xãá xààxÜ
 
 
HS&E Performance of any Construction Industry is
measured against the completion of project without
any major incident.
Construction industry is considered as one of the most
dangerous trade due to mixture of multiple activities.
Thousands of people lost their lives or suffered from
disabilities annually, which contribute drastic impact on
financial and social health.
Adopting high standards of HSE and keeping extra measures
against the precarious activities during the enormous
construction works, resulted in achieving more than 200
Injury Free Days and 1 Million Man-hours without LTI.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
     
 
     
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
g|àÄxá ctzx 6
Management Remarks 2
HSE Statistics 3
Triumphs & Mileposts 4 & 5
Campaigns 6
Global Instances 7 & 8
Team Building Activities 9
Project Progress 10
Ongoing Challenges 11
Table Of Content
 MUNIR AHMED KHAN 
Sr. Construction Manager 
Health Safety & Environment is a first priority and
Core value of any organization which upholds
National / International Contour in construction
Business.
HSE performance can never be achieved in any industry until
and unless we do not train & educate our employees, holding
them accountable / responsible on HSE performance &
appreciation on best HSE performance.
We have implemented high standard of HSE on UZ750
Project in order to Establish Safe Work Practices, Enforce
Safety Rules and Regulation, Training & Education of the
employees to avoid hazards, allocating & implementing
Safety Accountabilities & Responsibilities, Setting HSE
Performance Objectives and appreciating the best HSE
Performances. More than 200 Injury Free Days and 1 Million
Man-hour without LTI are our pride of performances so far.
 SALAH HASSAN MOUSA ALSHAYBAT
Site Manager 
IIF - Incident & Injury Free
HSE - Health Safety & Environment
TBT - Tool Box Talk
TI - Task Instruction
HTV - Heavy Traffic Vehicles
WWF - World Wild Fund
LTI - Lost Time Injury
TRIR - Total Recordable Incident Rate
PTD - Project to Date
ZADCO- Zakum Development Company Co. Ltd.
PED - Petrofac Emirates & Daewoo
Shipbuilding and Marine Engineering Co. Ltd.
 
Abriviations
 
VÄÉáx XÇvÉâÇàxÜá
SUPPORTED BY: - IJAZ AHMED
Site HSE Lead, North Island
FAHAD MEHMOOD
Site HSE Lead, Central Island
MUHAMMAD SHAOIB AZEEM
Site HSE Lead, South Island
FAHEEM AHMED
Site Construction Lead, North Island
RASHID IQBAL
Site Construction Lead, South Island
JAVAID IQBAL
Site Construction Lead, Central Island
COMPILED BY: - FAROOQ LIAQAT
HSE Manager, UZ-750 Project
EDITIED BY: - KAAB RAZA QAZI
Training & Incident Coordinator (C. I.)
REVIEWED BY: - SYED ABDUL MOEED 
UAE Business Construction Head
SALAH HASSAN MOUSA ALSHAYBAT 
Site Manager, UZ-750 Project
MUNIR AHMED KHAN 
Sr. Construction Manager, UZ-750 Project
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
31 ‐ 35
50%
36 ‐ 40
25%
41 ‐ 45
12%
51 ‐ 55
13%
No. of incidents Per Age
31 ‐ 35
36 ‐ 40
41 ‐ 45
51 ‐ 55
FR ON TLINE  
SUPER V IS OR
P IPE   F I T T E R  /  
F A B RI CA T O R
DR I V E R O P E R A T O R
1
2
1
4
NO. OF INCIDENT PER CRAFT
0 0.05 0.1 0.15
YEAR 2015
YEAR 2016
SET TARGET FOR PROJECT TRIR
SET TARGET FOR DESCON TRIR
0
0
0.125
0.05
Total Recordable Injury Rates (TRIR)
 So far on the project, we do not have any recordable injury. 
Year 2015 Year 2016
17285
14092
TRAINING MAN‐HOURS (YEAR WISE)
0
200000
400000
600000
800000
1000000
1200000
1400000
PTD Man‐Hours PTD LTI Free
Man‐Hours
1301140 1301140
PROJECT MAN‐HOURS
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Incident Injury Free (IIF) is a day when an individual works without causing any 
injury to himself, his co‐worker and reports any recordable incident. 
DESCON has achieved more than 200 IIF days on each island which shows the entire 
commitment of its employees towards daily routine activities 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
 
 
 
 
 
 
 
