Using Project Management To
Improve ROI
Day One Event
November 6, 2012
www.successfulprojectsforleaders.com 2
Statistics
• On the whole, acquirers have < 50% chance of being
successful.
• Just 23% of acquisitions earn their cost of capital
• Synergies projected for M&A deals are not achieved within
70% of cases.
• In the first 4-8 months following a deal, productivity may be
reduced by up to 50%.
• A number of factors give rise to these statistics: poor
fit, incomplete due diligence, and ineffectively
managed integration.
www.successfulprojectsforleaders.com 3
Integrating one business into another is
inherently difficult
• Target companies are strategically sought but follow-up acts are
poorly orchestrated.
• The structuring, financing, and closing of a deal are only
preliminary steps. The real work comes after the deal is signed.
• Too many companies make the mistake of separating the major
phases of a deal (i.e. due diligence, agreement, integration)
• These phases themselves need to be integrated.
• They need to be orchestrated under a single management
structure.
• This management structure needs to be in place early—at the time
due diligence begins.
www.successfulprojectsforleaders.com 4
Solution
• Companies that have effective policies in place for managing
the post-merger period can improve their odds of success by as
much as 50%.
• Companies that have strong integration plans, by contrast with
those that have weak ones, have produced shareholder returns
above industry average.
• A faster integration process yields better results than a slower
one, resulting in speed to market, technological process,
employee commitment, stable focus on customers
www.successfulprojectsforleaders.com 5
Integration Management Structure
• Managing an acquisition, regardless of size, is distinctly different from
managing an operation.
• Initiating
• Planning
• Execution
• Monitoring & Control
• Close-Out
• This requires more than a rudimentary integration plan, constant
vigilance, regular governance, and clear communication, both
horizontal as well as vertical
• => If your leadership team is spending the necessary time to manage
the integration, who’s managing the operations,
• Which of these 2 are you willing to give up?
www.successfulprojectsforleaders.com 6
Program Management of the PMI
• The integration needs to be set up in a “projectized”
organizational structure
• A department-like structure that exists for the duration of the
integration
• Focusing purely on the integration
• Directly reports to Senior Leadership (Governance Board)
www.successfulprojectsforleaders.com 7
Program Management of the PMI
• Treat the transition period like a special program
comprised of a number of projects
• Integration manager is the program manager
• Ensures all work is “process-ized”
• Monitors the “mini-integrations”
• Ensures adherence to progress against the schedule and
milestones
• Ensures focus on value & priorities
• Ensures proper risk management
• Helps to preserve the potential of the deal
www.successfulprojectsforleaders.com 8
Why is this necessary?
• Program management provides a needed structure and
discipline.
• Integration (Program) manager 100% focused on integration
• Ensures consistent progress
• Ensures risk mitigation and management throughout
• Keeps focus on the integration, schedule, costs, and ROI
• Ensures that the integration remains a priority
• Lets management concentrate on daily operations
• Lack of adherence to this leads to schedule overruns, cost
overruns, overabundance of issues, resource drains, loss of
focus, erosion of ROI.
www.successfulprojectsforleaders.com 9
Typical Program Structure
Integration
(Program) Manager
Business Unit 1
Project Manager
Business Unit 2
Project Manager
Business Unit 3
Project Manager
www.successfulprojectsforleaders.com 10
Integration Management as Change Agents
• Integration management needs to consider the
immense requirement for change management
• Ensure that the WIIFM issues are addressed
• Ensure that buy-in is achieved
• Ensure that clearly-defined leadership roles exist
• Ensure that extensive, ongoing communication exists
• Ensure focus on the customers
• Ensure that decisions are made, even the tough ones
• Ensure that focused initiatives are created
• Ensure that resistance at all levels is recognized and
managed.
www.successfulprojectsforleaders.com 11
Part II: Day One Plus One
Using Project Management To Further Enhance
ROI
www.successfulprojectsforleaders.com 12
Post PMI Factors to Consider
• Project Budgeting
• Governance
• Risk Tracking & Quality Management
• Work Sold & Translation Into Actionable Items
• Scope & Schedule Management
www.successfulprojectsforleaders.com 13
Why a repeatable methodology is necessary
• A project management methodology—something that
is enforced from the top down and is used
consistently throughout the organization—certainly
will have some upfront costs associated with it.
• When used correctly, however, it can save an
organization up to hundreds of thousands of dollars a
year in above the line costs.
www.successfulprojectsforleaders.com 14
Project Budgeting
• The profitability of the organization begins with the
project budget estimates themselves.
• If an organization has to make a choice to fund only
one or two projects NPV, IRR, MIRR, etc will be used
as a financial metric.
• What does it mean if the project’s budget estimate
was never estimated correctly?
www.successfulprojectsforleaders.com 15
Poor Estimates Leads to Poor Project
Selection
• Lower estimate
• Typical of projects where estimators pull numbers out of air,
didn’t consider all tasks needed to be done, didn’t correctly
estimate task durations
• project investment will be artificially lower than the actual cost
• project will have an artificially higher value for NPV, IRR, or MIRR
• It can get selected over projects that actually give a better ROI.
• Higher estimate
• Typical of projects whose estimates are “padded”, (estimator
arbitrarily adds money to the estimate “just in case”)
• Required investment for the project will be higher
• Financial metrics will be artificially lower
• Different, less profitable project can get selected.
www.successfulprojectsforleaders.com 16
Governance
• Organizations need a connection between Operations and
project groups
• There needs to be structured, consistent and meaningful flow of
information between these two groups.
• Project health
• Issues
• Risks
• Actuals vs. estimates
• Business Priorities
• Change management
• Lack of proper governance leads to objectives not being
communicated to the project groups or not being interpreted
correctly by the project groups. As a result, measurements
made by the project groups cannot be related to these
objectives.
www.successfulprojectsforleaders.com 17
Governance
• Development of standards and practices
• directed at the effective execution of projects and the
attainment of schedule, cost, scope, and quality objectives,
• Communication of enterprise-level objectives to the
