SlideShare una empresa de Scribd logo
1 de 6
Descargar para leer sin conexión
ISSN 2394-7349
International Journal of Novel Research in Engineering and Science
Vol. 2, Issue 1, pp: (35-40), Month: March 2015 - August 2015, Available at: www.noveltyjournals.com
Page | 35
Novelty Journals
Supply Chain Management: Effective Tool in
Construction Industry
Mulla Aneesa.I1
, Dr. A.K.Gupta2
, Prof. D.B.Desai3
1
M.E.(Construction & Management) Part-II, 2
Professor & Principal I/C, 3
Associate Prof., Head of Dept.
1,2,3
Dr. J.J. Magdum college of Engineering, Jaysingpur
Abstract: Supply Chain Management is recognized as a leading process improvement, cost saving and revenue
enhancing business strategy. It applies to all businesses involved in the delivery of construction projects. Supply
Chain Management requires a corporate initiative, supported by strategic and tactical planning, to instill systems
thinking and promote a new discipline that companies must master. Construction Projects Supply Chain
Management requires a good understanding of production management; planning, design, and construction; and
business drivers like other disciplines within an organization, such as structural, mechanical, electrical, or process
engineering, accounting and materials management. Supply Chain Management must have a champion who can
drive the ideas across disciplines within the organization as well as across organizational boundaries.
Keywords: Supply chain management (SCM), construction supply chain, collaboration, bench marking (BM), total
quality management(TQM), Customer Relationship Management(CRM).
I. INTRODUCTION
Construction industry is the second largest economic activity in India. Indian Construction Industry can be divided into
three market segments: Infrastructure, Industrial and Real Estate. Infrastructure constitutes of roads, ports, airports,
irrigation, railway, and power projects etc. In the Indian context, it is estimated that 1% growth in infrastructure yields a
cascading effect of 2.5% growth of GDP. There is a massive investment flow into the infrastructural development in India
and other Asian countries. Looking at the ubiquitous construction activity in the country and strong future prospects, it is
important to devise the strategies to enhance the productivity in construction activity which seems to lag far behind in
comparison to other manufacturing and service industries.
In the lack of construction firms’ initiative for higher productivity and better quality, construction industry has seen
commoditization; where contracts are awarded on the basis of minimum bid. This in turn has reduced the profit margins
and industry players have been averse of making investments for productivity enhancement. Current firm-specific cost
reduction doesn’t confer any sustainable advantage in the global market. With the increasing global competition, Indian
firms need to involve all the stakeholders of the construction supply chain who influence the productivity of the project.
This is possible only through greater coordination among various players. Firms need to follow a supply chain approach
to achieve global standards. Rising revenues of construction industry and strong future prospects would encourage
construction firms to make investments to achieve higher productivity.
The issue of delays, cost over-runs and quality non-conformance is closely related to the Supply Chain Management
(SCM) and we believe that applying SCM principles, Use of Information Technology (IT) and supply chain integration
can bring significant increase in the productivity in construction projects.
II. SUPPLY CHAIN MANAGEMENT
SCM tries to achieve more than just planning of product and information flow; and it also aims at connecting and
synchronizing the processes of other inter-related organisations such as the client, suppliers and customers.
“SCM is an innovative and revolutionary managerial approach which involves a working culture change and a voluntary
initiated agreement for integration and synchronization of two or more inter-dependent members within variety of
ISSN 2394-7349
International Journal of Novel Research in Engineering and Science
Vol. 2, Issue 1, pp: (35-40), Month: March 2015 - August 2015, Available at: www.noveltyjournals.com
Page | 36
Novelty Journals
organization level and boundaries as well as range of inter-linked construction life-cycle processes (initiation to
handover). It promotes joint effort and strategy on all activities which are underpinned by mutual trust, responsibility,
benefit and risk sharing based on a long-term perspective on relationship. Value is achieved through optimization and
management of processes, resources, core competencies, talent, information, power and technology within the supply
chain towards accomplishment of a set of shared objective and goals, enhance competitive advantage, breaking down any
discontinuities and meeting distinctive client needs. Consequently, jointly agreed benchmarks, targets, expectation and
values are put in place for continuous improvement efforts and are supported by aligned incentive schemes towards
sustaining the endeavor”.
2.1 Managing supply chains in construction:
SCM has become increasingly popular in construction literature and practice, and a number of SCM initiatives have been
launched. Together with related concepts such as lean thinking, JIT and partnering, SCM is suggested as a promising
means for improving construction performance the main idea being that supply chain processes should be integrated in
order to provide better customer value (Latham,1994; Egan, 1998; Strategic Forum, 2002).However, in line with the
general SCM literature suggesting that the implementation of SCM practices might pose a number of challenges (see Bask
and Juga, 2001; Jahre and Fabbe-Costes, 2005), SCM is considered to be especially problematic in relation to the
construction industry (Briscoe and Dainty, 2005; Fearne and Fowler, 2006; Fernie and Thorpe, 2007). Both SCM and lean
construction have been criticized for their vague terminology and rhetoric and lack of interest in more critical scrutiny of
the sectors for which the concepts were originally developed (Winch, 2003; Green and May, 2003; Green et al., 2005).
This has further been proposed as an explanation for slow adoption as well as a lack of ability to provide the promised
benefits.
Hence, there is a need for further scrutiny and understanding of applications of the concept in this industry. In the
following, we inquire into how supply chains, and in particular supply chain integration, are viewed in the construction
literature, first through a review of construction literature with regard to supply chain integration, then by discussing
different interdependencies in and between construction supply chains.
2.2 Principles underpinning supply chain management:
Supply chain management is actually concerned with more than the movement of materials from point to point. However,
there are some principles attached to the use of supply chain management posited by Handfield and Nichols (2002:
6).These principles are described as follows:
 The only entity that injects money into a supply chain is the end customer. That is until the client initiates a
procurement process, the supply remains idle;
 The solution that is stable over the long term is one in which every element of the supply chain, from raw material to
end customer, profits from the process. It is short sighted for businesses to believe they can solve their cost problems by
punishing suppliers and customers. Shifting costs and problems without solving root causes is inherently unstable and
mostly unsuccessful over the long term. The best supply chains will solve problems, implement the best solutions, and
share the benefits among their members
 Supply chain management is about economic value added. Supply chain management is not just about cost reduction.
It‟s about the total content of a final product or service, including quality, technology, delivery, and after-sales service.
It‟s about managing the total process and ultimately meeting the needs of the client. The integrated management of
information and materials across the supply chain offers the benefits of increasing the value-added by supply chain
members, removing waste, reducing cost, and improving customer satisfaction (Handfield and Nichols, 2002: 32).
 In the same sense, Pryke (2002: 17) suggests that the observation of construction project governance through the
analysis of transactions classified broadly into information exchange, performance incentives and contractual
relationships, provides benefits in relation to clarity and quantification, particularly as procurement methods move away
from the traditional contracting system previously prevalent in the construction industry.
 Therefore supply chain managers strive to achieve the ideas of fully integrated and effective supply chains ,capable of
creating and sustaining competitive advantage.(Christopher and Towill, 2002 cited by Christopher and Peck, 2004: 1).
ISSN 2394-7349
International Journal of Novel Research in Engineering and Science
Vol. 2, Issue 1, pp: (35-40), Month: March 2015 - August 2015, Available at: www.noveltyjournals.com
Page | 37
Novelty Journals
 To this end they must balance downward cost pressures and need for efficiency, with effective means to manage the
demands of market-driven service needs and the known risks of routine supply chain failures (Christopher and Peck,
2004: 1).
2.3 Benefits of Supply Chain Management:
Following are the benefits of effective SCM:
 Transparency, trust and efficiency in the management of the supply chain present benefits to all parties involved in
project delivery:
 Clients can develop improved ability to identify strengths, weaknesses, opportunities and threats in the chain, and
increased value for money and efficiency;
 Contractors can access improved early and continuous communications with clients and stakeholders, and a more
competitive subcontractor base offering better skills, expertise, innovation and value for money, and
 Subcontractors can engender improved communication with contractors and assurance of continuity in business.
2.4 The Role of Supply chain in Construction Industry:
The manufacturing industry is the pioneer industry which introduces the concept of SCM as a new and important tool to
perform the business process in a systematic and well defined way to save time, enhance quality and realize profit Tan,
(2001). The construction industry SCM processes are scattered and are partially adopted. The building and construction
industry can be divided into three main categories: building construction; heavy engineering construction and trade
construction. While building construction can be further divided into residential and non-residential for example
commercial and industrial building. Akintoye et.al. (2000) conducted a survey on supply chain management in UK
construction industry and they argue that there exists partnership relationship among contractors, suppliers and clients;
