Ekiti State Community And Social Dev. Agency (EKCSDA)
CSDP - PROJECT GOAL & OBJECTIVE
 Goal of the CSDP is to improve access to services for
 Human Development (HD)
 PDO is to sustainably increase access of poor people
 to improve social and natural resource infrastructure
 services.




   Ekiti State Community And Social Dev. Agency (EKCSDA)
Specifically, the CSDP is to:
 Empower communities to plan, part-finance,
 implement, monitor and maintain sustainable and
 socially inclusive multi-sectoral micro-projects.
 Facilitate and increase Community-LGA partnership
 on HD-related projects; and
 Increase the capacity of LGAs, State and Federal
 Agencies to implement and monitor CDD policies and
 interventions.




   Ekiti State Community And Social Dev. Agency (EKCSDA)
EVOLUTION OF CSDP
The fulcrum of operation of the new development
paradigm shift is based on community driven-
development (CDD) concept in design,
implementation and evaluation.
It is based on service delivery mechanisms that are
demand-driven, multi-sectoral, bottom-up and purely
participatory in planning, implementation,
monitoring and evaluation.
It is imperative to note that Community-Based
Poverty Reduction Project (CPRP) one of the most
successful projects in the world bank shelf (2001-2009)
metamorphosed to CSDP in the pilot states, Ekiti
state inclusive.

   Ekiti State Community And Social Dev. Agency (EKCSDA)
CSDP AGRREEMENTS
 The World Bank Board of Directors approved
 $200Million to the Federal Government of Nigeria for
 the implementation of CSDP on July 1, 2008 in
 Washington DC.
 Financing Agreement was signed by the FGN and
 World Bank on 24th November, 2008 for $200m.
 Subsidiary Agreement was signed by FGN and Ekiti
 State Government on 1st April, 2009 for $5m.
 Project Duration: Five Years (2009-2013)
 Beneficiaries: Twenty-Six (26) States, Ekiti State
 inclusive.

    Ekiti State Community And Social Dev. Agency (EKCSDA)
LOAN REPAYMENT
 The Loan is payable in 30 years.
 Repayment starts on September 1, 2018.
 Final repayment is March 1, 2048.
 Credit -   Nigeria
 Loan -     State
 Grant -    Beneficiary Community




   Ekiti State Community And Social Dev. Agency (EKCSDA)
FUNDABLE (ELIGIBLE) MICRO-
PROJECTS
 Physical Infrastructure (Feeder Roads-construction
 and rehabilitation, culverts, bridges, etc)
 Social Infrastructure (Health Facilities, Water,
 Electricity, etc)
 Other Infrastructure (Vocational training centres,
 Market, etc)
 Environmental and Natural Resources Management
 (Erosion Control, Flood Control, Drainage System,
 etc)
 Safety Net Support (Fee Waiver, Workfare, etc)

     Ekiti State Community And Social Dev. Agency (EKCSDA)
NON-FUNDABLE PROJECTS
 Private Goods (Oba’s Palace, Saw mills)
 Worshipping Centres (Church, Mosque)
 Mega Projects (Airport, Dam, etc)




       Ekiti State Community And Social Dev. Agency (EKCSDA)
EKCSDA FINANCIAL OPERATIONS
 Operational Accounts:
 Drawdown Account – in which IDA funds are
 domiciled.
 Government Contribution Account – in which Annual
 State Government Contributions are domiciled.
 Interest Account – in which all interest earned from
 the 2 Accounts are domiciled.




       Ekiti State Community And Social Dev. Agency (EKCSDA)
EKITI STATE SUPPORT
 Establishment of the Agency by Law
 Provision of Office accommodation
 Payment of N100m Government Contribution
 Annually
 Constitution and Inauguration of Board of
 Directors




           Ekiti State Community And Social Dev. Agency
           (EKCSDA)
ACCOUNT STATUS
 Expected Draw Down from IDA –N750m
 Total Government Contribution to date – N200Million
 Outstanding Government Contribution (GC) till date
 – N200Million
 Draw Down to date – N718.7M




      Ekiti State Community And Social Dev. Agency (EKCSDA)
APPROVED COMMUNITY
DEVELOPMENT PLANS (CDP)
 No of Approved Community Development Plans –
 Sixty One (61) CDPs.
 No of Micro Projects in approved CDPs –
 One Hundred and Ninety (190)




            Ekiti State Community And Social Dev. Agency
            (EKCSDA)
MICRO PROJECTS PER SECTOR
SECTOR                      APPROVED               ON-GOING   COMPLETED
                            MP                     MP         &
                                                              FUNCTIONAL
                                                              MP
EDUCATION                   41                     5          17
RURAL                       28                     4          9
ELECTRIFICATION
ENVIRONMENT &               3                      1          1
NATURAL RESOURCES
GENDER &                    2                      0          1
VULNERABLE
HEALTH                      25                     6          8
SOCIO-ECONOMIC              33                     6          10
TRANSPORT                   38                     7          13
WATER                       20                     6          7
TOTAL                       190                    35
             Ekiti State Community And Social Dev. Agency
             (EKCSDA)
                                                              66
ACHIEVEMENTS
 Four hundred and eighty eight (488) Community
 Project Management Committees (CPMC) had been
 empowered to develop, part finance, implement and
 monitor micro social infrastructural projects across
 sectors in the state.
 Sixteen (16) Local Government Chairmen, Local
 Government Review Committees (LGRC) have had
 their capacity/skills strengthened to support
 communities and build progressive partnership
 between them.
             Ekiti State Community And Social Dev. Agency
             (EKCSDA)
ACHIEVEMENTS
 Out of Nominal marching allocation of ($5Million )=
 N750Million, N718.7Million / (96%) has been drawn
 down till date.
 Communities already imbibed Community Driven
 Development (CDD) approach to their developmental
 desires.




             Ekiti State Community And Social Dev. Agency
             (EKCSDA)
CHALLENGES
 Two years Government Contribution (GC) outstanding
 Local Government are yet to incorporate Community
 Development Plans (CDP) into their budget and also
 replicating Community Driven Development (CDD)
 approach to governance
 Non functional of LGRC in some LGAs.




            Ekiti State Community And Social Dev. Agency
            (EKCSDA)
IWOROKO COMMUNITY
BEFORE                                                      NOW
A stream as one of the sources of water in the
community                                                   Production of water from Motorized
                                                            Borehole




                                       Ekiti State Community And Social Dev.
                                                   Agency (EKCSDA)
OOTUNJA COMMUNITY
BEFORE
Rented shop used as Health Centre      NOW
                                       Constructed Basic Health Centre




              Ekiti State Community And Social Dev. Agency (EKCSDA)
IBEDOYIN COMMUNITY: PROJECT I
BEFORE             NOW
                   Constructed box culvert, drainage
Poor access road   and grading of road.




                    c
ODO-ORO COMMUNITY
BEFORE                                 NOW
Collapsed exams hall at Odo-Oro High
School.                                Constructed Examination Hall at Odo-Oro
                                       High School




               Ekiti State Community And Social Dev. Agency (EKCSDA)
ORUN COMMUNITY, ISE/ORUN LGA
                                      NOW
BEFORE                                Renovated science laboratory at Orun
Dilapidated science laboratory        Community High School.




