SlideShare una empresa de Scribd logo
1 de 3
THE 10 METHODS OF DESIGNS AND ACTUAL CONSTRUCTION APPLICATIONS OF CONCRETE
STRUCTURES TO AVOID WATER LEAKAGES ON BUILDING:
BY: EDUARDO H. PARE
November 2004
1) Proper design of concrete mix shall be achieved and applied on site application - i.e. concrete
aggregatesandcementcontents,andwater/cementratioshallbe strictlyinadherence withthe Code but
with considerations on actual local conditions and type of materials to be used.
2) Proper workmanshipof concrete shall be appliedonto the works - i.e. proper actual conveyance and
placement of concrete including correct actual applications of electrical and manual vibrationson fresh
concrete substratesshall be applied,honeycombingdue toaggregatessegregationshallalsobe avoided.
3) Proper concrete coversas requiredbythe Code forwhicha structure was designedwith,shall alsobe
strictlyimplementedontothe workssince hypotheticallyif the minimumconcrete coverisnotappliedor
it was not actually properly applied on each every aspect of the structure, it will affect the crack width
constrainsandthe overall functionsandresistance of the concrete elementssinceconcrete isanelement
fromwithinitsownelements - i.e.fibersof concreteshall alsobe analyzedoneachmillimeterof directions
and movements, etc.
4) Minimumandmaximumspacingof reinforcementsshall be appliedoneach aspector memberof the
structure since shrinkages,creeps,thermalhydrations,andotherconcrete servicestressesshallaffectthe
crack resistance of concrete on each pre-construction, post-construction, and occupancy activities and
periods of the structure/building.
5) Proper curing shall be applied on each aspect of the structures elements which shall include the
minimumtime requiredforformworksandscaffoldings/strutstobe removed - I do not agree withearly
removal of forms then installing back the struts or vertical supports since even within few minutesof
removal thenreinstalling- itshall surelyaffectthe shorttermdeflectionsof concreteelementsrelative to
the correct removal period of the same.
6) Though structural members and foundations are (hypothetically) designed within crack width
constrains stipulated in the Codes, as much as possible construction joints shall be avoided during
construction works on floors of the building, if construction joints are indeed required, such joints shall
be redesigned with provision of a least size but wider beam underneath the joints which shall serve to
have key grooved joint along such CJ beam.
7) It is technically incorrect to provide construction, movement or expansion joints on basement
slab/foundationandwalls - whichshall affectthe watertightnessof the structure.Foundationsandwalls
reinforcementsshall be designedanddetailedtohave adequate quantitiesandspacingtonotonlyresist
the design forces and stresses but including crack resistance requirements as specified in the Codes.
8) As much as possible no lateral embedments of electrical conduits, drainage pipes, and other utilities
elements casted inside the slabs and beams on floors - only vertical services sleeves and lines shall
penetrate the floors, since these lateral penetrations of utilities elements are one of main culprits on
water leakages on floors of buildings. These lateral penetrations particularly when theyare in sets or in
groupsof parallel rowsjustlikebundledconduitsandpipesinsidefloorslabsandbeamsshallcreate cracks
no matter how dense the spacing of reinforcements since concrete areas diminished in these lines.
9) Cold joints shall be avoided during concrete casting on floors - the ideal maximum time for the next
stage of concrete tojoinorconnectwithpreviousstage ormoduleof concrete shall be 45minutesorless.
10) If the Ready mix Supplier is in your doubt or is not reliable - conduct actual mock up sample of the
designmixestocome up witha cured-finishedpiece of module andtestedit against water ingressprior
to actual pouring of concrete onto the floors of the building.
Authors:
Eduardo H. Pare
Eduardo H. Pare, B.S. Civil Engineering
Professional Engineer
Civil & Structural Design & Construction
LinkedIn Profile Link: https://qa.linkedin.com/in/eduardo-h-pare-05468721
Facebook Profile Link: http://www.facebook.com/EddPare
I have had more than 25 years of post-graduate extensive Civil & Structural design experience as
a Professional Civil & Structural Engineer including PMC & EPCC Project Management & Contract
Administration. I was involved in the design, analyses and applications of Heavy Industrial &
Petrochemical Plants, Oil & Gas Marine Structures & Offshore Platforms including deep-sea
Caissons & Piles foundations, International Airports, Power Generation Plants, SCADA Control
Building, Gridstations & Substations, Commercial Buildings, Prestressed and Post-tensioned
Concrete Highway Bridges & Culverts, Large Storage Tanks & Towers. Utilizing the latest CAD
Design Softwares, I analyze & design Reinforced Concrete & Steel Structures including complex
underwater Reinforced Concrete Repair Works. I have had broad experience in Pre-Tender and
Post-Tendering Works, and Design Management and Coordination including Design Drawings &
Documents Systems management.
Relevant Projects Experience:
Senior Structural Engineer – ERGA Architects, Planners, and Consulting Engineers, Doha, Qatar;
Responsible for Structural Works Supervision in one or various ERGA projects sites in Qatar.
Review and Approve Contractors Submittals (Construction Drawings, Shop Drawings, As-Built
Drawings, Structural Design Calculation Documents, Method Statements, Concrete Mix Designs,
Subcontractors Prequalification Documents, and Material Samples). Responsible for structural
designs and analyses,construction executions, and construction supervisions for numerous types
of civil engineering works that include residential buildings, commercial buildings,
infrastructures, roads and all other related works. Responsible for group of Engineers and
Draftsmen for Design and Supervision Works.
Senior Structural Engineer – Lahmeyer International GmbH, a Germany based International
Engineering Consultant engaged in the design and supervision of KAHRAMAA, FEWA, DEWA,
ADWEA and TRANSCO power generation and distribution projects in Qatar & United Arab
Emirates. Assignedwithin the Designand Engineering Department for the designand engineering
reviews and approvals of the Civil, Structural, and Architectural aspects of Substations Buildings,
OHL Structures, and SCADA Control Building Projects in Qatar & UAE. Assigned to review and
coordinate relevant Contractors design and engineering documents and drawings submittals for
the projects. Involved in the Pre-Tendering and Post-Tendering Works including generation of
design criteria, specifications, and relevant Scope of Works for the projects.
Structural Engineer, COWI Consulting Engineers and Planners LLC, Muscat, Sultanate of Oman; a
Denmark based International Engineering Consultant engaged in the Design and Supervision of
the new 3 Billion USD Oman (Muscat and Salalah) International Airports Project. Assigned within
the Buildings Structural Department and involved in the Structural Analyses and Designs including
Applications of relevant Building Structures of the Project such as the 50 years life Passenger
Terminal Building.
Site Technical Office Manager, Enel Power C & D Saudi Arabia Ltd, Yanbu, Saudi Arabia; an Italy
based EPCC company for 130 MW STG Power Plant. Main responsibilities include Engineering
Designs Management & Applications, Design & Shop Drawings & Documents Controls,
Coordination of interdiscipline design interfaces, and Head Office Technical Coordination.
Civil & StructuralDesign Engineer, Enel Power C & D Saudi Arabia Ltd, Yanbu, Saudi Arabia; an
Italy based EPCC company for 130 MW STG Power Plant. Responsible for the Civil & Structural
Designs & Analyses of the Project including technical coordination with Client’s Design Manager.
In charge for the acquisitions of Design & Shop Drawings & Documents approval.
Lead Civil & Structural Design Engineer, Ras Lanuf Oil & Gas Processing Co. Inc., Ras Lanuf, Libya;
one of the largestgovernment oil companies. Assignedwithin the TechnicalServices Department,
Plant Engineering Division as Lead Civil & Structural Design Engineer responsible for the Civil &
Structural Designs & Analyses aspects of the whole plant. Leading a group of Civil & Structural
Engineers, Designers & Draftsmen, devise design & drafting schedule including Design & Shop
Drawings & Documents System Controls. In charge for Technical Coordination & Discussions with
Contractors Design Managers & Engineers.

