Policy and
Regulation
Project
Preparation
Financing and
Design
Project
Procurement
Construction
and Operation
Monitoring and
Evaluation
Decommissionin
g
Set policy requirements in
business case and build into
project objectives.
Integrate inclusivity at project
planning stage to maximise
benefits across the project
lifecycle.
Ensure the needs and
expectations of under-served and
vulnerable groups are taken into
account in preparing the design
and financial models for
infrastructure projects.
Specify the selected national or
international design standards
and codes that ensure universal
access in the Request for
Proposal (RfP) that will be issued
to bidders, and that will need to
be followed in the design and
construction of the project.
Assess potential labour supply
and demand issues, as the
integration of specific inclusivity
targets may be inhibited by
current market conditions.
Align monitoring and evaluation
with the overall program or
project objectives and integrate
measurable parameters
Formulate a decommissioning or
upgrade plan.
Provide a dedicated project
member who engages with under-
represented groups in the
decision-making process.
Identify financing models and
partners that consider high
socioeconomic returns and favour
the local economy in the form of
job creation and long-term
developmenta
Consider bidders’ experience and
qualifications in delivering
projects to maximise inclusivity
and social returns to the
community.
Offer employment and training to
members of groups in society
who do not have equal access to
employment for construction and
operation roles.
Ensure the findings feed into the
policy and regulatory cycle to
integrate lessons learned on
inclusivity.
Include social perspectives in
project strategy with measurable
objectives.
Evaluate and select national and
international design standards
and codes that ensure universal
access to physical infrastructure
and associated services.
Include specific inclusivity
conditions in the tender minimum
requirements, targets in the
award criteria and contractual
obligations.
Implement a robust payment
mechanism in line with the agreed
inclusivity targets.
ICED Gender and Inclusion Framework
Ensure sufficient and robust
disaggregated data are available
for project assessment.
Encourage the use of local
content and training if not already
set out in national law.
Consider the needs and
expectations of identified
stakeholders in the technical
feasibility studies.
Establish a Social Equity Plan to
facilitate interaction between the
procuring agency, bidders and
groups in society at risk of being
discriminated against, to
encourage dialogue and
participation in the process.
Include a socioeconomic study in
the financial feasibility studies
that incorporates the economic
and social costs and benefits of
the project, including those
related to inclusion, and that
allows for a sensitivity analysis of
the various factors.
Assess the project’s potential
benefits and also negative
impacts to society.
Targeted Stakeholder
INCLUSIVITY througout the PROJECT LIFECYCLE

Más contenido relacionado

La actualidad más candente

Proposal Preparation - NSERC Strategic Projects: Sherman Shen
Proposal Preparation - NSERC Strategic Projects: Sherman ShenProposal Preparation - NSERC Strategic Projects: Sherman Shen
Proposal Preparation - NSERC Strategic Projects: Sherman Shen
adoan
 
DAS PM RESPONSIBILITIES
DAS PM RESPONSIBILITIESDAS PM RESPONSIBILITIES
DAS PM RESPONSIBILITIES
Joseph Hoffman
 
Embedding BCE - Project review methodology
Embedding BCE - Project review methodologyEmbedding BCE - Project review methodology
Embedding BCE - Project review methodology
JISC BCE
 
Raising the standard for collaboration – delivering transformational collabor...
Raising the standard for collaboration – delivering transformational collabor...Raising the standard for collaboration – delivering transformational collabor...
Raising the standard for collaboration – delivering transformational collabor...
Association for Project Management
 

La actualidad más candente (10)

091112 Government R&D Funding And Company Behavior
091112 Government R&D Funding And Company Behavior091112 Government R&D Funding And Company Behavior
091112 Government R&D Funding And Company Behavior
 
From theory based policy evaluation to smart policy design: lessons learned f...
From theory based policy evaluation to smart policy design: lessons learned f...From theory based policy evaluation to smart policy design: lessons learned f...
From theory based policy evaluation to smart policy design: lessons learned f...
 
Proposal Preparation - NSERC Strategic Projects: Sherman Shen
Proposal Preparation - NSERC Strategic Projects: Sherman ShenProposal Preparation - NSERC Strategic Projects: Sherman Shen
Proposal Preparation - NSERC Strategic Projects: Sherman Shen
 
Kornelia Konrad-La empresa y las políticas de innovación transformadoras
Kornelia Konrad-La empresa y las políticas de innovación transformadorasKornelia Konrad-La empresa y las políticas de innovación transformadoras
Kornelia Konrad-La empresa y las políticas de innovación transformadoras
 
Effective partnerships: An example in water capacity development by Kees Leen...
Effective partnerships: An example in water capacity development by Kees Leen...Effective partnerships: An example in water capacity development by Kees Leen...
Effective partnerships: An example in water capacity development by Kees Leen...
 
