2. APPOINTMENT OF CONSULTANTS-avoid
conflict of interest
CONFLICT BETWEEN CONSULTANCY
AND PROCUREMENT
CONFLICT BETWEEN CONSULTANCY
AND CONTROLS/CONSULTANCY
CONFLICT BETWEEN CONSULTANT
AND EMPLOYER’S STAFF
ONLY ONE PROPOSAL IN
INDIVIDUAL’S CAPACITY OR JT
VENTURE
3. RECOVERIES FROMobservations of CTE/QA
OBSERVATIONS
TO BE MADE AS PER CONTRACT
TO BE MADE BY ENGINEER IN
CHARGE WITHOUT QUOATING
THIRD PARTY i.e. CTE OR QA TEAM
4. BANK GUARANTEE
FROM SCHEDULED BANK
OF REQUIRED AMOUNT
OF REQUIRED PERIOD
VALIDITY EXTENSION AFTER ITS
EXPIRY
VERIFICATION TO AVOID FORGE
DOCUMENT
INDEPENDENT VERIFICATION
DIRECTLY FROM THE BANK
5. MOBILIZATION ADVANCE
BG OF 110% ADVANCE TO
RECOVER INTEREST IF ANY.
NORMALLY SHOULD NOT BE PAID
IN LESS THAN TWO
INSTALMENTS.
INTEREST FREE BUT IF THE
CONTRACT IS TERMINATED DUE
TO DEFAULT OF THE CONTRACT,
INTEREST RATE TO BE
MENTIONED
7. MIX DESIGN
MINIMUM CEMENT CONTENT
MAXIMUM WATER CEMENT RATIO
MINIMUM GRADE OF CONCRETE
VALUE OF STANDARD DEVIATION TO BE
CHECKED
FOR ACCEPTANCE CRITERIA MEAN OF A
GROUP OF 4 NON OVERLAPPING
CONSECUTIVE TEST RESULTS
SAMPLES HAVING +/- 15% VARIATIONS OF
AVERGARE THREE SPECIMENS NOT
BEING DECLARED INVALID
8. POST TENDER NEGOTIATIONS
THERE SHOULD BE NO POST TENDER
NEGOTIATIONS OTHER THAN WITH L-1
THAT TOO EXCEPT IN CERTAIN
EXCEPTIONAL CIRCUMSTANCES
POST TENDER NEGOTIATION COULD
OFTEN BE A SOURCE OF CORRUPTION
NO POST NEGOTIATION WITH OTHER
THAN THE L-1
RECORD CIRCUMSTANCES OF
ACCEPTING SINGLE BID (CONSIDER
RATE JUSTIFICATION ALSO)
9. E - GOVERNANCE
NOT NECESSARY TO BE SECURED
TO BE CERTIFIED FROM THE
DEPARTMENT OF INFORMATION
TECHNOLOGY
18. VIGILANCE ANGLE TO BE EXAMINEDIN
CASE OF
IF ABNORMAL PROCUREMENTS
IF WORK AWARDED ON HIGH
RATES
IF AWARD IS DELAYED
DISCRETIONS ARE FREQUENTLY
RESORTED TO
FAVOURS ARE FOUND
BIASED AWARDS ETC.