Investor Presentation  January 2010
Forward-looking statements ,[object Object],[object Object]
About China Wind Power International Corp. China Wind is uniquely positioned to capitalize on the growing demand for wind energy in China China Wind is uniquely positioned to capitalize on the growing demand for wind energy in China
Demand China Exclusivity Du Mon County  Guaranteed Power Purchase Agreement Profitable 12-14%  IRR
Source:  IEA Rapid industrialization Looming energy shortage Facing one of the world's biggest environmental crisis China overview
China’s commitment to wind power 2008 12.2 GW 2010 30 GW 2020 100 GW of all power from renewable sources  by 2020 st tomorrow 1 4 th today
We make it, they take it ,[object Object],[object Object],Guaranteed demand ,[object Object],for China Wind
Our current focus: Heilongjiang  P rovince Exclusive rights to  Wind Power Generation Du Mon County Beijing Shanghai Heilonjoang Province Population: ~38 million Annual electricity use by 2010*: *  forecast 74 million MWh
Favourable location Power Grid <2km Wind Speed  70m: 6.9-7.5 m/s Beijing Shanghai ,[object Object],[object Object],[object Object]
Our portfolio Beijing Shanghai Included in power grid  master plan 546 MW over 5 development phases Longer-term potential for building out 1,150 MW
China Wind — Phase 1 Phase 2: 49.5 MW Phases 3-5: 448.5 MW Phase 1: 49 MW 74%  bank 26%  equity Financing Completed Turbines Status Commenced commercial Production Dec. 2009 34 turbines producing  power 30.4 GWh generated by end of Nov. 2009
Phase 1: turbines 56% of all globally installed wind power equipment is manufactured in China   (2007) DW1.0/56  Two-Bladed DT-1500  Doubly Fed 30 4
China Wind — Phase 2 Financing Turbines Status Construction  in progress 24 on order, 9 delivered plus 2 installed  70% bank* 30% equity Phase 2: 49.5 MW Phases 3-5: 448.5 MW Phase 1: 49 MW * awaiting final approval from Bank headquarters
Phase 2: turbines DW1.0/56  Two-Bladed HFDY1500/77  Directly Driven DT-1500  Doubly Fed 6 8 21
Phase 2: project timeline Q2/10 Turbines installation commenced  Construction completed Q3/09 Q1 /10 Debt financing Q1/09 Construction commenced Equity financing Q3/09
China Wind — Phases 3 to 5 Financing (targeted) Turbines Status 299 turbines planned 70% bank 30% equity Phase 3  feasibility  study complete Phase 4 & 5   feasibility  studies  underway Phase 2: 49.5 MW Phases 3-5: 448.5 MW  Phase 1: 49 MW
Phases 3 to 5: project timelines Q2/10 Construction begins Phase 5 ~150MW Phase 4 ~200MW Phase 3 ~100MW Q2/11 Construction begins Q2/12 Construction begins Q4/14 Construction completed Q2/13 Construction completed Q4/11 Construction  completed
Business model: costs and revenues* ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],*  Based on average 49 MW project Total Revenue  Total Project Cost  (including installation) Turbines/towers:  US $53.6M Construction:  US $13.1M Interest:  US $4.1M Other:  US $2.2M Total: US $73.0M
Targeted project economics*  (20 year average)   Capital cost/MW US $1.5 million Levered equity IRR 12-14% *  Based on average 49 MW project Installed capacity 49MW Capacity factor 26.31% Revenue: wind power US $8.5M Revenue: carbon credits US $1.8M Total revenue US $10.4M EBITDA US $8.3M Total profit after tax US $3.2M Annual cash flow to equity US $3.9M
Demand China Exclusivity Du Mon County  Guaranteed Power Purchase Agreement Profitable 12-14%  IRR
http://twitter.com/ChinaWindPower www.ChinaWindPowerInternational.com

Más contenido relacionado

La actualidad más candente

Market Briefing. Turkey. 28th January
Market Briefing. Turkey. 28th JanuaryMarket Briefing. Turkey. 28th January
Market Briefing. Turkey. 28th JanuaryUKTI2014
 
VIETNAM – NO LEGAL INSTRUMENT GUIDING THE DEVELOPMENT OF ROOFTOP SOLAR ENERGY...
VIETNAM – NO LEGAL INSTRUMENT GUIDING THE DEVELOPMENT OF ROOFTOP SOLAR ENERGY...VIETNAM – NO LEGAL INSTRUMENT GUIDING THE DEVELOPMENT OF ROOFTOP SOLAR ENERGY...
VIETNAM – NO LEGAL INSTRUMENT GUIDING THE DEVELOPMENT OF ROOFTOP SOLAR ENERGY...Dr. Oliver Massmann
 
VIETNAM – POWER SECTOR - NEW FEED-IN-TARIFFS FOR WIND ENERGY PROJECTS
VIETNAM – POWER SECTOR  - NEW FEED-IN-TARIFFS FOR WIND ENERGY PROJECTSVIETNAM – POWER SECTOR  - NEW FEED-IN-TARIFFS FOR WIND ENERGY PROJECTS
VIETNAM – POWER SECTOR - NEW FEED-IN-TARIFFS FOR WIND ENERGY PROJECTSDr. Oliver Massmann
 
VIETNAM – MOIT IS REVIEWING NEW FEED IN TARIFFS (FiTs) FOR WIND POWER PROJECTS
VIETNAM – MOIT IS REVIEWING NEW FEED IN TARIFFS (FiTs) FOR WIND POWER PROJECTSVIETNAM – MOIT IS REVIEWING NEW FEED IN TARIFFS (FiTs) FOR WIND POWER PROJECTS
VIETNAM – MOIT IS REVIEWING NEW FEED IN TARIFFS (FiTs) FOR WIND POWER PROJECTSDr. Oliver Massmann
 
Uae nuclear power sector opportunity analysis
Uae nuclear power sector opportunity analysisUae nuclear power sector opportunity analysis
Uae nuclear power sector opportunity analysisRajesh Sarma
 
