RISK MANAGEMENT
Graduation project 2017
Under Supervision of:
Dr. Mohamed Anwar El-Dardiry.
WHAT IS RISK?
Uncertain event which affects the
achievement of the objectives.
RISK & UNCERTINITY
All risks are uncertain but not all
uncertainties are risks.
POSITIVE & NEGATIVE RISKS
Risk types
Business Risk
Operational
Risk
Strategic Risk Legal Risk
RISK MANAGEMENT
It is the process of identifying, analyzing and
treating risks which affect the objectives.
PRINCIPLES OF RISK
MANAGEMENT
1. Risk management adds value.
2. Risk management is part of decision making.
3. Risk management is integral part of the
organization.
4. Risk management is a continuous process.
BENEFITS OF RISK MANAGEMENT
1. Increase the likelihood of achieving objectives.
2. Encourage proactive management.
3. Improve voluntary reporting.
4. Minimize losses.
IMPELEMENTATION OF RISK
MANAGEMENT
1. Establishing the context
To ensure that all significant risks are captured it is
necessary to know the objectives of the organization.
ESTABLISHING THE EXTERNAL CONTEXT
It is the external environment in which the
organization seeks to achieve its objectives.
ESTABLISHING THE INTERNAL CONTEXT
It is the internal environment in which the
organization seeks to achieve its objectives.
RISK IDENTIFICATION
This step includes identifying risks that may occur and
affect the achievement of the organization’s
objectives.
Also identifies causes and consequences of risks and
the area of impact.
RISK IDENTIFICATION
CHALLENGES
1. Identifying all risks
2. When a risk is not a risk
TECHNIQUES OF RISK
IDENTIFICATION
1. Brainstorming
 It is an interactive technique.
 Suitable for the initial identification of risks particularly for
large and unique projects.
 No judgements.
2. Checklist
 A Technique to simplify the identification of risks.
 Checklist of standard risks from previous projects that are
known to arise.
 Suitable for projects that are standard or routine in nature.
3. Interviews
WHAT IS RISK ANALYSIS?
 Determining the consequences and their probabilities
for identified risk events.
 Consequence determines the nature and type of
impact which could occur assuming that a particular
event situation or circumstance has occurred.
 The probability is that those consequences can occur.
METHODS USED IN ANALYZING
RISK
 Qualitative Analysis: the description of each risk and its
impacts or a subjective labelling of each risk (e.g. high/low) in
terms of both its impact and its probability of occurrence.
 Quantitative Analysis: Practical values for consequences and
their probabilities.
RISK ANALYSIS TECHNIQUES
 Failure modes and effects analysis (FMEA)
FMEA is a technique used to identify failure modes of the various
parts of a system and mechanisms, and their effects on
outcomes.
Event tree analysis (ETA)
 representing the sequences of events (out comes) due
to initiating event of the system that was designed to
reduce the initiating event consequences
Fault tree analysis (FTA)
 starts with the undesired event (top event) and
determines all the ways in which it could occur.
Risk evaluation
 Compares the identified and analyzed risk against given risk
criteria.
 Risk criteria represent the level of risk that the organization
sets out as acceptable or non-acceptable.
 Decisions:
1. whether a risk needs treatment.
2. priorities for treatment.
RISK TREATMENT
Determining what will be done in response to the
risks that have been identified.
SELECTING OF RISK TREATMENT
OPTIONS
 Selecting the most appropriate risk treatment option involves
balancing the costs and efforts of implementation against the
benefits derived.
RISK AVOIDANCE
 Strategies are directed to eliminating sources of risk or
reducing the likelihood of their occurrence.
RISK MITIGATION
 Minimizing the consequences of risks.
 Risk will take place and can not be avoided.
 The likelihoods of other risks may be reduced by risk
prevention strategies.
RISK SHARING
 Share the consequences of risks with the contract agreed
parties.
 Contracts are negotiated between an organization and its
suppliers or sub-contractors.
RISK ACCEPTANCE
 Accept a certain risk and live with it as its consequences to the
organization are simple.
 When the cost of treating such risks are much more than the
cost of not treating them.
INSURANCE
 Is a well-known risk sharing strategy.
 Used for physical assets and a limited range of commercial
risks.
 Purchasing organizations frequently require their suppliers to
have insurance policies These policies cover specific physical
risks, such as damage to goods in transit.
MONITORING & REVIEW
Continuous monitoring and review of risks is an
important part of implementation. It ensures that
new risks are detected and managed.
REGULAR MONITORING PROCESS
Regular meetings should be held to ensure that all
the important risks are examined.
UPDATING THE RISK REGISTER
