Today’s Production in a Packaged World
By Gan Chun Chet (August 2016)
Quite remarkable that today production figures are governed by customers’ appetite. As
worldpopulationincreasesyearafteryear,thisdemandhastobe meetto serve the required figures.
In a period of economic recovery (also stability required) comes an era of rapid increase in demand,
predictionthatone wouldfigure outinvolvingstock-upof finishgoodstosatisfythe marketasdemand
are required. Increase in production hours seems promising to earn the extra bonus, withmultiplier
effectthatcouldbringprofitgains back intothe business,thus able topay investorstheirreturns.
This is a typical scenario of business atmosphere in today’s production environment which
affected investors.The risk involvedis too much in the sense where in some cases investorsare not
gettingbackthe promisedreturns.Onthe otherhand,itisa lossof investmentthat businessmanare
not able to get back its initial investmentvalue due tothe sluggishmarket inailingeconomy andthe
increased structural cost. Business closure and debt occurs amongst investors which dampen the
future.
Therefore isittooriskytobuilt-upstocks,inviewthatcustomers’ mightchange theirappetite
again for othermarketsegment. Inorder terms,organisationprofitis salesdependentbasedonreal
salesdemand. Andif the real demandforacertainproductsor services are ona maturity course,one
will knowthatthe focusshouldbe ongrowth products instead.Therefore,the notionof stock-upyour
saleable productsbasedonmarketresearchandforecastisof great importance.
Imagine the image and reputation of the particular organisation of interest at sight, are of
similar views on either side – whether you are a customer or a buyer. In fact, at point of sales, your
perception of your customer is the same as their perception on your products/services and there is
where a productispurchased.
Worldeconomicindicatorsshowsthatthe marketsentimenthasrecoveredwithstockmarket
trendingupwardsandindustrialoutputatitspeaklevel worldwide,afterthe greatglobal recessionin
2007-2008. The situation seemstolook good. Some Interestingpartof the processtechnologythatis
implementedinvolves fully automated technology.However,some are semi-automatic.Itreallydoes
not matter as long as the bottleneck in critical processes are identified and rectified, not affecting
those inthe waitinglist(orthroughput),i.e.toolongwaithoursordevelopmentleadtimeforinstance.
Itwasfoundthatthe bottleneckof the processmainly duetothe packagingmachineisineach
setup activity. Therefore, one of the new technology developed to meet this change requirement is
as follows:-
In a packaging machine, the glue sealer injection time is fully automated depending on the
packsize.Basedon anelectroniccampprogrammer,itisable toinject theglueonatimely programme,
precisely whenitisrequired.Thiseliminatesmanuallyadjustmenttasks. Inadditionthe compression
sectionisfullyeliminatedduetothe newglue characteristicthatsealsstronglybystationaryflapsonly.
Thisfurtherreduces the critical setuptime.
This move requireshighlyskill workforce toimplementhigherendprocesstechnologyandit
isinfactindemandwhichrequireshighlyskilledengineerstoperformthe tasks.Inpackagingmachine
only forexample,aretrofit projectoncertainexistingsectionof the productionmachine willincrease
the speedof everysetuptask, thusincreasesproductioncompetitiveness.
Is it A Changed World or Still A Changing World?
The drive for automation, whether fully or semi built-in has occurred. In the automated
productionenvironment,fullyautomatingrepetitivetasksandsemi-automateothers,will reduce the
cost of ownership eventually. However, it is unlikelyto eliminate all the manual task due to cost
matters. Therefore, perform in-house studies appropriately before embarking on the type of
technologyanditsinvolvement,costimpactinthe longterm.
The paradox of products/service drivenbymanufacturingcapability isnolongermakingsense
andhas changedtoa customeractive paradigm.Whatcustomersneedisafact thatcannotbe change
but justto meetthe demandinorderto staycompetitive.
InnovativeProductDesigns,Engineering
Innovative productsdesignthatallowsfrequentsetuptime are the way forward.Systematic
designs approach developed by Phal and Beitz set-off strategy that increases the probability of
technical andeconomicsuccessof the design.
Some company move forward to meet the cost requirements. Some decision might be
conservative thusnofurtherinvestmentinthisnature,i.e.the decisionis notnecessarilytoimplement
a particulartechnology.Whateverthe decisionis,the innovative technology oridea/philosophy that
are implementedmustmeetthe company’spolicyasitformsacoherentpartof the businesssolution.
Conclusion
With the available productiontechnology,whetheritisfullyor semi-automateddependson
market timing and acceptance. Solutionsthat are not necessarilyto be implemented yet have to be
deferto laterdevelopmentstage.Implementthe necessarysolution(s) thatwill benefityourcurrent
condition.Strategizeyourfuture endeavour.