VIETNAM – NEW PRICING FRAMEWORK FOR SOLAR AND WIND POWER PROJECTS
VIETNAM – NEW PRICING FRAMEWORK FOR SOLAR  AND WIND POWER PROJECTSVIETNAM – NEW PRICING FRAMEWORK FOR SOLAR  AND WIND POWER PROJECTS
VIETNAM – NEW PRICING FRAMEWORK FOR SOLAR AND WIND POWER PROJECTSDr. Oliver Massmann
 
Offshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For DeploymentOffshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For DeploymentGlenn Klith Andersen
 
VIETNAM - DUANE MORRIS ASSISTS CLIENT IN DEVELOPING THE LARGEST INTERTIDAL WI...
VIETNAM - DUANE MORRIS ASSISTS CLIENT IN DEVELOPING THE LARGEST INTERTIDAL WI...VIETNAM - DUANE MORRIS ASSISTS CLIENT IN DEVELOPING THE LARGEST INTERTIDAL WI...
VIETNAM - DUANE MORRIS ASSISTS CLIENT IN DEVELOPING THE LARGEST INTERTIDAL WI...Dr. Oliver Massmann
 
Vietnam - Power Development Master Plan 8 - what you must know:
Vietnam - Power Development Master Plan 8 - what you must know: Vietnam - Power Development Master Plan 8 - what you must know:
Vietnam - Power Development Master Plan 8 - what you must know: Dr. Oliver Massmann
 
VIETNAM - SOLAR POWER FEED IN TARIFFS BREAKING NEWS - FINAL DRAFT DECISION ON...
VIETNAM - SOLAR POWER FEED IN TARIFFS BREAKING NEWS - FINAL DRAFT DECISION ON...VIETNAM - SOLAR POWER FEED IN TARIFFS BREAKING NEWS - FINAL DRAFT DECISION ON...
VIETNAM - SOLAR POWER FEED IN TARIFFS BREAKING NEWS - FINAL DRAFT DECISION ON...Dr. Oliver Massmann
 
VIETNAM - Power Development Planning VIII (“PDP8”) - Vietnam Government’s p...
 VIETNAM - Power Development Planning VIII (“PDP8”)  - Vietnam Government’s p... VIETNAM - Power Development Planning VIII (“PDP8”)  - Vietnam Government’s p...
VIETNAM - Power Development Planning VIII (“PDP8”) - Vietnam Government’s p...Dr. Oliver Massmann
 
VIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOW
VIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOWVIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOW
VIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOWDr. Oliver Massmann
 
VIETNAM – SOLAR POWER - FINAL DRAFT DECISION ON SOLAR POWER FEED-IN-TARIFFS (...
VIETNAM – SOLAR POWER - FINAL DRAFT DECISION ON SOLAR POWER FEED-IN-TARIFFS (...VIETNAM – SOLAR POWER - FINAL DRAFT DECISION ON SOLAR POWER FEED-IN-TARIFFS (...
VIETNAM – SOLAR POWER - FINAL DRAFT DECISION ON SOLAR POWER FEED-IN-TARIFFS (...Dr. Oliver Massmann
 
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...Dr. Oliver Massmann
 
Current status of energy sector in sudan
Current status of energy sector in sudanCurrent status of energy sector in sudan
Current status of energy sector in sudanMohamed Abbas
 
Prospective of large scale wind power in Sudan
Prospective of large scale wind power in SudanProspective of large scale wind power in Sudan
Prospective of large scale wind power in SudanMohammed Khalf Allah
 
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – WHY YOU SHOULD INVEST IN RE...
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – WHY YOU SHOULD INVEST IN RE...LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – WHY YOU SHOULD INVEST IN RE...
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – WHY YOU SHOULD INVEST IN RE...Dr. Oliver Massmann
 
Vietnam Power Sector
Vietnam Power SectorVietnam Power Sector
Vietnam Power SectorHuy Nguyen
 

La actualidad más candente (19)

Market Briefing. Turkey. 28th January
Market Briefing. Turkey. 28th JanuaryMarket Briefing. Turkey. 28th January
Market Briefing. Turkey. 28th January
 
VIETNAM – NO LEGAL INSTRUMENT GUIDING THE DEVELOPMENT OF ROOFTOP SOLAR ENERGY...
VIETNAM – NO LEGAL INSTRUMENT GUIDING THE DEVELOPMENT OF ROOFTOP SOLAR ENERGY...VIETNAM – NO LEGAL INSTRUMENT GUIDING THE DEVELOPMENT OF ROOFTOP SOLAR ENERGY...
VIETNAM – NO LEGAL INSTRUMENT GUIDING THE DEVELOPMENT OF ROOFTOP SOLAR ENERGY...
 
VIETNAM – POWER SECTOR - NEW FEED-IN-TARIFFS FOR WIND ENERGY PROJECTS
VIETNAM – POWER SECTOR  - NEW FEED-IN-TARIFFS FOR WIND ENERGY PROJECTSVIETNAM – POWER SECTOR  - NEW FEED-IN-TARIFFS FOR WIND ENERGY PROJECTS
VIETNAM – POWER SECTOR - NEW FEED-IN-TARIFFS FOR WIND ENERGY PROJECTS
 
VIETNAM – MOIT IS REVIEWING NEW FEED IN TARIFFS (FiTs) FOR WIND POWER PROJECTS
VIETNAM – MOIT IS REVIEWING NEW FEED IN TARIFFS (FiTs) FOR WIND POWER PROJECTSVIETNAM – MOIT IS REVIEWING NEW FEED IN TARIFFS (FiTs) FOR WIND POWER PROJECTS
VIETNAM – MOIT IS REVIEWING NEW FEED IN TARIFFS (FiTs) FOR WIND POWER PROJECTS
 
Uae nuclear power sector opportunity analysis
Uae nuclear power sector opportunity analysisUae nuclear power sector opportunity analysis
Uae nuclear power sector opportunity analysis
 
VIETNAM – NEW PRICING FRAMEWORK FOR SOLAR AND WIND POWER PROJECTS
VIETNAM – NEW PRICING FRAMEWORK FOR SOLAR  AND WIND POWER PROJECTSVIETNAM – NEW PRICING FRAMEWORK FOR SOLAR  AND WIND POWER PROJECTS
VIETNAM – NEW PRICING FRAMEWORK FOR SOLAR AND WIND POWER PROJECTS
 
Offshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For DeploymentOffshore Wind Power Experiences Potential And Key Issues For Deployment
Offshore Wind Power Experiences Potential And Key Issues For Deployment
 
VIETNAM - DUANE MORRIS ASSISTS CLIENT IN DEVELOPING THE LARGEST INTERTIDAL WI...
VIETNAM - DUANE MORRIS ASSISTS CLIENT IN DEVELOPING THE LARGEST INTERTIDAL WI...VIETNAM - DUANE MORRIS ASSISTS CLIENT IN DEVELOPING THE LARGEST INTERTIDAL WI...
VIETNAM - DUANE MORRIS ASSISTS CLIENT IN DEVELOPING THE LARGEST INTERTIDAL WI...
 