project teams
• Communication of project information to
management
• Efforts are efficient and effective
• Projects are still the best ones to support strategic objectives
• Whether there are performance issues associated with
meeting objectives.
www.successfulprojectsforleaders.com 18
The Biggest Impact
• The organization is highly fragmented and functional in nature,
with difficulty coordinating all the team activities.
• There is a lack of any connection between Management and
project groups along with no structured, consistent and
meaningful flow of information between these two groups.
• Senior management is not able to properly prioritize the
collective initiatives.
• Historically, projects have not been aligned with strategic
objectives to ensure that projects are contributing to growth,
competitive advantage, revenue, cash flow, or other objectives
of the organization
• There is a lack of full-time oversight for and across all projects
that includes monitoring against established criteria and
advising Management of status and issues that would affect the
planned benefits of projects.
www.successfulprojectsforleaders.com 19
Biggest Impact, continued
• There is a need to ensure that standards are
established, communicated, and enforced on an
enterprise-wide basis so that project governance can
be conducted relative to strategic goals.
• There has been a failure of management to establish
cross-departmental coordination toward goals for
products, services, and customers.
www.successfulprojectsforleaders.com 20
Risk Management
• No one can predict all of the negative events that might occur on
a project
• Project risk management brings the team as close to that as one
can get.
• Project team isn’t caught off-guard by threats that occur
• Time and labor aren’t taken away from critical path activities.
• If the team had to stop planned activities in order to put out fires all the
time
• the project schedule would slip
• the budget would be overrun
• quality could suffer
• Financial benefits might not be realized
• windows of opportunity might be missed
• Profitability is effected
www.successfulprojectsforleaders.com 21
Further Benefits of Risk Management
• When one uses risk management the price for the
project doesn’t have to be artificially inflated, or
padded, to cover some unknown occurrence
• Create a task-by-task contingency account to cover pre-
determined “what-ifs”
• Money released once threat is no longer valid
• Manages Parkinson’s syndrome
www.successfulprojectsforleaders.com 22
Translating Work Sold Into Actionable Items
• Rework quickly erodes project profits
• Rework results from a lack of managing quality into
the end product (service)
• Unrealistic commitments made by Sales
• A lack on the project team’s part to completely identify the
end-users’ requirements and needs
• Misunderstanding between the end-users and your team of
what the end users’ requirements are
www.successfulprojectsforleaders.com 23
Scope Management
• Not having a well-constructed scope sets projects up
for failure before they begin
• Scope is a delineation of both what is considered to
be a part of the project and what is not considered to
be part of the project
• The more vague the scope is, the more rework will occur
• The more vague the scope is, the more the work will grow
without a proportional change in budget (Scope Creep,
Goldplating)
• Missed deadlines
• Cost overages
www.successfulprojectsforleaders.com 24
Schedule & Cost Management
• Constant vigilance is required to keep the project on
budget and on schedule.
• Cost and time estimates must be broken on a task-by-task
basis and a month-by-month basis
• Guarantees efficient comparisons of estimated planned
expenditures against actual expenditures.
• Regular cost and schedule monitoring is espoused by
project management governing organizations
• Catch the project when it has varied slightly from cost and/or
schedule targets.
• This allows corrective action to be taken.
www.successfulprojectsforleaders.com 25
Portfolio Management (PPM)
• Identifying opportunities and needs
• Selecting which projects are to be undertaken to best meet
objectives and needs
• Selecting which projects are to be terminated or deferred due to
performance issues or non-compliance with objectives
• Establishing project priorities
• Projecting revenue and effect on cash flow
• Resource Prioritization
• Aligning projects with strategic objectives to ensure that projects
are contributing to growth, competitive advantage, revenue,
cash flow, or other objectives of the organization
• Evaluating the value and benefits of projects to the organization
• Evaluating project benefits vis-a-vis predicted risks
• Ensuring balance among projects in the portfolio to provide the
optimal mix to protect and enhance the organization’s future
www.successfulprojectsforleaders.com 26
Change Control
• Organizations need discipline to ensure that its teams
implement only changes that are worth pursuing
• Politics, pet ideas
• This prevents unnecessary or overly costly changes from
derailing projects.
• A rigorous process needs to be established and managed to
evaluate the impact of changes before implementing them.
• Many changes that initially sound like good ideas will get thrown out
once the true cost of the change is known.
• The enterprise impact needs to be understood. A project change
that might be beneficial to one SBU might be detrimental to
another.
• If the benefit of the change is worth the cost, the change is
added to the scope. Otherwise, it’s deferred or rejected
www.successfulprojectsforleaders.com 27
Summary
• Research from Gartner, Inc. suggests that organizations who
establish enterprise standards for project management,
including a project office with suitable governance, will
experience half as many major project cost overruns, delays
and cancellations as those that fail to do so (M. Light, T. Berg,
“The Project Office: Teams, Processes and Tools,” Gartner
Strategic Analysis Report, 1 August 2000).
• The only way to ensure that standards are established,
communicated, and enforced on an enterprise-wide basis so
that project governance can be conducted relative to strategic
goals is to elevate project management to the strategic level.
This also reduces the failure of management to establish cross
departmental coordination toward goals for products, services
and customers which appears to be the major hurdle with many
organizations.
www.successfulprojectsforleaders.com 28
Bottom Line
• Projects should be profit generators and not financial burdens
• Risks and quality should never be unknowns
• Budgets and schedules shouldn’t be stabs in the dark, arbitrary,
or general guidelines.
• Running successful projects isn’t magic or luck.
• SPFL sets up the right infrastructure and methodology to follow
• Provide senior-level oversight and governance (VirtualPMOTM)
• Linkage between LT and project teams
• Ensure consistency, drive toward continuous improvement
• Bottom line results

