SlideShare una empresa de Scribd logo
1 de 6
Descargar para leer sin conexión
ENGR.MUHAMMAD FAHIM IQBAL
 Cell phone 0302-7842003—0321-7732258
 Email: fahim_bs@yahoo.com
 Email: fahimiqbal809@Gmail.com
OBJECTIVE
My objective is to achieve excellence in a dynamic organization. I enjoy
working as Part of an effective team in a friendly environment. I am capable of working on
my own initiative and possess excellent organizing abilities. I possess excellent
Communication skills and I am able to work under pressure to meet deadlines. Always
work hard and efficiently to achieve my goals. My words are not the simple Saying words
because I will show you by practically
Experience
KSS ENGINEERING PVT LTD(January 2014 to Present)
Responsibilities
CORE COMPETENCIES:
Good Command Over:
 Putty
 Total Commander
 RBS Element Manager
 MOshell
 Mini-Link Craft
 OMT
 MS Office
 Proficient in C and C++
 SDR installation
 Commissioning of SDR
 Alarm patching & commissioning
of SDR
Good communication skills, Can face the challenges, Team work, Punctual
CAREER COMPETENCIES
 Ericsson 3G onsite commissioning
 BTS swap
 3G installation
 Power swap
 Trouble shooting
 Complete installation of Huawei BTS3900
 Ericsson 3G complete installation
 Ericsson DUW installation and configuration
 Huawei 3G complete installation
 2G , 3G , LTE complete installation of ZTE
 Commissioning of SDR 3900,
SDR8700,SDR6800.SDR3600,SDR8910
BSS Engineer;
1. Working on ERICSSON, ZTE, Huawei project in Multan and Faisalabad, layyah region.
2. Having experience regarding ALKATEL dismantling equipment.
3. Installation of SDR , commissioning of SDR
4. Commissioning of SDR 3900, SDR8700,SDR6800.SDR3600,SDR8910
5. Alarm patching of SDR
6. Configuration of ZTE microwave
7. Hands on experience on LMT for SDR.
8. Installation, integration and Commissioning of RBS 6000 family (900/1800).
9. Troubleshooting of RBS faults
10. Hands on experience on OMT for RBS.
11. Expansion of TRX (900/1800).
12. Expansion of RBS.
13. Complete installation experience on RBS-6301 (OFC Solution outdoor).
14. Complete installation experience on RBS-6101, 6201 (Feeder Solution outdoor).
15. ALARMS patching on OVP relays from RBS to RECTIFIER and then to ATS PANNEL.
(Gen set, GLO, AC-main failure, BLVD, system on batteries, battery high temp, and rectifier
door, rectifier major & Minor).
16. Generating the IDB file according to the site configuration.
17. DUG loading via OMT in order to visible the site in BSC.
18. Installation & commissioning of EMERSON rectifier logging into it via IETESTER.
19. Installation & Commissioning of DELTA Rectifier.
20. Defining ALARMS through OMT alarms inlet.
21. Verifying Alarms through OMT & then from NOC.
22. Installation of DUG in RBS.
23. Synchronization of DUG-900 with DUG-1800 through ESB port via SYNC CABLE.
24. Loading DUG file into the flash card by using OMT.
25. Installation of RRU’s & Fiber from RRU to DUG-900 and DUG-1800.
26. Installation of RUS 900 and RUS 1800.
Microwave Transmission Engineer;
1. Installation of CN 210 (COMPAQ NODE).
2. Installation of TN magazine (2P, 6P & 20P).
3. Installation of MMU-2H, MMU-2K, MMU-3A cards in magazine.
4. E1 Routings, Traffic routings, (Site to Site E-1 Routing)
5. Configuring cards via MINILINK CRAFT according to the link budget.
6. Update releases via FTP SERVER.
7. DCN Implementation in Traffic Node (20P, 6P, 2P).
8. Configuration of XPIC link (Cross Polar Interference Canceller), while
maintaining XPD value.
9. Installation and alignment of MINILINK MICROWAVE DISHES for traffic utilization.
10. Preparing of SID, S at Ericsson Document.
11.DCN Implementation in Traffic Node (20P, 6P, 2P). Visibility of sites on NMS.