Vietnam - Power Development Master Plan 8 - what you must know:
Vietnam - Power Development Master Plan 8 - what you must know: Vietnam - Power Development Master Plan 8 - what you must know:
Vietnam - Power Development Master Plan 8 - what you must know:
 
VIETNAM - SOLAR POWER FEED IN TARIFFS BREAKING NEWS - FINAL DRAFT DECISION ON...
VIETNAM - SOLAR POWER FEED IN TARIFFS BREAKING NEWS - FINAL DRAFT DECISION ON...VIETNAM - SOLAR POWER FEED IN TARIFFS BREAKING NEWS - FINAL DRAFT DECISION ON...
VIETNAM - SOLAR POWER FEED IN TARIFFS BREAKING NEWS - FINAL DRAFT DECISION ON...
 
VIETNAM - Power Development Planning VIII (“PDP8”) - Vietnam Government’s p...
 VIETNAM - Power Development Planning VIII (“PDP8”)  - Vietnam Government’s p... VIETNAM - Power Development Planning VIII (“PDP8”)  - Vietnam Government’s p...
VIETNAM - Power Development Planning VIII (“PDP8”) - Vietnam Government’s p...
 
VIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOW
VIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOWVIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOW
VIETNAM – SOLAR POWER AUCTION SYSTEM: WHAT YOU MUST KNOW
 
VIETNAM – SOLAR POWER - FINAL DRAFT DECISION ON SOLAR POWER FEED-IN-TARIFFS (...
VIETNAM – SOLAR POWER - FINAL DRAFT DECISION ON SOLAR POWER FEED-IN-TARIFFS (...VIETNAM – SOLAR POWER - FINAL DRAFT DECISION ON SOLAR POWER FEED-IN-TARIFFS (...
VIETNAM – SOLAR POWER - FINAL DRAFT DECISION ON SOLAR POWER FEED-IN-TARIFFS (...
 
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
VIETNAM—POWER, ENERGY, AND THE AFFECT OF RECENT TRADE AGREEMENTS EU VIETNAM F...
 
Current status of energy sector in sudan
Current status of energy sector in sudanCurrent status of energy sector in sudan
Current status of energy sector in sudan
 
Prospective of large scale wind power in Sudan
Prospective of large scale wind power in SudanProspective of large scale wind power in Sudan
Prospective of large scale wind power in Sudan
 
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – WHY YOU SHOULD INVEST IN RE...
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – WHY YOU SHOULD INVEST IN RE...LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – WHY YOU SHOULD INVEST IN RE...
LAWYER IN VIETNAM DR. OLIVER MASSMANN - VIETNAM – WHY YOU SHOULD INVEST IN RE...
 
Vietnam Power Sector
Vietnam Power SectorVietnam Power Sector
Vietnam Power Sector
 
Presentation1
Presentation1Presentation1
Presentation1
 

Destacado

Scentsy challenge
Scentsy  challengeScentsy  challenge
Scentsy challengeJim Pappas
 
Economic Times June 28 (2nd Article), 2009
Economic Times June 28 (2nd Article), 2009Economic Times June 28 (2nd Article), 2009
Economic Times June 28 (2nd Article), 2009Jagannadham Thunuguntla
 
O astronauta brasileiro e o “Regresso das Estrelas”: mito e política científi...
O astronauta brasileiro e o “Regresso das Estrelas”: mito e política científi...O astronauta brasileiro e o “Regresso das Estrelas”: mito e política científi...
O astronauta brasileiro e o “Regresso das Estrelas”: mito e política científi...Marcelo Sabbatini
 
Palestra V simSIS - Inovação na universidade, é possível?
Palestra V simSIS - Inovação na universidade, é possível?Palestra V simSIS - Inovação na universidade, é possível?
Palestra V simSIS - Inovação na universidade, é possível?Crescencio Rodrigues Lima Neto
 
Fronteiras teórico-pedagógicas da educação a distância (EaD): entre paradoxos...
Fronteiras teórico-pedagógicas da educação a distância (EaD): entre paradoxos...Fronteiras teórico-pedagógicas da educação a distância (EaD): entre paradoxos...
Fronteiras teórico-pedagógicas da educação a distância (EaD): entre paradoxos...Marcelo Sabbatini
 
Ifasedomodernismo1922 1930-140627182727-phpapp02
Ifasedomodernismo1922 1930-140627182727-phpapp02Ifasedomodernismo1922 1930-140627182727-phpapp02
Ifasedomodernismo1922 1930-140627182727-phpapp02E.E. Mario Martins Pereira
 
Carta Profesional
Carta ProfesionalCarta Profesional
Carta ProfesionalRox Zamora
 
Biologics World Taiwan 2016 (email me at justin.dejesus@imapac.com)
Biologics World Taiwan 2016 (email me at justin.dejesus@imapac.com) Biologics World Taiwan 2016 (email me at justin.dejesus@imapac.com)
Biologics World Taiwan 2016 (email me at justin.dejesus@imapac.com) Justin Barin de Jesus
 
Aprendendo a Construir jogos com o Construct 2
Aprendendo a Construir jogos com o Construct 2 Aprendendo a Construir jogos com o Construct 2
Aprendendo a Construir jogos com o Construct 2 Diogo Padilha
 
Aula01 - introdução, Activity
Aula01 - introdução,  ActivityAula01 - introdução,  Activity
Aula01 - introdução, ActivityArthur Emanuel
 
Design Procedure of Tabletop Foundations for Vibrating Machines
Design Procedure of Tabletop Foundations for Vibrating MachinesDesign Procedure of Tabletop Foundations for Vibrating Machines
Design Procedure of Tabletop Foundations for Vibrating MachinesKee H. Lee, P.Eng.
 