Más contenido relacionado

La actualidad más candente

How to implement team communication strategies remotely
How to implement team communication strategies remotelyHow to implement team communication strategies remotely
How to implement team communication strategies remotelyOrangescrum
 
Project initiation topic 2.5_project organization structure
Project initiation topic 2.5_project organization structureProject initiation topic 2.5_project organization structure
Project initiation topic 2.5_project organization structureRudreshSamant
 
Article - Global Project Management
Article - Global Project ManagementArticle - Global Project Management
Article - Global Project ManagementGregory A. Garrett
 
Project Management - Foundation
Project Management - FoundationProject Management - Foundation
Project Management - FoundationShabbeer Zafar
 
Programs and Portfolios - Multi-project Management
Programs and Portfolios - Multi-project ManagementPrograms and Portfolios - Multi-project Management
Programs and Portfolios - Multi-project ManagementBryan Fenech
 
Making the most of your constrained resources optimizing resource allocation ...
Making the most of your constrained resources optimizing resource allocation ...Making the most of your constrained resources optimizing resource allocation ...
Making the most of your constrained resources optimizing resource allocation ...Productivity Intelligence Institute
 
Project governance
Project governanceProject governance
Project governanceGlen Alleman
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project ManagementUW Madison
 
10 critical factors for success of a project
10 critical factors for success of a project10 critical factors for success of a project
10 critical factors for success of a projectZilicus
 
SSCG Project Management Services
SSCG Project Management ServicesSSCG Project Management Services
SSCG Project Management ServicesSSCG Consulting
 
How to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMOHow to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMOLaura Barnard, PMP
 
PMP selected topics and ideas
PMP selected topics and ideasPMP selected topics and ideas
PMP selected topics and ideasAhmad Hamid
 
Project Management Chapter 1 and chapter 2 Rosetti
Project Management Chapter 1 and chapter 2 RosettiProject Management Chapter 1 and chapter 2 Rosetti
Project Management Chapter 1 and chapter 2 Rosettidrosetti
 
Reinventing Project and Portfolio Management at the State of Michigan with Ch...
Reinventing Project and Portfolio Management at the State of Michigan with Ch...Reinventing Project and Portfolio Management at the State of Michigan with Ch...
Reinventing Project and Portfolio Management at the State of Michigan with Ch...Changepoint
 

La actualidad más candente (20)

Planning budgeting forecasting
Planning budgeting forecastingPlanning budgeting forecasting
Planning budgeting forecasting
 
How to implement team communication strategies remotely
How to implement team communication strategies remotelyHow to implement team communication strategies remotely
How to implement team communication strategies remotely
 
Project initiation topic 2.5_project organization structure
Project initiation topic 2.5_project organization structureProject initiation topic 2.5_project organization structure
Project initiation topic 2.5_project organization structure
 
Successful pm
Successful pmSuccessful pm
Successful pm
 
Article - Global Project Management
Article - Global Project ManagementArticle - Global Project Management
Article - Global Project Management
 
Project Management - Foundation
Project Management - FoundationProject Management - Foundation
Project Management - Foundation
 
Programs and Portfolios - Multi-project Management
Programs and Portfolios - Multi-project ManagementPrograms and Portfolios - Multi-project Management
Programs and Portfolios - Multi-project Management
 
Setting up pmo
Setting up pmoSetting up pmo
Setting up pmo
 
Making the most of your constrained resources optimizing resource allocation ...
Making the most of your constrained resources optimizing resource allocation ...Making the most of your constrained resources optimizing resource allocation ...
Making the most of your constrained resources optimizing resource allocation ...
 