              Ekiti State Community And Social Dev. Agency (EKCSDA)
UPPERLAND COMMUNITY
BEFORE                                           NOW
Improvised wooden culvert
                                                 Constructed Twin Box Culvert




                            Ekiti State Community And Social Dev.
                                        Agency (EKCSDA)
KAJOLA-ISE COMMUNITY
EXISTING DILAPIDATED HEALTH             CONSTRUCTED BASIC HEALTH
CENTRE                                  CENTRE




        Ekiti State Community And Social Dev. Agency (EKCSDA)
BOLORUNDURO COMMUNITY
ON-GOING RE-CONSTRUCTION OF A
TWIN-BOX CULVERT                           CONSTRUCTED TWIN BOX CULVERT




                      Ekiti State Community And Social Dev.
                                  Agency (EKCSDA)
COVENANT COMMUNITY
BEFORE
BAD CONDITION OF ROAD AT                    NOW
COVENANT COMMUNITY                          CONSTRUCTED TWIN BOX CULVERT.




                       Ekiti State Community And Social Dev.
                                   Agency (EKCSDA)
ABA EDE COMMUNITY, ISE
BEFORE                                       NOW
 A STREAM AS SOURCE OF WATER IN              PRODUCTION OF WATER FROM
THE COMMUNITY                                MOTORIZED BOREHOLE PROJECT




                        Ekiti State Community And Social Dev.
                                    Agency (EKCSDA)
OSIN COMMUNITY
BEFORE                                     NOW
OLD BLOCK OF 4 CLASSROOMS , HALL           REHABILITATED BLOCK OF 4 CLASSROOMS,
AND OFFICES AT OSIN HIGH SCHOOL            HALL AND OFFICES




                         Ekiti State Community And Social Dev.
                                     Agency (EKCSDA)
ORISUNMBARE COMMUNITY, IJERO
                                            CONSTRUCTED EXAMINATION HALL AT
BEFORE                                      COMMUNITY HIGH SCHOOL,
EXISTING EXAMINATION HALL                   ORISUNMBARE




                       Ekiti State Community And Social Dev.
                                   Agency (EKCSDA)
IROPORA COMMUNITY: PROJECT I
        Construction of Information and Skill
     Acquisition Centre with facilities (Completed)




             Ekiti State Community And Social Dev.
                         Agency (EKCSDA)
IROPORA COMMUNITY: PROJECT II
          Construction of six unit lock up shops (Completed)




        Ekiti State Community And Social Dev.
                    Agency (EKCSDA)
IROPORA COMMUNITY PROJECT IV
   Construction of box culvert and drainage (Completed)




                Ekiti State Community And Social Dev.
                            Agency (EKCSDA)
IBEDOYIN COMMUNITY: PROJECT I
Construction of a box culvert, drainage and grading of road (Completed)




                     Ekiti State Community And Social Dev.
                                 Agency (EKCSDA)
IBEDOYIN COMMUNITY PROJECT II
        Channelization (Completed)




         Ekiti State Community And Social Dev.
                     Agency (EKCSDA)
IBEDOYIN COMMUNITY PROJECT III
 Construction of (750X830)mm Ring Culvert with Line Drains (Completed)




                     Ekiti State Community And Social Dev.
                                 Agency (EKCSDA)
IWOROKO COMMUNITY PROJECT 1
     Construction of bore hole (Completed)




           Ekiti State Community And Social Dev.
                       Agency (EKCSDA)
IWOROKO COMMUNITY PROJECT 11
  Construction of 12 units lock up shops (Completed)




               Ekiti State Community And Social Dev.
                           Agency (EKCSDA)
IGEDE COMMUNITY PROJECT 1
Construction of 8km Igede- Erijiyan Feeder Road with Culverts (Completed)




                      Ekiti State Community And Social Dev.
                                  Agency (EKCSDA)
ESURE EKITI – PROJECT I
 construction of Administrative block




       Ekiti State Community And Social Dev.
                   Agency (EKCSDA)
ESURE EKITI – PROJECT 11
   Construction of community hall




       Ekiti State Community And Social Dev.
                   Agency (EKCSDA)
COVENANT COMMUNITY
 Construction of culvert (completed)




      Ekiti State Community And Social Dev.
                  Agency (EKCSDA)
UPPERLAND COMMUNITY
Construction of twin box culvert at Upperland




          Ekiti State Community And Social Dev.
                      Agency (EKCSDA)
IFEOLUWA COMMUNITY, ADO EKITI
       Extension of Electricity (Completed)




          Ekiti State Community And Social Dev.
                      Agency (EKCSDA)
OKE ASO/OSUN COMMUNITY,ADO EKITI I
Rehabilitation of feeder road (Completed)




                          Ekiti State Community And Social Dev.
                                      Agency (EKCSDA)
OKE ASO/OSUN COMMUNITY,ADO EKITI II
  Construction of health centre(Completed)




                            Ekiti State Community And Social Dev.
                                        Agency (EKCSDA)
IGBAYE-AAYE COMMUNITY I
 Construction of Basic Health Centre (Completed)




            Ekiti State Community And Social Dev.
                        Agency (EKCSDA)
IGBAYE-AAYE COMMUNITY II
    Construction of Borehole (Completed)




          Ekiti State Community And Social Dev.
                      Agency (EKCSDA)
IGBAYE-AAYE COMMUNITY III
    Rehabilitation of feeder road (Completed)




            Ekiti State Community And Social Dev.
                        Agency (EKCSDA)
KAJOLA-ISE COMMUNITY PROJECT 1
     Completed Staff Quarters at Arinjale High School




              Ekiti State Community And Social Dev.
                          Agency (EKCSDA)
KAJOLA-ISE COMMUNITY II
 Construction of Basic Health Centre (Completed)




            Ekiti State Community And Social Dev.
                        Agency (EKCSDA)
ORUN COMMUNITY I
Renovation of Science and Computer Laboratory (Completed)




                Ekiti State Community And Social Dev.
                            Agency (EKCSDA)
ORUN COMMUNITY II
 Extension of Electricity (Completed)




      Ekiti State Community And Social Dev.
                  Agency (EKCSDA)
OBADA COMMUNITY , ISE I
Rehabilitation of a block of 3 classrooms and offices (Completed)




                  Ekiti State Community And Social Dev.
                              Agency (EKCSDA)
OBADA COMMUNITY, ISE II
Construction of Science Laboratory and Computer room (Completed)




