Railway Bridge & Tunnel Engineering
† Contents
 Introduction to Steel Girder Bridges
 Erection of Steel Girder Bridges
 Methods
 Erection of Steel Truss Bridges
 References
† Introduction to Steel Bridges
 The steel girder bridge is a structure in which a floor system and roadway,
concrete or timber, is supported by girders, usually rolled section beams which
are plain or encased in concrete
 These are normally used for railways and rarely for highways
 Following data should be collected prior to the erection of these bridges:
 Time estimate for the construction of a bridge
 Condition of proper equipment and machinery
 Condition of bridge site
 Facility for transportation and storage of materials at bridge site
 Necessary supporting system for superstructure
 Availability of steel structures
 Width and depth of flow in the river
 Height of bridge from river bed
Methods for erection of steel bridges
Erection by Lifting Method
Erection by Staging
Erection by Floating
Erection by Rolling
Erection by Launching of single girder span
† ERECTION OF STEEL GIRDER BRIDGES
† Erection of Steel Bridges
 Methods
 Erection by Lifting Method
 Steel girders upto span of 30 m can be
easily erected if the height is 5 to 6 m
 This method is suitable for rivers which
are dry for the most part of the year
 A platform is created by filling earth to
sufficient height and levelled
 Girders are assembled on the river bed and field riveted/bolted
 They are lifted into position by means of stiff-leg derrick cranes or ordinary
rope worked from anchored crab winches
 The flooring and the bracings are then field connected to the girders placed in
position
SOLNA BRIDGE, STOCHOLM, SWEDEN
† Erection of Steel Bridges
 Methods
 Erection by Staging:
 Favourable conditions:
 Depth of water in the river is shallow
 Height of superstructure above the river should not be
excessive
 Span should be simply supported
 Staging consists of trestle frames which may be of steel or
timber
 Iron staging is lighter than timber staging and, therefore, can be
easily transported
 Staging is suitably designed and after it is constructed, the
erection of steel girders is commenced on the staging
† Erection of Steel Bridges
 Methods
 Erection by Floating:
 Favourable conditions for this method are:
 Depth of water in the river is more
Floating barges/pontoons are used to carry the steel girders
Bridge is assembled on the barges and is floated into position when
complete.
The barges are so positioned that
span is over the final alignment,
when the jacks are used to lower the
span on the bearings.
Finally the barges are sunk by
flooding the tanks
Coleman Bridge, York River in Yorktown
† Erection of Steel Bridges
 Methods
 Erection by Rolling:
 This method is adopted for erection of continuous girders on deep gorges
 First span near the abutment is erected by any one method of erection
 Girders of the first span are brought to the required position by rolling
them from the abutment through the erected span
 This method is also known as the Incremental Launching Method and has
become very popular for the concrete girders
 Second span is cantilevered when it projects from the erected span and
acquires counter weight for its stability
 This counter weight is provided by the successive span connected to it and
its back
† Erection of Steel Bridges
 Erection by Launching of single girder span
 Each girder is first assembled on a
track of rollers behind one of the
abutments and is cantilevered as far
as possible over the span.
 The lifting blocks are then fastened
to the outmost point of the girder
and the heavy wire is coupled to the
winch.
 Rear end of the girder is tied to
another winch which is released
slowly so that sudden forward motion
may no take place.
† Erection of Steel Truss Bridges
 These bridges are erected with the help of a stiff derrick traveller and two
false work bents
 Erection procedure may be described in four stages:
 Second stage
 Move traveller (crane) to
B
 Erect false work bent T2
 Assemble the section BC
 First stage
 Erect false work bent T1
 Assemble the section AB
† Erection of Steel Truss Bridges
 Third stage
 Move traveller to C
 Remove false work bent T1 from B
and erect it at D
 Assemble the section CD
 Fourth stage
 Move traveller (crane) to D
 Assemble the section DE
 Release the false work bent T1 and T2
† References
 ftp://ftp.mdt.mt.gov/research/LIBRARY/NSBASBEGS-1-OL-
STEEL_BRIDGE-AASHTO.PDF
 http://www.deldot.gov/archaeology/historic_pres/hist_bridge_surv
ey/pdf/steel.pdf
 http://www.kwhconstructors.com/img/gallery/williamr.bennettbridg
e/wrb_bridge5.JPG
Erection of steel Structure