MOOC for Public Health Physicians: Innovative Method in Ensuring Continuous C...
MOOC for Public Health Physicians: Innovative Method in Ensuring Continuous C...MOOC for Public Health Physicians: Innovative Method in Ensuring Continuous C...
MOOC for Public Health Physicians: Innovative Method in Ensuring Continuous C...Azmi Mohd Tamil
 
TDC2016SP - Trilha Microservices
TDC2016SP - Trilha MicroservicesTDC2016SP - Trilha Microservices
TDC2016SP - Trilha Microservicestdc-globalcode
 
Componentes internos y externos del computador
Componentes internos y externos del computadorComponentes internos y externos del computador
Componentes internos y externos del computadorDiego Javela
 
SXSW Cultures of Advocacy
SXSW Cultures of AdvocacySXSW Cultures of Advocacy
SXSW Cultures of AdvocacyGSD&M
 

Destacado (17)

Scentsy challenge
Scentsy  challengeScentsy  challenge
Scentsy challenge
 
Economic Times June 28 (2nd Article), 2009
Economic Times June 28 (2nd Article), 2009Economic Times June 28 (2nd Article), 2009
Economic Times June 28 (2nd Article), 2009
 
O astronauta brasileiro e o “Regresso das Estrelas”: mito e política científi...
O astronauta brasileiro e o “Regresso das Estrelas”: mito e política científi...O astronauta brasileiro e o “Regresso das Estrelas”: mito e política científi...
O astronauta brasileiro e o “Regresso das Estrelas”: mito e política científi...
 
1
11
1
 
Palestra V simSIS - Inovação na universidade, é possível?
Palestra V simSIS - Inovação na universidade, é possível?Palestra V simSIS - Inovação na universidade, é possível?
Palestra V simSIS - Inovação na universidade, é possível?
 
Fronteiras teórico-pedagógicas da educação a distância (EaD): entre paradoxos...
Fronteiras teórico-pedagógicas da educação a distância (EaD): entre paradoxos...Fronteiras teórico-pedagógicas da educação a distância (EaD): entre paradoxos...
Fronteiras teórico-pedagógicas da educação a distância (EaD): entre paradoxos...
 
Ifasedomodernismo1922 1930-140627182727-phpapp02
Ifasedomodernismo1922 1930-140627182727-phpapp02Ifasedomodernismo1922 1930-140627182727-phpapp02
Ifasedomodernismo1922 1930-140627182727-phpapp02
 
Carta Profesional
Carta ProfesionalCarta Profesional
Carta Profesional
 
Blessed
BlessedBlessed
Blessed
 
Biologics World Taiwan 2016 (email me at justin.dejesus@imapac.com)
Biologics World Taiwan 2016 (email me at justin.dejesus@imapac.com) Biologics World Taiwan 2016 (email me at justin.dejesus@imapac.com)
Biologics World Taiwan 2016 (email me at justin.dejesus@imapac.com)
 
Aprendendo a Construir jogos com o Construct 2
Aprendendo a Construir jogos com o Construct 2 Aprendendo a Construir jogos com o Construct 2
Aprendendo a Construir jogos com o Construct 2
 
Aula01 - introdução, Activity
Aula01 - introdução,  ActivityAula01 - introdução,  Activity
Aula01 - introdução, Activity
 
Design Procedure of Tabletop Foundations for Vibrating Machines
Design Procedure of Tabletop Foundations for Vibrating MachinesDesign Procedure of Tabletop Foundations for Vibrating Machines
Design Procedure of Tabletop Foundations for Vibrating Machines
 
MOOC for Public Health Physicians: Innovative Method in Ensuring Continuous C...
MOOC for Public Health Physicians: Innovative Method in Ensuring Continuous C...MOOC for Public Health Physicians: Innovative Method in Ensuring Continuous C...
MOOC for Public Health Physicians: Innovative Method in Ensuring Continuous C...
 
TDC2016SP - Trilha Microservices
TDC2016SP - Trilha MicroservicesTDC2016SP - Trilha Microservices
TDC2016SP - Trilha Microservices
 
Componentes internos y externos del computador
Componentes internos y externos del computadorComponentes internos y externos del computador
Componentes internos y externos del computador
 
SXSW Cultures of Advocacy
SXSW Cultures of AdvocacySXSW Cultures of Advocacy
SXSW Cultures of Advocacy
 

Similar a China Wind Investor Presentation - January 2010

Investor Presentation - September 2010
Investor Presentation - September 2010Investor Presentation - September 2010
Investor Presentation - September 2010ChinaWind
 
Birendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBirendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBanaDurga
 
Enron sutton bridge power projec 2
Enron sutton bridge power projec 2Enron sutton bridge power projec 2
Enron sutton bridge power projec 2maureenceniza
 
Vietnam - Investing in Wind Energy - The Guide
Vietnam - Investing in Wind Energy - The GuideVietnam - Investing in Wind Energy - The Guide
Vietnam - Investing in Wind Energy - The GuideDr. Oliver Massmann
 
Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8 Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8 Dr. Oliver Massmann
 
2017 Outlook for Vietnam Renewable Energy
2017 Outlook for Vietnam Renewable Energy2017 Outlook for Vietnam Renewable Energy
2017 Outlook for Vietnam Renewable EnergyHoang Le Hang
 
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"seleven
 
China Clean Energy Industry Report, 2009 2010
China Clean Energy Industry Report, 2009 2010China Clean Energy Industry Report, 2009 2010
China Clean Energy Industry Report, 2009 2010ResearchInChina
 
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...Dr. Oliver Massmann
 
Enron Sutton Bridge Power Project
Enron Sutton Bridge Power ProjectEnron Sutton Bridge Power Project
Enron Sutton Bridge Power Projecthyperactive010
 
Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8 Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8 Dr. Oliver Massmann
 