 The risk register database is the main risk management
tool for monitoring the risk management process within
the project. It lists the ranked risks and references the
associated risk action plans.
Keeping the risk register up to date is very important.
New risks will be identified and will be entered into the
risk register. Risks that have been managed, avoided or
are no longer relevant can be removed from the risk
register.
COMMUNICATION & REPORTING
Reasons for communication:
Communication within the project team
Communication with an owner or client
REPORTS
 Formal reporting may be required for large or particularly
risky projects.
 What is large or risky depends very much on the organization
and its own policies and procedures. For example, some
companies undertake and report on formal risk analyses only
on very large projects, while others perform them routinely on
relatively small activities.
CASE STUDY: SYNTHETIC
APERATURE RADAR (SAR)
 (SAR) is a form of radar that is used to create two- or three-
dimensional images of objects, such as landscapes.
BACKGROUND
 The project of this case study is the development of an
experimental Synthetic Aperture Radar (SAR).
 Due to the high costs of test flights, the synthetic aperture is
obtained by operating the radar on a rail on a building roof.
 The project has been running at Defencetek over a number of
years. The objective for 2001 was to obtain the first images.
 At the point that the risk management process was started,
the outstanding work for the year, that was considered risky,
was as follows:
Work Breakdown Structure (WBS) of the
RoofSAR work included in the risk process.
RISK MANAGEMENT PROCESS
DEFINE PHASE
This phase involved the definition of project
stakeholders, documenting project objectives,
documenting of the design as well as the updating of
the WBS and schedule.
FOCUS PHASE
 This phase involved the identification of the risk management
stakeholders and also documented the risk management
process to be followed. The corporate level risks were also
identified as well as the resources and schedule for the risk
management process.
IDENTIFY PHASE
 The risk identification was carried out with the help of the
project system engineer and the project engineer. Risks were
identified per WBS item.
 For each identified risk a risk response was decided upon,
written on another Post-it and attached to the risk identified.
STRUCTURE PHASE
 During the structure phase, a risk distribution matrix was drawn on a
whiteboard. Each risk was then allocated a place on the matrix. A risk
prioritization table was compiled using this matrix. A more detailed risk
response was then developed for risks with a priority of it.
OWNERSHIP PHASE
 During this phase, the name of the person responsible for the
risk was written on the Post-it detailing each risk. This was
used to complete the risk responsibility allocation table.
ESTIMATE PHASE
EATIMATION OF LIKELIHOOD TABLE
Impact of risk determination table (Estimation of impact)
Task level risk impact determination
Risk likelihood and impact determination
EVALUATE PHASE
 During the evaluate phase the likelihood and impact
determined during the estimate phase were used to
determine a risk value both for the high-level tasks and then
at the level of each risk as follows:
Risk = Likelihood*Impact
but a qualitative risk rating will then be given to each task
using this Table , also taking into account that risks with
high impact are important.
Qualitative rating of risks.
High-level tasks risk ratings.
Note that where the impact of a risk is above 0.8, the risk obtained a qualitative
rating of high, whether the risk value was above 0.8 or not. This is due to the
fact that risks with high impact need to be carefully managed.
Ratings per identified risk.
PLAN PHASE (TREATMENT)
 During the plan phase the detailed risk responses developed
during the structure phase were updated. Thereafter the
project WBS, detailed activity level statements of work and
schedule were also updated.
MANAGE PHASE (MONITORING)
 All the risks identified during the risk management plan
compilation were monitored in a weekly progress meeting.
Each risk was assigned a status of: In process, Completed or
Pending. Where a risk was in process an indication was given
of what the required action was in order to overcome the risk.
Where a risk was completed a completion, date was indicated.
Pending only applied to risks that were not expected to affect
the project in the next two weeks.
CONCLUSION
 The risk management process added a lot of value to the
RoofSAR project. The main benefit was that the project team
was aware of the risks which could then be managed.
 Several of the risks originally identified materialized and due
to the risk analysis did not negatively affect the success of the
project.
Risk management