they only focus on the production planning and purchasing factors for the SCM process in construction industry and lists
the barriers which can hindrance the successful process of SCM in construction industry. Vrijhoef and Koskela (2000)
discussed four roles of supply chain management as described in the fig. 1. These four roles in construction industry can
be recognized based on the focus of the industry either construction site or supply chain or even both. The authors claimed
these roles have major impact on the construction industry.
Fig. 1 Four Role of SCM in Construction Industry (Vrijhoef and Koskela :2000)
ISSN 2394-7349
International Journal of Novel Research in Engineering and Science
Vol. 2, Issue 1, pp: (35-40), Month: March 2015 - August 2015, Available at: www.noveltyjournals.com
Page | 38
Novelty Journals
For example rule 1 focus on the interface between the supply chain and the construction site, the main impact of this is to
reduce the costs and duration of site activities. These four roles does not seems to be mutually exclusive, while in practice
these four roles are simultaneously applied to the supply chains in order to improve the efficiency of SCM processes.
Welling and Kamann (2001) suggest that building and construction industry supply chains can be at firm level or project
level. The firm level can provide stable and long term supply chains on the other hand project level supply chain are
mostly temporary because their durations are already fixed. Love et.al (2002) identified the partnership relationship
related to the alliances, which can be either strategic or project based. The project based alliances are more towards short
term alliances for the temporary projects while the strategic alliances focuses on the long term partnership relationship for
the large projects and the alliance is based on more than one project. Hence the partnership relationship plays vital role in
building and construction industry which develops the trust and commitment. Saad et.al.( 2002) provides a review on the
adoption of SCM in construction industry and suggest that construction experts has some knowledge of SCM, but still
they need more attention towards the implementation of SCM by increasing their conceptual understanding and how new
SCM can be implemented systematically. Briscoe and Dainty (2005) recommended the most common characteristics for
structural projects for the construction industry, which make hindrances to make fully utilize of supply chain in
construction projects, for example one-off projects, the project which are located on different sites ( i.e geographically
dispersed) and also the high fragmentation, which is a natural characteristic of any construction project, Khalfan et.al
(2007) presents the different views on the building trust among supply chain participants in the construction projects. El-
Saboni e.al. (2007) and El-Saboni e.al.(2009) investigates the success of the construction projects in UAE are based on
modern electronic communication management system. They provide a state of art on the usage of modern
communication technologies in construction industry and also they investigate how these modern system influence the
relationship of different project team members.Ali.et.al. (2010) studies the performance of construction projects in
Malaysia; their research is based on quantitative data collection and through questionnaire surveys. In addition, they argue
that Malaysian industry is still infancy to adopt the partnering approach their partnering approach is still local based this
may be due to the influence of the culture. Soemardi et.al.(2007) explains the application of SCM in the Indonesian
construction industry. They argue that the SCM processes in Indonesian construction industry are still in infancy or the
SCM processes are not adopted at all. However their study is starting points towards the application of SCM in
Indonesian construction industry, there still need more research in this area. Barkhi and Daghfous (2009) study shows the
application of TQM, SCM and CRM implementations in the UAE hotels. UAE also attracts tourist in the, with increase of
tourist in the UAE, hotel managements four to five star category hotels have realized the benefits of the supply chain
management. This case is a unique case and has relevance to the application of SCM in a UAE industry. Fig. 2 shows the
qualifications and consequences of TQM, CRM and SCM implementation in UAE hotel industry. From the
implementation it has been clearly identified that SCM increases the operation efficiency, so it does not only provide
relationship management with the contractor and supplier but has an overall impact on the efficiency of the services
delivered by the hotel management.
Fig. 2 Antecedents and Consequences of TQM, CRM and SCM Implementation. ( Barkhi and Daghfous :2009 )
ISSN 2394-7349
International Journal of Novel Research in Engineering and Science
Vol. 2, Issue 1, pp: (35-40), Month: March 2015 - August 2015, Available at: www.noveltyjournals.com
Page | 39
Novelty Journals
2.5 Construction Supply Chains: Characteristics:
Construction supply chain involves stakeholders who are individual service providers such as subcontractors, designers,
engineering consultants, transporters etc. and manufacturers of materials and equipments. On an average material cost
contributes 50% to the project cost and hundreds of material and equipment suppliers take part in the supply chain. Apart
from these suppliers, activities of the construction projects are subcontracted to specialty contractors such as designers,
electrical, engineering, plumbing etc. Being a demand driven industry owner’s involvement in the project remains crucial
and continuous information flow from client is essential. Fig. 3, shows the highly non-linear characteristic of construction
supply chains where strong supply chain information and material linkages are shown. Construction can be viewed as a
complex of manufacturing and services. In this sense, many of the operations involved in manufacturing have similarity
with construction projects in their characteristics. As an example, procuring materials and assembling them to make a
product is common in both manufacturing and construction. This is the reason why Toyota, the leading Japanese auto
manufacturer, has entered into housing construction and applying mass production and lean manufacturing techniques
there.
Fig. 3: Construction supply chain
III. CONCLUSION
Supply chain management (SCM) is a great opportunity for the construction industry primarily to reduce cost and time,
and thus improve profitability. SCM principles seem to have much strength to smoothen and integrate the construction
processes. The supply chains in construction could be divided into two major groups as materials chain and the
construction chain, which would help to separate the procurement and management operations.
However, both chains are linked through a SCM database, which is further linked with the central project database. This
would ensure the smooth flow of information within the different chains and results in increased collaboration within the
supply chain partners. Obstacles for supply chain management are found to be poor level of logistical competence, lack of
guidance for creating strategic alliances, inability to integrate the company’s internal procedures, strong project focus as
well as the attitudes and traditions in the construction industry.
Some serious flaws in the current project planning practices, which ignore information and resource constraints. Also the
Risk Management should be more effective, in lack of which firms cannot avoid delays and cost over-runs. Forming
Integrated Supply Chains is a strategy that construction industry should follow by forming long-term relationships with
ISSN 2394-7349
International Journal of Novel Research in Engineering and Science
Vol. 2, Issue 1, pp: (35-40), Month: March 2015 - August 2015, Available at: www.noveltyjournals.com
Page | 40
Novelty Journals
suppliers; subcontractors and other supply chain players, sharing information for mutual benefits; and using IT to make it
more efficient and effective.
REFERENCES
[1] Gohari Ali, “Supply Chain Management in Construction Industry”, Advances In Management, Vol No.7, No.8,pp.
17-22, 2014.
[2] Lin Lin, Peter Gibson, ,“Implementing supply chain quality management in subcontracting system for construction
quality”, Journal of System and Management Sciences, Vol No.1, No. 1, pp. 46-58, 2011.
[3] Lockamy Archie and McCormack Kevin, “The development of a supply chain management process maturity model
using the concepts of business process orientation”, Supply Chain Management: An International Journal, Vol No.
9,No. 4,pp. 272-278, 2004.
[4] O’Brien William J., “Construction Supply-Chain Management: A Vision for Advanced Coordination, Costing, and
Control” ,Construction Supply-Chain Management, Vol No:1,Page Nos. 1-7, 2000.
[5] Petrovic-Lazarevic Sonja, Matanda Margaret & Worthy Russell, “Supply Chain Management In Building And
Construction Industry: Case of Australian Residential Sector”,Department of management working paperseries, Vol
No. 21 , No. 06 , pp. 1-10, 2006.
[6] Ping.HT serng.; Yin Samuel Y. L.; and Li Sherman, “Developing a Resource Supply Chain Planning System for
Construction Projects”,Journal of Construction Engineering and Management © ASCE, Vol No.132, No.4 pp.393-
407, 2006 .
[7] RiaziMehdi, RiaziSalman, Skitmore, Martin, & Cheung, Yan Ki Fiona, “The use of supply chain management to
reduce delays:Malaysian public sector construction projects” , In Proceedings of the 6th Nordic Conference on
Construction Economics and Organisation in Society, Copenhagen, Denmark, Vol No.2,pp. 403-414, 2011.
[8] Siva Jessica And Zhang Peng, “A Supply Chain Management Self Assessment Framework For Waste Minimisation
For The Residential Sector” , Australian Housing Supply Chain Alliance, RMIT University, Page 1-37, March 2013.
[9] Syed Mahmood Ahmed, Salman Azhar, Irtishad Ahmad, “Supply chain management in construction Scope, benefits
and barriers”, Delhi Business Review, Vol No. 3, No. 1, pp.23-29, 2002.
[10] Viswanadham N. & Kumar Vinit, “Achieving Rural & Global Supply Chain Excellence” , ISB, Gachibowli ,
Hyderabad 500032,, Hyderabad,2006.
[11] Vrijhoef Ruben and Koskela Lauri, “Roles of supply chain management in construction”, Proceedings IGLC, Vol
No.7, pp. 133-146, 1999.
[12] Vrijhoef Ruben and Koskela Lauri, “The Four Roles of supply chain management in construction”, European
Journal of Purchasing and supply management, Vol No.6, pp.169-178, 2000.
[13] Walsh Kenneth D., M.; Hershauer James C.; Iris D. Tommelein, A.M.ASCE; and Tobi A. Walsh, “Strategic
Positioning of Inventory to Match Demand in a Capital Projects Supply Chain”, Journal of construction engineering
and management © ASCE, Vol No.130, No.6,pp.818-825, 2004.
[14] A. Vetro, H. Sun, P. DaGraca, and T. Poon, “Minimum drift architectures for three-layer scalable DTV decoding,”
IEEE Transaction on Consumer Electronics, Vol. 44, No. 3, pp. 527-536, Aug. 1998.
[15] M. Young, the Technical Writer's Handbook. Mill Valley, CA: University Science, 1989.