Más contenido relacionado

La actualidad más candente

Retrofitting of concrete structure
Retrofitting of concrete structureRetrofitting of concrete structure
Retrofitting of concrete structure
shlok patel
 

La actualidad más candente (20)

What is post tensioning
What is post tensioningWhat is post tensioning
What is post tensioning
 
Box culverts
Box culvertsBox culverts
Box culverts
 
Design of rcc structures note
Design of rcc structures noteDesign of rcc structures note
Design of rcc structures note
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls CABLE ANCHORING AND GROUTING / Diaphragm Walls
CABLE ANCHORING AND GROUTING / Diaphragm Walls
 
Classification of bridges
Classification of bridgesClassification of bridges
Classification of bridges
 
Pavement Materials Bitumen
Pavement Materials  BitumenPavement Materials  Bitumen
Pavement Materials Bitumen
 
Ductile detailing IS 13920
Ductile detailing IS 13920Ductile detailing IS 13920
Ductile detailing IS 13920
 
Bridge inspection,maintenance and repair
Bridge inspection,maintenance and repairBridge inspection,maintenance and repair
Bridge inspection,maintenance and repair
 
Bridge
BridgeBridge
Bridge
 
Pile foundations
Pile foundationsPile foundations
Pile foundations
 
Retrofitting of concrete structure
Retrofitting of concrete structureRetrofitting of concrete structure
Retrofitting of concrete structure
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 
BITUMINOUS ROAD PPT
BITUMINOUS ROAD PPTBITUMINOUS ROAD PPT
BITUMINOUS ROAD PPT
 
Study of Bridge Bearings
Study of Bridge BearingsStudy of Bridge Bearings
Study of Bridge Bearings
 
Design of staircases
Design of staircasesDesign of staircases
Design of staircases
 
Repair to overcome low member strength
Repair to overcome low member strength Repair to overcome low member strength
Repair to overcome low member strength
 
Bridge loading
Bridge loadingBridge loading
Bridge loading
 
Chapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiitingChapter 4 repair, rehabilitation & retrofiiting
Chapter 4 repair, rehabilitation & retrofiiting
 
Bridge pier
Bridge pierBridge pier
Bridge pier
 

Destacado (9)

Ind training ppt
Ind training pptInd training ppt
Ind training ppt
 
Sheet metal operations1class
Sheet metal operations1class Sheet metal operations1class
Sheet metal operations1class
 
Equipments for erection and compaction
Equipments for erection and compactionEquipments for erection and compaction
Equipments for erection and compaction
 
Sheet metal shop
Sheet metal shopSheet metal shop
Sheet metal shop
 
Presentation on steel, fabrication & erection Munger Ganga Bridge
Presentation on steel, fabrication & erection  Munger Ganga BridgePresentation on steel, fabrication & erection  Munger Ganga Bridge
Presentation on steel, fabrication & erection Munger Ganga Bridge
 
6 weeks training for B-tech students
6 weeks training for B-tech students6 weeks training for B-tech students
6 weeks training for B-tech students
 
Summer Training Presentation, DLW Varanasi
Summer Training Presentation, DLW VaranasiSummer Training Presentation, DLW Varanasi
Summer Training Presentation, DLW Varanasi
 
sheet metal
sheet metalsheet metal
sheet metal
 
BHEL MECHANICAL ( 4TH YEAR ) INTERNSHIP -BLOCK-3(TURBINE SHOP)
BHEL MECHANICAL ( 4TH YEAR ) INTERNSHIP -BLOCK-3(TURBINE SHOP)BHEL MECHANICAL ( 4TH YEAR ) INTERNSHIP -BLOCK-3(TURBINE SHOP)
BHEL MECHANICAL ( 4TH YEAR ) INTERNSHIP -BLOCK-3(TURBINE SHOP)
 

