Launching activities on participative
River Basin Management Plans
Upper Kura above Mingachevir
Azerbaijan
Workshop
Baku, July 3rd 2018
European Union Water Initiative plus
for Eastern Partnership
Yannick Pochon
International Office for Water
• Inform on theWFD objectives, concepts and principles
• Understand the assignements for RBMP’s in Upper Kura
above Mingachevir districts and the main challenges
• Facilitate contacts between the consultants and stakeholders
for the development of RBMPs
• Ensure the best global coordination between contracts on-
going for RBMPs development
Objectives of the workshop
PAVE THE WAY TO RBMPs IN
AZERBAIJAN
For AZERBAIJAN
1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
Output 2.3 Development and implementation of pilot RBMPs
Activity 2.3.1
Assessment of the needs and identification of priorities in implementation of the RBMPs
Assessment of existing RBMP (Central Kura subbasins) and the priorities and needs for RBMPlanning
Activity 2.3.2
Technical Support in the elaboration and implementation of the pilot RBMPs
Development of new pilot RBMP: Kura basin district in Azerbaijan upstream Mingachevir dam
Surface Water bodies delineation + main sub-basins in the pilot basin
Groundwater bodies delineation
Groundwater monitoring system development
Description of the characteristics of the river basin
Pressures & impacts analysis of human activities on water ressources
Identification & mapping of protected areas
Cost recovery analysis (economic analysis part 1 related to the characterisation)
First thematic summary on basin characterisation
Objectives including status & risk assessment and Main Issues
Programme of Measures including economic analysis part 2 on costing and financing
Draft RBMP and dashboard on implementation monitoring
Second thematic summary on RBMP
Development of the pilot coastal waterbodies for the Kura Delta at Neftchala
Survey of transitional and costal water bodies at Kura Delta and reporting of results
Delineation of Coastal and transitional Water bodies
Activity 2.3.3
Technical Support to the RBM institutions for coordination in transboundary river basins
Support establishing transboundary coordination, strengthen existing units with continuous support
Assessment of RBMP consistency on both sides of the borders (AZ/GE)
Activity 2.3.4 Biological, ecological, and chemical surveys for development and implementation of RBMPs
SW Field Surveys and on site sampling training on biology, hydromorphology and chemisty
GW Field Surveys and on site sampling training to identify Chemical and Quantitative Status of GWBs
Activity 2.3.5 Investigatory monitoring of water bodies at risk of high pollution
Investigatory monitoring of water bodies at risk of high pollution or related issues
Activity 2.3.6 Development and strengthening of national databases on water related issues
Preliminary steps 1 Diagnostic phase
Support national platform implementaiton (maintenance, support config)
Support map and indicator production (map template, metadata , hosting for sharing)
Integration of data sources and publication through web services
Support to specific complementary processing for data provider or at national level
Activity 2.3.7 Establish a system for regular monitoring of the RBMPs implementation
Selection of indicators to monitor the implementation of the programme of measures
Development of procedures, mechanisms and tool (dash board) to monitor RBMPs implementation
RESULT-3
Output 3.1 Lessons learnt regulary collected, shared and communicated to stakeholders
Activity 3.1.1 Development, regular update and implementation of a communication strategy
Communication and visibility plan development
Implementation of Communication and Visibility actions (Information materials, Country webpage,
Press-releases, Awareness raising events, Social media)
Stakeholder liaison (contacts, distribution list, mass media list); Liaison with EU delegation
Activity 3.1.2
Support public and stakeholder participation in the preparation, implementation, review and update of
RBMPs
Stakeholder communication strategy development for participative RBMPlanning update EPIRB
Basin consultations C 0 Consult. 1 Consult. 2
Organisation and facilitation of basin consultation (Public consultations, Stakeholder meetings) linked to 2.3.2
Consultation -1 : Timetable and work plan C 0
Consultation -2 - Main issues
Consultation -3: Draft RBMP
2020
January February March April May June July August September
2019
January February March April May June July August September October November December
EUWI+ work plan 2018-2020
September October
2018
January February March April May June July August November December
• Project reminder
• TheWFD principles and the national legal framework for
RBMP’s in Azerbaijan
• An experience feedback from EPIRB pilot basins
• Presentations of AZ contractors on their visions on
implementation: drafting RBMP, pressure-impact analysis,
interaction with the other contractors (GW and SW
delineation), etc.
Main items
Main items
• Purpose and main challenges of RBMP in Upper Kura : review
of theTOR/ and application of the methodological guidelines
• Provisional schedule and coordination between the different
consultants
• Methodological Q/A session
Round table
Source : fotolia
EU MEMBER STATES CONSORTIUM:
EASTERN PARTNERSHIP (EaP) COUNTRIES:
BELARUS MOLDOVA UKRAINEARMENIA AZERBAIJAN GEORGIA
AUSTRIA FRANCE
INTERNATIONAL ORGANISATIONS:
Main objective: to improve the management of water resources
OBJECTIVES
• improve the management of water resources in the EaP countries
(AZ, AM, BY, GE, MD, UA)
• achieve convergence of national water policies and strategies with
the Water Framework Directive (WFD)
EXPECTED RESULTS
 Result 1: Legal and regulatory frameworks improved
 Result 2: River Basins Management Plans designed and implemented
 Result 3: Lessons learnt regularly collected, shared and
communicated to stakeholders
The EUWI+ East Project
8
RESULT 3
Stakeholders
involvement Communication
RESULT 2
River Basin
Management
Planning
Data
management
Monitoring &
laboratories
Result 1: Legal and regulatory framework improved
in line with the EU Water Framework
Directive (WFD), Integrated Water
Resources Management and Multilateral
Environmental Agreements.
Result 2: River Basins Management Plans designed
and implemented in line with the EU WFD
principles, from pilot basin to country scale.
Result 3: Stakeholder involvement and
communication
Lessons learnt regularly collected, shared
and communicated to stakeholders.
RESULT 1
National Policy
Dialogue
Legislative and
regulatory reform
Capacity
Building
RESULT 3
Stakeholders
involvement Communication
RESULT 2
River Basin
Management
Planning
Data
management
Monitoring &
laboratories
Result 1: Legal and regulatory framework improved
in line with the EU Water Framework
Directive (WFD), Integrated Water
Resources Management and Multilateral
Environmental Agreements.
Result 2: River Basins Management Plans designed
and implemented in line with the EU WFD
principles, from pilot basin to country scale.
Result 3: Stakeholder involvement and
communication
Lessons learnt regularly collected, shared
and communicated to stakeholders.
RESULT 1
National Policy
Dialogue
Legislative and
regulatory reform
Capacity
Building
National legal frame for RBMP’s in AZ
• Rafig
11
EPIRB Feedback
• Zurab / Rafig
12
Presentations from consultants
• Approach, Methods,Teams,Timetables
France
552,000 km²
66 million inhabitants
Discussion / Questions
17
Source : fotolia
18
İnstitusional çərçivə
Milli Qanunvericilik
Rayonların(hövzə) sərhədlərinin müəyyənləşdirilməsi;
səlahiyyətli qurumlar inzibati quruluş; koordinasiya
Tədbirlər Proqramı
Tədbir:
İşlər
Tədbir:
İşlərTədbir:
Qaydalar
Tədbir:
İdarəçilik
Tədbir:
bilik
Tədbir
qaydalar
Tədbir:
Qaydalar Tədbir:
idarəçilik
Tədbir:
İdarəetmə
Tədbir:
Bilik
Tədbir: Bilik
Tədbir:
Məlumatlılıq
Tədbir:
məlumatlılıqTədbir:
Məlumatlılıq
Monitorinq və vəziyyətin
qiymətləndirilməsi
Ekoloji məqsədlər
Tədbirlərin həyata
keçirilməsi
İctimaiyyətləməsləhətləşməvəmaraqlıtərəflərincəlbolunması
Hövzənin səciyyələndirilməsi;
təzyiq/təsir analizi; iqtisadi təhlil
SuİnformasiyaSistemi
Tədbir:
İşlərTədbir:
İşlər
Tədbir:
İşlər
What is a River Basin Management Plan (RBMP)?
• An holistic and integrated approach for water resources management
and aquatic ecosystems,
• In order to improve population health, water resources and ecosystems,
to foster development, and consistency of sectoral policies.
• A planning document, developed in accordance with an established
methodology, elaborated with public participation, and respect to local
beliefs,
• A non-technical and clear document with a legal scope for decision
makers and to enhancing awareness.
• Content: characterisation of River Basin (pressures, status); diagnosis and
main issues; trends and objectives; programme of measures and
dashboard.
20
The WFD: a major text for water policy in next years
More than 30 European directives
