SlideShare una empresa de Scribd logo
1 de 21
Descargar para leer sin conexión
Petersberg Phase II / Athens Declaration Process
Protection and Sustainable Use of Transboundary Waters in SEE

Roundtable on Transboundary Water Management
        Zagreb, 15 – 16 December 2011
           g ,




      Neretva and Trebisnjica
       Management Project
Introduction of the Project
                Introduction of the Project
•   NTMP is a regional cooperation project ‐ Republic of 
    Croatia and Bosnia and Herzegovina.
•   Transboundary river basin on the territory of:
    T    b    d     i   b i      th t it        f
     •   Republic of Croatia 
           • Dubrovnik‐Neretva County  and
           • Split‐Dalmatia County
     •   Bosnia and Herzegovina (B&H)
           • Federation of BiH (FB&H)
                   • Herzegovina‐Neretva Canton (7)/ 
                       Western Herzegovina Canton (8)
                   • Herzeg‐Bosnia Canton (10)
           • Republika Srpska (RS)
                  p         p   ( )
                   • Trebinje Region
•   The Neretva is:
     •   the longest river of the Adriatic catchment area (215 
         km long, with only 22 km in Croatia) 
     •   the water richest tributary of the Adriatic Sea on the 
         the water –richest tributary of the Adriatic Sea on the
         territory of these two countries
     •   complex karst hydrography makes it difficult to define 
         the exact boundaries of the catchment area (around 
         10,500 km2)
     •   the water regime of the Neretva River basin has been 
         significantly modified by the construction of 
         hydropower facilities in the upper and middle sections 
         of the Neretva River and on the Trebišnjica River with 7 
         reservoirs built from 1954 to 1985.
Background
                                                                • Implementation Teams
 Legal Basis
   g
Cooperation between the Republic of Croatia and Bosnia and 
                      Herzegovina
                                                                                                     BOSNIA AND 
                                                                  REPUBLIC OF 
  Agreement between the Governments of Croatia and BiH                                              HERZEGOVINA 
                                                                                                    HERZEGOVINA
                                                                    CROATIA
  regulating water management relations concluded in July                                               (BiH)
                1996 – approved and ratified

  Grant Agreement concluded in September 2008 with the 
         g                         p
  International Bank for Reconstruction and Development 
      (IBRD) acting as an Implementing Agency of GEF                     Project 
                                                                                                         BiH Project 
                                                                 Implementation Team 
                                                                                                    Implementation Team 
Project Agreement concluded with the International Bank for       (PIT)  Hrvatske vode           
                                                                                                    (PMT & PIT) May 2009
          Reconstruction and Development (IBRD)
                     i     d     l        (     )                  19 December 2008
                                                                   19 December 2008


 Memorandum of Understanding signed between Bosnia and 
Herzegovina and the Republic of Croatia on implementation of 
              joint activities under the Project
              joint activities under the Project

                                                                    COORDINATION                      COORDINATION 
               Agreements become effective                           COMMITTEE                         COMMITTEE
  Croatia – 7 January 2009           BiH – 6 March 2009                8 June 2009                    22 October 2009 


    Official start (meeting in Sarajevo) 12‐13 March 2009
Project Implementation
Project Implementation Structure
                                       Interstate Water 
                                         Commission



                                                                Component 1         Component 4           Components 2&3


      MRDFWM
                                        Coordination 
                                         Committee
                                                                BiH MOFTER

      HV PIT (5)                                                   PMT
                                  TA
                                                                    FM
     MRDFWM (1)
                                                                Procurement               FBiH 
       MC (2)                                                                            MAWMF
     MEPPPC (1)
      MAFRD (1)                                                                                              RS MAFWM
                                                           TA




                                                                              Agency for Adriatic Sea    Agency for Adriatic Sea 
                                                                               Watershed, Mostar          Watershed, Trebinje
FM                 Procurement



                                                                                           MAWMF          MAFWM




                                                                                   PIT




                                                                                                                         PIT
                                                                                             MET           MSPCEE
             Reporting relation
               p     g
                                                                                           Municip.       Municip.