2010 deep research report on china pv power station
2010 deep research report on china pv power station2010 deep research report on china pv power station
2010 deep research report on china pv power stationqyresearch
 
2010 deep research report on china pv power station
2010 deep research report on china pv power station2010 deep research report on china pv power station
2010 deep research report on china pv power stationqyresearch
 
Vietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsVietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsDr. Oliver Massmann
 
Vietnam – Green Growth – 2015
Vietnam – Green Growth – 2015Vietnam – Green Growth – 2015
Vietnam – Green Growth – 2015Dr. Oliver Massmann
 
Wind power in pakistan by tahir
Wind power in pakistan by tahirWind power in pakistan by tahir
Wind power in pakistan by tahirfauzia samreen
 

Similar a China Wind Investor Presentation - January 2010 (20)

China Wind Power - Fall 2011
China Wind Power - Fall 2011China Wind Power - Fall 2011
China Wind Power - Fall 2011
 
Investor Presentation - September 2010
Investor Presentation - September 2010Investor Presentation - September 2010
Investor Presentation - September 2010
 
China Wind Power Investor Presentation September 2010
China Wind Power Investor Presentation September 2010China Wind Power Investor Presentation September 2010
China Wind Power Investor Presentation September 2010
 
영문=10mw. fiji
영문=10mw. fiji영문=10mw. fiji
영문=10mw. fiji
 
Birendra Behuria ppt.pptx
Birendra Behuria ppt.pptxBirendra Behuria ppt.pptx
Birendra Behuria ppt.pptx
 
Enron sutton bridge power projec 2
Enron sutton bridge power projec 2Enron sutton bridge power projec 2
Enron sutton bridge power projec 2
 
Vietnam - Investing in Wind Energy - The Guide
Vietnam - Investing in Wind Energy - The GuideVietnam - Investing in Wind Energy - The Guide
Vietnam - Investing in Wind Energy - The Guide
 
PSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptxPSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptx
 
Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8 Omass - Decarbonization - PDP 8
Omass - Decarbonization - PDP 8
 
2017 Outlook for Vietnam Renewable Energy
2017 Outlook for Vietnam Renewable Energy2017 Outlook for Vietnam Renewable Energy
2017 Outlook for Vietnam Renewable Energy
 
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
TÜV Rheinland "Solar Investment Risk Mitigation Workshop"
 
China Clean Energy Industry Report, 2009 2010
China Clean Energy Industry Report, 2009 2010China Clean Energy Industry Report, 2009 2010
China Clean Energy Industry Report, 2009 2010
 
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
Vietnam Power and Energy Future with Power Development Plan 8 - Getting deals...
 
Enron Sutton Bridge Power Project
Enron Sutton Bridge Power ProjectEnron Sutton Bridge Power Project
Enron Sutton Bridge Power Project
 
Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8 Omass - Vietnam Energy Future - PDP 8
Omass - Vietnam Energy Future - PDP 8
 
2010 deep research report on china pv power station
2010 deep research report on china pv power station2010 deep research report on china pv power station
2010 deep research report on china pv power station
 
2010 deep research report on china pv power station
2010 deep research report on china pv power station2010 deep research report on china pv power station
2010 deep research report on china pv power station
 
Vietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key HighlightsVietnam's Plan for Implementation of PDP8 – Key Highlights
Vietnam's Plan for Implementation of PDP8 – Key Highlights
 
Vietnam – Green Growth – 2015
Vietnam – Green Growth – 2015Vietnam – Green Growth – 2015
Vietnam – Green Growth – 2015
 
Wind power in pakistan by tahir
Wind power in pakistan by tahirWind power in pakistan by tahir
Wind power in pakistan by tahir
 

Más de TMX Equicom

Forsys Metals IR Presentation
Forsys Metals IR Presentation Forsys Metals IR Presentation
Forsys Metals IR Presentation TMX Equicom
 
Forsys Investor Presentation October 2013
Forsys Investor Presentation   October 2013Forsys Investor Presentation   October 2013
Forsys Investor Presentation October 2013TMX Equicom
 
[WEBINAR] Accessing the U.S. Retail Audience: A 'Blue Sky' Opportunity
[WEBINAR] Accessing the U.S. Retail Audience: A 'Blue Sky' Opportunity [WEBINAR] Accessing the U.S. Retail Audience: A 'Blue Sky' Opportunity
[WEBINAR] Accessing the U.S. Retail Audience: A 'Blue Sky' Opportunity TMX Equicom
 
Crawl Walk Run -- a guide to social media for public companies
Crawl Walk Run -- a guide to social media for public companiesCrawl Walk Run -- a guide to social media for public companies
Crawl Walk Run -- a guide to social media for public companiesTMX Equicom
 
Rio Verde Minerals - Investor Presentation
Rio Verde Minerals - Investor Presentation Rio Verde Minerals - Investor Presentation
Rio Verde Minerals - Investor Presentation TMX Equicom
 
Liberty mines investor presentation march 2012 final
Liberty mines investor presentation march 2012 finalLiberty mines investor presentation march 2012 final
Liberty mines investor presentation march 2012 finalTMX Equicom
 
Maximizing your PDAC Experience
Maximizing your PDAC ExperienceMaximizing your PDAC Experience
Maximizing your PDAC ExperienceTMX Equicom
 
Social Media: Why Bother?
Social Media: Why Bother?Social Media: Why Bother?
Social Media: Why Bother?TMX Equicom
 
Reaching Retail Investors with Waggle, the TSX's new social network
Reaching Retail Investors with Waggle, the TSX's new social networkReaching Retail Investors with Waggle, the TSX's new social network
Reaching Retail Investors with Waggle, the TSX's new social networkTMX Equicom
 
The Changing Expectations of the IR Web Audience
The Changing Expectations of the IR Web AudienceThe Changing Expectations of the IR Web Audience
The Changing Expectations of the IR Web AudienceTMX Equicom
 
Maximizing the Value of Your Annual Report
Maximizing the Value of Your Annual ReportMaximizing the Value of Your Annual Report
Maximizing the Value of Your Annual ReportTMX Equicom
 
Red Crescent Resources investor presentation may 2011
Red Crescent Resources investor presentation may 2011Red Crescent Resources investor presentation may 2011
Red Crescent Resources investor presentation may 2011TMX Equicom
 