concerning water
With the WFD
A sectorial approach
fight against some substances
(Dangerous substances directives, Nitrate
directive, …)
 standards and regulation by use (potable
water, bathing, …)
Before 2000
A main objective : protection of aquatic bodies
and of water ressources
Upcoming abrogation of several directives
21
Panorama of European Directives
Daughter Directives
of 76/464/EEC
80/68/EEC
« groundwater » *
76/464/EEC
« dangerous
substances » *
98/83/EU and 80/68/EEC
« drinking water »
79/869/EEC
« shellfish waters » *
78/659/EU « waters
supporting fish life » *
76/160/EEC « bathing water »
75/440/EEC « surface water
intended for the
abstraction of
drinking water » *
Quality of
Aquatic body
Discharges
Integrated management of water quality
* Directives to be integrated into the Water Framework Directive
96/61/EEC « IPPC »
91/676/EEC « nitrates »
91/271/EEC « Urban
Waste Water »
22
The WFD leans on confirmed or reinforced principles
•Management by hydrographic districts
•Planning Cycle 6 years (2015, 2021,2027)
• Protection of aquatic ecosystems and terrestrian ecosystems which
depends directly from
• Economical analysis (new)
• Public participation (new)
Characterisati
on
WB, pressures
and impacts
Main issues
Environmental
objectives /
Programmes
of measures
River basin
management
plan
Implement
Programme of
measures
Monitoring,
progress and
achievement
Assess and
Revise
RBMP principles
23
Participation
Time table and
work prog
Main issues
Draft RBMP
Adoption
Political
approval
Incremental process:
River basin planning cycles
2009
1st river basin
management plan
2015
2nd river basin
management plan
2021
3rd river basin
management plan
Today + Preparation 3rd+ Preparation 2nd
25
Some Objectives and obligations of
results
• Reach the good status of surface waters (ecological and chemical) and
groundwaters (chemical and quantitative),
• No deterioration,
•Objectives to reach in protected areas,
•To suppress the discharges of prioritary dangerous substances in 20
years and
et to reduce emissions of prioritary substances
Environmental objectives:
26
Some objectives and obligations of results
OBLIGATIONS OF RESULTS FOR ALL THE BODIES
All the aquatic bodies are concerned :
rivers and streams, lakes, groundwaters, coastal
zone… wetlands…
A stong ambition clearly expressed : obligations of
results :
–« Going in the right way» isn’t sufficient…
– The good status in 2015 has to be reached… unless motivated
derogations…
27
Reinforcement of economical approach
The text of the Water Framework Directive is introducing a deep
use of economical analysis in the process of integrated basin
management.
 Optimising the choice of measures
– Use of cost-effectiveness analysis for the definition of the programme of
measures
 Justifying the derogations to objectives
– Use of cost-benefit analysis to justify time delays and lower
objectives for the water bodies
 Assessment of the cost recovery for water services
– Including environmental and ressource costs
Economic analysis, a decision tool for :
28
Public participation:
« Success of this Directive relies on close cooperation and coherent action at
Community, Member State and local level as well as on information, consultation and
involvement of the public, including users. » (Preamble 14 of WFD)
1) « Member States shall encourage the active involvement of all
interested parties in the implementation of this Directive, in particular in the
production, review and updating of the river basin management plans. »
 Notion of active participation of interested parties
2) « Member States shall ensure that, for each river basin district, they
publish and make available for comments to the public, including users »
3) « On request, access shall be given to background documents and
information used for the development of the draft river basin management
plan.».
 Notion of information and consultation of public
Article 14 of the Directive:
29
Public participation:
 must be ensured
 Access to information for the
public all along the process
Consultation is concerning only
three steps of elaboration of
management plan (2006 to 2008)
and targets public
 Must be encouraged
 Concerning the all process of
planification (from 2003 to
2015)
Active participation targets
interested parties
INFORMATION CONSULTATION ACTIVE
PARTICIPATION
30
The notion ofWater Body
On a basin, homogeneous units of diagnostic are defined; the Water Bodies.
They are delineated from morphological, biological, geological,
hydrological… conditions. The delineation is based on criteria given in
the text of WFD and detailed in european workgroups
31
The notion ofWater Body
High Valley – Mountainous streams
(altitude, slope, geology, …)
Downstream sector –
Alluvial plain Main tributary from
a karstic area
32
The notion ofWater Body
One Water body
One homogeneous Status
One objective
33
The notion of Good Status
General conditions
Non-synthetics pollutants
Synthetic pollutants
Hydro-morphology
Physico-chemicalBiology
Ecological status Chemical status
Status
The worse (art 2
§ 17)
The worse
(an V 1.4.2.)
Phytoplancton
Flora
Invertebrate
Fish
34
Somes bodies couldn’t reach the objectives of
Good Status in 2015
 « exemptions» on delays : 2021, 2027
 less stricts objectives
 (pollution pressures too important)
 The « heavily modified » on physical aspects
(navigation, energy, urban area…) :
objective = good potential
… But everything has to be justified on
technical and economical point of view !
35
Somes bodies couldn’t reach the objectivces of « Good Status » in
2015
Objective : good status in 2015
Objective : Good potential in 2015
Objective : Good status in 2021
Objective :
Good status in 2015
Giriş
Hövzənin təsnifatı
Təsirlər
Mövcud status
Əsas məsələlər, əsas
dəyərlər = Prioritetlər
Ətraf Mühit məqsədləri
TP toplusu
Sosial- iqrisadi amillər
Məsləhətləşmə sənədi
ÇHİP hazırlanması, nəticələr və aparılan işlər
Köməkçi sənədlər
Ətraf Mühit
məqsədləri
Tədbirlər
Proqramı
Mühafizə olunan
ərazilər
SIS və web
xəritənin inkişafı
Əsas məsələlr
Təzyiqlər, insan
təsiri və risk
Məsləhətləşmə
prosesi
İqtisadi təhlil
Səlahiyyətli
qurumlar, əlaqə
nöqtələri və
qurumlar
Monitorinq
proqramları və
suların movcud
statusu
Hələ başlamayıb
Başlayıb
Hazırdı
1 2 3
4 5 bis
6
7
8 9 10
5
Hövzənin təsnifatı
Transversal steps
İcra göstəriciləri
2003
Art.312/2003
Transposal
2004 20062005 2007 2008 20102009 2011 2012 20142013 2015
Art.153/2005
Report
Art.153/2007
Report
Art.153/2010
Report
Art.812/2012
Common approach
Art.13 12/2009
RBMP
Deadlines and objectives
Art.9 12/2010
Pricing policy
2000
Art.242000
WFD
Art.412/2015
GOOD
STATUS
Art.6 12/2004
Protected areas register
Art.5
Characterisation of RBD
12/2004
Art.812/2006
Monitoring programme
12/2009
Programme of measures
Art.11
2021
2027
2. Initial characterisation
First step, initial characterisation
- Describe the basin (water bodies, typology
...);
- Describe the human occupation of the
territory;
- Describe the pressures of human activities
on aquatic environments
- Describes the status of water bodies
- Derive an assessment of impacts;
- Predict the risk of not achieving the goals by
2021;
- Assessment of cost recovery.
Water bodies
Pressures
Source:Ministryoftheenvironment,
Québec,Canada
Domestic uses:
• drinking water supply
• wastewater treatment
Industrial uses
• abstraction
• discharges
Agricultural uses
• abstraction
• diffuse discharges
Recreational / ecological uses
• angling
• bathing...
hydropower
Aquaculture
Surface waters: ecological status
+15%
Remaining effort !
Delimitation of Surface Water Bodies
Pressure on surface water (Organic Matter)
Discussion / Questions
44
Q/A session
• Methodological aspects
45
Azərbaycan
ÇHİP-nın İşlənib
Hazırlanması üçün
Pilot Hövzə
ÇHİP-nın
Transsərhəd
Uyğunlaşdırılması
47
Status : condition of aWB resulting from natural and
anthropogenic factors (= potential)
Status can be : High, good, moderate, poor, or bad.
Depending on ecological, hydromorphological, chemical and
quantitative parameters
Methodological indications for developing RBMPs in Armenia
EPIRB guidance documents
CIS Guidance documents
Introduction to the WFD
Discussion / Questions
49
Linkages between contracts and activities
50
51
Data management
the task of the contractor will include:
-To collect the necessary datasets at the level of the producers;
-To work with the data producers in order that the dataset provided are described on line
into the metadata catalogue made available by the project;
-To copy the raw data made available by each producer on the FTP made available by the
project.
The corresponding expected results can be formulated as follow:
-All datasets used are described in English and in Russian (at least) into the metadata
catalogue;
-All raw dataset used are available on FTP.
The letter of request for data should include the obligation that the data producer
provides the corresponding metadata sheet fulfilled.
52
Metadata catalogue
Thank you for your attention
54