Project governance
Project governanceProject governance
Project governance
 
Critical Success Factors & Project Management
Critical Success Factors & Project ManagementCritical Success Factors & Project Management
Critical Success Factors & Project Management
 
Balanced scorecard for effective project selection process
Balanced scorecard for effective project selection processBalanced scorecard for effective project selection process
Balanced scorecard for effective project selection process
 
Introduction To Project Management
Introduction To Project ManagementIntroduction To Project Management
Introduction To Project Management
 
10 critical factors for success of a project
10 critical factors for success of a project10 critical factors for success of a project
10 critical factors for success of a project
 
SSCG Project Management Services
SSCG Project Management ServicesSSCG Project Management Services
SSCG Project Management Services
 
Project Management Essentials
Project Management Essentials Project Management Essentials
Project Management Essentials
 
How to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMOHow to Setup a High-IMPACT PMO
How to Setup a High-IMPACT PMO
 
PMP selected topics and ideas
PMP selected topics and ideasPMP selected topics and ideas
PMP selected topics and ideas
 
Project Management Chapter 1 and chapter 2 Rosetti
Project Management Chapter 1 and chapter 2 RosettiProject Management Chapter 1 and chapter 2 Rosetti
Project Management Chapter 1 and chapter 2 Rosetti
 
Reinventing Project and Portfolio Management at the State of Michigan with Ch...
Reinventing Project and Portfolio Management at the State of Michigan with Ch...Reinventing Project and Portfolio Management at the State of Michigan with Ch...
Reinventing Project and Portfolio Management at the State of Michigan with Ch...
 

Similar a Using Project Management to Improve ROI Day 1 Event

In persuit of perfection internal auditor the gate keepers of ethics in jamai...
In persuit of perfection internal auditor the gate keepers of ethics in jamai...In persuit of perfection internal auditor the gate keepers of ethics in jamai...
In persuit of perfection internal auditor the gate keepers of ethics in jamai...Patrick Thompson
 
Altus Alliance 2016 - Project Success Begins with Management
Altus Alliance 2016 - Project Success Begins with ManagementAltus Alliance 2016 - Project Success Begins with Management
Altus Alliance 2016 - Project Success Begins with ManagementSparkrock
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementYamanta Raj Niroula, PMP
 
Program Office Background
Program Office BackgroundProgram Office Background
Program Office BackgroundGlen Alleman
 
How to drive your project into success?
How to drive your project into success?How to drive your project into success?
How to drive your project into success?Jouni Ruotanen
 
A Business Analyst Approach -Developing A Business Case That Delivers Value T...
A Business Analyst Approach -Developing A Business Case That Delivers Value T...A Business Analyst Approach -Developing A Business Case That Delivers Value T...
A Business Analyst Approach -Developing A Business Case That Delivers Value T...Ali Zeeshan
 
A business analyst approach
A business analyst approachA business analyst approach
A business analyst approachAli Zeeshan
 
Presentation KCPMI 2016 PDD Days Portfolio Balance
Presentation   KCPMI 2016 PDD Days Portfolio BalancePresentation   KCPMI 2016 PDD Days Portfolio Balance
Presentation KCPMI 2016 PDD Days Portfolio BalanceRon Montgomery
 
From project to portfolio management - how to successfully bridge the gap web...
From project to portfolio management - how to successfully bridge the gap web...From project to portfolio management - how to successfully bridge the gap web...
From project to portfolio management - how to successfully bridge the gap web...Association for Project Management
 
Developing A Business Case
Developing A Business CaseDeveloping A Business Case
Developing A Business CaseSunil-QA
 
Developing a Business Case
Developing a Business CaseDeveloping a Business Case
Developing a Business CaseSunil-QA
 
AI in Project Management.pdf
AI in Project Management.pdfAI in Project Management.pdf
AI in Project Management.pdfJamieDornan2
 
PMO and PPM Best Practices
PMO and PPM Best PracticesPMO and PPM Best Practices
PMO and PPM Best PracticesJeff McClay
 
New Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program AssuranceNew Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program AssuranceSusan Schanta
 
Project management frame work part 1
Project management frame work part 1Project management frame work part 1
Project management frame work part 1Mohamed , PMP
 