Más contenido relacionado

La actualidad más candente

PMI-RMP Exam Prep Presentation
PMI-RMP Exam Prep PresentationPMI-RMP Exam Prep Presentation
PMI-RMP Exam Prep Presentationscottdreynolds
 
Project portfolio management - webinar
Project portfolio management - webinarProject portfolio management - webinar
Project portfolio management - webinarAli Zeeshan
 
Project Management 101
Project Management 101Project Management 101
Project Management 101MurftheSurf
 
Risk Identification Process PowerPoint Presentation Slides
Risk Identification Process PowerPoint Presentation SlidesRisk Identification Process PowerPoint Presentation Slides
Risk Identification Process PowerPoint Presentation SlidesSlideTeam
 
Risk Management Best Practices
Risk Management Best PracticesRisk Management Best Practices
Risk Management Best PracticesPMILebanonChapter
 
Elements of Project Management
Elements of Project ManagementElements of Project Management
Elements of Project ManagementKevin Thomas
 
Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Managementguest90bddb
 
Third-Party Risk Management: A Case Study in Oversight
Third-Party Risk Management: A Case Study in OversightThird-Party Risk Management: A Case Study in Oversight
Third-Party Risk Management: A Case Study in OversightNICSA
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementKaustubh Gupta
 
TPRM - POV Presentation Final v2
TPRM - POV Presentation Final v2 TPRM - POV Presentation Final v2
TPRM - POV Presentation Final v2 Jason Mussman
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project managementMohamed Amin
 
Fundamentals of project management july 7, 2012 revised
Fundamentals of project management july 7, 2012 revisedFundamentals of project management july 7, 2012 revised
Fundamentals of project management july 7, 2012 revisedgorby626
 
Project scope management
 Project scope management Project scope management
Project scope managementSidraSaleem17
 
Project Management Chap. 1 Introduction
Project Management   Chap. 1 IntroductionProject Management   Chap. 1 Introduction
Project Management Chap. 1 IntroductionAperto Libro Academy
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Managementmovinghats
 

La actualidad más candente (20)

Pmi rmp-2020 - v6
Pmi rmp-2020 - v6Pmi rmp-2020 - v6
Pmi rmp-2020 - v6
 
PMI-RMP Exam Prep Presentation
PMI-RMP Exam Prep PresentationPMI-RMP Exam Prep Presentation
PMI-RMP Exam Prep Presentation
 
Project portfolio management - webinar
Project portfolio management - webinarProject portfolio management - webinar
Project portfolio management - webinar
 
Project Management 101
Project Management 101Project Management 101
Project Management 101
 
Risk Identification Process PowerPoint Presentation Slides
Risk Identification Process PowerPoint Presentation SlidesRisk Identification Process PowerPoint Presentation Slides
Risk Identification Process PowerPoint Presentation Slides
 
Risk Management Best Practices
Risk Management Best PracticesRisk Management Best Practices
Risk Management Best Practices
 
Pmp risk management
Pmp risk managementPmp risk management
Pmp risk management
 
Elements of Project Management
Elements of Project ManagementElements of Project Management
Elements of Project Management
 