Más contenido relacionado

La actualidad más candente

Collaborative Procurement as an enabler of Innovation
Collaborative Procurement as an enabler of InnovationCollaborative Procurement as an enabler of Innovation
Collaborative Procurement as an enabler of InnovationRandal de Souza Rezende
 
Value chain analysis
Value chain analysisValue chain analysis
Value chain analysisKamal Singh
 
Value chain analysis (1)
Value chain analysis (1)Value chain analysis (1)
Value chain analysis (1)Suraj9766
 
Supply chain-network-optimization-services 16
Supply chain-network-optimization-services 16Supply chain-network-optimization-services 16
Supply chain-network-optimization-services 16ITC Infotech
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Managementbaqeralmurohin
 
INTEGRAL BUSINESS @ DETECON
INTEGRAL BUSINESS @ DETECONINTEGRAL BUSINESS @ DETECON
INTEGRAL BUSINESS @ DETECONMarc Wagner
 
Roland berger best_practices_in_new_product_development_20130419
Roland berger best_practices_in_new_product_development_20130419Roland berger best_practices_in_new_product_development_20130419
Roland berger best_practices_in_new_product_development_20130419Alberto Garcia Romera
 
Data-Driven Simulation-Enhanced optimization of Service operations
Data-Driven Simulation-Enhanced optimization of Service operationsData-Driven Simulation-Enhanced optimization of Service operations
Data-Driven Simulation-Enhanced optimization of Service operationsSudhendu Rai
 
An integrated inventory optimisation model for facility location allocation p...
An integrated inventory optimisation model for facility location allocation p...An integrated inventory optimisation model for facility location allocation p...
An integrated inventory optimisation model for facility location allocation p...Ramkrishna Manatkar
 
Determinantsof Strategic Supply Chain Management in Enhancing Organization Pe...
Determinantsof Strategic Supply Chain Management in Enhancing Organization Pe...Determinantsof Strategic Supply Chain Management in Enhancing Organization Pe...
Determinantsof Strategic Supply Chain Management in Enhancing Organization Pe...paperpublications3
 
Cost Modeling for Purchasing - A Fundamental Skill
Cost Modeling for Purchasing - A Fundamental SkillCost Modeling for Purchasing - A Fundamental Skill
Cost Modeling for Purchasing - A Fundamental SkillBill Kohnen
 
Sustainable supplier selection: the effect of logistical collaboration on log...
Sustainable supplier selection: the effect of logistical collaboration on log...Sustainable supplier selection: the effect of logistical collaboration on log...
Sustainable supplier selection: the effect of logistical collaboration on log...IJERA Editor
 
which supply chain strategies can guarantee higher manufacturer’s operational...
which supply chain strategies can guarantee higher manufacturer’s operational...which supply chain strategies can guarantee higher manufacturer’s operational...
which supply chain strategies can guarantee higher manufacturer’s operational...INFOGAIN PUBLICATION
 
Servitization Anastacia Simonchik
Servitization Anastacia SimonchikServitization Anastacia Simonchik
Servitization Anastacia SimonchikOrkestra
 
The Effect of Business Strategy on Innovation and Firm Performance in the Sma...
The Effect of Business Strategy on Innovation and Firm Performance in the Sma...The Effect of Business Strategy on Innovation and Firm Performance in the Sma...
The Effect of Business Strategy on Innovation and Firm Performance in the Sma...theijes
 

La actualidad más candente (17)

