Neretva and Trebisnjica Management Project
International Roundtable on Protection and Sustainable Use of Trans-boundary Waters in South East Europe, 15-16 December 2011, Zagreb, Croatia
2. Introduction of the Project
Introduction of the Project
• NTMP is a regional cooperation project ‐ Republic of
Croatia and Bosnia and Herzegovina.
• Transboundary river basin on the territory of:
T b d i b i th t it f
• Republic of Croatia
• Dubrovnik‐Neretva County and
• Split‐Dalmatia County
• Bosnia and Herzegovina (B&H)
• Federation of BiH (FB&H)
• Herzegovina‐Neretva Canton (7)/
Western Herzegovina Canton (8)
• Herzeg‐Bosnia Canton (10)
• Republika Srpska (RS)
p p ( )
• Trebinje Region
• The Neretva is:
• the longest river of the Adriatic catchment area (215
km long, with only 22 km in Croatia)
• the water richest tributary of the Adriatic Sea on the
the water –richest tributary of the Adriatic Sea on the
territory of these two countries
• complex karst hydrography makes it difficult to define
the exact boundaries of the catchment area (around
10,500 km2)
• the water regime of the Neretva River basin has been
significantly modified by the construction of
hydropower facilities in the upper and middle sections
of the Neretva River and on the Trebišnjica River with 7
reservoirs built from 1954 to 1985.
3. Background
• Implementation Teams
Legal Basis
g
Cooperation between the Republic of Croatia and Bosnia and
Herzegovina
BOSNIA AND
REPUBLIC OF
Agreement between the Governments of Croatia and BiH HERZEGOVINA
HERZEGOVINA
CROATIA
regulating water management relations concluded in July (BiH)
1996 – approved and ratified
Grant Agreement concluded in September 2008 with the
g p
International Bank for Reconstruction and Development
(IBRD) acting as an Implementing Agency of GEF Project
BiH Project
Implementation Team
Implementation Team
Project Agreement concluded with the International Bank for (PIT) Hrvatske vode
(PMT & PIT) May 2009
Reconstruction and Development (IBRD)
i d l ( ) 19 December 2008
19 December 2008
Memorandum of Understanding signed between Bosnia and
Herzegovina and the Republic of Croatia on implementation of
joint activities under the Project
joint activities under the Project
COORDINATION COORDINATION
Agreements become effective COMMITTEE COMMITTEE
Croatia – 7 January 2009 BiH – 6 March 2009 8 June 2009 22 October 2009
Official start (meeting in Sarajevo) 12‐13 March 2009
4. Project Implementation
Project Implementation Structure
Interstate Water
Commission
Component 1 Component 4 Components 2&3
MRDFWM
Coordination
Committee
BiH MOFTER
HV PIT (5) PMT
TA
FM
MRDFWM (1)
Procurement FBiH
MC (2) MAWMF
MEPPPC (1)
MAFRD (1) RS MAFWM
TA
Agency for Adriatic Sea Agency for Adriatic Sea
Watershed, Mostar Watershed, Trebinje
FM Procurement
MAWMF MAFWM
PIT
PIT
MET MSPCEE
Reporting relation
p g
Municip. Municip.
Working relation
5. Water Management Characteristics of the Region
h f h
oThe water regime of the
oThe water regime of the
Neretva River basin has been
significantly modified by the
construction of hydropower
facilities in the upper and
f iliti i th d
middle sections of the
Neretva River and on the
Trebišnjica River with
River with
reservoirs:
• Jablanica (1954)
( )
• Rama (1969)
• Grabovica (1981)
• Salakovac (1981)
• Mostar (1985)
• Gorica (1965) and Bileća
(1968)
• Equalizing basins of Čapljina
E li i b i f Č lji
pumping HPP in Popovo
polje and Svitava (1978)
6.
7.
