1. GUDC HONG
KONG
STANFORD CAMPUS IN HONG KONG
PROJECT (CHKP)
STANFORD UNIVERSITY
LJUBLJANA UNIVERSITY
TEAM MEMBERS
Sam Wright
Andy Li
Theo Lim
Jakob Lozej
Dominik Košak
MENTORS
Derek Ouyang
Sinan Mihelčič
2. HONG KONG TEAM
UNIVERSITY OF
LJUBLJANA
STANFORD
UNIVERSITY
GUDC
HONG KONG
3. INTRODUCTION
WHAT?
Stanford technological campus proposal
WHERE?
Search for the most suitable site in Hong Kong
HOW?
Via internet resources, online interaction, university professors and
mentors
WHY?
To learn designing and making decisions for urban development,
To use strategic thinking as a key for successful process in the
project,
To understand the decision-impact process based on gathered
information
4. MISSION STATEMENT
The Stanford Center in Hong Kong is a not-for-profit subsidiary of Stanford University
headquartered in Hong Kong SAR, China, established in 2005 as an overseas office to
facilitate Stanford University’s presence in the rapidly growing East Asia Region. Along
with Stanford Centers in Beijing, China, and Kyoto, Japan, The Stanford Center in Hong
Kong is concerned with supporting and cultivating academic and political relations with
major East Asian institutions. In addition, the Stanford Center in Hong Kong has a
particular focus on networking with local businesses and corporations, especially in the
areas of engineering and technology.
As part of its overall mission, The Stanford Center in Hong Kong is developing a new
project, the Campus Hong Kong Project (CHKP), which has three main goals:
TO ESTABLISH a physical campus in the city of Hong Kong which introduces
undergraduate and graduate-level education in the technology sector, namely in
sciences, engineering, and business;
TO ENCOURAGE closer academic, social, business, and cultural ties between the
University and the rapidly growing East Asia Region;
TO ENGENDER a mutually beneficial interaction space for the people of Hong Kong
and Stanford affliates around the world.
5. ORDER OF PRESENTATION
1. Introduction
2. Context & Background
3. Site Selection
4. Site Analysis
5. Concepts
6. Financing
7. Public Relations &
Outreach
8. Future Directions
8. INTRODUCTION
MAINLAND
CHINA
NEW
TERRITORIES
LANTAU KOWLOON
HONG KONG
ISLAND
OUTLYING
ISLANDS
9. GENERAL INFORMATION
Official name: Hong Kong Special Administrative Region of the People's
Republic of China
Official languages: Chinese, English
Area: land - 1,104 km² (426 sq mi), water - 50 km² (19 sq mi)
Population: 7,061,200 (2010), 6,480 km² / 16,576/sq mi
Time zone: HKT (UTC+8)
Currency: Hong Kong dollar
Human development index (HDI): 0.898 (very high)
10. BRIEF HISTORY
Current Hong Kong was first incorporated into China during the Qin Dynasty
and largely remained under Chinese rule until 1841 during the Qing Dynasty. Hong
Kong became a colony of the British Empire after the First Opium War (1839–42).
Originally confined to Hong Kong Island, the colony's boundaries were extended in
stages to the Kowloon Peninsula in 1860 and then the New Territories in 1898. It
was occupied by Japan during the Pacific War, after which the British resumed
control until 1997, when China resumed sovereignty.
Hong Kong in 1843 (English colonial area) seen from Kowloon peninsula.
11. DISTRICTS
HONG KONG ISLAND (Central, East Coast, South Coast)
Hong Kong Island is the site of the original British settlement. Most of Hong Kong's highest
skyscrapers and the financial centre can be found here, including its famous skyline along the
northern coastline. Hong Kong's financial centre, shopping. Overall, Hong Kong Island is more
modern and wealthy than the other areas of Hong Kong.
KOWLOON
This peninsula jutting south towards Hong Kong Island from the Asian continent is the most
populous area in Hong Kong and at one time it was the most densely populated place in the
world. Today, it offers a chaotic mix of malls, street markets and residential tenements.
NEW TERRITORIES
Named by British officials when leased from the Chinese government in 1898, the New
Territories contain a curious mix of small farms, villages, industrial installations, mountainous
country parks and towns that have populations the size of some cities.
LANTAU
The largest of the Outlying Islands, twice the size of Hong Kong Island and famous for its high
peaks, wild landscapes, great beaches and the airport, which has a significant role in Hong
Kong's economy.