Más contenido relacionado

La actualidad más candente

Dannielle Gray - Annual Meeting
Dannielle Gray - Annual MeetingDannielle Gray - Annual Meeting
Dannielle Gray - Annual Meeting
AIPRO
 

La actualidad más candente (20)

10 Local Authority Water and Communities Office. Matt Shortt
10 Local Authority Water and Communities Office. Matt Shortt10 Local Authority Water and Communities Office. Matt Shortt
10 Local Authority Water and Communities Office. Matt Shortt
 
Eurasian Soil Partnership Implementation Plan
Eurasian Soil Partnership Implementation PlanEurasian Soil Partnership Implementation Plan
Eurasian Soil Partnership Implementation Plan
 
Participative River Basin Management Planning by Yunona Videnina and Pierre H...
Participative River Basin Management Planning by Yunona Videnina and Pierre H...Participative River Basin Management Planning by Yunona Videnina and Pierre H...
Participative River Basin Management Planning by Yunona Videnina and Pierre H...
 
1 - Opening Remarks Matt Crowe
1 - Opening Remarks Matt Crowe1 - Opening Remarks Matt Crowe
1 - Opening Remarks Matt Crowe
 
Transboundary Waters - Lesotho & Swaziland: complementarity, consistency, or ...
Transboundary Waters - Lesotho & Swaziland: complementarity, consistency, or ...Transboundary Waters - Lesotho & Swaziland: complementarity, consistency, or ...
Transboundary Waters - Lesotho & Swaziland: complementarity, consistency, or ...
 