Introduce Project Management
Introduce Project ManagementIntroduce Project Management
Introduce Project Management
 
Project governance
Project governanceProject governance
Project governance
 
Third-Party Risk Management: A Case Study in Oversight
Third-Party Risk Management: A Case Study in OversightThird-Party Risk Management: A Case Study in Oversight
Third-Party Risk Management: A Case Study in Oversight
 
Risk management
Risk managementRisk management
Risk management
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
TPRM - POV Presentation Final v2
TPRM - POV Presentation Final v2 TPRM - POV Presentation Final v2
TPRM - POV Presentation Final v2
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
 
Fundamentals of project management july 7, 2012 revised
Fundamentals of project management july 7, 2012 revisedFundamentals of project management july 7, 2012 revised
Fundamentals of project management july 7, 2012 revised
 
What are the Basic Principles of Project Management | AIMS, UK
What are the Basic Principles of Project Management | AIMS, UK What are the Basic Principles of Project Management | AIMS, UK
What are the Basic Principles of Project Management | AIMS, UK
 
Project scope management
 Project scope management Project scope management
Project scope management
 
Project Management Chap. 1 Introduction
Project Management   Chap. 1 IntroductionProject Management   Chap. 1 Introduction
Project Management Chap. 1 Introduction
 
Introduction to Project Management
Introduction to Project ManagementIntroduction to Project Management
Introduction to Project Management
 

Similar a Risk management

Risk Management Methodologies in Construction Industries
Risk Management Methodologies in Construction IndustriesRisk Management Methodologies in Construction Industries
Risk Management Methodologies in Construction IndustriesIRJET Journal
 
Project of entrepreneurship
Project of entrepreneurship Project of entrepreneurship
Project of entrepreneurship AliAbbas390458
 
Chapter 1 risk management (3)
Chapter 1  risk management (3)Chapter 1  risk management (3)
Chapter 1 risk management (3)rafeeqameen
 
Beyond PMP: Risk Management
Beyond PMP: Risk ManagementBeyond PMP: Risk Management
Beyond PMP: Risk Managementabhinayverma
 
Construction project management & risk mitigation
Construction project management & risk mitigationConstruction project management & risk mitigation
Construction project management & risk mitigationrajlaxmipardeshi
 
project risk management
project risk managementproject risk management
project risk managementAshima Thakur
 
Final Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptxFinal Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptxGeorgeKabongah2
 
Project risk management: Techniques and strategies
Project risk management: Techniques and strategiesProject risk management: Techniques and strategies
Project risk management: Techniques and strategiesDebashishDas49
 
Project Management by Mostafa Ewees
Project Management  by Mostafa EweesProject Management  by Mostafa Ewees
Project Management by Mostafa EweesMostafa Ewees
 
Risk management Phase 1-5 Individual Project.docx
Risk management Phase 1-5 Individual Project.docxRisk management Phase 1-5 Individual Project.docx
Risk management Phase 1-5 Individual Project.docxjoellemurphey
 
Bertrand's Individual Essay
Bertrand's Individual EssayBertrand's Individual Essay
Bertrand's Individual EssayPrince Bertrand
 
Risk management(software engineering)
Risk management(software engineering)Risk management(software engineering)
Risk management(software engineering)Priya Tomar
 
Pm0016 set-1
Pm0016 set-1Pm0016 set-1
Pm0016 set-1Paul Hunt
 

Similar a Risk management (20)

Risk Management Methodologies in Construction Industries
Risk Management Methodologies in Construction IndustriesRisk Management Methodologies in Construction Industries
Risk Management Methodologies in Construction Industries
 
Project of entrepreneurship
Project of entrepreneurship Project of entrepreneurship
Project of entrepreneurship
 
Chapter 1 risk management (3)
Chapter 1  risk management (3)Chapter 1  risk management (3)
Chapter 1 risk management (3)
 