OUTLYING ISLANDS
Well-known weekend destinations for the locals, the Outlying Islands are most of the islands
surrounding Hong Kong Island. They range from significant population centers to rocks poking
out of the sea.
12.
13. SOCIAL REPORT
Population 0-14 15-24 25-34 35-44 45-54 55-64 65+
by Age
Percentage of 13.5% 13.1% 15.3% 18.1% 17.5% 10% 12.5%
Population
Total Male 482,500 445,400 462,000 547,000 594,200 353,500 339,500
Population
Total Female 452,100 459,300 592,000 698,400 613,400 337,400 464,800
Population
Average age is 41.7 years and life expectancy is 82.9 years.
Ethnicity
The majority of Hong Kongers of Chinese descent trace their ancestry to various
parts of Southern China: the Guangzhou area, Sze Yap, Chaoshan, Fujian and
Shanghai. Population by
Ethnicity
Chinese 95%
Filipino 2.1%
Indonesian 0.8%
Westerners 0.7%
Indian 0.3%
Other 1.1%
14. SOCIAL REPORT
Education Attainment 2005 2010 Occupation Distribution 2005
No Schooling / Pre-Primary 6.4% 5.4% Managers and Administrators 9.7%
Primary 19.3% 17% Professionals 6.5%
Secondary 51.5% 52.3% Associate Professionals 19.3%
Post-Secondary 22.8% 25.4% Clerks 16.1%
Service Workers and Shop 16%
Labour Force Participation Rate Sales Workers
The size of the total labor force in Hong Kong
Craft and Related Workers 7.1%
for 2010 was 3.65 million. This represented
59.7 per cent of the total population aged 15 Plant and Machine Operators 5.8%
and over. The distribution of the employed and Assemblers
population in Hong Kong by occupation for Elementary Occupations 19.4%
2010 was as follows:
Higher Education
Main higher education institutions in Hong
Kong are The University of Hong Kong
(21,500 students), The Hong Kong University
of Science and Technology (8,000 students),
Chinese University of Hong Kong (14,300
students), Hong Kong Polytechnic University
(28,300 students).
15. CONSTRUCTION REPORT
● 7,650 Skyscrapers
● Lack of buildable area has created very dense construction
● Many developed areas are on top of Reclaimed Land
● Land Reclamation dates back to Han Dynasty (206 BCE – 9CE)
● Many projects are in development on Hong Kong Island and West Kowloon
● The closure of Kai Tak Airport has lifted height restrictions, allowing more
high rises to be built in West Kowloon
Reclaimed land in Hong Kong (yellow).
16. ZONING AND PARKS
A spread-out American-style campus is possible in the New
Salient Facts and Figures:
Territories cf. China University of HK near Fo Tan, below
● Hong Kong has just over 1100 sq km of land controlled by a
dedicated council
● 40% of usable land is dedicated to conservation
● 67% of land is still undeveloped
● Permits to build are easier to obtain in the New Territories; harder
to obtain in Kowloon; nearly impossible to obtain for HK island.
● Most development is happening on new lands in the New
Territories or reclaimed land in Kowloon.
● Most new industries and universities are located in the New
Territories. A spread-out American-style campus is possible in the
New Territories.
17. PROPOSED SITES MAP
1) KAI TAK AIRPORT, KOWLOON 4) FO TAN, NEW TERRITORIES
2) WEST KOWLOON, KOWLOON 5) TUEN MUN, NEW TERRITORIES
3) AUSTIN, KOWLOON
23. 1) DECISION MATRIX CRITERIA
Decision Matrix Explanation:
- Each criteria and sub-criteria is evaluated in 1-5 tier system (1 - worst, 5 - best)
- Each sub-criteria is differently weighted, based on the importance of the subject
- All provided data is objective and was found on the Internet or other authentic sources
- Decision matrix also includes subjective data, provided by the locals
Economic - 20%
Transportation - 20%
Construction - 15%
Parks and Zoning - 10%
Sustainability and
Environment - 15%
Political and Neighborhood
Feasibility - 20%
24. ECONOMIC DECISION MATRIX
Construction Land Financial Weighted
Site / Subject
Costs prices feasibility total
Kai Tak Airport 3 2 5 3.3
Austin 3 2 5 3.3
West Kowloon 3 2 5 3.3
Fo Tan 4 4 4 4
Tuen Mun 4 4 4 4
Economic - 20 %
1. Construction Cost - 33.3%