                    Ekiti State Community And Social Dev.
                                Agency (EKCSDA)
ABA EDE COMMUNITY, ISE PROJECT I
    Production of water from borehole project (Completed)




                Ekiti State Community And Social Dev.
                            Agency (EKCSDA)
ABA EDE COMMUNITY, ISE PROJECT II
        Extension of Electricity (Completed)




           Ekiti State Community And Social Dev.
                       Agency (EKCSDA)
ABA EDE COMMUNITY, ISE PROJECT III
    Procurement and Installation of Transformer (Completed)




                   Ekiti State Community And Social Dev.
                               Agency (EKCSDA)
IKOLE COMMUNITY
Construction of examination hall at Ikole City College (Completed)




          Ekiti State Community And Social Dev.
                      Agency (EKCSDA)
OOTUNJA COMMUNITY-PROJECT I
       Construction of health Center




       Ekiti State Community And Social Dev.
                   Agency (EKCSDA)
OOTUNJA COMMUNITY-PROJECT II
    Construction of feeder and Culvert (Completed)




           Ekiti State Community And Social Dev.
                       Agency (EKCSDA)
OOTUNJA COMMUNITY-PROJECT III
    Construction of feeder and Culvert (Completed)




              Ekiti State Community And Social Dev.
                          Agency (EKCSDA)
ODO ORO COMMUNITY PROJECT I
   Construction of examination hall at Odo Oro High School




                Ekiti State Community And Social Dev.
                            Agency (EKCSDA)
ODO ORO COMMUNITY PROJECT II
    Construction of a block of 3 classrooms and toilets




              Ekiti State Community And Social Dev.
                          Agency (EKCSDA)
ODO ORA COMMUNITY I
Construction of 10 unit lock-up shops with toilets (Completed)




                    Ekiti State Community And Social Dev.
                                Agency (EKCSDA)
IDO EKITI COMMUNITY PROJECT I
   Extension of electricity at Alapo Quarters (Completed)




               Ekiti State Community And Social Dev.
                           Agency (EKCSDA)
IDO EKITI COMMUNITY PROJECT II
   Construction of Water Storage tank at 16 locations (Completed)




                    Ekiti State Community And Social Dev.
                                Agency (EKCSDA)
IDO EKITI COMMUNITY PROJECT III
       Construction of drainage (Completed)




           Ekiti State Community And Social Dev.
                       Agency (EKCSDA)
EJIGAN COMMUNITY
Construction of 4 Nos Culverts (Completed)




          Ekiti State Community And Social Dev.
                      Agency (EKCSDA)
ILASA COMMUNITY PROJECT I
Purchase and Installation of 200kva Transformer (Completed)




                 Ekiti State Community And Social Dev.
                             Agency (EKCSDA)
AYAGBE COMMUNITY, OMUO PROJECT I
       Completion of Community Hall (Completed)




              Ekiti State Community And Social Dev.
                          Agency (EKCSDA)
AYAGBE COMMUNITY, OMUO PROJECT II
          Channelization (Completed)




           Ekiti State Community And Social Dev.
                       Agency (EKCSDA)
AYAGBE COMMUNITY, OMUO PROJECT III
 Production of Water from hand pump at two different locations (Completed)




                         Ekiti State Community And Social Dev.
                                     Agency (EKCSDA)
OSIN COMMUNITY PROJECT I
  Construction of block of classrooms (Completed)




           Ekiti State Community And Social Dev.
                       Agency (EKCSDA)
ILUPEJU COMMUNITY PROJECT 1
Reconstruction and renovation of computer centre with equipment




                 Ekiti State Community And Social Dev.
                             Agency (EKCSDA)
IGOGO COMMUNITY
Procurement of Science Laboratory and Computer equipments (Completed)




                     Ekiti State Community And Social Dev.
                                 Agency (EKCSDA)
IGOGO COMMUNITY PROJECT II
 Purchase & Installation of 300kva 33/0.415kv transformer




               Ekiti State Community And Social Dev.
                           Agency (EKCSDA)
AAYE OJA COMMUNITY PROJECT I
Construction of Science Laboratory and Computer room (Completed)




                    Ekiti State Community And Social Dev.
                                Agency (EKCSDA)
AFAO/KAJOLA COMMUNITY, IKERE-PROJECT I
      Purchase and Installation Of 200kva Transformer (Completed)




                     Ekiti State Community And Social Dev.
                                 Agency (EKCSDA)
AFAO/KAJOLA COMMUNITY, IKERE-PROJECT II
          Construction of Health Center (completed)




                Ekiti State Community And Social Dev.
                            Agency (EKCSDA)
AFAO/KAJOLA COMMUNITY, IKERE PROJECT III
           Construction Of Culvert (Completed)




                Ekiti State Community And Social Dev.
                            Agency (EKCSDA)
JIOBA COMMUNITY, ODE EKITI
    Production of water from hand pump




         Ekiti State Community And Social Dev.
                     Agency (EKCSDA)
JIOBA COMMUNITY, ODE EKITI
      construction of health centre




       Ekiti State Community And Social Dev.
                   Agency (EKCSDA)
IJAN COMMUNITY, I
construction of examination hall




    Ekiti State Community And Social Dev.
                Agency (EKCSDA)
ANIFOWOSHE, AISEGBA EKITI 1
   Production of water from hand pump




        Ekiti State Community And Social Dev.
                    Agency (EKCSDA)
IDO-ILE COMMUNITY I
Construction of basic health centre




    Ekiti State Community And Social Dev.
                Agency (EKCSDA)
IGBAMITORO COMMUNITY PROJECT 1
 Construction of Computer and Science Laboratory (Completed)




                  Ekiti State Community And Social Dev.
                              Agency (EKCSDA)
IGBAMITORO COMMUNITY PROJECT II
       Completion of a block of 4 classrooms




             Ekiti State Community And Social Dev.
                         Agency (EKCSDA)
SURULERE - IRE EKITI COMMUNITY
 Construction of a block of three class rooms (on-going)




              Ekiti State Community And Social Dev.
                          Agency (EKCSDA)
ODE EKITI COMMUNITY
Construction of Box culvert (on-going)




    Ekiti State Community And Social Dev.
                Agency (EKCSDA)
IPERE COMMUNITY
Construction of Science Laboratory (on-going)




        Ekiti State Community And Social Dev.
                    Agency (EKCSDA)
EDA-ILE COMMUNITY
Construction of open market stalls (on-going)




        Ekiti State Community And Social Dev.
                    Agency (EKCSDA)
ISAN COMMUNITY
Construction of block of three classrooms with two offices (on-going)




                    Ekiti State Community And Social Dev.
                                Agency (EKCSDA)
ARAROMI-OKE COMMUNITY
 Completion of Community Hall (On-going)




       Ekiti State Community And Social Dev.
                   Agency (EKCSDA)
OTUN EKITI COMMUNITY
Construction of science laboratory (on going)