PMEC Study Material.pdf
PMEC Study Material.pdfPMEC Study Material.pdf
PMEC Study Material.pdfMrUmairKhan1
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Managementmuhammadyasirsaeedqa
 

Similar a Using Project Management to Improve ROI Day 1 Event (20)

The New Trends in Project Management الاتجاهات الحديثة في إدارة المشاريع
The New Trends in Project Management  الاتجاهات الحديثة في إدارة المشاريعThe New Trends in Project Management  الاتجاهات الحديثة في إدارة المشاريع
The New Trends in Project Management الاتجاهات الحديثة في إدارة المشاريع
 
In persuit of perfection internal auditor the gate keepers of ethics in jamai...
In persuit of perfection internal auditor the gate keepers of ethics in jamai...In persuit of perfection internal auditor the gate keepers of ethics in jamai...
In persuit of perfection internal auditor the gate keepers of ethics in jamai...
 
Altus Alliance 2016 - Project Success Begins with Management
Altus Alliance 2016 - Project Success Begins with ManagementAltus Alliance 2016 - Project Success Begins with Management
Altus Alliance 2016 - Project Success Begins with Management
 
Challenging Aspects of Modern Project Management
Challenging Aspects of Modern Project ManagementChallenging Aspects of Modern Project Management
Challenging Aspects of Modern Project Management
 
Program Office Background
Program Office BackgroundProgram Office Background
Program Office Background
 
How to drive your project into success?
How to drive your project into success?How to drive your project into success?
How to drive your project into success?
 
A Business Analyst Approach -Developing A Business Case That Delivers Value T...
A Business Analyst Approach -Developing A Business Case That Delivers Value T...A Business Analyst Approach -Developing A Business Case That Delivers Value T...
A Business Analyst Approach -Developing A Business Case That Delivers Value T...
 
A business analyst approach
A business analyst approachA business analyst approach
A business analyst approach
 
Presentation KCPMI 2016 PDD Days Portfolio Balance
Presentation   KCPMI 2016 PDD Days Portfolio BalancePresentation   KCPMI 2016 PDD Days Portfolio Balance
Presentation KCPMI 2016 PDD Days Portfolio Balance
 
From project to portfolio management - how to successfully bridge the gap web...
From project to portfolio management - how to successfully bridge the gap web...From project to portfolio management - how to successfully bridge the gap web...
From project to portfolio management - how to successfully bridge the gap web...
 
Developing A Business Case
Developing A Business CaseDeveloping A Business Case
Developing A Business Case
 
Developing a Business Case
Developing a Business CaseDeveloping a Business Case
Developing a Business Case
 
AI in Project Management.pdf
AI in Project Management.pdfAI in Project Management.pdf
AI in Project Management.pdf
 
PMO and PPM Best Practices
PMO and PPM Best PracticesPMO and PPM Best Practices
PMO and PPM Best Practices
 
New Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program AssuranceNew Techniques to Elevate QA to Program Assurance
New Techniques to Elevate QA to Program Assurance
 
Project management frame work part 1
Project management frame work part 1Project management frame work part 1
Project management frame work part 1
 
PMEC Study Material.pdf
PMEC Study Material.pdfPMEC Study Material.pdf
PMEC Study Material.pdf
 
Benefits Realization Management إدارة تحقيق المنافع
Benefits Realization Management  إدارة تحقيق المنافعBenefits Realization Management  إدارة تحقيق المنافع
Benefits Realization Management إدارة تحقيق المنافع
 
Strategy And Project Alignment V1.0
Strategy And Project Alignment V1.0Strategy And Project Alignment V1.0
Strategy And Project Alignment V1.0
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 

Más de Ed Kozak

Improvement of Hospital Project Cost and Schedule Mgmt Final Rpt
Improvement of Hospital Project Cost and Schedule Mgmt  Final RptImprovement of Hospital Project Cost and Schedule Mgmt  Final Rpt
Improvement of Hospital Project Cost and Schedule Mgmt Final RptEd Kozak
 
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...Ed Kozak
 
The Chief Project Officer And How One Can Benefit Your Organization
The Chief Project Officer And How One Can Benefit Your OrganizationThe Chief Project Officer And How One Can Benefit Your Organization
The Chief Project Officer And How One Can Benefit Your OrganizationEd Kozak
 
If You Want To Earn More Profits Follow An Established Project Management Met...
If You Want To Earn More Profits Follow An Established Project Management Met...If You Want To Earn More Profits Follow An Established Project Management Met...
If You Want To Earn More Profits Follow An Established Project Management Met...Ed Kozak
 
Your Projects May Be Robbing You Blind
Your Projects May Be Robbing You BlindYour Projects May Be Robbing You Blind
Your Projects May Be Robbing You BlindEd Kozak
 
How Project Management Can Improve Your Profitability
How Project Management Can Improve Your ProfitabilityHow Project Management Can Improve Your Profitability
How Project Management Can Improve Your ProfitabilityEd Kozak
 