12. Configuration of ZTE microwave 8120, 8250 according to the link budget.
13. Updates V LAN id according to sites configuration.
EXPERIENCE
KCN ENGINEERING PVT LTD(January 2013 to 15-NOVEMBER 2013)
Responsibilities
1. Working as a field Engineer (BSS & Transmission Engineer) at Mobilink Ericsson,
CM PAK ZTE, CM PAK Huawei, ZTE Telenor project at central region.
2. To view Engineering documents (layout) & make sure to install mention equipment
according to engineering documents.
3. To commissioned 2P, 6P, 20P, CN.
4. To commissioned RBS 6101, 6102, 6301, 6201.
5. Supervise all team & defend all facing problems.
6. To verify & generating all External alarms.
7. Patching of external alarms in RBS and rectifier. Installation of AU external alarms in
ATS panel.
8. To troubleshoots all facing issues during troubleshooting at RBS & IDU (2P, 6P, 20P,
CN).
9. To make IDB in DUG in RBS.
10. To commissioned Emerson Rectifier.
11. To make installation of RRU (RRU B8, RRU B3) RUS (RUS B8,RUS B3).
12. Preparing of SID, S at Ericsson Document.
13. To make installation of dish such as 0.3, 0.6, 0.9, 1.2, 1.8m.
14. Hands on experience on OMT for RBS.
15. Expansion of TRX (900/1800).
16. Expansion of RBS.
17. DCN Implementation in Traffic Node (20P, 6P, 2P).
18. Configuration of XPIC link (Cross Polar Interference Canceller),
while maintaining XPD value
19.DCN Implementation in Traffic Node (20P, 6P, 2P). Visibility of sites on
NMS.
20. E1 Routings, Traffic routings, (Site to Site E-1 Routing)
21. GSM MSOFT Hardware system.(UET LAHORE)
22. MSOFT Basic Data Configuration.
23. MSOFT routine Operation & maintenance.
24. HLR hardware System.(UET LAHORE)
25. HLR Basic data Configuration.
26. HLR routing Operation & maintenance.
27. GSM BTS System .(UET LAHORE)
28. BSC Hardware System.
29. GSM BTS Data Configuration.
30. BSC Field Maintenance,
31. Multiplexing and De-Multiplexing.
32. Pak Human Resources Development organization (NGO) Multan.(2004—2005)
COMPUTER SKILLS
o Windows xp, 2000, 98
o In page, Internet Operation, MS Office
o Computer Hardware (Software Installation, Troubleshooting, Assembling, Up
gradation System Configurations Basic Networking, General Repair & maintenance)
PERSONAL PROFILE
 Father's Name: Main khurshid Ahmed
 Date of Birth: 15-03-1987
 CNIC: 32203-7428212-1
 Marital Status: Single
 Domicile: Layyah
 Religion: Islam
 Permanent Address: Muhallah Eid Gah near Chungi no 8 C/O Madni Shafa Khana Layyah
 Postal Address: Muhallah Eid Gah near Chungi no 8 C/O Madni Shafa Khana Layyah
 Resident Phone: 0606-319568
 Mob NO: 0332-9640658
 Qualification : D.A.E (Electrical) (2006)
 Board Name : P.BT.E. Lahore.
 Qualification : Matriculation (2002)
 Board Name : B.I.S.E. D.G.KHAN.
 Qualification : BS-Telecom (2011)
 Board Name : Gomal University, D.I.Khan
ACADEMICS
MARKS SHEET
Degree Board / University Year
Percentage/
CGPA
Subject
SSC BISE D.G.KHAN 2002 51% Science Group
DAE PBTE Lahore 2006 67.09% DAE
BS-Telecom.
Gomal University.
D.I.Khan
2007-11 2.92
Specialization in
telecom
DIT GVTI Layyah 2008 A+
DIT (PHRDO) Multan 2004-05 A+
PROFESSIONALS SKILLS PROFILE
My Education has equipped me with
 Excellent Verbal and interpersonal Communication.
 Affluent presentation skills.
 A sublime exposure of creativity and stress management.
LANGUAGES PROFICIENCY
 Urdu, English. Punjabi, Saraiki
 Playing games given below.
 Study General knowledge books.
 Gardening.
Winner of six Medals in
Volleyball, Basketball Table Tanis Cricket
Athletics, Foot Ball.
 Converting power supply from AC to DC.
 Will be furnished on demand.
HOBBIES
SPORTS
MINI-PROJECTS
REFERENCE:

Más contenido relacionado

La actualidad más candente

Huawei DBS 3900 Hardware Structure
Huawei DBS 3900 Hardware StructureHuawei DBS 3900 Hardware Structure
Huawei DBS 3900 Hardware Structureibrahimnabil17
 
Huawei GSM Principles
Huawei GSM PrinciplesHuawei GSM Principles
Huawei GSM PrinciplesAchmad Fauzi
 
A glance over cellular Communication systems and BSS network equipment
A glance over cellular Communication systems and BSS network equipmentA glance over cellular Communication systems and BSS network equipment
A glance over cellular Communication systems and BSS network equipmentAhmed Nabeeh
 
Zte utran ur11.1 optional feature description
Zte utran ur11.1 optional feature descriptionZte utran ur11.1 optional feature description
Zte utran ur11.1 optional feature descriptionMd Kamruzzaman
 
146661638 configuring-rbs-6201-gsm-with-rus
146661638 configuring-rbs-6201-gsm-with-rus146661638 configuring-rbs-6201-gsm-with-rus
146661638 configuring-rbs-6201-gsm-with-rusSyed Ahmad
 
Nokia engineer basic_training_session_v1
Nokia engineer basic_training_session_v1Nokia engineer basic_training_session_v1
Nokia engineer basic_training_session_v1mohameddawood35
 
02 opti x rtn 900 v100r002 system hardware-20100223-a
02 opti x rtn 900 v100r002 system hardware-20100223-a02 opti x rtn 900 v100r002 system hardware-20100223-a
02 opti x rtn 900 v100r002 system hardware-20100223-aWaheed Ali
 
Wi max rru3702 troubleshooting guide v1.0-20100609-a
Wi max rru3702 troubleshooting guide v1.0-20100609-aWi max rru3702 troubleshooting guide v1.0-20100609-a
Wi max rru3702 troubleshooting guide v1.0-20100609-aAmjad Jamil
 
Huawei White Spaces E & V Band Technology
Huawei White Spaces E & V Band TechnologyHuawei White Spaces E & V Band Technology
Huawei White Spaces E & V Band TechnologyAdrian Hall
 
240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-trainingShelton Siziba
 
Huaweiumtsnodebconfigurationprinciple 161222082051
Huaweiumtsnodebconfigurationprinciple 161222082051Huaweiumtsnodebconfigurationprinciple 161222082051
Huaweiumtsnodebconfigurationprinciple 161222082051moussaCoulibaly22
 
Ultrasite technical for 4op
Ultrasite technical for 4opUltrasite technical for 4op
Ultrasite technical for 4opTempus Telcosys
 
Gsm r 5.0 bts3012 ae configuration principle v1.0(20120726)
Gsm r 5.0 bts3012 ae configuration principle v1.0(20120726)Gsm r 5.0 bts3012 ae configuration principle v1.0(20120726)
Gsm r 5.0 bts3012 ae configuration principle v1.0(20120726)Pham My
 