Lifting  and  Rigging  are  dangerous  activities  if  not  focused  properly.  Due  to  their 
potential to cause harms, damages and injuries, these are considered as Back Bone of 
construction industry. 
Observing  the  HSE  Statistics  on  lifting  and  rigging  incidents  in  previous  projects, 
DESCON  conducted  Lifting  and  Rigging  Workshops  on  all  islands.  These  Workshops 
contained Lessons Learned Incidents, discussion on translated Petrofac Procedure and 
Practical Session on Safe Lifting and Rigging, conducted and supervised by Lifting and 
Riffing Superintendents. 
Robust message from Practical HSE demonstrations stay longer in worker’s mind 
and heart. Island Safety Days on Man machine Interface, Dropped Objects & Heat 
Stress Awareness were organized at different islands where play‐actors, from the 
core of their heart, put remarkable efforts to make Island Safety Days successful and 
appreciated by DESCON, PED & ZEDCO Senior Management. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
HSE posters competition was one of the best initiative at 
site in order to simulate the creativity and ideas among 
the workers. More than 30 posters were received from all 
islands.  The  top  3  posters  were  awarded  as  Best  HSE 
Poster by the Senior Management. 
Hands are the most useable tools in any industry. Most of the injuries 
in the construction industry are related to hand and fingers. Due to 
wide use of hand tools at site, DESCON decided to launch HAND AND 
FINGER SAFETY CAMPAIGN at all islands, which was comprised of 
Hand and Finger Safety Awareness, Posters & Flyers, Development of 
Hand  and  Finger  Safety  Commitment  Board  and  focusing  site 
inspection to use proper type of gloves for each activity 
Dropped objects have a major input 
of  multiple  injuries  /  fatalities  in 
construction  industries  where  the 
work  at  height  is  involved.  80%  of 
activities at site are related to work 
at  height,  where  dropped  objects 
and  personal  falls  are  potential 
hazards, if not mitigated properly. 
Dropped Objects & Work at Height 
Campaign was commenced at Site. 
Dropped Objects and WAH practical awareness to the workforce, Provision of lanyards with 
the tools, Provision of wooden boxes at height, Provision of Gin Wheels / Pulleys fitted with 
rope & certified bags for lifting of material, establishment of dropped object intervention 
and hazard hunt team were included in this campaign.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
   
 
 
 
 
 
Earth Hour is an international event organized by the World Wide 
Fund  (WWF)  which  focuses  on  the  importance  of  energy 
conservation and celebrated in encouraging people to turn off 
their unnecessary lights when not in use. 
This year on 29th March, 2016, DESCON celebrated Earth Hour 
event  at  Central  Island,  comprised  of  circulation  and 
dissemination of HSE Posture and Flyer on importance of Earth 
Hours. 
5th  June  2016  was  celebrated  as  a 
WORLD  ENVIROEMENT  DAY  and 
ILLEGAL WILD LIFE TRADE is a Theme of 
this year which was communicated and 
circulated to the workforce through HSE 
Flyers. 
In addition, every 1st week of the Month 
a  Site  Wide  Massive  Housekeeping  is 
carried  out  at  Site  including  all  the 
Management  &  Non‐Management  staff 
at Site in order to refresh the importance 
of WORLD ENVIRONMENT DAY. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
The  main  goals  of  the  World  Health  Day  2016  (07‐04‐
2016) campaign were to increase  awareness about the 
rise in diabetes, its staggering burden and consequences. 
Similarly, Dietetic Awareness Campaigns were launched 
at North & Central Islands with the collaboration of PED 
Medical  &  HSE  Staff  which  included  the  circulation  & 
destination of HSE flyers on Diabetes Awareness to the 
workforce and random sampling of blood sugar check in 
the  morning  &  after  lunch  at  site  with  dedicated  male 
nurses, ambulances and HSE staffs 
In UAE, summer starts in late May and lasts till September in UAE. The weather is hot in 
UAE with temperatures reaching 45 °C (113 °F). The humidity is very high averaging over 
90%. 
PREVENTIVE MEASURES
Descon Launched Heat Stress Awareness Campaigns at site which included the following 
control measures. 
1. Heat Stress Awareness / Trainings OF all the employees. 
2.  Fatigue Assessment / surveys of critical crafts at Site. 
3. Provision of proper welfare facilities e.g. rest shelters, water stations, ablution blocks 
& fans etc. 
4. Celebration of Island Safety Days on Heat Stress Awareness at all islands. 
5. Water Parade during Task Instruction and in regular interval during the course of 
activity by the supervisors.  
6. Display of Heat Stress related Posters at site. 
7. TBTs on the Heat Stress Awareness & Control Measures. 
8. Visibility of Line / senior management at site all the time at site 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Appreciations / Team Building Parties plays significant role in energizing & altering the behavior / attitude of the 
workforce at site in owning the HSE. 
Descon celebrates Monthly SHES Communication Activity which includes celebrations of HSE milestones at different 
islands,  Lunch  &  Diner  with  Workers,  Senior  Management  walkthroughs  focusing  on  behavior  and  positive 
intervention with the workforce etc. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
GRE 
Fabrication
4%
E&I
4%
Mechanical
92%
PROJECT  CONTRIBUTION 
MAN‐HOUR WISE
GRE
FabricationE&IMechanical
100%
100%
100%
52.44%
0.30%
12.04%
WORK PROGRESS
Done Total
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
PROJECT TOTAL 
PROGRESS
Total, 
100%
Done, 
12.34%
 