Beyond PMP: Risk Management
Beyond PMP: Risk ManagementBeyond PMP: Risk Management
Beyond PMP: Risk Management
 
TOPIC5.pdf
TOPIC5.pdfTOPIC5.pdf
TOPIC5.pdf
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Project/Program Risk management
Project/Program Risk managementProject/Program Risk management
Project/Program Risk management
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
Construction project management & risk mitigation
Construction project management & risk mitigationConstruction project management & risk mitigation
Construction project management & risk mitigation
 
project risk management
project risk managementproject risk management
project risk management
 
Final Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptxFinal Class Presentation on Determining Project Stakeholders & Risks.pptx
Final Class Presentation on Determining Project Stakeholders & Risks.pptx
 
Project risk management: Techniques and strategies
Project risk management: Techniques and strategiesProject risk management: Techniques and strategies
Project risk management: Techniques and strategies
 
Project Management by Mostafa Ewees
Project Management  by Mostafa EweesProject Management  by Mostafa Ewees
Project Management by Mostafa Ewees
 
PMP_Project Risk Management
PMP_Project Risk ManagementPMP_Project Risk Management
PMP_Project Risk Management
 
Essentials of Risk Management
Essentials of Risk ManagementEssentials of Risk Management
Essentials of Risk Management
 
Risk management Phase 1-5 Individual Project.docx
Risk management Phase 1-5 Individual Project.docxRisk management Phase 1-5 Individual Project.docx
Risk management Phase 1-5 Individual Project.docx
 
Bertrand's Individual Essay
Bertrand's Individual EssayBertrand's Individual Essay
Bertrand's Individual Essay
 
8. project risk management
8. project risk management8. project risk management
8. project risk management
 
Risk management(software engineering)
Risk management(software engineering)Risk management(software engineering)
Risk management(software engineering)
 
Pm0016 set-1
Pm0016 set-1Pm0016 set-1
Pm0016 set-1
 

Último

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projectssmsksolar
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Standamitlee9823
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoordharasingh5698
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 

Último (20)