Huawei XPIC Hardware Connection
Huawei XPIC Hardware ConnectionHuawei XPIC Hardware Connection
Huawei XPIC Hardware Connectionibrahimnabil17
 
How to configure the logical distance of gpon
How to configure the logical distance of gponHow to configure the logical distance of gpon
How to configure the logical distance of gponHuanetwork
 
Microwave Huawei RTN Hardware Structure
Microwave Huawei RTN Hardware StructureMicrowave Huawei RTN Hardware Structure
Microwave Huawei RTN Hardware Structureibrahimnabil17
 
The Review of Huawei OLT
The Review of Huawei OLTThe Review of Huawei OLT
The Review of Huawei OLTHuanetwork
 
Mobilink 2G3G Swap Guide V1.8 20150406 (1)
Mobilink 2G3G Swap Guide V1.8 20150406 (1)Mobilink 2G3G Swap Guide V1.8 20150406 (1)
Mobilink 2G3G Swap Guide V1.8 20150406 (1)Abdul Mateen Rahim
 

La actualidad más candente (20)

Huawei DBS 3900 Hardware Structure
Huawei DBS 3900 Hardware StructureHuawei DBS 3900 Hardware Structure
Huawei DBS 3900 Hardware Structure
 
Huawei GSM Principles
Huawei GSM PrinciplesHuawei GSM Principles
Huawei GSM Principles
 
A glance over cellular Communication systems and BSS network equipment
A glance over cellular Communication systems and BSS network equipmentA glance over cellular Communication systems and BSS network equipment
A glance over cellular Communication systems and BSS network equipment
 
Zte utran ur11.1 optional feature description
Zte utran ur11.1 optional feature descriptionZte utran ur11.1 optional feature description
Zte utran ur11.1 optional feature description
 
146661638 configuring-rbs-6201-gsm-with-rus
146661638 configuring-rbs-6201-gsm-with-rus146661638 configuring-rbs-6201-gsm-with-rus
146661638 configuring-rbs-6201-gsm-with-rus
 
Nokia engineer basic_training_session_v1
Nokia engineer basic_training_session_v1Nokia engineer basic_training_session_v1
Nokia engineer basic_training_session_v1
 
02 opti x rtn 900 v100r002 system hardware-20100223-a
02 opti x rtn 900 v100r002 system hardware-20100223-a02 opti x rtn 900 v100r002 system hardware-20100223-a
02 opti x rtn 900 v100r002 system hardware-20100223-a
 
Wi max rru3702 troubleshooting guide v1.0-20100609-a
Wi max rru3702 troubleshooting guide v1.0-20100609-aWi max rru3702 troubleshooting guide v1.0-20100609-a
Wi max rru3702 troubleshooting guide v1.0-20100609-a
 
zte mobilink bts swap
zte mobilink bts swapzte mobilink bts swap
zte mobilink bts swap
 
Huawei White Spaces E & V Band Technology
Huawei White Spaces E & V Band TechnologyHuawei White Spaces E & V Band Technology
Huawei White Spaces E & V Band Technology
 
3G Product Summary
3G Product Summary3G Product Summary
3G Product Summary
 
240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training
 
Huaweiumtsnodebconfigurationprinciple 161222082051
Huaweiumtsnodebconfigurationprinciple 161222082051Huaweiumtsnodebconfigurationprinciple 161222082051
Huaweiumtsnodebconfigurationprinciple 161222082051
 
Ultrasite technical for 4op
Ultrasite technical for 4opUltrasite technical for 4op
Ultrasite technical for 4op
 
Gsm r 5.0 bts3012 ae configuration principle v1.0(20120726)
Gsm r 5.0 bts3012 ae configuration principle v1.0(20120726)Gsm r 5.0 bts3012 ae configuration principle v1.0(20120726)
Gsm r 5.0 bts3012 ae configuration principle v1.0(20120726)
 
