HYDROGRAPH
• is a graph showing the rate of flow
(discharge) versus time past a
specific point in a river, or other
channel or conduit carrying flow.
• It can also refer to a graph showing
the volume of water reaching a
particular outfall.
• graphs are commonly used in the design
of sewerage, more specifically, the design
of surface water sewerage systems
and combined sewers.
COMPONENTS OF A HYDROGRAPH
• Rising limb: The rising limb of hydro graph, also known
as concentration curve, reflects a prolonged increase in
discharge from a catchment area, typically in response
to a rainfall event
• Recession (or falling) limb: The recession limb extends
from the peak flow rate onward. The end of stormflow
(aka quickflow or direct runoff) and the return to
groundwater-derived flow (base flow) is often taken as
the point of inflection of the recession limb. The
recession limb represents the withdrawal of water
from the storage built up in the basin during the earlier
phases of the hydrograph.
• Peak discharge: the highest point on the
hydro graph when the rate of discharge is
greatest
• Lag time: the time interval from the center of
mass of rainfall excess to the peak of the
resulting hydrograph
• Time to peak: time interval from the start of
the resulting hydro graph
• Discharge: the rate of flow (volume per unit
time) passing a specific location in a river or
other channel
• Unit Hydrograph
Hydrograph usually consists of a fairly regular lower
portion that changes slowly throughout the year and
a rapidly fluctuating component that represents the
immediate response to rainfall.
The lower, slowly changing portion is termed base
flow. The rapidly fluctuating component is called
direct runoff.
D = duration of excess rain
Look at hyetograph, here 2 hours
UNIT HYDROGRAPH
• The amount of run-off resulting from 1 unit
(1cm, 1mm, 1ft, etc.) of rainfall excess.
• is essentially a tool for determining the direct
runoff response to rainfall.
• Once you know the watershed’s response to
one storm, you can predict what its response
for another will look like.
UH
Basic Assumptions of UH
1. The effective rainfall is uniformly distributed within its duration
2. The effective rainfall is uniformly distributed over the whole
drainage basin
3. The base duration of direct runoff hydrograph due to an effective
rainfall of unit duration is constant.
4. The ordinates of DRH are directly proportional to the total
amount of DR of each hydrograph
5. For a given basin, the runoff hydrograph due to a given period of
rainfall reflects all the combined physical characteristics of basin
(time-invariant)
• Remove the base flow amount from the
hydrograph.
• Calculate the net rainfall by removing the
infiltration and retention storage from the
hyetograph.
• Scale the new hydrograph units to yield a unit
hydrograph for, say, 1 inch for one hour, or 1/2
in/hr for 2 hours, or 1/3 in/hr for 3 hr, etc.
How to get a unit hydrograph, UH
net
hydrograph
net hyetograph
A Unit Hydrograph has
1.0 inches of
Direct Runoff for the
storm duration.
Here we start with 2 inches for 2 hours net rainfall. That is, 1 inch per hour for 2 hours.
To get a 2-hour UH, we want 1/2 inches/hour for two hours. So we have to divide the
hydrograph ordinates by 2.
We divided each hydrograph ordinate by two, resulting in a 2–
hour Unit Hydrograph, i.e. One inch of direct runoff total from
the 2 hour storm make a 1 hour UH.
Tb is the time base
Define “ordinate”
Notice hydrograph is not as tall
Convert the direct runoff
hydrograph below to a 2-HR UH.
In the hyetograph F = 0.5 in/hr
In the hydrograph, base flow = 100 cfs
EXAMPLE
1 in/hr x 2 hours = 2 inches, so 2 inches for a 2 hour
storm. This is twice too big. We want 1 inch total for the
storm, so we must divide each NET hydrograph ordinate
by 2
Draw the Net Hyetograph, and calculate the total direct runoff, in inches, over
the watershed.
Net HyetographOriginal Hyetograph
We removed the base flow from the gross hydrograph, then divided
each ordinate by two, to get a unit hydrograph for a 2-hour storm.
We have characterized our watershed; now we know how it will
behave in a storm.
Synthetic Unit Hydrograph
• Synthetic hydrographs are derived by
– Relating hydrograph characteristics such as peak
flow, base time etc. with watershed characteristics
such as area and time of concentration.
– Using dimensionless unit hydrograph
– Based on watershed storage
Need for synthetic UH
• UH is applicable only for gauged watershed
and for the point on the stream where data
are measured
• For other locations on the stream in the same
watershed or for nearby (ungauged)
watersheds, synthetic procedures are used.
Snyder’s Method
Snyder’s method allows the computations of
(a) lag time (tL);
(b) UH duration (tr);
(c) UH peak discharge (qp);
(d) Hydrograph time width at 50% and 75% (W50,
W75) of peak flow
UH
Snyder’s Method
1. Lag time (tL): time from the center of rainfall –
excess to the UH peak
tL = C1Ct (LLc)0.3
where tL = Time [hrs]; C1 = 0.75 for SI unit; 1.0 for
English unit; Ct = Coefficient which is a function of
watershed slope and shape, 1.8~2.2 (for steeper
slope, Ct is smaller); L = length of the main channel
[mi, km]; Lc = length along the main channel to the
point nearest to the watershed centroid
UH
Snyder’s Method
2. UH Duration (tr):
tr = tL / 5.5
where tr and tL are in [hrs]. If the duration of UH is other than tr, then the
lag time needs to be adjusted as
tpL = tL + 0.25 (tR - tr)
where tLR = adjusted lag time; tR = desired UH duration.
3. UH Peak Discharge (qp):
or
where C2 = 2.75 for SI unit; 640 for English unit; Cp = coefficient
accounting for flood wave and storage condition, 0.4 ~ 0.8;
qp = specific discharge, [m3/s/km2] or [ft3/s/mi2]
To compute actual discharge, Qp = Aqp
UH
p
t
p
C
2
C
p
q 
pR
t
p
C
2
C
p
q 
Snyder’s Method
4. Time Base (tb):
Assuming triangular UH,
tb = C3 / qp
where tb – [hrs]; C3 = 5.56 for SI unit, 1290 for English unit.
5. UH Widths: or
where
CW, 75 = 1.22 for SI unit; 440 for English unit;
CW, 50 = 2.14 for SI unit; 770 for English unit;.
W50, W75 are in hours; Usually, 1/3 of the width is distributed before UH
peak and 2/3 after the peak
Remember to check that the volume of UH is close to 1 cm or 1 inch
UH
1.08
p
q
w,75
C
75
W 
1.08
p
q
w,50
C
50
W 
Use Snyder’s method to develop a UH for the area
of 100mi2 described below. Sketch the appropriate
shape. What duration rainfall does this correspond
to?
Ct = 1.8, L= 18mi, Cp = 0.6, Lc= 10mi
EXAMPLE:
Calculate tp
tp = tl= Ct(LLC)^0.3
= 1.8(18·10) 0.3 hr,
= 8.6
Calculate Qp
Qp= 640(cp)(A)/tp
= 640(0.6)(100)/8.6
= 4465 cfs
since this is a small watershed,
Tb ≈4tp = 4(8.6)
= 34.4 hr
Duration of rainfall
D= tp/5.5 hr
= 8.6/5.5 hr
= 1.6 hr
SOLUTION
Hydrograph