Más contenido relacionado

Similar a Today's Production Technology

Australian mining magazine turning mining performance around
Australian mining magazine  turning mining performance aroundAustralian mining magazine  turning mining performance around
Australian mining magazine turning mining performance aroundHendrik Lourens
 
American connector company supply chain
American connector company supply chainAmerican connector company supply chain
American connector company supply chainUdit Jain
 
Application of lean manufacturing tools in garments production
Application of lean manufacturing tools in garments productionApplication of lean manufacturing tools in garments production
Application of lean manufacturing tools in garments productionRazib Mahmud
 
Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)pratik negi
 
Checking the activities and Performance Management in the Automotive Industry
Checking the activities and Performance Management in the Automotive IndustryChecking the activities and Performance Management in the Automotive Industry
Checking the activities and Performance Management in the Automotive IndustryIRJET Journal
 
Sales & operations planning
Sales & operations planningSales & operations planning
Sales & operations planningShreyas Nair
 
Manufacturers use project erp for tough times
Manufacturers use project erp for tough timesManufacturers use project erp for tough times
Manufacturers use project erp for tough timesKaizenlogcom
 
Manufacturers use project erp for tough times
Manufacturers use project erp for tough timesManufacturers use project erp for tough times
Manufacturers use project erp for tough timesKaizenlogcom
 
CIOReview_Manufacturing Special Edition_TCS Article
CIOReview_Manufacturing Special Edition_TCS ArticleCIOReview_Manufacturing Special Edition_TCS Article
CIOReview_Manufacturing Special Edition_TCS ArticleAmit Bhowmik
 
Complexities of Materials Management
Complexities of Materials ManagementComplexities of Materials Management
Complexities of Materials ManagementBS Murthy
 
3m Transcript 2006 2nd
3m Transcript 2006 2nd3m Transcript 2006 2nd
3m Transcript 2006 2ndfinance10
 
Space Age Furniture Company The Space Age Furniture Company manufa.docx
Space Age Furniture Company The Space Age Furniture Company manufa.docxSpace Age Furniture Company The Space Age Furniture Company manufa.docx
Space Age Furniture Company The Space Age Furniture Company manufa.docxwhitneyleman54422
 
just in time approace literature view
just in time approace literature viewjust in time approace literature view
just in time approace literature viewAnqur Rauth
 
Group 5 STRATEGY CAPACITY PLANNING (1).pptx
Group 5 STRATEGY CAPACITY PLANNING (1).pptxGroup 5 STRATEGY CAPACITY PLANNING (1).pptx
Group 5 STRATEGY CAPACITY PLANNING (1).pptxUnklabMedia
 
leewayhertz.com-AI in production planning Pioneering innovation in the heart ...
leewayhertz.com-AI in production planning Pioneering innovation in the heart ...leewayhertz.com-AI in production planning Pioneering innovation in the heart ...
leewayhertz.com-AI in production planning Pioneering innovation in the heart ...KristiLBurns
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING Aqib ali
 

Similar a Today's Production Technology (20)

Australian mining magazine turning mining performance around
Australian mining magazine  turning mining performance aroundAustralian mining magazine  turning mining performance around
Australian mining magazine turning mining performance around
 