Similar a Erection of steel Structure

Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
AISC/NSBA
 

Similar a Erection of steel Structure (20)

Bridge-SIT-01.pptx
Bridge-SIT-01.pptxBridge-SIT-01.pptx
Bridge-SIT-01.pptx
 
Bridge-SGI-01_Pranoti.pdf
Bridge-SGI-01_Pranoti.pdfBridge-SGI-01_Pranoti.pdf
Bridge-SGI-01_Pranoti.pdf
 
Suspension bridges
Suspension bridgesSuspension bridges
Suspension bridges
 
suspension bridge ppt
suspension bridge pptsuspension bridge ppt
suspension bridge ppt
 
CTP.ppt
CTP.pptCTP.ppt
CTP.ppt
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
1.5 class a,b
1.5 class a,b1.5 class a,b
1.5 class a,b
 
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
Pre-Fabricated Steel Bridges for Accelerated Bridge Construction (ABC)
 
bridges.ppt
bridges.pptbridges.ppt
bridges.ppt
 
Bridge introduction-8th-civil
Bridge introduction-8th-civilBridge introduction-8th-civil
Bridge introduction-8th-civil
 
Suspension bridge
Suspension bridgeSuspension bridge
Suspension bridge
 
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
MODULE-IV INFRASTRUCTURE ENGINEERING BTCVC702
 
Bridge
Bridge Bridge
Bridge
 
stress ribbon bridge.pptx
stress ribbon bridge.pptxstress ribbon bridge.pptx
stress ribbon bridge.pptx
 
Transmission tower
Transmission towerTransmission tower
Transmission tower
 
Bridges Functionality and Aesthetics
Bridges Functionality and AestheticsBridges Functionality and Aesthetics
Bridges Functionality and Aesthetics
 
suspension bridge
suspension bridgesuspension bridge
suspension bridge
 
Bridges (1)
Bridges (1)Bridges (1)
Bridges (1)
 
DIFFERENT TYPES OF ROAD AND RAILWAY BRIDGES
DIFFERENT TYPES OF ROAD AND RAILWAY BRIDGESDIFFERENT TYPES OF ROAD AND RAILWAY BRIDGES
DIFFERENT TYPES OF ROAD AND RAILWAY BRIDGES
 
Tony
TonyTony
Tony
 

Más de Gaurang Kakadiya (12)

Different types of pile
Different types of pile Different types of pile
Different types of pile
 
Coffer dam and its type
Coffer dam and its typeCoffer dam and its type
Coffer dam and its type
 
Basic runway length
Basic runway lengthBasic runway length
Basic runway length
 
Earthquack 2001 Bhuj,Gujarat
Earthquack 2001 Bhuj,GujaratEarthquack 2001 Bhuj,Gujarat
Earthquack 2001 Bhuj,Gujarat
 
Non Destructive test
Non Destructive testNon Destructive test
Non Destructive test
 
Geotechnical engineering II
Geotechnical engineering IIGeotechnical engineering II
Geotechnical engineering II
 
Methods of in site Permeability Test
Methods of in site Permeability TestMethods of in site Permeability Test
Methods of in site Permeability Test
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concrete
 
Admixtures
AdmixturesAdmixtures
Admixtures
 
Blasting equipment
Blasting equipmentBlasting equipment
Blasting equipment
 
Quality control of concrete
Quality control of concreteQuality control of concrete
Quality control of concrete
 
Wind Energy Non Conventional Energy Sources
Wind Energy Non Conventional  Energy SourcesWind Energy Non Conventional  Energy Sources
Wind Energy Non Conventional Energy Sources
 

Último

Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Último (20)

Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptxOrlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
Orlando’s Arnold Palmer Hospital Layout Strategy-1.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 