             Working relation
Water Management Characteristics of the Region
                       h               f h
oThe water regime of the
oThe water regime of the 
Neretva River basin has been 
significantly modified by the 
construction of hydropower 
facilities in the upper and 
f iliti i th              d
middle sections of the 
Neretva River and on the 
Trebišnjica River with
              River with 
reservoirs:

 •    Jablanica (1954)
                (     )
 •    Rama (1969)
 •    Grabovica (1981)
 •    Salakovac (1981)
 •    Mostar (1985)
 •    Gorica (1965) and Bileća 
      (1968)
 •    Equalizing basins of Čapljina
      E    li i b i      f Č lji
      pumping HPP in Popovo
      polje and Svitava (1978)
Component 1 – Improved 
Transboundary Water 
T    b   d    W
Resource Management



                          Institution and capacity building
                          Institution and capacity building



                          Measurement, monitoring, and information management
                          Measurement, monitoring, and information management



                          Development of Water Information System, including GIS
                          Development of Water Information System, including GIS 


                          Development of Neretva and Trebišnjica River Basin 
                          Management Plan (RBMP)
                                          (      )
Subcomponent: Neretva and 
    Trebišnjica River Basin Management 
    T biš ji Ri       B i M          t
               Plan (NTRBMP)                                     •       The general goal of the project is to improve water 
The NTRBMP consists of river basin management plans that 
address the issues of interest for the entire basin area in a        management and thus ensure the fulfillment and improvement of 
synchronized manner with special emphasis on the                     functions that the watercourses of this basin have in water 
valorization of transboundary impacts, i.e. impacts between 
                                 y p    ,      p                     management on the national level.
                                                                           g
river basin districts.
                       River basin
                        district in 
                                                                 Monitoring
                         Croatia



                                                                                                       Characterization



                                                                             Status
                     NTRBMP




                                                                                                   n
                                                                                      implementation
                                                                                                                Implementation
                                                                                           Plan 
                                                                                                       Status
  River basin                          River basin
   district in                          district in 
      FBiH                                  RS
                                                                     Reporting to the
                                                                                    e                           Measures Dead‐lines   Funds
                                                                                                                                              Competent
                                                                         public                        Risks                                  institution
Improved Operation of Reservoirs and HPPs
• C d i
  Conducting a study to determine the minimum 
                    d    d       i   h     i i
  environmental flow in the Neretva and Trebišnjica
  Rivers
• Preparing a plan, guidelines, and training program for 
  optimal management of multipurpose HPP reservoirs 
  optimal management of multipurpose HPP reservoirs
• Developing a dynamic management model for 
  reservoir operation
  reservoir operation
• Developing and implementing mathematical models 
  for hydrological predictions, HPP operations, 
  for hydrological predictions HPP operations
  forecasting and decision‐making
Prostorna distribucija godišnjeg suficita/deficita količina kišnih padavina u posljednjoj
     dekadi (1999-2008.) u poređenju sa referentnim periodom (1961-1990.) u BiH




