SlideShare una empresa de Scribd logo
1 de 17
Eng. El Sayed Amer
Eng. El Sayed Amer
Eng. El Sayed Amer
Leveling &Cold Cutting
• The flange must be installed so that the top is level.
• Cold Cutting equipment is used
1
Eng. El Sayed Amer
Welding
• The wellhead flange attaches to the first cemented surface casing string designed to
hold pressure.
• Well flange attachment to the casing may be by welding, forming, threaded
connection or set screws.
2
Eng. El Sayed Amer
Welding2
C a s i n g H e a d S p o o l
Eng. El Sayed Amer
Weld test
• Test welds to 3,000 psi or 80% of casing collapse.
3
TEST PORT
Eng. El Sayed Amer
Casing running and hanger set
• The second string of casing is run and the hanger is landed in
the bowl.
• Lock down screws engaged
4
Eng. El Sayed Amer
N/U and test BOP
• Make sure the BOP, test plug, and the casing head are
compatible
5
Eng. El Sayed Amer
N/U and test BOP
• Lower the wear bushing through the blowout preventers and
riser until it lands on the load shoulder of the casing head
6
Eng. El Sayed Amer
Continue drilling operation8
RIH and set new casing10
SET hanger and lDS11
N/D BOP12
Retrieve wear bushing9
Eng. El Sayed Amer
The casing spool follows13
Eng. El Sayed Amer
N/U BOP and test plug14
Eng. El Sayed Amer
test BOP15
Eng. El Sayed Amer
Install Tubing spool15
Eng. El Sayed Amer
Run Tubing and set hanger16
Eng. El Sayed Amer
Installation of tree assembly17
Eng. El Sayed Amer
DIMENSIONS ARE SUBJECT TO CHANGE ACCORDING TO ACTUAL
FIELD CONDITIONS

Más contenido relacionado

La actualidad más candente

Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdf
mmody4
 

La actualidad más candente (20)

Landing nipples X & XN
Landing nipples X & XN Landing nipples X & XN
Landing nipples X & XN
 
Wellhead basics
Wellhead basicsWellhead basics
Wellhead basics
 
Scsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valveScsssv surface control subsurface safety valve
Scsssv surface control subsurface safety valve
 
Well intervention
Well  interventionWell  intervention
Well intervention
 
Wellhead function, rating and selection
Wellhead function, rating and selectionWellhead function, rating and selection
Wellhead function, rating and selection
 
Ssd spm
Ssd   spmSsd   spm
Ssd spm
 
1. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 11. sequance of well drilling and completion part 1
1. sequance of well drilling and completion part 1
 
Wellheads Training .pdf
Wellheads Training .pdfWellheads Training .pdf
Wellheads Training .pdf
 
Packers GFK
Packers GFKPackers GFK
Packers GFK
 
Production packer
Production packerProduction packer
Production packer
 
Well Completion Design.pdf
Well Completion Design.pdfWell Completion Design.pdf
Well Completion Design.pdf
 
Packer milling
Packer millingPacker milling
Packer milling
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
WELLHEAD FOR OIL AND GAS WELL.pptx
WELLHEAD FOR OIL AND GAS WELL.pptxWELLHEAD FOR OIL AND GAS WELL.pptx
WELLHEAD FOR OIL AND GAS WELL.pptx
 
Wellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and moreWellhead and christmas tree components, functions and more
Wellhead and christmas tree components, functions and more
 
introduction to completions and workovers (2)
introduction to completions and workovers (2)introduction to completions and workovers (2)
introduction to completions and workovers (2)
 
Tubing Landing nipples in petroleum industry
Tubing Landing nipples in petroleum industryTubing Landing nipples in petroleum industry
Tubing Landing nipples in petroleum industry
 
Wellhead
WellheadWellhead
Wellhead
 
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
SPII Compact Wellhead - Worldwide Oilfield Machine Inc.
 
3. sequances of drilling operations
3. sequances of drilling operations3. sequances of drilling operations
3. sequances of drilling operations
 

Similar a Installation procedures of wellhead

Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
Ahmed Radwan
 
Singapore Presentation 2015 new
Singapore Presentation 2015 newSingapore Presentation 2015 new
Singapore Presentation 2015 new
Tom Ray
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trial
Nagesh H
 

Similar a Installation procedures of wellhead (20)

Good practices in PSC work.ppt
Good practices in PSC work.pptGood practices in PSC work.ppt
Good practices in PSC work.ppt
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
Best practices day 4 am new
Best practices day 4 am newBest practices day 4 am new
Best practices day 4 am new
 
Inspection of Heat exchanger .pdf
Inspection of Heat exchanger .pdfInspection of Heat exchanger .pdf
Inspection of Heat exchanger .pdf
 
Inspection of heat exchanger during manufacturing
Inspection of heat exchanger  during manufacturingInspection of heat exchanger  during manufacturing
Inspection of heat exchanger during manufacturing
 
Piping hydrotest
Piping hydrotestPiping hydrotest
Piping hydrotest
 
Welding — arc stud welding of metallic
Welding — arc stud welding of metallicWelding — arc stud welding of metallic
Welding — arc stud welding of metallic
 
Z Cloud
Z CloudZ Cloud
Z Cloud
 
Sv168 Wall Mounted Manual
Sv168 Wall Mounted ManualSv168 Wall Mounted Manual
Sv168 Wall Mounted Manual
 