Ijm 06 09_008
Ijm 06 09_008Ijm 06 09_008
Ijm 06 09_008
 
Collaborative Procurement as an enabler of Innovation
Collaborative Procurement as an enabler of InnovationCollaborative Procurement as an enabler of Innovation
Collaborative Procurement as an enabler of Innovation
 
Value chain analysis
Value chain analysisValue chain analysis
Value chain analysis
 
Value chain analysis (1)
Value chain analysis (1)Value chain analysis (1)
Value chain analysis (1)
 
Supply chain-network-optimization-services 16
Supply chain-network-optimization-services 16Supply chain-network-optimization-services 16
Supply chain-network-optimization-services 16
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 
INTEGRAL BUSINESS @ DETECON
INTEGRAL BUSINESS @ DETECONINTEGRAL BUSINESS @ DETECON
INTEGRAL BUSINESS @ DETECON
 
Roland berger best_practices_in_new_product_development_20130419
Roland berger best_practices_in_new_product_development_20130419Roland berger best_practices_in_new_product_development_20130419
Roland berger best_practices_in_new_product_development_20130419
 
Data-Driven Simulation-Enhanced optimization of Service operations
Data-Driven Simulation-Enhanced optimization of Service operationsData-Driven Simulation-Enhanced optimization of Service operations
Data-Driven Simulation-Enhanced optimization of Service operations
 
An integrated inventory optimisation model for facility location allocation p...
An integrated inventory optimisation model for facility location allocation p...An integrated inventory optimisation model for facility location allocation p...
An integrated inventory optimisation model for facility location allocation p...
 
Determinantsof Strategic Supply Chain Management in Enhancing Organization Pe...
Determinantsof Strategic Supply Chain Management in Enhancing Organization Pe...Determinantsof Strategic Supply Chain Management in Enhancing Organization Pe...
Determinantsof Strategic Supply Chain Management in Enhancing Organization Pe...
 
Cost Modeling for Purchasing - A Fundamental Skill
Cost Modeling for Purchasing - A Fundamental SkillCost Modeling for Purchasing - A Fundamental Skill
Cost Modeling for Purchasing - A Fundamental Skill
 
Cost Saving
Cost SavingCost Saving
Cost Saving
 
Sustainable supplier selection: the effect of logistical collaboration on log...
Sustainable supplier selection: the effect of logistical collaboration on log...Sustainable supplier selection: the effect of logistical collaboration on log...
Sustainable supplier selection: the effect of logistical collaboration on log...
 
which supply chain strategies can guarantee higher manufacturer’s operational...
which supply chain strategies can guarantee higher manufacturer’s operational...which supply chain strategies can guarantee higher manufacturer’s operational...
which supply chain strategies can guarantee higher manufacturer’s operational...
 
Servitization Anastacia Simonchik
Servitization Anastacia SimonchikServitization Anastacia Simonchik
Servitization Anastacia Simonchik
 
The Effect of Business Strategy on Innovation and Firm Performance in the Sma...
The Effect of Business Strategy on Innovation and Firm Performance in the Sma...The Effect of Business Strategy on Innovation and Firm Performance in the Sma...
The Effect of Business Strategy on Innovation and Firm Performance in the Sma...
 

Destacado

Market reseaech on corporate client for the hotel o
Market reseaech on corporate client for the hotel oMarket reseaech on corporate client for the hotel o
Market reseaech on corporate client for the hotel ogkomal
 
Impact of advertisement on hotel industry
Impact of advertisement on hotel industryImpact of advertisement on hotel industry
Impact of advertisement on hotel industryamitspe
 
Measuring service quality
Measuring service qualityMeasuring service quality
Measuring service qualityjohntoms1
 
Boutique hotels Research Report
Boutique hotels Research ReportBoutique hotels Research Report
Boutique hotels Research ReportAmrith Srinivas
 
A project report on service quality gap model and quality dimensions
A project report on service quality gap model and quality dimensionsA project report on service quality gap model and quality dimensions
A project report on service quality gap model and quality dimensionsProjects Kart
 
How to Handle Guest with Complaints in Hotel
How to Handle Guest with Complaints in HotelHow to Handle Guest with Complaints in Hotel
How to Handle Guest with Complaints in HotelHotelCluster
 
Customer relationship management in Hotel Industry
Customer relationship management in Hotel IndustryCustomer relationship management in Hotel Industry
Customer relationship management in Hotel IndustryMilan Padariya
 
service quality-models-ppt
 service quality-models-ppt service quality-models-ppt
service quality-models-pptsubroto36
 
Final supply-chain-project on McDonalds
Final supply-chain-project on McDonaldsFinal supply-chain-project on McDonalds
Final supply-chain-project on McDonaldsSaira Sharif
 
A project report of customer satisfaction survey on vodafone
A project report of customer satisfaction survey on vodafoneA project report of customer satisfaction survey on vodafone
A project report of customer satisfaction survey on vodafoneProjects Kart
 
CRM - Customer Relationship Management
CRM - Customer Relationship ManagementCRM - Customer Relationship Management
CRM - Customer Relationship Managementvinaya.hs
 
A project report on hr practice in hotel industry
A project report on hr practice in hotel industryA project report on hr practice in hotel industry
A project report on hr practice in hotel industryProjects Kart
 
Management information system
Management information systemManagement information system
Management information systemSikander Saini
 
Trial exam questions+answers logistics and supply chain management 2
Trial exam questions+answers logistics and supply chain management 2Trial exam questions+answers logistics and supply chain management 2
Trial exam questions+answers logistics and supply chain management 2Khaoula Marai
 
Supply chain management of McDonalds
Supply chain management of McDonaldsSupply chain management of McDonalds
Supply chain management of McDonaldsSaravanan rulez
 

Destacado (16)

Market reseaech on corporate client for the hotel o
Market reseaech on corporate client for the hotel oMarket reseaech on corporate client for the hotel o
Market reseaech on corporate client for the hotel o
 
Impact of advertisement on hotel industry
Impact of advertisement on hotel industryImpact of advertisement on hotel industry
Impact of advertisement on hotel industry
 
Measuring service quality
Measuring service qualityMeasuring service quality
Measuring service quality
 
Survey Design
Survey DesignSurvey Design
Survey Design
 
Boutique hotels Research Report
Boutique hotels Research ReportBoutique hotels Research Report
Boutique hotels Research Report
 
A project report on service quality gap model and quality dimensions
A project report on service quality gap model and quality dimensionsA project report on service quality gap model and quality dimensions
A project report on service quality gap model and quality dimensions
 
How to Handle Guest with Complaints in Hotel
How to Handle Guest with Complaints in HotelHow to Handle Guest with Complaints in Hotel
How to Handle Guest with Complaints in Hotel
 
Customer relationship management in Hotel Industry
Customer relationship management in Hotel IndustryCustomer relationship management in Hotel Industry
Customer relationship management in Hotel Industry
 
service quality-models-ppt
 service quality-models-ppt service quality-models-ppt
service quality-models-ppt
 
Final supply-chain-project on McDonalds
Final supply-chain-project on McDonaldsFinal supply-chain-project on McDonalds
Final supply-chain-project on McDonalds
 
A project report of customer satisfaction survey on vodafone
A project report of customer satisfaction survey on vodafoneA project report of customer satisfaction survey on vodafone
A project report of customer satisfaction survey on vodafone
 