American connector company supply chain
American connector company supply chainAmerican connector company supply chain
American connector company supply chain
 
Application of lean manufacturing tools in garments production
Application of lean manufacturing tools in garments productionApplication of lean manufacturing tools in garments production
Application of lean manufacturing tools in garments production
 
Just in time concept
Just in time conceptJust in time concept
Just in time concept
 
Bmw Lean Manufacturing (Pratik Negi)
Bmw Lean Manufacturing  (Pratik Negi)Bmw Lean Manufacturing  (Pratik Negi)
Bmw Lean Manufacturing (Pratik Negi)
 
Checking the activities and Performance Management in the Automotive Industry
Checking the activities and Performance Management in the Automotive IndustryChecking the activities and Performance Management in the Automotive Industry
Checking the activities and Performance Management in the Automotive Industry
 
Sales & operations planning
Sales & operations planningSales & operations planning
Sales & operations planning
 
Shriram Article Version 3
Shriram Article Version 3Shriram Article Version 3
Shriram Article Version 3
 
Manufacturers use project erp for tough times
Manufacturers use project erp for tough timesManufacturers use project erp for tough times
Manufacturers use project erp for tough times
 
Manufacturers use project erp for tough times
Manufacturers use project erp for tough timesManufacturers use project erp for tough times
Manufacturers use project erp for tough times
 
CIOReview_Manufacturing Special Edition_TCS Article
CIOReview_Manufacturing Special Edition_TCS ArticleCIOReview_Manufacturing Special Edition_TCS Article
CIOReview_Manufacturing Special Edition_TCS Article
 
Complexities of Materials Management
Complexities of Materials ManagementComplexities of Materials Management
Complexities of Materials Management
 
3m Transcript 2006 2nd
3m Transcript 2006 2nd3m Transcript 2006 2nd
3m Transcript 2006 2nd
 
PulpPlan_IPW_2014
PulpPlan_IPW_2014PulpPlan_IPW_2014
PulpPlan_IPW_2014
 
OGFJ Article
OGFJ ArticleOGFJ Article
OGFJ Article
 
Space Age Furniture Company The Space Age Furniture Company manufa.docx
Space Age Furniture Company The Space Age Furniture Company manufa.docxSpace Age Furniture Company The Space Age Furniture Company manufa.docx
Space Age Furniture Company The Space Age Furniture Company manufa.docx
 
just in time approace literature view
just in time approace literature viewjust in time approace literature view
just in time approace literature view
 
Group 5 STRATEGY CAPACITY PLANNING (1).pptx
Group 5 STRATEGY CAPACITY PLANNING (1).pptxGroup 5 STRATEGY CAPACITY PLANNING (1).pptx
Group 5 STRATEGY CAPACITY PLANNING (1).pptx
 
leewayhertz.com-AI in production planning Pioneering innovation in the heart ...
leewayhertz.com-AI in production planning Pioneering innovation in the heart ...leewayhertz.com-AI in production planning Pioneering innovation in the heart ...
leewayhertz.com-AI in production planning Pioneering innovation in the heart ...
 
AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING AGGREGATE PRODUCTION PLANNING
AGGREGATE PRODUCTION PLANNING
 

Más de Gan Chun Chet

Trust Measurement Presentation_Part 3
Trust Measurement Presentation_Part 3Trust Measurement Presentation_Part 3
Trust Measurement Presentation_Part 3Gan Chun Chet
 
Predicting Machine Setup Time_Suggeting A Limit Determiner, Institute of Engi...
Predicting Machine Setup Time_Suggeting A Limit Determiner, Institute of Engi...Predicting Machine Setup Time_Suggeting A Limit Determiner, Institute of Engi...
Predicting Machine Setup Time_Suggeting A Limit Determiner, Institute of Engi...Gan Chun Chet
 