        Ekiti State Community And Social Dev.
                    Agency (EKCSDA)
ORIN EKITI COMMUNITY
completion of Community Hall (on going)




       Ekiti State Community And Social Dev.
                   Agency (EKCSDA)
PICTORIAL PRESENTATION OF
    EKCSDA ACTIVITIES




        Ekiti State Community And Social Dev.
                    Agency (EKCSDA)
SENSITIZATION
SENSITIZATION AT OBADA COMMUNITY           SENSITIZATION AT ORUN COMMUNITY




                        Ekiti State Community And Social Dev.
                                    Agency (EKCSDA)
PARTICIPATORY RURAL APPRAISAL (PRA) FACILITATION
PRA AT EPE COMMUNITY MOBA LGA            PRA AT IROPORA COMMUNITY




                       Ekiti State Community And Social Dev.
                                   Agency (EKCSDA)
PARTICIPATORY RURAL APPRAISAL (PRA)
            FACILITATION CONT’D
PRA AT OMUO OKE                            PRA AT OMUO OKE
A WOMAN CASTING HER VOTE                   THE KABIYESI CASTING HIS VOTE FOR THE
                                           PROJECTS OF HIS CHOICE




                      Ekiti State Community And Social Dev.
                                  Agency (EKCSDA)
COMMUNITY PROJECT MANAGEMENT COMMITTEE
 (CPMC) AND 3 OTHER SUB-COMMITTEES ELECTION
                 FACILITATION
CPMC ELECTION AT ISAN                   CPMC ELECTION AT ILORO




                   Ekiti State Community And Social Dev.
                               Agency (EKCSDA)
FIELD APPRAISAL
ODO ORO                                             OOTUNJA
FIELD APPRAISSAL TEAM AT THE PROPOSED SITE          FIELD APPRAISSAL TEAM AT THE PROPOSED
FOR THE CONSTRUCTION OF EXAM HALL AT ODO            SITE FOR THE CONSTRUCTION OF HEALTH
ORO HIGH SCHOOL                                     CENTRE AT OOTUNJA COMMUNITY




                               Ekiti State Community And Social Dev.
                                           Agency (EKCSDA)
CPMC & SUB COMMITTEE TRAINING ON
       PROJECT MANAGEMENT
RESOURCE PERSON TEACHING
                                            CROSS SECTION OF PARTICIPANTS
THE PARTICIPANTS




                      Ekiti State Community And Social Dev.
                                  Agency (EKCSDA)
PROJECT LAUNCH
SIGNING OF PROJECT AND FINANCING               EXECUTIVE GOV. OF EKITI STATE, DR. KAYODE
AGREEMENTS BETWEEN EKCSDA AND                 FAYEMI, FLANKED BY THE COMMUNITY LEADER,
IWOROKO COMMUNITY                             HRM, OBA ALADEJANA, THE ALAWOROKO OF
                                              IWOROKO AND TWO MEMBERS OF THE STATE
                                              EXECUTIVE COUNCIL AT THE PROJECT LAUNCH.




                         Ekiti State Community And Social Dev.
                                     Agency (EKCSDA)
PROJECT LAUNCH CONT’D
FOUNDATION LAYING CEREMONY OF AN                  COMMUNITY WOMEN REJOICING AT
EXAMINATION HALL BY FINANCE                       UPPERLAND COMMUNITY PROJECT
COMMISSIONER, HON. DAPO KOLAWOLE AT               LAUNCH
IKOLE CITY COLLEGE




                             Ekiti State Community And Social Dev.
                                         Agency (EKCSDA)
PROJECT LAUNCH AT ODO ORO
          COMMUNITY




                                      CROSS-SECTION OF THE COMMUNITY
WOMEN OF THE COMMUNITY                 MEMBERS AT THE PROJECT LAUNCH
DANCING AT THE CEREMONY




                  Ekiti State Community And Social Dev.
                              Agency (EKCSDA)
WORLD BANK MISSION VISIT TO EKITI
            STATE
The WB Mission Team Leader, Prof.
Falusi and other team members,
                                              Prof. Falusi at Ibedoyin
                                              Community
Mrs. T. Buba (FPSU) and Mrs.
Ogunmefun (FMF) at Ibedoyin.




                         Ekiti State Community And Social Dev.
                                     Agency (EKCSDA)

Más contenido relacionado

La actualidad más candente

[나스미디어] 2020 태국 디지털 광고 트렌드 리포트
[나스미디어] 2020 태국 디지털 광고 트렌드 리포트[나스미디어] 2020 태국 디지털 광고 트렌드 리포트
[나스미디어] 2020 태국 디지털 광고 트렌드 리포트
NASGLOBAL
 
Makalah proses perencanaan pembangunan suatu desa
Makalah proses perencanaan pembangunan suatu desaMakalah proses perencanaan pembangunan suatu desa
Makalah proses perencanaan pembangunan suatu desa
Operator Warnet Vast Raha
 

La actualidad más candente (20)

Makalah jpt pratama 2018 kominfo
Makalah jpt pratama 2018 kominfoMakalah jpt pratama 2018 kominfo
Makalah jpt pratama 2018 kominfo
 
Vietnam Consumer Finance Market Report 2019
Vietnam Consumer Finance Market Report 2019 Vietnam Consumer Finance Market Report 2019
Vietnam Consumer Finance Market Report 2019
 
[나스미디어] 2020 태국 디지털 광고 트렌드 리포트
[나스미디어] 2020 태국 디지털 광고 트렌드 리포트[나스미디어] 2020 태국 디지털 광고 트렌드 리포트
[나스미디어] 2020 태국 디지털 광고 트렌드 리포트
 
Reasons For E Government
Reasons For E GovernmentReasons For E Government
Reasons For E Government
 
eGovernance Explained - Mukund Nadgowda
eGovernance Explained - Mukund NadgowdaeGovernance Explained - Mukund Nadgowda
eGovernance Explained - Mukund Nadgowda
 
Smartphone Survey
Smartphone SurveySmartphone Survey
Smartphone Survey
 
衛生福利部:「長期照顧服務法」
衛生福利部:「長期照顧服務法」衛生福利部:「長期照顧服務法」
衛生福利部:「長期照顧服務法」
 
0728 ppt
0728 ppt0728 ppt
0728 ppt
 
Makalah proses perencanaan pembangunan suatu desa
Makalah proses perencanaan pembangunan suatu desaMakalah proses perencanaan pembangunan suatu desa
Makalah proses perencanaan pembangunan suatu desa
 
Digital Bangladesh
Digital BangladeshDigital Bangladesh
Digital Bangladesh
 
Vietnam market trend (Q2, 2020)
Vietnam market trend (Q2, 2020)Vietnam market trend (Q2, 2020)
Vietnam market trend (Q2, 2020)
 