CRM - Customer Relationship Management
CRM - Customer Relationship ManagementCRM - Customer Relationship Management
CRM - Customer Relationship Management
 
A project report on hr practice in hotel industry
A project report on hr practice in hotel industryA project report on hr practice in hotel industry
A project report on hr practice in hotel industry
 
Management information system
Management information systemManagement information system
Management information system
 
Trial exam questions+answers logistics and supply chain management 2
Trial exam questions+answers logistics and supply chain management 2Trial exam questions+answers logistics and supply chain management 2
Trial exam questions+answers logistics and supply chain management 2
 
Supply chain management of McDonalds
Supply chain management of McDonaldsSupply chain management of McDonalds
Supply chain management of McDonalds
 

Similar a Effective SCM in Construction

Investigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction CompaniesInvestigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction CompaniesIRJET Journal
 
IRJET- Review on Risk Assessment of Supply Chain Management in Constructi...
IRJET-  	  Review on Risk Assessment of Supply Chain Management in Constructi...IRJET-  	  Review on Risk Assessment of Supply Chain Management in Constructi...
IRJET- Review on Risk Assessment of Supply Chain Management in Constructi...IRJET Journal
 
Review on Smart Supply Chain Management
Review on Smart Supply Chain ManagementReview on Smart Supply Chain Management
Review on Smart Supply Chain ManagementIRJET Journal
 
IRJET- Review Paper on Supply Chain Management of Windshield
IRJET- Review Paper on Supply Chain Management of WindshieldIRJET- Review Paper on Supply Chain Management of Windshield
IRJET- Review Paper on Supply Chain Management of WindshieldIRJET Journal
 
IRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
IRJET- The Systematic Procedure to Sort Out Contractor in Construction FieldIRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
IRJET- The Systematic Procedure to Sort Out Contractor in Construction FieldIRJET Journal
 
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...IRJET Journal
 
TQM in Construction Management A Review
TQM in Construction Management A ReviewTQM in Construction Management A Review
TQM in Construction Management A Reviewijtsrd
 
Simulation in the supply chain context a survey Sergio Terzia,.docx
Simulation in the supply chain context a survey Sergio Terzia,.docxSimulation in the supply chain context a survey Sergio Terzia,.docx
Simulation in the supply chain context a survey Sergio Terzia,.docxbudabrooks46239
 
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...Dr. David Mburu (PhD)
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET Journal
 
Supply Chain Optimization under New Product Development and Emergence of Risk...
Supply Chain Optimization under New Product Development and Emergence of Risk...Supply Chain Optimization under New Product Development and Emergence of Risk...
Supply Chain Optimization under New Product Development and Emergence of Risk...IIJSRJournal
 
Is supply chain management important to implement
Is supply chain management important to implementIs supply chain management important to implement
Is supply chain management important to implementAlexander Decker
 
IRJET- A Study on Supply Chain Management in Construction Projects
IRJET- A Study on Supply Chain Management in Construction ProjectsIRJET- A Study on Supply Chain Management in Construction Projects
IRJET- A Study on Supply Chain Management in Construction ProjectsIRJET Journal
 
A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS
A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTSA STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS
A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTSTina Gabel
 
Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...IRJET Journal
 
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...IRJET Journal
 
An Empirical Review On Supply Chain Integration
An Empirical Review On Supply Chain IntegrationAn Empirical Review On Supply Chain Integration
An Empirical Review On Supply Chain IntegrationStephen Faucher
 
Lecture on Innovation & Cost Saving Strategies in Facilities Management
Lecture on Innovation & Cost Saving Strategies in Facilities ManagementLecture on Innovation & Cost Saving Strategies in Facilities Management
Lecture on Innovation & Cost Saving Strategies in Facilities ManagementWhitbags
 

Similar a Effective SCM in Construction (20)

Investigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction CompaniesInvestigation of Supply Chain Management in Construction Companies
Investigation of Supply Chain Management in Construction Companies
 
IRJET- Review on Risk Assessment of Supply Chain Management in Constructi...
IRJET-  	  Review on Risk Assessment of Supply Chain Management in Constructi...IRJET-  	  Review on Risk Assessment of Supply Chain Management in Constructi...
IRJET- Review on Risk Assessment of Supply Chain Management in Constructi...
 
Review on Smart Supply Chain Management
Review on Smart Supply Chain ManagementReview on Smart Supply Chain Management
Review on Smart Supply Chain Management
 
IRJET- Review Paper on Supply Chain Management of Windshield
IRJET- Review Paper on Supply Chain Management of WindshieldIRJET- Review Paper on Supply Chain Management of Windshield
IRJET- Review Paper on Supply Chain Management of Windshield
 
IRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
IRJET- The Systematic Procedure to Sort Out Contractor in Construction FieldIRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
IRJET- The Systematic Procedure to Sort Out Contractor in Construction Field
 
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
IRJET- Study of Supplier Evaluation and Development Practices in Supply Chain...
 
TQM in Construction Management A Review
TQM in Construction Management A ReviewTQM in Construction Management A Review
TQM in Construction Management A Review
 
Simulation in the supply chain context a survey Sergio Terzia,.docx
Simulation in the supply chain context a survey Sergio Terzia,.docxSimulation in the supply chain context a survey Sergio Terzia,.docx
Simulation in the supply chain context a survey Sergio Terzia,.docx
 
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...
OVERCOMING PROJECT MANAGEMENT CHALLENGES THROUGH SUSTAINABLE SUPPLY CHAIN MAN...
 
IRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction IndustryIRJET-Quality Benchmarking in Construction Industry
IRJET-Quality Benchmarking in Construction Industry
 
Supply Chain Optimization under New Product Development and Emergence of Risk...
Supply Chain Optimization under New Product Development and Emergence of Risk...Supply Chain Optimization under New Product Development and Emergence of Risk...
Supply Chain Optimization under New Product Development and Emergence of Risk...
 
Ijm 06 09_008
Ijm 06 09_008Ijm 06 09_008
Ijm 06 09_008
 
Ijm 06 09_008
Ijm 06 09_008Ijm 06 09_008
Ijm 06 09_008
 
Is supply chain management important to implement
Is supply chain management important to implementIs supply chain management important to implement
Is supply chain management important to implement
 
IRJET- A Study on Supply Chain Management in Construction Projects
IRJET- A Study on Supply Chain Management in Construction ProjectsIRJET- A Study on Supply Chain Management in Construction Projects
IRJET- A Study on Supply Chain Management in Construction Projects
 
A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS
A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTSA STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS
A STUDY ON SUPPLY CHAIN MANAGEMENT IN CONSTRUCTION PROJECTS
 
Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...Issues in large scale adoption of Supply Chain Management in Indian Construct...
Issues in large scale adoption of Supply Chain Management in Indian Construct...
 
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
Lean Waste Assessment and Blue Print for Elimination of Waste Through Lean Di...
 