Predictive Method in Analyzing Past Data_(May_09), Institute of Engineers Mal...
Predictive Method in Analyzing Past Data_(May_09), Institute of Engineers Mal...Predictive Method in Analyzing Past Data_(May_09), Institute of Engineers Mal...
Predictive Method in Analyzing Past Data_(May_09), Institute of Engineers Mal...Gan Chun Chet
 
Modelling Trust of Customer and Supplier Interaction_2023 Vol 10 Issue 1.pdf
Modelling Trust of Customer and Supplier Interaction_2023 Vol 10 Issue 1.pdfModelling Trust of Customer and Supplier Interaction_2023 Vol 10 Issue 1.pdf
Modelling Trust of Customer and Supplier Interaction_2023 Vol 10 Issue 1.pdfGan Chun Chet
 
Oil and Gas Industry : Datasheet for Fire and Gas Detectors.pdf
Oil and Gas Industry : Datasheet for Fire and Gas Detectors.pdfOil and Gas Industry : Datasheet for Fire and Gas Detectors.pdf
Oil and Gas Industry : Datasheet for Fire and Gas Detectors.pdfGan Chun Chet
 
Fire and Gas Detection System : Part 3_Technical Features, Locating Detectors...
Fire and Gas Detection System : Part 3_Technical Features, Locating Detectors...Fire and Gas Detection System : Part 3_Technical Features, Locating Detectors...
Fire and Gas Detection System : Part 3_Technical Features, Locating Detectors...Gan Chun Chet
 
Fire and Gas Detection System : Part 2_Block Diagram_Philosophy, Signal Types...
Fire and Gas Detection System : Part 2_Block Diagram_Philosophy, Signal Types...Fire and Gas Detection System : Part 2_Block Diagram_Philosophy, Signal Types...
Fire and Gas Detection System : Part 2_Block Diagram_Philosophy, Signal Types...Gan Chun Chet
 
Fire and Gas Detection System : Part 1_The Field Devices and Its Panels
Fire and Gas Detection System : Part 1_The Field Devices and Its PanelsFire and Gas Detection System : Part 1_The Field Devices and Its Panels
Fire and Gas Detection System : Part 1_The Field Devices and Its PanelsGan Chun Chet
 
Trust Measurement Presentation_2.pptx
Trust Measurement Presentation_2.pptxTrust Measurement Presentation_2.pptx
Trust Measurement Presentation_2.pptxGan Chun Chet
 
Boundary Layer Oscillation for Aircraft Cavity/Surfaces
Boundary Layer Oscillation for Aircraft Cavity/SurfacesBoundary Layer Oscillation for Aircraft Cavity/Surfaces
Boundary Layer Oscillation for Aircraft Cavity/SurfacesGan Chun Chet
 
Noise dB to dBA Calculation_Gan Chun Chet.pptx
Noise dB to dBA Calculation_Gan Chun Chet.pptxNoise dB to dBA Calculation_Gan Chun Chet.pptx
Noise dB to dBA Calculation_Gan Chun Chet.pptxGan Chun Chet
 
Noise Error Calculation_Gan Chun Chet.pptx
Noise Error Calculation_Gan Chun Chet.pptxNoise Error Calculation_Gan Chun Chet.pptx
Noise Error Calculation_Gan Chun Chet.pptxGan Chun Chet
 
Noise_Proofing Linking Equations.pdf
Noise_Proofing Linking Equations.pdfNoise_Proofing Linking Equations.pdf
Noise_Proofing Linking Equations.pdfGan Chun Chet
 
The Prediction of Time Trending Techniques in Manufacuturing
The Prediction of Time Trending Techniques in ManufacuturingThe Prediction of Time Trending Techniques in Manufacuturing
The Prediction of Time Trending Techniques in ManufacuturingGan Chun Chet
 
The Philosophy and Characteristics of Trust Measurement in Practice.docx
The Philosophy and Characteristics of Trust Measurement in Practice.docxThe Philosophy and Characteristics of Trust Measurement in Practice.docx
The Philosophy and Characteristics of Trust Measurement in Practice.docxGan Chun Chet
 