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 

Risk management

  • 1. RISK MANAGEMENT Graduation project 2017 Under Supervision of: Dr. Mohamed Anwar El-Dardiry.
  • 2. WHAT IS RISK? Uncertain event which affects the achievement of the objectives.
  • 3.
  • 4. RISK & UNCERTINITY All risks are uncertain but not all uncertainties are risks.
  • 7. RISK MANAGEMENT It is the process of identifying, analyzing and treating risks which affect the objectives.
  • 8. PRINCIPLES OF RISK MANAGEMENT 1. Risk management adds value. 2. Risk management is part of decision making. 3. Risk management is integral part of the organization. 4. Risk management is a continuous process.
  • 9. BENEFITS OF RISK MANAGEMENT 1. Increase the likelihood of achieving objectives. 2. Encourage proactive management. 3. Improve voluntary reporting. 4. Minimize losses.
  • 10. IMPELEMENTATION OF RISK MANAGEMENT 1. Establishing the context To ensure that all significant risks are captured it is necessary to know the objectives of the organization.
  • 11. ESTABLISHING THE EXTERNAL CONTEXT It is the external environment in which the organization seeks to achieve its objectives. ESTABLISHING THE INTERNAL CONTEXT It is the internal environment in which the organization seeks to achieve its objectives.
  • 12. RISK IDENTIFICATION This step includes identifying risks that may occur and affect the achievement of the organization’s objectives. Also identifies causes and consequences of risks and the area of impact.
  • 13. RISK IDENTIFICATION CHALLENGES 1. Identifying all risks 2. When a risk is not a risk
  • 14. TECHNIQUES OF RISK IDENTIFICATION 1. Brainstorming  It is an interactive technique.  Suitable for the initial identification of risks particularly for large and unique projects.  No judgements.
  • 15.
  • 16. 2. Checklist  A Technique to simplify the identification of risks.  Checklist of standard risks from previous projects that are known to arise.  Suitable for projects that are standard or routine in nature.
  • 18. WHAT IS RISK ANALYSIS?  Determining the consequences and their probabilities for identified risk events.  Consequence determines the nature and type of impact which could occur assuming that a particular event situation or circumstance has occurred.  The probability is that those consequences can occur.
  • 19. METHODS USED IN ANALYZING RISK  Qualitative Analysis: the description of each risk and its impacts or a subjective labelling of each risk (e.g. high/low) in terms of both its impact and its probability of occurrence.  Quantitative Analysis: Practical values for consequences and their probabilities.
  • 20. RISK ANALYSIS TECHNIQUES  Failure modes and effects analysis (FMEA) FMEA is a technique used to identify failure modes of the various parts of a system and mechanisms, and their effects on outcomes.
  • 21. Event tree analysis (ETA)  representing the sequences of events (out comes) due to initiating event of the system that was designed to reduce the initiating event consequences
  • 22. Fault tree analysis (FTA)  starts with the undesired event (top event) and determines all the ways in which it could occur.
  • 23. Risk evaluation  Compares the identified and analyzed risk against given risk criteria.  Risk criteria represent the level of risk that the organization sets out as acceptable or non-acceptable.  Decisions: 1. whether a risk needs treatment. 2. priorities for treatment.
  • 24. RISK TREATMENT Determining what will be done in response to the risks that have been identified.
  • 25. SELECTING OF RISK TREATMENT OPTIONS  Selecting the most appropriate risk treatment option involves balancing the costs and efforts of implementation against the benefits derived.
  • 26. RISK AVOIDANCE  Strategies are directed to eliminating sources of risk or reducing the likelihood of their occurrence.
  • 27. RISK MITIGATION  Minimizing the consequences of risks.  Risk will take place and can not be avoided.  The likelihoods of other risks may be reduced by risk prevention strategies.
  • 28. RISK SHARING  Share the consequences of risks with the contract agreed parties.  Contracts are negotiated between an organization and its suppliers or sub-contractors.
  • 29. RISK ACCEPTANCE  Accept a certain risk and live with it as its consequences to the organization are simple.  When the cost of treating such risks are much more than the cost of not treating them.
  • 30. INSURANCE  Is a well-known risk sharing strategy.  Used for physical assets and a limited range of commercial risks.  Purchasing organizations frequently require their suppliers to have insurance policies These policies cover specific physical risks, such as damage to goods in transit.
  • 31. MONITORING & REVIEW Continuous monitoring and review of risks is an important part of implementation. It ensures that new risks are detected and managed.
  • 32. REGULAR MONITORING PROCESS Regular meetings should be held to ensure that all the important risks are examined.
  • 33. UPDATING THE RISK REGISTER  The risk register database is the main risk management tool for monitoring the risk management process within the project. It lists the ranked risks and references the associated risk action plans. Keeping the risk register up to date is very important. New risks will be identified and will be entered into the risk register. Risks that have been managed, avoided or are no longer relevant can be removed from the risk register.