An Empirical Review On Supply Chain Integration
An Empirical Review On Supply Chain IntegrationAn Empirical Review On Supply Chain Integration
An Empirical Review On Supply Chain Integration
 
Lecture on Innovation & Cost Saving Strategies in Facilities Management
Lecture on Innovation & Cost Saving Strategies in Facilities ManagementLecture on Innovation & Cost Saving Strategies in Facilities Management
Lecture on Innovation & Cost Saving Strategies in Facilities Management
 

Más de Est

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017Est
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3Est
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4Est
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmEst
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM PartneringEst
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in constructionEst
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscmEst
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangementEst
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2Est
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016Est
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systemsEst
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docxEst
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignmentEst
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MSEst
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrmEst
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergEst
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationEst
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communicationEst
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016Est
 
BS 2 5 electrical installatition
BS 2 5 electrical installatitionBS 2 5 electrical installatition
BS 2 5 electrical installatitionEst
 

Más de Est (20)

SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017SABD PROGRAMME GUIDE 2017
SABD PROGRAMME GUIDE 2017
 
Sabd undergraduate pg draft v3
Sabd undergraduate pg draft   v3Sabd undergraduate pg draft   v3
Sabd undergraduate pg draft v3
 
BS 2 Fire protection 4
BS 2 Fire protection 4BS 2 Fire protection 4
BS 2 Fire protection 4
 
CSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscmCSCM Chapter 11 relationship management cscm
CSCM Chapter 11 relationship management cscm
 
CSCM Partnering
CSCM PartneringCSCM Partnering
CSCM Partnering
 
CSCM Communication in construction
CSCM Communication in constructionCSCM Communication in construction
CSCM Communication in construction
 
CSCM Material delivery problems cscm
CSCM Material delivery problems cscmCSCM Material delivery problems cscm
CSCM Material delivery problems cscm
 
BS 2 Escalators arrangement
BS 2 Escalators arrangementBS 2 Escalators arrangement
BS 2 Escalators arrangement
 
BS 2 Escalators 1of 2
BS 2 Escalators 1of 2BS 2 Escalators 1of 2
BS 2 Escalators 1of 2
 
BS 2 Group assignment brief question august 2016
BS 2 Group assignment brief  question august 2016BS 2 Group assignment brief  question august 2016
BS 2 Group assignment brief question august 2016
 
BS 2 Variable air volume systems
BS 2 Variable air volume systemsBS 2 Variable air volume systems
BS 2 Variable air volume systems
 
CSCM Bim group assignment.docx
CSCM Bim group assignment.docxCSCM Bim group assignment.docx
CSCM Bim group assignment.docx
 
CSCM individual assignment
CSCM individual assignmentCSCM individual assignment
CSCM individual assignment
 
Management science group assignment MS
Management science group assignment MSManagement science group assignment MS
Management science group assignment MS
 
MS Tutorial 12 hrm
MS Tutorial 12 hrmMS Tutorial 12 hrm
MS Tutorial 12 hrm
 
MS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerbergMS Case study development for entrepreneur mark zuckerberg
MS Case study development for entrepreneur mark zuckerberg
 
MS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivationMS Lecture 7 leadership and motivation
MS Lecture 7 leadership and motivation
 
MS Lecture 8 communication
MS Lecture 8 communicationMS Lecture 8 communication
MS Lecture 8 communication
 
MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016MS Qsb 2413 group project 2016
MS Qsb 2413 group project 2016
 
BS 2 5 electrical installatition
BS 2 5 electrical installatitionBS 2 5 electrical installatition
BS 2 5 electrical installatition
 

Último

Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Pereraictsugar
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...lizamodels9
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,noida100girls
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfrichard876048
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Riya Pathan
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 

Último (20)

Kenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith PereraKenya Coconut Production Presentation by Dr. Lalith Perera
Kenya Coconut Production Presentation by Dr. Lalith Perera
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
Call Girls In Radisson Blu Hotel New Delhi Paschim Vihar ❤️8860477959 Escorts...
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
BEST Call Girls In Old Faridabad ✨ 9773824855 ✨ Escorts Service In Delhi Ncr,
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
Innovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdfInnovation Conference 5th March 2024.pdf
Innovation Conference 5th March 2024.pdf
 
Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737Independent Call Girls Andheri Nightlaila 9967584737
Independent Call Girls Andheri Nightlaila 9967584737
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 