Don't Add Risk And Double Investment Requirements By Estimating Project Budge...
Don't Add Risk And Double Investment Requirements By Estimating Project Budge...Don't Add Risk And Double Investment Requirements By Estimating Project Budge...
Don't Add Risk And Double Investment Requirements By Estimating Project Budge...Ed Kozak
 

Más de Ed Kozak (7)

Improvement of Hospital Project Cost and Schedule Mgmt Final Rpt
Improvement of Hospital Project Cost and Schedule Mgmt  Final RptImprovement of Hospital Project Cost and Schedule Mgmt  Final Rpt
Improvement of Hospital Project Cost and Schedule Mgmt Final Rpt
 
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
The Work Breakdown Structure: Lack Of A Good One Already Sets Your Project Up...
 
The Chief Project Officer And How One Can Benefit Your Organization
The Chief Project Officer And How One Can Benefit Your OrganizationThe Chief Project Officer And How One Can Benefit Your Organization
The Chief Project Officer And How One Can Benefit Your Organization
 
If You Want To Earn More Profits Follow An Established Project Management Met...
If You Want To Earn More Profits Follow An Established Project Management Met...If You Want To Earn More Profits Follow An Established Project Management Met...
If You Want To Earn More Profits Follow An Established Project Management Met...
 
Your Projects May Be Robbing You Blind
Your Projects May Be Robbing You BlindYour Projects May Be Robbing You Blind
Your Projects May Be Robbing You Blind
 
How Project Management Can Improve Your Profitability
How Project Management Can Improve Your ProfitabilityHow Project Management Can Improve Your Profitability
How Project Management Can Improve Your Profitability
 
Don't Add Risk And Double Investment Requirements By Estimating Project Budge...
Don't Add Risk And Double Investment Requirements By Estimating Project Budge...Don't Add Risk And Double Investment Requirements By Estimating Project Budge...
Don't Add Risk And Double Investment Requirements By Estimating Project Budge...
 

Último

PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876dlhescort
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Sheetaleventcompany
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsP&CO
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...lizamodels9
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...amitlee9823
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noidadlhescort
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxWorkforce Group
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escortdlhescort
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon investment
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...rajveerescorts2022
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Falcon Invoice Discounting
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...amitlee9823
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture conceptP&CO
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876dlhescort
 

Último (20)

PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
Chandigarh Escorts Service 📞8868886958📞 Just📲 Call Nihal Chandigarh Call Girl...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
Call Girls From Raj Nagar Extension Ghaziabad❤️8448577510 ⊹Best Escorts Servi...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂EscortCall Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
Call Girls In Nangloi Rly Metro ꧂…….95996 … 13876 Enjoy ꧂Escort
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
👉Chandigarh Call Girls 👉9878799926👉Just Call👉Chandigarh Call Girl In Chandiga...
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
Call Girls Jp Nagar Just Call 👗 7737669865 👗 Top Class Call Girl Service Bang...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
Call Girls in Delhi, Escort Service Available 24x7 in Delhi 959961-/-3876
 