DAS PM RESPONSIBILITIES
DAS PM RESPONSIBILITIESDAS PM RESPONSIBILITIES
DAS PM RESPONSIBILITIES
 
Embedding BCE - Project review methodology
Embedding BCE - Project review methodologyEmbedding BCE - Project review methodology
Embedding BCE - Project review methodology
 
Digital Content Development Programme
Digital Content Development ProgrammeDigital Content Development Programme
Digital Content Development Programme
 
Raising the standard for collaboration – delivering transformational collabor...
Raising the standard for collaboration – delivering transformational collabor...Raising the standard for collaboration – delivering transformational collabor...
Raising the standard for collaboration – delivering transformational collabor...
 
Alignment Assessment of industry programmes against the OECD Due Diligence Gu...
Alignment Assessment of industry programmes against the OECD Due Diligence Gu...Alignment Assessment of industry programmes against the OECD Due Diligence Gu...
Alignment Assessment of industry programmes against the OECD Due Diligence Gu...
 

Similar a Inclusivity through project lifecycle

PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
rexcris
 
Michelle Andree, PMP, SSGBC - Senior Project Manager Resume 120114
Michelle Andree, PMP, SSGBC - Senior Project Manager Resume 120114Michelle Andree, PMP, SSGBC - Senior Project Manager Resume 120114
Michelle Andree, PMP, SSGBC - Senior Project Manager Resume 120114
Michelle Andree, PMP
 

Similar a Inclusivity through project lifecycle (20)

Assignment brief project management
Assignment brief project managementAssignment brief project management
Assignment brief project management
 
The Key Considerations for Successfully Implementing an Offshore Model in You...
The Key Considerations for Successfully Implementing an Offshore Model in You...The Key Considerations for Successfully Implementing an Offshore Model in You...
The Key Considerations for Successfully Implementing an Offshore Model in You...
 
OECD Gender inclusive competition policy – Key findings from William Kovacic ...
OECD Gender inclusive competition policy – Key findings from William Kovacic ...OECD Gender inclusive competition policy – Key findings from William Kovacic ...
OECD Gender inclusive competition policy – Key findings from William Kovacic ...
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
 
Engr_Shah_Resume
Engr_Shah_ResumeEngr_Shah_Resume
Engr_Shah_Resume
 
Project Management Competency Guide for Digital Transformation
Project Management Competency Guide for Digital TransformationProject Management Competency Guide for Digital Transformation
Project Management Competency Guide for Digital Transformation
 
Resource Mobilisation
Resource MobilisationResource Mobilisation
Resource Mobilisation
 
Overall presentation integrated policies and policy coherence for sd gs.
Overall presentation integrated policies and policy coherence for sd gs.Overall presentation integrated policies and policy coherence for sd gs.
Overall presentation integrated policies and policy coherence for sd gs.
 
Workshop in Infrastructure Governance Indicators in Indonesia
Workshop in Infrastructure Governance Indicators in IndonesiaWorkshop in Infrastructure Governance Indicators in Indonesia
Workshop in Infrastructure Governance Indicators in Indonesia
 
L2 PM Project Feasibility study.pptx
L2 PM Project Feasibility study.pptxL2 PM Project Feasibility study.pptx
L2 PM Project Feasibility study.pptx
 
Renovation roadmaps for buildings by The Policy Partners
Renovation roadmaps for buildings by The Policy PartnersRenovation roadmaps for buildings by The Policy Partners
Renovation roadmaps for buildings by The Policy Partners
 
Workshop on Infrastructure Governance Indicators in the Phillipines
Workshop on Infrastructure Governance Indicators in the PhillipinesWorkshop on Infrastructure Governance Indicators in the Phillipines
Workshop on Infrastructure Governance Indicators in the Phillipines
 
RPN 2022 Manila: Session 3.1 Erika Bozzay OECD.pdf
RPN 2022 Manila: Session 3.1 Erika Bozzay OECD.pdfRPN 2022 Manila: Session 3.1 Erika Bozzay OECD.pdf
RPN 2022 Manila: Session 3.1 Erika Bozzay OECD.pdf
 
Michelle Andree, PMP, SSGBC - Senior Project Manager Resume 120114
Michelle Andree, PMP, SSGBC - Senior Project Manager Resume 120114Michelle Andree, PMP, SSGBC - Senior Project Manager Resume 120114
Michelle Andree, PMP, SSGBC - Senior Project Manager Resume 120114
 
ipa_routemap_asset_management_module.pdf
ipa_routemap_asset_management_module.pdfipa_routemap_asset_management_module.pdf
ipa_routemap_asset_management_module.pdf
 
Feasibility assessment of selected sites for the pilot project on the feasibi...
Feasibility assessment of selected sites for the pilot project on the feasibi...Feasibility assessment of selected sites for the pilot project on the feasibi...
Feasibility assessment of selected sites for the pilot project on the feasibi...
 