Effective SCM in Construction

  • 1. ISSN 2394-7349 International Journal of Novel Research in Engineering and Science Vol. 2, Issue 1, pp: (35-40), Month: March 2015 - August 2015, Available at: www.noveltyjournals.com Page | 35 Novelty Journals Supply Chain Management: Effective Tool in Construction Industry Mulla Aneesa.I1 , Dr. A.K.Gupta2 , Prof. D.B.Desai3 1 M.E.(Construction & Management) Part-II, 2 Professor & Principal I/C, 3 Associate Prof., Head of Dept. 1,2,3 Dr. J.J. Magdum college of Engineering, Jaysingpur Abstract: Supply Chain Management is recognized as a leading process improvement, cost saving and revenue enhancing business strategy. It applies to all businesses involved in the delivery of construction projects. Supply Chain Management requires a corporate initiative, supported by strategic and tactical planning, to instill systems thinking and promote a new discipline that companies must master. Construction Projects Supply Chain Management requires a good understanding of production management; planning, design, and construction; and business drivers like other disciplines within an organization, such as structural, mechanical, electrical, or process engineering, accounting and materials management. Supply Chain Management must have a champion who can drive the ideas across disciplines within the organization as well as across organizational boundaries. Keywords: Supply chain management (SCM), construction supply chain, collaboration, bench marking (BM), total quality management(TQM), Customer Relationship Management(CRM). I. INTRODUCTION Construction industry is the second largest economic activity in India. Indian Construction Industry can be divided into three market segments: Infrastructure, Industrial and Real Estate. Infrastructure constitutes of roads, ports, airports, irrigation, railway, and power projects etc. In the Indian context, it is estimated that 1% growth in infrastructure yields a cascading effect of 2.5% growth of GDP. There is a massive investment flow into the infrastructural development in India and other Asian countries. Looking at the ubiquitous construction activity in the country and strong future prospects, it is important to devise the strategies to enhance the productivity in construction activity which seems to lag far behind in comparison to other manufacturing and service industries. In the lack of construction firms’ initiative for higher productivity and better quality, construction industry has seen commoditization; where contracts are awarded on the basis of minimum bid. This in turn has reduced the profit margins and industry players have been averse of making investments for productivity enhancement. Current firm-specific cost reduction doesn’t confer any sustainable advantage in the global market. With the increasing global competition, Indian firms need to involve all the stakeholders of the construction supply chain who influence the productivity of the project. This is possible only through greater coordination among various players. Firms need to follow a supply chain approach to achieve global standards. Rising revenues of construction industry and strong future prospects would encourage construction firms to make investments to achieve higher productivity. The issue of delays, cost over-runs and quality non-conformance is closely related to the Supply Chain Management (SCM) and we believe that applying SCM principles, Use of Information Technology (IT) and supply chain integration can bring significant increase in the productivity in construction projects. II. SUPPLY CHAIN MANAGEMENT SCM tries to achieve more than just planning of product and information flow; and it also aims at connecting and synchronizing the processes of other inter-related organisations such as the client, suppliers and customers. “SCM is an innovative and revolutionary managerial approach which involves a working culture change and a voluntary initiated agreement for integration and synchronization of two or more inter-dependent members within variety of
  • 2. ISSN 2394-7349 International Journal of Novel Research in Engineering and Science Vol. 2, Issue 1, pp: (35-40), Month: March 2015 - August 2015, Available at: www.noveltyjournals.com Page | 36 Novelty Journals organization level and boundaries as well as range of inter-linked construction life-cycle processes (initiation to handover). It promotes joint effort and strategy on all activities which are underpinned by mutual trust, responsibility, benefit and risk sharing based on a long-term perspective on relationship. Value is achieved through optimization and management of processes, resources, core competencies, talent, information, power and technology within the supply chain towards accomplishment of a set of shared objective and goals, enhance competitive advantage, breaking down any discontinuities and meeting distinctive client needs. Consequently, jointly agreed benchmarks, targets, expectation and values are put in place for continuous improvement efforts and are supported by aligned incentive schemes towards sustaining the endeavor”. 2.1 Managing supply chains in construction: SCM has become increasingly popular in construction literature and practice, and a number of SCM initiatives have been launched. Together with related concepts such as lean thinking, JIT and partnering, SCM is suggested as a promising means for improving construction performance the main idea being that supply chain processes should be integrated in order to provide better customer value (Latham,1994; Egan, 1998; Strategic Forum, 2002).However, in line with the general SCM literature suggesting that the implementation of SCM practices might pose a number of challenges (see Bask and Juga, 2001; Jahre and Fabbe-Costes, 2005), SCM is considered to be especially problematic in relation to the construction industry (Briscoe and Dainty, 2005; Fearne and Fowler, 2006; Fernie and Thorpe, 2007). Both SCM and lean construction have been criticized for their vague terminology and rhetoric and lack of interest in more critical scrutiny of the sectors for which the concepts were originally developed (Winch, 2003; Green and May, 2003; Green et al., 2005). This has further been proposed as an explanation for slow adoption as well as a lack of ability to provide the promised benefits. Hence, there is a need for further scrutiny and understanding of applications of the concept in this industry. In the following, we inquire into how supply chains, and in particular supply chain integration, are viewed in the construction literature, first through a review of construction literature with regard to supply chain integration, then by discussing different interdependencies in and between construction supply chains. 2.2 Principles underpinning supply chain management: Supply chain management is actually concerned with more than the movement of materials from point to point. However, there are some principles attached to the use of supply chain management posited by Handfield and Nichols (2002: 6).These principles are described as follows:  The only entity that injects money into a supply chain is the end customer. That is until the client initiates a procurement process, the supply remains idle;  The solution that is stable over the long term is one in which every element of the supply chain, from raw material to end customer, profits from the process. It is short sighted for businesses to believe they can solve their cost problems by punishing suppliers and customers. Shifting costs and problems without solving root causes is inherently unstable and mostly unsuccessful over the long term. The best supply chains will solve problems, implement the best solutions, and share the benefits among their members  Supply chain management is about economic value added. Supply chain management is not just about cost reduction. It‟s about the total content of a final product or service, including quality, technology, delivery, and after-sales service. It‟s about managing the total process and ultimately meeting the needs of the client. The integrated management of information and materials across the supply chain offers the benefits of increasing the value-added by supply chain members, removing waste, reducing cost, and improving customer satisfaction (Handfield and Nichols, 2002: 32).  In the same sense, Pryke (2002: 17) suggests that the observation of construction project governance through the analysis of transactions classified broadly into information exchange, performance incentives and contractual relationships, provides benefits in relation to clarity and quantification, particularly as procurement methods move away from the traditional contracting system previously prevalent in the construction industry.  Therefore supply chain managers strive to achieve the ideas of fully integrated and effective supply chains ,capable of creating and sustaining competitive advantage.(Christopher and Towill, 2002 cited by Christopher and Peck, 2004: 1).
  • 3. ISSN 2394-7349 International Journal of Novel Research in Engineering and Science Vol. 2, Issue 1, pp: (35-40), Month: March 2015 - August 2015, Available at: www.noveltyjournals.com Page | 37 Novelty Journals  To this end they must balance downward cost pressures and need for efficiency, with effective means to manage the demands of market-driven service needs and the known risks of routine supply chain failures (Christopher and Peck, 2004: 1). 2.3 Benefits of Supply Chain Management: Following are the benefits of effective SCM:  Transparency, trust and efficiency in the management of the supply chain present benefits to all parties involved in project delivery:  Clients can develop improved ability to identify strengths, weaknesses, opportunities and threats in the chain, and increased value for money and efficiency;  Contractors can access improved early and continuous communications with clients and stakeholders, and a more competitive subcontractor base offering better skills, expertise, innovation and value for money, and  Subcontractors can engender improved communication with contractors and assurance of continuity in business. 2.4 The Role of Supply chain in Construction Industry: The manufacturing industry is the pioneer industry which introduces the concept of SCM as a new and important tool to perform the business process in a systematic and well defined way to save time, enhance quality and realize profit Tan, (2001). The construction industry SCM processes are scattered and are partially adopted. The building and construction industry can be divided into three main categories: building construction; heavy engineering construction and trade construction. While building construction can be further divided into residential and non-residential for example commercial and industrial building. Akintoye et.al. (2000) conducted a survey on supply chain management in UK construction industry and they argue that there exists partnership relationship among contractors, suppliers and clients; they only focus on the production planning and purchasing factors for the SCM process in construction industry and lists the barriers which can hindrance the successful process of SCM in construction industry. Vrijhoef and Koskela (2000) discussed four roles of supply chain management as described in the fig. 1. These four roles in construction industry can be recognized based on the focus of the industry either construction site or supply chain or even both. The authors claimed these roles have major impact on the construction industry. Fig. 1 Four Role of SCM in Construction Industry (Vrijhoef and Koskela :2000)