Vietnam edtech elearning report 2023 | Một năm bản lề cho sự bứt phá
Vietnam edtech elearning report 2023 | Một năm bản lề cho sự bứt pháVietnam edtech elearning report 2023 | Một năm bản lề cho sự bứt phá
Vietnam edtech elearning report 2023 | Một năm bản lề cho sự bứt phá
 
Kemenperin-Perpres 68 tahun 2022 REV7.pptx
Kemenperin-Perpres 68 tahun 2022 REV7.pptxKemenperin-Perpres 68 tahun 2022 REV7.pptx
Kemenperin-Perpres 68 tahun 2022 REV7.pptx
 
Telaahan tambahan penghasilan kab paser
Telaahan tambahan penghasilan kab paserTelaahan tambahan penghasilan kab paser
Telaahan tambahan penghasilan kab paser
 
1111208少子高齡時代護理人力綢繆芻議簡報
1111208少子高齡時代護理人力綢繆芻議簡報1111208少子高齡時代護理人力綢繆芻議簡報
1111208少子高齡時代護理人力綢繆芻議簡報
 
VIETNAM MOBILE APPLICATION REPORT 2021
VIETNAM MOBILE APPLICATION REPORT 2021VIETNAM MOBILE APPLICATION REPORT 2021
VIETNAM MOBILE APPLICATION REPORT 2021
 
106年度社區整體照顧服務體系行政說明
106年度社區整體照顧服務體系行政說明106年度社區整體照顧服務體系行政說明
106年度社區整體照顧服務體系行政說明
 
B tech it project report on attendence management system
B tech it project report on attendence management systemB tech it project report on attendence management system
B tech it project report on attendence management system
 
Vietnam Banking Report 2022: Leading the post-pandemic growth
Vietnam Banking Report 2022: Leading the post-pandemic growthVietnam Banking Report 2022: Leading the post-pandemic growth
Vietnam Banking Report 2022: Leading the post-pandemic growth
 
第3817次行政院會 討一懶人包
第3817次行政院會 討一懶人包第3817次行政院會 討一懶人包
第3817次行政院會 討一懶人包
 

Similar a Ekiti State Community and Social Development Agency (ECKSDA)

Commissioning Of Rural Information Technology Centers In Ido-Osi And Omuo-Eki...
Commissioning Of Rural Information Technology Centers In Ido-Osi And Omuo-Eki...Commissioning Of Rural Information Technology Centers In Ido-Osi And Omuo-Eki...
Commissioning Of Rural Information Technology Centers In Ido-Osi And Omuo-Eki...
Government of Ekiti State, Nigeria
 
Community mapping report final
Community mapping report finalCommunity mapping report final
Community mapping report final
akinden
 
Community mapping report final
Community mapping report finalCommunity mapping report final
Community mapping report final
akinden
 
Social security and mgnrega
Social security and mgnregaSocial security and mgnrega
Social security and mgnrega
Aakash Gupta
 
CV OF BOLA OLOWE - 2015
CV OF BOLA OLOWE - 2015CV OF BOLA OLOWE - 2015
CV OF BOLA OLOWE - 2015
Bola Olowe
 
Lions ability mission c2 odisha
Lions ability mission c2 odishaLions ability mission c2 odisha
Lions ability mission c2 odisha
lionsleaders
 
Community Newsletter January 2011
Community  Newsletter  January 2011Community  Newsletter  January 2011
Community Newsletter January 2011
cercopan
 
Sustainable Cambodia Water & Related Programs Report 2010
Sustainable Cambodia Water & Related Programs Report 2010Sustainable Cambodia Water & Related Programs Report 2010
Sustainable Cambodia Water & Related Programs Report 2010
Rotary Club of Freshwater Bay
 
Koica cambodia office en
Koica cambodia office enKoica cambodia office en
Koica cambodia office en
koicasroeu
 

Similar a Ekiti State Community and Social Development Agency (ECKSDA) (20)

Commissioning Of Rural Information Technology Centers In Ido-Osi And Omuo-Eki...
Commissioning Of Rural Information Technology Centers In Ido-Osi And Omuo-Eki...Commissioning Of Rural Information Technology Centers In Ido-Osi And Omuo-Eki...
Commissioning Of Rural Information Technology Centers In Ido-Osi And Omuo-Eki...
 
One Magazine Winter 2015
One Magazine Winter 2015One Magazine Winter 2015
One Magazine Winter 2015
 
Journey so far he's one year in office 01a (3)
Journey so far   he's one year in office 01a (3)Journey so far   he's one year in office 01a (3)
Journey so far he's one year in office 01a (3)
 
internship report on IESCO Wapda final project 2014
internship report on IESCO Wapda final project 2014internship report on IESCO Wapda final project 2014
internship report on IESCO Wapda final project 2014
 
THAILAND COUNTRY-WIDE Slum Upgrading - Ms. Thipparat Noppaladarom
THAILAND  COUNTRY-WIDE Slum Upgrading - Ms. Thipparat NoppaladaromTHAILAND  COUNTRY-WIDE Slum Upgrading - Ms. Thipparat Noppaladarom
THAILAND COUNTRY-WIDE Slum Upgrading - Ms. Thipparat Noppaladarom
 
BPP Vetted Contracts For March 2013
BPP Vetted Contracts For March 2013BPP Vetted Contracts For March 2013
BPP Vetted Contracts For March 2013
 
Community mapping report final
Community mapping report finalCommunity mapping report final
Community mapping report final
 
Community mapping report final
Community mapping report finalCommunity mapping report final
Community mapping report final
 
EEDA Achievements at a Glance
EEDA Achievements at a GlanceEEDA Achievements at a Glance
EEDA Achievements at a Glance
 
Rural dweller’s perception of impacts of motorcycle(okada) services in commun...
Rural dweller’s perception of impacts of motorcycle(okada) services in commun...Rural dweller’s perception of impacts of motorcycle(okada) services in commun...
Rural dweller’s perception of impacts of motorcycle(okada) services in commun...
 
Rural dweller’s perception of impacts of motorcycle(okada) services in commun...
Rural dweller’s perception of impacts of motorcycle(okada) services in commun...Rural dweller’s perception of impacts of motorcycle(okada) services in commun...
Rural dweller’s perception of impacts of motorcycle(okada) services in commun...
 