Japan’s efforts on mainstreaming climate change adaptation into vietnamese de...
Japan’s efforts on mainstreaming climate change adaptation into vietnamese de...Japan’s efforts on mainstreaming climate change adaptation into vietnamese de...
Japan’s efforts on mainstreaming climate change adaptation into vietnamese de...
 
Digital Water - The Water Framework Directive data management and visualisati...
Digital Water - The Water Framework Directive data management and visualisati...Digital Water - The Water Framework Directive data management and visualisati...
Digital Water - The Water Framework Directive data management and visualisati...
 
Smp2 part c action plan final
Smp2 part c action plan finalSmp2 part c action plan final
Smp2 part c action plan final
 
2 - Characterising Catchments - a shared approach. Jenny Deakin
2 - Characterising Catchments - a shared approach. Jenny Deakin2 - Characterising Catchments - a shared approach. Jenny Deakin
2 - Characterising Catchments - a shared approach. Jenny Deakin
 
7 Proposed Characterisation Timetable for Local Authority Visits. Marie Archbold
7 Proposed Characterisation Timetable for Local Authority Visits. Marie Archbold7 Proposed Characterisation Timetable for Local Authority Visits. Marie Archbold
7 Proposed Characterisation Timetable for Local Authority Visits. Marie Archbold
 
“EUWI+ Project Progress and changes occurred in previous period. Georgia” by ...
“EUWI+ Project Progress and changes occurred in previous period. Georgia” by ...“EUWI+ Project Progress and changes occurred in previous period. Georgia” by ...
“EUWI+ Project Progress and changes occurred in previous period. Georgia” by ...
 
6. investigative Assessments for evaluating and targeting mitigation measures...
6. investigative Assessments for evaluating and targeting mitigation measures...6. investigative Assessments for evaluating and targeting mitigation measures...
6. investigative Assessments for evaluating and targeting mitigation measures...
 
Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010Appendix k metadata and bibliographic database final_dec2010
Appendix k metadata and bibliographic database final_dec2010
 
Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010Appendix b stakeholder engagement and consultation final_dec2010
Appendix b stakeholder engagement and consultation final_dec2010
 
Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010Appendix i part a sea annexes_final_dec2010
Appendix i part a sea annexes_final_dec2010
 
Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010Appendix j wfd assessment final_dec2010
Appendix j wfd assessment final_dec2010
 
Dannielle Gray - Annual Meeting
Dannielle Gray - Annual MeetingDannielle Gray - Annual Meeting
Dannielle Gray - Annual Meeting
 
LaMP: Great Lakes Program Reporting
LaMP: Great Lakes Program ReportingLaMP: Great Lakes Program Reporting
LaMP: Great Lakes Program Reporting
 
Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010Appendix i part a sea_final_dec2010
Appendix i part a sea_final_dec2010
 
Presentation: Romania Agricultural Pollution Control Project [4th Global Nitr...
Presentation: Romania Agricultural Pollution Control Project [4th Global Nitr...Presentation: Romania Agricultural Pollution Control Project [4th Global Nitr...
Presentation: Romania Agricultural Pollution Control Project [4th Global Nitr...
 

Similar a Launching activities on participative River Basin Management Plans

stampriet first meeting report
stampriet first meeting reportstampriet first meeting report
stampriet first meeting report
groundwatercop
 

Similar a Launching activities on participative River Basin Management Plans (20)

Participative River Basin Management Planning by Yannick POCHON and Yunona VI...
Participative River Basin Management Planning by Yannick POCHON and Yunona VI...Participative River Basin Management Planning by Yannick POCHON and Yunona VI...
Participative River Basin Management Planning by Yannick POCHON and Yunona VI...
 
Launching activities on RBMPs in Georgia and Azerbaijan
Launching activities on RBMPs in Georgia and AzerbaijanLaunching activities on RBMPs in Georgia and Azerbaijan
Launching activities on RBMPs in Georgia and Azerbaijan
 
Day 1 neno kukuric igrac- ggreta project
Day 1 neno kukuric   igrac- ggreta projectDay 1 neno kukuric   igrac- ggreta project
Day 1 neno kukuric igrac- ggreta project
 
EU4Environment water and data regional launch event
EU4Environment water and data regional launch eventEU4Environment water and data regional launch event
EU4Environment water and data regional launch event
 
EU4Env water and data regional launch event
EU4Env water and data regional launch eventEU4Env water and data regional launch event
EU4Env water and data regional launch event
 
Moldova
MoldovaMoldova
Moldova
 
Stampriet first meeting report
Stampriet first meeting reportStampriet first meeting report
Stampriet first meeting report
 
stampriet first meeting report
stampriet first meeting reportstampriet first meeting report
stampriet first meeting report
 
Azerbaijan
AzerbaijanAzerbaijan
Azerbaijan
 
Day1 3 ross_execution_andorganisation
Day1 3 ross_execution_andorganisationDay1 3 ross_execution_andorganisation
Day1 3 ross_execution_andorganisation
 
Item 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_finalItem 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_final
 
Master ppt whole project report 2021
Master ppt whole project report 2021Master ppt whole project report 2021
Master ppt whole project report 2021
 
Syr darya 2
Syr darya 2Syr darya 2
Syr darya 2
 
International Cooperation in Water Management and Pollution Control in the Da...
International Cooperation in Water Management and Pollution Control in the Da...International Cooperation in Water Management and Pollution Control in the Da...
International Cooperation in Water Management and Pollution Control in the Da...
 
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
EU4Environment Water and Data - Implementing Partners' presentation atSecond ...
 
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
EU4Environment Water and Data_Azerbaijan NPD Thematic Session 1
 
Information as a basis to establish transboundary cooperation: the experience...
Information as a basis to establish transboundary cooperation: the experience...Information as a basis to establish transboundary cooperation: the experience...
Information as a basis to establish transboundary cooperation: the experience...
 
International Cooperation in Water Management and Pollution Control in the Da...
International Cooperation in Water Management and Pollution Control in the Da...International Cooperation in Water Management and Pollution Control in the Da...
International Cooperation in Water Management and Pollution Control in the Da...
 