Más contenido relacionado

La actualidad más candente

La actualidad más candente (18)

Ramy Mikhail updated
Ramy Mikhail updatedRamy Mikhail updated
Ramy Mikhail updated
 
Sr. Civil & Structural Designer
Sr. Civil & Structural DesignerSr. Civil & Structural Designer
Sr. Civil & Structural Designer
 
Brief Profile Sanjeev Kadam - 2016
Brief Profile Sanjeev Kadam -    2016Brief Profile Sanjeev Kadam -    2016
Brief Profile Sanjeev Kadam - 2016
 
Updated CV (LEONARDO M VILLAMIL JR) 19-1-16
Updated CV  (LEONARDO M  VILLAMIL JR) 19-1-16Updated CV  (LEONARDO M  VILLAMIL JR) 19-1-16
Updated CV (LEONARDO M VILLAMIL JR) 19-1-16
 
Madian CV_Sr Civil Structural Tech Eng
Madian CV_Sr Civil Structural  Tech EngMadian CV_Sr Civil Structural  Tech Eng
Madian CV_Sr Civil Structural Tech Eng
 
SMA CV2016-1
SMA CV2016-1SMA CV2016-1
SMA CV2016-1
 
Ajay-Patil
Ajay-PatilAjay-Patil
Ajay-Patil
 
Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016Erfan Farooqui CV- 17072016
Erfan Farooqui CV- 17072016
 
Salem mohamed curriculum vitae
Salem mohamed curriculum vitaeSalem mohamed curriculum vitae
Salem mohamed curriculum vitae
 