Erection of steel Structure

  • 1. Shree Swami Atmanand Saraswati Institute of Technology Erection of Steel Girder and Steel Truss Bridges Prepared By :- Balar Piyush 110763106063 Vekariya Sandeep R. 120763106001 Kakadiya Gaurang A. 120763106002 Balar Jigar H. 120763106003 Guided By :- Prof. A.P. Satasia Prof. P. V. Trivedi Prof. R. R.Tripathi Railway Bridge & Tunnel Engineering
  • 2. † Contents  Introduction to Steel Girder Bridges  Erection of Steel Girder Bridges  Methods  Erection of Steel Truss Bridges  References
  • 3. † Introduction to Steel Bridges  The steel girder bridge is a structure in which a floor system and roadway, concrete or timber, is supported by girders, usually rolled section beams which are plain or encased in concrete  These are normally used for railways and rarely for highways  Following data should be collected prior to the erection of these bridges:  Time estimate for the construction of a bridge  Condition of proper equipment and machinery  Condition of bridge site  Facility for transportation and storage of materials at bridge site  Necessary supporting system for superstructure  Availability of steel structures  Width and depth of flow in the river  Height of bridge from river bed
  • 4. Methods for erection of steel bridges Erection by Lifting Method Erection by Staging Erection by Floating Erection by Rolling Erection by Launching of single girder span † ERECTION OF STEEL GIRDER BRIDGES
  • 5. † Erection of Steel Bridges  Methods  Erection by Lifting Method  Steel girders upto span of 30 m can be easily erected if the height is 5 to 6 m  This method is suitable for rivers which are dry for the most part of the year  A platform is created by filling earth to sufficient height and levelled  Girders are assembled on the river bed and field riveted/bolted  They are lifted into position by means of stiff-leg derrick cranes or ordinary rope worked from anchored crab winches  The flooring and the bracings are then field connected to the girders placed in position
  • 6.
  • 8. † Erection of Steel Bridges  Methods  Erection by Staging:  Favourable conditions:  Depth of water in the river is shallow  Height of superstructure above the river should not be excessive  Span should be simply supported  Staging consists of trestle frames which may be of steel or timber  Iron staging is lighter than timber staging and, therefore, can be easily transported  Staging is suitably designed and after it is constructed, the erection of steel girders is commenced on the staging
  • 9.
  • 10. † Erection of Steel Bridges  Methods  Erection by Floating:  Favourable conditions for this method are:  Depth of water in the river is more Floating barges/pontoons are used to carry the steel girders Bridge is assembled on the barges and is floated into position when complete. The barges are so positioned that span is over the final alignment, when the jacks are used to lower the span on the bearings. Finally the barges are sunk by flooding the tanks
  • 11. Coleman Bridge, York River in Yorktown
  • 12. † Erection of Steel Bridges  Methods  Erection by Rolling:  This method is adopted for erection of continuous girders on deep gorges  First span near the abutment is erected by any one method of erection  Girders of the first span are brought to the required position by rolling them from the abutment through the erected span  This method is also known as the Incremental Launching Method and has become very popular for the concrete girders  Second span is cantilevered when it projects from the erected span and acquires counter weight for its stability  This counter weight is provided by the successive span connected to it and its back
  • 13.
  • 14. † Erection of Steel Bridges  Erection by Launching of single girder span  Each girder is first assembled on a track of rollers behind one of the abutments and is cantilevered as far as possible over the span.  The lifting blocks are then fastened to the outmost point of the girder and the heavy wire is coupled to the winch.  Rear end of the girder is tied to another winch which is released slowly so that sudden forward motion may no take place.
  • 15.
  • 16. † Erection of Steel Truss Bridges  These bridges are erected with the help of a stiff derrick traveller and two false work bents  Erection procedure may be described in four stages:  Second stage  Move traveller (crane) to B  Erect false work bent T2  Assemble the section BC  First stage  Erect false work bent T1  Assemble the section AB
  • 17. † Erection of Steel Truss Bridges  Third stage  Move traveller to C  Remove false work bent T1 from B and erect it at D  Assemble the section CD  Fourth stage  Move traveller (crane) to D  Assemble the section DE  Release the false work bent T1 and T2