WORKSHOP RIVER BASIN MANAGEMENT PLAN 29 MAY 2018, MINSK
WORKSHOP RIVER BASIN MANAGEMENT PLAN 29 MAY 2018, MINSKWORKSHOP RIVER BASIN MANAGEMENT PLAN 29 MAY 2018, MINSK
WORKSHOP RIVER BASIN MANAGEMENT PLAN 29 MAY 2018, MINSK
 
AMCOW AFRICA’s Groundwater DVELOPMENT Programme: For Water Security and Resil...
AMCOW AFRICA’s Groundwater DVELOPMENT Programme: For Water Security and Resil...AMCOW AFRICA’s Groundwater DVELOPMENT Programme: For Water Security and Resil...
AMCOW AFRICA’s Groundwater DVELOPMENT Programme: For Water Security and Resil...
 

Más de EU Water Initiative plus for Eastern Partnership

Más de EU Water Initiative plus for Eastern Partnership (20)

Опыт работы бассейновых советов, участие заинтересованных сторон и общественн...
Опыт работы бассейновых советов, участие заинтересованных сторон и общественн...Опыт работы бассейновых советов, участие заинтересованных сторон и общественн...
Опыт работы бассейновых советов, участие заинтересованных сторон и общественн...
 
Pressures, impacts and risk on surface water. Concept and examples
Pressures, impacts and risk on surface water. Concept and examplesPressures, impacts and risk on surface water. Concept and examples
Pressures, impacts and risk on surface water. Concept and examples
 
Dnieper River Basin in Belarus - Factsheet (EN)
Dnieper River Basin in Belarus - Factsheet (EN)Dnieper River Basin in Belarus - Factsheet (EN)
Dnieper River Basin in Belarus - Factsheet (EN)
 
Factsheet Khrami-Debed in Georgie (EN)
Factsheet Khrami-Debed in Georgie (EN)Factsheet Khrami-Debed in Georgie (EN)
Factsheet Khrami-Debed in Georgie (EN)
 
Sevan Lake River Basin - Factsheet
Sevan Lake River Basin - FactsheetSevan Lake River Basin - Factsheet
Sevan Lake River Basin - Factsheet
 
Hrazdan river basin in Armenia - Factsheet
Hrazdan river basin in Armenia - FactsheetHrazdan river basin in Armenia - Factsheet
Hrazdan river basin in Armenia - Factsheet
 
EU twinning project “Upgrading the National Environmental Monitoring System (...
EU twinning project “Upgrading the National Environmental Monitoring System (...EU twinning project “Upgrading the National Environmental Monitoring System (...
EU twinning project “Upgrading the National Environmental Monitoring System (...
 
SEIS project presentation, Mr. Vafadar Ismayilov
SEIS project presentation, Mr. Vafadar Ismayilov SEIS project presentation, Mr. Vafadar Ismayilov
SEIS project presentation, Mr. Vafadar Ismayilov
 
National targets under the Protocol on Water and Health
National targets under the Protocol on Water and HealthNational targets under the Protocol on Water and Health
National targets under the Protocol on Water and Health
 
Presentation of the national targets under the UNECE-WHO/Europe Protocol on W...
Presentation of the national targets under the UNECE-WHO/Europe Protocol on W...Presentation of the national targets under the UNECE-WHO/Europe Protocol on W...
Presentation of the national targets under the UNECE-WHO/Europe Protocol on W...
 
Update on EUWI+ Laboratories’ development and update on surface water, coasta...
Update on EUWI+ Laboratories’ development and update on surface water, coasta...Update on EUWI+ Laboratories’ development and update on surface water, coasta...
Update on EUWI+ Laboratories’ development and update on surface water, coasta...
 
Developing National Water Strategy for Ukraine: opportunities of approximatio...
Developing National Water Strategy for Ukraine: opportunities of approximatio...Developing National Water Strategy for Ukraine: opportunities of approximatio...
Developing National Water Strategy for Ukraine: opportunities of approximatio...
 
National Water Strategy for Azerbaijan
National Water Strategy for AzerbaijanNational Water Strategy for Azerbaijan
National Water Strategy for Azerbaijan
 
Practical work in groups
Practical work in groupsPractical work in groups
Practical work in groups
 
Safety and Health Precautions in Laboratories
Safety and Health Precautions in LaboratoriesSafety and Health Precautions in Laboratories
Safety and Health Precautions in Laboratories
 
IT-Requirements
IT-RequirementsIT-Requirements
IT-Requirements
 
The new revision of the ISO 17025
The new revision of the ISO 17025The new revision of the ISO 17025
The new revision of the ISO 17025
 
ISO 17025 – technical requirements
ISO 17025 – technical requirementsISO 17025 – technical requirements
ISO 17025 – technical requirements
 
The ISO 17025 standard: principles and management requirements
The ISO 17025 standard: principles and management requirementsThe ISO 17025 standard: principles and management requirements
The ISO 17025 standard: principles and management requirements
 
The Principles of Quality Management
The Principles of Quality ManagementThe Principles of Quality Management
The Principles of Quality Management
 

Último

一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
zubnm
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
ZAPPAC1
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
Monica Sydney
 
Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...
Open Access Research Paper
 
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdfTraining Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Basel Ahmed
 

Último (20)

Deforestation
DeforestationDeforestation
Deforestation
 
Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.Cyclone Case Study Odisha 1999 Super Cyclone in India.
Cyclone Case Study Odisha 1999 Super Cyclone in India.
 
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
一比一原版(UMiami毕业证书)迈阿密大学毕业证如何办理
 
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...Presentation: Farmer-led climate adaptation - Project launch and overview by ...
Presentation: Farmer-led climate adaptation - Project launch and overview by ...
 
Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...Principle of erosion control- Introduction to contouring,strip cropping,conto...
Principle of erosion control- Introduction to contouring,strip cropping,conto...
 
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi EscortsHigh Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
High Profile Escort in Abu Dhabi 0524076003 Abu Dhabi Escorts
 
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
NO1 Google Kala Jadu Expert Specialist In Qatar Kala Jadu Expert Specialist I...
 
NO1 Google Best Black Magic Specialist Near Me Spiritual Healer Powerful Love...
NO1 Google Best Black Magic Specialist Near Me Spiritual Healer Powerful Love...NO1 Google Best Black Magic Specialist Near Me Spiritual Healer Powerful Love...
NO1 Google Best Black Magic Specialist Near Me Spiritual Healer Powerful Love...
 