Singapore Presentation 2015 new
Singapore Presentation 2015 newSingapore Presentation 2015 new
Singapore Presentation 2015 new
 
Pre commissioning steam turbines load trial
Pre commissioning steam turbines load trialPre commissioning steam turbines load trial
Pre commissioning steam turbines load trial
 
An introduction to steel piles
An introduction to steel piles An introduction to steel piles
An introduction to steel piles
 
perforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast jointperforated joint, flow coupling and blast joint
perforated joint, flow coupling and blast joint
 
safety while prestressed concrete
safety while prestressed concretesafety while prestressed concrete
safety while prestressed concrete
 
FABRICATION OF BRIDGE GRIDER ,GLUED JOINT AT STRUCTURAL YARD AND CASTING OF ...
FABRICATION OF BRIDGE GRIDER ,GLUED JOINT AT STRUCTURAL YARD AND CASTING OF  ...FABRICATION OF BRIDGE GRIDER ,GLUED JOINT AT STRUCTURAL YARD AND CASTING OF  ...
FABRICATION OF BRIDGE GRIDER ,GLUED JOINT AT STRUCTURAL YARD AND CASTING OF ...
 
Essential Steps in Selecting the Correct Hose End Fitting
Essential Steps in Selecting the Correct Hose End FittingEssential Steps in Selecting the Correct Hose End Fitting
Essential Steps in Selecting the Correct Hose End Fitting
 
High pressure system- Anaesthesia Machine
High pressure system- Anaesthesia MachineHigh pressure system- Anaesthesia Machine
High pressure system- Anaesthesia Machine
 
Pharma catalogue 2017 18
Pharma catalogue 2017 18Pharma catalogue 2017 18
Pharma catalogue 2017 18
 
Handboek Aristorod Lasdraden
Handboek Aristorod LasdradenHandboek Aristorod Lasdraden
Handboek Aristorod Lasdraden
 
wellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdfwellheads-170105153648 (1).pdf
wellheads-170105153648 (1).pdf
 

Más de Elsayed Amer

Más de Elsayed Amer (12)

5. Gas Dehydration.pdf
5. Gas Dehydration.pdf5. Gas Dehydration.pdf
5. Gas Dehydration.pdf
 
Gas Processing.pdf
Gas Processing.pdfGas Processing.pdf
Gas Processing.pdf
 
Well completion 1 wleg
Well completion 1 wlegWell completion 1 wleg
Well completion 1 wleg
 
Rig components
Rig componentsRig components
Rig components
 
complete guide to process valves
complete guide to process valves complete guide to process valves
complete guide to process valves
 
Valves operation and functions complete guide
Valves operation and functions complete guideValves operation and functions complete guide
Valves operation and functions complete guide
 
Sequence of well drilling part 1
Sequence of well drilling part 1Sequence of well drilling part 1
Sequence of well drilling part 1
 
3. natural gas composition
3. natural gas composition3. natural gas composition
3. natural gas composition
 
6. phase separatation
6. phase separatation6. phase separatation
6. phase separatation
 
2. egyptian natural gas industry and gas procing
2. egyptian natural gas industry and gas procing2. egyptian natural gas industry and gas procing
2. egyptian natural gas industry and gas procing
 
3. a. natural gas composition 1
3. a. natural gas composition 13. a. natural gas composition 1
3. a. natural gas composition 1
 
1. natural gas overview
1. natural gas overview1. natural gas overview
1. natural gas overview
 

Último

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Christo Ananth
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Último (20)

Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

Installation procedures of wellhead

  • 3. Eng. El Sayed Amer Leveling &Cold Cutting • The flange must be installed so that the top is level. • Cold Cutting equipment is used 1
  • 4. Eng. El Sayed Amer Welding • The wellhead flange attaches to the first cemented surface casing string designed to hold pressure. • Well flange attachment to the casing may be by welding, forming, threaded connection or set screws. 2
  • 5. Eng. El Sayed Amer Welding2 C a s i n g H e a d S p o o l
  • 6. Eng. El Sayed Amer Weld test • Test welds to 3,000 psi or 80% of casing collapse. 3 TEST PORT
  • 7. Eng. El Sayed Amer Casing running and hanger set • The second string of casing is run and the hanger is landed in the bowl. • Lock down screws engaged 4
  • 8. Eng. El Sayed Amer N/U and test BOP • Make sure the BOP, test plug, and the casing head are compatible 5
  • 9. Eng. El Sayed Amer N/U and test BOP • Lower the wear bushing through the blowout preventers and riser until it lands on the load shoulder of the casing head 6
  • 10. Eng. El Sayed Amer Continue drilling operation8 RIH and set new casing10 SET hanger and lDS11 N/D BOP12 Retrieve wear bushing9
  • 11. Eng. El Sayed Amer The casing spool follows13
  • 12. Eng. El Sayed Amer N/U BOP and test plug14
  • 13. Eng. El Sayed Amer test BOP15
  • 14. Eng. El Sayed Amer Install Tubing spool15
  • 15. Eng. El Sayed Amer Run Tubing and set hanger16
  • 16. Eng. El Sayed Amer Installation of tree assembly17
  • 17. Eng. El Sayed Amer DIMENSIONS ARE SUBJECT TO CHANGE ACCORDING TO ACTUAL FIELD CONDITIONS