Más contenido relacionado

La actualidad más candente (20)

Floods
FloodsFloods
Floods
 
Stream Gauging
Stream GaugingStream Gauging
Stream Gauging
 
Stream flow measurement
Stream flow  measurementStream flow  measurement
Stream flow measurement
 
Stilling basin
Stilling basinStilling basin
Stilling basin
 
Rain gauges
Rain gaugesRain gauges
Rain gauges
 
S curve hydrograph
S curve hydrographS curve hydrograph
S curve hydrograph
 
Flood frequency analyses
Flood frequency analysesFlood frequency analyses
Flood frequency analyses
 
Canal alignment
Canal alignmentCanal alignment
Canal alignment
 
Diversion headwork
Diversion headwork Diversion headwork
Diversion headwork
 
Runoff
RunoffRunoff
Runoff
 
Aquifer Parameter Estimation
Aquifer Parameter EstimationAquifer Parameter Estimation
Aquifer Parameter Estimation
 
Water Balance Analysis
Water Balance AnalysisWater Balance Analysis
Water Balance Analysis
 
Design Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's TheoryDesign Of Hydraulic Structure - Kennedy's Theory
Design Of Hydraulic Structure - Kennedy's Theory
 
design of rain gauge network
design of rain gauge networkdesign of rain gauge network
design of rain gauge network
 
Flood routing
Flood routingFlood routing
Flood routing
 
Stage measurement
Stage measurementStage measurement
Stage measurement
 
Canal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage WorksCanal Regulation & Cross Drainage Works
Canal Regulation & Cross Drainage Works
 