                                                                                   HM postaje.kmz
Precipation Data
                          Precipation Data
•   Prema podacima Federalnog hidrometeorološkog zavoda, u periodu od 1.11. do 8.12.2010. godine 
    Prema podacima Federalnog hidrometeorološkog zavoda u periodu od 1 11 do 8 12 2010 godine
    ukupne padaline sa snijegom na stanici Ivan Sedlo su iznosile 545,00 mm (što je više od 35% od 
    ukupnog srednjeg godišnjeg prosjeka), na stanici Mostar 491,80 mm, na stanici Livno 446,10 mm, 
    na stanici Bjelašnica 398,50 mm, na stanici Stolac 461,20 mm, na stanici Neum 339,40 mm.
•   Prema podacima sa nekih od mjernih stanica AVP Jadranskog mora i elektroprivrednih poduzeća 
           p                        j                           g              p          p
    ukupne padaline su iznosile:
•   Konjic – Hagenuk ‐ od 1.11. do 5.12. ukupno 460,30 mm (u periodu od 17.11.‐5.12. ukupno 270,90 
    mm)
•   Glavatičevo most – od 17.11. do 3.12., 354,80 mm (u periodu od 1.11.‐1.12. ukupno 539,20 mm)
•   Brana HE Jablanica – od 1.11. do 5.12. ukupno 832,10 mm
•   MP Umoljani – od 1.11. do 8.12. ukupno 711,40 mm
•   MP Trešnjevica – od 1.11. do 8.12. ukupno 425,20 mm
•   MP Jasenik  od 1.11. do 8.12. ukupno 414,90 mm
    MP Jasenik – od 1.11. do 8.12. ukupno 414,90 mm
•   MP Čuhovići – od 1.11. do 8.12. ukupno 433,00 mm (u periodu od 17.11‐8.12 ukupno 327,30 mm)
•   MP Jasenjani – od 1.11. do 8.12. ukupno 999,40 mm (u periodu od 17.11‐8.12 ukupno 657,70 mm)
•   MP Blidinje – od 1.11. do 8.12. ukupno 841,00 mm
•   HP Humac  – od 1.11. do 8.12. ukupno 343,80 mm (u periodu od 17.11‐8.12 ukupno 255,60 mm)
    HP Humac od 1 11 do 8 12 ukupno 343 80 mm (u periodu od 17 11 8 12 ukupno 255 60 mm)
THANK YOU FOR YOUR ATTENTION

Más contenido relacionado

Destacado

Destacado (11)

Marco Keiner_Intervention_Mapping the Issues
Marco Keiner_Intervention_Mapping the IssuesMarco Keiner_Intervention_Mapping the Issues
Marco Keiner_Intervention_Mapping the Issues
 
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Dimitris F...
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Dimitris F...Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Dimitris F...
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Dimitris F...
 
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Angela Kla...
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Angela Kla...Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Angela Kla...
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Angela Kla...
 
Workshop on Flood management in a transboundary context, 13-14.12.2011, Jacob...
Workshop on Flood management in a transboundary context, 13-14.12.2011, Jacob...Workshop on Flood management in a transboundary context, 13-14.12.2011, Jacob...
Workshop on Flood management in a transboundary context, 13-14.12.2011, Jacob...
 
006a NCWRM 2011 Fixler_Israel
006a NCWRM 2011 Fixler_Israel006a NCWRM 2011 Fixler_Israel
006a NCWRM 2011 Fixler_Israel
 
006b NCWRM 2011 Civili_MEDPOL
006b NCWRM 2011 Civili_MEDPOL006b NCWRM 2011 Civili_MEDPOL
006b NCWRM 2011 Civili_MEDPOL
 
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Dejan Pano...
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Dejan Pano...Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Dejan Pano...
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Dejan Pano...
 
006b NCWRM 2011 Papadoyannakis_EC_DGEnv
006b NCWRM 2011 Papadoyannakis_EC_DGEnv006b NCWRM 2011 Papadoyannakis_EC_DGEnv
006b NCWRM 2011 Papadoyannakis_EC_DGEnv
 
006a NCWRM 2011 Hamdy_CIHEAM_MAI Bari
006a NCWRM 2011 Hamdy_CIHEAM_MAI Bari006a NCWRM 2011 Hamdy_CIHEAM_MAI Bari
006a NCWRM 2011 Hamdy_CIHEAM_MAI Bari
 
003 NCWRM 2011 Taqash_Jordan
003 NCWRM 2011 Taqash_Jordan003 NCWRM 2011 Taqash_Jordan
003 NCWRM 2011 Taqash_Jordan
 
Workshop on Flood management in a transboundary context, 13-14.12.2011, Justo...
Workshop on Flood management in a transboundary context, 13-14.12.2011, Justo...Workshop on Flood management in a transboundary context, 13-14.12.2011, Justo...
Workshop on Flood management in a transboundary context, 13-14.12.2011, Justo...
 