Huawei XPIC Hardware Connection
Huawei XPIC Hardware ConnectionHuawei XPIC Hardware Connection
Huawei XPIC Hardware Connection
 
How to configure the logical distance of gpon
How to configure the logical distance of gponHow to configure the logical distance of gpon
How to configure the logical distance of gpon
 
Microwave Huawei RTN Hardware Structure
Microwave Huawei RTN Hardware StructureMicrowave Huawei RTN Hardware Structure
Microwave Huawei RTN Hardware Structure
 
The Review of Huawei OLT
The Review of Huawei OLTThe Review of Huawei OLT
The Review of Huawei OLT
 
Mobilink 2G3G Swap Guide V1.8 20150406 (1)
Mobilink 2G3G Swap Guide V1.8 20150406 (1)Mobilink 2G3G Swap Guide V1.8 20150406 (1)
Mobilink 2G3G Swap Guide V1.8 20150406 (1)
 

Similar a ENGR M FAHIM IQBAL CV

Similar a ENGR M FAHIM IQBAL CV (20)

CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27CV Abdul jabbar2016Se June 27
CV Abdul jabbar2016Se June 27
 
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3GMAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
MAZHAR NEW CV with Huawei,ZTE,LCC KSA 3G
 
MTA
MTAMTA
MTA
 
Imtiaz Ali ... CV
Imtiaz Ali ... CV Imtiaz Ali ... CV
Imtiaz Ali ... CV
 
Modassar Resume
Modassar ResumeModassar Resume
Modassar Resume
 
telecom engineer cv-1
telecom engineer cv-1telecom engineer cv-1
telecom engineer cv-1
 
Junaid Eisa CV-May2016
Junaid Eisa CV-May2016Junaid Eisa CV-May2016
Junaid Eisa CV-May2016
 
Naveed CV (1) (1)
Naveed CV (1) (1)Naveed CV (1) (1)
Naveed CV (1) (1)
 
Aashar_CV
Aashar_CVAashar_CV
Aashar_CV
 
Jeffin_BSS_CV
Jeffin_BSS_CVJeffin_BSS_CV
Jeffin_BSS_CV
 
rahul rathour
rahul  rathourrahul  rathour
rahul rathour
 
Asif CV
Asif CVAsif CV
Asif CV
 
APAA SIMON AHUNGWA
APAA SIMON AHUNGWAAPAA SIMON AHUNGWA
APAA SIMON AHUNGWA
 
Ahmed Abdel Mohsen. C.V
Ahmed Abdel Mohsen. C.VAhmed Abdel Mohsen. C.V
Ahmed Abdel Mohsen. C.V
 
Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015
 
CV Hamed Sabbah
CV Hamed SabbahCV Hamed Sabbah
CV Hamed Sabbah
 
Esrar Alam Transmission Engineer
Esrar Alam  Transmission EngineerEsrar Alam  Transmission Engineer
Esrar Alam Transmission Engineer
 
imran cv (1)
imran cv (1)imran cv (1)
imran cv (1)
 
Pmp rf engineer resume
Pmp rf engineer resumePmp rf engineer resume
Pmp rf engineer resume
 
Tamim Rihawi Cv 2011
Tamim Rihawi Cv 2011Tamim Rihawi Cv 2011
Tamim Rihawi Cv 2011
 