AL-WarrenCV2016
AL-WarrenCV2016AL-WarrenCV2016
AL-WarrenCV2016
 
Roberts CV
Roberts CVRoberts CV
Roberts CV
 
Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015
Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015
Hossam(civil structural engineer) cover letter+cv-resume-3-09-2015
 
r_1
r_1r_1
r_1
 
Jai Prakash sharma CV
Jai Prakash sharma CVJai Prakash sharma CV
Jai Prakash sharma CV
 
Resume -Amarnath
Resume -AmarnathResume -Amarnath
Resume -Amarnath
 
KANNAN RESUME
KANNAN RESUMEKANNAN RESUME
KANNAN RESUME
 
Shilpesh CV
Shilpesh CVShilpesh CV
Shilpesh CV
 
S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXP
S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXPS S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXP
S S N PRASAD AKSHINTALA - CIVIL ME +4 YEARS EXP
 

Destacado

Tutorial acerca de powerpoint online
Tutorial acerca de powerpoint onlineTutorial acerca de powerpoint online
Tutorial acerca de powerpoint onlineRomy Riofrio
 
Calculo de letrinas
Calculo de letrinasCalculo de letrinas
Calculo de letrinasignacio93
 
Brexit un comentariu
Brexit  un comentariuBrexit  un comentariu
Brexit un comentariuClaudiu D
 
Transparenta IGSU ?
Transparenta IGSU ?Transparenta IGSU ?
Transparenta IGSU ?Claudiu D
 
Tugas yusnita
Tugas yusnitaTugas yusnita
Tugas yusnitaadekdewa
 
Opsamling digital levendegørelse ws3
Opsamling digital levendegørelse ws3Opsamling digital levendegørelse ws3
Opsamling digital levendegørelse ws3Freelancekvinden
 
Calculo de tanque septico
Calculo de tanque septicoCalculo de tanque septico
Calculo de tanque septicoignacio93
 
EDUARDO H. PARE WORK CERTIFICATE_LI_ABU DHABI
EDUARDO H. PARE WORK CERTIFICATE_LI_ABU DHABIEDUARDO H. PARE WORK CERTIFICATE_LI_ABU DHABI
EDUARDO H. PARE WORK CERTIFICATE_LI_ABU DHABIEduardo H. Pare
 
EDUARDO H. PARE WORK CERTIFICATE_ENEL2
EDUARDO H. PARE WORK CERTIFICATE_ENEL2EDUARDO H. PARE WORK CERTIFICATE_ENEL2
EDUARDO H. PARE WORK CERTIFICATE_ENEL2Eduardo H. Pare
 
M.SC. Certificate
M.SC. CertificateM.SC. Certificate
M.SC. CertificateAhmed Taha
 
POWTOON - PRESENTACIONES ANIMADAS
POWTOON - PRESENTACIONES ANIMADASPOWTOON - PRESENTACIONES ANIMADAS
POWTOON - PRESENTACIONES ANIMADASHugo Artus
 

Destacado (15)

Tutorial acerca de powerpoint online
Tutorial acerca de powerpoint onlineTutorial acerca de powerpoint online
Tutorial acerca de powerpoint online
 
Calculo de letrinas
Calculo de letrinasCalculo de letrinas
Calculo de letrinas
 
Licences
LicencesLicences
Licences
 
Brexit un comentariu
Brexit  un comentariuBrexit  un comentariu
Brexit un comentariu
 
Transparenta IGSU ?
Transparenta IGSU ?Transparenta IGSU ?
Transparenta IGSU ?
 
Tugas yusnita
Tugas yusnitaTugas yusnita
Tugas yusnita
 
Morten ladefoged 27 maj
Morten ladefoged 27 majMorten ladefoged 27 maj
Morten ladefoged 27 maj
 
Rodrigo-Interior Design + Construction
Rodrigo-Interior Design + ConstructionRodrigo-Interior Design + Construction
Rodrigo-Interior Design + Construction
 
Opsamling digital levendegørelse ws3
Opsamling digital levendegørelse ws3Opsamling digital levendegørelse ws3
Opsamling digital levendegørelse ws3
 
Calculo de tanque septico
Calculo de tanque septicoCalculo de tanque septico
Calculo de tanque septico
 
EDUARDO H. PARE WORK CERTIFICATE_LI_ABU DHABI
EDUARDO H. PARE WORK CERTIFICATE_LI_ABU DHABIEDUARDO H. PARE WORK CERTIFICATE_LI_ABU DHABI
EDUARDO H. PARE WORK CERTIFICATE_LI_ABU DHABI
 
EDUARDO H. PARE WORK CERTIFICATE_ENEL2
EDUARDO H. PARE WORK CERTIFICATE_ENEL2EDUARDO H. PARE WORK CERTIFICATE_ENEL2
EDUARDO H. PARE WORK CERTIFICATE_ENEL2
 