Más de GWP-Mediterranean (GWP-Med)

Más de GWP-Mediterranean (GWP-Med) (19)

Presentation by Mr. Kaabi (Tunisia)
Presentation by Mr. Kaabi (Tunisia)Presentation by Mr. Kaabi (Tunisia)
Presentation by Mr. Kaabi (Tunisia)
 
Presentation by Ms. Anthi Brouma (GWP-Med)
Presentation by Ms. Anthi Brouma (GWP-Med)Presentation by Ms. Anthi Brouma (GWP-Med)
Presentation by Ms. Anthi Brouma (GWP-Med)
 
Al Hmaidi (Palestine)
Al Hmaidi (Palestine)Al Hmaidi (Palestine)
Al Hmaidi (Palestine)
 
Knowledge brokering in the Sava river basin management planning, 30 Nov-2 Dec...
Knowledge brokering in the Sava river basin management planning, 30 Nov-2 Dec...Knowledge brokering in the Sava river basin management planning, 30 Nov-2 Dec...
Knowledge brokering in the Sava river basin management planning, 30 Nov-2 Dec...
 
Workshop on Flood management in a transboundary context, 13-14.12.2011
Workshop on Flood management in a transboundary context, 13-14.12.2011Workshop on Flood management in a transboundary context, 13-14.12.2011
Workshop on Flood management in a transboundary context, 13-14.12.2011
 
Workshop on Flood management in a transboundary context, 13-14.12.2011, Dimit...
Workshop on Flood management in a transboundary context, 13-14.12.2011, Dimit...Workshop on Flood management in a transboundary context, 13-14.12.2011, Dimit...
Workshop on Flood management in a transboundary context, 13-14.12.2011, Dimit...
 
Workshop on Flood management in a transboundary context, 13-14.12.2011,Erjon ...
Workshop on Flood management in a transboundary context, 13-14.12.2011,Erjon ...Workshop on Flood management in a transboundary context, 13-14.12.2011,Erjon ...
Workshop on Flood management in a transboundary context, 13-14.12.2011,Erjon ...
 
Workshop on Flood management in a transboundary context, 13-14.12.2011,Vladim...
Workshop on Flood management in a transboundary context, 13-14.12.2011,Vladim...Workshop on Flood management in a transboundary context, 13-14.12.2011,Vladim...
Workshop on Flood management in a transboundary context, 13-14.12.2011,Vladim...
 
Workshop on Flood management in a transboundary context, 13-14.12.2011, Marti...
Workshop on Flood management in a transboundary context, 13-14.12.2011, Marti...Workshop on Flood management in a transboundary context, 13-14.12.2011, Marti...
Workshop on Flood management in a transboundary context, 13-14.12.2011, Marti...
 
Marco Keiner_ Intervention_Institutions and Legal Frameworks
Marco Keiner_ Intervention_Institutions and Legal FrameworksMarco Keiner_ Intervention_Institutions and Legal Frameworks
Marco Keiner_ Intervention_Institutions and Legal Frameworks
 
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Zeljko Dragan
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Zeljko DraganInt. Roundtable on Transboundary Waters Management, 15-16.12.2011, Zeljko Dragan
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Zeljko Dragan
 
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Ivica Trumbic
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Ivica TrumbicInt. Roundtable on Transboundary Waters Management, 15-16.12.2011, Ivica Trumbic
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Ivica Trumbic
 
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Holger Tre...
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Holger Tre...Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Holger Tre...
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Holger Tre...
 
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Miroslav K...
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Miroslav K...Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Miroslav K...
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Miroslav K...
 
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Enrique Ci...
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Enrique Ci...Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Enrique Ci...
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Enrique Ci...
 
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Marina Bab...
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Marina Bab...Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Marina Bab...
Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Marina Bab...
 
