CME Warehouse - temperature & humidity controlled storage of regulated product, also include the HVAC system in the Retained Sample Store (existing R22 plant obsolete)
Beginners Guide to TikTok for Search - Rachel Pearson - We are Tilt __ Bright...
Global Pharmaceutical Manufacturer – Memphis – Tennessee
1. EECO2 Case Study
Global Pharmaceutical Manufacturer – Memphis – Tennessee
CME Warehouse - temperature & humidity controlled storage
of regulated product, also include the HVAC system in the
Retained Sample Store (existing R22 plant obsolete)
2. Benefits:
Delivering Global Energy Saving Solutions
The core expertise & experience within EECO2 is not the usual Consultant format as we all come from a design & build
background, commercially grounded and totally focused upon the identification & cost effective delivery of identified
energy savings.
Core Objective of all services:
Use our acquired experience & knowledge to provide cost effective, energy & emission reduction solutions from initial
opportunity identification through implementation & verification of savings delivered globally.
Actual Verified Benefits:
Energy savings delivered = 1.95m kWhr/pa
Energy cost savings = $135,000
Emissions reduction = 917 te CO2
Simple pay back = 1.5 years
Capital cost avoidance from not replacing Retained Sample Store HVAC = $35,000
EEC02 Limited
Suite 9, The Green
Fountain Street, Macclesfield
Cheshire, SK10 1JN
Tel: +44 (0) 1625 660 717 |Email: info@eeco2.co.uk
3. About the Project:
Facility: CME Warehouse - temperature & humidity controlled storage of
regulated product, also include the HVAC system in the Retained Sample Store
(existing R22 plant obsolete)
Issue: Very high energy demand driven by original HVAC design & layout
Brief: Reduce energy demand without compromising on Compliance
Solution:
• Reduce existing air change rates
• Reduce existing fresh air volume
• Install 2 new VSD’s to the 100kw supply air fans
• Replace the existing supply air diffusers to improve air distribution
• Use existing warehouse HVAC system to serve Retained Sample Store
• Risk based approach to mitigate potential “out of condition” impact
EEC02 Limited
Suite 9, The Green
Fountain Street, Macclesfield
Cheshire, SK10 1JN
Tel: +44 (0) 1625 660 717 |Email: info@eeco2.co.uk
4. Conclusion and Comments:
Conclusion:
EECO2 supported HVAC design review, project scoped out & local contractors bid to complete project – project let &
successfully completed
Site Energy Manager Comments:
“This project was key for delivering the sites 2010 energy target. It exemplifies how the proper air flow & fresh air can
contribute significant energy savings. This type of project will be replicated in the remaining areas of our Facility”
Site Energy Manager
EEC02 Limited
Suite 9, The Green
Fountain Street, Macclesfield
Cheshire, SK10 1JN
Tel: +44 (0) 1625 660 717 |Email: info@eeco2.co.uk
5. Contact Details:
General Enquiries & Sales Connect with us:
Tel: +44 (0) 1625 660 717
Email: info@eeco2.co.uk Follow us on Linkedin
Technical Support Like us on Facebook
Tel: +44 (0) 1625 660 717
Email: info@eeco2.co.uk Follow us on Twitter
EEC02 Limited Add us on Google Plus
Suite 9, The Green
Fountain Street, Macclesfield
Cheshire, SK10 1JN