Trust Measurement Gan Chun Chet 07.01.2022
Trust Measurement Gan Chun Chet 07.01.2022Trust Measurement Gan Chun Chet 07.01.2022
Trust Measurement Gan Chun Chet 07.01.2022Gan Chun Chet
 
mV to dBm Airflow Across Cavity_Gan Chun Chet_07.01.2021
mV to dBm Airflow Across Cavity_Gan Chun Chet_07.01.2021mV to dBm Airflow Across Cavity_Gan Chun Chet_07.01.2021
mV to dBm Airflow Across Cavity_Gan Chun Chet_07.01.2021Gan Chun Chet
 
Control System_3rd Order System_Root Locus Method
Control System_3rd Order System_Root Locus MethodControl System_3rd Order System_Root Locus Method
Control System_3rd Order System_Root Locus MethodGan Chun Chet
 
PID Controllers Control Engineering
PID Controllers Control EngineeringPID Controllers Control Engineering
PID Controllers Control EngineeringGan Chun Chet
 
Noise Reduction Modelling Study for Aircraft Cavity - Chun C Gan
Noise Reduction Modelling Study for Aircraft Cavity  - Chun C GanNoise Reduction Modelling Study for Aircraft Cavity  - Chun C Gan
Noise Reduction Modelling Study for Aircraft Cavity - Chun C GanGan Chun Chet
 

Más de Gan Chun Chet (20)

Trust Measurement Presentation_Part 3
Trust Measurement Presentation_Part 3Trust Measurement Presentation_Part 3
Trust Measurement Presentation_Part 3
 
Predicting Machine Setup Time_Suggeting A Limit Determiner, Institute of Engi...
Predicting Machine Setup Time_Suggeting A Limit Determiner, Institute of Engi...Predicting Machine Setup Time_Suggeting A Limit Determiner, Institute of Engi...
Predicting Machine Setup Time_Suggeting A Limit Determiner, Institute of Engi...
 
Predictive Method in Analyzing Past Data_(May_09), Institute of Engineers Mal...
Predictive Method in Analyzing Past Data_(May_09), Institute of Engineers Mal...Predictive Method in Analyzing Past Data_(May_09), Institute of Engineers Mal...
Predictive Method in Analyzing Past Data_(May_09), Institute of Engineers Mal...
 
Modelling Trust of Customer and Supplier Interaction_2023 Vol 10 Issue 1.pdf
Modelling Trust of Customer and Supplier Interaction_2023 Vol 10 Issue 1.pdfModelling Trust of Customer and Supplier Interaction_2023 Vol 10 Issue 1.pdf
Modelling Trust of Customer and Supplier Interaction_2023 Vol 10 Issue 1.pdf
 
Oil and Gas Industry : Datasheet for Fire and Gas Detectors.pdf
Oil and Gas Industry : Datasheet for Fire and Gas Detectors.pdfOil and Gas Industry : Datasheet for Fire and Gas Detectors.pdf
Oil and Gas Industry : Datasheet for Fire and Gas Detectors.pdf
 
Fire and Gas Detection System : Part 3_Technical Features, Locating Detectors...
Fire and Gas Detection System : Part 3_Technical Features, Locating Detectors...Fire and Gas Detection System : Part 3_Technical Features, Locating Detectors...
Fire and Gas Detection System : Part 3_Technical Features, Locating Detectors...
 
Fire and Gas Detection System : Part 2_Block Diagram_Philosophy, Signal Types...
Fire and Gas Detection System : Part 2_Block Diagram_Philosophy, Signal Types...Fire and Gas Detection System : Part 2_Block Diagram_Philosophy, Signal Types...
Fire and Gas Detection System : Part 2_Block Diagram_Philosophy, Signal Types...
 