NCWRM Conference 2011_AGENDA_final
NCWRM Conference 2011_AGENDA_finalNCWRM Conference 2011_AGENDA_final
NCWRM Conference 2011_AGENDA_final
 
007 NCWRM 2011 Nikitas_H2020
007 NCWRM 2011 Nikitas_H2020007 NCWRM 2011 Nikitas_H2020
007 NCWRM 2011 Nikitas_H2020
 
007 NCWRM 2011 Choukr-Allah_AWC
007 NCWRM 2011 Choukr-Allah_AWC007 NCWRM 2011 Choukr-Allah_AWC
007 NCWRM 2011 Choukr-Allah_AWC
 

Int. Roundtable on Transboundary Waters Management, 15-16.12.2011, Damir Mrden

  • 2. Introduction of the Project Introduction of the Project • NTMP is a regional cooperation project ‐ Republic of  Croatia and Bosnia and Herzegovina. • Transboundary river basin on the territory of: T b d i b i th t it f • Republic of Croatia  • Dubrovnik‐Neretva County  and • Split‐Dalmatia County • Bosnia and Herzegovina (B&H) • Federation of BiH (FB&H) • Herzegovina‐Neretva Canton (7)/  Western Herzegovina Canton (8) • Herzeg‐Bosnia Canton (10) • Republika Srpska (RS) p p ( ) • Trebinje Region • The Neretva is: • the longest river of the Adriatic catchment area (215  km long, with only 22 km in Croatia)  • the water richest tributary of the Adriatic Sea on the  the water –richest tributary of the Adriatic Sea on the territory of these two countries • complex karst hydrography makes it difficult to define  the exact boundaries of the catchment area (around  10,500 km2) • the water regime of the Neretva River basin has been  significantly modified by the construction of  hydropower facilities in the upper and middle sections  of the Neretva River and on the Trebišnjica River with 7  reservoirs built from 1954 to 1985.
  • 3. Background • Implementation Teams Legal Basis g Cooperation between the Republic of Croatia and Bosnia and  Herzegovina BOSNIA AND  REPUBLIC OF  Agreement between the Governments of Croatia and BiH  HERZEGOVINA  HERZEGOVINA CROATIA regulating water management relations concluded in July  (BiH) 1996 – approved and ratified Grant Agreement concluded in September 2008 with the  g p International Bank for Reconstruction and Development  (IBRD) acting as an Implementing Agency of GEF Project  BiH Project  Implementation Team  Implementation Team  Project Agreement concluded with the International Bank for  (PIT)  Hrvatske vode            (PMT & PIT) May 2009 Reconstruction and Development (IBRD) i d l ( ) 19 December 2008 19 December 2008 Memorandum of Understanding signed between Bosnia and  Herzegovina and the Republic of Croatia on implementation of  joint activities under the Project joint activities under the Project COORDINATION  COORDINATION  Agreements become effective COMMITTEE   COMMITTEE Croatia – 7 January 2009 BiH – 6 March 2009 8 June 2009 22 October 2009  Official start (meeting in Sarajevo) 12‐13 March 2009
  • 4. Project Implementation Project Implementation Structure Interstate Water  Commission Component 1 Component 4 Components 2&3 MRDFWM Coordination  Committee BiH MOFTER HV PIT (5) PMT TA FM MRDFWM (1) Procurement FBiH  MC (2) MAWMF MEPPPC (1) MAFRD (1) RS MAFWM TA Agency for Adriatic Sea  Agency for Adriatic Sea  Watershed, Mostar Watershed, Trebinje FM Procurement MAWMF MAFWM PIT PIT MET MSPCEE Reporting relation p g Municip. Municip. Working relation
  • 5. Water Management Characteristics of the Region h f h oThe water regime of the oThe water regime of the  Neretva River basin has been  significantly modified by the  construction of hydropower  facilities in the upper and  f iliti i th d middle sections of the  Neretva River and on the  Trebišnjica River with River with  reservoirs: • Jablanica (1954) ( ) • Rama (1969) • Grabovica (1981) • Salakovac (1981) • Mostar (1985) • Gorica (1965) and Bileća  (1968) • Equalizing basins of Čapljina E li i b i f Č lji pumping HPP in Popovo polje and Svitava (1978)