Characteristics of Watershed
Characteristics of WatershedCharacteristics of Watershed
Characteristics of Watershed
 
Reservoir sedimentation
Reservoir sedimentationReservoir sedimentation
Reservoir sedimentation
 
4 runoff and floods
4 runoff and floods4 runoff and floods
4 runoff and floods
 

Destacado

Unit hydrograph by anwar
Unit hydrograph by anwarUnit hydrograph by anwar
Unit hydrograph by anwarMuhammad Anwar
 
Terraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structureTerraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structureMoudud Hasan
 
hydraulic jump
hydraulic jumphydraulic jump
hydraulic jumpArun kumar
 
Chapter 8:Hydraulic Jump and its characterstics
Chapter 8:Hydraulic Jump and its charactersticsChapter 8:Hydraulic Jump and its characterstics
Chapter 8:Hydraulic Jump and its charactersticsBinu Khadka
 
Hydrograph explanation and animation
Hydrograph explanation and animationHydrograph explanation and animation
Hydrograph explanation and animationDuncanAshton
 
geographyalltheway.com - IB Geography - The Bradshaw Model
geographyalltheway.com - IB Geography - The Bradshaw Modelgeographyalltheway.com - IB Geography - The Bradshaw Model
geographyalltheway.com - IB Geography - The Bradshaw ModelRichard Allaway
 
Runoff and Hydrograph
Runoff and HydrographRunoff and Hydrograph
Runoff and HydrographSajjad Ahmad
 
Engr.ARSHAD ALI CV..
Engr.ARSHAD ALI CV..Engr.ARSHAD ALI CV..
Engr.ARSHAD ALI CV..arshad ali
 
Damp proofing course archna
Damp proofing course archnaDamp proofing course archna
Damp proofing course archnaAmynaah Amye
 
Geo Technical Engineering Introduction
Geo Technical Engineering IntroductionGeo Technical Engineering Introduction
Geo Technical Engineering IntroductionLatif Hyder Wadho
 
Lect 14 lateral_earthpressures
Lect 14 lateral_earthpressuresLect 14 lateral_earthpressures
Lect 14 lateral_earthpressuresHanan Hussain
 
Geotech. Engg. Ch#04 lateral earth pressure
Geotech. Engg. Ch#04 lateral earth pressureGeotech. Engg. Ch#04 lateral earth pressure
Geotech. Engg. Ch#04 lateral earth pressureIrfan Malik
 
Goetech. engg. Ch# 03 settlement analysis signed
Goetech. engg. Ch# 03 settlement analysis signedGoetech. engg. Ch# 03 settlement analysis signed
Goetech. engg. Ch# 03 settlement analysis signedIrfan Malik
 
Types Of Cement...PRC-I
Types Of Cement...PRC-ITypes Of Cement...PRC-I
Types Of Cement...PRC-IIrfan Malik
 

Destacado (20)

Unit hydrograph by anwar
Unit hydrograph by anwarUnit hydrograph by anwar
Unit hydrograph by anwar
 
Terraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structureTerraces:Soil Water Conservation structure
Terraces:Soil Water Conservation structure
 
hydraulic jump
hydraulic jumphydraulic jump
hydraulic jump
 
Hydraulic jump
Hydraulic jumpHydraulic jump
Hydraulic jump
 
Chapter 8:Hydraulic Jump and its characterstics
Chapter 8:Hydraulic Jump and its charactersticsChapter 8:Hydraulic Jump and its characterstics
Chapter 8:Hydraulic Jump and its characterstics
 
Hydrograph explanation and animation
Hydrograph explanation and animationHydrograph explanation and animation
Hydrograph explanation and animation
 
geographyalltheway.com - IB Geography - The Bradshaw Model
geographyalltheway.com - IB Geography - The Bradshaw Modelgeographyalltheway.com - IB Geography - The Bradshaw Model
geographyalltheway.com - IB Geography - The Bradshaw Model
 
Runoff and Hydrograph
Runoff and HydrographRunoff and Hydrograph
Runoff and Hydrograph
 
Engr.ARSHAD ALI CV..
Engr.ARSHAD ALI CV..Engr.ARSHAD ALI CV..
Engr.ARSHAD ALI CV..
 