 
 
 
 
 
 
 
 
 
 
Heat Stress Season 2016.
SIMOPS Work & PTW Formalities
Availability of barge for mobilization of
resources.
Adverse weather conditions.
Welder’s Competency for golden joints.
Limited Storage area.
Purging constraints for welding.
U/G cable pulling for Electrical &
Instrumentation.
High curie RT source movement to the
island.
High thickness and cladded metal welding.
High Humid atmosphere.
Carrying on the jobs at a high-node with
regards to HSE & QA/QC and all other
aspects

Más contenido relacionado

La actualidad más candente

Lijo trasport HSE Resume
Lijo trasport HSE ResumeLijo trasport HSE Resume
Lijo trasport HSE Resume
Lijo Poulose
 
CV_Aswan SAFETY MANAGER
CV_Aswan SAFETY MANAGERCV_Aswan SAFETY MANAGER
CV_Aswan SAFETY MANAGER
Mohamed Aswan
 
Jayashankar doc
Jayashankar docJayashankar doc
Jayashankar doc
jsc1091
 
CV of Prabu-HSE Engineer.DOCX
CV of Prabu-HSE Engineer.DOCXCV of Prabu-HSE Engineer.DOCX
CV of Prabu-HSE Engineer.DOCX
Prabu Thangavel
 
Safi-Ullah HSE Resume
Safi-Ullah HSE ResumeSafi-Ullah HSE Resume
Safi-Ullah HSE Resume
saif jutt
 
Resume of Mr. Alzen T. Octaviano
Resume of Mr. Alzen T. OctavianoResume of Mr. Alzen T. Octaviano
Resume of Mr. Alzen T. Octaviano
Alzen Octavio
 

La actualidad más candente (20)

HSE Manager CV
HSE Manager CVHSE Manager CV
HSE Manager CV
 
Prajin CV HSE Officer
Prajin CV HSE OfficerPrajin CV HSE Officer
Prajin CV HSE Officer
 
RAFIQ HSE
RAFIQ HSERAFIQ HSE
RAFIQ HSE
 
Lijo trasport HSE Resume
Lijo trasport HSE ResumeLijo trasport HSE Resume
Lijo trasport HSE Resume
 
CV_Aswan SAFETY MANAGER
CV_Aswan SAFETY MANAGERCV_Aswan SAFETY MANAGER
CV_Aswan SAFETY MANAGER
 
Resume-sabu
Resume-sabuResume-sabu
Resume-sabu
 
Projects HSE Manager
Projects HSE Manager   Projects HSE Manager
Projects HSE Manager
 
Jayashankar doc
Jayashankar docJayashankar doc
Jayashankar doc
 
Newsletter ONEgas
Newsletter ONEgasNewsletter ONEgas
Newsletter ONEgas
 
Cv glendon hse officer
Cv glendon   hse officerCv glendon   hse officer
Cv glendon hse officer
 
KVRcv2015
KVRcv2015KVRcv2015
KVRcv2015
 
Isaac safety curriculum vitae
Isaac  safety curriculum vitaeIsaac  safety curriculum vitae
Isaac safety curriculum vitae
 
CV of Prabu-HSE Engineer.DOCX
CV of Prabu-HSE Engineer.DOCXCV of Prabu-HSE Engineer.DOCX
CV of Prabu-HSE Engineer.DOCX
 
First aid certification
First aid certificationFirst aid certification
First aid certification
 
Safi-Ullah HSE Resume
Safi-Ullah HSE ResumeSafi-Ullah HSE Resume
Safi-Ullah HSE Resume
 