M.SC. Certificate
M.SC. CertificateM.SC. Certificate
M.SC. Certificate
 
POWTOON - PRESENTACIONES ANIMADAS
POWTOON - PRESENTACIONES ANIMADASPOWTOON - PRESENTACIONES ANIMADAS
POWTOON - PRESENTACIONES ANIMADAS
 
monografía
monografíamonografía
monografía
 

Similar a 10 METHODS TO PREVENT WATER LEAKS

Similar a 10 METHODS TO PREVENT WATER LEAKS (20)

EDUARDO H. PARE CV
EDUARDO H. PARE  CVEDUARDO H. PARE  CV
EDUARDO H. PARE CV
 
QA QC CIVIL
QA QC CIVILQA QC CIVIL
QA QC CIVIL
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
M.Salah cv1
M.Salah cv1M.Salah cv1
M.Salah cv1
 
cv for Project Engineer
cv for Project Engineercv for Project Engineer
cv for Project Engineer
 
Concrete method rev02
Concrete method rev02Concrete method rev02
Concrete method rev02
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
Muneer CV 2016
Muneer CV 2016Muneer CV 2016
Muneer CV 2016
 
Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 
Mohamed Hassan cv 30816
Mohamed Hassan cv 30816Mohamed Hassan cv 30816
Mohamed Hassan cv 30816
 
Summery
SummerySummery
Summery
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
Mohamed osama cv piping
Mohamed osama cv pipingMohamed osama cv piping
Mohamed osama cv piping
 
RESUME
RESUMERESUME
RESUME
 
IRJET- Temperature Effect on Concrete Bridge
IRJET-  	  Temperature Effect on Concrete BridgeIRJET-  	  Temperature Effect on Concrete Bridge
IRJET- Temperature Effect on Concrete Bridge
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
 
IRJET- Analysis of Prestressed Concrete Girder for Bridges
IRJET- Analysis of Prestressed Concrete Girder for BridgesIRJET- Analysis of Prestressed Concrete Girder for Bridges
IRJET- Analysis of Prestressed Concrete Girder for Bridges
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 
Esteban Raganit_2016
Esteban Raganit_2016Esteban Raganit_2016
Esteban Raganit_2016
 

Más de Eduardo H. Pare

EDUARDO H. PARE CV STRUCTURAL ENGINEER CIRCA 17.04.2022.pdf
EDUARDO H. PARE CV STRUCTURAL ENGINEER CIRCA 17.04.2022.pdfEDUARDO H. PARE CV STRUCTURAL ENGINEER CIRCA 17.04.2022.pdf
EDUARDO H. PARE CV STRUCTURAL ENGINEER CIRCA 17.04.2022.pdfEduardo H. Pare
 
RCC COLUMNS REPAIR/STRENGTHENING DETAILS
RCC COLUMNS REPAIR/STRENGTHENING DETAILSRCC COLUMNS REPAIR/STRENGTHENING DETAILS
RCC COLUMNS REPAIR/STRENGTHENING DETAILSEduardo H. Pare
 
COMMON MATERIALS VOC LIST
COMMON MATERIALS VOC LISTCOMMON MATERIALS VOC LIST
COMMON MATERIALS VOC LISTEduardo H. Pare
 
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...Eduardo H. Pare
 
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – LIBYA RASCO (19...
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – LIBYA RASCO (19...EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – LIBYA RASCO (19...
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – LIBYA RASCO (19...Eduardo H. Pare
 
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – MALAYSIA DSD (1...
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – MALAYSIA DSD (1...EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – MALAYSIA DSD (1...
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – MALAYSIA DSD (1...Eduardo H. Pare
 
EDUARDO H. PARE DESIGN CALCULATION OF ANCHOR BOLTS FOR 22M LIGHTING POLES
EDUARDO H. PARE DESIGN CALCULATION OF ANCHOR BOLTS FOR 22M LIGHTING POLESEDUARDO H. PARE DESIGN CALCULATION OF ANCHOR BOLTS FOR 22M LIGHTING POLES
EDUARDO H. PARE DESIGN CALCULATION OF ANCHOR BOLTS FOR 22M LIGHTING POLESEduardo H. Pare
 
EDUARDO H. PARE WORK CERTIFICATE AT ERGA QATAR LLC
EDUARDO H. PARE WORK CERTIFICATE AT ERGA QATAR LLCEDUARDO H. PARE WORK CERTIFICATE AT ERGA QATAR LLC
EDUARDO H. PARE WORK CERTIFICATE AT ERGA QATAR LLCEduardo H. Pare
 
EDUARDO H. PARE THOUGHTS & INSIGHTS OF LIFE
EDUARDO H. PARE THOUGHTS & INSIGHTS OF LIFEEDUARDO H. PARE THOUGHTS & INSIGHTS OF LIFE
EDUARDO H. PARE THOUGHTS & INSIGHTS OF LIFEEduardo H. Pare
 