Fire and Gas Detection System : Part 1_The Field Devices and Its Panels
Fire and Gas Detection System : Part 1_The Field Devices and Its PanelsFire and Gas Detection System : Part 1_The Field Devices and Its Panels
Fire and Gas Detection System : Part 1_The Field Devices and Its Panels
 
Trust Measurement Presentation_2.pptx
Trust Measurement Presentation_2.pptxTrust Measurement Presentation_2.pptx
Trust Measurement Presentation_2.pptx
 
Boundary Layer Oscillation for Aircraft Cavity/Surfaces
Boundary Layer Oscillation for Aircraft Cavity/SurfacesBoundary Layer Oscillation for Aircraft Cavity/Surfaces
Boundary Layer Oscillation for Aircraft Cavity/Surfaces
 
Noise dB to dBA Calculation_Gan Chun Chet.pptx
Noise dB to dBA Calculation_Gan Chun Chet.pptxNoise dB to dBA Calculation_Gan Chun Chet.pptx
Noise dB to dBA Calculation_Gan Chun Chet.pptx
 
Noise Error Calculation_Gan Chun Chet.pptx
Noise Error Calculation_Gan Chun Chet.pptxNoise Error Calculation_Gan Chun Chet.pptx
Noise Error Calculation_Gan Chun Chet.pptx
 
Noise_Proofing Linking Equations.pdf
Noise_Proofing Linking Equations.pdfNoise_Proofing Linking Equations.pdf
Noise_Proofing Linking Equations.pdf
 
The Prediction of Time Trending Techniques in Manufacuturing
The Prediction of Time Trending Techniques in ManufacuturingThe Prediction of Time Trending Techniques in Manufacuturing
The Prediction of Time Trending Techniques in Manufacuturing
 
The Philosophy and Characteristics of Trust Measurement in Practice.docx
The Philosophy and Characteristics of Trust Measurement in Practice.docxThe Philosophy and Characteristics of Trust Measurement in Practice.docx
The Philosophy and Characteristics of Trust Measurement in Practice.docx
 
Trust Measurement Gan Chun Chet 07.01.2022
Trust Measurement Gan Chun Chet 07.01.2022Trust Measurement Gan Chun Chet 07.01.2022
Trust Measurement Gan Chun Chet 07.01.2022
 
mV to dBm Airflow Across Cavity_Gan Chun Chet_07.01.2021
mV to dBm Airflow Across Cavity_Gan Chun Chet_07.01.2021mV to dBm Airflow Across Cavity_Gan Chun Chet_07.01.2021
mV to dBm Airflow Across Cavity_Gan Chun Chet_07.01.2021
 
Control System_3rd Order System_Root Locus Method
Control System_3rd Order System_Root Locus MethodControl System_3rd Order System_Root Locus Method
Control System_3rd Order System_Root Locus Method
 
PID Controllers Control Engineering
PID Controllers Control EngineeringPID Controllers Control Engineering
PID Controllers Control Engineering
 
Noise Reduction Modelling Study for Aircraft Cavity - Chun C Gan
Noise Reduction Modelling Study for Aircraft Cavity  - Chun C GanNoise Reduction Modelling Study for Aircraft Cavity  - Chun C Gan
Noise Reduction Modelling Study for Aircraft Cavity - Chun C Gan
 