  • 34. COMMUNICATION & REPORTING Reasons for communication: Communication within the project team Communication with an owner or client
  • 35. REPORTS  Formal reporting may be required for large or particularly risky projects.  What is large or risky depends very much on the organization and its own policies and procedures. For example, some companies undertake and report on formal risk analyses only on very large projects, while others perform them routinely on relatively small activities.
  • 36. CASE STUDY: SYNTHETIC APERATURE RADAR (SAR)  (SAR) is a form of radar that is used to create two- or three- dimensional images of objects, such as landscapes.
  • 37. BACKGROUND  The project of this case study is the development of an experimental Synthetic Aperture Radar (SAR).  Due to the high costs of test flights, the synthetic aperture is obtained by operating the radar on a rail on a building roof.  The project has been running at Defencetek over a number of years. The objective for 2001 was to obtain the first images.  At the point that the risk management process was started, the outstanding work for the year, that was considered risky, was as follows:
  • 38. Work Breakdown Structure (WBS) of the RoofSAR work included in the risk process.
  • 40. DEFINE PHASE This phase involved the definition of project stakeholders, documenting project objectives, documenting of the design as well as the updating of the WBS and schedule.
  • 41. FOCUS PHASE  This phase involved the identification of the risk management stakeholders and also documented the risk management process to be followed. The corporate level risks were also identified as well as the resources and schedule for the risk management process.
  • 42. IDENTIFY PHASE  The risk identification was carried out with the help of the project system engineer and the project engineer. Risks were identified per WBS item.
  • 43.  For each identified risk a risk response was decided upon, written on another Post-it and attached to the risk identified.
  • 44. STRUCTURE PHASE  During the structure phase, a risk distribution matrix was drawn on a whiteboard. Each risk was then allocated a place on the matrix. A risk prioritization table was compiled using this matrix. A more detailed risk response was then developed for risks with a priority of it.
  • 45. OWNERSHIP PHASE  During this phase, the name of the person responsible for the risk was written on the Post-it detailing each risk. This was used to complete the risk responsibility allocation table.
  • 46. ESTIMATE PHASE EATIMATION OF LIKELIHOOD TABLE
  • 47. Impact of risk determination table (Estimation of impact) Task level risk impact determination
  • 48. Risk likelihood and impact determination
  • 49. EVALUATE PHASE  During the evaluate phase the likelihood and impact determined during the estimate phase were used to determine a risk value both for the high-level tasks and then at the level of each risk as follows: Risk = Likelihood*Impact
  • 50. but a qualitative risk rating will then be given to each task using this Table , also taking into account that risks with high impact are important. Qualitative rating of risks.
  • 52. Note that where the impact of a risk is above 0.8, the risk obtained a qualitative rating of high, whether the risk value was above 0.8 or not. This is due to the fact that risks with high impact need to be carefully managed. Ratings per identified risk.
  • 53. PLAN PHASE (TREATMENT)  During the plan phase the detailed risk responses developed during the structure phase were updated. Thereafter the project WBS, detailed activity level statements of work and schedule were also updated.
  • 54. MANAGE PHASE (MONITORING)  All the risks identified during the risk management plan compilation were monitored in a weekly progress meeting. Each risk was assigned a status of: In process, Completed or Pending. Where a risk was in process an indication was given of what the required action was in order to overcome the risk. Where a risk was completed a completion, date was indicated. Pending only applied to risks that were not expected to affect the project in the next two weeks.
  • 55.
  • 56. CONCLUSION  The risk management process added a lot of value to the RoofSAR project. The main benefit was that the project team was aware of the risks which could then be managed.  Several of the risks originally identified materialized and due to the risk analysis did not negatively affect the success of the project.

Notas del editor

  1. دي بقي الريسكس الي بتأثر علي الديليفرابلز ....بيتم حساب الليكلي هود والايمباكت تقديريا من المسؤلين وبيتاخد ليها افريج
  2. بعد الاستيميت فيز ...بستخدمه عشان اعرف مستويات الريسك في كل تاسك عندي
  3. كواليتاتيف رانج ..عن طريق قيم الريسك الي بتطلعلي بحدد الراتينج بتاع كل ريسك فيهم
  4. هنا الريسبونس الي جبناها في الاستركشر فيز بيتعملها تحديث ...والبروسيديورس بتاعتها بتتحط في البلان بتاع المشروع ...وبيكون ليها سكيدول وبادجت ...الريسك مانجمنت هنا بتتضاف للبلان والاستيتمنتس بتاع للمشروع
  5. كل الريسكات الي تم دراستها بيتم مراقبتها اسبوعيا ...كل ريسك فيهم بيكون ليها ستيتس او انيديكيشنز معينة وهما In process ,completed or pending