Bringing the chasm from research and Innovation to sustainable socioeconomic ...
Bringing the chasm from research and Innovation to sustainable socioeconomic ...Bringing the chasm from research and Innovation to sustainable socioeconomic ...
Bringing the chasm from research and Innovation to sustainable socioeconomic ...
 
Global Poverty Action Fund (GPAF) Funding Seminar
Global Poverty Action Fund (GPAF) Funding SeminarGlobal Poverty Action Fund (GPAF) Funding Seminar
Global Poverty Action Fund (GPAF) Funding Seminar
 
Econ dev v tech ncr 2010
Econ dev v tech ncr 2010Econ dev v tech ncr 2010
Econ dev v tech ncr 2010
 
Understanding the Review Criteria and Adaptation Fund Request for Funding Pro...
Understanding the Review Criteria and Adaptation Fund Request for Funding Pro...Understanding the Review Criteria and Adaptation Fund Request for Funding Pro...
Understanding the Review Criteria and Adaptation Fund Request for Funding Pro...
 

Último

Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
ZurliaSoop
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
vineshkumarsajnani12
 

Último (20)

Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
WheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond InsightsWheelTug Short Pitch Deck 2024 | Byond Insights
WheelTug Short Pitch Deck 2024 | Byond Insights
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book nowPARK STREET 💋 Call Girl 9827461493 Call Girls in  Escort service book now
PARK STREET 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
Unveiling Falcon Invoice Discounting: Leading the Way as India's Premier Bill...
 
Falcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business PotentialFalcon Invoice Discounting: Unlock Your Business Potential
Falcon Invoice Discounting: Unlock Your Business Potential
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 

Inclusivity through project lifecycle

  • 1. 1 2 3 4 5 6 7 Policy and Regulation Project Preparation Financing and Design Project Procurement Construction and Operation Monitoring and Evaluation Decommissionin g Set policy requirements in business case and build into project objectives. Integrate inclusivity at project planning stage to maximise benefits across the project lifecycle. Ensure the needs and expectations of under-served and vulnerable groups are taken into account in preparing the design and financial models for infrastructure projects. Specify the selected national or international design standards and codes that ensure universal access in the Request for Proposal (RfP) that will be issued to bidders, and that will need to be followed in the design and construction of the project. Assess potential labour supply and demand issues, as the integration of specific inclusivity targets may be inhibited by current market conditions. Align monitoring and evaluation with the overall program or project objectives and integrate measurable parameters Formulate a decommissioning or upgrade plan. Provide a dedicated project member who engages with under- represented groups in the decision-making process. Identify financing models and partners that consider high socioeconomic returns and favour the local economy in the form of job creation and long-term developmenta Consider bidders’ experience and qualifications in delivering projects to maximise inclusivity and social returns to the community. Offer employment and training to members of groups in society who do not have equal access to employment for construction and operation roles. Ensure the findings feed into the policy and regulatory cycle to integrate lessons learned on inclusivity. Include social perspectives in project strategy with measurable objectives. Evaluate and select national and international design standards and codes that ensure universal access to physical infrastructure and associated services. Include specific inclusivity conditions in the tender minimum requirements, targets in the award criteria and contractual obligations. Implement a robust payment mechanism in line with the agreed inclusivity targets. ICED Gender and Inclusion Framework Ensure sufficient and robust disaggregated data are available for project assessment. Encourage the use of local content and training if not already set out in national law. Consider the needs and expectations of identified stakeholders in the technical feasibility studies. Establish a Social Equity Plan to facilitate interaction between the procuring agency, bidders and groups in society at risk of being discriminated against, to encourage dialogue and participation in the process. Include a socioeconomic study in the financial feasibility studies that incorporates the economic and social costs and benefits of the project, including those related to inclusion, and that allows for a sensitivity analysis of the various factors. Assess the project’s potential benefits and also negative impacts to society. Targeted Stakeholder INCLUSIVITY througout the PROJECT LIFECYCLE