  • 6.
  • 7.
  • 8. Component 1 – Improved  Transboundary Water  T b d W Resource Management Institution and capacity building Institution and capacity building Measurement, monitoring, and information management Measurement, monitoring, and information management Development of Water Information System, including GIS Development of Water Information System, including GIS  Development of Neretva and Trebišnjica River Basin  Management Plan (RBMP) ( )
  • 9. Subcomponent: Neretva and  Trebišnjica River Basin Management  T biš ji Ri B i M t Plan (NTRBMP) • The general goal of the project is to improve water  The NTRBMP consists of river basin management plans that  address the issues of interest for the entire basin area in a  management and thus ensure the fulfillment and improvement of  synchronized manner with special emphasis on the  functions that the watercourses of this basin have in water  valorization of transboundary impacts, i.e. impacts between  y p , p management on the national level. g river basin districts. River basin district in  Monitoring Croatia Characterization Status NTRBMP n implementation Implementation Plan  Status River basin River basin district in  district in  FBiH RS Reporting to the e Measures Dead‐lines Funds Competent public Risks institution
  • 10. Improved Operation of Reservoirs and HPPs • C d i Conducting a study to determine the minimum  d d i h i i environmental flow in the Neretva and Trebišnjica Rivers • Preparing a plan, guidelines, and training program for  optimal management of multipurpose HPP reservoirs  optimal management of multipurpose HPP reservoirs • Developing a dynamic management model for  reservoir operation reservoir operation • Developing and implementing mathematical models  for hydrological predictions, HPP operations,  for hydrological predictions HPP operations forecasting and decision‐making
  • 11. Prostorna distribucija godišnjeg suficita/deficita količina kišnih padavina u posljednjoj dekadi (1999-2008.) u poređenju sa referentnim periodom (1961-1990.) u BiH HM postaje.kmz
  • 12.
  • 13.
  • 14.
  • 15. Precipation Data Precipation Data • Prema podacima Federalnog hidrometeorološkog zavoda, u periodu od 1.11. do 8.12.2010. godine  Prema podacima Federalnog hidrometeorološkog zavoda u periodu od 1 11 do 8 12 2010 godine ukupne padaline sa snijegom na stanici Ivan Sedlo su iznosile 545,00 mm (što je više od 35% od  ukupnog srednjeg godišnjeg prosjeka), na stanici Mostar 491,80 mm, na stanici Livno 446,10 mm,  na stanici Bjelašnica 398,50 mm, na stanici Stolac 461,20 mm, na stanici Neum 339,40 mm. • Prema podacima sa nekih od mjernih stanica AVP Jadranskog mora i elektroprivrednih poduzeća  p j g p p ukupne padaline su iznosile: • Konjic – Hagenuk ‐ od 1.11. do 5.12. ukupno 460,30 mm (u periodu od 17.11.‐5.12. ukupno 270,90  mm) • Glavatičevo most – od 17.11. do 3.12., 354,80 mm (u periodu od 1.11.‐1.12. ukupno 539,20 mm) • Brana HE Jablanica – od 1.11. do 5.12. ukupno 832,10 mm • MP Umoljani – od 1.11. do 8.12. ukupno 711,40 mm • MP Trešnjevica – od 1.11. do 8.12. ukupno 425,20 mm • MP Jasenik  od 1.11. do 8.12. ukupno 414,90 mm MP Jasenik – od 1.11. do 8.12. ukupno 414,90 mm • MP Čuhovići – od 1.11. do 8.12. ukupno 433,00 mm (u periodu od 17.11‐8.12 ukupno 327,30 mm) • MP Jasenjani – od 1.11. do 8.12. ukupno 999,40 mm (u periodu od 17.11‐8.12 ukupno 657,70 mm) • MP Blidinje – od 1.11. do 8.12. ukupno 841,00 mm • HP Humac  – od 1.11. do 8.12. ukupno 343,80 mm (u periodu od 17.11‐8.12 ukupno 255,60 mm) HP Humac od 1 11 do 8 12 ukupno 343 80 mm (u periodu od 17 11 8 12 ukupno 255 60 mm)
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
  • 21. THANK YOU FOR YOUR ATTENTION