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
How to Reduce Health Risks from Asbestos Dust Not Just limited to Constructio...
 
Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...Clinico-mycological profile of isolates of superficial fungal infection: A st...
Clinico-mycological profile of isolates of superficial fungal infection: A st...
 
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery NewsletterYil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
Yil Me Hu Summer 2023 Edition - Nisqually Salmon Recovery Newsletter
 
Research.pptxdfdddddddddddddddddddddddddddddddddddd
Research.pptxdfddddddddddddddddddddddddddddddddddddResearch.pptxdfdddddddddddddddddddddddddddddddddddd
Research.pptxdfdddddddddddddddddddddddddddddddddddd
 
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery NewsletterYil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
Yil Me Hu Spring 2024 - Nisqually Salmon Recovery Newsletter
 
Sustainable Recovery and Reconstruction Framework (SURRF)(1).pdf
Sustainable Recovery and Reconstruction Framework  (SURRF)(1).pdfSustainable Recovery and Reconstruction Framework  (SURRF)(1).pdf
Sustainable Recovery and Reconstruction Framework (SURRF)(1).pdf
 
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptxHertwich_EnvironmentalImpacts_BuildingsGRO.pptx
Hertwich_EnvironmentalImpacts_BuildingsGRO.pptx
 
Call girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl servicesCall girl in Ajman 0503464457 Ajman Call girl services
Call girl in Ajman 0503464457 Ajman Call girl services
 
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdfTraining Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
Training Of Trainers FAI Eng. Basel Tilapia Welfare.pdf
 
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
Call Girl in Faridabad ₹7.5k Pick Up & Drop With Cash Payment #8168257667
 
Russian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girlsRussian Call girl Dubai 0503464457 Dubai Call girls
Russian Call girl Dubai 0503464457 Dubai Call girls
 
Call girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girlCall girl in Sharjah 0503464457 Sharjah Call girl
Call girl in Sharjah 0503464457 Sharjah Call girl
 