ENGR M FAHIM IQBAL CV

  • 1. ENGR.MUHAMMAD FAHIM IQBAL  Cell phone 0302-7842003—0321-7732258  Email: fahim_bs@yahoo.com  Email: fahimiqbal809@Gmail.com OBJECTIVE My objective is to achieve excellence in a dynamic organization. I enjoy working as Part of an effective team in a friendly environment. I am capable of working on my own initiative and possess excellent organizing abilities. I possess excellent Communication skills and I am able to work under pressure to meet deadlines. Always work hard and efficiently to achieve my goals. My words are not the simple Saying words because I will show you by practically Experience KSS ENGINEERING PVT LTD(January 2014 to Present) Responsibilities CORE COMPETENCIES: Good Command Over:  Putty  Total Commander  RBS Element Manager  MOshell  Mini-Link Craft  OMT  MS Office  Proficient in C and C++  SDR installation  Commissioning of SDR  Alarm patching & commissioning of SDR Good communication skills, Can face the challenges, Team work, Punctual
  • 2. CAREER COMPETENCIES  Ericsson 3G onsite commissioning  BTS swap  3G installation  Power swap  Trouble shooting  Complete installation of Huawei BTS3900  Ericsson 3G complete installation  Ericsson DUW installation and configuration  Huawei 3G complete installation  2G , 3G , LTE complete installation of ZTE  Commissioning of SDR 3900, SDR8700,SDR6800.SDR3600,SDR8910 BSS Engineer; 1. Working on ERICSSON, ZTE, Huawei project in Multan and Faisalabad, layyah region. 2. Having experience regarding ALKATEL dismantling equipment. 3. Installation of SDR , commissioning of SDR 4. Commissioning of SDR 3900, SDR8700,SDR6800.SDR3600,SDR8910 5. Alarm patching of SDR 6. Configuration of ZTE microwave 7. Hands on experience on LMT for SDR. 8. Installation, integration and Commissioning of RBS 6000 family (900/1800). 9. Troubleshooting of RBS faults 10. Hands on experience on OMT for RBS. 11. Expansion of TRX (900/1800). 12. Expansion of RBS. 13. Complete installation experience on RBS-6301 (OFC Solution outdoor). 14. Complete installation experience on RBS-6101, 6201 (Feeder Solution outdoor). 15. ALARMS patching on OVP relays from RBS to RECTIFIER and then to ATS PANNEL. (Gen set, GLO, AC-main failure, BLVD, system on batteries, battery high temp, and rectifier door, rectifier major & Minor). 16. Generating the IDB file according to the site configuration. 17. DUG loading via OMT in order to visible the site in BSC.
  • 3. 18. Installation & commissioning of EMERSON rectifier logging into it via IETESTER. 19. Installation & Commissioning of DELTA Rectifier. 20. Defining ALARMS through OMT alarms inlet. 21. Verifying Alarms through OMT & then from NOC. 22. Installation of DUG in RBS. 23. Synchronization of DUG-900 with DUG-1800 through ESB port via SYNC CABLE. 24. Loading DUG file into the flash card by using OMT. 25. Installation of RRU’s & Fiber from RRU to DUG-900 and DUG-1800. 26. Installation of RUS 900 and RUS 1800. Microwave Transmission Engineer; 1. Installation of CN 210 (COMPAQ NODE). 2. Installation of TN magazine (2P, 6P & 20P). 3. Installation of MMU-2H, MMU-2K, MMU-3A cards in magazine. 4. E1 Routings, Traffic routings, (Site to Site E-1 Routing) 5. Configuring cards via MINILINK CRAFT according to the link budget. 6. Update releases via FTP SERVER. 7. DCN Implementation in Traffic Node (20P, 6P, 2P). 8. Configuration of XPIC link (Cross Polar Interference Canceller), while maintaining XPD value. 9. Installation and alignment of MINILINK MICROWAVE DISHES for traffic utilization. 10. Preparing of SID, S at Ericsson Document. 11.DCN Implementation in Traffic Node (20P, 6P, 2P). Visibility of sites on NMS. 12. Configuration of ZTE microwave 8120, 8250 according to the link budget. 13. Updates V LAN id according to sites configuration. EXPERIENCE KCN ENGINEERING PVT LTD(January 2013 to 15-NOVEMBER 2013) Responsibilities 1. Working as a field Engineer (BSS & Transmission Engineer) at Mobilink Ericsson, CM PAK ZTE, CM PAK Huawei, ZTE Telenor project at central region.