STRUCTURAL CALCULATION - CURTAIN WALL (SAMPLE DESIGN)
STRUCTURAL CALCULATION - CURTAIN WALL (SAMPLE DESIGN)STRUCTURAL CALCULATION - CURTAIN WALL (SAMPLE DESIGN)
STRUCTURAL CALCULATION - CURTAIN WALL (SAMPLE DESIGN)Eduardo H. Pare
 
LADDER AND HANDRAIL DETAILS
LADDER AND HANDRAIL DETAILSLADDER AND HANDRAIL DETAILS
LADDER AND HANDRAIL DETAILSEduardo H. Pare
 
EDUARDO H. PARE - PRC BOARD CERTIFICATE
EDUARDO H. PARE - PRC BOARD CERTIFICATEEDUARDO H. PARE - PRC BOARD CERTIFICATE
EDUARDO H. PARE - PRC BOARD CERTIFICATEEduardo H. Pare
 
EDUARDO H. PARE - ENGINEERING DEGREE CERTIFICATE
EDUARDO H. PARE - ENGINEERING DEGREE CERTIFICATEEDUARDO H. PARE - ENGINEERING DEGREE CERTIFICATE
EDUARDO H. PARE - ENGINEERING DEGREE CERTIFICATEEduardo H. Pare
 
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...Eduardo H. Pare
 
EDUARDO H. PARE WORK CERTIFICATE - ZAPANTA REALTY & DEVT
EDUARDO H. PARE WORK CERTIFICATE - ZAPANTA REALTY & DEVTEDUARDO H. PARE WORK CERTIFICATE - ZAPANTA REALTY & DEVT
EDUARDO H. PARE WORK CERTIFICATE - ZAPANTA REALTY & DEVTEduardo H. Pare
 
EDUARDO H. PARE WORK CERTIFICATE - MASIPAG SERVICES
EDUARDO H. PARE WORK CERTIFICATE - MASIPAG SERVICESEDUARDO H. PARE WORK CERTIFICATE - MASIPAG SERVICES
EDUARDO H. PARE WORK CERTIFICATE - MASIPAG SERVICESEduardo H. Pare
 
EDUARDO H. PARE POEMS & THOUGHTS
EDUARDO H. PARE POEMS & THOUGHTSEDUARDO H. PARE POEMS & THOUGHTS
EDUARDO H. PARE POEMS & THOUGHTSEduardo H. Pare
 
EDUARDO H. PARE NARRATIVE OF LOVE I
EDUARDO H. PARE NARRATIVE OF LOVE IEDUARDO H. PARE NARRATIVE OF LOVE I
EDUARDO H. PARE NARRATIVE OF LOVE IEduardo H. Pare
 
EDUARDO H. PARE NARRATIVE OF LOVE II
EDUARDO H. PARE NARRATIVE OF LOVE IIEDUARDO H. PARE NARRATIVE OF LOVE II
EDUARDO H. PARE NARRATIVE OF LOVE IIEduardo H. Pare
 

Más de Eduardo H. Pare (20)

EDUARDO H. PARE CV STRUCTURAL ENGINEER CIRCA 17.04.2022.pdf
EDUARDO H. PARE CV STRUCTURAL ENGINEER CIRCA 17.04.2022.pdfEDUARDO H. PARE CV STRUCTURAL ENGINEER CIRCA 17.04.2022.pdf
EDUARDO H. PARE CV STRUCTURAL ENGINEER CIRCA 17.04.2022.pdf
 
RCC COLUMNS REPAIR/STRENGTHENING DETAILS
RCC COLUMNS REPAIR/STRENGTHENING DETAILSRCC COLUMNS REPAIR/STRENGTHENING DETAILS
RCC COLUMNS REPAIR/STRENGTHENING DETAILS
 
COMMON MATERIALS VOC LIST
COMMON MATERIALS VOC LISTCOMMON MATERIALS VOC LIST
COMMON MATERIALS VOC LIST
 
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...
EDUARDO H. PARE WORK EXPERIENCE CERTIFICATE – LAHMEYER INTERNATIONAL QATAR (2...
 
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – LIBYA RASCO (19...
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – LIBYA RASCO (19...EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – LIBYA RASCO (19...
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – LIBYA RASCO (19...
 
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – MALAYSIA DSD (1...
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – MALAYSIA DSD (1...EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – MALAYSIA DSD (1...
EDUARDO H. PARE (AUTHENTICATED) WORK EXPERIENCE CERTIFICATE – MALAYSIA DSD (1...
 