Launching activities on participative River Basin Management Plans

  • 1. Launching activities on participative River Basin Management Plans Upper Kura above Mingachevir Azerbaijan Workshop Baku, July 3rd 2018 European Union Water Initiative plus for Eastern Partnership Yannick Pochon International Office for Water
  • 2. • Inform on theWFD objectives, concepts and principles • Understand the assignements for RBMP’s in Upper Kura above Mingachevir districts and the main challenges • Facilitate contacts between the consultants and stakeholders for the development of RBMPs • Ensure the best global coordination between contracts on- going for RBMPs development Objectives of the workshop PAVE THE WAY TO RBMPs IN AZERBAIJAN
  • 3. For AZERBAIJAN 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Output 2.3 Development and implementation of pilot RBMPs Activity 2.3.1 Assessment of the needs and identification of priorities in implementation of the RBMPs Assessment of existing RBMP (Central Kura subbasins) and the priorities and needs for RBMPlanning Activity 2.3.2 Technical Support in the elaboration and implementation of the pilot RBMPs Development of new pilot RBMP: Kura basin district in Azerbaijan upstream Mingachevir dam Surface Water bodies delineation + main sub-basins in the pilot basin Groundwater bodies delineation Groundwater monitoring system development Description of the characteristics of the river basin Pressures & impacts analysis of human activities on water ressources Identification & mapping of protected areas Cost recovery analysis (economic analysis part 1 related to the characterisation) First thematic summary on basin characterisation Objectives including status & risk assessment and Main Issues Programme of Measures including economic analysis part 2 on costing and financing Draft RBMP and dashboard on implementation monitoring Second thematic summary on RBMP Development of the pilot coastal waterbodies for the Kura Delta at Neftchala Survey of transitional and costal water bodies at Kura Delta and reporting of results Delineation of Coastal and transitional Water bodies Activity 2.3.3 Technical Support to the RBM institutions for coordination in transboundary river basins Support establishing transboundary coordination, strengthen existing units with continuous support Assessment of RBMP consistency on both sides of the borders (AZ/GE) Activity 2.3.4 Biological, ecological, and chemical surveys for development and implementation of RBMPs SW Field Surveys and on site sampling training on biology, hydromorphology and chemisty GW Field Surveys and on site sampling training to identify Chemical and Quantitative Status of GWBs Activity 2.3.5 Investigatory monitoring of water bodies at risk of high pollution Investigatory monitoring of water bodies at risk of high pollution or related issues Activity 2.3.6 Development and strengthening of national databases on water related issues Preliminary steps 1 Diagnostic phase Support national platform implementaiton (maintenance, support config) Support map and indicator production (map template, metadata , hosting for sharing) Integration of data sources and publication through web services Support to specific complementary processing for data provider or at national level Activity 2.3.7 Establish a system for regular monitoring of the RBMPs implementation Selection of indicators to monitor the implementation of the programme of measures Development of procedures, mechanisms and tool (dash board) to monitor RBMPs implementation RESULT-3 Output 3.1 Lessons learnt regulary collected, shared and communicated to stakeholders Activity 3.1.1 Development, regular update and implementation of a communication strategy Communication and visibility plan development Implementation of Communication and Visibility actions (Information materials, Country webpage, Press-releases, Awareness raising events, Social media) Stakeholder liaison (contacts, distribution list, mass media list); Liaison with EU delegation Activity 3.1.2 Support public and stakeholder participation in the preparation, implementation, review and update of RBMPs Stakeholder communication strategy development for participative RBMPlanning update EPIRB Basin consultations C 0 Consult. 1 Consult. 2 Organisation and facilitation of basin consultation (Public consultations, Stakeholder meetings) linked to 2.3.2 Consultation -1 : Timetable and work plan C 0 Consultation -2 - Main issues Consultation -3: Draft RBMP 2020 January February March April May June July August September 2019 January February March April May June July August September October November December EUWI+ work plan 2018-2020 September October 2018 January February March April May June July August November December
  • 4. • Project reminder • TheWFD principles and the national legal framework for RBMP’s in Azerbaijan • An experience feedback from EPIRB pilot basins • Presentations of AZ contractors on their visions on implementation: drafting RBMP, pressure-impact analysis, interaction with the other contractors (GW and SW delineation), etc. Main items
  • 5. Main items • Purpose and main challenges of RBMP in Upper Kura : review of theTOR/ and application of the methodological guidelines • Provisional schedule and coordination between the different consultants • Methodological Q/A session
  • 7. EU MEMBER STATES CONSORTIUM: EASTERN PARTNERSHIP (EaP) COUNTRIES: BELARUS MOLDOVA UKRAINEARMENIA AZERBAIJAN GEORGIA AUSTRIA FRANCE INTERNATIONAL ORGANISATIONS: Main objective: to improve the management of water resources
  • 8. OBJECTIVES • improve the management of water resources in the EaP countries (AZ, AM, BY, GE, MD, UA) • achieve convergence of national water policies and strategies with the Water Framework Directive (WFD) EXPECTED RESULTS  Result 1: Legal and regulatory frameworks improved  Result 2: River Basins Management Plans designed and implemented  Result 3: Lessons learnt regularly collected, shared and communicated to stakeholders The EUWI+ East Project 8
  • 9. RESULT 3 Stakeholders involvement Communication RESULT 2 River Basin Management Planning Data management Monitoring & laboratories Result 1: Legal and regulatory framework improved in line with the EU Water Framework Directive (WFD), Integrated Water Resources Management and Multilateral Environmental Agreements. Result 2: River Basins Management Plans designed and implemented in line with the EU WFD principles, from pilot basin to country scale. Result 3: Stakeholder involvement and communication Lessons learnt regularly collected, shared and communicated to stakeholders. RESULT 1 National Policy Dialogue Legislative and regulatory reform Capacity Building
  • 10. RESULT 3 Stakeholders involvement Communication RESULT 2 River Basin Management Planning Data management Monitoring & laboratories Result 1: Legal and regulatory framework improved in line with the EU Water Framework Directive (WFD), Integrated Water Resources Management and Multilateral Environmental Agreements. Result 2: River Basins Management Plans designed and implemented in line with the EU WFD principles, from pilot basin to country scale. Result 3: Stakeholder involvement and communication Lessons learnt regularly collected, shared and communicated to stakeholders. RESULT 1 National Policy Dialogue Legislative and regulatory reform Capacity Building
  • 11. National legal frame for RBMP’s in AZ • Rafig 11
  • 13. Presentations from consultants • Approach, Methods,Teams,Timetables
  • 15.
  • 16.
  • 18. 18 İnstitusional çərçivə Milli Qanunvericilik Rayonların(hövzə) sərhədlərinin müəyyənləşdirilməsi; səlahiyyətli qurumlar inzibati quruluş; koordinasiya Tədbirlər Proqramı Tədbir: İşlər Tədbir: İşlərTədbir: Qaydalar Tədbir: İdarəçilik Tədbir: bilik Tədbir qaydalar Tədbir: Qaydalar Tədbir: idarəçilik Tədbir: İdarəetmə Tədbir: Bilik Tədbir: Bilik Tədbir: Məlumatlılıq Tədbir: məlumatlılıqTədbir: Məlumatlılıq Monitorinq və vəziyyətin qiymətləndirilməsi Ekoloji məqsədlər Tədbirlərin həyata keçirilməsi İctimaiyyətləməsləhətləşməvəmaraqlıtərəflərincəlbolunması Hövzənin səciyyələndirilməsi; təzyiq/təsir analizi; iqtisadi təhlil SuİnformasiyaSistemi Tədbir: İşlərTədbir: İşlər Tədbir: İşlər
  • 19. What is a River Basin Management Plan (RBMP)? • An holistic and integrated approach for water resources management and aquatic ecosystems, • In order to improve population health, water resources and ecosystems, to foster development, and consistency of sectoral policies. • A planning document, developed in accordance with an established methodology, elaborated with public participation, and respect to local beliefs, • A non-technical and clear document with a legal scope for decision makers and to enhancing awareness. • Content: characterisation of River Basin (pressures, status); diagnosis and main issues; trends and objectives; programme of measures and dashboard.