Using Project Management to Improve ROI Day 1 Event

  • 1. www.successfulprojectsforleaders.com 1 Using Project Management To Improve ROI Day One Event November 6, 2012
  • 2. www.successfulprojectsforleaders.com 2 Statistics • On the whole, acquirers have < 50% chance of being successful. • Just 23% of acquisitions earn their cost of capital • Synergies projected for M&A deals are not achieved within 70% of cases. • In the first 4-8 months following a deal, productivity may be reduced by up to 50%. • A number of factors give rise to these statistics: poor fit, incomplete due diligence, and ineffectively managed integration.
  • 3. www.successfulprojectsforleaders.com 3 Integrating one business into another is inherently difficult • Target companies are strategically sought but follow-up acts are poorly orchestrated. • The structuring, financing, and closing of a deal are only preliminary steps. The real work comes after the deal is signed. • Too many companies make the mistake of separating the major phases of a deal (i.e. due diligence, agreement, integration) • These phases themselves need to be integrated. • They need to be orchestrated under a single management structure. • This management structure needs to be in place early—at the time due diligence begins.
  • 4. www.successfulprojectsforleaders.com 4 Solution • Companies that have effective policies in place for managing the post-merger period can improve their odds of success by as much as 50%. • Companies that have strong integration plans, by contrast with those that have weak ones, have produced shareholder returns above industry average. • A faster integration process yields better results than a slower one, resulting in speed to market, technological process, employee commitment, stable focus on customers
  • 5. www.successfulprojectsforleaders.com 5 Integration Management Structure • Managing an acquisition, regardless of size, is distinctly different from managing an operation. • Initiating • Planning • Execution • Monitoring & Control • Close-Out • This requires more than a rudimentary integration plan, constant vigilance, regular governance, and clear communication, both horizontal as well as vertical • => If your leadership team is spending the necessary time to manage the integration, who’s managing the operations, • Which of these 2 are you willing to give up?
  • 6. www.successfulprojectsforleaders.com 6 Program Management of the PMI • The integration needs to be set up in a “projectized” organizational structure • A department-like structure that exists for the duration of the integration • Focusing purely on the integration • Directly reports to Senior Leadership (Governance Board)
  • 7. www.successfulprojectsforleaders.com 7 Program Management of the PMI • Treat the transition period like a special program comprised of a number of projects • Integration manager is the program manager • Ensures all work is “process-ized” • Monitors the “mini-integrations” • Ensures adherence to progress against the schedule and milestones • Ensures focus on value & priorities • Ensures proper risk management • Helps to preserve the potential of the deal
  • 8. www.successfulprojectsforleaders.com 8 Why is this necessary? • Program management provides a needed structure and discipline. • Integration (Program) manager 100% focused on integration • Ensures consistent progress • Ensures risk mitigation and management throughout • Keeps focus on the integration, schedule, costs, and ROI • Ensures that the integration remains a priority • Lets management concentrate on daily operations • Lack of adherence to this leads to schedule overruns, cost overruns, overabundance of issues, resource drains, loss of focus, erosion of ROI.
  • 9. www.successfulprojectsforleaders.com 9 Typical Program Structure Integration (Program) Manager Business Unit 1 Project Manager Business Unit 2 Project Manager Business Unit 3 Project Manager
  • 10. www.successfulprojectsforleaders.com 10 Integration Management as Change Agents • Integration management needs to consider the immense requirement for change management • Ensure that the WIIFM issues are addressed • Ensure that buy-in is achieved • Ensure that clearly-defined leadership roles exist • Ensure that extensive, ongoing communication exists • Ensure focus on the customers • Ensure that decisions are made, even the tough ones • Ensure that focused initiatives are created • Ensure that resistance at all levels is recognized and managed.
  • 11. www.successfulprojectsforleaders.com 11 Part II: Day One Plus One Using Project Management To Further Enhance ROI
  • 12. www.successfulprojectsforleaders.com 12 Post PMI Factors to Consider • Project Budgeting • Governance • Risk Tracking & Quality Management • Work Sold & Translation Into Actionable Items • Scope & Schedule Management
  • 13. www.successfulprojectsforleaders.com 13 Why a repeatable methodology is necessary • A project management methodology—something that is enforced from the top down and is used consistently throughout the organization—certainly will have some upfront costs associated with it. • When used correctly, however, it can save an organization up to hundreds of thousands of dollars a year in above the line costs.
  • 14. www.successfulprojectsforleaders.com 14 Project Budgeting • The profitability of the organization begins with the project budget estimates themselves. • If an organization has to make a choice to fund only one or two projects NPV, IRR, MIRR, etc will be used as a financial metric. • What does it mean if the project’s budget estimate was never estimated correctly?
  • 15. www.successfulprojectsforleaders.com 15 Poor Estimates Leads to Poor Project Selection • Lower estimate • Typical of projects where estimators pull numbers out of air, didn’t consider all tasks needed to be done, didn’t correctly estimate task durations • project investment will be artificially lower than the actual cost • project will have an artificially higher value for NPV, IRR, or MIRR • It can get selected over projects that actually give a better ROI. • Higher estimate • Typical of projects whose estimates are “padded”, (estimator arbitrarily adds money to the estimate “just in case”) • Required investment for the project will be higher • Financial metrics will be artificially lower • Different, less profitable project can get selected.
  • 16. www.successfulprojectsforleaders.com 16 Governance • Organizations need a connection between Operations and project groups • There needs to be structured, consistent and meaningful flow of information between these two groups. • Project health • Issues • Risks • Actuals vs. estimates • Business Priorities • Change management • Lack of proper governance leads to objectives not being communicated to the project groups or not being interpreted correctly by the project groups. As a result, measurements made by the project groups cannot be related to these objectives.