EDUARDO H. PARE DESIGN CALCULATION OF ANCHOR BOLTS FOR 22M LIGHTING POLES
EDUARDO H. PARE DESIGN CALCULATION OF ANCHOR BOLTS FOR 22M LIGHTING POLESEDUARDO H. PARE DESIGN CALCULATION OF ANCHOR BOLTS FOR 22M LIGHTING POLES
EDUARDO H. PARE DESIGN CALCULATION OF ANCHOR BOLTS FOR 22M LIGHTING POLES
 
EDUARDO H. PARE WORK CERTIFICATE AT ERGA QATAR LLC
EDUARDO H. PARE WORK CERTIFICATE AT ERGA QATAR LLCEDUARDO H. PARE WORK CERTIFICATE AT ERGA QATAR LLC
EDUARDO H. PARE WORK CERTIFICATE AT ERGA QATAR LLC
 
EDUARDO H. PARE THOUGHTS & INSIGHTS OF LIFE
EDUARDO H. PARE THOUGHTS & INSIGHTS OF LIFEEDUARDO H. PARE THOUGHTS & INSIGHTS OF LIFE
EDUARDO H. PARE THOUGHTS & INSIGHTS OF LIFE
 
BS 8110, PART-3, 1985
BS 8110, PART-3, 1985BS 8110, PART-3, 1985
BS 8110, PART-3, 1985
 
STRUCTURAL CALCULATION - CURTAIN WALL (SAMPLE DESIGN)
STRUCTURAL CALCULATION - CURTAIN WALL (SAMPLE DESIGN)STRUCTURAL CALCULATION - CURTAIN WALL (SAMPLE DESIGN)
STRUCTURAL CALCULATION - CURTAIN WALL (SAMPLE DESIGN)
 
LADDER AND HANDRAIL DETAILS
LADDER AND HANDRAIL DETAILSLADDER AND HANDRAIL DETAILS
LADDER AND HANDRAIL DETAILS
 
EDUARDO H. PARE - PRC BOARD CERTIFICATE
EDUARDO H. PARE - PRC BOARD CERTIFICATEEDUARDO H. PARE - PRC BOARD CERTIFICATE
EDUARDO H. PARE - PRC BOARD CERTIFICATE
 
EDUARDO H. PARE - ENGINEERING DEGREE CERTIFICATE
EDUARDO H. PARE - ENGINEERING DEGREE CERTIFICATEEDUARDO H. PARE - ENGINEERING DEGREE CERTIFICATE
EDUARDO H. PARE - ENGINEERING DEGREE CERTIFICATE
 
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...
NONLINEAR STRUCTURAL ANALYSIS FOR SEISMIC DESIGN (ALL COPYRIGHT BY NIST - US ...
 
EDUARDO H. PARE WORK CERTIFICATE - ZAPANTA REALTY & DEVT
EDUARDO H. PARE WORK CERTIFICATE - ZAPANTA REALTY & DEVTEDUARDO H. PARE WORK CERTIFICATE - ZAPANTA REALTY & DEVT
EDUARDO H. PARE WORK CERTIFICATE - ZAPANTA REALTY & DEVT
 
EDUARDO H. PARE WORK CERTIFICATE - MASIPAG SERVICES
EDUARDO H. PARE WORK CERTIFICATE - MASIPAG SERVICESEDUARDO H. PARE WORK CERTIFICATE - MASIPAG SERVICES
EDUARDO H. PARE WORK CERTIFICATE - MASIPAG SERVICES
 
EDUARDO H. PARE POEMS & THOUGHTS
EDUARDO H. PARE POEMS & THOUGHTSEDUARDO H. PARE POEMS & THOUGHTS
EDUARDO H. PARE POEMS & THOUGHTS
 
EDUARDO H. PARE NARRATIVE OF LOVE I
EDUARDO H. PARE NARRATIVE OF LOVE IEDUARDO H. PARE NARRATIVE OF LOVE I
EDUARDO H. PARE NARRATIVE OF LOVE I
 
EDUARDO H. PARE NARRATIVE OF LOVE II
EDUARDO H. PARE NARRATIVE OF LOVE IIEDUARDO H. PARE NARRATIVE OF LOVE II
EDUARDO H. PARE NARRATIVE OF LOVE II
 

Último

VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...SUHANI PANDEY
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...Call Girls in Nagpur High Profile
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxjeswinjees
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...ranjana rawat
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja Nehwal
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Servicearoranaina404
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️soniya singh
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...babafaisel
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...kumaririma588
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Call Girls in Nagpur High Profile
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja Nehwal
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵anilsa9823
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsCharles Obaleagbon
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...BarusRa
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130Suhani Kapoor
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentationamedia6
 
Government polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdGovernment polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdshivubhavv
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdftbatkhuu1
 
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call GirlsCBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girlsmodelanjalisharma4
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)amitlee9823
 

Último (20)

VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
VIP Model Call Girls Kalyani Nagar ( Pune ) Call ON 8005736733 Starting From ...
 
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...Booking open Available Pune Call Girls Kirkatwadi  6297143586 Call Hot Indian...
Booking open Available Pune Call Girls Kirkatwadi 6297143586 Call Hot Indian...
 
Stark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptxStark Industries Marketing Plan (1).pptx
Stark Industries Marketing Plan (1).pptx
 
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
(AISHA) Ambegaon Khurd Call Girls Just Call 7001035870 [ Cash on Delivery ] P...
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Gi...
 