Today's Production Technology

  • 1. Today’s Production in a Packaged World By Gan Chun Chet (August 2016) Quite remarkable that today production figures are governed by customers’ appetite. As worldpopulationincreasesyearafteryear,thisdemandhastobe meetto serve the required figures. In a period of economic recovery (also stability required) comes an era of rapid increase in demand, predictionthatone wouldfigure outinvolvingstock-upof finishgoodstosatisfythe marketasdemand are required. Increase in production hours seems promising to earn the extra bonus, withmultiplier effectthatcouldbringprofitgains back intothe business,thus able topay investorstheirreturns. This is a typical scenario of business atmosphere in today’s production environment which affected investors.The risk involvedis too much in the sense where in some cases investorsare not gettingbackthe promisedreturns.Onthe otherhand,itisa lossof investmentthat businessmanare not able to get back its initial investmentvalue due tothe sluggishmarket inailingeconomy andthe increased structural cost. Business closure and debt occurs amongst investors which dampen the future. Therefore isittooriskytobuilt-upstocks,inviewthatcustomers’ mightchange theirappetite again for othermarketsegment. Inorder terms,organisationprofitis salesdependentbasedonreal salesdemand. Andif the real demandforacertainproductsor services are ona maturity course,one will knowthatthe focusshouldbe ongrowth products instead.Therefore,the notionof stock-upyour saleable productsbasedonmarketresearchandforecastisof great importance. Imagine the image and reputation of the particular organisation of interest at sight, are of similar views on either side – whether you are a customer or a buyer. In fact, at point of sales, your perception of your customer is the same as their perception on your products/services and there is where a productispurchased.
  • 2. Worldeconomicindicatorsshowsthatthe marketsentimenthasrecoveredwithstockmarket trendingupwardsandindustrialoutputatitspeaklevel worldwide,afterthe greatglobal recessionin 2007-2008. The situation seemstolook good. Some Interestingpartof the processtechnologythatis implementedinvolves fully automated technology.However,some are semi-automatic.Itreallydoes not matter as long as the bottleneck in critical processes are identified and rectified, not affecting those inthe waitinglist(orthroughput),i.e.toolongwaithoursordevelopmentleadtimeforinstance. Itwasfoundthatthe bottleneckof the processmainly duetothe packagingmachineisineach setup activity. Therefore, one of the new technology developed to meet this change requirement is as follows:- In a packaging machine, the glue sealer injection time is fully automated depending on the packsize.Basedon anelectroniccampprogrammer,itisable toinject theglueonatimely programme, precisely whenitisrequired.Thiseliminatesmanuallyadjustmenttasks. Inadditionthe compression sectionisfullyeliminatedduetothe newglue characteristicthatsealsstronglybystationaryflapsonly. Thisfurtherreduces the critical setuptime. This move requireshighlyskill workforce toimplementhigherendprocesstechnologyandit isinfactindemandwhichrequireshighlyskilledengineerstoperformthe tasks.Inpackagingmachine only forexample,aretrofit projectoncertainexistingsectionof the productionmachine willincrease the speedof everysetuptask, thusincreasesproductioncompetitiveness. Is it A Changed World or Still A Changing World? The drive for automation, whether fully or semi built-in has occurred. In the automated productionenvironment,fullyautomatingrepetitivetasksandsemi-automateothers,will reduce the cost of ownership eventually. However, it is unlikelyto eliminate all the manual task due to cost matters. Therefore, perform in-house studies appropriately before embarking on the type of technologyanditsinvolvement,costimpactinthe longterm.
  • 3. The paradox of products/service drivenbymanufacturingcapability isnolongermakingsense andhas changedtoa customeractive paradigm.Whatcustomersneedisafact thatcannotbe change but justto meetthe demandinorderto staycompetitive. InnovativeProductDesigns,Engineering Innovative productsdesignthatallowsfrequentsetuptime are the way forward.Systematic designs approach developed by Phal and Beitz set-off strategy that increases the probability of technical andeconomicsuccessof the design. Some company move forward to meet the cost requirements. Some decision might be conservative thusnofurtherinvestmentinthisnature,i.e.the decisionis notnecessarilytoimplement a particulartechnology.Whateverthe decisionis,the innovative technology oridea/philosophy that are implementedmustmeetthe company’spolicyasitformsacoherentpartof the businesssolution. Conclusion With the available productiontechnology,whetheritisfullyor semi-automateddependson market timing and acceptance. Solutionsthat are not necessarilyto be implemented yet have to be deferto laterdevelopmentstage.Implementthe necessarysolution(s) thatwill benefityourcurrent condition.Strategizeyourfuture endeavour.