  • 17. www.successfulprojectsforleaders.com 17 Governance • Development of standards and practices • directed at the effective execution of projects and the attainment of schedule, cost, scope, and quality objectives, • Communication of enterprise-level objectives to the project teams • Communication of project information to management • Efforts are efficient and effective • Projects are still the best ones to support strategic objectives • Whether there are performance issues associated with meeting objectives.
  • 18. www.successfulprojectsforleaders.com 18 The Biggest Impact • The organization is highly fragmented and functional in nature, with difficulty coordinating all the team activities. • There is a lack of any connection between Management and project groups along with no structured, consistent and meaningful flow of information between these two groups. • Senior management is not able to properly prioritize the collective initiatives. • Historically, projects have not been aligned with strategic objectives to ensure that projects are contributing to growth, competitive advantage, revenue, cash flow, or other objectives of the organization • There is a lack of full-time oversight for and across all projects that includes monitoring against established criteria and advising Management of status and issues that would affect the planned benefits of projects.
  • 19. www.successfulprojectsforleaders.com 19 Biggest Impact, continued • There is a need to ensure that standards are established, communicated, and enforced on an enterprise-wide basis so that project governance can be conducted relative to strategic goals. • There has been a failure of management to establish cross-departmental coordination toward goals for products, services, and customers.
  • 20. www.successfulprojectsforleaders.com 20 Risk Management • No one can predict all of the negative events that might occur on a project • Project risk management brings the team as close to that as one can get. • Project team isn’t caught off-guard by threats that occur • Time and labor aren’t taken away from critical path activities. • If the team had to stop planned activities in order to put out fires all the time • the project schedule would slip • the budget would be overrun • quality could suffer • Financial benefits might not be realized • windows of opportunity might be missed • Profitability is effected
  • 21. www.successfulprojectsforleaders.com 21 Further Benefits of Risk Management • When one uses risk management the price for the project doesn’t have to be artificially inflated, or padded, to cover some unknown occurrence • Create a task-by-task contingency account to cover pre- determined “what-ifs” • Money released once threat is no longer valid • Manages Parkinson’s syndrome
  • 22. www.successfulprojectsforleaders.com 22 Translating Work Sold Into Actionable Items • Rework quickly erodes project profits • Rework results from a lack of managing quality into the end product (service) • Unrealistic commitments made by Sales • A lack on the project team’s part to completely identify the end-users’ requirements and needs • Misunderstanding between the end-users and your team of what the end users’ requirements are
  • 23. www.successfulprojectsforleaders.com 23 Scope Management • Not having a well-constructed scope sets projects up for failure before they begin • Scope is a delineation of both what is considered to be a part of the project and what is not considered to be part of the project • The more vague the scope is, the more rework will occur • The more vague the scope is, the more the work will grow without a proportional change in budget (Scope Creep, Goldplating) • Missed deadlines • Cost overages
  • 24. www.successfulprojectsforleaders.com 24 Schedule & Cost Management • Constant vigilance is required to keep the project on budget and on schedule. • Cost and time estimates must be broken on a task-by-task basis and a month-by-month basis • Guarantees efficient comparisons of estimated planned expenditures against actual expenditures. • Regular cost and schedule monitoring is espoused by project management governing organizations • Catch the project when it has varied slightly from cost and/or schedule targets. • This allows corrective action to be taken.
  • 25. www.successfulprojectsforleaders.com 25 Portfolio Management (PPM) • Identifying opportunities and needs • Selecting which projects are to be undertaken to best meet objectives and needs • Selecting which projects are to be terminated or deferred due to performance issues or non-compliance with objectives • Establishing project priorities • Projecting revenue and effect on cash flow • Resource Prioritization • Aligning projects with strategic objectives to ensure that projects are contributing to growth, competitive advantage, revenue, cash flow, or other objectives of the organization • Evaluating the value and benefits of projects to the organization • Evaluating project benefits vis-a-vis predicted risks • Ensuring balance among projects in the portfolio to provide the optimal mix to protect and enhance the organization’s future
  • 26. www.successfulprojectsforleaders.com 26 Change Control • Organizations need discipline to ensure that its teams implement only changes that are worth pursuing • Politics, pet ideas • This prevents unnecessary or overly costly changes from derailing projects. • A rigorous process needs to be established and managed to evaluate the impact of changes before implementing them. • Many changes that initially sound like good ideas will get thrown out once the true cost of the change is known. • The enterprise impact needs to be understood. A project change that might be beneficial to one SBU might be detrimental to another. • If the benefit of the change is worth the cost, the change is added to the scope. Otherwise, it’s deferred or rejected
  • 27. www.successfulprojectsforleaders.com 27 Summary • Research from Gartner, Inc. suggests that organizations who establish enterprise standards for project management, including a project office with suitable governance, will experience half as many major project cost overruns, delays and cancellations as those that fail to do so (M. Light, T. Berg, “The Project Office: Teams, Processes and Tools,” Gartner Strategic Analysis Report, 1 August 2000). • The only way to ensure that standards are established, communicated, and enforced on an enterprise-wide basis so that project governance can be conducted relative to strategic goals is to elevate project management to the strategic level. This also reduces the failure of management to establish cross departmental coordination toward goals for products, services and customers which appears to be the major hurdle with many organizations.
  • 28. www.successfulprojectsforleaders.com 28 Bottom Line • Projects should be profit generators and not financial burdens • Risks and quality should never be unknowns • Budgets and schedules shouldn’t be stabs in the dark, arbitrary, or general guidelines. • Running successful projects isn’t magic or luck. • SPFL sets up the right infrastructure and methodology to follow • Provide senior-level oversight and governance (VirtualPMOTM) • Linkage between LT and project teams • Ensure consistency, drive toward continuous improvement • Bottom line results