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts ServiceVVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
VVIP CALL GIRLS Lucknow 💓 Lucknow < Renuka Sharma > 7877925207 Escorts Service
 
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
Call Girls in Kalkaji Delhi 8264348440 call girls ❤️
 
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
Kala jadu for love marriage | Real amil baba | Famous amil baba | kala jadu n...
 
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...Verified Trusted Call Girls Adugodi💘 9352852248  Good Looking standard Profil...
Verified Trusted Call Girls Adugodi💘 9352852248 Good Looking standard Profil...
 
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...Top Rated  Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
Top Rated Pune Call Girls Saswad ⟟ 6297143586 ⟟ Call Me For Genuine Sex Serv...
 
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
Pooja 9892124323, Call girls Services and Mumbai Escort Service Near Hotel Hy...
 
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service  🧵
CALL ON ➥8923113531 🔝Call Girls Kalyanpur Lucknow best Female service 🧵
 
WAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past QuestionsWAEC Carpentry and Joinery Past Questions
WAEC Carpentry and Joinery Past Questions
 
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...AMBER GRAIN EMBROIDERY | Growing folklore elements |  Root-based materials, w...
AMBER GRAIN EMBROIDERY | Growing folklore elements | Root-based materials, w...
 
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
VIP Call Girls Service Bhagyanagar Hyderabad Call +91-8250192130
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentation
 
Government polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcdGovernment polytechnic college-1.pptxabcd
Government polytechnic college-1.pptxabcd
 
Editorial design Magazine design project.pdf
Editorial design Magazine design project.pdfEditorial design Magazine design project.pdf
Editorial design Magazine design project.pdf
 
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call GirlsCBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
CBD Belapur Individual Call Girls In 08976425520 Panvel Only Genuine Call Girls
 
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
Escorts Service Nagavara ☎ 7737669865☎ Book Your One night Stand (Bangalore)
 