8. Component 1 – Improved
Transboundary Water
T b d W
Resource Management
Institution and capacity building
Institution and capacity building
Measurement, monitoring, and information management
Measurement, monitoring, and information management
Development of Water Information System, including GIS
Development of Water Information System, including GIS
Development of Neretva and Trebišnjica River Basin
Management Plan (RBMP)
( )
9. Subcomponent: Neretva and
Trebišnjica River Basin Management
T biš ji Ri B i M t
Plan (NTRBMP) • The general goal of the project is to improve water
The NTRBMP consists of river basin management plans that
address the issues of interest for the entire basin area in a management and thus ensure the fulfillment and improvement of
synchronized manner with special emphasis on the functions that the watercourses of this basin have in water
valorization of transboundary impacts, i.e. impacts between
y p , p management on the national level.
g
river basin districts.
River basin
district in
Monitoring
Croatia
Characterization
Status
NTRBMP
n
implementation
Implementation
Plan
Status
River basin River basin
district in district in
FBiH RS
Reporting to the
e Measures Dead‐lines Funds
Competent
public Risks institution
10. Improved Operation of Reservoirs and HPPs
• C d i
Conducting a study to determine the minimum
d d i h i i
environmental flow in the Neretva and Trebišnjica
Rivers
• Preparing a plan, guidelines, and training program for
optimal management of multipurpose HPP reservoirs
optimal management of multipurpose HPP reservoirs
• Developing a dynamic management model for
reservoir operation
reservoir operation
• Developing and implementing mathematical models
for hydrological predictions, HPP operations,
for hydrological predictions HPP operations
forecasting and decision‐making
11. Prostorna distribucija godišnjeg suficita/deficita količina kišnih padavina u posljednjoj
dekadi (1999-2008.) u poređenju sa referentnim periodom (1961-1990.) u BiH
HM postaje.kmz
12.
13.
14.
15. Precipation Data
Precipation Data
• Prema podacima Federalnog hidrometeorološkog zavoda, u periodu od 1.11. do 8.12.2010. godine
Prema podacima Federalnog hidrometeorološkog zavoda u periodu od 1 11 do 8 12 2010 godine
ukupne padaline sa snijegom na stanici Ivan Sedlo su iznosile 545,00 mm (što je više od 35% od
ukupnog srednjeg godišnjeg prosjeka), na stanici Mostar 491,80 mm, na stanici Livno 446,10 mm,
na stanici Bjelašnica 398,50 mm, na stanici Stolac 461,20 mm, na stanici Neum 339,40 mm.
• Prema podacima sa nekih od mjernih stanica AVP Jadranskog mora i elektroprivrednih poduzeća
p j g p p
ukupne padaline su iznosile:
• Konjic – Hagenuk ‐ od 1.11. do 5.12. ukupno 460,30 mm (u periodu od 17.11.‐5.12. ukupno 270,90
mm)
• Glavatičevo most – od 17.11. do 3.12., 354,80 mm (u periodu od 1.11.‐1.12. ukupno 539,20 mm)
• Brana HE Jablanica – od 1.11. do 5.12. ukupno 832,10 mm
• MP Umoljani – od 1.11. do 8.12. ukupno 711,40 mm
• MP Trešnjevica – od 1.11. do 8.12. ukupno 425,20 mm
• MP Jasenik od 1.11. do 8.12. ukupno 414,90 mm
MP Jasenik – od 1.11. do 8.12. ukupno 414,90 mm
• MP Čuhovići – od 1.11. do 8.12. ukupno 433,00 mm (u periodu od 17.11‐8.12 ukupno 327,30 mm)
• MP Jasenjani – od 1.11. do 8.12. ukupno 999,40 mm (u periodu od 17.11‐8.12 ukupno 657,70 mm)
• MP Blidinje – od 1.11. do 8.12. ukupno 841,00 mm
• HP Humac – od 1.11. do 8.12. ukupno 343,80 mm (u periodu od 17.11‐8.12 ukupno 255,60 mm)
HP Humac od 1 11 do 8 12 ukupno 343 80 mm (u periodu od 17 11 8 12 ukupno 255 60 mm)