Social security and mgnrega
Social security and mgnregaSocial security and mgnrega
Social security and mgnrega
 
CV OF BOLA OLOWE - 2015
CV OF BOLA OLOWE - 2015CV OF BOLA OLOWE - 2015
CV OF BOLA OLOWE - 2015
 
Lions ability mission c2 odisha
Lions ability mission c2 odishaLions ability mission c2 odisha
Lions ability mission c2 odisha
 
KEL RESOURCE CENTER WARD 02 Digine LLG.pdf
KEL RESOURCE CENTER WARD 02 Digine LLG.pdfKEL RESOURCE CENTER WARD 02 Digine LLG.pdf
KEL RESOURCE CENTER WARD 02 Digine LLG.pdf
 
Community Newsletter January 2011
Community  Newsletter  January 2011Community  Newsletter  January 2011
Community Newsletter January 2011
 
SiG@ MaRS Info Session
SiG@ MaRS Info SessionSiG@ MaRS Info Session
SiG@ MaRS Info Session
 
Sustainable Cambodia Water & Related Programs Report 2010
Sustainable Cambodia Water & Related Programs Report 2010Sustainable Cambodia Water & Related Programs Report 2010
Sustainable Cambodia Water & Related Programs Report 2010
 
Koica cambodia office en
Koica cambodia office enKoica cambodia office en
Koica cambodia office en
 
Auckland Council Immersion Session
Auckland Council Immersion SessionAuckland Council Immersion Session
Auckland Council Immersion Session
 

Más de Government of Ekiti State, Nigeria

Más de Government of Ekiti State, Nigeria (20)

Ekiti state 2016 approved budget details
Ekiti state 2016 approved budget detailsEkiti state 2016 approved budget details
Ekiti state 2016 approved budget details
 
Ekiti state 2016 approved budget details
Ekiti state 2016 approved budget detailsEkiti state 2016 approved budget details
Ekiti state 2016 approved budget details
 
Ekiti state 2016 approved budget details
Ekiti state 2016 approved budget detailsEkiti state 2016 approved budget details
Ekiti state 2016 approved budget details
 
Ekiti State 2016 Approved Budget Details
Ekiti State 2016 Approved Budget DetailsEkiti State 2016 Approved Budget Details
Ekiti State 2016 Approved Budget Details
 
Ekiti State Public Procurement Law
Ekiti State Public Procurement LawEkiti State Public Procurement Law
Ekiti State Public Procurement Law
 
Scholarship for Post Graduate Ng
Scholarship for Post Graduate NgScholarship for Post Graduate Ng
Scholarship for Post Graduate Ng
 
Scholarship for Overseas Students
Scholarship for Overseas StudentsScholarship for Overseas Students
Scholarship for Overseas Students
 
Scholarsrhip for Undergraduate
Scholarsrhip for UndergraduateScholarsrhip for Undergraduate
Scholarsrhip for Undergraduate
 
Physically Challenged
Physically ChallengedPhysically Challenged
Physically Challenged
 
Busary form 1
Busary form 1Busary form 1
Busary form 1
 
2015 Budget Speech Delivered by the Executive Governor of Ekiti State
2015 Budget Speech Delivered by the Executive Governor of Ekiti State2015 Budget Speech Delivered by the Executive Governor of Ekiti State
2015 Budget Speech Delivered by the Executive Governor of Ekiti State
 
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
Ekit State Budget 2015 Analysis by the Ministry of Budget and Economic Planning.
 
Bursary Award 2012/2013
Bursary Award 2012/2013Bursary Award 2012/2013
Bursary Award 2012/2013
 
Effective service delivery
Effective service deliveryEffective service delivery
Effective service delivery
 
Prof. ade ajayi ad. approved
Prof. ade ajayi ad. approvedProf. ade ajayi ad. approved
Prof. ade ajayi ad. approved
 
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
Ekiti State College of Technical and Commercial Agriculture Academic & Non-Ac...
 
Champion Newspapers' Governor of the year
Champion Newspapers' Governor of the yearChampion Newspapers' Governor of the year
Champion Newspapers' Governor of the year
 
1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA
1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA
1st Year Memorial Service of Mrs Funmilayo Adunni OLAYINKA
 
One Year After...Moremi Lives on
One Year After...Moremi Lives onOne Year After...Moremi Lives on
One Year After...Moremi Lives on
 
Overview of 2014 Budget
Overview of 2014 BudgetOverview of 2014 Budget
Overview of 2014 Budget
 

Último

FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
Renandantas16
 

Último (20)

Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Organizational Transformation Lead with Culture
Organizational Transformation Lead with CultureOrganizational Transformation Lead with Culture
Organizational Transformation Lead with Culture
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Majnu Ka Tilla, Delhi Contact Us 8377877756
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
John Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdfJohn Halpern sued for sexual assault.pdf
John Halpern sued for sexual assault.pdf
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
RSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors DataRSA Conference Exhibitor List 2024 - Exhibitors Data
RSA Conference Exhibitor List 2024 - Exhibitors Data
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...Ensure the security of your HCL environment by applying the Zero Trust princi...
Ensure the security of your HCL environment by applying the Zero Trust princi...
 

Ekiti State Community and Social Development Agency (ECKSDA)