CV_Senior Manager HSE (Safety and Health Officer)
CV_Senior Manager HSE (Safety and Health Officer)CV_Senior Manager HSE (Safety and Health Officer)
CV_Senior Manager HSE (Safety and Health Officer)
 
Eng.Hazem's CV
Eng.Hazem's CVEng.Hazem's CV
Eng.Hazem's CV
 
Resume of Mr. Alzen T. Octaviano
Resume of Mr. Alzen T. OctavianoResume of Mr. Alzen T. Octaviano
Resume of Mr. Alzen T. Octaviano
 
SEUN UPDATED CV NEW
SEUN UPDATED CV NEWSEUN UPDATED CV NEW
SEUN UPDATED CV NEW
 
mahmood_shareef_2523 Updated CV Engineer
mahmood_shareef_2523 Updated CV Engineermahmood_shareef_2523 Updated CV Engineer
mahmood_shareef_2523 Updated CV Engineer
 

Similar a Descon HSE News Letter - UZ750 Project, January - June 2016

Similar a Descon HSE News Letter - UZ750 Project, January - June 2016 (20)

Jijin updated cv 25 oct-15-12-55-27 (2)
Jijin updated cv 25 oct-15-12-55-27 (2)Jijin updated cv 25 oct-15-12-55-27 (2)
Jijin updated cv 25 oct-15-12-55-27 (2)
 
CV Conrado Duque 23 May 2016-1
CV Conrado Duque 23 May 2016-1CV Conrado Duque 23 May 2016-1
CV Conrado Duque 23 May 2016-1
 
ANOOP CV 2016 JUN
ANOOP CV 2016 JUNANOOP CV 2016 JUN
ANOOP CV 2016 JUN
 
Hse manager (amarnath kapa)
Hse manager (amarnath kapa)Hse manager (amarnath kapa)
Hse manager (amarnath kapa)
 
mahmood_shareef_2523 Updated CV Engineer
mahmood_shareef_2523 Updated CV Engineermahmood_shareef_2523 Updated CV Engineer
mahmood_shareef_2523 Updated CV Engineer
 
Eduardo CV 2015 final - pdf
Eduardo CV 2015 final - pdfEduardo CV 2015 final - pdf
Eduardo CV 2015 final - pdf
 
Resume of ARMANDO ILAGAN
Resume of ARMANDO  ILAGANResume of ARMANDO  ILAGAN
Resume of ARMANDO ILAGAN
 
Haztek Brochure
Haztek BrochureHaztek Brochure
Haztek Brochure
 
JavaidGradIOSHiDipNEBOSHCV
JavaidGradIOSHiDipNEBOSHCVJavaidGradIOSHiDipNEBOSHCV
JavaidGradIOSHiDipNEBOSHCV
 
Naushad MM CV - 2016
Naushad MM CV - 2016Naushad MM CV - 2016
Naushad MM CV - 2016
 
Shahid Ali CV SM
Shahid Ali CV SMShahid Ali CV SM
Shahid Ali CV SM
 
Abdelaziz Fawzy CV 1-11
Abdelaziz Fawzy CV 1-11Abdelaziz Fawzy CV 1-11
Abdelaziz Fawzy CV 1-11
 
CV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem ShaikCV-Safety Engineer - Ahmed Kaleem Shaik
CV-Safety Engineer - Ahmed Kaleem Shaik
 
JG Resume (C1)
JG Resume (C1)JG Resume (C1)
JG Resume (C1)
 
RESUME OF JAYSON CANETE 01 (1)
RESUME OF JAYSON CANETE 01 (1)RESUME OF JAYSON CANETE 01 (1)
RESUME OF JAYSON CANETE 01 (1)
 
CV_Barakat Alkenani(DCNS)
CV_Barakat Alkenani(DCNS)CV_Barakat Alkenani(DCNS)
CV_Barakat Alkenani(DCNS)
 
Amjad islam (HSE)
Amjad islam (HSE)Amjad islam (HSE)
Amjad islam (HSE)
 
CV-Ruad Adwan
CV-Ruad AdwanCV-Ruad Adwan
CV-Ruad Adwan
 
Turatech CV - Nathaniel Eze
Turatech CV - Nathaniel EzeTuratech CV - Nathaniel Eze
Turatech CV - Nathaniel Eze
 
Oumh 2203 report writing the write up
Oumh 2203 report writing the write upOumh 2203 report writing the write up
Oumh 2203 report writing the write up
 

Descon HSE News Letter - UZ750 Project, January - June 2016