2. Land Prices - 33.3%
3. Financial Feasibility - 33.3%
25. TRANSPORTATION DECISION MATRIX
Travel Travel Time Distance to Frequenc Number of Rounded
Travel Time Weighted
Time to to Mainland Closest MTR y of MTR MTR Lines Weighted
to Downtown Total
Airport China Station Transit near the Site Total
Kai Tak
Airport 1 3 4 2 5 3 2.95 3
West
Kowloon 3 5 5 5 3 5 4.6 4.6
Austin 2 3 5 4 3 5 4.1 4.1
Fo Tan 1 2 3 5 5 3 3.65 3.7
Tuen
Mun 1 1 1 2 4 2 2.05 2
Transportation - 20%
1. Travel Time to Airport - 5%
2. Travel Time to Downtown HK - 15%
3. Travel Time to China Mainland Travel Hub - 5%
4. Distance to Closest MTR station - 30%
5. Frequency of MTR Trains - 15%
6. Number of MTR Lines near the Site - 30%
27. PARKS AND ZONING MATRIX
Distance to
Site / subject % Park Space % Park Space Official Land Distance to
Edge of City
measurement 1 mile radius 5 mile radius Utilization shore
(m)
Kai Tak airport 0 2.1 Residential 2500 m 0m
West Kowloon 4.8 5.1 Commercial 6500 m 200 m
Austin 4.9 4.8 Vacant 7000 m 250 m
Fo Tan 18.2% 16.0% Open Space 500 m 8500 m
Tuen Mun 15.3% 14.9% Commercial 500 m 6700 m
% of Total 20% 30% N/A 30% 20%
Parks and Zoning - 10%
28. SUSTAINABILITY AND ENVIRONMENT MATRIX
Site / subject H2O2/HNO3 O3 Concentration
measurement (Ave. 2007) (Ave. 2007)
330 micrograms/cubic
Kai Tak Airport 22.4
meter
West Kowloon 19.5 290
Austin 27.4 320
Fo Tan 8.8 200
Tuen Mun 16.2 250
% of Total 60% 40%
Sustainability and Environment - 15%
40. SITE ANALYSIS – construction
- coastal land reclamation consists of two layers: highly permeable
layer consisting of crushed rock fragments underneath a less permeable
layer (sand)
- land reclamation increases water level
- deep foundations have a profound impact on underground water flow
● building on reclaimed land demands ground improvement and
constant maintenance (drainages) – Source: Preliminary assessment of the impacts of deep foundations and
land reclamation on groundwater flow in a coastal area in Hong Kong, China
ASCERTAINMENTS:
● LESS CONTACT AREA WITH GROUND = LOWER COSTS FOR
CONSTRUCTION AND MAINTAINING
● BUILDING ON RECLAIMED LAND DEMANDS AT LEAST 20 % MORE
INVESTMENT THAN BUILDING ON ORDINARY LAND
45. CAMPUS PROGRAMMATIC SCHEME
Student Housing
Common Facilities
168,000 ft2
Technical Facilities
30,000 ft2
Laboratories Building
12,500 ft2
Technical Incubator Building
12,500 ft2 20,000 ft2
Business School Building
15,000 ft2
Engineering School Building
10,000 ft2
46. CAMPUS VOLUMETRIC PROGRAM
50F
Student Housing
Common Facilities
Technical Facilities
Laboratories Building
Technical Incubator Building
Business School Building
13F
Engineering School Building
10F 9F 11F
9F 7F
47. CAMPUS PROGRAMMATIC SCHEME
ENGINEERING SCHOOL + LABORATORY BUILDING – specialized in
construction techniques and innovative approaches to construction and
materials which will contribute to local developement
TECHNOLOGICAL INCUBATOR – making collaborative environment
with local companies and young enterprises which will boost
approaching to the market
BUSINESS SCHOOL – exploring new ways of fostering an
entrepreneurship community
STUDENT HOUSING – providing residential space for 800 students
COMMON FACILITIES – providing comfortable and healthy
environment for staff, students and locals
OPEN SPACES – use of existing green space on the western side
(peninsula)
57. CONCEPT DECISION FACTORS
Concept 1 Concept 2
Construction Better
Views Better
Access Better
Building Heights Better
Potential for Growth Better
Distance to Green Spaces Better
Plot Size-Cost Better
Feng Shui Better
Overall Better
58. FINANCE
Minimize Risks
Mitigate Costs
1. Buy the land
2. Partner with a local developer
3. Make a pre-emption agreement with
the city of Hong Kong
Principal sources of data used in the
cost estimation model :
- Hong Kong's Rating and Valuation
Department
- Hong Kong's land sales in 2009-2011
- Hong Kong Census and Statistics
60. FINANCE
Laboratories building
15,000 sq ft $17.5 mil.