  • 20. 20 The WFD: a major text for water policy in next years More than 30 European directives concerning water With the WFD A sectorial approach fight against some substances (Dangerous substances directives, Nitrate directive, …)  standards and regulation by use (potable water, bathing, …) Before 2000 A main objective : protection of aquatic bodies and of water ressources Upcoming abrogation of several directives
  • 21. 21 Panorama of European Directives Daughter Directives of 76/464/EEC 80/68/EEC « groundwater » * 76/464/EEC « dangerous substances » * 98/83/EU and 80/68/EEC « drinking water » 79/869/EEC « shellfish waters » * 78/659/EU « waters supporting fish life » * 76/160/EEC « bathing water » 75/440/EEC « surface water intended for the abstraction of drinking water » * Quality of Aquatic body Discharges Integrated management of water quality * Directives to be integrated into the Water Framework Directive 96/61/EEC « IPPC » 91/676/EEC « nitrates » 91/271/EEC « Urban Waste Water »
  • 22. 22 The WFD leans on confirmed or reinforced principles •Management by hydrographic districts •Planning Cycle 6 years (2015, 2021,2027) • Protection of aquatic ecosystems and terrestrian ecosystems which depends directly from • Economical analysis (new) • Public participation (new)
  • 23. Characterisati on WB, pressures and impacts Main issues Environmental objectives / Programmes of measures River basin management plan Implement Programme of measures Monitoring, progress and achievement Assess and Revise RBMP principles 23 Participation Time table and work prog Main issues Draft RBMP Adoption Political approval
  • 24. Incremental process: River basin planning cycles 2009 1st river basin management plan 2015 2nd river basin management plan 2021 3rd river basin management plan Today + Preparation 3rd+ Preparation 2nd
  • 25. 25 Some Objectives and obligations of results • Reach the good status of surface waters (ecological and chemical) and groundwaters (chemical and quantitative), • No deterioration, •Objectives to reach in protected areas, •To suppress the discharges of prioritary dangerous substances in 20 years and et to reduce emissions of prioritary substances Environmental objectives:
  • 26. 26 Some objectives and obligations of results OBLIGATIONS OF RESULTS FOR ALL THE BODIES All the aquatic bodies are concerned : rivers and streams, lakes, groundwaters, coastal zone… wetlands… A stong ambition clearly expressed : obligations of results : –« Going in the right way» isn’t sufficient… – The good status in 2015 has to be reached… unless motivated derogations…
  • 27. 27 Reinforcement of economical approach The text of the Water Framework Directive is introducing a deep use of economical analysis in the process of integrated basin management.  Optimising the choice of measures – Use of cost-effectiveness analysis for the definition of the programme of measures  Justifying the derogations to objectives – Use of cost-benefit analysis to justify time delays and lower objectives for the water bodies  Assessment of the cost recovery for water services – Including environmental and ressource costs Economic analysis, a decision tool for :
  • 28. 28 Public participation: « Success of this Directive relies on close cooperation and coherent action at Community, Member State and local level as well as on information, consultation and involvement of the public, including users. » (Preamble 14 of WFD) 1) « Member States shall encourage the active involvement of all interested parties in the implementation of this Directive, in particular in the production, review and updating of the river basin management plans. »  Notion of active participation of interested parties 2) « Member States shall ensure that, for each river basin district, they publish and make available for comments to the public, including users » 3) « On request, access shall be given to background documents and information used for the development of the draft river basin management plan.».  Notion of information and consultation of public Article 14 of the Directive:
  • 29. 29 Public participation:  must be ensured  Access to information for the public all along the process Consultation is concerning only three steps of elaboration of management plan (2006 to 2008) and targets public  Must be encouraged  Concerning the all process of planification (from 2003 to 2015) Active participation targets interested parties INFORMATION CONSULTATION ACTIVE PARTICIPATION
  • 30. 30 The notion ofWater Body On a basin, homogeneous units of diagnostic are defined; the Water Bodies. They are delineated from morphological, biological, geological, hydrological… conditions. The delineation is based on criteria given in the text of WFD and detailed in european workgroups
  • 31. 31 The notion ofWater Body High Valley – Mountainous streams (altitude, slope, geology, …) Downstream sector – Alluvial plain Main tributary from a karstic area
  • 32. 32 The notion ofWater Body One Water body One homogeneous Status One objective
  • 33. 33 The notion of Good Status General conditions Non-synthetics pollutants Synthetic pollutants Hydro-morphology Physico-chemicalBiology Ecological status Chemical status Status The worse (art 2 § 17) The worse (an V 1.4.2.) Phytoplancton Flora Invertebrate Fish
  • 34. 34 Somes bodies couldn’t reach the objectives of Good Status in 2015  « exemptions» on delays : 2021, 2027  less stricts objectives  (pollution pressures too important)  The « heavily modified » on physical aspects (navigation, energy, urban area…) : objective = good potential … But everything has to be justified on technical and economical point of view !
  • 35. 35 Somes bodies couldn’t reach the objectivces of « Good Status » in 2015 Objective : good status in 2015 Objective : Good potential in 2015 Objective : Good status in 2021 Objective : Good status in 2015
  • 36. Giriş Hövzənin təsnifatı Təsirlər Mövcud status Əsas məsələlər, əsas dəyərlər = Prioritetlər Ətraf Mühit məqsədləri TP toplusu Sosial- iqrisadi amillər Məsləhətləşmə sənədi ÇHİP hazırlanması, nəticələr və aparılan işlər Köməkçi sənədlər Ətraf Mühit məqsədləri Tədbirlər Proqramı Mühafizə olunan ərazilər SIS və web xəritənin inkişafı Əsas məsələlr Təzyiqlər, insan təsiri və risk Məsləhətləşmə prosesi İqtisadi təhlil Səlahiyyətli qurumlar, əlaqə nöqtələri və qurumlar Monitorinq proqramları və suların movcud statusu Hələ başlamayıb Başlayıb Hazırdı 1 2 3 4 5 bis 6 7 8 9 10 5 Hövzənin təsnifatı Transversal steps İcra göstəriciləri
  • 37. 2003 Art.312/2003 Transposal 2004 20062005 2007 2008 20102009 2011 2012 20142013 2015 Art.153/2005 Report Art.153/2007 Report Art.153/2010 Report Art.812/2012 Common approach Art.13 12/2009 RBMP Deadlines and objectives Art.9 12/2010 Pricing policy 2000 Art.242000 WFD Art.412/2015 GOOD STATUS Art.6 12/2004 Protected areas register Art.5 Characterisation of RBD 12/2004 Art.812/2006 Monitoring programme 12/2009 Programme of measures Art.11 2021 2027 2. Initial characterisation
  • 38. First step, initial characterisation - Describe the basin (water bodies, typology ...); - Describe the human occupation of the territory; - Describe the pressures of human activities on aquatic environments - Describes the status of water bodies - Derive an assessment of impacts; - Predict the risk of not achieving the goals by 2021; - Assessment of cost recovery.
  • 40. Pressures Source:Ministryoftheenvironment, Québec,Canada Domestic uses: • drinking water supply • wastewater treatment Industrial uses • abstraction • discharges Agricultural uses • abstraction • diffuse discharges Recreational / ecological uses • angling • bathing... hydropower Aquaculture
  • 41. Surface waters: ecological status +15% Remaining effort !
  • 42. Delimitation of Surface Water Bodies
  • 43. Pressure on surface water (Organic Matter)
  • 46. Azərbaycan ÇHİP-nın İşlənib Hazırlanması üçün Pilot Hövzə ÇHİP-nın Transsərhəd Uyğunlaşdırılması
  • 47. 47
  • 48. Status : condition of aWB resulting from natural and anthropogenic factors (= potential) Status can be : High, good, moderate, poor, or bad. Depending on ecological, hydromorphological, chemical and quantitative parameters Methodological indications for developing RBMPs in Armenia EPIRB guidance documents CIS Guidance documents Introduction to the WFD
  • 50. Linkages between contracts and activities 50
  • 51. 51
  • 52. Data management the task of the contractor will include: -To collect the necessary datasets at the level of the producers; -To work with the data producers in order that the dataset provided are described on line into the metadata catalogue made available by the project; -To copy the raw data made available by each producer on the FTP made available by the project. The corresponding expected results can be formulated as follow: -All datasets used are described in English and in Russian (at least) into the metadata catalogue; -All raw dataset used are available on FTP. The letter of request for data should include the obligation that the data producer provides the corresponding metadata sheet fulfilled. 52
  • 54. Thank you for your attention 54