  • 4. 2. To view Engineering documents (layout) & make sure to install mention equipment according to engineering documents. 3. To commissioned 2P, 6P, 20P, CN. 4. To commissioned RBS 6101, 6102, 6301, 6201. 5. Supervise all team & defend all facing problems. 6. To verify & generating all External alarms. 7. Patching of external alarms in RBS and rectifier. Installation of AU external alarms in ATS panel. 8. To troubleshoots all facing issues during troubleshooting at RBS & IDU (2P, 6P, 20P, CN). 9. To make IDB in DUG in RBS. 10. To commissioned Emerson Rectifier. 11. To make installation of RRU (RRU B8, RRU B3) RUS (RUS B8,RUS B3). 12. Preparing of SID, S at Ericsson Document. 13. To make installation of dish such as 0.3, 0.6, 0.9, 1.2, 1.8m. 14. Hands on experience on OMT for RBS. 15. Expansion of TRX (900/1800). 16. Expansion of RBS. 17. DCN Implementation in Traffic Node (20P, 6P, 2P). 18. Configuration of XPIC link (Cross Polar Interference Canceller), while maintaining XPD value 19.DCN Implementation in Traffic Node (20P, 6P, 2P). Visibility of sites on NMS. 20. E1 Routings, Traffic routings, (Site to Site E-1 Routing) 21. GSM MSOFT Hardware system.(UET LAHORE) 22. MSOFT Basic Data Configuration. 23. MSOFT routine Operation & maintenance. 24. HLR hardware System.(UET LAHORE) 25. HLR Basic data Configuration. 26. HLR routing Operation & maintenance. 27. GSM BTS System .(UET LAHORE) 28. BSC Hardware System. 29. GSM BTS Data Configuration. 30. BSC Field Maintenance, 31. Multiplexing and De-Multiplexing. 32. Pak Human Resources Development organization (NGO) Multan.(2004—2005) COMPUTER SKILLS
  • 5. o Windows xp, 2000, 98 o In page, Internet Operation, MS Office o Computer Hardware (Software Installation, Troubleshooting, Assembling, Up gradation System Configurations Basic Networking, General Repair & maintenance) PERSONAL PROFILE  Father's Name: Main khurshid Ahmed  Date of Birth: 15-03-1987  CNIC: 32203-7428212-1  Marital Status: Single  Domicile: Layyah  Religion: Islam  Permanent Address: Muhallah Eid Gah near Chungi no 8 C/O Madni Shafa Khana Layyah  Postal Address: Muhallah Eid Gah near Chungi no 8 C/O Madni Shafa Khana Layyah  Resident Phone: 0606-319568  Mob NO: 0332-9640658  Qualification : D.A.E (Electrical) (2006)  Board Name : P.BT.E. Lahore.  Qualification : Matriculation (2002)  Board Name : B.I.S.E. D.G.KHAN.  Qualification : BS-Telecom (2011)  Board Name : Gomal University, D.I.Khan ACADEMICS
  • 6. MARKS SHEET Degree Board / University Year Percentage/ CGPA Subject SSC BISE D.G.KHAN 2002 51% Science Group DAE PBTE Lahore 2006 67.09% DAE BS-Telecom. Gomal University. D.I.Khan 2007-11 2.92 Specialization in telecom DIT GVTI Layyah 2008 A+ DIT (PHRDO) Multan 2004-05 A+ PROFESSIONALS SKILLS PROFILE My Education has equipped me with  Excellent Verbal and interpersonal Communication.  Affluent presentation skills.  A sublime exposure of creativity and stress management. LANGUAGES PROFICIENCY  Urdu, English. Punjabi, Saraiki  Playing games given below.  Study General knowledge books.  Gardening. Winner of six Medals in Volleyball, Basketball Table Tanis Cricket Athletics, Foot Ball.  Converting power supply from AC to DC.  Will be furnished on demand. HOBBIES SPORTS MINI-PROJECTS REFERENCE: