECS accommodation in Residential Plots
Feasibility of ECS accommodation in Residential PlotsFeasibility of ECS accommodation in Residential Plots
Feasibility of ECS accommodation in Residential PlotsIram Aziz
 
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHAIT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHAalwayslogo
 

Similar a BE Cost Plan (20)

BE COST APPRAISAL
BE COST APPRAISALBE COST APPRAISAL
BE COST APPRAISAL
 
Be presentation rev
Be presentation revBe presentation rev
Be presentation rev
 
Far , setback , fire system , sprinkle , handicap
Far , setback , fire system , sprinkle , handicapFar , setback , fire system , sprinkle , handicap
Far , setback , fire system , sprinkle , handicap
 
FINAL VOLUME 2 20.12
FINAL VOLUME 2 20.12FINAL VOLUME 2 20.12
FINAL VOLUME 2 20.12
 
Highlights of revised draft dcr 2034
Highlights of revised draft dcr 2034Highlights of revised draft dcr 2034
Highlights of revised draft dcr 2034
 
TechTown 1st Floor Renovation
TechTown 1st Floor RenovationTechTown 1st Floor Renovation
TechTown 1st Floor Renovation
 
Maharashtra State_Building bye laws (Gist)
Maharashtra State_Building bye laws (Gist)Maharashtra State_Building bye laws (Gist)
Maharashtra State_Building bye laws (Gist)
 
CREATING-BUILDING-PLANS-AS-PER-NBCP-RULE-7-8.pptx
CREATING-BUILDING-PLANS-AS-PER-NBCP-RULE-7-8.pptxCREATING-BUILDING-PLANS-AS-PER-NBCP-RULE-7-8.pptx
CREATING-BUILDING-PLANS-AS-PER-NBCP-RULE-7-8.pptx
 
20181205 gci price list 1
20181205 gci price list 120181205 gci price list 1
20181205 gci price list 1
 
building rules.pptx
building rules.pptxbuilding rules.pptx
building rules.pptx
 
Cec application form_a
Cec application form_aCec application form_a
Cec application form_a
 
1260700786 rule viii light&ventlatn(anotatd)
1260700786 rule viii light&ventlatn(anotatd)1260700786 rule viii light&ventlatn(anotatd)
1260700786 rule viii light&ventlatn(anotatd)
 
MCHI DRAFT DCR 2034 24.08.2016 by Manoj Daisaria (1).pdf
MCHI DRAFT DCR 2034 24.08.2016 by Manoj Daisaria (1).pdfMCHI DRAFT DCR 2034 24.08.2016 by Manoj Daisaria (1).pdf
MCHI DRAFT DCR 2034 24.08.2016 by Manoj Daisaria (1).pdf
 
smartparkannb.pdf
smartparkannb.pdfsmartparkannb.pdf
smartparkannb.pdf
 
Amrapali Spring Meadows,NOIDA ext. 1/2/3 Bhk @ 9910296802
Amrapali Spring Meadows,NOIDA ext. 1/2/3 Bhk @ 9910296802Amrapali Spring Meadows,NOIDA ext. 1/2/3 Bhk @ 9910296802
Amrapali Spring Meadows,NOIDA ext. 1/2/3 Bhk @ 9910296802
 
Feasibility Report Format
Feasibility Report FormatFeasibility Report Format
Feasibility Report Format
 
Designing of sprinkler irrigation system
Designing of sprinkler irrigation systemDesigning of sprinkler irrigation system
Designing of sprinkler irrigation system
 
Brouches of Jaypee Green
Brouches of Jaypee GreenBrouches of Jaypee Green
Brouches of Jaypee Green
 
Feasibility of ECS accommodation in Residential Plots
Feasibility of ECS accommodation in Residential PlotsFeasibility of ECS accommodation in Residential Plots
Feasibility of ECS accommodation in Residential Plots
 
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHAIT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
IT TOWER DESIGN CHANDAKA BHUBANESWAR ODISHA
 

Más de Doreen Yeo

Value management presentation slides
Value management presentation slidesValue management presentation slides
Value management presentation slidesDoreen Yeo
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slidesDoreen Yeo
 
CIPAA presentation
CIPAA presentationCIPAA presentation
CIPAA presentationDoreen Yeo
 
Financial Management Report
Financial Management ReportFinancial Management Report
Financial Management ReportDoreen Yeo
 
Pp2 coursework 2 brief
Pp2 coursework 2  briefPp2 coursework 2  brief
Pp2 coursework 2 briefDoreen Yeo
 
BE cost appraisal
BE cost appraisalBE cost appraisal
BE cost appraisalDoreen Yeo
 
Estimating seminar 2 glazing answer
Estimating seminar 2 glazing answerEstimating seminar 2 glazing answer
Estimating seminar 2 glazing answerDoreen Yeo
 
Estimating seminar 1 slides
Estimating seminar 1 slidesEstimating seminar 1 slides
Estimating seminar 1 slidesDoreen Yeo
 
Assignment ceiling finishes
Assignment ceiling finishesAssignment ceiling finishes
Assignment ceiling finishesDoreen Yeo
 
PP1 assignment presentation slides
PP1 assignment presentation slidesPP1 assignment presentation slides
PP1 assignment presentation slidesDoreen Yeo
 
Software Application presentation slides
Software Application presentation slidesSoftware Application presentation slides
Software Application presentation slidesDoreen Yeo
 
Measurement IV assignment presentation slides
Measurement IV assignment presentation slides Measurement IV assignment presentation slides
Measurement IV assignment presentation slides Doreen Yeo
 
Building Services ll Assignment
Building Services ll AssignmentBuilding Services ll Assignment
Building Services ll AssignmentDoreen Yeo
 
Management Science Report
Management Science ReportManagement Science Report
Management Science ReportDoreen Yeo
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2Doreen Yeo
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1Doreen Yeo
 
Stormwater management presentation slides
Stormwater management presentation slidesStormwater management presentation slides
Stormwater management presentation slidesDoreen Yeo
 
Sustainable stormwater management(building services1)
Sustainable stormwater management(building services1)Sustainable stormwater management(building services1)
Sustainable stormwater management(building services1)Doreen Yeo
 

Más de Doreen Yeo (20)

Value management presentation slides
Value management presentation slidesValue management presentation slides
Value management presentation slides
 
Project management assignment slides
Project management assignment slidesProject management assignment slides
Project management assignment slides
 
CIPAA presentation
CIPAA presentationCIPAA presentation
CIPAA presentation
 
Financial Management Report
Financial Management ReportFinancial Management Report
Financial Management Report
 
CSI Report
CSI ReportCSI Report
CSI Report
 
Pp2 coursework 2 brief
Pp2 coursework 2  briefPp2 coursework 2  brief
Pp2 coursework 2 brief
 
BE cost appraisal
BE cost appraisalBE cost appraisal
BE cost appraisal
 
Estimating seminar 2 glazing answer
Estimating seminar 2 glazing answerEstimating seminar 2 glazing answer
Estimating seminar 2 glazing answer
 
Estimating seminar 1 slides
Estimating seminar 1 slidesEstimating seminar 1 slides
Estimating seminar 1 slides
 
Assignment ceiling finishes
Assignment ceiling finishesAssignment ceiling finishes
Assignment ceiling finishes
 
PP1 report
PP1 reportPP1 report
PP1 report
 
PP1 assignment presentation slides
PP1 assignment presentation slidesPP1 assignment presentation slides
PP1 assignment presentation slides
 
Software Application presentation slides
Software Application presentation slidesSoftware Application presentation slides
Software Application presentation slides
 
Measurement IV assignment presentation slides
Measurement IV assignment presentation slides Measurement IV assignment presentation slides
Measurement IV assignment presentation slides
 
Building Services ll Assignment
Building Services ll AssignmentBuilding Services ll Assignment
Building Services ll Assignment
 
Management Science Report
Management Science ReportManagement Science Report
Management Science Report
 
Site surveying report 2
Site surveying report 2Site surveying report 2
Site surveying report 2
 
Site surveying report 1
Site surveying report 1Site surveying report 1
Site surveying report 1
 
Stormwater management presentation slides
Stormwater management presentation slidesStormwater management presentation slides
Stormwater management presentation slides
 
Sustainable stormwater management(building services1)
Sustainable stormwater management(building services1)Sustainable stormwater management(building services1)
Sustainable stormwater management(building services1)
 

Último

SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajanpragatimahajan3
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDThiyagu K
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 

Último (20)

SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
social pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajansocial pharmacy d-pharm 1st year by Pragati K. Mahajan
social pharmacy d-pharm 1st year by Pragati K. Mahajan
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Measures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SDMeasures of Dispersion and Variability: Range, QD, AD and SD
Measures of Dispersion and Variability: Range, QD, AD and SD
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 

BE Cost Plan

  • 1. PRELIMINARY COST APPRAISAL NO. ___ GFA (m2) CFA (m2) Office 61,653 67,819 Other Commercial Uses - Retail 15,413 16,955 Basement Car Parks (Office) 2,817 Basement Car Parks(Retail/F&B) 704 Additional 70 Car Parking Lots for Public Use 875 Plot A2 F&B Kiosk 100 Total 77,067 89,269 Items Unit Qty Rate RM$ RM$ 1 Plot A1 - Office a) Grade A Office (Min. 80%of Max. GFA) CFA (m2) (67,819) (4,200) (284,840,000) b) Basement Car Parks (225 lots @ 12.5 m2 per lot) CFA (m2) (2,817) (1,500) (4,230,000) c) Associated External Works (allowance 2% of 1a) Item (5,696,800) Sub-total (For Plot A1 - Office) GFA (ft2) (663,635) (444) (294,766,800) 2 Plot A1 - Other Commercial Use a) Retails CFA (m2) (16,955) (2,955) (50,100,000) TCOT Clause 4.16.3& 4.16.4 b) Basement Car Parks (56 lots @ 12.5 m2 per lot) CFA (m2) (704) (1,500) (1,060,000) c) Associated External Works (allowance 2% of 2a) Item (1,002,000) Sub-total (For Plot A1 - RETAILS) GFA (ft2) (165,909) (314) (52,162,000) 3 Plot A2 (At-Grade Open Space) a) F&B Kiosk (Single-Storey Structure) (GFA=100m2) CFA (m2) (100) (3,600) (360,000) b) Softscape with Lush Landscaping (Min. 40% of Site Area) m2 (1,512) (650) (980,000) c) Amenities (i.e. Playground, Night Lighting, Park Furniture) (Allowance) item (60,352) TCOT Clause 4.20 Sub-total (For Plot A2 At-Grade Open Space) GFA(ft2) (16,275) (86) (1,400,352) 4 Cost Associated to Land Parcel (Allowance) a) Greenery Replacement and Landscaping (Assume Sky Terraces/Roof Gardens, etc. (Single Storey Volume)) m2 (3,233) (1,000) (3,230,000) TCOT Clause 4.7 b) Underground Pedestrian Network m 97 208,333 (20,208,301) c) At-Grade Pedestrian Network m (191) (2,500) (477,500) d) Above-Grade Pedestrian Network (2nd Storey) i) Min. 4.0m wide pedestrian walkway at 2nd storey within the development on Plot A1 fronting Cecil Street and linking to the adjacent Bangkok Bank Building (Approx. 53m length) m (53) (75,000) (3,980,000) TCOT Clause 4.23.1 e) Additional 70 Car Parking Spaces for Public Use (70 lots @ 12.5 m2 per lot) CFA (m2) (875) (1,500) (1,310,000) TCOT Clause 4.27.2 f) Night Lighting Item (500,000) TCOT Clause 4.28
  • 2. g) Road Improvement Works h) Demolition Works i) Demolish former Telok Ayer Performing Arts Centre (182 Cecil Street) and all the annex buildings within Plot A1 and A2 Item (300,000) TCOT Clause 4.31.1(a) ii) Demolish existing surface car park and kerbside car and motorcycle parking lots along Telok Ayer Street Item (50,000) TCOT Clause 4.31.1(b) i) Min. 7.0m wide Covered Linkway to Connect the Proposed Development to the Existing Bus Shelter Along Cecil Street (Approx. 18m length) m2 (126) (325) (40,950) TCOT Clause 4.32.2 5 Others (Allowance) a) Utilities Detection Works Item (30,000) b) Site Survey/Investigation Item (20,000) c) Geotechnical Investigation Works Item (50,000) d) Hoarding and Signboard Item (90,000) e) Cadastral Survey (Plot A1, A2 & A3) (Allowance) Item (20,000) f) Utilities Connection Charges Item (100,000) g) Services Diversion - As per Tender Documents excluding GST) - Electricity (Clause 4.2.1) Item (100,000) h) Traffic Impact Assessment Item (30,000) i) Protection of Existing Roadside Trees Item (150,000) Sub-total (For Cost Associated to Land Parcel (Item 4 & 5)) GFA (ft2) (831,594) (37) (30,686,751) 6 Green Mark Requirements a) Green Mark / Green RE Platinum (Allowance of 8% of Item 1 to 2 above) Item (27,754,304) Sub-total (For Green Mark Platinum Requirements) GFA (ft2) (831,594) (33) (27,754,304) Total for Item 1 to 6 (Excluding Contingencies & Cost Escalations) (406,770,207) Cost per sq m of GFA (77,257 m2) GFA (m2) (77,257) (5,265) Cost per sq ft of GFA (831,594 ft2) GFA (ft2) (831,594) (489) 7 Contingencies (Allowance at 5% of Item 1 to 7 above) Item 5% (20,340,000) Total for Item 1 to 7 (Including Contingencies but Excluding Cost Escalations) (427,110,207) Cost per sq m of GFA (77,257m2) GFA (m2) (77,257) (5,528) Cost per sq ft of GFA (831,594ft2) GFA (ft2) (831,594) (514) 8 Cost Escalation (Assuming tender to be called in one year's time) Item 5% (21,360,000) Total for Item 1 to 8 (Including Contingencies & Cost Escalation) (448,470,207) Cost per sq m of GFA (77,257m2) GFA (m2) (77,257) (5,805) Cost per sq ft of GFA (831,594ft2) GFA (ft2) (831,594) (539)
  • 3. Things to note: (INTERNAL REFERENCE ONLY DO NOT SEND TO CLIENT) 1) Allowable development: Commercial Use: Plot A1 and Plot A2 (below-grade area only) At least 80% of the GFA (i.e. 61,730 m2) is to be for office use. The remaining GFA of 15,432 sqm can be for additional office use or other permitted uses, such as retail, Food and Beverage (F&B) uses, of such types and quantum. Residential use is not permitted in the development. The successful tenderer shall not strata-subdivide the development. Open Space Use: Plot A2 (at-grade area only) Plot A2 is designated as an open space. Additional maximum permissible GFA of 100 sqm is allowed for a F&B kiosk within the at-grade open space. This maximum permissible GFA of 100 sqm is not transferrable to other parts of the developments Plot A3 (subterranean space below Telok Ayer Street) Plot A3 is to be developed for part of an underground pedestrian walkway to Tanjong Pagar MRT Station only. No commercial GFA is allowed. 2) Borehole terminates at 18.05m to 18.15m 3) Max. building height: High-rise zone (within Plot A1) Max. 50 Storeys; Technical height control of 250.0m AMSL Low-rise zone (within Plot A1) a) Fronting Telok Ayer Street and adjacent to 21 McCallum Street (The Clift) and 180 Cecil Street (Bangkok Bank Building): Min. 19.0m (approx. 123.5m RL) and Max. 32.5 m (approx. 137.0m RL) b) Fronting onto the Telok Ayer Chinese Methodist Church (TACMC) and the open space shall be set back at least 15.0m as indicated on the Control Plans. Within this setback area, any structures if provided, shall have a height of about 10.5m (approx. 115.0m RL) to match the height of the lower window sill at the third storey of the eastern facade of TACMC Open Space (Plot A2) If F&B kiosk is provided within the open space, subject to Max. 1 storey 4) Activity-generating uses such as retail, F&B, entertainment, sports and recreational uses (such as fitness centre, gymnasium, etc) and other similar uses shall be provided at the following locations (Clause 4.4): a) The 1st storey level of the development fronting Cecil Street, Telok Ayer Street and the building setback area b) Underground pedestrian walkway within part of Plots A1 & A2 (along at least one side) c) Encouraged to be provided at the 2nd storey pedestrian link, along at least one side 5) Outdoor Refreshment Areas (ORAs) are allowed within the Land Parcel (Plot A1). The GFA for ORAs will be computed as part of the Max. GFA (Clause 4.5) 6) Landscape Replacement Areas equivalent in area to the Site Area of the Land Parcel shall be incorporated (Clause 4.7). At least 40% is to be used for softscape (permanent planting and the remaining areas can be used for hardscape) 7) No foundations/basement levels are allowed to be constructed within 3.0m from the common boundary with the TACMC (Clause 4.10a) 8) Min. Green Mark Platinum (Clause 5.4) 9) Required to provide additional 70 car parking lots (Clause 4.27.2) 10) Car parking spaces to be located within the basement levels of the development (Clause 4.27.3)