Engineering building
30,000 sq ft $26 mil.
61. FINANCE
Student Housing
170,000 sq ft $115.5 mil.
Common Facilities
12,500 sq ft $8.25 mil.
62. FINANCE
Phase 1 scenarios:
Predicted scenarios in year 2021
Best-case scenario
Business as Usual
Continue the project to phase 2 as
-Signed pre-emption agreement planned.
-Differences in cultures won‘t
represent a bigger obstacle
-Equivalent sponsor funding to
Stanford CA
-Popularity among students
Rent the facilities until it is possible to buy
aditional land.
Predicted risks
-Unavailability of land for growth
-Local disapproval
-Cultural barrier Selling all the facilities with profit.
-Lack of sponsor funding
-Unpopularity among students Worst-case scenario
63. FINANCE
Technological incubator
10,000 sq ft $9 mil.
Business school building
20,000 sq ft $17.25 mil.
64. FINANCE
Technical Facilities
15,000 sq ft $10 mil.
Land Purchase
32,300 sq ft $9.5 mil.
65. FINANCE
Phase 2 scenarios:
Predicted scenarios in year 2028
Best-case scenario
Business as Usual
The project is a enormous success.
-Stanford University is a key element Revenues and donations are higher than
of HK‘s education system predicted.
- Differences in cultures won‘t
rapresent a bigger obstacle
-Equivalent sponsor funding to
Stanford CA School activities will pursue normally.
-Popularity among students Stanford will need to foster relationship
with surrounding companies.
Predicted risks
- Non-acceptance from local
companies
In case of unpredictable events facilities
-Local disapproval will be sold with loss.
-Cultural barrier Worst-case scenario
-Lack of sponsor funding
66. FINANCE
All Facilities and Invested Capital (IC) Engineering building 30,000 sq ft
$26 mil.
Laboratories building 15,000 sq ft
$17.5 mil.
Student housing 170,000 sq ft
$115.5 mil.
Common facilities 12,500 sq ft
$8.25 mil.
Business school 20,000 sq ft
$17.25 mil.
Tech incubator 10,000 sq ft
$9 mil.
Technical facilities 15,000 sq ft
$10 mil.
Surrounding land 32,300 sq ft
$9.5 mil.
Total IC
$213 mil.
67. FINANCE
How to justify the higher investment compared to other
sites in Hong Kong? Is it justifiable at all?
Justification:
- proximity of corporations and companies
- prestigious location
- closeness to all needed infrastructure
- facilitation of the exit strategy
68. DEVELOPER LIAISON
Terms of Agreement:
1. Stanford is the owner of the land, SHKP is
the main developer. Sun Hung Kai Properties
(SHKP)
2. SHKP develops campus and other
properties together with Stanford as a main
stakeholder.
3. SHKP will take full profit from any non
university-related residential, retail, and office
tower units.
4. SHKP and Stanford will jointly manage
architectural design and character of the
entire development. The two areas of the
project should be integrated to a certain
extent, but the Stanford area should have
more of the feel of a campus.
5. SHKP will profit from proximity and prestige
to leverage higher profits on their
development units.
6. Stanford and SHKP will agree upon further
terms regarding compensation through
annuities or other means.
69. PUBLIC OUTREACH AND INVOLVEMENT
Inform and Engage the
Public
Public Information Meetings
-Union Square
-Docks and Harbor Development
-HKU, other universities
-West Kowloon
Local contribution to project
-Public art
-Architecture Competition
-Information Booths in Local Malls,
MTR Stations
Information Media Channels
-Twitter (@StanfordinHK)
-Facebook (StanfordinHK)
-Newspaper and TV ads
70. POLITICS, PERMITTING AND PROCESS
We will consult with SHKP to guide us through the
permitting process. We will need to gain permits from the
following authorities:
HK Planning and Development Board
HK Department of Education
HK Buildings Department
HK Environmental Protection Department
West Kowloon District Council
Union City District Council
In addition, we will collaborate with the following groups to
ensure social and cultural integration of our project:
Society for Community Organization (SoCO)
HK Heritage Studies and Promotion
Organization
Monte Jade Science Technology Association
Hong Kong Electronics and Technology
Association (HKETA)
and others
71. FUTURE DIRECTIONS
1. Develop Institutional and Developer Relations
2. Obtain Stanford-side Approvals and Final Program Requirements
3. Detailed Architectural and Schematic Design
4. Carry Out PR and Outreach Plan
5. Environmental Review Process