Damp proofing course archna
Damp proofing course archnaDamp proofing course archna
Damp proofing course archna
 
Geo Technical Engineering Introduction
Geo Technical Engineering IntroductionGeo Technical Engineering Introduction
Geo Technical Engineering Introduction
 
Lect 14 lateral_earthpressures
Lect 14 lateral_earthpressuresLect 14 lateral_earthpressures
Lect 14 lateral_earthpressures
 
Earth pressure
Earth pressureEarth pressure
Earth pressure
 
2.foundation
2.foundation2.foundation
2.foundation
 
Coffer dams types
Coffer dams  typesCoffer dams  types
Coffer dams types
 
Geotech. Engg. Ch#04 lateral earth pressure
Geotech. Engg. Ch#04 lateral earth pressureGeotech. Engg. Ch#04 lateral earth pressure
Geotech. Engg. Ch#04 lateral earth pressure
 
Goetech. engg. Ch# 03 settlement analysis signed
Goetech. engg. Ch# 03 settlement analysis signedGoetech. engg. Ch# 03 settlement analysis signed
Goetech. engg. Ch# 03 settlement analysis signed
 
Types Of Cement...PRC-I
Types Of Cement...PRC-ITypes Of Cement...PRC-I
Types Of Cement...PRC-I
 
1.building
1.building1.building
1.building
 
ce235-eh-lec-2
ce235-eh-lec-2ce235-eh-lec-2
ce235-eh-lec-2
 

Similar a Hydrograph

Frosted-Glass-Star-Business-Product-Introduction.pptx
Frosted-Glass-Star-Business-Product-Introduction.pptxFrosted-Glass-Star-Business-Product-Introduction.pptx
Frosted-Glass-Star-Business-Product-Introduction.pptxChelDems
 
Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrographuzma shaikh
 
Various methods to calculate peak discharge.ppt
Various  methods to calculate peak discharge.pptVarious  methods to calculate peak discharge.ppt
Various methods to calculate peak discharge.pptiqbal sheikh
 
150860106006 54 55_62
150860106006 54 55_62150860106006 54 55_62
150860106006 54 55_62Riya2001998
 
HIE-Module 3 (1).pptx
HIE-Module 3 (1).pptxHIE-Module 3 (1).pptx
HIE-Module 3 (1).pptxVortexBolthe
 
Hydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power PlantHydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power PlantParamjeet Singh Jamwal
 
HydrographAnalysis07.pptx
HydrographAnalysis07.pptxHydrographAnalysis07.pptx
HydrographAnalysis07.pptxssuser33cd2a
 
Runoff - Hydrology and Irrigation Engineering
Runoff - Hydrology and Irrigation EngineeringRunoff - Hydrology and Irrigation Engineering
Runoff - Hydrology and Irrigation Engineeringsurekha1287
 
Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrographSatish Taji
 
Lesson 15_Hydrograph Separation.pdf
Lesson 15_Hydrograph Separation.pdfLesson 15_Hydrograph Separation.pdf
Lesson 15_Hydrograph Separation.pdfFAhimMurshed7
 
Water resources engineering
Water resources engineeringWater resources engineering
Water resources engineeringhusna004
 
Introduction to Hydrology
Introduction to HydrologyIntroduction to Hydrology
Introduction to HydrologyDivakarPamanji
 
5-Runoff computation (2).ppt
5-Runoff computation (2).ppt5-Runoff computation (2).ppt
5-Runoff computation (2).pptJohnAyele
 
Mass and Flow duration curves
Mass and Flow duration curvesMass and Flow duration curves
Mass and Flow duration curvesVignesh Sekar
 
Module 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysisModule 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysisAnkit Patel
 

Similar a Hydrograph (20)

Frosted-Glass-Star-Business-Product-Introduction.pptx
Frosted-Glass-Star-Business-Product-Introduction.pptxFrosted-Glass-Star-Business-Product-Introduction.pptx
Frosted-Glass-Star-Business-Product-Introduction.pptx
 
Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrograph
 
Various methods to calculate peak discharge.ppt
Various  methods to calculate peak discharge.pptVarious  methods to calculate peak discharge.ppt
Various methods to calculate peak discharge.ppt
 
150860106006 54 55_62
150860106006 54 55_62150860106006 54 55_62
150860106006 54 55_62
 
Hwre en nu 35,44
Hwre en nu 35,44Hwre en nu 35,44
Hwre en nu 35,44
 
HIE-Module 3 (1).pptx
HIE-Module 3 (1).pptxHIE-Module 3 (1).pptx
HIE-Module 3 (1).pptx
 
Computation of Runoff
Computation of RunoffComputation of Runoff
Computation of Runoff
 
Hydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power PlantHydrology & Site Selection of Hydro Power Plant
Hydrology & Site Selection of Hydro Power Plant
 
HydrographAnalysis07.pptx
HydrographAnalysis07.pptxHydrographAnalysis07.pptx
HydrographAnalysis07.pptx
 
Hydrology
Hydrology Hydrology
Hydrology
 
Runoff - Hydrology and Irrigation Engineering
Runoff - Hydrology and Irrigation EngineeringRunoff - Hydrology and Irrigation Engineering
Runoff - Hydrology and Irrigation Engineering
 
Synthetic unit hydrograph
Synthetic unit hydrographSynthetic unit hydrograph
Synthetic unit hydrograph
 
L7 hydrograph
L7 hydrographL7 hydrograph
L7 hydrograph
 
Lesson 15_Hydrograph Separation.pdf
Lesson 15_Hydrograph Separation.pdfLesson 15_Hydrograph Separation.pdf
Lesson 15_Hydrograph Separation.pdf
 
Water resources engineering
Water resources engineeringWater resources engineering
Water resources engineering
 
Introduction to Hydrology
Introduction to HydrologyIntroduction to Hydrology
Introduction to Hydrology
 
5-Runoff computation (2).ppt
5-Runoff computation (2).ppt5-Runoff computation (2).ppt
5-Runoff computation (2).ppt
 
Geo Hydrology
Geo Hydrology Geo Hydrology
Geo Hydrology
 
Mass and Flow duration curves
Mass and Flow duration curvesMass and Flow duration curves
Mass and Flow duration curves
 
Module 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysisModule 2 ch-1 heytograph and hydrology analysis
Module 2 ch-1 heytograph and hydrology analysis
 

Último

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 

Último (20)