  • 4. ISSN 2394-7349 International Journal of Novel Research in Engineering and Science Vol. 2, Issue 1, pp: (35-40), Month: March 2015 - August 2015, Available at: www.noveltyjournals.com Page | 38 Novelty Journals For example rule 1 focus on the interface between the supply chain and the construction site, the main impact of this is to reduce the costs and duration of site activities. These four roles does not seems to be mutually exclusive, while in practice these four roles are simultaneously applied to the supply chains in order to improve the efficiency of SCM processes. Welling and Kamann (2001) suggest that building and construction industry supply chains can be at firm level or project level. The firm level can provide stable and long term supply chains on the other hand project level supply chain are mostly temporary because their durations are already fixed. Love et.al (2002) identified the partnership relationship related to the alliances, which can be either strategic or project based. The project based alliances are more towards short term alliances for the temporary projects while the strategic alliances focuses on the long term partnership relationship for the large projects and the alliance is based on more than one project. Hence the partnership relationship plays vital role in building and construction industry which develops the trust and commitment. Saad et.al.( 2002) provides a review on the adoption of SCM in construction industry and suggest that construction experts has some knowledge of SCM, but still they need more attention towards the implementation of SCM by increasing their conceptual understanding and how new SCM can be implemented systematically. Briscoe and Dainty (2005) recommended the most common characteristics for structural projects for the construction industry, which make hindrances to make fully utilize of supply chain in construction projects, for example one-off projects, the project which are located on different sites ( i.e geographically dispersed) and also the high fragmentation, which is a natural characteristic of any construction project, Khalfan et.al (2007) presents the different views on the building trust among supply chain participants in the construction projects. El- Saboni e.al. (2007) and El-Saboni e.al.(2009) investigates the success of the construction projects in UAE are based on modern electronic communication management system. They provide a state of art on the usage of modern communication technologies in construction industry and also they investigate how these modern system influence the relationship of different project team members.Ali.et.al. (2010) studies the performance of construction projects in Malaysia; their research is based on quantitative data collection and through questionnaire surveys. In addition, they argue that Malaysian industry is still infancy to adopt the partnering approach their partnering approach is still local based this may be due to the influence of the culture. Soemardi et.al.(2007) explains the application of SCM in the Indonesian construction industry. They argue that the SCM processes in Indonesian construction industry are still in infancy or the SCM processes are not adopted at all. However their study is starting points towards the application of SCM in Indonesian construction industry, there still need more research in this area. Barkhi and Daghfous (2009) study shows the application of TQM, SCM and CRM implementations in the UAE hotels. UAE also attracts tourist in the, with increase of tourist in the UAE, hotel managements four to five star category hotels have realized the benefits of the supply chain management. This case is a unique case and has relevance to the application of SCM in a UAE industry. Fig. 2 shows the qualifications and consequences of TQM, CRM and SCM implementation in UAE hotel industry. From the implementation it has been clearly identified that SCM increases the operation efficiency, so it does not only provide relationship management with the contractor and supplier but has an overall impact on the efficiency of the services delivered by the hotel management. Fig. 2 Antecedents and Consequences of TQM, CRM and SCM Implementation. ( Barkhi and Daghfous :2009 )
  • 5. ISSN 2394-7349 International Journal of Novel Research in Engineering and Science Vol. 2, Issue 1, pp: (35-40), Month: March 2015 - August 2015, Available at: www.noveltyjournals.com Page | 39 Novelty Journals 2.5 Construction Supply Chains: Characteristics: Construction supply chain involves stakeholders who are individual service providers such as subcontractors, designers, engineering consultants, transporters etc. and manufacturers of materials and equipments. On an average material cost contributes 50% to the project cost and hundreds of material and equipment suppliers take part in the supply chain. Apart from these suppliers, activities of the construction projects are subcontracted to specialty contractors such as designers, electrical, engineering, plumbing etc. Being a demand driven industry owner’s involvement in the project remains crucial and continuous information flow from client is essential. Fig. 3, shows the highly non-linear characteristic of construction supply chains where strong supply chain information and material linkages are shown. Construction can be viewed as a complex of manufacturing and services. In this sense, many of the operations involved in manufacturing have similarity with construction projects in their characteristics. As an example, procuring materials and assembling them to make a product is common in both manufacturing and construction. This is the reason why Toyota, the leading Japanese auto manufacturer, has entered into housing construction and applying mass production and lean manufacturing techniques there. Fig. 3: Construction supply chain III. CONCLUSION Supply chain management (SCM) is a great opportunity for the construction industry primarily to reduce cost and time, and thus improve profitability. SCM principles seem to have much strength to smoothen and integrate the construction processes. The supply chains in construction could be divided into two major groups as materials chain and the construction chain, which would help to separate the procurement and management operations. However, both chains are linked through a SCM database, which is further linked with the central project database. This would ensure the smooth flow of information within the different chains and results in increased collaboration within the supply chain partners. Obstacles for supply chain management are found to be poor level of logistical competence, lack of guidance for creating strategic alliances, inability to integrate the company’s internal procedures, strong project focus as well as the attitudes and traditions in the construction industry. Some serious flaws in the current project planning practices, which ignore information and resource constraints. Also the Risk Management should be more effective, in lack of which firms cannot avoid delays and cost over-runs. Forming Integrated Supply Chains is a strategy that construction industry should follow by forming long-term relationships with
  • 6. ISSN 2394-7349 International Journal of Novel Research in Engineering and Science Vol. 2, Issue 1, pp: (35-40), Month: March 2015 - August 2015, Available at: www.noveltyjournals.com Page | 40 Novelty Journals suppliers; subcontractors and other supply chain players, sharing information for mutual benefits; and using IT to make it more efficient and effective. REFERENCES [1] Gohari Ali, “Supply Chain Management in Construction Industry”, Advances In Management, Vol No.7, No.8,pp. 17-22, 2014. [2] Lin Lin, Peter Gibson, ,“Implementing supply chain quality management in subcontracting system for construction quality”, Journal of System and Management Sciences, Vol No.1, No. 1, pp. 46-58, 2011. [3] Lockamy Archie and McCormack Kevin, “The development of a supply chain management process maturity model using the concepts of business process orientation”, Supply Chain Management: An International Journal, Vol No. 9,No. 4,pp. 272-278, 2004. [4] O’Brien William J., “Construction Supply-Chain Management: A Vision for Advanced Coordination, Costing, and Control” ,Construction Supply-Chain Management, Vol No:1,Page Nos. 1-7, 2000. [5] Petrovic-Lazarevic Sonja, Matanda Margaret & Worthy Russell, “Supply Chain Management In Building And Construction Industry: Case of Australian Residential Sector”,Department of management working paperseries, Vol No. 21 , No. 06 , pp. 1-10, 2006. [6] Ping.HT serng.; Yin Samuel Y. L.; and Li Sherman, “Developing a Resource Supply Chain Planning System for Construction Projects”,Journal of Construction Engineering and Management © ASCE, Vol No.132, No.4 pp.393- 407, 2006 . [7] RiaziMehdi, RiaziSalman, Skitmore, Martin, & Cheung, Yan Ki Fiona, “The use of supply chain management to reduce delays:Malaysian public sector construction projects” , In Proceedings of the 6th Nordic Conference on Construction Economics and Organisation in Society, Copenhagen, Denmark, Vol No.2,pp. 403-414, 2011. [8] Siva Jessica And Zhang Peng, “A Supply Chain Management Self Assessment Framework For Waste Minimisation For The Residential Sector” , Australian Housing Supply Chain Alliance, RMIT University, Page 1-37, March 2013. [9] Syed Mahmood Ahmed, Salman Azhar, Irtishad Ahmad, “Supply chain management in construction Scope, benefits and barriers”, Delhi Business Review, Vol No. 3, No. 1, pp.23-29, 2002. [10] Viswanadham N. & Kumar Vinit, “Achieving Rural & Global Supply Chain Excellence” , ISB, Gachibowli , Hyderabad 500032,, Hyderabad,2006. [11] Vrijhoef Ruben and Koskela Lauri, “Roles of supply chain management in construction”, Proceedings IGLC, Vol No.7, pp. 133-146, 1999. [12] Vrijhoef Ruben and Koskela Lauri, “The Four Roles of supply chain management in construction”, European Journal of Purchasing and supply management, Vol No.6, pp.169-178, 2000. [13] Walsh Kenneth D., M.; Hershauer James C.; Iris D. Tommelein, A.M.ASCE; and Tobi A. Walsh, “Strategic Positioning of Inventory to Match Demand in a Capital Projects Supply Chain”, Journal of construction engineering and management © ASCE, Vol No.130, No.6,pp.818-825, 2004. [14] A. Vetro, H. Sun, P. DaGraca, and T. Poon, “Minimum drift architectures for three-layer scalable DTV decoding,” IEEE Transaction on Consumer Electronics, Vol. 44, No. 3, pp. 527-536, Aug. 1998. [15] M. Young, the Technical Writer's Handbook. Mill Valley, CA: University Science, 1989.