Frontier rare earths investor presentation june 2011
Frontier rare earths investor presentation june 2011Frontier rare earths investor presentation june 2011
Frontier rare earths investor presentation june 2011TMX Equicom
 
Reaching the Retail Investor
Reaching the Retail InvestorReaching the Retail Investor
Reaching the Retail InvestorTMX Equicom
 
TMX Equicom Corporate Presentation
TMX Equicom Corporate PresentationTMX Equicom Corporate Presentation
TMX Equicom Corporate PresentationTMX Equicom
 
Will PowerPoint for Food
Will PowerPoint for FoodWill PowerPoint for Food
Will PowerPoint for FoodTMX Equicom
 
IPO Communications
IPO CommunicationsIPO Communications
IPO CommunicationsTMX Equicom
 
Getting Started with Social Media
Getting Started with Social MediaGetting Started with Social Media
Getting Started with Social MediaTMX Equicom
 
Building U.S. Exposure
Building U.S. ExposureBuilding U.S. Exposure
Building U.S. ExposureTMX Equicom
 
U.S. Silver Investor Presentation March 2011
U.S. Silver Investor Presentation March 2011U.S. Silver Investor Presentation March 2011
U.S. Silver Investor Presentation March 2011TMX Equicom
 

Más de TMX Equicom (20)

Forsys Metals IR Presentation
Forsys Metals IR Presentation Forsys Metals IR Presentation
Forsys Metals IR Presentation
 
Forsys Investor Presentation October 2013
Forsys Investor Presentation   October 2013Forsys Investor Presentation   October 2013
Forsys Investor Presentation October 2013
 
[WEBINAR] Accessing the U.S. Retail Audience: A 'Blue Sky' Opportunity
[WEBINAR] Accessing the U.S. Retail Audience: A 'Blue Sky' Opportunity [WEBINAR] Accessing the U.S. Retail Audience: A 'Blue Sky' Opportunity
[WEBINAR] Accessing the U.S. Retail Audience: A 'Blue Sky' Opportunity
 
Crawl Walk Run -- a guide to social media for public companies
Crawl Walk Run -- a guide to social media for public companiesCrawl Walk Run -- a guide to social media for public companies
Crawl Walk Run -- a guide to social media for public companies
 
Rio Verde Minerals - Investor Presentation
Rio Verde Minerals - Investor Presentation Rio Verde Minerals - Investor Presentation
Rio Verde Minerals - Investor Presentation
 
Liberty mines investor presentation march 2012 final
Liberty mines investor presentation march 2012 finalLiberty mines investor presentation march 2012 final
Liberty mines investor presentation march 2012 final
 
Maximizing your PDAC Experience
Maximizing your PDAC ExperienceMaximizing your PDAC Experience
Maximizing your PDAC Experience
 
Social Media: Why Bother?
Social Media: Why Bother?Social Media: Why Bother?
Social Media: Why Bother?
 
Reaching Retail Investors with Waggle, the TSX's new social network
Reaching Retail Investors with Waggle, the TSX's new social networkReaching Retail Investors with Waggle, the TSX's new social network
Reaching Retail Investors with Waggle, the TSX's new social network
 
The Changing Expectations of the IR Web Audience
The Changing Expectations of the IR Web AudienceThe Changing Expectations of the IR Web Audience
The Changing Expectations of the IR Web Audience
 
Maximizing the Value of Your Annual Report
Maximizing the Value of Your Annual ReportMaximizing the Value of Your Annual Report
Maximizing the Value of Your Annual Report
 
Red Crescent Resources investor presentation may 2011
Red Crescent Resources investor presentation may 2011Red Crescent Resources investor presentation may 2011
Red Crescent Resources investor presentation may 2011
 
Frontier rare earths investor presentation june 2011
Frontier rare earths investor presentation june 2011Frontier rare earths investor presentation june 2011
Frontier rare earths investor presentation june 2011
 
Reaching the Retail Investor
Reaching the Retail InvestorReaching the Retail Investor
Reaching the Retail Investor
 
TMX Equicom Corporate Presentation
TMX Equicom Corporate PresentationTMX Equicom Corporate Presentation
TMX Equicom Corporate Presentation
 
Will PowerPoint for Food
Will PowerPoint for FoodWill PowerPoint for Food
Will PowerPoint for Food
 
IPO Communications
IPO CommunicationsIPO Communications
IPO Communications
 
Getting Started with Social Media
Getting Started with Social MediaGetting Started with Social Media
Getting Started with Social Media
 
Building U.S. Exposure
Building U.S. ExposureBuilding U.S. Exposure
Building U.S. Exposure
 
U.S. Silver Investor Presentation March 2011
U.S. Silver Investor Presentation March 2011U.S. Silver Investor Presentation March 2011
U.S. Silver Investor Presentation March 2011
 

Último

Teekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings ResultsTeekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings ResultsTeekay Corporation
 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfProbe Gold
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationPaul West-Sells
 
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024Osisko Gold Royalties Ltd
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024Kweku Zurek
 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024gstubel
 
Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024KDDI
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationLeonardo
 
Teekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Ltd
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCAMILRI
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna SpA
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCAMILRI
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024nicola_mining
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsTILDEN
 
Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Philip Rabenok
 
Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024TeckResourcesLtd
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024CollectiveMining1
 

Último (20)

Teekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings ResultsTeekay Corporation Q1-24 Earnings Results
Teekay Corporation Q1-24 Earnings Results
 
Corporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdfCorporate Presentation Probe Canaccord Conference 2024.pdf
Corporate Presentation Probe Canaccord Conference 2024.pdf
 
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdfITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
ITAU EQUITY_STRATEGY_WARM_UP_20240505 DHG.pdf
 
Western Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 PresentationWestern Copper and Gold - May 2024 Presentation
Western Copper and Gold - May 2024 Presentation
 
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
Osisko Gold Royalties Ltd - Corporate Presentation, May 2024
 
countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024countries with the highest gold reserves in 2024
countries with the highest gold reserves in 2024
 
Osisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 ResultsOsisko Gold Royalties Ltd - Q1 2024 Results
Osisko Gold Royalties Ltd - Q1 2024 Results
 
AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024AMG Quarterly Investor Presentation May 2024
AMG Quarterly Investor Presentation May 2024
 
Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024Financial Results for the Fiscal Year Ended March 2024
Financial Results for the Fiscal Year Ended March 2024
 
The Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results PresentationThe Leonardo 1Q 2024 Results Presentation
The Leonardo 1Q 2024 Results Presentation
 
Teekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings PresentationTeekay Tankers Q1-24 Earnings Presentation
Teekay Tankers Q1-24 Earnings Presentation
 
SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024SME IPO Opportunity and Trends of May 2024
SME IPO Opportunity and Trends of May 2024
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdf
 
Terna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results PresentationTerna - 1Q 2024 Consolidated Results Presentation
Terna - 1Q 2024 Consolidated Results Presentation
 
Camil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdfCamil Institutional Presentation_Mai24.pdf
Camil Institutional Presentation_Mai24.pdf
 
Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024Nicola Mining Inc. Corporate Presentation May 2024
Nicola Mining Inc. Corporate Presentation May 2024
 
Diligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage StartupsDiligence Checklist for Early Stage Startups
Diligence Checklist for Early Stage Startups
 
Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024Osisko Development - Investor Presentation - May 2024
Osisko Development - Investor Presentation - May 2024
 
Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024Teck Supplemental Information, May 2, 2024
Teck Supplemental Information, May 2, 2024
 
Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024Collective Mining | Corporate Presentation - May 2024
Collective Mining | Corporate Presentation - May 2024
 

China Wind Investor Presentation - January 2010

  • 1. Investor Presentation January 2010
  • 2.
  • 3. About China Wind Power International Corp. China Wind is uniquely positioned to capitalize on the growing demand for wind energy in China China Wind is uniquely positioned to capitalize on the growing demand for wind energy in China
  • 4. Demand China Exclusivity Du Mon County Guaranteed Power Purchase Agreement Profitable 12-14% IRR
  • 5. Source: IEA Rapid industrialization Looming energy shortage Facing one of the world's biggest environmental crisis China overview
  • 6. China’s commitment to wind power 2008 12.2 GW 2010 30 GW 2020 100 GW of all power from renewable sources by 2020 st tomorrow 1 4 th today
  • 7.
  • 8. Our current focus: Heilongjiang P rovince Exclusive rights to Wind Power Generation Du Mon County Beijing Shanghai Heilonjoang Province Population: ~38 million Annual electricity use by 2010*: * forecast 74 million MWh
  • 9.
  • 10. Our portfolio Beijing Shanghai Included in power grid master plan 546 MW over 5 development phases Longer-term potential for building out 1,150 MW
  • 11. China Wind — Phase 1 Phase 2: 49.5 MW Phases 3-5: 448.5 MW Phase 1: 49 MW 74% bank 26% equity Financing Completed Turbines Status Commenced commercial Production Dec. 2009 34 turbines producing power 30.4 GWh generated by end of Nov. 2009
  • 12. Phase 1: turbines 56% of all globally installed wind power equipment is manufactured in China (2007) DW1.0/56 Two-Bladed DT-1500 Doubly Fed 30 4
  • 13. China Wind — Phase 2 Financing Turbines Status Construction in progress 24 on order, 9 delivered plus 2 installed 70% bank* 30% equity Phase 2: 49.5 MW Phases 3-5: 448.5 MW Phase 1: 49 MW * awaiting final approval from Bank headquarters
  • 14. Phase 2: turbines DW1.0/56 Two-Bladed HFDY1500/77 Directly Driven DT-1500 Doubly Fed 6 8 21
  • 15. Phase 2: project timeline Q2/10 Turbines installation commenced Construction completed Q3/09 Q1 /10 Debt financing Q1/09 Construction commenced Equity financing Q3/09
  • 16. China Wind — Phases 3 to 5 Financing (targeted) Turbines Status 299 turbines planned 70% bank 30% equity Phase 3 feasibility study complete Phase 4 & 5 feasibility studies underway Phase 2: 49.5 MW Phases 3-5: 448.5 MW Phase 1: 49 MW
  • 17. Phases 3 to 5: project timelines Q2/10 Construction begins Phase 5 ~150MW Phase 4 ~200MW Phase 3 ~100MW Q2/11 Construction begins Q2/12 Construction begins Q4/14 Construction completed Q2/13 Construction completed Q4/11 Construction completed
  • 18.
  • 19. Targeted project economics* (20 year average) Capital cost/MW US $1.5 million Levered equity IRR 12-14% * Based on average 49 MW project Installed capacity 49MW Capacity factor 26.31% Revenue: wind power US $8.5M Revenue: carbon credits US $1.8M Total revenue US $10.4M EBITDA US $8.3M Total profit after tax US $3.2M Annual cash flow to equity US $3.9M
  • 20. Demand China Exclusivity Du Mon County Guaranteed Power Purchase Agreement Profitable 12-14% IRR