University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 

Hydrograph

  • 1.
  • 2. HYDROGRAPH • is a graph showing the rate of flow (discharge) versus time past a specific point in a river, or other channel or conduit carrying flow. • It can also refer to a graph showing the volume of water reaching a particular outfall.
  • 3. • graphs are commonly used in the design of sewerage, more specifically, the design of surface water sewerage systems and combined sewers.
  • 4. COMPONENTS OF A HYDROGRAPH • Rising limb: The rising limb of hydro graph, also known as concentration curve, reflects a prolonged increase in discharge from a catchment area, typically in response to a rainfall event • Recession (or falling) limb: The recession limb extends from the peak flow rate onward. The end of stormflow (aka quickflow or direct runoff) and the return to groundwater-derived flow (base flow) is often taken as the point of inflection of the recession limb. The recession limb represents the withdrawal of water from the storage built up in the basin during the earlier phases of the hydrograph.
  • 5. • Peak discharge: the highest point on the hydro graph when the rate of discharge is greatest • Lag time: the time interval from the center of mass of rainfall excess to the peak of the resulting hydrograph • Time to peak: time interval from the start of the resulting hydro graph • Discharge: the rate of flow (volume per unit time) passing a specific location in a river or other channel
  • 6.
  • 7.
  • 8. • Unit Hydrograph Hydrograph usually consists of a fairly regular lower portion that changes slowly throughout the year and a rapidly fluctuating component that represents the immediate response to rainfall. The lower, slowly changing portion is termed base flow. The rapidly fluctuating component is called direct runoff. D = duration of excess rain Look at hyetograph, here 2 hours
  • 9. UNIT HYDROGRAPH • The amount of run-off resulting from 1 unit (1cm, 1mm, 1ft, etc.) of rainfall excess. • is essentially a tool for determining the direct runoff response to rainfall. • Once you know the watershed’s response to one storm, you can predict what its response for another will look like.
  • 10. UH Basic Assumptions of UH 1. The effective rainfall is uniformly distributed within its duration 2. The effective rainfall is uniformly distributed over the whole drainage basin 3. The base duration of direct runoff hydrograph due to an effective rainfall of unit duration is constant. 4. The ordinates of DRH are directly proportional to the total amount of DR of each hydrograph 5. For a given basin, the runoff hydrograph due to a given period of rainfall reflects all the combined physical characteristics of basin (time-invariant)
  • 11. • Remove the base flow amount from the hydrograph. • Calculate the net rainfall by removing the infiltration and retention storage from the hyetograph. • Scale the new hydrograph units to yield a unit hydrograph for, say, 1 inch for one hour, or 1/2 in/hr for 2 hours, or 1/3 in/hr for 3 hr, etc. How to get a unit hydrograph, UH
  • 12. net hydrograph net hyetograph A Unit Hydrograph has 1.0 inches of Direct Runoff for the storm duration. Here we start with 2 inches for 2 hours net rainfall. That is, 1 inch per hour for 2 hours. To get a 2-hour UH, we want 1/2 inches/hour for two hours. So we have to divide the hydrograph ordinates by 2.
  • 13. We divided each hydrograph ordinate by two, resulting in a 2– hour Unit Hydrograph, i.e. One inch of direct runoff total from the 2 hour storm make a 1 hour UH. Tb is the time base Define “ordinate” Notice hydrograph is not as tall
  • 14. Convert the direct runoff hydrograph below to a 2-HR UH. In the hyetograph F = 0.5 in/hr In the hydrograph, base flow = 100 cfs EXAMPLE
  • 15. 1 in/hr x 2 hours = 2 inches, so 2 inches for a 2 hour storm. This is twice too big. We want 1 inch total for the storm, so we must divide each NET hydrograph ordinate by 2 Draw the Net Hyetograph, and calculate the total direct runoff, in inches, over the watershed. Net HyetographOriginal Hyetograph
  • 16. We removed the base flow from the gross hydrograph, then divided each ordinate by two, to get a unit hydrograph for a 2-hour storm. We have characterized our watershed; now we know how it will behave in a storm.
  • 17.
  • 18. Synthetic Unit Hydrograph • Synthetic hydrographs are derived by – Relating hydrograph characteristics such as peak flow, base time etc. with watershed characteristics such as area and time of concentration. – Using dimensionless unit hydrograph – Based on watershed storage
  • 19. Need for synthetic UH • UH is applicable only for gauged watershed and for the point on the stream where data are measured • For other locations on the stream in the same watershed or for nearby (ungauged) watersheds, synthetic procedures are used.
  • 20. Snyder’s Method Snyder’s method allows the computations of (a) lag time (tL); (b) UH duration (tr); (c) UH peak discharge (qp); (d) Hydrograph time width at 50% and 75% (W50, W75) of peak flow UH
  • 21. Snyder’s Method 1. Lag time (tL): time from the center of rainfall – excess to the UH peak tL = C1Ct (LLc)0.3 where tL = Time [hrs]; C1 = 0.75 for SI unit; 1.0 for English unit; Ct = Coefficient which is a function of watershed slope and shape, 1.8~2.2 (for steeper slope, Ct is smaller); L = length of the main channel [mi, km]; Lc = length along the main channel to the point nearest to the watershed centroid UH
  • 22. Snyder’s Method 2. UH Duration (tr): tr = tL / 5.5 where tr and tL are in [hrs]. If the duration of UH is other than tr, then the lag time needs to be adjusted as tpL = tL + 0.25 (tR - tr) where tLR = adjusted lag time; tR = desired UH duration. 3. UH Peak Discharge (qp): or where C2 = 2.75 for SI unit; 640 for English unit; Cp = coefficient accounting for flood wave and storage condition, 0.4 ~ 0.8; qp = specific discharge, [m3/s/km2] or [ft3/s/mi2] To compute actual discharge, Qp = Aqp UH p t p C 2 C p q  pR t p C 2 C p q 
  • 23. Snyder’s Method 4. Time Base (tb): Assuming triangular UH, tb = C3 / qp where tb – [hrs]; C3 = 5.56 for SI unit, 1290 for English unit. 5. UH Widths: or where CW, 75 = 1.22 for SI unit; 440 for English unit; CW, 50 = 2.14 for SI unit; 770 for English unit;. W50, W75 are in hours; Usually, 1/3 of the width is distributed before UH peak and 2/3 after the peak Remember to check that the volume of UH is close to 1 cm or 1 inch UH 1.08 p q w,75 C 75 W  1.08 p q w,50 C 50 W 
  • 24. Use Snyder’s method to develop a UH for the area of 100mi2 described below. Sketch the appropriate shape. What duration rainfall does this correspond to? Ct = 1.8, L= 18mi, Cp = 0.6, Lc= 10mi EXAMPLE:
  • 25. Calculate tp tp = tl= Ct(LLC)^0.3 = 1.8(18·10) 0.3 hr, = 8.6 Calculate Qp Qp= 640(cp)(A)/tp = 640(0.6)(100)/8.6 = 4465 cfs since this is a small watershed, Tb ≈4tp = 4(8.6) = 34.4 hr Duration of rainfall D= tp/5.5 hr = 8.6/5.5 hr = 1.6 hr SOLUTION