  • 1. BRIEF ON EKITI STATE COMMUNITY AND SOCIAL DEVELOPMENT AGENCY (EKCSDA) MARCH 21, 2012 Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 2. CSDP - PROJECT GOAL & OBJECTIVE Goal of the CSDP is to improve access to services for Human Development (HD) PDO is to sustainably increase access of poor people to improve social and natural resource infrastructure services. Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 3. Specifically, the CSDP is to: Empower communities to plan, part-finance, implement, monitor and maintain sustainable and socially inclusive multi-sectoral micro-projects. Facilitate and increase Community-LGA partnership on HD-related projects; and Increase the capacity of LGAs, State and Federal Agencies to implement and monitor CDD policies and interventions. Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 4. EVOLUTION OF CSDP The fulcrum of operation of the new development paradigm shift is based on community driven- development (CDD) concept in design, implementation and evaluation. It is based on service delivery mechanisms that are demand-driven, multi-sectoral, bottom-up and purely participatory in planning, implementation, monitoring and evaluation. It is imperative to note that Community-Based Poverty Reduction Project (CPRP) one of the most successful projects in the world bank shelf (2001-2009) metamorphosed to CSDP in the pilot states, Ekiti state inclusive. Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 5. CSDP AGRREEMENTS The World Bank Board of Directors approved $200Million to the Federal Government of Nigeria for the implementation of CSDP on July 1, 2008 in Washington DC. Financing Agreement was signed by the FGN and World Bank on 24th November, 2008 for $200m. Subsidiary Agreement was signed by FGN and Ekiti State Government on 1st April, 2009 for $5m. Project Duration: Five Years (2009-2013) Beneficiaries: Twenty-Six (26) States, Ekiti State inclusive. Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 6. LOAN REPAYMENT The Loan is payable in 30 years. Repayment starts on September 1, 2018. Final repayment is March 1, 2048. Credit - Nigeria Loan - State Grant - Beneficiary Community Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 7. FUNDABLE (ELIGIBLE) MICRO- PROJECTS Physical Infrastructure (Feeder Roads-construction and rehabilitation, culverts, bridges, etc) Social Infrastructure (Health Facilities, Water, Electricity, etc) Other Infrastructure (Vocational training centres, Market, etc) Environmental and Natural Resources Management (Erosion Control, Flood Control, Drainage System, etc) Safety Net Support (Fee Waiver, Workfare, etc) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 8. NON-FUNDABLE PROJECTS Private Goods (Oba’s Palace, Saw mills) Worshipping Centres (Church, Mosque) Mega Projects (Airport, Dam, etc) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 9. EKCSDA FINANCIAL OPERATIONS Operational Accounts: Drawdown Account – in which IDA funds are domiciled. Government Contribution Account – in which Annual State Government Contributions are domiciled. Interest Account – in which all interest earned from the 2 Accounts are domiciled. Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 10. EKITI STATE SUPPORT Establishment of the Agency by Law Provision of Office accommodation Payment of N100m Government Contribution Annually Constitution and Inauguration of Board of Directors Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 11. ACCOUNT STATUS Expected Draw Down from IDA –N750m Total Government Contribution to date – N200Million Outstanding Government Contribution (GC) till date – N200Million Draw Down to date – N718.7M Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 12. APPROVED COMMUNITY DEVELOPMENT PLANS (CDP) No of Approved Community Development Plans – Sixty One (61) CDPs. No of Micro Projects in approved CDPs – One Hundred and Ninety (190) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 13. MICRO PROJECTS PER SECTOR SECTOR APPROVED ON-GOING COMPLETED MP MP & FUNCTIONAL MP EDUCATION 41 5 17 RURAL 28 4 9 ELECTRIFICATION ENVIRONMENT & 3 1 1 NATURAL RESOURCES GENDER & 2 0 1 VULNERABLE HEALTH 25 6 8 SOCIO-ECONOMIC 33 6 10 TRANSPORT 38 7 13 WATER 20 6 7 TOTAL 190 35 Ekiti State Community And Social Dev. Agency (EKCSDA) 66
  • 14. ACHIEVEMENTS Four hundred and eighty eight (488) Community Project Management Committees (CPMC) had been empowered to develop, part finance, implement and monitor micro social infrastructural projects across sectors in the state. Sixteen (16) Local Government Chairmen, Local Government Review Committees (LGRC) have had their capacity/skills strengthened to support communities and build progressive partnership between them. Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 15. ACHIEVEMENTS Out of Nominal marching allocation of ($5Million )= N750Million, N718.7Million / (96%) has been drawn down till date. Communities already imbibed Community Driven Development (CDD) approach to their developmental desires. Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 16. CHALLENGES Two years Government Contribution (GC) outstanding Local Government are yet to incorporate Community Development Plans (CDP) into their budget and also replicating Community Driven Development (CDD) approach to governance Non functional of LGRC in some LGAs. Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 17. IWOROKO COMMUNITY BEFORE NOW A stream as one of the sources of water in the community Production of water from Motorized Borehole Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 18. OOTUNJA COMMUNITY BEFORE Rented shop used as Health Centre NOW Constructed Basic Health Centre Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 19. IBEDOYIN COMMUNITY: PROJECT I BEFORE NOW Constructed box culvert, drainage Poor access road and grading of road. c
  • 20. ODO-ORO COMMUNITY BEFORE NOW Collapsed exams hall at Odo-Oro High School. Constructed Examination Hall at Odo-Oro High School Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 21. ORUN COMMUNITY, ISE/ORUN LGA NOW BEFORE Renovated science laboratory at Orun Dilapidated science laboratory Community High School. Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 22. UPPERLAND COMMUNITY BEFORE NOW Improvised wooden culvert Constructed Twin Box Culvert Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 23. KAJOLA-ISE COMMUNITY EXISTING DILAPIDATED HEALTH CONSTRUCTED BASIC HEALTH CENTRE CENTRE Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 24. BOLORUNDURO COMMUNITY ON-GOING RE-CONSTRUCTION OF A TWIN-BOX CULVERT CONSTRUCTED TWIN BOX CULVERT Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 25. COVENANT COMMUNITY BEFORE BAD CONDITION OF ROAD AT NOW COVENANT COMMUNITY CONSTRUCTED TWIN BOX CULVERT. Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 26. ABA EDE COMMUNITY, ISE BEFORE NOW A STREAM AS SOURCE OF WATER IN PRODUCTION OF WATER FROM THE COMMUNITY MOTORIZED BOREHOLE PROJECT Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 27. OSIN COMMUNITY BEFORE NOW OLD BLOCK OF 4 CLASSROOMS , HALL REHABILITATED BLOCK OF 4 CLASSROOMS, AND OFFICES AT OSIN HIGH SCHOOL HALL AND OFFICES Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 28. ORISUNMBARE COMMUNITY, IJERO CONSTRUCTED EXAMINATION HALL AT BEFORE COMMUNITY HIGH SCHOOL, EXISTING EXAMINATION HALL ORISUNMBARE Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 29. IROPORA COMMUNITY: PROJECT I Construction of Information and Skill Acquisition Centre with facilities (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 30. IROPORA COMMUNITY: PROJECT II Construction of six unit lock up shops (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 31. IROPORA COMMUNITY PROJECT IV Construction of box culvert and drainage (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 32. IBEDOYIN COMMUNITY: PROJECT I Construction of a box culvert, drainage and grading of road (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 33. IBEDOYIN COMMUNITY PROJECT II Channelization (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 34. IBEDOYIN COMMUNITY PROJECT III Construction of (750X830)mm Ring Culvert with Line Drains (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 35. IWOROKO COMMUNITY PROJECT 1 Construction of bore hole (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 36. IWOROKO COMMUNITY PROJECT 11 Construction of 12 units lock up shops (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 37. IGEDE COMMUNITY PROJECT 1 Construction of 8km Igede- Erijiyan Feeder Road with Culverts (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 38. ESURE EKITI – PROJECT I construction of Administrative block Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 39. ESURE EKITI – PROJECT 11 Construction of community hall Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 40. COVENANT COMMUNITY Construction of culvert (completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 41. UPPERLAND COMMUNITY Construction of twin box culvert at Upperland Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 