10 METHODS TO PREVENT WATER LEAKS

  • 1. THE 10 METHODS OF DESIGNS AND ACTUAL CONSTRUCTION APPLICATIONS OF CONCRETE STRUCTURES TO AVOID WATER LEAKAGES ON BUILDING: BY: EDUARDO H. PARE November 2004 1) Proper design of concrete mix shall be achieved and applied on site application - i.e. concrete aggregatesandcementcontents,andwater/cementratioshallbe strictlyinadherence withthe Code but with considerations on actual local conditions and type of materials to be used. 2) Proper workmanshipof concrete shall be appliedonto the works - i.e. proper actual conveyance and placement of concrete including correct actual applications of electrical and manual vibrationson fresh concrete substratesshall be applied,honeycombingdue toaggregatessegregationshallalsobe avoided. 3) Proper concrete coversas requiredbythe Code forwhicha structure was designedwith,shall alsobe strictlyimplementedontothe workssince hypotheticallyif the minimumconcrete coverisnotappliedor it was not actually properly applied on each every aspect of the structure, it will affect the crack width constrainsandthe overall functionsandresistance of the concrete elementssinceconcrete isanelement fromwithinitsownelements - i.e.fibersof concreteshall alsobe analyzedoneachmillimeterof directions and movements, etc. 4) Minimumandmaximumspacingof reinforcementsshall be appliedoneach aspector memberof the structure since shrinkages,creeps,thermalhydrations,andotherconcrete servicestressesshallaffectthe crack resistance of concrete on each pre-construction, post-construction, and occupancy activities and periods of the structure/building. 5) Proper curing shall be applied on each aspect of the structures elements which shall include the minimumtime requiredforformworksandscaffoldings/strutstobe removed - I do not agree withearly removal of forms then installing back the struts or vertical supports since even within few minutesof removal thenreinstalling- itshall surelyaffectthe shorttermdeflectionsof concreteelementsrelative to the correct removal period of the same. 6) Though structural members and foundations are (hypothetically) designed within crack width constrains stipulated in the Codes, as much as possible construction joints shall be avoided during construction works on floors of the building, if construction joints are indeed required, such joints shall be redesigned with provision of a least size but wider beam underneath the joints which shall serve to have key grooved joint along such CJ beam. 7) It is technically incorrect to provide construction, movement or expansion joints on basement slab/foundationandwalls - whichshall affectthe watertightnessof the structure.Foundationsandwalls reinforcementsshall be designedanddetailedtohave adequate quantitiesandspacingtonotonlyresist the design forces and stresses but including crack resistance requirements as specified in the Codes. 8) As much as possible no lateral embedments of electrical conduits, drainage pipes, and other utilities elements casted inside the slabs and beams on floors - only vertical services sleeves and lines shall penetrate the floors, since these lateral penetrations of utilities elements are one of main culprits on water leakages on floors of buildings. These lateral penetrations particularly when theyare in sets or in groupsof parallel rowsjustlikebundledconduitsandpipesinsidefloorslabsandbeamsshallcreate cracks no matter how dense the spacing of reinforcements since concrete areas diminished in these lines. 9) Cold joints shall be avoided during concrete casting on floors - the ideal maximum time for the next stage of concrete tojoinorconnectwithpreviousstage ormoduleof concrete shall be 45minutesorless. 10) If the Ready mix Supplier is in your doubt or is not reliable - conduct actual mock up sample of the designmixestocome up witha cured-finishedpiece of module andtestedit against water ingressprior to actual pouring of concrete onto the floors of the building. Authors: Eduardo H. Pare
  • 2. Eduardo H. Pare, B.S. Civil Engineering Professional Engineer Civil & Structural Design & Construction LinkedIn Profile Link: https://qa.linkedin.com/in/eduardo-h-pare-05468721 Facebook Profile Link: http://www.facebook.com/EddPare I have had more than 25 years of post-graduate extensive Civil & Structural design experience as a Professional Civil & Structural Engineer including PMC & EPCC Project Management & Contract Administration. I was involved in the design, analyses and applications of Heavy Industrial & Petrochemical Plants, Oil & Gas Marine Structures & Offshore Platforms including deep-sea Caissons & Piles foundations, International Airports, Power Generation Plants, SCADA Control Building, Gridstations & Substations, Commercial Buildings, Prestressed and Post-tensioned Concrete Highway Bridges & Culverts, Large Storage Tanks & Towers. Utilizing the latest CAD Design Softwares, I analyze & design Reinforced Concrete & Steel Structures including complex underwater Reinforced Concrete Repair Works. I have had broad experience in Pre-Tender and Post-Tendering Works, and Design Management and Coordination including Design Drawings & Documents Systems management.
  • 3. Relevant Projects Experience: Senior Structural Engineer – ERGA Architects, Planners, and Consulting Engineers, Doha, Qatar; Responsible for Structural Works Supervision in one or various ERGA projects sites in Qatar. Review and Approve Contractors Submittals (Construction Drawings, Shop Drawings, As-Built Drawings, Structural Design Calculation Documents, Method Statements, Concrete Mix Designs, Subcontractors Prequalification Documents, and Material Samples). Responsible for structural designs and analyses,construction executions, and construction supervisions for numerous types of civil engineering works that include residential buildings, commercial buildings, infrastructures, roads and all other related works. Responsible for group of Engineers and Draftsmen for Design and Supervision Works. Senior Structural Engineer – Lahmeyer International GmbH, a Germany based International Engineering Consultant engaged in the design and supervision of KAHRAMAA, FEWA, DEWA, ADWEA and TRANSCO power generation and distribution projects in Qatar & United Arab Emirates. Assignedwithin the Designand Engineering Department for the designand engineering reviews and approvals of the Civil, Structural, and Architectural aspects of Substations Buildings, OHL Structures, and SCADA Control Building Projects in Qatar & UAE. Assigned to review and coordinate relevant Contractors design and engineering documents and drawings submittals for the projects. Involved in the Pre-Tendering and Post-Tendering Works including generation of design criteria, specifications, and relevant Scope of Works for the projects. Structural Engineer, COWI Consulting Engineers and Planners LLC, Muscat, Sultanate of Oman; a Denmark based International Engineering Consultant engaged in the Design and Supervision of the new 3 Billion USD Oman (Muscat and Salalah) International Airports Project. Assigned within the Buildings Structural Department and involved in the Structural Analyses and Designs including Applications of relevant Building Structures of the Project such as the 50 years life Passenger Terminal Building. Site Technical Office Manager, Enel Power C & D Saudi Arabia Ltd, Yanbu, Saudi Arabia; an Italy based EPCC company for 130 MW STG Power Plant. Main responsibilities include Engineering Designs Management & Applications, Design & Shop Drawings & Documents Controls, Coordination of interdiscipline design interfaces, and Head Office Technical Coordination. Civil & StructuralDesign Engineer, Enel Power C & D Saudi Arabia Ltd, Yanbu, Saudi Arabia; an Italy based EPCC company for 130 MW STG Power Plant. Responsible for the Civil & Structural Designs & Analyses of the Project including technical coordination with Client’s Design Manager. In charge for the acquisitions of Design & Shop Drawings & Documents approval. Lead Civil & Structural Design Engineer, Ras Lanuf Oil & Gas Processing Co. Inc., Ras Lanuf, Libya; one of the largestgovernment oil companies. Assignedwithin the TechnicalServices Department, Plant Engineering Division as Lead Civil & Structural Design Engineer responsible for the Civil & Structural Designs & Analyses aspects of the whole plant. Leading a group of Civil & Structural Engineers, Designers & Draftsmen, devise design & drafting schedule including Design & Shop Drawings & Documents System Controls. In charge for Technical Coordination & Discussions with Contractors Design Managers & Engineers.