Notas del editor

  1. Before we begin with the presentation, I would like to draw your attention to the disclaimer with regards to forward-looking statements. [Pause]
  2. … which we believe is a tremendous opportunity for Canadian investors for the following four main reasons: First, we are uniquely positioned to capitalize on the explosive demand for wind power in China; Second, we have the exclusive rights for wind energy development in Du Mon County; which as I will show you later, is a very favorable location for wind power generation; Third, the law guarantees our sale of wind energy to the power grid – which is important given our pipeline and potential 860 MW capacity – and we already have a 20-year Power Purchase Agreement in place; and, Fourth, we expect to be profitable as a result of the competitive terms on (1) our turbines , (2) bank facility , (3) power purchase agreement with the Chinese grid and (4) forward sale of green credits to Goldman Sachs . So let me start by talking about demand for wind energy in China.
  3. T he Chinese government has recently indicated they are targeting GDP growth of 8% this year, one of the fastest growing economies in the world . As China continues its rapid economic growth, energy consumption and pollution will increase . By 2030, electricity consumption is expected to grow almost fourfold. Everybody knows China has very severe pollution problem because currently 80% of China’s electricity supply comes from coal . China ranks as the world&apos;s secound largest emitter of greenhouse gases.
  4. Therefore, Government officials recently characterized the move to wind power as “ vital ” and announced a 14.6 billion US Dollars investment to increase wind power capacity to 30 GW by 2010 . Today, China’s installed wind capacity is the fourth largest in the world. By 2020 , the country is projected to have 100GW , making China No. 1 in the world. The sale of our wind energy to the power grid is guaranteed . This is because the country’s target to have 15% of all power to be derived from renewable sources by 2020 is not just a goal …
  5. … it’s the law . China passed the Renewable Energy Law in 2005, and the law went into effect in January 2006. This law requires power grid companies to buy all output of local registered renewable energy producers. The implication for us, China Wind Power International is – if we make it , the grid company, in our case that is Heilongjiang Provincial Power Grid must buy it .
  6. Our current focus is on Heilongjiang Province, which is the nation’s traditional industry base for a number of industries. We have the exclusive rights to develop wind energy in Du Mon County in the province. Du Mon County is a west suburb of Daqing City. Daqing has the fourth largest oil field in the world and accounts for one fifth of China’s oil production.
  7. The on-grid tariff in Heilongjiang Province is higher than that of most other provinces in China. Du Mon County is a favorable location with great potential for wind energy development. Our wind farms are located on open land that receives an abundance of sunshine and wind. The wind is strong and the speed is 6.9 to 7.5 meters per second at a height of 70 meters, the height of our 1.5 MW turbine’s tower. The sites are on flat, solid ground that is easy to construct and easy to access through cement roads connecting to the highway. Also important, we are less than 2 kilometers from the power grid.
  8. We conducted wind assessment studies in Du Mon County starting in 2005, and the studies demonstrated that the potential installed capacity for wind energy development is 860MW over an area of 220 square kilometers. Our current plan is to build out eight wind farms representing 546 MW over five phases . These wind farms are already included in the Power Grid Master Plan of Daqing City , which means we do not have any foreseeable barriers to hook up to the grid in the future
  9. Wind Farm #1 is already up and running. The 49 MW farm is over 50% completed . At the present time, we have installed 23 turbines out of 36 planned to install, among which 18 turbines are already producing power during trial production. We signed 20-year Power Purchase Agreement and the Grid Connection and Dispatching Agreements with the power grid. We signed an Emissions Reduction Purchase Agreement or ERPA with Goldman Sachs to sell all the Certified Emission Reduction or CERs generated from Wind Farm #1to them. Wind farm #1 is fully financed, with 74% of funds coming from bank loans and the other 26% being equity investment. The interest rate is 5.94%.
  10. For Wind Farm #1, we purchased 36 turbines from local manufacturers in China at a competitive price . Using local suppliers also provide the convenience for maintenance and services . To give you an indication of the size of the Chinese turbine manufacturing industry –- In 2007, 56% of all globally installed wind power equipment was manufactured in China, and more and more wind power equipment manufacturers are moving to China.
  11. Let’s now look at the P hase 2, which we raising money for. Phase 2 will use 33 1.5 MW turbines, totaling 49.5 MW, the same as those used in Wind Farm #1, same manufacturer, same terms and conditions. The average unit price for the turbines will be 852 US Dollars per kW, which is a very competitive price We have already received some of the 33 turbines on order. The total investment for Wind Farm #2 is projected to be approximately 76 million US Dollars, again, which will be financed 70% by bank loan.
  12. For Wind Farm #1, we purchased 36 turbines from local manufacturers in China at a competitive price . Using local suppliers also provide the convenience for maintenance and services . To give you an indication of the size of the Chinese turbine manufacturing industry –- In 2007, 56% of all globally installed wind power equipment was manufactured in China, and more and more wind power equipment manufacturers are moving to China.
  13. The foundation construction for Phase 2 started in February. Turbine installation will begin in the third quarter and We expect to finish Phase 2 by the end of this year.
  14. Beyond Phase 2, our growth plan over the next five years will capitalize on the continued, explosive growth of Chinese renewable energy industry . We have plans for Phases 3, 4 and 5 to build out an additional 448.5 MW. We have submitted the application for Phase 3 for government approval and the feasibility studies for Phases 4 and 5 are already underway. For the future wind projects, we will be targeting project financing consisting of about 70% bank loans and 30% equity investment.
  15. We will continue to grow by project increments of up to 50MW for each wind farm. This is our plan for Phase 3, 4, and 5.
  16. Let’s take a look on a breakdown of project costs for Wind Farm #1, on your left side. The total project costs are 73 million US Dollars. On the revenue side, Wind Farm #1 is expected to generate over 110 thousand MW hours per year . We are selling the power at the price of 89 Dollars per megawatt hour. The power price was set by the government. Under our ERPA with Goldman Sachs, , the carbon credit price per ton of carbon dioxide is 14.81 US Dollars . Wind Farm #1 is expected to generate over 124 thousand tons of CERs every year, that translates to 1.8 million US Dollars profit per year, that is net profit .
  17. Wind Farm #1’s capacity factor is rated at 26% based on the wind resources and the types of turbines we used, which the research firm of China Meteorological Administration estimated conservatively after applying a 30% discount. Based on these figures, the annual revenue for Wind Farm #1 is projected to be approximately 10.4 million US Dollars , and EBITDA is projected to be approximately 8.3 million US Dollars . Future wind farm projects are expected to have approximately the same pro forma financials .
  18. Before turning the presentation over to GMP, I would like to recap our investment highlights. First, the Chinese government has required that renewable energy must fulfill 15% of China&apos;s increasing energy consumption by 2020. This will translate to incredible growth in demand for wind energy, which we are well-positioned to capitalize on ; Second, we have the exclusive rights to a favorable location for wind energy development – which is important given our pipeline and potential 860 MW capacity; Third, we are guaranteed that our wind energy will be purchased and we already have a Power Purchase Agreement in place for our first wind farm; and Finally, we are confident that we will be profitable as a result of the competitive terms on (1) our turbines , (2) bank facility , (3) power purchase agreement with the Chinese grid and (4) forward sale of green credits to Goldman Sachs . Now I would like to turn the presentation over to GMP to review the transaction. After that, Wendell and I will answer any questions you may have. Thank you very much.