42. IFEOLUWA COMMUNITY, ADO EKITI Extension of Electricity (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 43. OKE ASO/OSUN COMMUNITY,ADO EKITI I Rehabilitation of feeder road (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 44. OKE ASO/OSUN COMMUNITY,ADO EKITI II Construction of health centre(Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 45. IGBAYE-AAYE COMMUNITY I Construction of Basic Health Centre (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 46. IGBAYE-AAYE COMMUNITY II Construction of Borehole (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 47. IGBAYE-AAYE COMMUNITY III Rehabilitation of feeder road (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 48. KAJOLA-ISE COMMUNITY PROJECT 1 Completed Staff Quarters at Arinjale High School Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 49. KAJOLA-ISE COMMUNITY II Construction of Basic Health Centre (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 50. ORUN COMMUNITY I Renovation of Science and Computer Laboratory (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 51. ORUN COMMUNITY II Extension of Electricity (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 52. OBADA COMMUNITY , ISE I Rehabilitation of a block of 3 classrooms and offices (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 53. OBADA COMMUNITY, ISE II Construction of Science Laboratory and Computer room (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 54. ABA EDE COMMUNITY, ISE PROJECT I Production of water from borehole project (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 55. ABA EDE COMMUNITY, ISE PROJECT II Extension of Electricity (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 56. ABA EDE COMMUNITY, ISE PROJECT III Procurement and Installation of Transformer (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 57. IKOLE COMMUNITY Construction of examination hall at Ikole City College (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 58. OOTUNJA COMMUNITY-PROJECT I Construction of health Center Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 59. OOTUNJA COMMUNITY-PROJECT II Construction of feeder and Culvert (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 60. OOTUNJA COMMUNITY-PROJECT III Construction of feeder and Culvert (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 61. ODO ORO COMMUNITY PROJECT I Construction of examination hall at Odo Oro High School Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 62. ODO ORO COMMUNITY PROJECT II Construction of a block of 3 classrooms and toilets Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 63. ODO ORA COMMUNITY I Construction of 10 unit lock-up shops with toilets (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 64. IDO EKITI COMMUNITY PROJECT I Extension of electricity at Alapo Quarters (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 65. IDO EKITI COMMUNITY PROJECT II Construction of Water Storage tank at 16 locations (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 66. IDO EKITI COMMUNITY PROJECT III Construction of drainage (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 67. EJIGAN COMMUNITY Construction of 4 Nos Culverts (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 68. ILASA COMMUNITY PROJECT I Purchase and Installation of 200kva Transformer (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 69. AYAGBE COMMUNITY, OMUO PROJECT I Completion of Community Hall (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 70. AYAGBE COMMUNITY, OMUO PROJECT II Channelization (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 71. AYAGBE COMMUNITY, OMUO PROJECT III Production of Water from hand pump at two different locations (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 72. OSIN COMMUNITY PROJECT I Construction of block of classrooms (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 73. ILUPEJU COMMUNITY PROJECT 1 Reconstruction and renovation of computer centre with equipment Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 74. IGOGO COMMUNITY Procurement of Science Laboratory and Computer equipments (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 75. IGOGO COMMUNITY PROJECT II Purchase & Installation of 300kva 33/0.415kv transformer Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 76. AAYE OJA COMMUNITY PROJECT I Construction of Science Laboratory and Computer room (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 77. AFAO/KAJOLA COMMUNITY, IKERE-PROJECT I Purchase and Installation Of 200kva Transformer (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 78. AFAO/KAJOLA COMMUNITY, IKERE-PROJECT II Construction of Health Center (completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 79. AFAO/KAJOLA COMMUNITY, IKERE PROJECT III Construction Of Culvert (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 80. JIOBA COMMUNITY, ODE EKITI Production of water from hand pump Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 81. JIOBA COMMUNITY, ODE EKITI construction of health centre Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 82. IJAN COMMUNITY, I construction of examination hall Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 83. ANIFOWOSHE, AISEGBA EKITI 1 Production of water from hand pump Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 84. IDO-ILE COMMUNITY I Construction of basic health centre Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 85. IGBAMITORO COMMUNITY PROJECT 1 Construction of Computer and Science Laboratory (Completed) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 86. IGBAMITORO COMMUNITY PROJECT II Completion of a block of 4 classrooms Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 87. SURULERE - IRE EKITI COMMUNITY Construction of a block of three class rooms (on-going) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 88. ODE EKITI COMMUNITY Construction of Box culvert (on-going) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 89. IPERE COMMUNITY Construction of Science Laboratory (on-going) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 90. EDA-ILE COMMUNITY Construction of open market stalls (on-going) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 91. ISAN COMMUNITY Construction of block of three classrooms with two offices (on-going) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 92. ARAROMI-OKE COMMUNITY Completion of Community Hall (On-going) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 93. OTUN EKITI COMMUNITY Construction of science laboratory (on going) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 94. ORIN EKITI COMMUNITY completion of Community Hall (on going) Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 95. PICTORIAL PRESENTATION OF EKCSDA ACTIVITIES Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 96. SENSITIZATION SENSITIZATION AT OBADA COMMUNITY SENSITIZATION AT ORUN COMMUNITY Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 97. PARTICIPATORY RURAL APPRAISAL (PRA) FACILITATION PRA AT EPE COMMUNITY MOBA LGA PRA AT IROPORA COMMUNITY Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 98. PARTICIPATORY RURAL APPRAISAL (PRA) FACILITATION CONT’D PRA AT OMUO OKE PRA AT OMUO OKE A WOMAN CASTING HER VOTE THE KABIYESI CASTING HIS VOTE FOR THE PROJECTS OF HIS CHOICE Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 99. COMMUNITY PROJECT MANAGEMENT COMMITTEE (CPMC) AND 3 OTHER SUB-COMMITTEES ELECTION FACILITATION CPMC ELECTION AT ISAN CPMC ELECTION AT ILORO Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 100. FIELD APPRAISAL ODO ORO OOTUNJA FIELD APPRAISSAL TEAM AT THE PROPOSED SITE FIELD APPRAISSAL TEAM AT THE PROPOSED FOR THE CONSTRUCTION OF EXAM HALL AT ODO SITE FOR THE CONSTRUCTION OF HEALTH ORO HIGH SCHOOL CENTRE AT OOTUNJA COMMUNITY Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 101. CPMC & SUB COMMITTEE TRAINING ON PROJECT MANAGEMENT RESOURCE PERSON TEACHING CROSS SECTION OF PARTICIPANTS THE PARTICIPANTS Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 102. PROJECT LAUNCH SIGNING OF PROJECT AND FINANCING EXECUTIVE GOV. OF EKITI STATE, DR. KAYODE AGREEMENTS BETWEEN EKCSDA AND FAYEMI, FLANKED BY THE COMMUNITY LEADER, IWOROKO COMMUNITY HRM, OBA ALADEJANA, THE ALAWOROKO OF IWOROKO AND TWO MEMBERS OF THE STATE EXECUTIVE COUNCIL AT THE PROJECT LAUNCH. Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 103. PROJECT LAUNCH CONT’D FOUNDATION LAYING CEREMONY OF AN COMMUNITY WOMEN REJOICING AT EXAMINATION HALL BY FINANCE UPPERLAND COMMUNITY PROJECT COMMISSIONER, HON. DAPO KOLAWOLE AT LAUNCH IKOLE CITY COLLEGE Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 104. PROJECT LAUNCH AT ODO ORO COMMUNITY CROSS-SECTION OF THE COMMUNITY WOMEN OF THE COMMUNITY MEMBERS AT THE PROJECT LAUNCH DANCING AT THE CEREMONY Ekiti State Community And Social Dev. Agency (EKCSDA)
  • 105. WORLD BANK MISSION VISIT TO EKITI STATE The WB Mission Team Leader, Prof. Falusi and other team members, Prof. Falusi at Ibedoyin Community Mrs. T. Buba (FPSU) and Mrs. Ogunmefun (FMF) at Ibedoyin. Ekiti State Community And Social Dev. Agency (EKCSDA)